Projects Without Final Cost Reports

Projects Without Final Cost Reports

THE STATE EDUCATION DEPARTMENT

FACILITIES PLANNING


UPDATED: 10/24/12 at 11:36:16




CLARKSTOWN CENTRAL SCHOOL DISTRICT: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 50-01-01-06
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
07-0036    Additions and Alterations    0-001-010  02/04/08   02 - 16                        0       70,000     /  /                /  /       /  /        /  /    HCM
01-0806    Reconstruction               0-003-007  06/07/02   2,9,10                         0       48,060     /  /                /  /       /  /        /  /    MGL
01-0864    Reconstruction               0-006-007  11/27/02   8,9,155,15,16                  0      171,046     /  /                /  /       /  /        /  /    MGL
06-0564    Reconstruction               0-007-011  05/17/07   2,15                           0       35,000     /  /                /  /       /  /        /  /    HCM
05-0682    Reconstruction               0-011-007  05/23/06   2,155,15,16                    0    1,238,413     /  /                /  /       /  /      09/04/07  HCM
11-0266    Reconstruction               0-011-010  09/27/10   10                             0      204,645     /  /                /  /       /  /        /  /    HCM
03-1440    Reconstruction               0-012-016  04/13/05   4,155                          0      120,000     /  /                /  /       /  /        /  /    HCM
00-0017    Reconstruction               0-018-007  07/28/00   2,16                           0      350,000     /  /                /  /       /  /        /  /    MGL
03-1441    Reconstruction               0-018-014  04/13/05   8,9,155,16                     0       56,500     /  /                /  /       /  /      01/24/07  HCM


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




NANUET UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 50-01-08-03
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
03-0334    Reconstruction               0-001-010  10/15/04   2                              0      830,895     /  /                /  /       /  /      08/31/05  HCM
07-0065    Reconstruction               0-001-013  07/24/07   8,10,13,155,16                 0            0     /  /                /  /       /  /        /  /    HCM
07-0989    Reconstruction               0-001-014  05/09/08   7,8,155,16                     0       67,285     /  /                /  /       /  /        /  /    HCM
09-0974    Reconstruction               0-001-015  08/19/10   10,13,155,16                   0      452,891     /  /                /  /       /  /        /  /    HCM
03-0064    Additions and Alterations    0-002-008  05/07/04   02 - 16                        0    5,972,825     /  /                /  /       /  /      12/02/05  HCM
09-0975    Reconstruction               0-002-012  08/19/10   10,13,155,16                   0      736,852     /  /                /  /       /  /        /  /    HCM
99-1075    Reconstruction               0-003-010  03/21/00   2,16                           0            0     /  /                /  /       /  /        /  /    BJB
04-1427    Reconstruction               0-003-016  07/19/05   2,9,16                         0      304,000     /  /                /  /       /  /      08/31/05  HCM
09-0976    Reconstruction               0-003-020  08/19/10   10,13,155,16                   0      702,746     /  /                /  /       /  /        /  /    HCM
03-0065    Reconstruction               0-004-008  05/07/04   2,8,9,16                       0    8,991,161     /  /                /  /       /  /      08/31/05  HCM
09-0977    Reconstruction               0-004-012  08/19/10   10,13,155,16                   0      427,481     /  /                /  /       /  /        /  /    HCM
06-1677    New Construction             7-010-001  09/12/08   02 - 16                        0            0     /  /                /  /       /  /        /  /    HCM


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




NORTH ROCKLAND/HAVERSTRAW-STONY PT: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 50-02-01-06
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
01-0285    Reconstruction               0-007-010  02/08/02   155,15,16                      0       92,650     /  /                /  /       /  /        /  /    MAC
08-1452    Reconstruction               0-014-006  07/24/09   15                             0      500,000     /  /                /  /       /  /        /  /    HCM
00-1868    Additions and Alterations    0-016-016  06/12/01   02 - 16                        0    1,175,000     /  /                /  /       /  /      01/18/02  RDR
03-1071    Reconstruction               0-016-017  05/24/04   2                              0      327,000     /  /                /  /       /  /      02/09/06  MAC
04-0319    Reconstruction               0-016-018  11/05/04   2                              0      151,000     /  /                /  /       /  /        /  /    MAC
01-0284    Reconstruction               0-024-007  02/08/02   155,15,16                      0      114,450     /  /                /  /       /  /        /  /    MAC
08-1453    Reconstruction               0-024-009  07/24/09   15                             0      500,000     /  /                /  /       /  /        /  /    HCM
99-0303    Reconstruction               0-025-009  10/07/99   9,155                          0      750,000     /  /                /  /       /  /        /  /    BJB
03-1192    Reconstruction               0-025-011  04/09/04   7                              0      895,000     /  /                /  /       /  /        /  /    MAC
01-1106SR  New Construction             0-031-001  05/23/02   02 - 16                        0            0     /  /                /  /       /  /      09/23/04  MAC
03-1651    Reconstruction               0-042-002  01/26/05   8                              0      580,295     /  /                /  /       /  /        /  /    MAC
06-1525    Reconstruction               0-042-003  06/05/07   7                              0      425,000     /  /                /  /       /  /        /  /    HCM
02-0124    Reconstruction               8-030-005  09/17/02   7                              0      477,000     /  /                /  /       /  /        /  /    MAC
03-1563    Reconstruction               8-030-009  07/23/04   155                            0       50,000     /  /                /  /       /  /      09/03/04  MAC
07-1769    Reconstruction               8-030-010  07/29/08   2                              0      316,500     /  /                /  /       /  /        /  /    HCM


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




SOUTH ORANGETOWN CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 50-03-01-06
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




NYACK UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 50-03-04-03
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
09-1358    Reconstruction               0-001-009  07/16/10   8                              0      430,000     /  /                /  /       /  /        /  /    DDJ
00-0158    Reconstruction               0-003-006  09/26/00   2,16                           0      270,000     /  /                /  /       /  /        /  /    MGL
02-0344    Reconstruction               0-003-FP1  06/24/03   16                             0        4,675     /  /                /  /       /  /      08/01/03  MGL


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




PEARL RIVER UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 50-03-08-03
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
04-0624    Additions and Alterations    0-002-008  04/07/05   02 - 16                        0    2,234,346     /  /                /  /       /  /        /  /    HCM
08-0552    Reconstruction               0-002-009  03/03/09   4,9,15                         0      100,500     /  /                /  /       /  /        /  /    HCM
04-0625    Additions and Alterations    0-003-009  04/07/05   02 - 16                        0    1,187,938     /  /                /  /       /  /        /  /    HCM
03-1448    Reconstruction               0-003-010  06/01/04   155                            0      534,800     /  /                /  /       /  /        /  /    HCM
02-2083    Reconstruction               0-009-013  05/01/03   2                              0      156,000     /  /                /  /       /  /        /  /    HCM
04-0626    Additions and Alterations    0-009-014  04/07/05   02 - 16                        0    7,019,754     /  /                /  /       /  /        /  /    HCM
03-1447    Reconstruction               0-009-015  06/01/04   2,7                            0      709,200     /  /                /  /       /  /        /  /    HCM
08-1055    Reconstruction               0-009-016  06/01/09   16                             0      860,000     /  /                /  /       /  /        /  /    HCM
04-0627    Additions and Alterations    0-010-007  04/07/05   02 - 16                        0    1,949,747     /  /                /  /       /  /        /  /    HCM
08-0553    Reconstruction               0-010-008  03/03/09   4,8,9,10,15                    0       65,000     /  /                /  /       /  /        /  /    HCM
02-2082    Reconstruction               0-011-011  05/01/03   2                              0      102,000     /  /                /  /       /  /        /  /    HCM
04-0628    Additions and Alterations    0-011-012  04/07/05   02 - 16                        0    3,686,400     /  /                /  /       /  /        /  /    HCM
08-1056    Reconstruction               0-011-013  06/01/09   16                             0      405,000     /  /                /  /       /  /        /  /    HCM
08-0550    Reconstruction               0-011-014  12/15/08   7                              0      484,000     /  /                /  /       /  /        /  /    HCM


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




RAMAPO CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 50-04-01-06
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




EAST RAMAPO CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 50-04-02-06
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
05-0368    Reconstruction               0-003-014  03/08/06   155,16                         0    2,145,303     /  /                /  /       /  /      06/25/07  HCM
08-0419    Reconstruction               0-003-016  10/06/08   2,9                            0      250,000     /  /                /  /       /  /        /  /    HCM
03-0167    Reconstruction               0-005-006  08/11/03   155                            0      300,000     /  /                /  /       /  /        /  /    HCM
03-0168    Reconstruction               0-006-008  08/11/03   8,9,10,15,16                   0      214,000     /  /                /  /       /  /        /  /    HCM
03-0169    Reconstruction               0-008-009  08/11/03   2                              0      300,000     /  /                /  /       /  /        /  /    HCM
02-2481    Reconstruction               0-011-006  07/08/03   7                              0      700,000     /  /                /  /       /  /        /  /    MGL
03-0170    Reconstruction               0-011-007  08/11/03   7,9,10,15,16                   0      340,000     /  /                /  /       /  /        /  /    HCM
05-0671    Reconstruction               0-011-008  03/06/06   155,16                         0      110,000     /  /                /  /       /  /      12/06/06  HCM
03-0171    Reconstruction               0-013-011  08/11/03   8,9,155,15,16                  0      103,000     /  /                /  /       /  /        /  /    HCM
03-0172    Reconstruction               0-014-010  08/11/03   8,9,10,15,16                   0       90,000     /  /                /  /       /  /        /  /    HCM
03-0173    Reconstruction               0-015-010  08/11/03   2,4,7,8,9,10,155,15,           0      107,000     /  /                /  /       /  /        /  /    HCM
08-0960    Reconstruction               0-015-012  01/30/09   2,4                            0       80,000     /  /                /  /       /  /        /  /    HCM
08-0961    Reconstruction               0-016-011  01/30/09   4                              0       80,000     /  /                /  /       /  /        /  /    HCM
03-0174    Additions and Alterations    0-020-006  08/11/03   02 - 16                        0      130,000     /  /                /  /       /  /        /  /    HCM
03-0175    Additions and Alterations    0-022-012  08/11/03   02 - 16                        0      200,000     /  /                /  /       /  /        /  /    HCM
03-0176    Reconstruction               0-027-009  08/11/03   2,9,10,15,16                   0      215,000     /  /                /  /       /  /        /  /    HCM
03-0177    Reconstruction               0-030-007  08/11/03   4,9,10,15,16                   0      215,000     /  /                /  /       /  /        /  /    HCM
03-0178    Reconstruction               0-034-010  08/11/03   2,4,8,9,155,16                 0      107,000     /  /                /  /       /  /        /  /    HCM
03-0179    Reconstruction               0-037-009  08/11/03   4,8,9,10,15,16                 0      215,000     /  /                /  /       /  /        /  /    HCM
03-0180    Reconstruction               0-038-009  08/11/03   2,4,9,10,15,16                 0      215,000     /  /                /  /       /  /        /  /    HCM
07-0383    New Construction             7-054-001  09/18/07   02 - 16                        0      100,000     /  /                /  /       /  /        /  /    HCM


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




EDWIN GOULD ACAD-LAKESIDE RAMAPO UFS: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 50-04-14-02
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




BOCES ROCKLAND: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 50-90-00-00
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition