REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO LATE or OVERDUE FCRs / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO LATE or OVERDUE FCRs / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO LATE or OVERDUE FCRs / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
04-0365 Reconstruction 0-002-032 12/23/04 2,15,16 0 250,000 / / / / / / / / DDJ
08-0332 Reconstruction 0-002-035 03/05/09 2,4,9,155,16 0 1,275,000 / / / / / / / / DDJ
08-0333 Reconstruction 0-003-019 03/05/09 2,16 0 191,000 / / / / / / / / DDJ
99-0352 Reconstruction 0-004-022 05/31/00 4 0 22,000 / / / / / / / / MGL
08-0334 Reconstruction 0-004-025 03/05/09 7,9,13,155,16 0 195,000 / / / / / / / / DDJ
08-0335 Reconstruction 0-007-019 03/05/09 2,16 0 200,000 / / / / / / / / DDJ
08-0336 Reconstruction 0-008-019 03/05/09 2,9,16 0 50,000 / / / / / / / / DDJ
04-0366 Reconstruction 0-009-002 12/23/04 2,15 0 124,500 / / / / / / / / DDJ
00-1156 Reconstruction 0-009-005 06/27/01 2,4,7,8,9,155,15,16 0 200,000 / / / / / / / / MGL
99-1651 Reconstruction 0-009-006 07/27/00 16 0 203,000 / / / / / / / / MGL
01-0959 Reconstruction 0-009-007 05/21/02 15 0 50,000 / / / / / / / / MGL
04-0367 Reconstruction 0-010-015 12/23/04 2,15,16 0 124,500 / / / / / / / / DDJ
08-0337 Reconstruction 0-010-022 03/05/09 9,16 0 65,000 / / / / / / / / DDJ
04-0368 Reconstruction 0-011-020 12/23/04 2,15,16 0 151,000 / / / / / / / / DDJ
08-0338 Reconstruction 0-011-024 03/05/09 9,155,16 0 260,000 / / / / / / / / DDJ
00-0692 Reconstruction 5-012-002 04/11/01 2,4,7,8,9,155,15,16 0 216,000 / / / / / / / / MGL
08-0339 Additions and Alterations 5-012-006 03/05/09 02 - 16 0 1,343,000 / / / / / / / / DDJ
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
03-1041 Reconstruction 0-002-019 06/21/04 2,10 0 146,000 / / / / / / / / JOD
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
02-1218GP Reconstruction 0-004-FP1 03/17/03 16 0 0 / / / / / / / / MGL
07-0729 Reconstruction 0-006-019 12/11/07 2,15 0 100,000 / / / / / / / / DDJ
01-1210 New Construction 7-009-001 05/01/02 02 - 16 0 54,000 / / / / / / 09/01/05 HCM
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
07-0099 Reconstruction 0-001-010 09/11/07 15 0 45,000 / / / / / / / / MGL
06-0194 Reconstruction 0-003-009 03/14/07 2 0 75,000 / / / / / / / / MGL
06-1388 Reconstruction 0-003-010 09/12/07 15 0 45,000 / / / / / / / / MGL
98-1151 Additions and Alterations 0-004-007 04/15/99 02 - 16 0 1,193,881 / / / / / / 09/09/99 RDR
06-0193 Reconstruction 0-004-008 03/14/07 2 0 105,000 / / / / / / / / MGL
06-1389 Reconstruction 0-004-009 09/12/07 15 0 45,000 / / / / / / / / MGL
07-0100 Reconstruction 0-008-013 09/11/07 15 0 45,000 / / / / / / / / MGL
98-1124 New Construction 0-020-001 06/02/99 02 - 16 0 105,872 / / / / / / 09/09/99 RDR
98-1164 New Construction 0-021-001 06/02/99 02 - 16 0 58,783 / / / / / / 09/09/99 RDR
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
02-1064 Reconstruction 0-001-007 02/21/03 8 0 347,000 / / / / / / / / MAC
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
05-1181 Reconstruction 0-002-018 07/05/06 155,15 0 27,000 / / / / / / / / DDJ
05-1183 Reconstruction 0-005-015 07/06/06 155,15,16 0 8,800 / / / / / / / / DDJ
05-1184 Reconstruction 5-007-005 07/05/06 2 0 22,300 / / / / / / / / DDJ
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
06-0613 Reconstruction 0-008-022 12/28/06 15,16 0 19,916 / / / / / / 09/10/07 DDJ
05-0187 Reconstruction 0-009-026 09/14/05 155 0 60,000 / / / / / / / / DDJ
05-0192 Reconstruction 0-015-018 10/18/05 2,155,15 0 40,475 / / / / / / / / DDJ
06-0614 Reconstruction 0-015-020 12/28/06 15,16 0 19,916 / / / / / / 09/10/07 DDJ
07-1824 Reconstruction 0-018-014 09/11/08 2,4,7,8,9,155,15,16 0 2,966,048 / / / / / / 07/17/09 DDJ
02-0250 New Construction 7-030-001 09/24/02 02 - 16 0 150,000 / / / / / / 02/09/06 HCM
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
04-0062 Reconstruction 0-002-012 04/01/05 155,16 0 411,557 / / / / / / / / MAC
04-0063 Reconstruction 0-003-009 04/01/05 155,16 0 633,450 / / / / / / / / MAC
04-0064 Reconstruction 0-004-008 04/01/05 2,155,16 0 1,250,703 / / / / / / / / MAC
04-0065 Reconstruction 0-005-009 04/01/05 155,16 0 197,895 / / / / / / / / MAC
99-1772 Reconstruction 0-010-007 08/16/00 2,15,16 0 130,000 / / / / / / / / BJB
04-0066 Reconstruction 0-010-012 04/01/05 155,16 0 493,924 / / / / / / / / MAC
02-0478 Reconstruction 0-010-FP1 12/02/02 16 0 38,784 / / / / / / 05/30/03 MGL
04-0067 Reconstruction 0-011-007 04/01/05 155,16 0 188,466 / / / / / / / / MAC
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
08-1552 Reconstruction 0-001-005 03/18/10 2,155,15,16 0 97,527 / / / / / / / / DDJ
08-1553 Reconstruction 0-002-016 03/18/10 2,155,15,16 0 499,691 / / / / / / / / DDJ
08-1554 Reconstruction 0-003-017 03/18/10 2,155,15,16 0 515,408 / / / / / / / / DDJ
08-1555 Reconstruction 0-004-014 03/18/10 2,155,15,16 0 393,731 / / / / / / / / DDJ
08-1556 Reconstruction 0-006-013 03/18/10 2,155,15,16 0 954,816 / / / / / / / / DDJ
08-1557 Reconstruction 0-007-015 03/18/10 2,155,15,16 0 1,654,535 / / / / / / / / DDJ
08-1558 Reconstruction 0-008-024 03/18/10 2,155,16 0 1,305,742 / / / / / / / / DDJ
08-1559 Reconstruction 0-010-019 03/18/10 2,155,15,16 0 868,426 / / / / / / / / DDJ
08-1560 Reconstruction 0-011-015 03/18/10 2,155,15,16 0 444,358 / / / / / / / / DDJ
08-1561 Reconstruction 0-012-012 03/18/10 2,155,15,16 0 421,815 / / / / / / / / DDJ
08-1562 Reconstruction 0-013-017 03/18/10 2,155,15,16 0 457,539 / / / / / / / / DDJ
08-1563 Reconstruction 0-014-015 03/18/10 2,155,15,16 0 397,406 / / / / / / / / HCM
08-1564 Reconstruction 0-015-014 03/18/10 2,155,15,16 0 396,630 / / / / / / / / DDJ
08-1565 Reconstruction 0-016-024 03/18/10 2,155,15,16 0 2,040,975 / / / / / / / / DDJ
08-1566 Reconstruction 0-017-014 03/18/10 2,155,15,16 0 1,126,655 / / / / / / / / DDJ
08-1567 Reconstruction 0-018-012 03/18/10 2,155,15,16 0 424,316 / / / / / / / / DDJ
08-1568 Reconstruction 0-019-015 03/18/10 2,155,15,16 0 928,489 / / / / / / / / DDJ
01-0225SR New Construction 0-050-001 11/05/01 02 - 16 0 0 / / / / / / / / MGL
08-1569 Reconstruction 0-050-003 03/18/10 2,155,15,16 0 1,724,587 / / / / / / / / DDJ
09-1082 Reconstruction 0-050-004 03/15/10 7 0 2,530,000 / / / / / / / / DDJ
08-1570 Reconstruction 0-051-004 03/18/10 2,155,15,16 0 949,212 / / / / / / / / DDJ
08-1572 Reconstruction 5-021-007 03/18/10 2,155,16 0 168,479 / / / / / / / / DDJ
01-0529 New Construction 7-067-001 03/20/02 02 - 16 0 436,100 / / / / / / / / MGL
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
09-1578 Reconstruction 0-001-013 08/12/10 16 0 211,213 / / / / / / / / HCM
09-1579 Reconstruction 0-002-014 08/12/10 16 0 64,582 / / / / / / / / HCM
10-0402 Additions and Alterations 0-002-015 12/10/10 02 - 16 0 402,930 / / / / / / / / HCM
09-1580 Reconstruction 0-004-001 08/12/10 16 0 20,827 / / / / / / / / HCM
09-1581 Reconstruction 0-005-001 08/12/10 16 0 10,000 / / / / / / / / HCM
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO LATE or OVERDUE FCRs / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
06-0824 Additions and Alterations 0-002-010 02/13/07 02 - 16 0 148,200 / / / / / / / / DDJ
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
99-0163 Reconstruction 0-005-005 08/25/99 2 0 21,900 / / / / / / / / MGL
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
06-1289 Reconstruction 5-007-001 12/10/07 2,155,16 0 606,000 / / / / / / / / JOD
09-0617 Reconstruction 5-007-003 02/12/10 15 0 44,000 / / / / / / / / JOD
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO LATE or OVERDUE FCRs / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO LATE or OVERDUE FCRs / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
04-1416 Additions and Alterations 0-001-007 01/25/06 02 - 16 0 5,753,770 / / / / / / / / JOD
03-0535SR Additions and Alterations 0-011-006 10/13/04 02 - 16 0 459,000 / / / / / / / / HCM
07-2127 Reconstruction 7-999-007 07/14/08 10,16 0 4,376,496 / / / / / / / / JOD
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO LATE or OVERDUE FCRs / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
00-1694SR Additions and Alterations 0-006-006 06/08/01 02 - 16 0 0 / / / / / / / / RDR
07-2088 New Construction 7-020-001 05/13/09 02 - 16 0 287,125 / / / / / / / / JOD
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO LATE or OVERDUE FCRs / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
02-0044 Reconstruction 5-021-L01 07/12/02 0 33,600 / / / / / / / / RDR
04-1347 Reconstruction 5-021-L02 05/27/05 0 162,500 / / / / / / / / RDR
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO LATE or OVERDUE FCRs / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
01-0382 Reconstruction 0-003-013 02/28/02 15 0 26,325 / / / / / / / / MGL
98-1762 Reconstruction 0-004-006 07/20/99 4 0 25,000 / / / / / / / / MGL
01-0383 Reconstruction 0-004-010 02/28/02 15 0 22,750 / / / / / / / / MGL
06-0075 Reconstruction 0-004-013 11/09/06 4,8 0 150,000 / / / / / / / / HCM
00-0778 Reconstruction 0-006-010 05/03/01 7 0 155,500 / / / / / / / / MGL
02-0311 Additions and Alterations 0-006-017 08/27/03 02 - 16 0 592,250 / / / / / / / / MGL
02-2256 Additions and Alterations 0-006-020 08/12/03 02 - 16 0 490,250 / / / / / / 08/26/03 HCM
05-1244 Additions and Alterations 0-006-022 10/10/06 02 - 16 0 1,710,507 / / / / / / 03/14/07 HCM
08-1476 Reconstruction 0-006-026 04/29/09 15 0 73,561 / / / / / / / / HCM
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO LATE or OVERDUE FCRs / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
09-0257 Reconstruction 7-005-003 01/11/10 2,155 0 25,000 / / / / / / / / DDJ
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO LATE or OVERDUE FCRs / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
04-1172 Reconstruction 0-001-016 05/19/05 7 0 82,125 / / / / / / / / RDR
06-1037 Reconstruction 0-001-017 04/06/07 2,8,9,16 0 70,000 / / / / / / / / MGL
08-1385 Reconstruction 0-003-017 05/29/09 10 0 6,569 / / / / / / / / DDJ
99-1606 New Construction 0-010-001 06/05/00 02 - 16 0 131,300 / / / / / / / / RDR
04-0117 New Construction 0-012-001 01/24/05 02 - 16 0 0 / / / / / / / / RDR
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
98-0844 Additions and Alterations 0-001-006 05/18/99 02 - 16 0 3,554,000 / / / / / / 08/25/00 BJB
06-0310 Reconstruction 0-001-007 01/12/07 8,9,155,15,16 0 875,796 / / / / / / / / MGL
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
99-0451 Reconstruction 0-003-006 04/04/00 8,155,15 0 58,500 / / / / / / / / MGL
99-0452 Reconstruction 0-004-010 04/04/00 155,15,16 0 48,000 / / / / / / / / MGL
99-0454 Reconstruction 0-006-006 04/04/00 8,155,15,16 0 322,000 / / / / / / 03/17/03 MGL
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
00-1969 Reconstruction 0-007-021 07/20/01 8,10,15 0 34,900 / / / / / / / / MGL
01-0602 New Construction 7-012-001 06/20/02 02 - 16 0 226,500 / / / / / / / / MGL
02-2367 New Construction 7-013-001 06/10/03 02 - 16 0 1,074,475 / / / / / / 03/10/06 DDJ
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO LATE or OVERDUE FCRs / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
03-1409 Reconstruction 0-003-015 05/17/04 10 0 150,000 / / / / / / / / HCM
07-1861 Additions and Alterations 0-010-023 05/21/08 02 - 16 0 34,400 / / / / / / / / HCM
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
09-0434 Reconstruction 0-001-013 10/01/10 2,155,15,16 0 465,529 / / / / / / / / HCM
09-0435 Reconstruction 0-002-019 10/01/10 2,155,15,16 0 493,651 / / / / / / / / HCM
99-0612 Reconstruction 0-006-014 05/11/00 2,4,8,9 0 107,000 / / / / / / / / MAC
09-0436 Reconstruction 0-006-032 10/01/10 2,8,155,15,16 0 2,164,575 / / / / / / / / HCM
09-0437 Reconstruction 0-007-012 10/01/10 2,155,15,16 0 559,110 / / / / / / / / HCM
09-0438 Reconstruction 0-008-019 10/01/10 2,155,15,16 0 786,972 / / / / / / / / HCM
09-0439 Reconstruction 0-011-016 10/01/10 2,155,15,16 0 1,167,814 / / / / / / / / HCM
09-0440 Reconstruction 0-014-018 10/01/10 2,155,15,16 0 1,163,886 / / / / / / / / HCM
09-0441 Reconstruction 0-015-018 10/01/10 2,155,15,16 0 545,269 / / / / / / / / HCM
09-0442 Reconstruction 0-016-017 10/01/10 2,155,15,16 0 1,225,302 / / / / / / / / HCM
09-0443 Reconstruction 0-017-016 10/01/10 2,155,15,16 0 3,178,349 / / / / / / / / HCM
09-0444 Reconstruction 0-018-016 10/01/10 2,155,15,16 0 1,243,171 / / / / / / / / HCM
09-0445 Reconstruction 0-020-008 10/01/10 2,155,15,16 0 639,968 / / / / / / / / HCM
09-0446 Reconstruction 0-021-015 10/01/10 2,155,15,16 0 2,406,820 / / / / / / / / HCM
09-0447 Reconstruction 5-003-004 10/01/10 2,155,15,16 0 359,584 / / / / / / / / HCM
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
00-0245 Reconstruction 0-005-002 11/10/00 2 0 876,405 / / / / / / 07/01/01 BJB
09-1156 Reconstruction 7-999-002 10/15/10 10 0 479,850 / / / / / / / / HCM
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
01-1253 Reconstruction 0-004-005 05/30/02 155 0 85,000 / / / / / / / / MAC
09-0147 Reconstruction 0-007-009 03/10/10 8,16 0 13,143 / / / / / / / / JOD
01-1142 Reconstruction 0-008-011 11/25/02 13 0 2,381,470 / / / / / / 09/06/05 MAC
09-0149 Reconstruction 0-008-018 03/10/10 8,16 0 39,426 / / / / / / / / JOD
09-0151 Reconstruction 0-009-009 03/10/10 8,16 0 13,143 / / / / / / / / JOD
09-0153 Reconstruction 0-014-008 03/10/10 8,16 0 13,143 / / / / / / / / JOD
09-0155 Reconstruction 0-023-010 03/10/10 8,16 0 13,143 / / / / / / / / JOD
09-0157 Reconstruction 0-027-013 03/10/10 8,16 0 39,426 / / / / / / / / JOD
04-1410 Reconstruction 0-035-009 08/02/05 10 0 141,504 / / / / / / / / RDR
07-2248 Reconstruction 0-035-011 09/10/08 4,7,155,15,16 0 1,246,620 / / / / / / / / MGL
09-0159 Reconstruction 0-035-012 03/10/10 8,16 0 26,283 / / / / / / / / JOD
04-1411 Reconstruction 0-036-008 08/02/05 10 0 141,504 / / / / / / / / RDR
09-0161 Reconstruction 0-036-012 03/10/10 8,16 0 26,283 / / / / / / / / JOD
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
07-1903 Reconstruction 0-008-027 08/13/08 2,8,9 0 358,450 / / / / / / / / DDJ
09-0947 Reconstruction 0-008-030 11/12/10 2,16 0 425,425 / / / / / / / / DDJ
00-0008 Reconstruction 0-010-019 07/10/00 2,16 0 140,000 / / / / / / / / MGL
01-0645 Reconstruction 7-014-007 03/21/02 2 0 304,000 / / / / / / / / MGL
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO LATE or OVERDUE FCRs / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
09-0244 Reconstruction 0-002-009 02/10/10 2,8,10,155,15,16 0 170,510 / / / / / / / / JOD
00-1190 Additions and Alterations 0-003-012 08/23/01 02 - 16 0 1,611,000 / / / / / / / / MGL
09-0245 Reconstruction 0-003-015 02/10/10 2,4,8,10,155,15,16 0 114,166 / / / / / / / / JOD
09-0246 Reconstruction 0-007-013 02/10/10 8,155,15,16 0 119,362 / / / / / / / / JOD
00-1178 Reconstruction 0-011-007 08/16/01 2,4,7,8,9,155,15,16 0 2,400,000 / / / / / / / / MGL
00-1274 Reconstruction 0-011-008 04/09/01 7 0 1,600,000 / / / / / / / / MGL
09-0248 Reconstruction 0-011-011 02/10/10 8,155,15,16 0 146,237 / / / / / / / / JOD
05-1262 Reconstruction 7-999-002 07/03/06 16 0 58,000 / / / / / / 08/28/06 JOD
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
00-0894 Reconstruction 0-002-008 06/20/01 9,15,16 0 195,000 / / / / / / 10/06/03 MGL
98-1276 Reconstruction 0-002-009 07/26/99 2,9,15,16 0 176,925 / / / / / / / / MGL
98-0523 Additions and Alterations 0-010-008 06/03/99 02 - 16 0 40,000 / / / / / / 12/21/00 MGL
98-1277 Reconstruction 0-010-009 07/26/99 8,9,10,155,15,16 0 123,075 / / / / / / / / MGL
99-0886 Additions and Alterations 0-010-011 06/06/00 02 - 16 0 705,000 / / / / / / / / MGL
98-1607 New Construction 0-025-001 09/01/99 02 - 16 0 52,460 / / / / / / / / MGL
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
08-0057 Additions and Alterations 0-004-019 04/10/09 02 - 16 0 2,330,000 / / / / / / / / MGL
08-1488 Reconstruction 0-004-021 09/18/09 2,4,7,8,9,155,15,16 0 1,402,878 / / / / / / / / MGL
08-0890 Additions and Alterations 0-006-010 07/27/09 02 - 16 0 4,125,000 / / / / / / / / MGL
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO LATE or OVERDUE FCRs / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
98-1772 Reconstruction 0-008-016 10/07/99 2,16 0 100,000 / / / / / / / / MGL
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
08-0296 Reconstruction 0-001-012 03/20/09 4,8,16 0 41,000 / / / / / / / / DDJ
07-2052 Reconstruction 0-001-013 02/13/09 155,16 0 415,427 / / / / / / / / DDJ
08-0297 Reconstruction 0-002-014 03/20/09 8,16 0 41,000 / / / / / / / / DDJ
07-2053 Reconstruction 0-002-015 02/13/09 155,16 0 398,276 / / / / / / / / DDJ
09-0547 Reconstruction 0-002-016 12/21/09 7,155 0 1,330,000 / / / / / / / / DDJ
08-0298 Reconstruction 0-004-017 03/20/09 8,16 0 41,500 / / / / / / / / DDJ
07-2054 Reconstruction 0-004-019 02/13/09 155,15,16 0 473,066 / / / / / / / / DDJ
08-0299 Reconstruction 0-005-015 03/20/09 8,16 0 41,000 / / / / / / / / DDJ
07-2055 Reconstruction 0-005-016 02/13/09 155,15,16 0 417,285 / / / / / / / / DDJ
09-0548 Reconstruction 0-005-017 12/21/09 7,155 0 1,300,000 / / / / / / / / DDJ
98-0855 Reconstruction 0-007-019 03/11/99 15 0 60,000 / / / / / / / / RDR
98-0661 Additions and Alterations 0-007-022 03/03/99 02 - 16 0 2,659,800 / / / / / / 09/05/01 RDR
07-1635 Reconstruction 0-007-029 04/15/08 2,7 0 5,010,000 / / / / / / 08/31/09 MGL
08-0300 Reconstruction 0-007-030 03/20/09 2,9,10,155,15,16 0 2,433,000 / / / / / / 11/27/09 DDJ
07-2056 Reconstruction 0-007-032 02/13/09 155,16 0 1,421,955 / / / / / / / / DDJ
08-0301 Reconstruction 0-009-010 03/20/09 8,16 0 41,000 / / / / / / / / DDJ
07-2057 Reconstruction 0-009-011 02/13/09 155,16 0 435,891 / / / / / / / / DDJ
09-0549 Reconstruction 0-009-012 12/21/09 7,155 0 1,400,000 / / / / / / / / DDJ
08-0302 Reconstruction 0-010-017 03/20/09 8,16 0 25,000 / / / / / / / / DDJ
07-2058 Reconstruction 0-010-019 02/13/09 2,8,155,15,16 0 2,002,841 / / / / / / / / DDJ
98-0856 Reconstruction 0-011-013 03/24/99 155 0 20,000 / / / / / / / / RDR
08-0303 Reconstruction 0-011-020 03/20/09 8,16 0 25,000 / / / / / / / / DDJ
07-2059 Reconstruction 0-011-022 02/13/09 155,15,16 0 1,871,345 / / / / / / / / DDJ
08-0304 Reconstruction 0-012-013 03/20/09 8,16 0 41,500 / / / / / / / / DDJ
07-2060 Reconstruction 0-012-015 02/13/09 2,8,155,16 0 587,697 / / / / / / / / DDJ
08-0305 Reconstruction 0-013-011 03/20/09 8,16 0 42,000 / / / / / / / / DDJ
07-2061 Reconstruction 0-013-013 02/13/09 155,16 0 515,314 / / / / / / / / DDJ
07-2062 Reconstruction 5-015-012 02/13/09 2,8,155,15,16 0 2,730,594 / / / / / / / / DDJ
98-0821 Reconstruction 7-999-004 03/18/99 16 0 5,237,000 / / / / / / / / RDR
04-1209 Reconstruction 7-999-005 06/23/05 16 0 793,650 / / / / / / / / RDR
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO LATE or OVERDUE FCRs / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
07-1264 Additions and Alterations 0-002-009 07/03/08 02 - 16 0 2,550,000 / / / / / / / / HCM
08-1309 Reconstruction 0-002-010 07/09/09 2,4,9,155,15,16 0 2,306,895 / / / / / / / / HCM
10-0032 Reconstruction 0-002-011 12/20/10 2,15,16 0 423,647 / / / / / / / / HCM
08-1310 Reconstruction 0-003-009 07/09/09 2,8,9,155,15,16 0 2,730,960 / / / / / / / / HCM
07-2145 Reconstruction 0-004-007 07/31/08 2,7 0 709,940 / / / / / / / / HCM
08-1311 Reconstruction 0-004-008 07/09/09 2,8,155,15,16 0 2,715,061 / / / / / / / / HCM
10-0033 Reconstruction 0-004-009 12/20/10 2,155,15,16 0 450,984 / / / / / / / / HCM
08-0978 Reconstruction 0-005-007 03/11/09 9 0 378,547 / / / / / / / / HCM
08-1312 Reconstruction 0-005-010 07/09/09 2,8,9,155,15,16 0 3,730,806 / / / / / / / / HCM
10-0003 Reconstruction 0-005-012 08/18/10 7,16 0 864,667 / / / / / / / / HCM
08-1645 Reconstruction 0-006-001 12/23/10 2,4,8,9,155,15,16 0 397,250 / / / / / / / / HCM
07-1265 Reconstruction 0-007-006 07/03/08 9 0 3,430,145 / / / / / / / / HCM
10-0034 Reconstruction 0-007-008 12/20/10 2,155,15,16 0 422,894 / / / / / / / / HCM
07-1266 Additions and Alterations 0-008-005 07/03/08 02 - 16 0 2,817,644 / / / / / / / / HCM
10-0035 Reconstruction 0-008-006 12/20/10 2,4,155,16 0 399,007 / / / / / / / / HCM
09-0085 Reconstruction 0-009-007 08/18/09 7 0 788,960 / / / / / / / / HCM
10-0036 Reconstruction 0-009-008 12/20/10 2,155,15,16 0 397,489 / / / / / / / / HCM
08-0979 Additions and Alterations 0-010-007 03/11/09 02 - 16 0 250,000 / / / / / / / / HCM
10-0004 Reconstruction 0-010-009 08/18/10 7 0 46,000 / / / / / / / / HCM
07-1268 Additions and Alterations 0-011-009 07/03/08 02 - 16 0 1,580,864 / / / / / / / / HCM
08-0980 Reconstruction 0-012-004 03/11/09 2,4,8,9,10,155,15,16 0 250,000 / / / / / / / / HCM
08-1313 Reconstruction 0-012-005 07/09/09 2,8,9,155,15,16 0 2,281,256 / / / / / / / / HCM
09-1310 Reconstruction 0-012-006 05/20/10 2,7 0 2,128,560 / / / / / / / / HCM
03-0647 Reconstruction 0-013-003 03/18/04 16 0 0 / / / / / / / / JOD
08-1314 Reconstruction 0-013-005 07/09/09 8 0 2,058,011 / / / / / / / / HCM
09-1311 Reconstruction 0-013-006 05/20/10 7 0 1,943,188 / / / / / / / / HCM
10-0037 Reconstruction 0-013-007 12/20/10 2,16 0 235,213 / / / / / / / / HCM
10-0038 Reconstruction 0-014-007 12/20/10 2,16 0 137,574 / / / / / / / / HCM
07-1270 Reconstruction 0-015-008 07/03/08 2,4,7,8,9,10,155,15, 0 4,970,000 / / / / / / / / HCM
08-0981 Reconstruction 0-016-005 03/11/09 2,4,8,9,155,15,16 0 500,000 / / / / / / / / HCM
08-1315 Reconstruction 0-016-006 07/09/09 2,8,9,155,15,16 0 5,637,315 / / / / / / / / HCM
10-0039 Reconstruction 0-016-007 12/20/10 2,155,15,16 0 663,102 / / / / / / / / HCM
08-0982 Reconstruction 0-017-004 03/11/09 2,4,8,9,10,155,15,16 0 250,000 / / / / / / / / HCM
08-1316 Reconstruction 0-017-005 07/09/09 2,8,9,155,15,16 0 2,083,947 / / / / / / / / HCM
08-1317 Reconstruction 0-018-005 07/09/09 2,4,155,16 0 2,329,661 / / / / / / / / HCM
09-1312 Reconstruction 0-018-006 05/20/10 13 0 1,914,000 / / / / / / / / HCM
07-1271 Reconstruction 0-019-007 07/03/08 2,4,8,9,155,15,16 0 2,280,577 / / / / / / / / HCM
08-0983 Reconstruction 0-020-008 03/11/09 2,4,7,8,10,155,15,16 0 315,000 / / / / / / / / HCM
07-2146 Reconstruction 0-020-009 07/31/08 2,4,7 0 189,937 / / / / / / / / HCM
08-1318 Reconstruction 0-020-010 07/09/09 2,8,155,15,16 0 5,105,310 / / / / / / / / HCM
09-1313 Reconstruction 0-020-011 05/20/10 7 0 1,938,554 / / / / / / / / HCM
00-0989 New Construction 0-036-001 07/12/01 02 - 16 0 350,000 / / / / / / 10/11/01 BJB
03-0042 New Construction 7-043-001 01/26/04 02 - 16 0 686,362 / / / / / / / / JOD
07-0347 Reconstruction 7-999-004 12/19/07 10 0 6,243,485 / / / / / / / / HCM
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
00-1809SR Reconstruction 0-001-007 07/24/01 2,16 0 1,367,659 / / / / / / 01/13/04 MGL
08-0904 Reconstruction 0-001-009 04/22/09 7 0 457,000 / / / / / / / / JOD
08-1143 Reconstruction 0-001-010 05/20/09 7,9,10,155,16 0 2,780,000 / / / / / / / / JOD
08-1144 Reconstruction 0-003-011 05/20/09 2,4,10,155 0 809,000 / / / / / / / / JOD
08-0905 Reconstruction 0-004-008 04/22/09 9,10 0 272,000 / / / / / / / / JOD
08-1145 Reconstruction 0-005-009 05/20/09 2,8,9,10,16 0 910,000 / / / / / / / / JOD
08-0906 Reconstruction 0-006-008 04/22/09 9,10 0 360,000 / / / / / / / / JOD
08-0907 Reconstruction 0-007-008 04/22/09 9,10,155 0 520,000 / / / / / / / / JOD
08-0908 Reconstruction 0-008-010 04/22/09 9,10 0 760,000 / / / / / / / / JOD
08-1146 Reconstruction 0-008-011 05/20/09 8,10,155,15,16 0 309,000 / / / / / / / / JOD
01-1509 Reconstruction 0-014-004 01/18/02 4,8,9 0 0 / / / / / / 02/07/03 MGL
00-0133 New Construction 0-016-001 01/25/01 02 - 16 0 400,000 / / / / / / 08/30/01 MGL
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO LATE or OVERDUE FCRs / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
03-1640 Reconstruction 0-007-011 07/07/04 2,7,155,16 0 510,825 / / / / / / / / HCM
99-0244 Reconstruction 7-999-001 11/18/99 16 0 195,000 / / / / / / / / MGL
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
07-2288 Reconstruction 0-005-012 12/09/08 2,10,15,16 0 40,831 / / / / / / / / HCM
00-0818 Reconstruction 0-006-002 05/08/01 2,13,15,16 0 30,000 / / / / / / / / MGL
01-0971 Reconstruction 0-008-001 07/15/02 2,155 0 55,000 / / / / / / / / MGL
07-2290 Reconstruction 0-010-014 12/09/08 2,4,8,10,14,15,16 0 380,524 / / / / / / / / HCM
00-0819 Reconstruction 0-035-002 05/08/01 2,15,16 0 30,000 / / / / / / 08/09/01 MGL
01-0972 New Construction 0-042-001 07/15/02 02 - 16 0 55,000 / / / / / / / / MGL
01-0973 New Construction 0-043-001 07/15/02 02 - 16 0 60,000 / / / / / / 10/08/02 MGL
01-0974 New Construction 0-044-001 07/15/02 02 - 16 0 60,000 / / / / / / 10/08/02 MGL
01-0975 New Construction 0-045-001 07/15/02 02 - 16 0 60,000 / / / / / / 10/08/02 MGL
03-1159 New Construction 0-046-001 06/15/04 02 - 16 0 1,100,000 / / / / / / / / HCM
06-1569 Reconstruction 7-999-005 10/05/07 13,16 0 150,000 / / / / / / / / HCM
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO LATE or OVERDUE FCRs / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
99-0963 Reconstruction 0-001-016 04/24/00 7 0 190,800 / / / / / / / / MEM
02-1556 Reconstruction 0-001-017 04/30/03 155,16 0 209,000 / / / / / / / / MAC
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
07-1897 Reconstruction 0-033-013 05/22/08 10 0 325,600 / / / / / / 12/23/08 DDJ
97-1457 New Construction 0-059-001 05/24/99 02 - 16 0 20,600 / / / / / / 10/26/98 MEM
97-1456 New Construction 0-060-001 05/24/99 02 - 16 0 20,600 / / / / / / 10/26/99 MEM
97-1422 New Construction 0-061-001 05/24/99 02 - 16 0 20,600 / / / / / / 10/26/98 MEM
97-1423 New Construction 0-062-001 05/24/99 02 - 16 0 20,600 / / / / / / 10/26/98 MEM
99-0256 New Construction 0-063-001 11/25/99 02 - 16 0 120,000 / / / / / / 09/03/99 MGL
07-0994 New Construction 5-076-001 06/24/08 02 - 16 0 619,129 / / / / / / / / DDJ
99-1672 Reconstruction 7-022-003 09/18/00 16 0 77,471 / / / / / / 09/01/01 MGL
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO LATE or OVERDUE FCRs / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
02-0763 Reconstruction 0-008-FP2 12/24/02 16 0 7,625 / / / / / / 02/21/03 MGL
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO LATE or OVERDUE FCRs / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
99-0108 Reconstruction 0-002-004 11/04/99 16 0 14,200 / / / / / / / / MEM
99-1290 Reconstruction 0-002-006 05/15/00 2,9,15,16 0 130,000 / / / / / / 12/11/00 MAC
06-0339 Additions and Alterations 0-002-010 02/05/07 02 - 16 0 13,381,861 / / / / / / 12/23/08 DDJ
07-1362 Reconstruction 0-002-012 02/20/08 7 0 275,000 / / / / / / / / DDJ
00-0554 Reconstruction 0-003-006 01/09/01 2,7 0 351,000 / / / / / / 09/10/01 MAC
02-1310 Reconstruction 0-003-008 04/09/03 8 0 47,000 / / / / / / 10/22/03 MAC
03-1098 Reconstruction 0-003-009 03/26/04 8 0 213,450 / / / / / / 02/04/05 MAC
03-1237 Reconstruction 0-003-010 05/14/03 16 0 41,875 / / / / / / / / MAC
04-1170 Additions and Alterations 0-003-012 07/20/05 02 - 16 0 4,628,905 / / / / / / 09/01/06 DDJ
04-0921 Reconstruction 0-003-013 03/28/05 8 0 136,550 / / / / / / / / DDJ
06-0424 Reconstruction 0-003-014 01/30/07 2 0 3,135,755 / / / / / / / / DDJ
02-1311 Reconstruction 0-004-006 04/09/03 8 0 795,758 / / / / / / / / MAC
01-1104 Reconstruction 0-004-012 04/26/02 7 0 86,000 / / / / / / / / MAC
02-1312 Reconstruction 0-004-013 04/09/03 8 0 92,277 / / / / / / 10/22/03 MAC
04-0527 Additions and Alterations 0-004-014 04/04/05 02 - 16 0 26,836,892 / / / / / / 01/26/07 DDJ
06-1365 Reconstruction 0-004-015 09/05/07 2,10 0 136,375 / / / / / / / / DDJ
05-0286 Reconstruction 0-004-016 12/30/05 16 0 250,000 / / / / / / 01/16/07 DDJ
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
04-1135 Reconstruction 0-001-010 07/07/05 4,8,15 0 812,130 / / / / / / / / JOD
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
99-1745 Alterations 0-001-001 08/29/00 02 - 16 0 97,500 / / / / / / 01/29/01 MAC
00-0441 Reconstruction 0-001-002 04/11/01 16 0 4,772 / / / / / / 10/11/01 MAC
99-1746 Alterations 0-002-001 08/29/00 02 - 16 0 97,500 / / / / / / 01/29/01 MAC
00-0442 Reconstruction 0-002-002 04/11/01 16 0 4,772 / / / / / / 10/11/01 MAC
00-0443 Reconstruction 0-003-004 04/11/01 155,16 0 178,200 / / / / / / 10/11/01 MAC
02-2287 Reconstruction 0-003-005 06/18/03 7 0 725,000 / / / / / / 12/03/03 MAC
03-0815 Reconstruction 0-003-006 12/17/03 2,9 0 152,100 / / / / / / 01/09/04 MAC
09-1458 Alterations 0-003-009 06/11/10 02 - 16 0 250,000 / / / / / / / / HCM
00-0446 Reconstruction 0-005-001 04/11/01 155,16 0 5,700 / / / / / / 10/11/01 MAC
00-0444 Reconstruction 0-010-004 04/11/01 155,16 0 204,135 / / / / / / 10/11/01 MAC
09-1552 Reconstruction 0-010-007 07/23/10 2,10,15,16 0 93,440 / / / / / / / / HCM
00-0445 Reconstruction 0-014-002 04/11/01 155,16 0 20,812 / / / / / / 10/11/01 MAC
00-0447 Reconstruction 8-007-002 04/11/01 155,16 0 4,000 / / / / / / 10/11/01 MAC
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
99-0443 Reconstruction 0-001-014 02/16/00 2,4,7,8,9,155,16 0 206,250 / / / / / / / / MGL
00-1560 Reconstruction 0-001-015 11/05/01 4,14,15 0 487,000 / / / / / / / / MGL
99-0444 Reconstruction 0-003-009 02/16/00 8,9,16 0 45,700 / / / / / / / / MGL
99-0445 Reconstruction 0-007-006 02/16/00 2,7 0 186,187 / / / / / / / / MGL
00-1561 Reconstruction 0-007-007 11/05/01 2,7 0 175,000 / / / / / / / / MGL
09-0345 Alterations 5-005-005 01/07/10 02 - 16 0 360,000 / / / / / / / / JOD
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
98-0671 Reconstruction 0-001-011 02/22/99 2,4 0 108,000 / / / / / / / / MGL
00-1593 Reconstruction 0-001-012 04/18/01 2,155 0 460,000 / / / / / / / / MGL
10-0358 New Construction 0-008-001 11/04/10 02 - 16 0 0 / / / / / / / / HCM
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO LATE or OVERDUE FCRs / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO LATE or OVERDUE FCRs / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
08-0820 Reconstruction 0-001-004 06/08/09 9,155,15,16 0 6,150,000 / / / / / / / / DDJ
07-2336 Reconstruction 0-011-001 12/05/08 2,8,14,155,16 0 5,857,000 / / / / / / / / DDJ
08-0790 Reconstruction 0-012-004 06/01/09 2,4,8,9,10,155,15,16 0 4,750,000 / / / / / / / / DDJ
09-1139 Additions and Alterations 0-014-002 09/01/10 02 - 16 0 16,200,000 / / / / / / / / DDJ
08-1100 Reconstruction 0-014-005 06/24/09 4,7,8,9,10,16 0 10,250,000 / / / / / / / / DDJ
08-1373 New Construction 7-023-001 07/23/09 02 - 16 0 500,000 / / / / / / / / DDJ
08-1389 Reconstruction 7-999-001 05/20/09 16 0 4,787,000 / / / / / / / / DDJ
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO LATE or OVERDUE FCRs / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
02-0413 Reconstruction 0-001-008 02/26/03 10 0 86,000 / / / / / / / / HCM
03-0231 Reconstruction 0-001-009 11/18/03 4 0 140,000 / / / / / / / / HCM
03-1525 Reconstruction 0-001-011 05/10/04 9 0 20,800 / / / / / / / / HCM
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
01-1182 Reconstruction 0-001-005 05/15/02 7 0 49,960 / / / / / / / / MGL
09-0511 Reconstruction 0-001-006 12/10/09 8 0 150,000 / / / / / / / / JOD
07-1822 Reconstruction 0-001-008 03/17/08 10 0 60,000 / / / / / / 08/02/08 JOD
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO LATE or OVERDUE FCRs / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
07-1533 Reconstruction 0-001-009 06/17/09 16 0 193,403 / / / / / / / / DDJ
08-0545 Reconstruction 0-001-010 06/17/09 2,4,8,10,155,15 0 1,441,911 / / / / / / / / DDJ
09-0449 Reconstruction 0-001-011 02/22/10 2 0 91,742 / / / / / / / / DDJ
04-0474 Reconstruction 0-005-003 02/08/05 7 0 288,000 / / / / / / 12/02/05 DDJ
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
98-0793 Reconstruction 0-001-004 03/24/99 7 0 140,500 / / / / / / / / MGL
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO LATE or OVERDUE FCRs / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO LATE or OVERDUE FCRs / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
09-1371 Reconstruction 0-007-003 05/24/10 2,8 0 90,000 / / / / / / / / HCM
02-2015 Reconstruction 0-016-001 04/23/03 9,15,16 0 140,000 / / / / / / 05/04/05 HCM
04-0104 Reconstruction 0-017-001 08/10/04 7 0 29,160 / / / / / / / / HCM
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO LATE or OVERDUE FCRs / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
04-0990 Reconstruction 0-001-006 04/01/05 7 0 330,200 / / / / / / / / JOD
05-0082 Reconstruction 0-001-007 12/21/05 10 0 11,029 / / / / / / 06/05/07 JOD
04-0991 Reconstruction 0-002-006 04/01/05 7 0 136,500 / / / / / / / / JOD
05-0083 Reconstruction 0-002-007 12/21/05 10 0 3,786 / / / / / / 06/05/07 JOD
04-0992 Reconstruction 0-003-004 04/01/05 7 0 162,500 / / / / / / / / JOD
05-0084 Reconstruction 0-003-005 12/21/05 10,155 0 59,294 / / / / / / 06/05/07 JOD
04-0993 Reconstruction 0-004-007 04/01/05 7 0 117,000 / / / / / / / / JOD
05-0085 Reconstruction 0-004-008 12/21/05 10,155 0 91,146 / / / / / / 06/05/07 JOD
05-0086 Reconstruction 0-011-008 12/21/05 10 0 2,891 / / / / / / 06/05/07 JOD
07-0654 Reconstruction 0-011-009 03/10/08 155,16 0 375,000 / / / / / / / / JOD
00-1948 Reconstruction 0-013-007 10/15/01 7,155 0 600,000 / / / / / / / / MGL
05-0087 Reconstruction 0-013-009 12/21/05 10 0 13,156 / / / / / / 06/05/07 JOD
04-0994 Reconstruction 0-014-004 04/01/05 7 0 111,800 / / / / / / / / JOD
05-0088 Reconstruction 0-014-005 12/21/05 10,155 0 55,581 / / / / / / 06/05/07 JOD
03-0515 Reconstruction 0-022-007 11/24/03 2 0 50,000 / / / / / / / / MAC
05-0089 Reconstruction 0-022-008 12/21/05 10 0 4,448 / / / / / / 06/05/07 JOD
05-0090 Reconstruction 0-025-004 12/21/05 10 0 1,251 / / / / / / 06/05/07 JOD
99-0020 Reconstruction 0-048-003 09/24/99 2 0 35,400 / / / / / / / / RDR
00-1993 Reconstruction 0-048-004 08/03/01 155,15,16 0 80,000 / / / / / / / / MAC
01-0046 Reconstruction 0-048-005 08/10/01 2 0 85,000 / / / / / / / / MAC
03-1099 Reconstruction 0-048-007 03/26/04 2,7 0 975,000 / / / / / / / / MAC
05-0091 Reconstruction 0-048-008 12/21/05 10,155,16 0 511,153 / / / / / / 06/05/07 JOD
05-0831 Reconstruction 0-048-009 04/10/06 15 0 21,300 / / / / / / 07/12/07 JOD
06-0109 Reconstruction 0-048-011 10/06/06 8 0 81,000 / / / / / / / / JOD
00-1939 Reconstruction 0-049-007 11/13/01 16 0 88,000 / / / / / / / / MAC
00-1992 Reconstruction 0-049-008 08/03/01 155,15,16 0 80,000 / / / / / / / / MAC
00-1763 Reconstruction 0-049-009 06/14/01 2,9 0 46,400 / / / / / / / / MAC
05-0092 Reconstruction 0-049-011 12/21/05 10,16 0 401,276 / / / / / / 06/05/07 JOD
05-0832 Reconstruction 0-049-012 04/10/06 15 0 19,900 / / / / / / 01/12/07 JOD
05-1236 Reconstruction 0-049-014 06/09/06 2 0 117,400 / / / / / / / / JOD
06-0110 Reconstruction 0-049-015 10/06/06 8 0 81,000 / / / / / / / / JOD
05-0093 Reconstruction 0-057-002 12/21/05 10,16 0 80,835 / / / / / / 06/05/07 JOD
05-0833 Reconstruction 0-057-003 04/10/06 15 0 19,900 / / / / / / 01/12/07 JOD
98-0403 Reconstruction 0-058-002 01/07/99 7 0 390,000 / / / / / / / / MGL
05-0094 Reconstruction 0-058-003 12/21/05 10,16 0 77,981 / / / / / / 06/05/07 JOD
98-1120 Reconstruction 0-059-002 05/14/99 7 0 650,000 / / / / / / / / MGL
05-0095 Reconstruction 0-059-004 12/21/05 10,155,16 0 441,768 / / / / / / 06/05/07 JOD
05-0834 Reconstruction 0-059-005 04/10/06 15 0 21,300 / / / / / / 07/12/07 JOD
03-1100 Reconstruction 0-061-005 03/26/04 7,155 0 1,035,000 / / / / / / / / MAC
05-0096 Reconstruction 0-061-006 12/21/05 10,155,16 0 654,593 / / / / / / 06/05/07 JOD
05-0835 Reconstruction 0-061-007 04/10/06 15 0 19,900 / / / / / / 03/21/07 JOD
01-0047 Additions and Alterations 0-076-002 02/21/02 02 - 16 0 70,000 / / / / / / / / MAC
99-0265 Reconstruction 8-063-002 09/30/99 2,9 0 11,900 / / / / / / / / RDR
00-0272 Reconstruction 8-072-001 10/02/00 2,9 0 15,500 / / / / / / / / MAC
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
- NO LATE or OVERDUE FCRs / / 0 0 / / / / / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
REVIEW BUILDING NAME/ BLDG./ NYSED FINAL ESTIMATED FCR FCR FCR TO FCR TO SUBST. PRJ.
NUMBER PROJECT SCOPE PROJ. NO. APPROVAL CSI CODES COST COST APPROVED REVIEWER STATE AID PROJ. MGR. COMPLETE MGR.
______________________________________________________________________________________________________________________________________________________________________
09-0672 Reconstruction 0-001-014 08/25/10 155,16 0 200,000 / / / / / / / / JOD
07-1702 Reconstruction 0-016-014 04/10/08 9 0 158,500 / / / / / / 01/05/09 JOD
08-0731 Reconstruction 0-016-017 02/10/09 2,16 0 1,925,000 / / / / / / / / JOD
07-1738 Reconstruction 0-017-020 04/25/08 2,16 0 2,500,000 / / / / / / / / JOD
04-1461 Reconstruction 0-021-006 08/03/05 155 0 518,838 / / / / / / 06/26/06 JOD
06-0329 Reconstruction 8-048-006 02/07/07 4,8,155,15,16 0 2,298,000 / / / / / / 12/17/07 JOD
04-0832 Reconstruction 8-054-003 04/13/05 16 0 340,000 / / / / / / / / JOD
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition