REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO LATE or OVERDUE FCRs / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
01-1340 Reconstruction 0-001-006 05/23/02 10 0 125,000 / / / / / / 02/04/03 BJB
08-1246 Reconstruction 0-001-015 05/05/10 8,155,15,16 0 112,334 / / / / / / / / DDJ
08-1247 Reconstruction 0-002-012 05/05/10 8 0 73,548 / / / / / / / / DDJ
09-0535 Reconstruction 0-005-011 04/19/10 13,16 0 445,000 / / / / / / / / DDJ
08-1248 Reconstruction 0-006-010 05/05/10 13,15,16 0 52,689 / / / / / / / / DDJ
02-0520 Reconstruction 0-007-008 05/20/03 2,10,155,15,16 0 120,000 / / / / / / 01/09/04 DDJ
08-1249 Reconstruction 0-008-012 05/05/10 155,15,16 0 1,358,163 / / / / / / / / DDJ
08-1250 Reconstruction 0-009-012 05/05/10 155,15,16 0 971,388 / / / / / / / / DDJ
05-1166 New Construction 7-018-001 05/11/06 02 - 16 0 44,500 / / / / / / / / DDJ
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
08-0646 Reconstruction 0-005-017 09/08/09 2,4,7,8,9,10,155,15, 0 340,720 / / / / / / / / JOD
00-0915 Reconstruction 0-007-010 07/03/01 10 0 15,800 / / / / / / / / MGL
03-0599 Reconstruction 0-009-011 06/30/04 7,9,155 0 495,307 / / / / / / / / JOD
00-0916 Reconstruction 0-010-014 07/03/01 2,9,10,15,16 0 21,100 / / / / / / / / MGL
03-0600 Reconstruction 0-010-015 06/30/04 7 0 406,637 / / / / / / / / JOD
00-0917 Reconstruction 0-012-026 07/03/01 2,8,9,155,16 0 89,900 / / / / / / / / MGL
08-0652 Reconstruction 0-012-031 09/08/09 2,4,7,8,9,10,14,155, 0 1,098,479 / / / / / / / / JOD
01-0249 Reconstruction 0-017-024 12/24/01 13 0 76,000 / / / / / / / / MGL
01-1252SR Additions and Alterations 0-017-025 05/24/02 02 - 16 0 0 / / / / / / / / MGL
05-1132 Reconstruction 0-017-029 11/10/06 2,7,8,9,10,155,15,16 0 786,748 / / / / / / 08/18/08 HCM
03-0608 Reconstruction 5-023-009 06/30/04 155,15,16 0 270,954 / / / / / / / / JOD
03-0609 Reconstruction 5-024-007 06/30/04 155 0 9,086 / / / / / / / / JOD
08-0662 Reconstruction 5-024-009 09/08/09 2,4,7,8,9,10,155,15, 0 1,186,093 / / / / / / / / JOD
04-1238 Reconstruction 7-053-001 09/20/05 0 60,460 / / / / / / / / JOD
08-1735 Reconstruction 7-999-003 10/23/09 10,16 0 1,132,306 / / / / / / / / JOD
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
08-1082SR Additions and Alterations 0-002-018 05/07/09 02 - 16 0 0 / / / / / / / / DDJ
08-1083SR Additions and Alterations 0-013-005 05/07/09 02 - 16 0 0 / / / / / / / / DDJ
08-1537 Additions and Alterations 0-013-005 10/23/09 02 - 16 0 830,300 / / / / / / / / DDJ
08-1084SR New Construction 5-016-001 05/07/09 02 - 16 0 0 / / / / / / / / DDJ
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO LATE or OVERDUE FCRs / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
07-0515 Reconstruction 0-004-012 03/12/08 2,9 0 0 / / / / / / 08/31/09 MGL
07-0520 Reconstruction 0-032-004 03/12/08 2,13,16 0 500 / / / / / / 08/31/09 MGL
01-0314 New Construction 7-019-001 03/22/02 02 - 16 0 43,500 / / / / / / 09/22/04 BJB
01-0315 New Construction 7-030-001 03/22/02 02 - 16 0 178,000 / / / / / / 09/22/04 BJB
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO LATE or OVERDUE FCRs / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
01-0288 New Construction 7-016-001 09/21/01 02 - 16 0 23,500 / / / / / / 11/01/06 MGL
04-0401 New Construction 7-017-001 04/29/05 02 - 16 0 28,000 / / / / / / 02/15/06 RDR
04-0402 New Construction 7-018-001 04/29/05 02 - 16 0 11,200 / / / / / / 02/15/06 RDR
07-1908 Reconstruction 7-018-002 04/07/08 2,10,155,15,16 0 30,968 / / / / / / 08/07/09 DDJ
07-1909 New Construction 7-021-001 04/07/08 02 - 16 0 99,205 / / / / / / 08/07/09 DDJ
07-1910 New Construction 7-022-001 04/07/08 02 - 16 0 28,218 / / / / / / 08/07/09 DDJ
07-1911 New Construction 7-023-001 04/02/08 02 - 16 0 250,465 / / / / / / 08/07/09 DDJ
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
08-1753 Reconstruction 0-001-011 10/07/09 2,4,8,9 0 293,890 / / / / / / / / DDJ
08-1754 Reconstruction 0-003-012 10/07/09 2,4,8,9,10,155,15 0 421,038 / / / / / / / / DDJ
08-1755 Reconstruction 0-004-010 10/07/09 2,4,8,9,10,155,15,16 0 220,615 / / / / / / / / DDJ
08-1756 Reconstruction 0-005-011 10/07/09 4,8,9,155,16 0 407,216 / / / / / / / / DDJ
08-1757 Reconstruction 0-007-012 10/07/09 2,8,9,10,155,16 0 400,303 / / / / / / / / DDJ
08-1758 Reconstruction 5-010-012 10/07/09 155 0 57,605 / / / / / / / / DDJ
08-1759 Reconstruction 7-012-002 10/07/09 155 0 45,816 / / / / / / / / DDJ
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO LATE or OVERDUE FCRs / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO LATE or OVERDUE FCRs / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO LATE or OVERDUE FCRs / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO LATE or OVERDUE FCRs / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
01-0097 Reconstruction 0-002-016 01/10/02 8 0 7,175 / / / / / / 09/06/02 MGL
05-0016 Reconstruction 0-002-020 03/30/06 2,16 0 0 / / / / / / / / JOD
09-0901 Reconstruction 0-003-024 08/24/10 2,4,9,14,155,16 0 170,000 / / / / / / / / JOD
04-1225 Reconstruction 0-007-017 04/12/05 13,155,15,16 0 451,000 / / / / / / / / JOD
04-1227 Reconstruction 0-009-018 04/25/06 155,16 0 310,000 / / / / / / / / JOD
09-0904 Reconstruction 0-009-024 08/24/10 2,9,155,15,16 0 60,500 / / / / / / / / JOD
99-0746 New Construction 0-021-001 04/25/00 02 - 16 0 100,000 / / / / / / / / MGL
03-0476 New Construction 7-029-001 11/14/03 02 - 16 0 30,000 / / / / / / / / JOD
03-0854 New Construction 7-032-001 06/14/04 02 - 16 0 30,000 / / / / / / / / JOD
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
09-1181 Reconstruction 0-002-008 05/28/10 2,8,9,155,15,16 0 150,170 / / / / / / / / DDJ
09-0629 Reconstruction 0-004-009 09/22/10 2,4,8,9,155,15,16 0 1,494,664 / / / / / / / / DDJ
08-1176 Reconstruction 0-004-010 03/11/09 2,9 0 422,074 / / / / / / / / DDJ
09-0632 Reconstruction 5-009-003 09/22/10 2,8,9,15 0 40,325 / / / / / / / / DDJ
03-1685 New Construction 7-011-001 04/26/05 02 - 16 0 29,000 / / / / / / 09/06/06 RDR
03-1686 New Construction 7-013-001 04/26/05 02 - 16 0 6,250 / / / / / / 09/06/06 RDR
03-1687 New Construction 7-014-001 04/26/05 02 - 16 0 13,750 / / / / / / 09/06/06 RDR
08-1308 Reconstruction 7-999-002 05/07/09 10,13,15,16 0 1,741,600 / / / / / / / / DDJ
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
10-0244 Reconstruction 0-002-016 10/29/10 13,16 0 26,500 / / / / / / / / DDJ
10-0245 Reconstruction 0-003-019 10/29/10 16 0 26,500 / / / / / / / / DDJ
10-0246 Reconstruction 0-004-020 10/29/10 0 26,500 / / / / / / / / DDJ
04-0899 Reconstruction 0-005-019 03/28/05 16 0 0 / / / / / / 04/11/07 RDR
10-0247 Reconstruction 0-005-024 10/29/10 13,16 0 26,500 / / / / / / / / DDJ
10-0248 Reconstruction 0-006-020 10/29/10 13,16 0 26,500 / / / / / / / / DDJ
10-0249 Reconstruction 0-007-017 10/29/10 13,16 0 26,500 / / / / / / / / DDJ
09-0492 Additions and Alterations 0-009-019 03/16/10 02 - 16 0 395,000 / / / / / / / / DDJ
10-0251 Reconstruction 0-012-018 10/29/10 13,16 0 25,750 / / / / / / / / DDJ
10-0252 Reconstruction 0-015-010 10/29/10 13,16 0 25,750 / / / / / / / / DDJ
03-0740 Reconstruction 0-016-014 02/09/04 2,7,9,16 0 0 / / / / / / / / RDR
10-0253 Reconstruction 0-017-021 10/29/10 13,16 0 25,750 / / / / / / / / DDJ
10-0254 Reconstruction 0-018-013 10/29/10 13,16 0 21,313 / / / / / / / / DDJ
04-0903 Reconstruction 0-019-016 03/28/05 16 0 0 / / / / / / 04/11/07 RDR
10-0255 Reconstruction 0-019-019 10/29/10 13,16 0 25,750 / / / / / / / / DDJ
10-0256 Reconstruction 0-020-013 10/29/10 13,16 0 29,274 / / / / / / / / DDJ
10-0257 Reconstruction 0-023-017 10/29/10 13,16 0 25,750 / / / / / / / / DDJ
04-0570 Reconstruction 0-025-015 01/07/05 2,4,8,16 0 0 / / / / / / / / RDR
10-0258 Reconstruction 0-025-017 10/29/10 13,16 0 25,750 / / / / / / / / DDJ
04-0906 Reconstruction 0-028-019 03/28/05 16 0 0 / / / / / / 04/11/07 RDR
10-0259 Reconstruction 0-028-022 10/29/10 13,16 0 26,580 / / / / / / / / DDJ
10-0260 Reconstruction 0-029-022 10/29/10 13,16 0 26,500 / / / / / / / / DDJ
04-0908 Reconstruction 0-030-018 03/28/05 16 0 0 / / / / / / 04/11/07 RDR
10-0261 Reconstruction 0-030-021 10/29/10 13,16 0 26,500 / / / / / / / / DDJ
08-0835 Reconstruction 0-031-009 03/04/09 10,13,16 0 688,182 / / / / / / / / DDJ
10-0262 Reconstruction 0-031-011 10/29/10 13,16 0 19,080 / / / / / / / / DDJ
10-0263 Reconstruction 0-033-020 10/29/10 13,16 0 26,500 / / / / / / / /
10-0264 Reconstruction 0-035-017 10/29/10 13,16 0 25,750 / / / / / / / / DDJ
10-0265 Reconstruction 0-036-016 10/29/10 13,16 0 25,750 / / / / / / / / DDJ
10-0266 Reconstruction 0-037-018 10/29/10 13,16 0 25,750 / / / / / / / / DDJ
08-0836 Reconstruction 0-039-016 03/04/09 2,4 0 397,000 / / / / / / / / DDJ
10-0267 Reconstruction 0-039-017 10/29/10 13,16 0 28,294 / / / / / / / / DDJ
10-0268 Reconstruction 0-041-022 10/29/10 13,16 0 25,750 / / / / / / / / DDJ
10-0269 Reconstruction 0-043-016 10/29/10 13,16 0 25,750 / / / / / / / / DDJ
10-0270 Reconstruction 0-045-017 10/29/10 13,16 0 25,750 / / / / / / / / DDJ
08-0837 Reconstruction 0-046-019 03/04/09 2,9 0 229,271 / / / / / / / / DDJ
10-0271 Reconstruction 0-046-020 10/29/10 13,16 0 26,500 / / / / / / / / DDJ
10-0272 Reconstruction 0-052-018 10/29/10 13,16 0 25,750 / / / / / / / / DDJ
09-0493 Reconstruction 0-059-002 03/16/10 4,7,8,9,155,15,16 0 821,687 / / / / / / / / DDJ
10-0273 Reconstruction 0-101-029 10/29/10 13,16 0 59,319 / / / / / / / / DDJ
04-0918 Reconstruction 0-102-024 03/28/05 16 0 0 / / / / / / 04/11/07 RDR
07-1933 Reconstruction 0-102-026 05/13/08 7 0 300,000 / / / / / / / / DDJ
09-1077 Reconstruction 0-102-029 05/04/10 7 0 707,969 / / / / / / / / DDJ
10-0274 Reconstruction 0-102-030 10/29/10 13,16 0 56,460 / / / / / / / / DDJ
10-0275 Reconstruction 0-103-029 10/29/10 13,16 0 54,519 / / / / / / / / DDJ
10-0276 Reconstruction 0-105-026 10/29/10 13,16 0 53,000 / / / / / / / / DDJ
04-0919 Reconstruction 0-107-020 03/28/05 16 0 0 / / / / / / 04/11/07 RDR
10-0277 Reconstruction 0-107-025 10/29/10 13,16 0 53,000 / / / / / / / / DDJ
10-0278 Reconstruction 0-110-031 10/29/10 13,16 0 53,000 / / / / / / / / DDJ
01-0301 Additions and Alterations 0-141-002 11/01/01 02 - 16 0 665,044 / / / / / / / / RDR
10-0280 Reconstruction 5-078-108 10/29/10 0 51,500 / / / / / / / / DDJ
04-0548 Reconstruction 7-134-002 02/01/05 2,4,8,15,16 0 250,000 / / / / / / / / RDR
98-0744 New Construction 7-156-001 04/06/99 02 - 16 0 50,000 / / / / / / 05/31/01 RDR
99-1203 Reconstruction 8-071-002 04/11/00 155,16 0 85,000 / / / / / / / / RDR
10-0281 Reconstruction 8-121-006 10/29/10 15,16 0 25,750 / / / / / / / / DDJ
07-1440 Reconstruction 8-176-L01 01/29/08 0 13,875,000 / / / / / / / / MGL
09-0375 Reconstruction 8-182-L01 11/13/09 0 657,587 / / / / / / / / DDJ
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO LATE or OVERDUE FCRs / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO LATE or OVERDUE FCRs / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO LATE or OVERDUE FCRs / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
05-0829 New Construction 7-015-001 02/02/07 02 - 16 0 390,000 / / / / / / 06/01/07 JOD
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
04-0234 Reconstruction 0-003-FP1 12/23/04 16 0 3,600 / / / / / / 08/31/04 JOD
04-0237 Reconstruction 0-009-FP1 12/23/04 16 0 3,600 / / / / / / 08/31/04 JOD
04-0238 Reconstruction 0-010-FP1 12/23/04 16 0 3,600 / / / / / / 08/31/04 JOD
04-0236 Reconstruction 0-012-FP1 12/23/04 16 0 3,600 / / / / / / 08/31/04 JOD
04-0232 Reconstruction 0-017-FP1 12/23/04 16 0 7,932 / / / / / / 08/31/04 JOD
04-0235 Reconstruction 0-018-FP1 12/23/04 16 0 7,932 / / / / / / 08/31/04 JOD
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
03-1632 New Construction 7-005-001 07/13/04 02 - 16 0 34,000 / / / / / / / / RDR
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
09-0590 Additions and Alterations 0-002-013 05/06/10 02 - 16 0 3,320,700 / / / / / / / / JOD
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO LATE or OVERDUE FCRs / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition