Projects Without Final Cost Reports

Projects Without Final Cost Reports

THE STATE EDUCATION DEPARTMENT

FACILITIES PLANNING


UPDATED: 10/24/12 at 11:36:15




BRIGHTON CENTRAL SCHOOL DISTRICT: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 26-01-01-06
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




GATES CHILI CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 26-04-01-06
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
01-1340    Reconstruction               0-001-006  05/23/02   10                             0      125,000     /  /                /  /       /  /      02/04/03  BJB
01-1436    Reconstruction               0-001-008  01/06/03   2,7,8,9,155,15,16              0      903,310     /  /                /  /       /  /      06/18/04  HCM
08-1246    Reconstruction               0-001-015  05/05/10   8,155,15,16                    0      112,334     /  /                /  /       /  /        /  /    DDJ
01-1437    Reconstruction               0-002-007  01/06/03   7,9,16                         0      175,800     /  /                /  /       /  /      06/18/04  HCM
08-1247    Reconstruction               0-002-012  05/05/10   8                              0       73,548     /  /                /  /       /  /        /  /    DDJ
01-1438    Reconstruction               0-005-007  01/06/03   2,7,155,16                     0      138,370     /  /                /  /       /  /      06/18/04  HCM
09-0535    Reconstruction               0-005-011  04/19/10   13,16                          0      445,000     /  /                /  /       /  /        /  /    DDJ
01-1439    Reconstruction               0-006-005  01/06/03   2,9,155,16                     0      428,790     /  /                /  /       /  /      06/18/04  HCM
08-1248    Reconstruction               0-006-010  05/05/10   13,15,16                       0       52,689     /  /                /  /       /  /        /  /    DDJ
01-1440    Reconstruction               0-007-007  01/06/03   2,7,155,16                     0      101,240     /  /                /  /       /  /      06/18/04  HCM
02-0520    Reconstruction               0-007-008  05/20/03   2,10,155,15,16                 0      120,000     /  /                /  /       /  /      01/09/04  DDJ
01-1441    Reconstruction               0-008-007  01/06/03   2,16                           0      184,530     /  /                /  /       /  /      06/18/04  HCM
08-1249    Reconstruction               0-008-012  05/05/10   155,15,16                      0    1,358,163     /  /                /  /       /  /        /  /    DDJ
01-1442    Reconstruction               0-009-007  01/06/03   2,7,9,16                       0      203,400     /  /                /  /       /  /      06/18/04  HCM
08-1250    Reconstruction               0-009-012  05/05/10   155,15,16                      0      971,388     /  /                /  /       /  /        /  /    DDJ
01-1445    Reconstruction               5-004-005  01/06/03   155                            0       56,300     /  /                /  /       /  /      06/18/04  HCM
05-1166    New Construction             7-018-001  05/11/06   02 - 16                        0       44,500     /  /                /  /       /  /        /  /    DDJ


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




GREECE CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 26-05-01-06
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
00-0914    Reconstruction               0-001-012  07/03/01   2,7                            0      167,492     /  /                /  /       /  /        /  /    MGL
01-1054    Reconstruction               0-004-021  01/08/03   15                             0      111,500     /  /                /  /       /  /        /  /    MGL
06-0165    Reconstruction               0-004-025  11/13/06   10                             0       22,544     /  /                /  /       /  /        /  /    HCM
05-1128    Reconstruction               0-005-016  11/10/06   2,10,155,15,16                 0       92,492     /  /                /  /       /  /      08/31/07  HCM
08-0646    Reconstruction               0-005-017  09/08/09   2,4,7,8,9,10,155,15,           0      340,720     /  /                /  /       /  /        /  /    JOD
03-0597    Reconstruction               0-006-009  06/30/04   2                              0      180,427     /  /                /  /       /  /      08/01/05  JOD
00-0915    Reconstruction               0-007-010  07/03/01   10                             0       15,800     /  /                /  /       /  /        /  /    MGL
03-0598    Reconstruction               0-007-011  06/30/04   155                            0    1,506,770     /  /                /  /       /  /      08/01/05  JOD
03-0599    Reconstruction               0-009-011  06/30/04   7,9,155                        0      495,307     /  /                /  /       /  /        /  /    JOD
00-0916    Reconstruction               0-010-014  07/03/01   2,9,10,15,16                   0       21,100     /  /                /  /       /  /        /  /    MGL
03-0600    Reconstruction               0-010-015  06/30/04   7                              0      406,637     /  /                /  /       /  /        /  /    JOD
00-0917    Reconstruction               0-012-026  07/03/01   2,8,9,155,16                   0       89,900     /  /                /  /       /  /        /  /    MGL
01-1055    Reconstruction               0-012-027  01/08/03   10                             0       59,700     /  /                /  /       /  /        /  /    MGL
06-0167    Reconstruction               0-012-030  12/05/06   10                             0       22,544     /  /                /  /       /  /        /  /    HCM
08-0652    Reconstruction               0-012-031  09/08/09   2,4,7,8,9,10,14,155,           0    1,098,479     /  /                /  /       /  /        /  /    JOD
03-0602    Reconstruction               0-013-008  06/30/04   8                              0      283,209     /  /                /  /       /  /      08/01/05  JOD
01-1056    Reconstruction               0-014-009  01/08/03   7                              0      325,000     /  /                /  /       /  /        /  /    MGL
01-0249    Reconstruction               0-017-024  12/24/01   13                             0       76,000     /  /                /  /       /  /        /  /    MGL
01-1252SR  Additions and Alterations    0-017-025  05/24/02   02 - 16                        0            0     /  /                /  /       /  /        /  /    MGL
00-0918    Reconstruction               0-017-026  07/03/01   2,9,155,15                     0      213,894     /  /                /  /       /  /        /  /    MGL
01-1057    Reconstruction               0-017-027  01/08/03   4,9                            0      179,200     /  /                /  /       /  /        /  /    MGL
03-0607    Reconstruction               0-017-028  06/30/04   14                             0      164,050     /  /                /  /       /  /      08/01/05  JOD
05-1132    Reconstruction               0-017-029  11/10/06   2,7,8,9,10,155,15,16           0      786,748     /  /                /  /       /  /      08/18/08  HCM
06-0168    Reconstruction               0-018-014  12/05/06   10                             0       17,903     /  /                /  /       /  /        /  /    HCM
00-0919    Reconstruction               0-031-013  07/03/01   2,8,9,155,16                   0      452,805     /  /                /  /       /  /        /  /    MGL
01-1058    Reconstruction               0-031-014  01/08/03   10,155,15,16                   0      309,000     /  /                /  /       /  /        /  /    MGL
03-0610    Reconstruction               0-031-015  06/30/04   8,155                          0      455,813     /  /                /  /       /  /      08/01/05  JOD
06-0169    Reconstruction               0-036-004  12/05/06   10                             0       17,903     /  /                /  /       /  /        /  /    HCM
00-0920    Reconstruction               5-023-006  07/03/01   2,155,15                       0      243,640     /  /                /  /       /  /        /  /    MGL
03-0608    Reconstruction               5-023-009  06/30/04   155,15,16                      0      270,954     /  /                /  /       /  /        /  /    JOD
00-0921    Additions and Alterations    5-024-005  07/03/01   02 - 16                        0      222,582     /  /                /  /       /  /        /  /    MGL
03-0609    Reconstruction               5-024-007  06/30/04   155                            0        9,086     /  /                /  /       /  /        /  /    JOD
08-0662    Reconstruction               5-024-009  09/08/09   2,4,7,8,9,10,155,15,           0    1,186,093     /  /                /  /       /  /        /  /    JOD
08-1429    Reconstruction               5-024-011  08/21/08   14                             0       42,074     /  /                /  /       /  /      09/02/08  JOD
00-1269    New Construction             7-043-001  05/11/01   02 - 16                        0       20,400     /  /                /  /       /  /      08/01/05  MGL
04-1238    Reconstruction               7-053-001  09/20/05                                  0       60,460     /  /                /  /       /  /        /  /    JOD
08-1735    Reconstruction               7-999-003  10/23/09   10,16                          0    1,132,306     /  /                /  /       /  /        /  /    JOD


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




EAST IRONDEQUOIT CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 26-08-01-06
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
08-1082SR  Additions and Alterations    0-002-018  05/07/09   02 - 16                        0            0     /  /                /  /       /  /        /  /    DDJ
08-1083SR  Additions and Alterations    0-013-005  05/07/09   02 - 16                        0            0     /  /                /  /       /  /        /  /    DDJ
08-1537    Additions and Alterations    0-013-005  10/23/09   02 - 16                        0      830,300     /  /                /  /       /  /        /  /    DDJ
08-1084SR  New Construction             5-016-001  05/07/09   02 - 16                        0            0     /  /                /  /       /  /        /  /    DDJ


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




DISCOVERY CHARTER SCHOOL DISTRICT: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 26-08-01-86
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




WEST IRONDEQUOIT CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 26-08-03-06
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
07-0515    Reconstruction               0-004-012  03/12/08   2,9                            0            0     /  /                /  /       /  /      08/31/09  MGL
07-0520    Reconstruction               0-032-004  03/12/08   2,13,16                        0          500     /  /                /  /       /  /      08/31/09  MGL
01-0314    New Construction             7-019-001  03/22/02   02 - 16                        0       43,500     /  /                /  /       /  /      09/22/04  BJB
01-0315    New Construction             7-030-001  03/22/02   02 - 16                        0      178,000     /  /                /  /       /  /      09/22/04  BJB


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




HONEOYE FALLS - LIMA CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 26-09-01-06
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




SPENCERPORT CENTRAL SCHOOL DISTRICT: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 26-10-01-06
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
01-0288    New Construction             7-016-001  09/21/01   02 - 16                        0       23,500     /  /                /  /       /  /      11/01/06  MGL
04-0401    New Construction             7-017-001  04/29/05   02 - 16                        0       28,000     /  /                /  /       /  /      02/15/06  RDR
04-0402    New Construction             7-018-001  04/29/05   02 - 16                        0       11,200     /  /                /  /       /  /      02/15/06  RDR
07-1908    Reconstruction               7-018-002  04/07/08   2,10,155,15,16                 0       30,968     /  /                /  /       /  /      08/07/09  DDJ
07-1909    New Construction             7-021-001  04/07/08   02 - 16                        0       99,205     /  /                /  /       /  /      08/07/09  DDJ
07-1910    New Construction             7-022-001  04/07/08   02 - 16                        0       28,218     /  /                /  /       /  /      08/07/09  DDJ
07-1911    New Construction             7-023-001  04/02/08   02 - 16                        0      250,465     /  /                /  /       /  /      08/07/09  DDJ


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




HILTON CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 26-11-01-06
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
08-1753    Reconstruction               0-001-011  10/07/09   2,4,8,9                        0      293,890     /  /                /  /       /  /        /  /    DDJ
08-1754    Reconstruction               0-003-012  10/07/09   2,4,8,9,10,155,15              0      421,038     /  /                /  /       /  /        /  /    DDJ
08-1755    Reconstruction               0-004-010  10/07/09   2,4,8,9,10,155,15,16           0      220,615     /  /                /  /       /  /        /  /    DDJ
08-1756    Reconstruction               0-005-011  10/07/09   4,8,9,155,16                   0      407,216     /  /                /  /       /  /        /  /    DDJ
08-1757    Reconstruction               0-007-012  10/07/09   2,8,9,10,155,16                0      400,303     /  /                /  /       /  /        /  /    DDJ
08-1758    Reconstruction               5-010-012  10/07/09   155                            0       57,605     /  /                /  /       /  /        /  /    DDJ
08-1759    Reconstruction               7-012-002  10/07/09   155                            0       45,816     /  /                /  /       /  /        /  /    DDJ


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




PENFIELD CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 26-12-01-06
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




PENFIELD CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 26-12-11-19
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




FAIRPORT CENTRAL SCHOOL DISTRICT: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 26-13-01-06
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
08-0614    Reconstruction               0-007-014  03/30/09   9,16                           0      676,382     /  /                /  /       /  /        /  /    DDJ
00-0991    New Construction             0-021-001  09/05/01   02 - 16                        0   16,000,000     /  /                /  /       /  /        /  /    BJB


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




EAST ROCHESTER UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 26-13-13-03
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




PITTSFORD CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 26-14-01-06
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
01-0097    Reconstruction               0-002-016  01/10/02   8                              0        7,175     /  /                /  /       /  /      09/06/02  MGL
05-0016    Reconstruction               0-002-020  03/30/06   2,16                           0            0     /  /                /  /       /  /        /  /    JOD
09-0900    Reconstruction               0-002-022  08/24/10   2,4,9,15                       0       44,000     /  /                /  /       /  /        /  /    JOD
09-0901    Reconstruction               0-003-024  08/24/10   2,4,9,14,155,16                0      170,000     /  /                /  /       /  /        /  /    JOD
09-0902    Reconstruction               0-004-018  08/24/10   2,4,7,8,9,15,16                0      934,747     /  /                /  /       /  /        /  /    JOD
04-1225    Reconstruction               0-007-017  04/12/05   13,155,15,16                   0      451,000     /  /                /  /       /  /        /  /    JOD
09-0903    Reconstruction               0-007-018  08/24/10   2,4,8,9,14,155,15,16           0    1,115,000     /  /                /  /       /  /        /  /    JOD
04-1227    Reconstruction               0-009-018  04/25/06   155,16                         0      310,000     /  /                /  /       /  /        /  /    JOD
09-0904    Reconstruction               0-009-024  08/24/10   2,9,155,15,16                  0       60,500     /  /                /  /       /  /        /  /    JOD
99-0746    New Construction             0-021-001  04/25/00   02 - 16                        0      100,000     /  /                /  /       /  /        /  /    MGL
03-0476    New Construction             7-029-001  11/14/03   02 - 16                        0       30,000     /  /                /  /       /  /        /  /    JOD
03-0854    New Construction             7-032-001  06/14/04   02 - 16                        0       30,000     /  /                /  /       /  /        /  /    JOD


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




CHURCHVILLE CHILI CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 26-15-01-06
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
09-1181    Reconstruction               0-002-008  05/28/10   2,8,9,155,15,16                0      150,170     /  /                /  /       /  /        /  /    DDJ
09-0629    Reconstruction               0-004-009  09/22/10   2,4,8,9,155,15,16              0    1,494,664     /  /                /  /       /  /        /  /    DDJ
08-1176    Reconstruction               0-004-010  03/11/09   2,9                            0      422,074     /  /                /  /       /  /        /  /    DDJ
09-0632    Reconstruction               5-009-003  09/22/10   2,8,9,15                       0       40,325     /  /                /  /       /  /        /  /    DDJ
03-1685    New Construction             7-011-001  04/26/05   02 - 16                        0       29,000     /  /                /  /       /  /      09/06/06  RDR
03-1686    New Construction             7-013-001  04/26/05   02 - 16                        0        6,250     /  /                /  /       /  /      09/06/06  RDR
03-1687    New Construction             7-014-001  04/26/05   02 - 16                        0       13,750     /  /                /  /       /  /      09/06/06  RDR
08-1308    Reconstruction               7-999-002  05/07/09   10,13,15,16                    0    1,741,600     /  /                /  /       /  /        /  /    DDJ


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




ROCHESTER CITY SCHOOLS: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 26-16-00-01
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
10-0244    Reconstruction               0-002-016  10/29/10   13,16                          0       26,500     /  /                /  /       /  /        /  /    DDJ
10-0245    Reconstruction               0-003-019  10/29/10   16                             0       26,500     /  /                /  /       /  /        /  /    DDJ
10-0246    Reconstruction               0-004-020  10/29/10                                  0       26,500     /  /                /  /       /  /        /  /    DDJ
04-0899    Reconstruction               0-005-019  03/28/05   16                             0            0     /  /                /  /       /  /      04/11/07  RDR
10-0247    Reconstruction               0-005-024  10/29/10   13,16                          0       26,500     /  /                /  /       /  /        /  /    DDJ
10-0248    Reconstruction               0-006-020  10/29/10   13,16                          0       26,500     /  /                /  /       /  /        /  /    DDJ
10-0249    Reconstruction               0-007-017  10/29/10   13,16                          0       26,500     /  /                /  /       /  /        /  /    DDJ
09-0492    Additions and Alterations    0-009-019  03/16/10   02 - 16                        0      395,000     /  /                /  /       /  /        /  /    DDJ
10-0251    Reconstruction               0-012-018  10/29/10   13,16                          0       25,750     /  /                /  /       /  /        /  /    DDJ
10-0252    Reconstruction               0-015-010  10/29/10   13,16                          0       25,750     /  /                /  /       /  /        /  /    DDJ
03-0740    Reconstruction               0-016-014  02/09/04   2,7,9,16                       0            0     /  /                /  /       /  /        /  /    RDR
04-0420    Reconstruction               0-017-019  01/19/05   2,7,9,155,15,16                0    1,930,914     /  /                /  /       /  /        /  /    RDR
10-0253    Reconstruction               0-017-021  10/29/10   13,16                          0       25,750     /  /                /  /       /  /        /  /    DDJ
10-0254    Reconstruction               0-018-013  10/29/10   13,16                          0       21,313     /  /                /  /       /  /        /  /    DDJ
04-0903    Reconstruction               0-019-016  03/28/05   16                             0            0     /  /                /  /       /  /      04/11/07  RDR
10-0255    Reconstruction               0-019-019  10/29/10   13,16                          0       25,750     /  /                /  /       /  /        /  /    DDJ
10-0256    Reconstruction               0-020-013  10/29/10   13,16                          0       29,274     /  /                /  /       /  /        /  /    DDJ
10-0257    Reconstruction               0-023-017  10/29/10   13,16                          0       25,750     /  /                /  /       /  /        /  /    DDJ
98-0950    Reconstruction               0-025-011  05/06/99   4,8,9,10,16                    0      546,600     /  /                /  /       /  /        /  /    RDR
04-0570    Reconstruction               0-025-015  01/07/05   2,4,8,16                       0            0     /  /                /  /       /  /        /  /    RDR
10-0258    Reconstruction               0-025-017  10/29/10   13,16                          0       25,750     /  /                /  /       /  /        /  /    DDJ
04-0906    Reconstruction               0-028-019  03/28/05   16                             0            0     /  /                /  /       /  /      04/11/07  RDR
10-0259    Reconstruction               0-028-022  10/29/10   13,16                          0       26,580     /  /                /  /       /  /        /  /    DDJ
10-0260    Reconstruction               0-029-022  10/29/10   13,16                          0       26,500     /  /                /  /       /  /        /  /    DDJ
04-0908    Reconstruction               0-030-018  03/28/05   16                             0            0     /  /                /  /       /  /      04/11/07  RDR
10-0261    Reconstruction               0-030-021  10/29/10   13,16                          0       26,500     /  /                /  /       /  /        /  /    DDJ
08-0835    Reconstruction               0-031-009  03/04/09   10,13,16                       0      688,182     /  /                /  /       /  /        /  /    DDJ
10-0262    Reconstruction               0-031-011  10/29/10   13,16                          0       19,080     /  /                /  /       /  /        /  /    DDJ
10-0263    Reconstruction               0-033-020  10/29/10   13,16                          0       26,500     /  /                /  /       /  /        /  /       
10-0264    Reconstruction               0-035-017  10/29/10   13,16                          0       25,750     /  /                /  /       /  /        /  /    DDJ
10-0265    Reconstruction               0-036-016  10/29/10   13,16                          0       25,750     /  /                /  /       /  /        /  /    DDJ
10-0266    Reconstruction               0-037-018  10/29/10   13,16                          0       25,750     /  /                /  /       /  /        /  /    DDJ
08-0836    Reconstruction               0-039-016  03/04/09   2,4                            0      397,000     /  /                /  /       /  /        /  /    DDJ
10-0267    Reconstruction               0-039-017  10/29/10   13,16                          0       28,294     /  /                /  /       /  /        /  /    DDJ
10-0268    Reconstruction               0-041-022  10/29/10   13,16                          0       25,750     /  /                /  /       /  /        /  /    DDJ
10-0269    Reconstruction               0-043-016  10/29/10   13,16                          0       25,750     /  /                /  /       /  /        /  /    DDJ
01-0680    Reconstruction               0-045-009  04/30/02   2,8,16                         0      130,643     /  /                /  /       /  /        /  /    RDR
10-0270    Reconstruction               0-045-017  10/29/10   13,16                          0       25,750     /  /                /  /       /  /        /  /    DDJ
08-0837    Reconstruction               0-046-019  03/04/09   2,9                            0      229,271     /  /                /  /       /  /        /  /    DDJ
10-0271    Reconstruction               0-046-020  10/29/10   13,16                          0       26,500     /  /                /  /       /  /        /  /    DDJ
10-0272    Reconstruction               0-052-018  10/29/10   13,16                          0       25,750     /  /                /  /       /  /        /  /    DDJ
09-0493    Reconstruction               0-059-002  03/16/10   4,7,8,9,155,15,16              0      821,687     /  /                /  /       /  /        /  /    DDJ
02-1101    Additions and Alterations    0-101-022  03/18/03   02 - 16                        0    3,754,763     /  /                /  /       /  /        /  /    RDR
04-0838    Reconstruction               0-101-025  04/13/05   7,8,9,155,15,16                0    3,463,485     /  /                /  /       /  /        /  /    RDR
10-0273    Reconstruction               0-101-029  10/29/10   13,16                          0       59,319     /  /                /  /       /  /        /  /    DDJ
04-0918    Reconstruction               0-102-024  03/28/05   16                             0            0     /  /                /  /       /  /      04/11/07  RDR
07-1933    Reconstruction               0-102-026  05/13/08   7                              0      300,000     /  /                /  /       /  /        /  /    DDJ
09-1077    Reconstruction               0-102-029  05/04/10   7                              0      707,969     /  /                /  /       /  /        /  /    DDJ
10-0274    Reconstruction               0-102-030  10/29/10   13,16                          0       56,460     /  /                /  /       /  /        /  /    DDJ
10-0275    Reconstruction               0-103-029  10/29/10   13,16                          0       54,519     /  /                /  /       /  /        /  /    DDJ
10-0276    Reconstruction               0-105-026  10/29/10   13,16                          0       53,000     /  /                /  /       /  /        /  /    DDJ
04-0919    Reconstruction               0-107-020  03/28/05   16                             0            0     /  /                /  /       /  /      04/11/07  RDR
10-0277    Reconstruction               0-107-025  10/29/10   13,16                          0       53,000     /  /                /  /       /  /        /  /    DDJ
10-0278    Reconstruction               0-110-031  10/29/10   13,16                          0       53,000     /  /                /  /       /  /        /  /    DDJ
01-0301    Additions and Alterations    0-141-002  11/01/01   02 - 16                        0      665,044     /  /                /  /       /  /        /  /    RDR
10-0280    Reconstruction               5-078-108  10/29/10                                  0       51,500     /  /                /  /       /  /        /  /    DDJ
04-0548    Reconstruction               7-134-002  02/01/05   2,4,8,15,16                    0      250,000     /  /                /  /       /  /        /  /    RDR
98-0744    New Construction             7-156-001  04/06/99   02 - 16                        0       50,000     /  /                /  /       /  /      05/31/01  RDR
99-1203    Reconstruction               8-071-002  04/11/00   155,16                         0       85,000     /  /                /  /       /  /        /  /    RDR
10-0281    Reconstruction               8-121-006  10/29/10   15,16                          0       25,750     /  /                /  /       /  /        /  /    DDJ
07-1440    Reconstruction               8-176-L01  01/29/08                                  0   13,875,000     /  /                /  /       /  /        /  /    MGL
07-0916    New Construction             8-177-001  03/17/08   02 - 16                        0    5,000,000     /  /                /  /       /  /        /  /    MGL
09-0375    Reconstruction               8-182-L01  11/13/09                                  0      657,587     /  /                /  /       /  /        /  /    DDJ


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




ROCHESTER CAREER MENTORING CHARTER S: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 26-16-00-86
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




YONUG WOMENS COLLEGE PREP CHARTER S: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 26-16-00-87
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




RUSH HENRIETTA CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 26-17-01-06
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




BROCKPORT CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 26-18-01-06
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
09-0347    Reconstruction               5-003-010  01/25/10                                  0    3,627,376     /  /                /  /       /  /        /  /    JOD
05-0829    New Construction             7-015-001  02/02/07   02 - 16                        0      390,000     /  /                /  /       /  /      06/01/07  JOD


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




WEBSTER CENTRAL SCHOOL DISTRICT: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 26-19-01-06
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
07-0235    Reconstruction               0-001-010  04/17/08   2,4,8,9,10,155,15,16           0    1,952,399     /  /                /  /       /  /        /  /    JOD
07-0230    Reconstruction               0-003-008  02/29/08   2,4,8,9,10,155,15,16           0    2,704,030     /  /                /  /       /  /        /  /    JOD
04-0234    Reconstruction               0-003-FP1  12/23/04   16                             0        3,600     /  /                /  /       /  /      08/31/04  JOD
07-0236    Reconstruction               0-009-010  04/17/08   2,4,8,9,10,155,15,16           0    4,931,488     /  /                /  /       /  /        /  /    JOD
04-0237    Reconstruction               0-009-FP1  12/23/04   16                             0        3,600     /  /                /  /       /  /      08/31/04  JOD
07-0237    Reconstruction               0-010-007  04/17/08   2,7,8,9,155,15,16              0      608,690     /  /                /  /       /  /        /  /    JOD
04-0238    Reconstruction               0-010-FP1  12/23/04   16                             0        3,600     /  /                /  /       /  /      08/31/04  JOD
07-0238    Reconstruction               0-011-020  04/17/08   2,4,8,9,10,155,15,16           0    4,445,864     /  /                /  /       /  /        /  /    JOD
07-0231    Reconstruction               0-012-009  02/29/08   2,4,8,10,155,15,16             0    2,643,945     /  /                /  /       /  /        /  /    JOD
04-0236    Reconstruction               0-012-FP1  12/23/04   16                             0        3,600     /  /                /  /       /  /      08/31/04  JOD
07-0219    Reconstruction               0-013-019  03/31/08   2,4,7,8,9,10,155,15,           0   13,530,261     /  /                /  /       /  /        /  /    JOD
07-0232    Reconstruction               0-016-006  02/29/08   2,8,9,10,155,15,16             0    1,245,362     /  /                /  /       /  /        /  /    JOD
07-0233    Reconstruction               0-017-006  02/29/08   2,4,8,9,10,155,15,16           0      889,520     /  /                /  /       /  /        /  /    JOD
04-0232    Reconstruction               0-017-FP1  12/23/04   16                             0        7,932     /  /                /  /       /  /      08/31/04  JOD
07-0234    Reconstruction               0-018-006  02/29/08   2,4,8,10,155,15,16             0    1,271,421     /  /                /  /       /  /        /  /    JOD
04-0235    Reconstruction               0-018-FP1  12/23/04   16                             0        7,932     /  /                /  /       /  /      08/31/04  JOD


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




WHEATLAND CHILI CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 26-20-01-04
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
03-1632    New Construction             7-005-001  07/13/04   02 - 16                        0       34,000     /  /                /  /       /  /        /  /    RDR


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




BOCES MONROE #1: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 26-91-00-00
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
09-0590    Additions and Alterations    0-002-013  05/06/10   02 - 16                        0    3,320,700     /  /                /  /       /  /        /  /    JOD


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




BOCES MONROE II-ORLEANS: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 26-92-00-00
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition