Projects Without Final Cost Reports

Projects Without Final Cost Reports

THE STATE EDUCATION DEPARTMENT

FACILITIES PLANNING


UPDATED: 10/24/12 at 11:36:15




ALLEGANY CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 04-01-01-04
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




WEST VALLEY CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 04-02-04-04
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




LIMESTONE UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 04-03-01-02
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 04-03-02-04
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
00-0703    Reconstruction               0-001-003  06/19/01   4,8,9,15,16                    0      630,325     /  /                /  /       /  /      08/29/03  MGL
00-0434    Reconstruction               0-001-004  02/22/01   2,8,9                          0      357,776     /  /                /  /       /  /      08/29/03  MGL
00-0436    Additions and Alterations    4-005-001  02/22/01   02 - 16                        0      116,556     /  /                /  /       /  /      08/29/03  MGL


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




ALLEGANY-LIMESTONE CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 04-03-02-06
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




ELLICOTTVILLE CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 04-09-01-04
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




FRANKLINVILLE CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 04-11-01-04
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




HINSDALE CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 04-14-01-04
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




LITTLE VALLEY CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 04-18-01-04
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




CATTARAUGUS CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 04-23-01-04
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




CATTARAUGUS-LITTLE VALLEY CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 04-23-02-04
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
08-0045    Reconstruction               0-009-003  02/06/09   2,4,7,8,9,10,155,15,           0    6,329,769     /  /                /  /       /  /        /  /    JOD
08-0253    New Construction             7-016-001  02/24/09   02 - 16                        0      524,936     /  /                /  /       /  /        /  /    JOD


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




OLEAN CITY SCHOOL DISTRICT: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 04-24-00-01
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
08-1776    Reconstruction               0-001-006  01/29/10   2,4,7,8,9,155,15,16            0   12,834,666     /  /                /  /       /  /        /  /    HCM
08-0213    Reconstruction               0-001-007  08/27/08   7                              0      175,100     /  /                /  /       /  /      06/30/09  HCM
08-1619    Reconstruction               0-001-008  06/09/09   10,16                          0      106,322     /  /                /  /       /  /        /  /    HCM
09-0223    Reconstruction               0-005-007  02/12/10   2,4,7,8,9,155,15,16            0    2,316,331     /  /                /  /       /  /        /  /    HCM
09-0225    Reconstruction               0-011-005  02/12/10   2,4,7,8,9,155,15,16            0    2,516,788     /  /                /  /       /  /        /  /    HCM
08-1777    Reconstruction               0-012-007  01/29/10   2,4,7,8,9,155,15,16            0    3,196,973     /  /                /  /       /  /        /  /    HCM


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




GOWANDA CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 04-28-01-06
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




PORTVILLE CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 04-29-01-04
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
00-0845SR  Additions and Alterations    0-001-015  03/08/01   02 - 16                        0            0     /  /                /  /       /  /        /  /    MGL


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




RANDOLPH CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 04-30-01-04
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




RANDOLPH ACADEMY UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 04-30-11-02
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




SALAMANCA CITY SCHOOLS: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 04-32-00-05
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
09-0382    Reconstruction               0-002-013  02/12/10   155,15,16                      0      141,840     /  /                /  /       /  /        /  /    JOD
09-0383    Reconstruction               0-008-007  02/12/10   2,4,8,9,10,155,15,16           0      114,317     /  /                /  /       /  /        /  /    JOD
06-1454    Additions and Alterations    0-009-006  11/06/07   02 - 16                        0    2,867,059     /  /                /  /       /  /        /  /    JOD
09-0384    Reconstruction               0-009-007  02/12/10   2,4,8,9,10,155,15,16           0      516,935     /  /                /  /       /  /        /  /    JOD
03-0233    Reconstruction               5-004-005  09/16/03   155,15,16                      0       35,000     /  /                /  /       /  /      01/19/04  JOD
06-1456    Reconstruction               5-004-007  11/06/07   2,4,8,9,155,15,16              0      508,674     /  /                /  /       /  /        /  /    JOD


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




YORKSHIRE-PIONEER CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 04-35-01-06
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
07-0024    Reconstruction               0-001-008  01/17/08   2,4,8,9,10,13,155,15           0    3,930,348     /  /                /  /       /  /        /  /    MGL
09-0931    Reconstruction               0-001-010  06/25/10   7,15,16                        0      481,183     /  /                /  /       /  /        /  /    JOD
07-0025    Reconstruction               0-010-012  01/17/08   4,7,8,9,10,13,155,15           0    2,782,599     /  /                /  /       /  /        /  /    MGL
09-0932    Reconstruction               0-010-014  06/25/10   15,16                          0      347,104     /  /                /  /       /  /        /  /    JOD
07-0026    Reconstruction               0-014-007  01/17/08   2,4,8,9,10,13,14,155           0   11,596,765     /  /                /  /       /  /        /  /    MGL
09-0933    Reconstruction               0-014-010  06/25/10                                  0      813,473     /  /                /  /       /  /        /  /    JOD
07-0027    Reconstruction               0-015-007  01/17/08   2,4,7,8,9,10,13,155,           0    7,462,451     /  /                /  /       /  /        /  /    MGL
09-0934    Reconstruction               5-011-008  06/25/10   7,15,16                        0      217,111     /  /                /  /       /  /        /  /    JOD


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




BOCES CATT-ALLEG-ERIE-WYOMING: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 04-90-00-00
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
99-0800    Reconstruction               0-008-015  03/27/00   7                              0      186,899     /  /                /  /       /  /        /  /    RDR


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition