WEST GENESEE CSD AT CAMILLUS: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 42-01-01-06
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
02-0193    Reconstruction               5-001-001  09/04/02   2,10                           0       97,900     /  /                /  /       /  /        /  /    MGL
00-1834    Reconstruction               5-014-002  10/30/01   8,9,155,15,16                  0      461,000     /  /                /  /       /  /      04/15/02  MGL


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




NORTH SYRACUSE CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 42-03-03-06
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
04-0777    Reconstruction               0-001-018  02/16/05   7                              0      285,126     /  /                /  /       /  /      09/26/06  HCM
04-0778    Reconstruction               0-002-013  02/16/05   7                              0    1,042,512     /  /                /  /       /  /      10/07/05  HCM
01-0965    Reconstruction               0-003-011  10/23/02   9,13,16                        0       56,000     /  /                /  /       /  /      08/28/03  MGL
04-0779    Reconstruction               0-003-012  02/16/05   7                              0      819,987     /  /                /  /       /  /      11/14/05  HCM
02-2159    Reconstruction               0-005-015  07/24/03   2,8,9,13,155,15,16             0    2,232,000     /  /                /  /       /  /        /  /    HCM
04-0781    Reconstruction               0-005-016  02/16/05   7                              0      154,798     /  /                /  /       /  /      09/26/06  HCM
01-0434    Additions and Alterations    0-008-016  07/17/02   02 - 16                        0    7,650,000     /  /                /  /       /  /      12/23/03  MGL
01-0860    Additions and Alterations    0-011-020  10/15/02   02 - 16                        0    1,900,000     /  /                /  /       /  /      01/30/04  MGL
04-0782    Reconstruction               0-011-022  02/16/05   7                              0      635,296     /  /                /  /       /  /      09/26/06  HCM
05-1043    Reconstruction               0-011-023  05/17/06   4,9,10,155,15                  0      125,000     /  /                /  /       /  /        /  /    HCM
00-0429    Reconstruction               0-012-015  12/28/00   2,10,155,16                    0       85,000     /  /                /  /       /  /        /  /    MGL
07-0127    Reconstruction               0-012-017  08/09/07   7                              0      163,000     /  /                /  /       /  /        /  /    HCM
04-0776    Reconstruction               0-016-023  02/16/05   2,4,8                          0    1,661,300     /  /                /  /       /  /      05/01/07  HCM
04-0783    Reconstruction               0-016-024  02/16/05   7                              0       63,941     /  /                /  /       /  /      11/14/05  HCM
10-0330    Reconstruction               0-016-025  10/27/10   7                              0      580,000     /  /                /  /       /  /        /  /    HCM
05-0205    Reconstruction               5-037-010  11/07/05   155,16                         0      442,200     /  /                /  /       /  /      11/17/06  HCM
98-0830    New Construction             7-042-001  03/04/99   02 - 16                        0    3,066,815     /  /                /  /       /  /        /  /    MGL
99-1081    New Construction             7-042-002  06/20/00   02 - 16                        0    3,479,185     /  /                /  /       /  /      06/12/02  MGL
07-1481    New Construction             7-046-001  07/08/08   02 - 16                        0      105,785     /  /                /  /       /  /        /  /    HCM
00-0365    Reconstruction               7-999-003  01/10/01   8,16                           0    1,400,000     /  /                /  /       /  /      01/28/04  MGL


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




EAST SYRACUSE MINOA: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 42-04-01-06
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
02-1755    Reconstruction               0-021-007  04/15/03   7                              0       31,115     /  /                /  /       /  /        /  /    HCM
02-1756    Reconstruction               0-023-003  04/15/03   7                              0      291,720     /  /                /  /       /  /        /  /    HCM
02-1757    Reconstruction               0-024-003  04/15/03   7                              0      371,720     /  /                /  /       /  /        /  /    HCM
03-0616    New Construction             7-027-001  08/03/05   02 - 16                        0       20,500     /  /                /  /       /  /      08/04/07  MGL


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




JAMESVILLE-DEWITT CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 42-04-11-06
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




JORDAN ELBRIDGE CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 42-05-01-06
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
08-1582    Reconstruction               0-001-009  05/19/09   2,4,7,155,15,16                0      450,200     /  /                /  /       /  /        /  /    JOD
08-1583    Reconstruction               0-004-011  05/19/09   2,4,7,155,15,16                0       40,600     /  /                /  /       /  /        /  /    JOD
09-0128    Reconstruction               0-009-011  08/19/09   2,4,10,15,16                   0      787,077     /  /                /  /       /  /        /  /    JOD
99-1260    New Construction             0-013-001  08/15/00   02 - 16                        0       20,000     /  /                /  /       /  /        /  /    RDR
09-0879    New Construction             7-006-001  03/08/10   02 - 16                        0       53,000     /  /                /  /       /  /        /  /    JOD
09-0880    New Construction             7-007-002  03/08/10   02 - 16                        0       14,200     /  /                /  /       /  /        /  /    JOD
00-1771    New Construction             7-015-001  11/27/01   02 - 16                        0       64,000     /  /                /  /       /  /      08/29/02  RDR


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




FABIUS-POMPEY CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 42-06-01-04
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




WESTHILL CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 42-07-01-06
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




SOLVAY UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 42-07-02-03
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




LAFAYETTE CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 42-08-07-04
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




BALDWINSVILLE CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 42-09-01-06
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
09-0685    Reconstruction               0-006-011  07/15/10   2,155,16                       0      660,000     /  /                /  /       /  /        /  /    HCM
09-0687    Reconstruction               0-011-009  07/15/10   2,155,15,16                    0    2,100,000     /  /                /  /       /  /        /  /    HCM


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




FAYETTEVILLE-MANLIUS CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 42-10-01-06
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
99-0762    Reconstruction               7-001-001  05/05/00   155,15,16                      0       12,000     /  /                /  /       /  /        /  /    BJB


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




MARCELLUS CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 42-11-01-06
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
09-1127    Reconstruction               0-001-014  06/14/10   16                             0       46,366     /  /                /  /       /  /        /  /    DDJ
09-1128    Reconstruction               0-002-008  06/14/10   16                             0       19,230     /  /                /  /       /  /        /  /    DDJ
03-0138    Reconstruction               0-003-003  09/04/03   2,15,16                        0       93,600     /  /                /  /       /  /        /  /    DDJ
04-0890    Reconstruction               0-005-012  12/19/05   2,4,7,8,9,10,155,15,           0    3,527,317     /  /                /  /       /  /        /  /    DDJ
09-1129    Reconstruction               0-005-015  06/14/10   16                             0       59,358     /  /                /  /       /  /        /  /    DDJ
04-0891    Reconstruction               5-006-002  12/19/05   2,10,155,15,16                 0      116,869     /  /                /  /       /  /        /  /    DDJ
09-1130    Reconstruction               5-012-002  06/14/10   16                             0       10,046     /  /                /  /       /  /        /  /    DDJ
04-0668    Reconstruction               7-009-002  03/21/05   2,4,8,155,15,16                0       27,450     /  /                /  /       /  /        /  /    DDJ
99-0916    New Construction             7-010-001  03/01/00   02 - 16                        0        5,000     /  /                /  /       /  /      04/01/02  BJB


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




ONONDAGA CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 42-12-01-04
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
06-0438    New Construction             7-010-001  06/04/07   02 - 16                        0    1,278,159     /  /                /  /       /  /        /  /    DDJ


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




LIVERPOOL CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 42-15-01-06
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
98-1318    Reconstruction               0-001-003  07/27/99   2,155,16                       0      917,276     /  /                /  /       /  /        /  /    RDR
99-1384    Reconstruction               0-001-005  06/20/00   155,15,16                      0       19,443     /  /                /  /       /  /      08/29/03  RDR
99-1386    Reconstruction               0-002-007  06/20/00   155,15,16                      0      335,986     /  /                /  /       /  /      08/27/03  RDR
98-1319    Reconstruction               0-003-003  07/27/99   155,16                         0      206,360     /  /                /  /       /  /        /  /    RDR
99-1385    Reconstruction               0-003-005  06/20/00   155,15,16                      0       18,272     /  /                /  /       /  /      08/29/03  RDR
99-1387    Reconstruction               0-004-005  06/20/00   155,15,16                      0      159,959     /  /                /  /       /  /      08/29/03  RDR
99-1388    Reconstruction               0-005-006  06/20/00   155,15,16                      0      258,512     /  /                /  /       /  /      08/29/03  RDR
99-1389    Reconstruction               0-007-003  06/20/00   155,15,16                      0      226,038     /  /                /  /       /  /      08/29/03  RDR
02-1916    Reconstruction               0-007-005  05/21/03   2,9,10                         0      127,725     /  /                /  /       /  /      09/02/03  MAC
05-0439    Reconstruction               0-007-007  02/15/06   2,4,7,8,9,155                  0    5,435,506     /  /                /  /       /  /      08/21/07  DDJ
98-1320    Reconstruction               0-009-004  07/27/99   155,16                         0    1,032,715     /  /                /  /       /  /        /  /    RDR
99-1390    Reconstruction               0-009-006  06/20/00   16                             0       32,255     /  /                /  /       /  /      08/29/03  RDR
98-1321    Reconstruction               0-010-005  07/27/99   155,16                         0    1,062,810     /  /                /  /       /  /        /  /    RDR
99-1391    Reconstruction               0-010-007  06/20/00   155,15,16                      0       36,018     /  /                /  /       /  /      08/29/03  RDR
99-1392    Reconstruction               0-012-003  06/20/00   155,15,16                      0      243,118     /  /                /  /       /  /      08/29/03  RDR
05-0725    Reconstruction               0-012-005  05/03/06   7                              0    1,134,000     /  /                /  /       /  /      05/08/07  DDJ
99-1393    Reconstruction               0-014-005  06/20/00   155,15,16                      0      247,887     /  /                /  /       /  /      08/29/03  RDR
99-1394    Reconstruction               0-015-003  06/20/00   155,15,16                      0      193,010     /  /                /  /       /  /      08/29/03  RDR
98-1322    Reconstruction               0-016-007  07/27/99   155,16                         0    5,431,616     /  /                /  /       /  /        /  /    RDR
99-1395    Reconstruction               0-016-011  06/20/00   16                             0    1,956,558     /  /                /  /       /  /      08/29/03  RDR
98-1323    Reconstruction               0-018-008  07/27/99   155,16                         0      232,541     /  /                /  /       /  /        /  /    RDR
99-1396    Reconstruction               0-018-010  06/20/00   155,15,16                      0       61,934     /  /                /  /       /  /      08/29/03  RDR
99-0126    Reconstruction               0-019-007  08/20/99   155,16                         0    2,600,390     /  /                /  /       /  /      02/04/04  RDR
99-1397    Reconstruction               0-024-004  06/20/00   155,15,16                      0      182,151     /  /                /  /       /  /      08/29/03  RDR
99-1398    Reconstruction               4-011-001  06/20/00   155,15,16                      0      171,208     /  /                /  /       /  /      08/29/03  RDR
99-1399    Reconstruction               5-008-002  06/20/00   155,15,16                      0       83,013     /  /                /  /       /  /      08/29/03  RDR
98-0630    New Construction             7-025-001  03/10/99   02 - 16                        0      122,000     /  /                /  /       /  /      10/29/99  MEM
99-1536    New Construction             7-027-001  07/14/00   02 - 16                        0       75,000     /  /                /  /       /  /      06/12/02  RDR
07-0411    New Construction             7-031-001  01/02/08   02 - 16                        0       63,000     /  /                /  /       /  /        /  /    DDJ


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




LYNCOURT UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 42-15-04-02
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
99-1607    Reconstruction               0-002-004  08/03/00   15,16                          0       87,000     /  /                /  /       /  /      01/03/01  BJB
00-1188    Reconstruction               0-002-005  04/12/01   8                              0      241,000     /  /                /  /       /  /      02/25/02  BJB


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




SKANEATELES CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 42-16-01-06
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
00-1692SR  Additions and Alterations    0-002-011  06/04/01   02 - 16                        0            0     /  /                /  /       /  /        /  /    BJB
07-1242    Additions and Alterations    0-002-013  03/06/08   02 - 16                        0    5,951,502     /  /                /  /       /  /      09/25/09  JOD
00-1693SR  Additions and Alterations    0-007-006  06/04/01   02 - 16                        0            0     /  /                /  /       /  /        /  /    BJB
07-1243    Reconstruction               5-003-003  03/06/08   2,4,7,8,9,155,15,16            0      803,444     /  /                /  /       /  /      09/02/08  JOD
07-2293    Reconstruction               5-003-004  08/22/08   7                              0       66,900     /  /                /  /       /  /      01/27/09  JOD


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




SYRACUSE CITY SCHOOL DISTRICT: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 42-18-00-01
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
09-1477    Reconstruction               0-004-010  09/30/10   2,4,7,8,9,10,155,15,           0      865,000     /  /                /  /       /  /        /  /    MGL
03-0112    Reconstruction               0-005-005  08/18/03   2,4,7,8,9,155,15,16            0    1,715,409     /  /                /  /       /  /        /  /    RDR
02-2364    Reconstruction               0-006-008  08/01/03   2,4                            0      130,000     /  /                /  /       /  /        /  /    RDR
06-0170    Reconstruction               0-006-009  10/16/06   10,155,15,16                   0      150,000     /  /                /  /       /  /      08/31/07  RDR
01-0109    Reconstruction               0-010-003  12/10/01   4                              0       31,200     /  /                /  /       /  /      05/13/02  RDR
03-0117    Reconstruction               0-016-007  08/18/03   2,4,7,8,9,155,15,16            0      201,298     /  /                /  /       /  /        /  /    RDR
10-0371    Additions and Alterations    0-050-007  12/21/10   02 - 16                        0   25,978,728     /  /                /  /       /  /        /  /    HCM
10-0372    Reconstruction               0-050-008  12/21/10   155,16                         0    1,667,857     /  /                /  /       /  /        /  /    HCM
10-0491    Additions and Alterations    0-050-009  12/21/10   02 - 16                        0    2,000,818     /  /                /  /       /  /        /  /    HCM
03-0113    Reconstruction               0-101-015  08/13/03   2,4,7,8,155,15,16              0      346,000     /  /                /  /       /  /      09/28/04  RDR
03-0114    Reconstruction               0-104-009  08/18/03   2,4,7,8,9,155,15,16            0      956,436     /  /                /  /       /  /        /  /    RDR
05-0245    Reconstruction               0-105-009  01/04/06   2,155,16                       0      247,500     /  /                /  /       /  /        /  /    RDR
03-0115    Reconstruction               0-112-008  09/11/03   2,4,7,8,155,15,16              0    2,000,000     /  /                /  /       /  /      09/13/04  RDR
03-0116    Reconstruction               0-123-024  08/18/03   2,4,8,9,10,155,15,16           0    2,000,000     /  /                /  /       /  /        /  /    RDR
10-0488    Additions and Alterations    0-125-009  12/30/10   02 - 16                        0   28,232,605     /  /                /  /       /  /        /  /    HCM
10-0490    Additions and Alterations    0-125-010  12/30/10   02 - 16                        0      705,600     /  /                /  /       /  /        /  /    HCM
10-0489    Additions and Alterations    0-125-011  12/30/10   02 - 16                        0    1,598,794     /  /                /  /       /  /        /  /    HCM
03-0118    Reconstruction               0-126-009  08/18/03   2,8,155,16                     0      158,160     /  /                /  /       /  /        /  /    RDR
06-0029    Reconstruction               7-999-006  10/11/06   13                             0      180,000     /  /                /  /       /  /      01/31/08  RDR
04-0720    Reconstruction               8-131-L02  02/10/05                                  0            0     /  /                /  /       /  /        /  /    RDR


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




TULLY CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 42-19-02-04
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
00-0649    Additions and Alterations    0-002-003  02/17/01   02 - 16                        0       41,000     /  /                /  /       /  /        /  /    MGL
05-0107    New Construction             0-007-001  01/20/06   02 - 16                        0       85,000     /  /                /  /       /  /      01/30/07  DDJ
01-1049    Additions and Alterations    4-004-004  12/23/02   02 - 16                        0      306,892     /  /                /  /       /  /        /  /    MGL


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




BOCES ONONDAGA-CORTLAND-MADISON: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 42-90-00-00
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
02-1236    Reconstruction               0-008-008  06/23/03   2,8,155,15,16                  0    1,633,000     /  /                /  /       /  /        /  /    MAC
05-1382    Reconstruction               8-027-001  07/27/06                                  0            0     /  /                /  /       /  /        /  /    JOD


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition