REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
Memorial Elementary:
08-1352SC Visual Structural Inspection 0-003-SC1 03/16/09 16 0 4,019 / / / / / / 02/19/09 JOD
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
ML King ES/LaFrancis Hardiman/Admin.:
06-1040 Reconstruction 0-002-020 06/22/07 8,9,10,15,16 0 428,000 / / / / / / 02/11/09 DDJ
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
North Country Learning Ctr.:
07-1824 Reconstruction 0-018-014 09/11/08 2,4,7,8,9,155,15,16 0 2,966,048 / / / / / / 07/17/09 DDJ
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
:
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
Middle School:
07-0296 Reconstruction 0-003-016 02/22/08 2,4,7,8,9,10,14,15,1 0 7,786,001 / / / / / / 09/01/09 HCM
John Marshall Elementary:
07-0297 Additions and Alterations 0-004-014 02/22/08 02 - 16 0 13,382,006 / / / / / / 09/01/09 HCM
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
:
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
North Senior High School:
02-1530 Additions and Alterations 0-008-009 08/29/03 02 - 16 0 33,242,222 / / / / / / 08/11/09 MAC
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
:
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
Senior High School:
05-1263 Reconstruction 0-007-009 08/17/06 7,9,10,155,15,16 0 262,000 / / / / / / 08/28/09 JOD
Junior High School:
05-1255 Reconstruction 0-011-009 07/05/06 7,8,10,155,15,16 0 255,000 / / / / / / 08/28/09 JOD
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
:
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
Connetquot High School:
07-1635 Reconstruction 0-007-029 04/15/08 2,7 0 5,010,000 / / / / / / 08/31/09 MGL
08-0300 Reconstruction 0-007-030 03/20/09 2,9,10,155,15,16 0 2,433,000 / / / / / / 11/27/09 DDJ
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
:
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
North Middle School:
06-1095 Reconstruction 0-011-008 06/08/07 2,4,7,8,9,155,15,16 0 692,742 / / / / / / 06/04/09 HCM
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
:
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO FCRs DUE THIS JUNE / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
JE Allen Jr. /Sr/ Highschool Mellvil:
07-1702 Reconstruction 0-016-014 04/10/08 9 0 158,500 / / / / / / 01/05/09 JOD
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition