Projects Without Final Cost Reports

Projects Without Final Cost Reports

THE STATE EDUCATION DEPARTMENT

FACILITIES PLANNING


UPDATED: 10/24/12 at 11:36:15




ALFRED ALMOND CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 02-01-01-04
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
09-1125    Reconstruction               0-001-008  04/27/10   2,7                            0    3,468,755     /  /                /  /       /  /        /  /    JOD
09-1229    Reconstruction               0-001-009  08/17/10   16                             0       90,300     /  /                /  /       /  /        /  /    JOD
09-1126    Reconstruction               5-002-005  04/27/10   2,7,10                         0      231,245     /  /                /  /       /  /        /  /    JOD
09-1230    Reconstruction               5-002-006  08/17/10   15,16                          0       77,635     /  /                /  /       /  /        /  /    JOD


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




BELMONT CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 02-05-01-04
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




ANDOVER CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 02-06-01-04
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




ANGELICA CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 02-07-01-04
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




GENESEE VALLEY CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 02-07-02-04
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
05-0027    Reconstruction               0-012-002  07/12/05   9                              0      170,000     /  /                /  /       /  /        /  /    DDJ
10-0141    Reconstruction               0-012-004  08/24/10   15,16                          0      160,000     /  /                /  /       /  /        /  /    DDJ


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




BELFAST CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 02-08-01-04
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




BOLIVAR CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 02-10-01-04
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




CANASERAGA CENTRAL SCHOOL DISTRICT: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 02-11-02-04
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
10-0401    Reconstruction               5-002-006  12/07/10   7                              0       81,300     /  /                /  /       /  /        /  /    DDJ


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




CUBA CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 02-15-01-04
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




FRIENDSHIP CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 02-16-01-04
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




FILLMORE CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 02-20-01-04
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




WHITESVILLE CENTRAL SCHOOL: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 02-21-01-04
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




RUSHFORD CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 02-23-01-04
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




CUBA-RUSHFORD CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 02-23-02-04
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
07-2063    Reconstruction               0-001-009  06/10/08   7                              0       91,693     /  /                /  /       /  /        /  /    HCM
07-2064    Reconstruction               0-003-002  06/10/08   7                              0       59,930     /  /                /  /       /  /        /  /    HCM
07-0186    Reconstruction               0-015-010  08/16/07   15,16                          0      100,522     /  /                /  /       /  /        /  /    HCM
06-0457    Reconstruction               0-020-004  11/21/06   155                            0       90,000     /  /                /  /       /  /        /  /    HCM
00-1103    New Construction             0-022-001  09/25/01   02 - 16                        0       73,900     /  /                /  /       /  /        /  /    BJB


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




WESTBURY UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 02-23-89-03
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




SCIO CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 02-24-01-04
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




WELLSVILLE CENTRAL SCHOOL DISTRICT: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 02-26-01-06
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
08-0697    Reconstruction               0-003-009  04/29/09   2,4,7,8,9,10,155,15,           0    7,534,945     /  /                /  /       /  /        /  /    DDJ
09-1329    Reconstruction               0-003-010  10/28/10   2,4,7,8,9,10,155,15,           0      596,073     /  /                /  /       /  /        /  /    DDJ
08-0698    Reconstruction               0-004-012  04/29/09   2,4,7,8,9,10,155,15,           0    3,703,336     /  /                /  /       /  /        /  /    DDJ
08-0699    Reconstruction               0-004-013  04/29/09   2,4,7,8,9,10,155,15,           0    2,693,782     /  /                /  /       /  /        /  /    DDJ


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




RICHBURG CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 02-29-01-04
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




BOLIVAR-RICHBURG CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 02-29-02-04
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
03-1033    Reconstruction               0-001-017  03/02/04   10                             0      282,650     /  /                /  /       /  /        /  /    HCM
05-0727    Reconstruction               0-001-019  03/01/06   10                             0      125,000     /  /                /  /       /  /        /  /    HCM
07-0460    Reconstruction               0-001-020  02/22/08   2,8,9,10,13,155,15,1           0    3,353,842     /  /                /  /       /  /        /  /    HCM
09-0562    Reconstruction               0-001-021  11/05/09   4                              0       17,125     /  /                /  /       /  /        /  /    HCM
09-1575    Reconstruction               0-001-022  08/03/10   4                              0      231,940     /  /                /  /       /  /        /  /    HCM
07-0461    Reconstruction               0-005-006  02/22/08   2,155,16                       0      252,247     /  /                /  /       /  /        /  /    HCM
07-0462    Reconstruction               0-011-012  02/22/08   2,9,10,155,15,16               0    1,492,741     /  /                /  /       /  /        /  /    HCM
09-0529    Reconstruction               5-012-008  02/22/08   4,15,16                        0       80,800     /  /                /  /       /  /        /  /    HCM
07-0463    Reconstruction               5-016-003  02/22/08   2,15,16                        0      594,491     /  /                /  /       /  /        /  /    HCM


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition