Projects Without Final Cost Reports

Projects Without Final Cost Reports

THE STATE EDUCATION DEPARTMENT

FACILITIES PLANNING


UPDATED: 10/24/12 at 11:36:16




BABYLON UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-01-01-03
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




WEST BABYLON UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-01-02-03
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




NORTH BABYLON UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-01-03-02
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




NORTH BABYLON UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-01-03-03
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
04-0365    Reconstruction               0-002-032  12/23/04   2,15,16                        0      250,000     /  /                /  /       /  /        /  /    DDJ
08-0332    Reconstruction               0-002-035  03/05/09   2,4,9,155,16                   0    1,275,000     /  /                /  /       /  /        /  /    DDJ
08-0333    Reconstruction               0-003-019  03/05/09   2,16                           0      191,000     /  /                /  /       /  /        /  /    DDJ
99-0352    Reconstruction               0-004-022  05/31/00   4                              0       22,000     /  /                /  /       /  /        /  /    MGL
08-0334    Reconstruction               0-004-025  03/05/09   7,9,13,155,16                  0      195,000     /  /                /  /       /  /        /  /    DDJ
08-0335    Reconstruction               0-007-019  03/05/09   2,16                           0      200,000     /  /                /  /       /  /        /  /    DDJ
08-0336    Reconstruction               0-008-019  03/05/09   2,9,16                         0       50,000     /  /                /  /       /  /        /  /    DDJ
04-0366    Reconstruction               0-009-002  12/23/04   2,15                           0      124,500     /  /                /  /       /  /        /  /    DDJ
00-1156    Reconstruction               0-009-005  06/27/01   2,4,7,8,9,155,15,16            0      200,000     /  /                /  /       /  /        /  /    MGL
99-1651    Reconstruction               0-009-006  07/27/00   16                             0      203,000     /  /                /  /       /  /        /  /    MGL
01-0959    Reconstruction               0-009-007  05/21/02   15                             0       50,000     /  /                /  /       /  /        /  /    MGL
04-0367    Reconstruction               0-010-015  12/23/04   2,15,16                        0      124,500     /  /                /  /       /  /        /  /    DDJ
08-0337    Reconstruction               0-010-022  03/05/09   9,16                           0       65,000     /  /                /  /       /  /        /  /    DDJ
04-0368    Reconstruction               0-011-020  12/23/04   2,15,16                        0      151,000     /  /                /  /       /  /        /  /    DDJ
08-0338    Reconstruction               0-011-024  03/05/09   9,155,16                       0      260,000     /  /                /  /       /  /        /  /    DDJ
00-0692    Reconstruction               5-012-002  04/11/01   2,4,7,8,9,155,15,16            0      216,000     /  /                /  /       /  /        /  /    MGL
08-0339    Additions and Alterations    5-012-006  03/05/09   02 - 16                        0    1,343,000     /  /                /  /       /  /        /  /    DDJ


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




LINDENHURST UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-01-04-03
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
03-1041    Reconstruction               0-002-019  06/21/04   2,10                           0      146,000     /  /                /  /       /  /        /  /    JOD


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




COPIAGUE UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-01-05-03
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
01-0584    Reconstruction               0-001-015  04/08/02   2                              0       45,000     /  /                /  /       /  /        /  /    HCM
01-0585    Reconstruction               0-002-011  04/08/02   2                              0       75,000     /  /                /  /       /  /        /  /    HCM
01-0586    Reconstruction               0-004-014  04/08/02   2,10                           0      135,000     /  /                /  /       /  /        /  /    HCM
02-1218GP  Reconstruction               0-004-FP1  03/17/03   16                             0            0     /  /                /  /       /  /        /  /    MGL
01-0587    Reconstruction               0-005-016  04/08/02   2,8                            0       70,000     /  /                /  /       /  /        /  /    HCM
01-0588    Reconstruction               0-006-012  04/08/02   10,13                          0      150,000     /  /                /  /       /  /        /  /    HCM
07-0729    Reconstruction               0-006-019  12/11/07   2,15                           0      100,000     /  /                /  /       /  /        /  /    DDJ
01-1210    New Construction             7-009-001  05/01/02   02 - 16                        0       54,000     /  /                /  /       /  /      09/01/05  HCM


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




AMITYVILLE UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-01-06-03
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
07-0099    Reconstruction               0-001-010  09/11/07   15                             0       45,000     /  /                /  /       /  /        /  /    MGL
06-0194    Reconstruction               0-003-009  03/14/07   2                              0       75,000     /  /                /  /       /  /        /  /    MGL
06-1388    Reconstruction               0-003-010  09/12/07   15                             0       45,000     /  /                /  /       /  /        /  /    MGL
98-1151    Additions and Alterations    0-004-007  04/15/99   02 - 16                        0    1,193,881     /  /                /  /       /  /      09/09/99  RDR
06-0193    Reconstruction               0-004-008  03/14/07   2                              0      105,000     /  /                /  /       /  /        /  /    MGL
06-1389    Reconstruction               0-004-009  09/12/07   15                             0       45,000     /  /                /  /       /  /        /  /    MGL
07-0100    Reconstruction               0-008-013  09/11/07   15                             0       45,000     /  /                /  /       /  /        /  /    MGL
98-1124    New Construction             0-020-001  06/02/99   02 - 16                        0      105,872     /  /                /  /       /  /      09/09/99  RDR
98-1164    New Construction             0-021-001  06/02/99   02 - 16                        0       58,783     /  /                /  /       /  /      09/09/99  RDR


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




DEER PARK UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-01-07-03
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
02-1064    Reconstruction               0-001-007  02/21/03   8                              0      347,000     /  /                /  /       /  /        /  /    MAC
00-1424    Reconstruction               0-008-027  04/02/01   7                              0    1,949,500     /  /                /  /       /  /        /  /    MAC
05-0339    Reconstruction               7-999-001  06/14/06   16                             0      424,530     /  /                /  /       /  /        /  /    MAC


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




WYANDANCH UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-01-09-02
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
05-0657    Reconstruction               0-002-017  02/07/06   15                             0       32,500     /  /                /  /       /  /      08/14/07  DDJ
05-1181    Reconstruction               0-002-018  07/05/06   155,15                         0       27,000     /  /                /  /       /  /        /  /    DDJ
06-1040    Reconstruction               0-002-020  06/22/07   8,9,10,15,16                   0      428,000     /  /                /  /       /  /      02/11/09  DDJ
08-1547    Reconstruction               0-002-023  05/13/09   2,9                            0      100,000     /  /                /  /       /  /        /  /    DDJ
05-0159    Reconstruction               0-004-013  02/07/06   15                             0       32,500     /  /                /  /       /  /      08/14/07  DDJ
05-1182    Reconstruction               0-004-014  07/06/06   2,155,15                       0       51,400     /  /                /  /       /  /        /  /    DDJ
09-0582    Reconstruction               0-004-018  12/23/09   7                              0      725,000     /  /                /  /       /  /        /  /    DDJ
02-1710    Reconstruction               0-005-012  05/05/03   7                              0      710,000     /  /                /  /       /  /        /  /    MGL
05-0160    Reconstruction               0-005-014  02/07/06   15                             0       32,500     /  /                /  /       /  /      08/14/07  DDJ
05-1183    Reconstruction               0-005-015  07/06/06   155,15,16                      0        8,800     /  /                /  /       /  /        /  /    DDJ
05-1184    Reconstruction               5-007-005  07/05/06   2                              0       22,300     /  /                /  /       /  /        /  /    DDJ


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




THREE VILLAGE CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-02-01-06
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
06-1596    Reconstruction               0-001-026  10/25/07   2,8,9,10,155,15,16             0      567,130     /  /                /  /       /  /      11/14/08  DDJ
06-0613    Reconstruction               0-008-022  12/28/06   15,16                          0       19,916     /  /                /  /       /  /      09/10/07  DDJ
05-0187    Reconstruction               0-009-026  09/14/05   155                            0       60,000     /  /                /  /       /  /        /  /    DDJ
05-0192    Reconstruction               0-015-018  10/18/05   2,155,15                       0       40,475     /  /                /  /       /  /        /  /    DDJ
06-0614    Reconstruction               0-015-020  12/28/06   15,16                          0       19,916     /  /                /  /       /  /      09/10/07  DDJ
07-1824    Reconstruction               0-018-014  09/11/08   2,4,7,8,9,155,15,16            0    2,966,048     /  /                /  /       /  /      07/17/09  DDJ
02-0250    New Construction             7-030-001  09/24/02   02 - 16                        0      150,000     /  /                /  /       /  /      02/09/06  HCM
08-0456    Reconstruction               7-999-004  12/11/08   13,16                          0    1,156,400     /  /                /  /       /  /        /  /    DDJ


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




BROOKHAVEN-COMSEWOGUE UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-02-03-02
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
04-0062    Reconstruction               0-002-012  04/01/05   155,16                         0      411,557     /  /                /  /       /  /        /  /    MAC
04-0063    Reconstruction               0-003-009  04/01/05   155,16                         0      633,450     /  /                /  /       /  /        /  /    MAC
04-0064    Reconstruction               0-004-008  04/01/05   2,155,16                       0    1,250,703     /  /                /  /       /  /        /  /    MAC
04-0065    Reconstruction               0-005-009  04/01/05   155,16                         0      197,895     /  /                /  /       /  /        /  /    MAC
99-1772    Reconstruction               0-010-007  08/16/00   2,15,16                        0      130,000     /  /                /  /       /  /        /  /    BJB
04-0066    Reconstruction               0-010-012  04/01/05   155,16                         0      493,924     /  /                /  /       /  /        /  /    MAC
02-0478    Reconstruction               0-010-FP1  12/02/02   16                             0       38,784     /  /                /  /       /  /      05/30/03  MGL
04-0067    Reconstruction               0-011-007  04/01/05   155,16                         0      188,466     /  /                /  /       /  /        /  /    MAC


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




SACHEM CENTRAL SCHOOL DISTRICT: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-02-05-06
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
08-1552    Reconstruction               0-001-005  03/18/10   2,155,15,16                    0       97,527     /  /                /  /       /  /        /  /    DDJ
01-0289    Additions and Alterations    0-002-006  12/18/01   02 - 16                        0    3,427,096     /  /                /  /       /  /      11/11/03  MGL
99-0016    Reconstruction               0-002-010  11/10/99   8,9                            0       17,360     /  /                /  /       /  /        /  /    RDR
08-1553    Reconstruction               0-002-016  03/18/10   2,155,15,16                    0      499,691     /  /                /  /       /  /        /  /    DDJ
08-1554    Reconstruction               0-003-017  03/18/10   2,155,15,16                    0      515,408     /  /                /  /       /  /        /  /    DDJ
08-1555    Reconstruction               0-004-014  03/18/10   2,155,15,16                    0      393,731     /  /                /  /       /  /        /  /    DDJ
08-1556    Reconstruction               0-006-013  03/18/10   2,155,15,16                    0      954,816     /  /                /  /       /  /        /  /    DDJ
08-1557    Reconstruction               0-007-015  03/18/10   2,155,15,16                    0    1,654,535     /  /                /  /       /  /        /  /    DDJ
08-1558    Reconstruction               0-008-024  03/18/10   2,155,16                       0    1,305,742     /  /                /  /       /  /        /  /    DDJ
00-1315    Reconstruction               0-010-013  10/13/01   8,9,15,16                      0      209,420     /  /                /  /       /  /        /  /    MGL
08-1559    Reconstruction               0-010-019  03/18/10   2,155,15,16                    0      868,426     /  /                /  /       /  /        /  /    DDJ
08-1560    Reconstruction               0-011-015  03/18/10   2,155,15,16                    0      444,358     /  /                /  /       /  /        /  /    DDJ
08-1561    Reconstruction               0-012-012  03/18/10   2,155,15,16                    0      421,815     /  /                /  /       /  /        /  /    DDJ
08-1562    Reconstruction               0-013-017  03/18/10   2,155,15,16                    0      457,539     /  /                /  /       /  /        /  /    DDJ
00-0717    Additions and Alterations    0-014-009  04/19/01   02 - 16                        0      450,000     /  /                /  /       /  /        /  /    MGL
08-1563    Reconstruction               0-014-015  03/18/10   2,155,15,16                    0      397,406     /  /                /  /       /  /        /  /    HCM
08-1564    Reconstruction               0-015-014  03/18/10   2,155,15,16                    0      396,630     /  /                /  /       /  /        /  /    DDJ
08-1565    Reconstruction               0-016-024  03/18/10   2,155,15,16                    0    2,040,975     /  /                /  /       /  /        /  /    DDJ
08-1566    Reconstruction               0-017-014  03/18/10   2,155,15,16                    0    1,126,655     /  /                /  /       /  /        /  /    DDJ
08-1567    Reconstruction               0-018-012  03/18/10   2,155,15,16                    0      424,316     /  /                /  /       /  /        /  /    DDJ
08-1568    Reconstruction               0-019-015  03/18/10   2,155,15,16                    0      928,489     /  /                /  /       /  /        /  /    DDJ
99-0914    New Construction             0-049-001  04/24/00   02 - 16                        0       27,540     /  /                /  /       /  /      09/01/00  RDR
01-0225SR  New Construction             0-050-001  11/05/01   02 - 16                        0            0     /  /                /  /       /  /        /  /    MGL
08-1569    Reconstruction               0-050-003  03/18/10   2,155,15,16                    0    1,724,587     /  /                /  /       /  /        /  /    DDJ
09-1082    Reconstruction               0-050-004  03/15/10   7                              0    2,530,000     /  /                /  /       /  /        /  /    DDJ
08-1570    Reconstruction               0-051-004  03/18/10   2,155,15,16                    0      949,212     /  /                /  /       /  /        /  /    DDJ
08-1572    Reconstruction               5-021-007  03/18/10   2,155,16                       0      168,479     /  /                /  /       /  /        /  /    DDJ
01-0529    New Construction             7-067-001  03/20/02   02 - 16                        0      436,100     /  /                /  /       /  /        /  /    MGL
01-0976    New Construction             7-068-001  03/20/02   02 - 16                        0            0     /  /                /  /       /  /        /  /    MGL
01-0977    New Construction             7-069-001  03/20/02   02 - 16                        0            0     /  /                /  /       /  /        /  /    MGL
07-1970    New Construction             7-070-001  09/24/08   02 - 16                        0       40,000     /  /                /  /       /  /        /  /    DDJ
07-1511    Reconstruction               7-077-002  02/27/08   2                              0       18,500     /  /                /  /       /  /        /  /    DDJ


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




PORT JEFFERSON UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-02-06-02
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
09-1578    Reconstruction               0-001-013  08/12/10   16                             0      211,213     /  /                /  /       /  /        /  /    HCM
09-1579    Reconstruction               0-002-014  08/12/10   16                             0       64,582     /  /                /  /       /  /        /  /    HCM
10-0402    Additions and Alterations    0-002-015  12/10/10   02 - 16                        0      402,930     /  /                /  /       /  /        /  /    HCM
09-1580    Reconstruction               0-004-001  08/12/10   16                             0       20,827     /  /                /  /       /  /        /  /    HCM
09-1581    Reconstruction               0-005-001  08/12/10   16                             0       10,000     /  /                /  /       /  /        /  /    HCM


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




MOUNT SINAI UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-02-07-02
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




MILLER PLACE UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-02-08-02
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
08-0825    Reconstruction               0-001-012  04/29/09   8,9,155,15,16                  0      486,979     /  /                /  /       /  /        /  /    DDJ
09-0525    Reconstruction               0-001-013  05/14/10   8,9,155,15,16                  0    2,424,900     /  /                /  /       /  /        /  /    DDJ
06-0824    Additions and Alterations    0-002-010  02/13/07   02 - 16                        0      148,200     /  /                /  /       /  /        /  /    DDJ
08-0826    Reconstruction               0-002-011  04/29/09   8,9,155,15,16                  0      868,750     /  /                /  /       /  /        /  /    DDJ
09-0526    Additions and Alterations    0-002-012  05/14/10   02 - 16                        0    2,829,904     /  /                /  /       /  /        /  /    DDJ
08-0827    Reconstruction               0-003-010  04/29/09   8,9,155,15,16                  0      664,500     /  /                /  /       /  /        /  /    DDJ
09-0527    Reconstruction               0-003-011  05/14/10   16                             0    4,702,300     /  /                /  /       /  /        /  /    DDJ
08-0828    Reconstruction               0-006-021  04/29/09   8,9,155,15,16                  0    1,755,771     /  /                /  /       /  /        /  /    DDJ
09-0528    Additions and Alterations    0-006-022  05/14/10   02 - 16                        0   15,442,896     /  /                /  /       /  /        /  /    DDJ


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




ROCKY POINT UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-02-09-02
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
99-0163    Reconstruction               0-005-005  08/25/99   2                              0       21,900     /  /                /  /       /  /        /  /    MGL


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




MIDDLE COUNTRY CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-02-11-06
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
06-1289    Reconstruction               5-007-001  12/10/07   2,155,16                       0      606,000     /  /                /  /       /  /        /  /    JOD
09-0617    Reconstruction               5-007-003  02/12/10   15                             0       44,000     /  /                /  /       /  /        /  /    JOD


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




LONGWOOD CENTRAL SCHOOL DISTRICT: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-02-12-06
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




SOUTH MANOR UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-02-21-02
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




PATCHOGUE-MEDFORD UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-02-24-03
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
04-1416    Additions and Alterations    0-001-007  01/25/06   02 - 16                        0    5,753,770     /  /                /  /       /  /        /  /    JOD
07-0087    Reconstruction               0-001-015  12/12/07   2,4,8,9,10,155,15,16           0    2,963,402     /  /                /  /       /  /        /  /    JOD
08-0056    Additions and Alterations    0-001-016  12/08/08   02 - 16                        0      942,414     /  /                /  /       /  /        /  /    JOD
03-0535SR  Additions and Alterations    0-011-006  10/13/04   02 - 16                        0      459,000     /  /                /  /       /  /        /  /    HCM
07-2127    Reconstruction               7-999-007  07/14/08   10,16                          0    4,376,496     /  /                /  /       /  /        /  /    JOD


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




WILLIAM FLOYD UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-02-32-03
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
08-0584    Reconstruction               0-003-010  04/08/09   2,8,155,16                     0    1,603,500     /  /                /  /       /  /        /  /    HCM
08-0585    Reconstruction               0-004-014  04/08/09   2,4,16                         0      260,500     /  /                /  /       /  /        /  /    HCM
08-0586    Reconstruction               0-009-009  04/08/09   9                              0      135,500     /  /                /  /       /  /        /  /    HCM
08-0587    Reconstruction               0-011-012  04/08/09   2,8                            0      486,175     /  /                /  /       /  /        /  /    HCM
05-1407    Reconstruction               0-011-013  04/06/07   2                              0      297,750     /  /                /  /       /  /        /  /    HCM
08-0588    Reconstruction               0-012-010  04/08/09   2,16                           0      135,500     /  /                /  /       /  /        /  /    HCM
08-0589    Reconstruction               0-053-002  04/08/09   2,16                           0      301,724     /  /                /  /       /  /        /  /    HCM
01-1074    New Construction             7-054-001  04/08/02   02 - 16                        0      424,000     /  /                /  /       /  /        /  /    HCM
01-1339    New Construction             7-055-001  10/02/02   02 - 16                        0      424,000     /  /                /  /       /  /        /  /    HCM
08-0100    Reconstruction               7-999-007  12/08/08   10,13,16                       0    5,400,000     /  /                /  /       /  /        /  /    HCM


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




CENTER MORICHES UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-02-33-02
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
00-1694SR  Additions and Alterations    0-006-006  06/08/01   02 - 16                        0            0     /  /                /  /       /  /        /  /    RDR
07-2088    New Construction             7-020-001  05/13/09   02 - 16                        0      287,125     /  /                /  /       /  /        /  /    JOD


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




EAST MORICHES UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-02-34-02
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
02-0863    Reconstruction               0-001-010  10/21/03   2,9,155,15,16                  0    1,137,399     /  /                /  /       /  /      09/10/04  MGL
00-1752    Reconstruction               0-001-012  06/12/01   7                              0      265,060     /  /                /  /       /  /      12/09/02  MGL
00-1751    Reconstruction               0-001-013  06/12/01   2                              0      164,218     /  /                /  /       /  /      09/02/03  MGL


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




SOUTH COUNTRY CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-02-35-06
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
07-1775    Reconstruction               0-002-008  01/09/09   2,8,155,16                     0    1,462,000     /  /                /  /       /  /        /  /    DDJ
09-0638    Reconstruction               0-002-009  05/06/10   9,155,16                       0      968,480     /  /                /  /       /  /        /  /    DDJ
09-1143    Reconstruction               0-002-010  05/27/10   2,9,155,16                     0    1,280,410     /  /                /  /       /  /        /  /    DDJ
07-1776    Reconstruction               0-003-008  01/09/09   8,9,155,16                     0    2,830,000     /  /                /  /       /  /        /  /    DDJ
09-0639    Reconstruction               0-003-009  05/06/10   9,155,16                       0      851,500     /  /                /  /       /  /        /  /    DDJ
09-1144    Reconstruction               0-003-010  05/27/10   2,155,16                       0      630,000     /  /                /  /       /  /        /  /    DDJ
07-1777    Reconstruction               0-004-010  01/09/09   2,4,8,10,155,16                0    3,130,800     /  /                /  /       /  /        /  /    DDJ
09-0640    Reconstruction               0-004-011  05/06/10   2,9,155,16                     0    1,574,470     /  /                /  /       /  /        /  /    DDJ
09-1145    Reconstruction               0-004-012  05/27/10   2,8,9,155,15,16                0    1,006,066     /  /                /  /       /  /        /  /    DDJ
07-1778    Reconstruction               0-005-008  01/09/09   8,9,155,16                     0    4,375,000     /  /                /  /       /  /        /  /    DDJ
09-0641    Reconstruction               0-005-009  05/06/10   7,16                           0      993,950     /  /                /  /       /  /        /  /    DDJ
09-1146    Reconstruction               0-005-010  05/27/10                                  0    1,807,800     /  /                /  /       /  /        /  /    JOD
07-1779    Reconstruction               0-006-008  01/09/09   2,4,8,10,155,16                0   11,720,450     /  /                /  /       /  /        /  /    DDJ
09-0642    Reconstruction               0-006-009  05/06/10   4,9,155,15,16                  0    1,712,020     /  /                /  /       /  /        /  /    DDJ
09-1147    Reconstruction               0-006-010  05/27/10   2,4,8,9,155,15,16              0    2,835,454     /  /                /  /       /  /        /  /    DDJ
07-1780    Reconstruction               0-007-008  01/09/09   2,4,8,9,155,15,16              0    2,925,000     /  /                /  /       /  /        /  /    DDJ
09-0643    Reconstruction               0-007-009  05/06/10   9,155,16                       0    1,024,850     /  /                /  /       /  /        /  /    DDJ
09-1148    Reconstruction               0-007-010  05/27/10   2,9,155,16                     0      315,000     /  /                /  /       /  /        /  /    DDJ
02-0044    Reconstruction               5-021-L01  07/12/02                                  0       33,600     /  /                /  /       /  /        /  /    RDR
04-1347    Reconstruction               5-021-L02  05/27/05                                  0      162,500     /  /                /  /       /  /        /  /    RDR
07-1781    Reconstruction               7-999-003  04/24/08   10,13,16                       0    6,000,000     /  /                /  /       /  /        /  /    MGL


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




EASTPORT-SOUTH MANOR CHS DISTRICT: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-02-51-07
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




EAST HAMPTON UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-03-01-02
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
01-0382    Reconstruction               0-003-013  02/28/02   15                             0       26,325     /  /                /  /       /  /        /  /    MGL
98-1762    Reconstruction               0-004-006  07/20/99   4                              0       25,000     /  /                /  /       /  /        /  /    MGL
01-0383    Reconstruction               0-004-010  02/28/02   15                             0       22,750     /  /                /  /       /  /        /  /    MGL
06-0075    Reconstruction               0-004-013  11/09/06   4,8                            0      150,000     /  /                /  /       /  /        /  /    HCM
00-0778    Reconstruction               0-006-010  05/03/01   7                              0      155,500     /  /                /  /       /  /        /  /    MGL
02-0311    Additions and Alterations    0-006-017  08/27/03   02 - 16                        0      592,250     /  /                /  /       /  /        /  /    MGL
02-2256    Additions and Alterations    0-006-020  08/12/03   02 - 16                        0      490,250     /  /                /  /       /  /      08/26/03  HCM
05-1244    Additions and Alterations    0-006-022  10/10/06   02 - 16                        0    1,710,507     /  /                /  /       /  /      03/14/07  HCM
08-1476    Reconstruction               0-006-026  04/29/09   15                             0       73,561     /  /                /  /       /  /        /  /    HCM


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




WAINSCOTT COMMON SCHOOL: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-03-02-08
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




AMAGANSETT UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-03-03-02
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
09-0257    Reconstruction               7-005-003  01/11/10   2,155                          0       25,000     /  /                /  /       /  /        /  /    DDJ


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




SPRINGS UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-03-04-02
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
06-0863    Reconstruction               0-001-009  09/07/07   2                              0      422,000     /  /                /  /       /  /        /  /    MGL
09-0171    Reconstruction               0-001-011  10/22/09   2,16                           0      159,427     /  /                /  /       /  /        /  /    JOD


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




SAG HARBOR UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-03-05-02
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
04-1172    Reconstruction               0-001-016  05/19/05   7                              0       82,125     /  /                /  /       /  /        /  /    RDR
06-1037    Reconstruction               0-001-017  04/06/07   2,8,9,16                       0       70,000     /  /                /  /       /  /        /  /    MGL
07-2161    Reconstruction               0-001-021  09/18/08   16                             0       50,000     /  /                /  /       /  /        /  /    DDJ
08-1384    Reconstruction               0-001-022  05/29/09   10                             0       55,854     /  /                /  /       /  /        /  /    DDJ
08-1385    Reconstruction               0-003-017  05/29/09   10                             0       32,100     /  /                /  /       /  /        /  /    DDJ
99-1606    New Construction             0-010-001  06/05/00   02 - 16                        0      131,300     /  /                /  /       /  /        /  /    RDR
04-0117    New Construction             0-012-001  01/24/05   02 - 16                        0            0     /  /                /  /       /  /        /  /    RDR


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




MONTAUK UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-03-06-02
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
98-0844    Additions and Alterations    0-001-006  05/18/99   02 - 16                        0    3,554,000     /  /                /  /       /  /      08/25/00  BJB
06-0310    Reconstruction               0-001-007  01/12/07   8,9,155,15,16                  0      875,796     /  /                /  /       /  /        /  /    MGL


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




ELWOOD UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-04-01-02
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
99-0451    Reconstruction               0-003-006  04/04/00   8,155,15                       0       58,500     /  /                /  /       /  /        /  /    MGL
04-0341    Alterations                  0-003-012  03/01/05   02 - 16                        0      102,185     /  /                /  /       /  /      09/02/05  JOD
99-0452    Reconstruction               0-004-010  04/04/00   155,15,16                      0       48,000     /  /                /  /       /  /        /  /    MGL
99-0454    Reconstruction               0-006-006  04/04/00   8,155,15,16                    0      322,000     /  /                /  /       /  /      03/17/03  MGL


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




COLD SPRING HARBOR CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-04-02-06
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
00-1969    Reconstruction               0-007-021  07/20/01   8,10,15                        0       34,900     /  /                /  /       /  /        /  /    MGL
01-0602    New Construction             7-012-001  06/20/02   02 - 16                        0      226,500     /  /                /  /       /  /        /  /    MGL
02-2367    New Construction             7-013-001  06/10/03   02 - 16                        0    1,074,475     /  /                /  /       /  /      03/10/06  DDJ


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




HUNTINGTON UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-04-03-03
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
03-0850    Reconstruction               0-013-008  03/18/04   2,8                            0      125,000     /  /                /  /       /  /      10/21/04  JOD


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




NORTHPORT-EAST NORTHPORT UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-04-04-03
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
07-1185    Reconstruction               0-002-015  06/05/08   9,15,16                        0      128,000     /  /                /  /       /  /        /  /    HCM
03-1409    Reconstruction               0-003-015  05/17/04   10                             0      150,000     /  /                /  /       /  /        /  /    HCM
10-0158    Reconstruction               0-003-017  11/04/10   8                              0      838,000     /  /                /  /       /  /        /  /    HCM
01-1478    Additions and Alterations    0-004-013  07/25/02   02 - 16                        0      201,300     /  /                /  /       /  /        /  /    MGL
02-1637    Additions and Alterations    0-005-012  07/09/03   02 - 16                        0      334,960     /  /                /  /       /  /      01/15/05  MGL
05-0667    Reconstruction               0-005-016  05/09/06   8                              0      212,000     /  /                /  /       /  /        /  /    HCM
06-0661    Reconstruction               0-007-013  03/09/07   4                              0       90,000     /  /                /  /       /  /        /  /    HCM
10-0159    Reconstruction               0-007-015  11/04/10   8                              0      162,000     /  /                /  /       /  /        /  /    HCM
01-0127    Additions and Alterations    0-008-014  01/24/02   02 - 16                        0    6,873,047     /  /                /  /       /  /      11/11/03  MGL
02-2013    Reconstruction               0-009-012  07/22/03   8                              0      106,000     /  /                /  /       /  /      02/21/06  MGL
07-1861    Additions and Alterations    0-010-023  05/21/08   02 - 16                        0       34,400     /  /                /  /       /  /        /  /    HCM
03-1158    New Construction             0-048-001  04/16/04   02 - 16                        0      520,000     /  /                /  /       /  /      08/22/05  HCM
07-1548    Reconstruction               7-999-003  04/25/08   16                             0    1,306,800     /  /                /  /       /  /        /  /    HCM


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




HALF HOLLOW HILLS CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-04-05-06
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
09-0434    Reconstruction               0-001-013  10/01/10   2,155,15,16                    0      465,529     /  /                /  /       /  /        /  /    HCM
09-0435    Reconstruction               0-002-019  10/01/10   2,155,15,16                    0      493,651     /  /                /  /       /  /        /  /    HCM
99-0612    Reconstruction               0-006-014  05/11/00   2,4,8,9                        0      107,000     /  /                /  /       /  /        /  /    MAC
09-0436    Reconstruction               0-006-032  10/01/10   2,8,155,15,16                  0    2,164,575     /  /                /  /       /  /        /  /    HCM
09-0437    Reconstruction               0-007-012  10/01/10   2,155,15,16                    0      559,110     /  /                /  /       /  /        /  /    HCM
09-0438    Reconstruction               0-008-019  10/01/10   2,155,15,16                    0      786,972     /  /                /  /       /  /        /  /    HCM
09-0439    Reconstruction               0-011-016  10/01/10   2,155,15,16                    0    1,167,814     /  /                /  /       /  /        /  /    HCM
09-0440    Reconstruction               0-014-018  10/01/10   2,155,15,16                    0    1,163,886     /  /                /  /       /  /        /  /    HCM
09-0441    Reconstruction               0-015-018  10/01/10   2,155,15,16                    0      545,269     /  /                /  /       /  /        /  /    HCM
09-0442    Reconstruction               0-016-017  10/01/10   2,155,15,16                    0    1,225,302     /  /                /  /       /  /        /  /    HCM
09-0443    Reconstruction               0-017-016  10/01/10   2,155,15,16                    0    3,178,349     /  /                /  /       /  /        /  /    HCM
09-0444    Reconstruction               0-018-016  10/01/10   2,155,15,16                    0    1,243,171     /  /                /  /       /  /        /  /    HCM
09-0445    Reconstruction               0-020-008  10/01/10   2,155,15,16                    0      639,968     /  /                /  /       /  /        /  /    HCM
09-0446    Reconstruction               0-021-015  10/01/10   2,155,15,16                    0    2,406,820     /  /                /  /       /  /        /  /    HCM
09-0447    Reconstruction               5-003-004  10/01/10   2,155,15,16                    0      359,584     /  /                /  /       /  /        /  /    HCM


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




HARBORFIELDS CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-04-06-06
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
00-0245    Reconstruction               0-005-002  11/10/00   2                              0      876,405     /  /                /  /       /  /      07/01/01  BJB
09-1156    Reconstruction               7-999-002  10/15/10   10                             0      479,850     /  /                /  /       /  /        /  /    HCM


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




COMMACK UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-04-10-03
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
01-1253    Reconstruction               0-004-005  05/30/02   155                            0       85,000     /  /                /  /       /  /        /  /    MAC
09-0147    Reconstruction               0-007-009  03/10/10   8,16                           0       13,143     /  /                /  /       /  /        /  /    JOD
02-1530    Additions and Alterations    0-008-009  08/29/03   02 - 16                        0   33,242,222     /  /                /  /       /  /      08/11/09  MAC
01-1142    Reconstruction               0-008-011  11/25/02   13                             0    2,381,470     /  /                /  /       /  /      09/06/05  MAC
06-0106    Reconstruction               0-008-015  08/15/06   2,10                           0    1,313,090     /  /                /  /       /  /      01/23/07  MGL
09-0149    Reconstruction               0-008-018  03/10/10   8,16                           0       39,426     /  /                /  /       /  /        /  /    JOD
01-1287    Reconstruction               0-009-007  05/23/02   7                              0      868,139     /  /                /  /       /  /      09/24/03  MAC
09-0151    Reconstruction               0-009-009  03/10/10   8,16                           0       13,143     /  /                /  /       /  /        /  /    JOD
09-0153    Reconstruction               0-014-008  03/10/10   8,16                           0       13,143     /  /                /  /       /  /        /  /    JOD
09-0155    Reconstruction               0-023-010  03/10/10   8,16                           0       13,143     /  /                /  /       /  /        /  /    JOD
09-0157    Reconstruction               0-027-013  03/10/10   8,16                           0       39,426     /  /                /  /       /  /        /  /    JOD
04-1410    Reconstruction               0-035-009  08/02/05   10                             0      141,504     /  /                /  /       /  /        /  /    RDR
07-2248    Reconstruction               0-035-011  09/10/08   4,7,155,15,16                  0    1,246,620     /  /                /  /       /  /        /  /    MGL
09-0159    Reconstruction               0-035-012  03/10/10   8,16                           0       26,283     /  /                /  /       /  /        /  /    JOD
04-1411    Reconstruction               0-036-008  08/02/05   10                             0      141,504     /  /                /  /       /  /        /  /    RDR
09-0161    Reconstruction               0-036-012  03/10/10   8,16                           0       26,283     /  /                /  /       /  /        /  /    JOD


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




SOUTH HUNTINGTON UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-04-13-03
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
02-0269    Reconstruction               0-006-011  01/30/03   155                            0       39,000     /  /                /  /       /  /      10/24/03  HCM
09-0948    Reconstruction               0-006-021  11/12/10   2,16                           0      425,425     /  /                /  /       /  /        /  /    DDJ
07-1903    Reconstruction               0-008-027  08/13/08   2,8,9                          0      358,450     /  /                /  /       /  /        /  /    DDJ
09-0947    Reconstruction               0-008-030  11/12/10   2,16                           0      425,425     /  /                /  /       /  /        /  /    DDJ
00-0008    Reconstruction               0-010-019  07/10/00   2,16                           0      140,000     /  /                /  /       /  /        /  /    MGL
02-0270    Reconstruction               0-011-011  01/30/03   155                            0       39,000     /  /                /  /       /  /      10/24/03  HCM
01-0645    Reconstruction               7-014-007  03/21/02   2                              0      304,000     /  /                /  /       /  /        /  /    MGL


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




BAY SHORE UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-05-01-03
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
08-0823    Reconstruction               0-005-017  03/24/09   16                             0      169,745     /  /                /  /       /  /        /  /    DDJ
05-0937    Reconstruction               0-006-021  05/19/06   2,9,15                         0    1,766,068     /  /                /  /       /  /      09/03/07  DDJ
08-0950    Reconstruction               0-006-026  03/24/09   16                             0      381,565     /  /                /  /       /  /        /  /    DDJ


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




ISLIP UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-05-02-02
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
09-0244    Reconstruction               0-002-009  02/10/10   2,8,10,155,15,16               0      170,510     /  /                /  /       /  /        /  /    JOD
00-1190    Additions and Alterations    0-003-012  08/23/01   02 - 16                        0    1,611,000     /  /                /  /       /  /        /  /    MGL
05-1259    Reconstruction               0-003-013  06/30/06   7                              0      530,000     /  /                /  /       /  /      10/15/06  JOD
09-0245    Reconstruction               0-003-015  02/10/10   2,4,8,10,155,15,16             0      114,166     /  /                /  /       /  /        /  /    JOD
05-1263    Reconstruction               0-007-009  08/17/06   7,9,10,155,15,16               0      262,000     /  /                /  /       /  /      08/28/09  JOD
07-0510    Reconstruction               0-007-010  12/13/07   15                             0      187,000     /  /                /  /       /  /      04/24/08  JOD
08-0191    Reconstruction               0-007-012  08/26/08   8,16                           0       55,000     /  /                /  /       /  /        /  /    JOD
09-0246    Reconstruction               0-007-013  02/10/10   8,155,15,16                    0      119,362     /  /                /  /       /  /        /  /    JOD
00-1178    Reconstruction               0-011-007  08/16/01   2,4,7,8,9,155,15,16            0    2,400,000     /  /                /  /       /  /        /  /    MGL
00-1274    Reconstruction               0-011-008  04/09/01   7                              0    1,600,000     /  /                /  /       /  /        /  /    MGL
05-1255    Reconstruction               0-011-009  07/05/06   7,8,10,155,15,16               0      255,000     /  /                /  /       /  /      08/28/09  JOD
09-0248    Reconstruction               0-011-011  02/10/10   8,155,15,16                    0      146,237     /  /                /  /       /  /        /  /    JOD
05-1262    Reconstruction               7-999-002  07/03/06   16                             0       58,000     /  /                /  /       /  /      08/28/06  JOD
09-0258    Reconstruction               7-999-003  10/30/09   10,16                          0      584,403     /  /                /  /       /  /        /  /    JOD
09-0259    Reconstruction               7-999-004  10/30/09   10,16                          0      385,625     /  /                /  /       /  /        /  /    JOD
09-0260    Reconstruction               7-999-005  10/30/09   10,16                          0      523,225     /  /                /  /       /  /        /  /    JOD


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




EAST ISLIP UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-05-03-03
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
00-0894    Reconstruction               0-002-008  06/20/01   9,15,16                        0      195,000     /  /                /  /       /  /      10/06/03  MGL
98-1276    Reconstruction               0-002-009  07/26/99   2,9,15,16                      0      176,925     /  /                /  /       /  /        /  /    MGL
98-0523    Additions and Alterations    0-010-008  06/03/99   02 - 16                        0       40,000     /  /                /  /       /  /      12/21/00  MGL
98-1277    Reconstruction               0-010-009  07/26/99   8,9,10,155,15,16               0      123,075     /  /                /  /       /  /        /  /    MGL
99-0886    Additions and Alterations    0-010-011  06/06/00   02 - 16                        0      705,000     /  /                /  /       /  /        /  /    MGL
98-1607    New Construction             0-025-001  09/01/99   02 - 16                        0       52,460     /  /                /  /       /  /        /  /    MGL


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




SAYVILLE UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-05-04-03
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
08-0057    Additions and Alterations    0-004-019  04/10/09   02 - 16                        0    2,330,000     /  /                /  /       /  /        /  /    MGL
08-1488    Reconstruction               0-004-021  09/18/09   2,4,7,8,9,155,15,16            0    1,402,878     /  /                /  /       /  /        /  /    MGL
08-0890    Additions and Alterations    0-006-010  07/27/09   02 - 16                        0    4,125,000     /  /                /  /       /  /        /  /    MGL
08-0077    Reconstruction               0-008-016  03/26/09   2,9,155,16                     0      303,012     /  /                /  /       /  /        /  /    MGL


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




BAYPORT BLUE POINT UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-05-05-02
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
09-0897    Reconstruction               0-001-015  02/22/10   7                              0      126,000     /  /                /  /       /  /        /  /    DDJ
05-0118    Reconstruction               0-004-018  09/26/05   155,15,16                      0       70,000     /  /                /  /       /  /        /  /    DDJ
09-0898    Reconstruction               0-004-019  02/22/10   7                              0      585,000     /  /                /  /       /  /        /  /    DDJ
03-1408    Additions and Alterations    4-012-001  08/12/04   02 - 16                        0    1,250,000     /  /                /  /       /  /        /  /    DDJ


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




HAUPPAUGE UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-05-06-03
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
98-1772    Reconstruction               0-008-016  10/07/99   2,16                           0      100,000     /  /                /  /       /  /        /  /    MGL


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




CONNETQUOT CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-05-07-06
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
08-0296    Reconstruction               0-001-012  03/20/09   4,8,16                         0       41,000     /  /                /  /       /  /        /  /    DDJ
07-2052    Reconstruction               0-001-013  02/13/09   155,16                         0      415,427     /  /                /  /       /  /        /  /    DDJ
08-0297    Reconstruction               0-002-014  03/20/09   8,16                           0       41,000     /  /                /  /       /  /        /  /    DDJ
07-2053    Reconstruction               0-002-015  02/13/09   155,16                         0      398,276     /  /                /  /       /  /        /  /    DDJ
09-0547    Reconstruction               0-002-016  12/21/09   7,155                          0    1,330,000     /  /                /  /       /  /        /  /    DDJ
08-0298    Reconstruction               0-004-017  03/20/09   8,16                           0       41,500     /  /                /  /       /  /        /  /    DDJ
07-2054    Reconstruction               0-004-019  02/13/09   155,15,16                      0      473,066     /  /                /  /       /  /        /  /    DDJ
08-0299    Reconstruction               0-005-015  03/20/09   8,16                           0       41,000     /  /                /  /       /  /        /  /    DDJ
07-2055    Reconstruction               0-005-016  02/13/09   155,15,16                      0      417,285     /  /                /  /       /  /        /  /    DDJ
09-0548    Reconstruction               0-005-017  12/21/09   7,155                          0    1,300,000     /  /                /  /       /  /        /  /    DDJ
98-0855    Reconstruction               0-007-019  03/11/99   15                             0       60,000     /  /                /  /       /  /        /  /    RDR
98-0661    Additions and Alterations    0-007-022  03/03/99   02 - 16                        0    2,659,800     /  /                /  /       /  /      09/05/01  RDR
07-1635    Reconstruction               0-007-029  04/15/08   2,7                            0    5,010,000     /  /                /  /       /  /      08/31/09  MGL
08-0300    Reconstruction               0-007-030  03/20/09   2,9,10,155,15,16               0    2,433,000     /  /                /  /       /  /      11/27/09  DDJ
07-2056    Reconstruction               0-007-032  02/13/09   155,16                         0    1,421,955     /  /                /  /       /  /        /  /    DDJ
08-0301    Reconstruction               0-009-010  03/20/09   8,16                           0       41,000     /  /                /  /       /  /        /  /    DDJ
07-2057    Reconstruction               0-009-011  02/13/09   155,16                         0      435,891     /  /                /  /       /  /        /  /    DDJ
09-0549    Reconstruction               0-009-012  12/21/09   7,155                          0    1,400,000     /  /                /  /       /  /        /  /    DDJ
08-0302    Reconstruction               0-010-017  03/20/09   8,16                           0       25,000     /  /                /  /       /  /        /  /    DDJ
07-2058    Reconstruction               0-010-019  02/13/09   2,8,155,15,16                  0    2,002,841     /  /                /  /       /  /        /  /    DDJ
98-0856    Reconstruction               0-011-013  03/24/99   155                            0       20,000     /  /                /  /       /  /        /  /    RDR
08-0303    Reconstruction               0-011-020  03/20/09   8,16                           0       25,000     /  /                /  /       /  /        /  /    DDJ
07-2059    Reconstruction               0-011-022  02/13/09   155,15,16                      0    1,871,345     /  /                /  /       /  /        /  /    DDJ
08-0304    Reconstruction               0-012-013  03/20/09   8,16                           0       41,500     /  /                /  /       /  /        /  /    DDJ
07-2060    Reconstruction               0-012-015  02/13/09   2,8,155,16                     0      587,697     /  /                /  /       /  /        /  /    DDJ
08-0305    Reconstruction               0-013-011  03/20/09   8,16                           0       42,000     /  /                /  /       /  /        /  /    DDJ
07-2061    Reconstruction               0-013-013  02/13/09   155,16                         0      515,314     /  /                /  /       /  /        /  /    DDJ
07-2062    Reconstruction               5-015-012  02/13/09   2,8,155,15,16                  0    2,730,594     /  /                /  /       /  /        /  /    DDJ
98-0821    Reconstruction               7-999-004  03/18/99   16                             0    5,237,000     /  /                /  /       /  /        /  /    RDR
04-1209    Reconstruction               7-999-005  06/23/05   16                             0      793,650     /  /                /  /       /  /        /  /    RDR


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




WEST ISLIP UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-05-09-03
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
06-0222    Reconstruction               0-001-010  12/06/06   2,155,16                       0      494,820     /  /                /  /       /  /      11/14/08  MGL
08-0724    Reconstruction               0-005-018  06/04/09   2,4,10,155,15,16               0    1,429,468     /  /                /  /       /  /        /  /    MGL
08-0725    Reconstruction               0-007-014  06/04/09   2,4,8,9,10,155,15,16           0    1,650,606     /  /                /  /       /  /        /  /    MGL
06-0223    Reconstruction               0-008-023  12/06/06   2,9                            0      356,637     /  /                /  /       /  /        /  /    MGL
08-0727    Reconstruction               0-009-015  06/04/09   2,4,10,155,15,16               0    1,203,073     /  /                /  /       /  /        /  /    MGL
08-0730    Reconstruction               0-012-015  06/04/09   2,4,10,155,15,16               0    1,336,511     /  /                /  /       /  /        /  /    MGL
07-0035    New Construction             7-025-001  09/12/07   02 - 16                        0       80,000     /  /                /  /       /  /      08/18/08  MGL
06-0107    Reconstruction               7-999-005  08/01/06   10                             0       63,600     /  /                /  /       /  /        /  /    MGL


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




BRENTWOOD UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-05-12-03
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
07-1264    Additions and Alterations    0-002-009  07/03/08   02 - 16                        0    2,550,000     /  /                /  /       /  /        /  /    HCM
08-1309    Reconstruction               0-002-010  07/09/09   2,4,9,155,15,16                0    2,306,895     /  /                /  /       /  /        /  /    HCM
10-0032    Reconstruction               0-002-011  12/20/10   2,15,16                        0      423,647     /  /                /  /       /  /        /  /    HCM
08-1310    Reconstruction               0-003-009  07/09/09   2,8,9,155,15,16                0    2,730,960     /  /                /  /       /  /        /  /    HCM
07-2145    Reconstruction               0-004-007  07/31/08   2,7                            0      709,940     /  /                /  /       /  /        /  /    HCM
08-1311    Reconstruction               0-004-008  07/09/09   2,8,155,15,16                  0    2,715,061     /  /                /  /       /  /        /  /    HCM
10-0033    Reconstruction               0-004-009  12/20/10   2,155,15,16                    0      450,984     /  /                /  /       /  /        /  /    HCM
08-0978    Reconstruction               0-005-007  03/11/09   9                              0      378,547     /  /                /  /       /  /        /  /    HCM
08-1312    Reconstruction               0-005-010  07/09/09   2,8,9,155,15,16                0    3,730,806     /  /                /  /       /  /        /  /    HCM
10-0003    Reconstruction               0-005-012  08/18/10   7,16                           0      864,667     /  /                /  /       /  /        /  /    HCM
08-1645    Reconstruction               0-006-001  12/23/10   2,4,8,9,155,15,16              0      397,250     /  /                /  /       /  /        /  /    HCM
07-1265    Reconstruction               0-007-006  07/03/08   9                              0    3,430,145     /  /                /  /       /  /        /  /    HCM
10-0034    Reconstruction               0-007-008  12/20/10   2,155,15,16                    0      422,894     /  /                /  /       /  /        /  /    HCM
07-1266    Additions and Alterations    0-008-005  07/03/08   02 - 16                        0    2,817,644     /  /                /  /       /  /        /  /    HCM
10-0035    Reconstruction               0-008-006  12/20/10   2,4,155,16                     0      399,007     /  /                /  /       /  /        /  /    HCM
09-0085    Reconstruction               0-009-007  08/18/09   7                              0      788,960     /  /                /  /       /  /        /  /    HCM
10-0036    Reconstruction               0-009-008  12/20/10   2,155,15,16                    0      397,489     /  /                /  /       /  /        /  /    HCM
08-0979    Additions and Alterations    0-010-007  03/11/09   02 - 16                        0      250,000     /  /                /  /       /  /        /  /    HCM
10-0004    Reconstruction               0-010-009  08/18/10   7                              0       46,000     /  /                /  /       /  /        /  /    HCM
07-1268    Additions and Alterations    0-011-009  07/03/08   02 - 16                        0    1,580,864     /  /                /  /       /  /        /  /    HCM
08-0980    Reconstruction               0-012-004  03/11/09   2,4,8,9,10,155,15,16           0      250,000     /  /                /  /       /  /        /  /    HCM
08-1313    Reconstruction               0-012-005  07/09/09   2,8,9,155,15,16                0    2,281,256     /  /                /  /       /  /        /  /    HCM
09-1310    Reconstruction               0-012-006  05/20/10   2,7                            0    2,128,560     /  /                /  /       /  /        /  /    HCM
03-0647    Reconstruction               0-013-003  03/18/04   16                             0            0     /  /                /  /       /  /        /  /    JOD
08-1314    Reconstruction               0-013-005  07/09/09   8                              0    2,058,011     /  /                /  /       /  /        /  /    HCM
09-1311    Reconstruction               0-013-006  05/20/10   7                              0    1,943,188     /  /                /  /       /  /        /  /    HCM
10-0037    Reconstruction               0-013-007  12/20/10   2,16                           0      235,213     /  /                /  /       /  /        /  /    HCM
10-0038    Reconstruction               0-014-007  12/20/10   2,16                           0      137,574     /  /                /  /       /  /        /  /    HCM
07-1270    Reconstruction               0-015-008  07/03/08   2,4,7,8,9,10,155,15,           0    4,970,000     /  /                /  /       /  /        /  /    HCM
08-0981    Reconstruction               0-016-005  03/11/09   2,4,8,9,155,15,16              0      500,000     /  /                /  /       /  /        /  /    HCM
08-1315    Reconstruction               0-016-006  07/09/09   2,8,9,155,15,16                0    5,637,315     /  /                /  /       /  /        /  /    HCM
10-0039    Reconstruction               0-016-007  12/20/10   2,155,15,16                    0      663,102     /  /                /  /       /  /        /  /    HCM
08-0982    Reconstruction               0-017-004  03/11/09   2,4,8,9,10,155,15,16           0      250,000     /  /                /  /       /  /        /  /    HCM
08-1316    Reconstruction               0-017-005  07/09/09   2,8,9,155,15,16                0    2,083,947     /  /                /  /       /  /        /  /    HCM
08-1317    Reconstruction               0-018-005  07/09/09   2,4,155,16                     0    2,329,661     /  /                /  /       /  /        /  /    HCM
09-1312    Reconstruction               0-018-006  05/20/10   13                             0    1,914,000     /  /                /  /       /  /        /  /    HCM
07-1271    Reconstruction               0-019-007  07/03/08   2,4,8,9,155,15,16              0    2,280,577     /  /                /  /       /  /        /  /    HCM
08-0983    Reconstruction               0-020-008  03/11/09   2,4,7,8,10,155,15,16           0      315,000     /  /                /  /       /  /        /  /    HCM
07-2146    Reconstruction               0-020-009  07/31/08   2,4,7                          0      189,937     /  /                /  /       /  /        /  /    HCM
08-1318    Reconstruction               0-020-010  07/09/09   2,8,155,15,16                  0    5,105,310     /  /                /  /       /  /        /  /    HCM
09-1313    Reconstruction               0-020-011  05/20/10   7                              0    1,938,554     /  /                /  /       /  /        /  /    HCM
00-0989    New Construction             0-036-001  07/12/01   02 - 16                        0      350,000     /  /                /  /       /  /      10/11/01  BJB
03-0042    New Construction             7-043-001  01/26/04   02 - 16                        0      686,362     /  /                /  /       /  /        /  /    JOD
07-0347    Reconstruction               7-999-004  12/19/07   10                             0    6,243,485     /  /                /  /       /  /        /  /    HCM


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




CENTRAL ISLIP UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-05-13-03
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
00-1809SR  Reconstruction               0-001-007  07/24/01   2,16                           0    1,367,659     /  /                /  /       /  /      01/13/04  MGL
08-0904    Reconstruction               0-001-009  04/22/09   7                              0      457,000     /  /                /  /       /  /        /  /    JOD
08-1143    Reconstruction               0-001-010  05/20/09   7,9,10,155,16                  0    2,780,000     /  /                /  /       /  /        /  /    JOD
08-1144    Reconstruction               0-003-011  05/20/09   2,4,10,155                     0      809,000     /  /                /  /       /  /        /  /    JOD
08-0905    Reconstruction               0-004-008  04/22/09   9,10                           0      272,000     /  /                /  /       /  /        /  /    JOD
08-1145    Reconstruction               0-005-009  05/20/09   2,8,9,10,16                    0      910,000     /  /                /  /       /  /        /  /    JOD
08-0906    Reconstruction               0-006-008  04/22/09   9,10                           0      360,000     /  /                /  /       /  /        /  /    JOD
08-0907    Reconstruction               0-007-008  04/22/09   9,10,155                       0      520,000     /  /                /  /       /  /        /  /    JOD
00-1810SR  Reconstruction               0-008-008  07/24/01   2,16                           0    1,985,463     /  /                /  /       /  /      01/13/04  MGL
03-0254    Reconstruction               0-008-009  02/17/04   2,13                           0    1,145,359     /  /                /  /       /  /      10/15/04  JOD
08-0908    Reconstruction               0-008-010  04/22/09   9,10                           0      760,000     /  /                /  /       /  /        /  /    JOD
08-1146    Reconstruction               0-008-011  05/20/09   8,10,155,15,16                 0      309,000     /  /                /  /       /  /        /  /    JOD
01-1509    Reconstruction               0-014-004  01/18/02   4,8,9                          0            0     /  /                /  /       /  /      02/07/03  MGL
00-0133    New Construction             0-016-001  01/25/01   02 - 16                        0      400,000     /  /                /  /       /  /      08/30/01  MGL


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




FIRE ISLAND UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-05-14-02
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




SHOREHAM-WADING RIVER CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-06-01-04
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
03-1640    Reconstruction               0-007-011  07/07/04   2,7,155,16                     0      510,825     /  /                /  /       /  /        /  /    HCM
99-0244    Reconstruction               7-999-001  11/18/99   16                             0      195,000     /  /                /  /       /  /        /  /    MGL


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




RIVERHEAD CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-06-02-04
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
07-2288    Reconstruction               0-005-012  12/09/08   2,10,15,16                     0       40,831     /  /                /  /       /  /        /  /    HCM
00-0818    Reconstruction               0-006-002  05/08/01   2,13,15,16                     0       30,000     /  /                /  /       /  /        /  /    MGL
01-0971    Reconstruction               0-008-001  07/15/02   2,155                          0       55,000     /  /                /  /       /  /        /  /    MGL
07-2290    Reconstruction               0-010-014  12/09/08   2,4,8,10,14,15,16              0      380,524     /  /                /  /       /  /        /  /    HCM
00-0819    Reconstruction               0-035-002  05/08/01   2,15,16                        0       30,000     /  /                /  /       /  /      08/09/01  MGL
01-0972    New Construction             0-042-001  07/15/02   02 - 16                        0       55,000     /  /                /  /       /  /        /  /    MGL
01-0973    New Construction             0-043-001  07/15/02   02 - 16                        0       60,000     /  /                /  /       /  /      10/08/02  MGL
01-0974    New Construction             0-044-001  07/15/02   02 - 16                        0       60,000     /  /                /  /       /  /      10/08/02  MGL
01-0975    New Construction             0-045-001  07/15/02   02 - 16                        0       60,000     /  /                /  /       /  /      10/08/02  MGL
03-1159    New Construction             0-046-001  06/15/04   02 - 16                        0    1,100,000     /  /                /  /       /  /        /  /    HCM
06-1569    Reconstruction               7-999-005  10/05/07   13,16                          0      150,000     /  /                /  /       /  /        /  /    HCM


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




LITTLE FLOWER UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-06-03-02
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




SHELTER ISLAND UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-07-01-02
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
99-0963    Reconstruction               0-001-016  04/24/00   7                              0      190,800     /  /                /  /       /  /        /  /    MEM
02-1556    Reconstruction               0-001-017  04/30/03   155,16                         0      209,000     /  /                /  /       /  /        /  /    MAC
06-1497    Additions and Alterations    0-001-018  07/06/07   02 - 16                        0      316,960     /  /                /  /       /  /        /  /    DDJ


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




SMITHTOWN CENTRAL SCHOOL DISTRICT: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-08-01-06
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
07-1897    Reconstruction               0-033-013  05/22/08   10                             0      325,600     /  /                /  /       /  /      12/23/08  DDJ
97-1457    New Construction             0-059-001  05/24/99   02 - 16                        0       20,600     /  /                /  /       /  /      10/26/98  MEM
97-1456    New Construction             0-060-001  05/24/99   02 - 16                        0       20,600     /  /                /  /       /  /      10/26/99  MEM
97-1422    New Construction             0-061-001  05/24/99   02 - 16                        0       20,600     /  /                /  /       /  /      10/26/98  MEM
97-1423    New Construction             0-062-001  05/24/99   02 - 16                        0       20,600     /  /                /  /       /  /      10/26/98  MEM
99-0256    New Construction             0-063-001  11/25/99   02 - 16                        0      120,000     /  /                /  /       /  /      09/03/99  MGL
07-0994    New Construction             5-076-001  06/24/08   02 - 16                        0      619,129     /  /                /  /       /  /        /  /    DDJ
99-1672    Reconstruction               7-022-003  09/18/00   16                             0       77,471     /  /                /  /       /  /      09/01/01  MGL


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




KINGS PARK CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-08-05-04
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




KINGS PARK CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-08-05-06
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
05-1178    Reconstruction               0-004-022  06/19/06   15                             0       27,336     /  /                /  /       /  /        /  /    RDR
02-0763    Reconstruction               0-008-FP2  12/24/02   16                             0        7,625     /  /                /  /       /  /      02/21/03  MGL
05-1371    Reconstruction               7-999-002  09/14/06   16                             0    1,685,454     /  /                /  /       /  /        /  /    HCM


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




REMSENBURG-SPEONK UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-09-01-02
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




WESTHAMPTON BEACH UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-09-02-02
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
99-0108    Reconstruction               0-002-004  11/04/99   16                             0       14,200     /  /                /  /       /  /        /  /    MEM
99-1290    Reconstruction               0-002-006  05/15/00   2,9,15,16                      0      130,000     /  /                /  /       /  /      12/11/00  MAC
06-0339    Additions and Alterations    0-002-010  02/05/07   02 - 16                        0   13,381,861     /  /                /  /       /  /      12/23/08  DDJ
07-1362    Reconstruction               0-002-012  02/20/08   7                              0      275,000     /  /                /  /       /  /        /  /    DDJ
00-0554    Reconstruction               0-003-006  01/09/01   2,7                            0      351,000     /  /                /  /       /  /      09/10/01  MAC
02-1310    Reconstruction               0-003-008  04/09/03   8                              0       47,000     /  /                /  /       /  /      10/22/03  MAC
03-1098    Reconstruction               0-003-009  03/26/04   8                              0      213,450     /  /                /  /       /  /      02/04/05  MAC
03-1237    Reconstruction               0-003-010  05/14/03   16                             0       41,875     /  /                /  /       /  /        /  /    MAC
04-1170    Additions and Alterations    0-003-012  07/20/05   02 - 16                        0    4,628,905     /  /                /  /       /  /      09/01/06  DDJ
04-0921    Reconstruction               0-003-013  03/28/05   8                              0      136,550     /  /                /  /       /  /        /  /    DDJ
06-0424    Reconstruction               0-003-014  01/30/07   2                              0    3,135,755     /  /                /  /       /  /        /  /    DDJ
02-1311    Reconstruction               0-004-006  04/09/03   8                              0      795,758     /  /                /  /       /  /        /  /    MAC
01-1104    Reconstruction               0-004-012  04/26/02   7                              0       86,000     /  /                /  /       /  /        /  /    MAC
02-1312    Reconstruction               0-004-013  04/09/03   8                              0       92,277     /  /                /  /       /  /      10/22/03  MAC
04-0527    Additions and Alterations    0-004-014  04/04/05   02 - 16                        0   26,836,892     /  /                /  /       /  /      01/26/07  DDJ
06-1365    Reconstruction               0-004-015  09/05/07   2,10                           0      136,375     /  /                /  /       /  /        /  /    DDJ
05-0286    Reconstruction               0-004-016  12/30/05   16                             0      250,000     /  /                /  /       /  /      01/16/07  DDJ


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




QUOGUE UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-09-03-02
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
04-1135    Reconstruction               0-001-010  07/07/05   4,8,15                         0      812,130     /  /                /  /       /  /        /  /    JOD


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




HAMPTON BAYS UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-09-05-02
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
99-1745    Alterations                  0-001-001  08/29/00   02 - 16                        0       97,500     /  /                /  /       /  /      01/29/01  MAC
00-0441    Reconstruction               0-001-002  04/11/01   16                             0        4,772     /  /                /  /       /  /      10/11/01  MAC
99-1746    Alterations                  0-002-001  08/29/00   02 - 16                        0       97,500     /  /                /  /       /  /      01/29/01  MAC
00-0442    Reconstruction               0-002-002  04/11/01   16                             0        4,772     /  /                /  /       /  /      10/11/01  MAC
00-0443    Reconstruction               0-003-004  04/11/01   155,16                         0      178,200     /  /                /  /       /  /      10/11/01  MAC
02-2287    Reconstruction               0-003-005  06/18/03   7                              0      725,000     /  /                /  /       /  /      12/03/03  MAC
03-0815    Reconstruction               0-003-006  12/17/03   2,9                            0      152,100     /  /                /  /       /  /      01/09/04  MAC
09-1458    Alterations                  0-003-009  06/11/10   02 - 16                        0      250,000     /  /                /  /       /  /        /  /    HCM
00-0446    Reconstruction               0-005-001  04/11/01   155,16                         0        5,700     /  /                /  /       /  /      10/11/01  MAC
00-0444    Reconstruction               0-010-004  04/11/01   155,16                         0      204,135     /  /                /  /       /  /      10/11/01  MAC
09-1552    Reconstruction               0-010-007  07/23/10   2,10,15,16                     0       93,440     /  /                /  /       /  /        /  /    HCM
00-0445    Reconstruction               0-014-002  04/11/01   155,16                         0       20,812     /  /                /  /       /  /      10/11/01  MAC
00-0447    Reconstruction               8-007-002  04/11/01   155,16                         0        4,000     /  /                /  /       /  /      10/11/01  MAC


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




SOUTHAMPTON UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-09-06-03
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
99-0443    Reconstruction               0-001-014  02/16/00   2,4,7,8,9,155,16               0      206,250     /  /                /  /       /  /        /  /    MGL
00-1560    Reconstruction               0-001-015  11/05/01   4,14,15                        0      487,000     /  /                /  /       /  /        /  /    MGL
99-0444    Reconstruction               0-003-009  02/16/00   8,9,16                         0       45,700     /  /                /  /       /  /        /  /    MGL
99-0445    Reconstruction               0-007-006  02/16/00   2,7                            0      186,187     /  /                /  /       /  /        /  /    MGL
00-1561    Reconstruction               0-007-007  11/05/01   2,7                            0      175,000     /  /                /  /       /  /        /  /    MGL
07-2169    Reconstruction               0-007-013  09/09/08   8                              0    1,805,567     /  /                /  /       /  /        /  /    JOD
09-0345    Alterations                  5-005-005  01/07/10   02 - 16                        0      360,000     /  /                /  /       /  /        /  /    JOD


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




BRIDGEHAMPTON UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-09-09-02
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
98-0671    Reconstruction               0-001-011  02/22/99   2,4                            0      108,000     /  /                /  /       /  /        /  /    MGL
00-1593    Reconstruction               0-001-012  04/18/01   2,155                          0      460,000     /  /                /  /       /  /        /  /    MGL
10-0358    New Construction             0-008-001  11/04/10   02 - 16                        0            0     /  /                /  /       /  /        /  /    HCM


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




SAGAPONACK COMMON SCHOOL: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-09-10-08
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




EASTPORT UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-09-11-02
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




EASTPORT - SOUTH MANOR CSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-09-12-06
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
08-0820    Reconstruction               0-001-004  06/08/09   9,155,15,16                    0    6,150,000     /  /                /  /       /  /        /  /    DDJ
07-2336    Reconstruction               0-011-001  12/05/08   2,8,14,155,16                  0    5,857,000     /  /                /  /       /  /        /  /    DDJ
08-0790    Reconstruction               0-012-004  06/01/09   2,4,8,9,10,155,15,16           0    4,750,000     /  /                /  /       /  /        /  /    DDJ
09-1139    Additions and Alterations    0-014-002  09/01/10   02 - 16                        0   16,200,000     /  /                /  /       /  /        /  /    DDJ
08-1100    Reconstruction               0-014-005  06/24/09   4,7,8,9,10,16                  0   10,250,000     /  /                /  /       /  /        /  /    DDJ
08-1373    New Construction             7-023-001  07/23/09   02 - 16                        0      500,000     /  /                /  /       /  /        /  /    DDJ
08-1389    Reconstruction               7-999-001  05/20/09   16                             0    4,787,000     /  /                /  /       /  /        /  /    DDJ


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




TUCKAHOE COMMON SCHOOL DISTRICT: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-09-13-08
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




EAST QUOGUE UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-09-17-02
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
02-0413    Reconstruction               0-001-008  02/26/03   10                             0       86,000     /  /                /  /       /  /        /  /    HCM
03-0231    Reconstruction               0-001-009  11/18/03   4                              0      140,000     /  /                /  /       /  /        /  /    HCM
03-1525    Reconstruction               0-001-011  05/10/04   9                              0       20,800     /  /                /  /       /  /        /  /    HCM


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




OYSTERPONDS UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-10-02-02
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
01-1182    Reconstruction               0-001-005  05/15/02   7                              0       49,960     /  /                /  /       /  /        /  /    MGL
09-0511    Reconstruction               0-001-006  12/10/09   8                              0      150,000     /  /                /  /       /  /        /  /    JOD
07-1822    Reconstruction               0-001-008  03/17/08   10                             0       60,000     /  /                /  /       /  /      08/02/08  JOD


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




FISHERS ISLAND UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-10-04-02
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




SOUTHOLD UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-10-05-02
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
07-1533    Reconstruction               0-001-009  06/17/09   16                             0      193,403     /  /                /  /       /  /        /  /    DDJ
08-0545    Reconstruction               0-001-010  06/17/09   2,4,8,10,155,15                0    1,441,911     /  /                /  /       /  /        /  /    DDJ
09-0449    Reconstruction               0-001-011  02/22/10   2                              0       91,742     /  /                /  /       /  /        /  /    DDJ
04-0474    Reconstruction               0-005-003  02/08/05   7                              0      288,000     /  /                /  /       /  /      12/02/05  DDJ


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




MATTITUCK-CUTCHOGUE UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-10-09-02
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
98-0793    Reconstruction               0-001-004  03/24/99   7                              0      140,500     /  /                /  /       /  /        /  /    MGL


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




GREENPORT UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-10-10-02
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




LAUREL COMMON SCHOOL: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-10-11-08
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




MATTITUCK - CUTCHOGUE UFSD: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-10-12-02
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
04-0884    Additions and Alterations    0-001-001  05/11/05   02 - 16                        0   17,406,990     /  /                /  /       /  /      08/15/06  HCM
05-0486    Reconstruction               0-001-002  06/22/06   4,7,8,9,15,16                  0    8,549,994     /  /                /  /       /  /      08/27/07  HCM
04-0885    Reconstruction               0-007-001  05/11/05   4,10                           0       65,726     /  /                /  /       /  /      08/15/06  HCM
09-1371    Reconstruction               0-007-003  05/24/10   2,8                            0       90,000     /  /                /  /       /  /        /  /    HCM
02-2015    Reconstruction               0-016-001  04/23/03   9,15,16                        0      140,000     /  /                /  /       /  /      05/04/05  HCM
04-0104    Reconstruction               0-017-001  08/10/04   7                              0       29,160     /  /                /  /       /  /        /  /    HCM


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




NEW SUFFOLK COMMON SCHOOL: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-10-15-08
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




BOCES EASTERN SUFFOLK: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-91-00-00
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
04-0990    Reconstruction               0-001-006  04/01/05   7                              0      330,200     /  /                /  /       /  /        /  /    JOD
05-0082    Reconstruction               0-001-007  12/21/05   10                             0       11,029     /  /                /  /       /  /      06/05/07  JOD
04-0991    Reconstruction               0-002-006  04/01/05   7                              0      136,500     /  /                /  /       /  /        /  /    JOD
05-0083    Reconstruction               0-002-007  12/21/05   10                             0        3,786     /  /                /  /       /  /      06/05/07  JOD
04-0992    Reconstruction               0-003-004  04/01/05   7                              0      162,500     /  /                /  /       /  /        /  /    JOD
05-0084    Reconstruction               0-003-005  12/21/05   10,155                         0       59,294     /  /                /  /       /  /      06/05/07  JOD
04-0993    Reconstruction               0-004-007  04/01/05   7                              0      117,000     /  /                /  /       /  /        /  /    JOD
05-0085    Reconstruction               0-004-008  12/21/05   10,155                         0       91,146     /  /                /  /       /  /      06/05/07  JOD
05-0086    Reconstruction               0-011-008  12/21/05   10                             0        2,891     /  /                /  /       /  /      06/05/07  JOD
07-0654    Reconstruction               0-011-009  03/10/08   155,16                         0      375,000     /  /                /  /       /  /        /  /    JOD
00-1948    Reconstruction               0-013-007  10/15/01   7,155                          0      600,000     /  /                /  /       /  /        /  /    MGL
05-0087    Reconstruction               0-013-009  12/21/05   10                             0       13,156     /  /                /  /       /  /      06/05/07  JOD
04-0994    Reconstruction               0-014-004  04/01/05   7                              0      111,800     /  /                /  /       /  /        /  /    JOD
05-0088    Reconstruction               0-014-005  12/21/05   10,155                         0       55,581     /  /                /  /       /  /      06/05/07  JOD
03-0515    Reconstruction               0-022-007  11/24/03   2                              0       50,000     /  /                /  /       /  /        /  /    MAC
05-0089    Reconstruction               0-022-008  12/21/05   10                             0        4,448     /  /                /  /       /  /      06/05/07  JOD
05-0090    Reconstruction               0-025-004  12/21/05   10                             0        1,251     /  /                /  /       /  /      06/05/07  JOD
99-0020    Reconstruction               0-048-003  09/24/99   2                              0       35,400     /  /                /  /       /  /        /  /    RDR
00-1993    Reconstruction               0-048-004  08/03/01   155,15,16                      0       80,000     /  /                /  /       /  /        /  /    MAC
01-0046    Reconstruction               0-048-005  08/10/01   2                              0       85,000     /  /                /  /       /  /        /  /    MAC
03-1099    Reconstruction               0-048-007  03/26/04   2,7                            0      975,000     /  /                /  /       /  /        /  /    MAC
05-0091    Reconstruction               0-048-008  12/21/05   10,155,16                      0      511,153     /  /                /  /       /  /      06/05/07  JOD
05-0831    Reconstruction               0-048-009  04/10/06   15                             0       21,300     /  /                /  /       /  /      07/12/07  JOD
06-0109    Reconstruction               0-048-011  10/06/06   8                              0       81,000     /  /                /  /       /  /        /  /    JOD
09-1142    Reconstruction               0-048-015  07/06/10   2,155,16                       0      168,500     /  /                /  /       /  /        /  /    JOD
00-1939    Reconstruction               0-049-007  11/13/01   16                             0       88,000     /  /                /  /       /  /        /  /    MAC
00-1992    Reconstruction               0-049-008  08/03/01   155,15,16                      0       80,000     /  /                /  /       /  /        /  /    MAC
00-1763    Reconstruction               0-049-009  06/14/01   2,9                            0       46,400     /  /                /  /       /  /        /  /    MAC
05-0092    Reconstruction               0-049-011  12/21/05   10,16                          0      401,276     /  /                /  /       /  /      06/05/07  JOD
05-0832    Reconstruction               0-049-012  04/10/06   15                             0       19,900     /  /                /  /       /  /      01/12/07  JOD
05-1236    Reconstruction               0-049-014  06/09/06   2                              0      117,400     /  /                /  /       /  /        /  /    JOD
06-0110    Reconstruction               0-049-015  10/06/06   8                              0       81,000     /  /                /  /       /  /        /  /    JOD
07-1050    Reconstruction               0-049-017  12/18/07   155,15,16                      0      330,000     /  /                /  /       /  /        /  /    JOD
05-0093    Reconstruction               0-057-002  12/21/05   10,16                          0       80,835     /  /                /  /       /  /      06/05/07  JOD
05-0833    Reconstruction               0-057-003  04/10/06   15                             0       19,900     /  /                /  /       /  /      01/12/07  JOD
08-1621    Reconstruction               0-057-004  05/21/09   4,8                            0    1,000,000     /  /                /  /       /  /        /  /    JOD
09-1507    Reconstruction               0-057-006  06/24/10   2,7                            0      540,000     /  /                /  /       /  /        /  /    JOD
98-0403    Reconstruction               0-058-002  01/07/99   7                              0      390,000     /  /                /  /       /  /        /  /    MGL
05-0094    Reconstruction               0-058-003  12/21/05   10,16                          0       77,981     /  /                /  /       /  /      06/05/07  JOD
07-1028    Reconstruction               0-058-005  12/26/07   2                              0      300,000     /  /                /  /       /  /        /  /    JOD
07-0717    Reconstruction               0-058-006  11/30/07   155,16                         0      395,000     /  /                /  /       /  /        /  /    JOD
98-1120    Reconstruction               0-059-002  05/14/99   7                              0      650,000     /  /                /  /       /  /        /  /    MGL
05-0095    Reconstruction               0-059-004  12/21/05   10,155,16                      0      441,768     /  /                /  /       /  /      06/05/07  JOD
05-0834    Reconstruction               0-059-005  04/10/06   15                             0       21,300     /  /                /  /       /  /      07/12/07  JOD
03-1100    Reconstruction               0-061-005  03/26/04   7,155                          0    1,035,000     /  /                /  /       /  /        /  /    MAC
05-0096    Reconstruction               0-061-006  12/21/05   10,155,16                      0      654,593     /  /                /  /       /  /      06/05/07  JOD
05-0835    Reconstruction               0-061-007  04/10/06   15                             0       19,900     /  /                /  /       /  /      03/21/07  JOD
01-0047    Additions and Alterations    0-076-002  02/21/02   02 - 16                        0       70,000     /  /                /  /       /  /        /  /    MAC
99-0265    Reconstruction               8-063-002  09/30/99   2,9                            0       11,900     /  /                /  /       /  /        /  /    RDR
00-0272    Reconstruction               8-072-001  10/02/00   2,9                            0       15,500     /  /                /  /       /  /        /  /    MAC


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




BOCES EASTERN SUFFOLK: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-92-00-00
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
  -        NO LATE or OVERDUE FCRs                   /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




BOCES WESTERN SUFFOLK: CAPITAL PROJECTS WITHOUT FINAL COST REPORTS
District No.: 58-93-00-00
last updated on 10/24/12
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________
09-0672    Reconstruction               0-001-014  08/25/10   155,16                         0      200,000     /  /                /  /       /  /        /  /    JOD
06-0560    Reconstruction               0-016-012  12/05/06   8                              0       49,190     /  /                /  /       /  /      09/02/08  JOD
07-1702    Reconstruction               0-016-014  04/10/08   9                              0      158,500     /  /                /  /       /  /      01/05/09  JOD
08-0731    Reconstruction               0-016-017  02/10/09   2,16                           0    1,925,000     /  /                /  /       /  /        /  /    JOD
09-0673    Reconstruction               0-016-020  08/10/10   155,15                         0      120,000     /  /                /  /       /  /        /  /    JOD
06-0561    Reconstruction               0-017-016  12/05/06   8                              0       36,000     /  /                /  /       /  /      01/16/08  JOD
07-1738    Reconstruction               0-017-020  04/25/08   2,16                           0    2,500,000     /  /                /  /       /  /        /  /    JOD
09-0674    Reconstruction               0-017-024  08/10/10   155,15,16                      0      244,847     /  /                /  /       /  /        /  /    JOD
09-0675    Reconstruction               0-018-019  08/10/10   4,15,16                        0      118,000     /  /                /  /       /  /        /  /    JOD
09-1564    Reconstruction               0-018-020  10/21/10   2,155,15,16                    0      606,000     /  /                /  /       /  /        /  /    JOD
04-1461    Reconstruction               0-021-006  08/03/05   155                            0      518,838     /  /                /  /       /  /        /  /    JOD
06-0562    Reconstruction               0-021-008  12/05/06   8                              0       22,000     /  /                /  /       /  /      01/16/08  JOD
08-0793    Reconstruction               0-021-010  04/09/09   8,9,155,16                     0      382,000     /  /                /  /       /  /        /  /    JOD
06-0329    Reconstruction               8-048-006  02/07/07   4,8,155,15,16                  0    2,298,000     /  /                /  /       /  /        /  /    JOD
04-0832    Reconstruction               8-054-003  04/13/05   16                             0      340,000     /  /                /  /       /  /        /  /    JOD


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition