REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
02-0193 Reconstruction 5-001-001 09/04/02 2,10 0 97,900 / / / / / / / / MGL
00-1834 Reconstruction 5-014-002 10/30/01 8,9,155,15,16 0 461,000 / / / / / / 04/15/02 MGL
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
02-2159 Reconstruction 0-005-015 07/24/03 2,8,9,13,155,15,16 0 2,232,000 / / / / / / / / HCM
04-0159 Additions and Alterations 0-010-018 11/03/04 02 - 16 0 20,991,300 / / / / / / 05/30/08 HCM
10-0330 Reconstruction 0-016-025 10/27/10 7 0 580,000 / / / / / / / / HCM
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
02-1755 Reconstruction 0-021-007 04/15/03 7 0 31,115 / / / / / / / / HCM
02-1756 Reconstruction 0-023-003 04/15/03 7 0 291,720 / / / / / / / / HCM
02-1757 Reconstruction 0-024-003 04/15/03 7 0 371,720 / / / / / / / / HCM
03-0616 New Construction 7-027-001 08/03/05 02 - 16 0 20,500 / / / / / / 08/04/07 MGL
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO LATE or OVERDUE FCRs / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
08-1582 Reconstruction 0-001-009 05/19/09 2,4,7,155,15,16 0 450,200 / / / / / / / / JOD
08-1583 Reconstruction 0-004-011 05/19/09 2,4,7,155,15,16 0 40,600 / / / / / / / / JOD
99-1260 New Construction 0-013-001 08/15/00 02 - 16 0 20,000 / / / / / / / / RDR
09-0879 New Construction 7-006-001 03/08/10 02 - 16 0 53,000 / / / / / / / / JOD
09-0880 New Construction 7-007-002 03/08/10 02 - 16 0 14,200 / / / / / / / / JOD
00-1771 New Construction 7-015-001 11/27/01 02 - 16 0 64,000 / / / / / / 08/29/02 RDR
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO LATE or OVERDUE FCRs / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO LATE or OVERDUE FCRs / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO LATE or OVERDUE FCRs / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO LATE or OVERDUE FCRs / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
09-0685 Reconstruction 0-006-011 07/15/10 2,155,16 0 660,000 / / / / / / / / HCM
09-0687 Reconstruction 0-011-009 07/15/10 2,155,15,16 0 2,100,000 / / / / / / / / HCM
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
99-0762 Reconstruction 7-001-001 05/05/00 155,15,16 0 12,000 / / / / / / / / BJB
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
09-1127 Reconstruction 0-001-014 06/14/10 16 0 46,366 / / / / / / / / DDJ
09-1128 Reconstruction 0-002-008 06/14/10 16 0 19,230 / / / / / / / / DDJ
03-0138 Reconstruction 0-003-003 09/04/03 2,15,16 0 93,600 / / / / / / / / DDJ
04-0890 Reconstruction 0-005-012 12/19/05 2,4,7,8,9,10,155,15, 0 3,527,317 / / / / / / / / DDJ
09-1129 Reconstruction 0-005-015 06/14/10 16 0 59,358 / / / / / / / / DDJ
04-0891 Reconstruction 5-006-002 12/19/05 2,10,155,15,16 0 116,869 / / / / / / / / DDJ
09-1130 Reconstruction 5-012-002 06/14/10 16 0 10,046 / / / / / / / / DDJ
04-0668 Reconstruction 7-009-002 03/21/05 2,4,8,155,15,16 0 27,450 / / / / / / / / DDJ
99-0916 New Construction 7-010-001 03/01/00 02 - 16 0 5,000 / / / / / / 04/01/02 BJB
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
06-0438 New Construction 7-010-001 06/04/07 02 - 16 0 1,278,159 / / / / / / / / DDJ
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
02-1916 Reconstruction 0-007-005 05/21/03 2,9,10 0 127,725 / / / / / / 09/02/03 MAC
05-0439 Reconstruction 0-007-007 02/15/06 2,4,7,8,9,155 0 5,435,506 / / / / / / 08/21/07 DDJ
05-0725 Reconstruction 0-012-005 05/03/06 7 0 1,134,000 / / / / / / 05/08/07 DDJ
98-0630 New Construction 7-025-001 03/10/99 02 - 16 0 122,000 / / / / / / 10/29/99 MEM
99-1536 New Construction 7-027-001 07/14/00 02 - 16 0 75,000 / / / / / / 06/12/02 RDR
07-0411 New Construction 7-031-001 01/02/08 02 - 16 0 63,000 / / / / / / / / DDJ
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
99-1607 Reconstruction 0-002-004 08/03/00 15,16 0 87,000 / / / / / / 01/03/01 BJB
00-1188 Reconstruction 0-002-005 04/12/01 8 0 241,000 / / / / / / 02/25/02 BJB
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
00-1692SR Additions and Alterations 0-002-011 06/04/01 02 - 16 0 0 / / / / / / / / BJB
00-1693SR Additions and Alterations 0-007-006 06/04/01 02 - 16 0 0 / / / / / / / / BJB
07-1243 Reconstruction 5-003-003 03/06/08 2,4,7,8,9,155,15,16 0 803,444 / / / / / / 09/02/08 JOD
07-2293 Reconstruction 5-003-004 08/22/08 7 0 66,900 / / / / / / 01/27/09 JOD
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
09-1477 Reconstruction 0-004-010 09/30/10 2,4,7,8,9,10,155,15, 0 865,000 / / / / / / / / MGL
03-0112 Reconstruction 0-005-005 08/18/03 2,4,7,8,9,155,15,16 0 1,715,409 / / / / / / / / RDR
02-2364 Reconstruction 0-006-008 08/01/03 2,4 0 130,000 / / / / / / / / RDR
06-0170 Reconstruction 0-006-009 10/16/06 10,155,15,16 0 150,000 / / / / / / 08/31/07 RDR
01-0109 Reconstruction 0-010-003 12/10/01 4 0 31,200 / / / / / / 05/13/02 RDR
03-0117 Reconstruction 0-016-007 08/18/03 2,4,7,8,9,155,15,16 0 201,298 / / / / / / / / RDR
10-0371 Additions and Alterations 0-050-007 12/21/10 02 - 16 0 25,978,728 / / / / / / / / HCM
10-0372 Reconstruction 0-050-008 12/21/10 155,16 0 1,667,857 / / / / / / / / HCM
10-0491 Additions and Alterations 0-050-009 12/21/10 02 - 16 0 2,000,818 / / / / / / / / HCM
03-0113 Reconstruction 0-101-015 08/13/03 2,4,7,8,155,15,16 0 346,000 / / / / / / 09/28/04 RDR
03-0114 Reconstruction 0-104-009 08/18/03 2,4,7,8,9,155,15,16 0 956,436 / / / / / / / / RDR
05-0245 Reconstruction 0-105-009 01/04/06 2,155,16 0 247,500 / / / / / / / / RDR
03-0115 Reconstruction 0-112-008 09/11/03 2,4,7,8,155,15,16 0 2,000,000 / / / / / / 09/13/04 RDR
03-0116 Reconstruction 0-123-024 08/18/03 2,4,8,9,10,155,15,16 0 2,000,000 / / / / / / / / RDR
10-0490 Additions and Alterations 0-125-010 12/30/10 02 - 16 0 705,600 / / / / / / / / HCM
10-0489 Additions and Alterations 0-125-011 12/30/10 02 - 16 0 1,598,794 / / / / / / / / HCM
03-0118 Reconstruction 0-126-009 08/18/03 2,8,155,16 0 158,160 / / / / / / / / RDR
06-0029 Reconstruction 7-999-006 10/11/06 13 0 180,000 / / / / / / 01/31/08 RDR
04-0720 Reconstruction 8-131-L02 02/10/05 0 0 / / / / / / / / RDR
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
05-0107 New Construction 0-007-001 01/20/06 02 - 16 0 85,000 / / / / / / 01/30/07 DDJ
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
05-1382 Reconstruction 8-027-001 07/27/06 0 0 / / / / / / / / JOD
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition