REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Main Building:
08-0062 Reconstruction 0-001-006 01/13/09 DONE DONE DONE 07/21/08 07/10/08 03/05/07 11/13/07 2,4,8,9,10,13,155,15 2,428,425 2,428,425 JOD 0 0 0 Hunt Engineers, 0 / / / /
08-0063 Reconstruction 0-001-007 01/13/09 DONE DONE DONE 07/21/08 07/10/08 03/14/08 11/13/07 2,9,10,15,16 3,802,483 3,802,483 JOD 0 0 222,078 Hunt Engineers, 0 / / / /
09-1125 Reconstruction 0-001-008 04/27/10 DONE DONE DONE 03/25/10 03/16/10 09/18/09 12/08/09 2,7 3,468,755 3,468,755 JOD 0 0 0 Hunt Engineers, 0 / / 11/28/12
09-1229 Reconstruction 0-001-009 08/17/10 DONE DONE DONE 04/05/10 03/31/10 03/15/10 11/13/07 16 90,300 90,300 JOD 0 0 0 Hunt Engineers, 0 / / 11/28/12
11-0872 Reconstruction 0-001-010 07/06/12 DONE DONE DONE 03/05/12 02/29/12 01/10/12 12/06/11 2,4,8,9,10,155,15,16 735,149 0 JOD 0 0 0 Hunt Engineers, 0 / / / /
- XX Reconstruction 0-001-011 CANCELLED / / / / 02/02/12 / / 2,4,8,9,10,155,15,16 0 18,940,728 JOD 0 0 0 0 / / / /
12-0534 Reconstruction 0-001-012 DONE DONE UNREVIEWED12/12/12 12/03/12 02/02/12 12/06/11 2,4,8,9,10,155,15,16 0 19,427,790 DDJ 0 0 0 Hunt Engineers, 0 / / / /
- Reconstruction 0-001-013 / / / / 02/02/12 / / 2,4,7,8,9,10,155,15, 0 0 JOD 0 0 0 0 / / / /
12-0299 Reconstruction 0-001-014 11/16/12 DONE DONE DONE 10/19/12 10/19/12 09/25/12 12/06/11 2,155,15,16 100,000 100,000 DDJ 0 0 0 Hunt Engineers, 0 / / / /
- XX Reconstruction 0-001-015 CANCELLED / / / / 02/02/12 / / 2,4,7,8,9,10,155,15, 0 18,940,728 JOD 0 0 0 0 / / / /
12-1240 Reconstruction 0-001-016 UNREVIEWED 06/03/13 06/03/13 05/09/13 05/21/13 155,15,16 0 0 MFS 0 0 0 Hunt Engineers, 0 / / / /
Athletic Field Storage Building:
08-0090 New Construction 2-007-001 01/13/09 DONE DONE DONE 07/24/08 07/10/08 07/17/08 11/13/07 02 - 16 60,000 0 JOD 0 0 0 Hunt Engineers, 0 / / / /
Bus Garage:
08-0064 Reconstruction 5-002-004 01/13/09 DONE DONE DONE 07/21/08 07/10/08 03/05/07 11/13/07 2,9,10,13,15,16 313,542 313,542 JOD 0 0 0 Hunt Engineers, 0 / / / /
09-1126 Reconstruction 5-002-005 04/27/10 DONE DONE DONE 03/25/10 03/16/10 09/18/09 12/08/09 2,7,10 231,245 231,245 JOD 0 0 0 Hunt Engineers, 0 / / 01/07/13
09-1230 Reconstruction 5-002-006 08/17/10 DONE DONE DONE 04/05/10 03/31/10 03/15/10 11/13/07 15,16 77,635 77,635 JOD 0 0 0 Hunt Engineers, 0 / / 03/14/13
New Concession Stand:
08-0065 New Construction 7-006-001 01/13/09 DONE DONE DONE 07/21/08 07/10/08 04/24/07 11/13/07 02 - 16 195,550 0 JOD 0 0 0 Hunt Engineers, 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
MAIN BUILDING:
07-1326 Reconstruction 0-001-006 08/05/08 DONE DONE DONE 01/04/08 01/02/08 08/15/06 03/27/07 2,4,7,8,9,10,155,15, 3,446,470 3,446,470 HCM 0 0 68,382 Habiterra Associates 0 / / / /
11-1284 Reconstruction 0-001-007 09/21/12 DONE DONE DONE 05/09/12 05/02/12 02/17/12 02/14/12 2,4,8,9,16 990,750 0 HCM 0 0 33,685 Habiterra Associates 0 / / / /
Bus Garage Maintenance:
07-1327 Reconstruction 5-002-002 08/05/08 DONE DONE DONE 01/04/08 01/02/08 08/15/06 03/27/07 4,7,8,155,15,16 183,530 183,530 HCM 0 0 0 Habiterra Associates 0 / / / /
11-1285 Reconstruction 5-002-003 09/21/12 DONE DONE DONE 05/09/12 05/02/12 02/17/12 02/14/12 7,16 75,500 0 HCM 0 0 0 Habiterra Associates 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
New Pre-K-12:
12-0153 Additions and Alterations 0-012-003 03/04/13 DONE DONE DONE 09/05/12 09/05/12 02/21/08 02/16/12 02 - 16 5,695,000 0 DDJ 0 0 120,000 Clark Patterson Lee 0 / / / /
10-0141 Reconstruction 0-012-004 08/24/10 DONE DONE DONE 08/24/10 08/16/10 07/20/10 07/26/10 15,16 160,000 0 DDJ 0 0 0 Habiterra Associates 0 / / / /
Track Storage:
10-1416DB Discovered Building 2-015-001 08/01/11 DONE DONE DONE 06/23/11 06/20/11 02/28/08 / / 02 - 16 0 0 DDJ 0 0 0 0 / / / /
TRANSPORATION STORAGE:
- New Construction 4-019-001 / / / / 08/27/08 / / 02 - 16 0 0 DDJ 0 0 0 0 / / / /
New Bus Garage:
12-0154 Reconstruction 5-011-003 03/04/13 DONE DONE DONE 09/13/12 09/05/12 09/13/12 02/16/12 2,4,7,8,9,10,13,155, 994,000 994,000 DDJ 0 0 0 Clark Patterson Lee 0 / / / /
Consessions & Restroom:
12-0155 New Construction 7-018-001 03/04/13 DONE DONE DONE 09/05/12 09/05/12 05/27/08 02/16/12 02 - 16 150,000 0 DDJ 0 0 0 Clark Patterson Lee 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Main Building:
07-1962 Additions and Alterations 0-001-009 11/04/08 DONE DONE DONE 04/15/08 04/04/08 02/12/07 06/21/07 02 - 16 9,455,542 8,682,512 MGL 0 0 332,299 Clark Patterson Lee 0 / / / /
Steel Storage Bldg.:
07-1963 Reconstruction 2-003-001 11/04/08 DONE DONE DONE 04/15/08 04/04/08 02/12/07 06/21/07 7,16 18,750 0 MGL 0 0 0 Clark Patterson Lee 0 / / / /
New Bus Garage:
07-1964 Reconstruction 5-007-002 11/04/08 DONE DONE DONE 04/15/08 04/04/08 / / 06/21/07 3,262,122 3,262,122 0 0 0 Clark Patterson Lee 0 / / / /
Growing Dome:
10-1130 New Construction 7-008-001 ADDENDUM REQ'D 04/04/11 03/29/11 01/21/11 06/21/07 02 - 16 0 0 HCM 0 0 0 Clark Patterson Lee 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Main Building:
10-0427 Reconstruction 0-001-004 03/16/11 DONE DONE DONE 11/05/10 10/26/10 11/27/07 06/15/10 2,4,7,8,9,10,155,15, 2,468,846 2,468,846 DDJ 0 0 118,944 SWBR Architects P.C. 0 / / / /
- Reconstruction 0-001-005 / / / / 09/10/10 / / 7 0 0 DDJ 0 0 0 0 / / / /
10-0400 Reconstruction 0-001-006 12/07/10 DONE DONE DONE 10/29/10 10/19/10 09/20/10 06/05/10 7 652,050 652,050 DDJ 0 0 32,716 SWBR Architects P.C. 0 / / 06/22/12
12-0404 Reconstruction 0-001-007 02/25/13 DONE DONE DONE 11/07/12 11/07/12 09/26/12 06/15/10 2,4,7,8,9,10,155,15, 1,430,500 0 DDJ 0 0 69,354 SWBR Architects P.C. 0 / / / /
Bus Garage(fmly Indust. Arts Bus Gar:
10-0428 Additions and Alterations 5-002-004 03/16/11 DONE DONE DONE 11/05/10 10/26/10 07/17/09 06/15/10 02 - 16 2,703,091 2,703,091 DDJ 0 0 0 SWBR Architects P.C. 0 / / / /
- Reconstruction 5-002-005 / / / / 09/10/10 / / 7 0 0 DDJ 0 0 0 0 / / / /
10-0401 Reconstruction 5-002-006 12/07/10 DONE DONE DONE 10/29/10 10/19/10 09/20/10 06/15/10 7 73,987 73,987 DDJ 0 0 0 SWBR Architects P.C. 0 / / 02/19/13
12-0405 Reconstruction 5-002-007 02/25/13 DONE DONE DONE 11/07/12 11/07/12 09/26/12 06/15/10 9,155,15,16 19,500 0 DDJ 0 0 0 SWBR Architects P.C. 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Main Building:
08-0066 Reconstruction 0-001-018 05/18/09 DONE DONE DONE 07/21/08 07/11/08 02/01/07 08/29/07 2,4,7,8,9,10,13,155, 8,307,755 8,121,444 HCM 0 0 282,294 Clark Patterson Lee 0 / / / /
09-0163 Reconstruction 0-001-020 09/10/09 DONE DONE DONE 08/25/09 08/24/09 08/05/09 08/29/07 2 180,150 180,150 HCM 0 0 0 Clark Patterson Lee 0 / / 10/01/12
New Bus Garage:
08-0067 Additions and Alterations 5-005-002 05/18/09 DONE DONE DONE 08/04/08 07/30/08 07/09/08 08/29/07 02 - 16 1,804,420 1,804,420 HCM 0 0 0 Clark Patterson Lee 0 / / 10/01/12
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Fillmore Main Building:
10-1017 Reconstruction 0-001-007 05/23/11 DONE DONE DONE 03/09/11 03/08/11 02/10/11 01/13/05 2,16 52,700 52,700 HCM 0 0 0 Habiterra Associates 0 / / / /
- Reconstruction 0-001-008 / / / / 06/14/13 / / 16 0 0 MFS 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Main Building:
09-1404 Reconstruction 0-001-008 09/13/10 DONE DONE DONE 05/07/10 05/03/10 04/02/10 12/21/06 155 122,550 122,550 HCM 0 0 2,451 Hunt Engineers, 0 / / / /
New Bus Garage:
09-1405 Reconstruction 5-009-002 09/13/10 DONE DONE DONE 05/07/10 05/03/10 04/02/10 12/20/06 155 12,875 12,875 HCM 0 0 0 Hunt Engineers, 0 / / / /
Concession Building:
11-0949DB Discovered Building 7-010-001 04/16/12 DONE DONE DONE ***ASBESTOS CERTIFICATION MISSING*** 0 HCM 0 0 0 Hunt Engineers, 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Cuba Campus K-5 Bldg:
10-1207 Reconstruction 0-001-010 02/02/12 DONE DONE DONE 04/20/11 04/15/11 02/26/10 12/07/10 7,8,9,10,155,15,16 4,521,640 0 HCM 0 0 303,597 Clark Patterson Lee 0 / / / /
Rushford K-5 Building:
10-1208 Reconstruction 0-015-011 02/02/12 DONE DONE DONE 04/20/11 04/15/11 02/26/10 12/07/10 7,8,9,10,155,15,16 1,708,130 1,708,130 HCM 0 0 128,608 Clark Patterson Lee 0 / / / /
New MS/HS 6-12:
10-1209 Reconstruction 0-020-006 02/02/12 DONE DONE DONE 04/20/11 04/15/11 02/26/10 12/07/10 7,8,9,10,13,155,15,1 4,560,888 0 HCM 0 0 310,995 Clark Patterson Lee 0 / / / /
Storage Building:
- PR New Construction 2-026-001 / / / / 06/07/11 / / 02 - 16 0 0 HCM 0 0 0 0 / / / /
12-0131 New Construction 2-026-001 05/28/13 DONE DONE DONE 08/31/12 08/31/12 06/07/11 12/07/10 02 - 16 24,300 0 HCM 0 0 0 Clark Patterson Lee 0 / / / /
New Bus Garage '96:
10-1210 Additions and Alterations 5-021-002 02/02/12 DONE DONE DONE 04/20/11 04/15/11 01/23/07 12/07/10 02 - 16 85,042 85,042 HCM 0 0 0 Clark Patterson Lee 0 / / / /
Press Box:
- DB Discovered Building 7-024-001 / / / / 12/29/08 / / 0 0 HCM 0 0 0 0 / / / /
Fish Hatchery:
- DB Discovered Building 7-025-001 / / / / 12/29/08 / / 0 0 HCM 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Main Building:
09-0278 Reconstruction 0-001-014 08/25/09 DONE DONE DONE 10/02/09 10/02/09 08/25/09 08/25/09 4,8 85,840 85,840 HCM 0 0 0 Clark Patterson Lee 0 / / / /
11-0384 Additions and Alterations 0-001-015 07/07/11 DONE DONE DONE 11/15/11 11/14/11 07/21/11 06/15/11 02 - 16 103,500 103,500 HCM 0 0 0 Clark Patterson Lee 0 / / 06/29/12
- PR Additions and Alterations 0-001-016 / / / / 07/26/11 / / 02 - 16 0 0 HCM 0 0 0 0 / / / /
Bus Garage:
11-0385 Reconstruction 5-002-006 07/27/11 DONE DONE DONE 11/15/11 11/14/11 08/29/05 06/15/11 15 59,880 59,880 HCM 0 0 0 Clark Patterson Lee 0 / / 06/29/12
- Reconstruction 5-002-007 / / / / 08/19/11 / / 7 0 0 HCM 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Washington Primary/Inter.:
08-0696XX Reconstruction 0-003-008 CANCELLED 11/05/08 11/04/08 11/14/07 02/12/08 2,4,7,8,9,10,155,15, 0 14,610,174 DDJ 0 0 0 Hunt Engineers, 0 / / / /
08-0697 Reconstruction 0-003-009 04/29/09 DONE DONE DONE 11/05/08 11/04/08 06/04/08 02/12/08 2,4,7,8,9,10,155,15, 7,534,945 7,534,945 DDJ 0 0 318,531 Hunt Engineers, 0 / / / /
09-1329 Reconstruction 0-003-010 10/28/10 DONE DONE DONE 04/16/10 04/15/10 07/13/09 05/19/09 2,4,7,8,9,10,155,15, 596,073 596,073 DDJ 0 0 596,073 Hunt Engineers, 0 / / / /
10-0360 Reconstruction 0-003-011 04/14/11 DONE DONE DONE 10/14/10 10/06/10 03/19/10 02/12/08 2,4,7,8,9,10,155,15, 2,926,372 2,926,372 DDJ 0 0 0 Hunt Engineers, 0 / / / /
High School/Middle School:
08-0698 Reconstruction 0-004-012 04/29/09 DONE DONE DONE 11/05/08 11/04/08 11/14/07 02/12/08 2,4,7,8,9,10,155,15, 3,703,336 3,703,336 DDJ 0 0 0 Hunt Engineers, 0 / / / /
08-0699 Reconstruction 0-004-013 04/29/09 DONE DONE DONE 11/05/08 11/04/08 06/04/08 02/12/08 2,4,7,8,9,10,155,15, 2,693,782 2,693,782 DDJ 0 0 150,000 Hunt Engineers, 0 / / / /
10-0361 Reconstruction 0-004-014 04/14/11 DONE DONE DONE 10/14/10 10/06/10 07/13/09 02/12/08 2,4,7,8,9,10,155,15, 1,344,119 1,344,119 DDJ 0 0 0 Hunt Engineers, 0 / / / /
12-0351 Reconstruction 0-004-015 11/02/12 DONE DONE DONE 10/30/12 10/22/12 10/24/12 02/12/08 2,7,155,16 113,200 113,200 DDJ 0 0 0 Hunt Engineers, 0 / / / /
New Bus Garage:
08-1514 New Construction 5-011-001 10/27/09 DONE DONE DONE 04/16/09 04/16/09 11/14/07 02/12/08 02 - 16 5,880,718 5,880,718 DDJ 0 0 0 Hunt Engineers, 0 / / / /
Temporary Bus garage:
09-1609TQ Temporary Quarters 5-013-001 12/07/10 DONE DONE DONE 07/06/10 05/10/10 06/02/10 / / 0 0 DDJ 0 0 0 0 / / / /
Press Box (New):
09-0790 New Construction 7-012-001 05/27/10 DONE DONE DONE 01/25/10 01/22/10 10/27/09 02/12/08 02 - 16 190,000 0 DDJ 0 0 0 Hunt Engineers, 0 / / 08/06/12
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Bolivar 6-12 Building:
09-0562 Reconstruction 0-001-021 11/05/09 DONE DONE DONE 12/07/09 12/04/09 10/15/09 05/15/07 4 17,125 19,000 HCM 0 0 17,125 Clark Patterson Lee 0 / / / /
09-1575 Reconstruction 0-001-022 08/03/10 DONE DONE DONE 07/02/10 06/22/10 04/20/10 05/15/07 4 231,940 300,000 HCM 0 0 231,940 Clark Patterson Lee 0 / / / /
Richburg K-5 Building:
11-0642 Reconstruction 0-011-013 04/24/12 DONE DONE DONE 01/11/12 01/09/12 03/25/11 05/15/07 2,15,16 350,000 350,000 HCM 0 0 0 Clark Patterson Lee 0 / / 06/10/13
Richburg Bus Garage:
09-0529 Reconstruction 5-012-008 02/22/08 DONE DONE DONE 11/30/09 11/23/09 10/30/07 05/15/07 4,15,16 80,800 107,000 HCM 0 0 0 Clark Patterson Lee 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED