BEACON CITY SCHOOLS: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 13-02-00-01
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
09-1166    Reconstruction               0-002-015  10/06/10   4,16                           0      252,000     /  /                /  /       /  /        /  /    JOD
09-1167    Reconstruction               0-003-011  10/06/10   4,16                           0      483,000     /  /                /  /       /  /        /  /    JOD
09-1168    Reconstruction               0-004-014  10/06/10   2,7,16                         0      788,000     /  /                /  /       /  /        /  /    JOD
09-1169    Reconstruction               0-006-016  10/06/10   9,155,16                       0      573,000     /  /                /  /       /  /        /  /    JOD
09-1170    Reconstruction               0-008-014  10/06/10   7,16                           0      358,000     /  /                /  /       /  /        /  /    JOD
09-1171    Reconstruction               0-020-006  10/06/10   8,9,16                         0      580,000     /  /                /  /       /  /        /  /    JOD
01-0700    Reconstruction               5-018-L01  06/11/02                                  0       80,892     /  /                /  /       /  /        /  /    RDR


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




DOVER UNION FREE SCHOOL DISTRICT: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 13-05-02-02
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




HYDE PARK CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 13-08-01-06
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
05-0468    Reconstruction               0-001-018  04/06/06   2,4,8,9,14,155,15,16           0    2,449,646     /  /                /  /       /  /        /  /    HCM
07-2297    Reconstruction               0-001-019  11/26/08   2,7,8                          0      304,023     /  /                /  /       /  /        /  /    HCM
08-0735    Reconstruction               0-001-020  03/12/09   2,7,8                          0    2,736,979     /  /                /  /       /  /        /  /    HCM
09-1341    Reconstruction               0-001-021  06/01/10   2,9,16                         0       54,900     /  /                /  /       /  /        /  /    HCM
05-0469    Reconstruction               0-002-016  04/06/06   2,4,8,9,155,15,16              0    1,548,970     /  /                /  /       /  /        /  /    HCM
07-2298    Reconstruction               0-002-018  11/26/08   2,8,13                         0      494,281     /  /                /  /       /  /        /  /    HCM
09-1342    Reconstruction               0-002-021  06/01/10   2,9,13,16                      0      148,210     /  /                /  /       /  /        /  /    HCM
05-0470    Reconstruction               0-003-015  04/06/06   2,4,7,8,9,14,155,15,           0    2,348,837     /  /                /  /       /  /        /  /    HCM
07-2299    Reconstruction               0-003-016  11/26/08   2,7,8                          0      355,172     /  /                /  /       /  /        /  /    HCM
08-0736    Reconstruction               0-003-017  03/12/09   7,8                            0      854,072     /  /                /  /       /  /        /  /    HCM
05-0471    Reconstruction               0-004-014  04/06/06   2,4,7,8,9,14,155,15,           0    1,289,034     /  /                /  /       /  /        /  /    HCM
07-2300    Reconstruction               0-004-015  11/26/08   2,7,8                          0      110,237     /  /                /  /       /  /        /  /    HCM
08-0737    Reconstruction               0-004-016  03/12/09   2,4,7,8                        0    1,417,588     /  /                /  /       /  /        /  /    HCM
09-1343    Reconstruction               0-004-017  06/01/10   2,9                            0       29,591     /  /                /  /       /  /        /  /    HCM
05-0472    Reconstruction               0-005-019  04/06/06   2,4,7,8,9,14,155,15,           0      731,044     /  /                /  /       /  /        /  /    HCM
07-2301    Reconstruction               0-005-020  11/26/08   2,7,8                          0      177,416     /  /                /  /       /  /        /  /    HCM
08-0738    Reconstruction               0-005-021  03/12/09   2,4,7,8                        0      755,839     /  /                /  /       /  /        /  /    HCM
09-1344    Reconstruction               0-005-022  06/01/10   2                              0       15,809     /  /                /  /       /  /        /  /    HCM
05-0473    Reconstruction               0-007-015  04/06/06   2,4,7,8,9,14,155,15,           0    2,098,122     /  /                /  /       /  /        /  /    HCM
07-2302    Reconstruction               0-007-016  11/26/08   2,7,8                          0      126,667     /  /                /  /       /  /        /  /    HCM
08-0739    Reconstruction               0-007-017  03/12/09   7,8                            0      128,927     /  /                /  /       /  /        /  /    HCM
05-0474    Reconstruction               0-013-016  04/06/06   2,4,7,8,9,155,15,16            0      572,346     /  /                /  /       /  /        /  /    HCM
07-2303    Reconstruction               0-013-017  11/26/08   2,7,8                          0      311,104     /  /                /  /       /  /        /  /    HCM
08-0740    Reconstruction               0-013-018  03/13/09   7,8                            0      971,585     /  /                /  /       /  /        /  /    HCM
09-1345    Reconstruction               0-013-019  06/01/10   2,9,16                         0      245,780     /  /                /  /       /  /        /  /    HCM


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




NORTHEAST (WEBUTUCK) CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 13-11-01-04
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
08-0892    Reconstruction               0-001-008  03/09/09   2,7,15                         0      271,800     /  /                /  /       /  /        /  /    JOD


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




PAWLING CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 13-12-01-04
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
98-0659    Reconstruction               0-001-013  03/04/99   2,155                          0      125,000     /  /                /  /       /  /        /  /    MGL
09-0108    Reconstruction               0-001-018  08/11/09   2                              0        9,500     /  /                /  /       /  /        /  /    JOD
07-1616    Reconstruction               0-002-013  04/23/08   2,4,7,16                       0    1,910,000     /  /                /  /       /  /      11/05/08  JOD
09-1321    Reconstruction               0-002-014  06/15/10   16                             0       60,000     /  /                /  /       /  /        /  /    JOD
98-1480    Reconstruction               0-006-002  06/18/99   2                              0      250,000     /  /                /  /       /  /      08/02/01  MGL
05-0040    Reconstruction               5-009-L01  01/26/06                                  0      848,500     /  /                /  /       /  /        /  /    JOD


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




PINE PLAINS CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 13-13-01-04
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




POUGHKEEPSIE CITY SCHOOLS: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 13-15-00-01
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
01-1370    Reconstruction               8-019-L01  05/29/02                                  0    8,400,000     /  /                /  /       /  /        /  /    MGL


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




ARLINGTON CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 13-16-01-06
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
06-0390    Reconstruction               0-002-012  02/27/07   2,4,7,8,9,10,155,15,           0    1,562,099     /  /                /  /       /  /        /  /    HCM
06-0391    Reconstruction               0-003-011  02/27/07   2,8,9,155,16                   0      479,357     /  /                /  /       /  /        /  /    HCM
06-0392    Reconstruction               0-004-010  02/27/07   2,7,155,15,16                  0    1,437,093     /  /                /  /       /  /        /  /    HCM
06-0393    Reconstruction               0-005-013  02/27/07   2,7,13,15,16                   0    1,360,874     /  /                /  /       /  /        /  /    HCM
06-0394    Reconstruction               0-006-009  02/27/07   2,8,155,15,16                  0    1,029,305     /  /                /  /       /  /        /  /    HCM
10-0208    Reconstruction               0-006-010  12/13/10   155,16                         0      221,000     /  /                /  /       /  /        /  /    HCM
06-0395    Reconstruction               0-007-010  02/27/07   2,7,8,155,15,16                0    1,337,411     /  /                /  /       /  /        /  /    HCM
10-0207    Reconstruction               0-007-011  09/14/10   10,155,15,16                   0      598,000     /  /                /  /       /  /        /  /    HCM
04-1349    Reconstruction               0-008-008  07/27/05   16                             0      365,000     /  /                /  /       /  /        /  /    HCM
09-1450    Alterations                  0-008-011  08/05/10   02 - 16                        0      239,625     /  /                /  /       /  /        /  /    HCM
06-0396    Reconstruction               0-009-006  02/27/07   2,9,155,15,16                  0    1,888,325     /  /                /  /       /  /        /  /    HCM
06-0397    Reconstruction               0-010-008  02/27/07   2,4,7,8,9,14,155,15,           0    2,239,675     /  /                /  /       /  /        /  /    HCM
06-0398    Reconstruction               0-012-006  02/27/07   2,7,14,155,15,16               0      946,507     /  /                /  /       /  /        /  /    HCM
06-0399    Reconstruction               0-013-003  02/27/07   2,4,7,9,14,155,15,16           0    1,057,115     /  /                /  /       /  /        /  /    HCM
09-1206    Reconstruction               5-039-L01  06/02/10                                  0      309,900     /  /                /  /       /  /        /  /    HCM
98-1468    New Construction             7-038-001  08/01/00   02 - 16                        0      130,000     /  /                /  /       /  /        /  /    BJB


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




SPACKENKILL UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 13-16-02-02
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
06-1002    Reconstruction               0-001-004  03/02/07   155                            0      135,000     /  /                /  /       /  /      12/31/07  JOD
06-1643    Reconstruction               0-001-005  07/06/07   2,155                          0      105,000     /  /                /  /       /  /        /  /    JOD
08-1657    Reconstruction               0-004-011  06/25/09   2,4,9,155                      0      100,000     /  /                /  /       /  /        /  /    JOD


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




RED HOOK CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 13-17-01-06
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
99-1374    Additions and Alterations    0-002-003  05/09/00   02 - 16                        0    1,217,000     /  /                /  /       /  /        /  /    MEM
05-0226    Reconstruction               7-020-001  10/03/05                                  0            0     /  /                /  /       /  /        /  /    HCM


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




RHINEBECK CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 13-18-01-04
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
05-1123    Reconstruction               0-002-015  10/12/06   8,155,16                       0      755,412     /  /                /  /       /  /        /  /    DDJ
07-1367    Reconstruction               0-002-016  01/28/08   2,8,16                         0      459,805     /  /                /  /       /  /        /  /    DDJ
04-0887    Additions and Alterations    0-004-011  04/22/05   02 - 16                        0    6,205,636     /  /                /  /       /  /      01/05/07  DDJ
05-1124    Reconstruction               0-004-012  10/12/06   8,155,16                       0       58,030     /  /                /  /       /  /        /  /    DDJ
07-1368    Reconstruction               0-004-013  01/28/08   2,8,16                         0      165,902     /  /                /  /       /  /        /  /    DDJ


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




RHINECLIFF UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 13-18-02-02
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




WAPPINGERS CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 13-21-01-06
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
01-1160    Reconstruction               0-002-010  06/06/02   2,8,9,10,155,15,16             0      161,324     /  /                /  /       /  /        /  /    MGL
07-0817    Reconstruction               0-002-013  02/04/08   155                            0      108,970     /  /                /  /       /  /        /  /    HCM
01-1162    Reconstruction               0-004-019  06/06/02   2,9                            0       12,350     /  /                /  /       /  /        /  /    MGL
07-0818    Reconstruction               0-008-018  02/04/08   2,155,15,16                    0       23,229     /  /                /  /       /  /        /  /    HCM
02-0808    Reconstruction               0-012-019  12/27/02   10,15                          0       89,000     /  /                /  /       /  /        /  /    RDR
03-0435    Reconstruction               0-012-020  04/09/04   2,4,7,8,9,155,15,16            0      771,996     /  /                /  /       /  /      08/30/05  HCM
09-1116    Reconstruction               0-012-025  10/25/10   16                             0      100,000     /  /                /  /       /  /        /  /    HCM
01-1161    Reconstruction               0-014-012  06/06/02   2,8,9,10,155,15,16             0      131,995     /  /                /  /       /  /        /  /    MGL
01-1164    Reconstruction               0-017-013  06/06/02   2,8,9,10,155,15,16             0       19,500     /  /                /  /       /  /        /  /    MGL
04-1338    Reconstruction               0-017-016  08/10/05   2,15                           0       39,000     /  /                /  /       /  /        /  /    HCM
01-1166    Reconstruction               0-019-011  06/06/02   2                              0      128,167     /  /                /  /       /  /        /  /    MGL
02-0807    Reconstruction               0-020-023  12/27/02   10                             0      112,000     /  /                /  /       /  /        /  /    RDR
04-1339    Reconstruction               0-020-024  08/10/05   2,15                           0       75,000     /  /                /  /       /  /        /  /    HCM
05-1416    Reconstruction               0-020-025  07/15/02   2                              0      774,255     /  /                /  /       /  /        /  /    HCM
07-1747    Reconstruction               0-020-027  05/14/08   15                             0      250,000     /  /                /  /       /  /        /  /    HCM
03-1518    New Construction             0-041-001  06/15/04   02 - 16                        0      285,490     /  /                /  /       /  /      09/07/04  HCM
04-0483    Reconstruction               5-038-L02  11/23/04                                  0      435,000     /  /                /  /       /  /        /  /    HCM


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




MILLBROOK CENTRAL SCHOOL DISTRICT: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 13-22-01-04
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




BOCES DUTCHESS: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 13-90-00-00
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
06-0076    Reconstruction               0-001-023  10/26/06   15,16                          0      260,000     /  /                /  /       /  /      09/14/07  JOD
00-1530    Reconstruction               8-014-008  11/28/01   16                             0       60,000     /  /                /  /       /  /      05/11/05  MAC


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition