Construction Project Status

Construction Project Status

THE STATE EDUCATION DEPARTMENT

FACILITIES PLANNING


UPDATED: 09/27/16 at 09:15:20




ALFRED ALMOND CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 02-01-01-04
last updated on 09/27/16
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Main Building:
11-0872   Reconstruction               0-001-010  07/06/12     DONE    DONE       DONE      03/05/12   02/29/12   01/10/12   12/06/11   2,4,8,9,10,155,15,16     735,149             0  JOD             0           0           0 Hunt Engineers,Architects & l           0      06/30/13                       09/02/14           
  -    XX Reconstruction               0-001-011                         CANCELLED            /  /       /  /     02/02/12     /  /     2,4,8,9,10,155,15,16           0    18,940,728  JOD             0           0           0                                         0        /  /                           /  /             
12-0534   Reconstruction               0-001-012  07/25/13     DONE    DONE       DONE      12/12/12   12/03/12   02/02/12   12/06/11   2,4,8,9,10,155,15,16   1,213,904     1,213,904  DDJ             0           0           0 Hunt Engineers,Architects & l           0      12/12/14                       01/27/15           
13-0152   Reconstruction               0-001-013  02/27/14     DONE    DONE       DONE      08/06/13   08/06/13   02/02/12   12/06/11   2,4,7,8,9,10,155,15,   3,413,447     3,413,447  JOD             0           0           0 Hunt Engineers,Architects & l           0      12/12/14                       01/27/15           
12-0299   Reconstruction               0-001-014  11/16/12     DONE    DONE       DONE      10/19/12   10/19/12   09/25/12   12/06/11   2,155,15,16              100,000       100,000  DDJ             0           0           0 Hunt Engineers,Architects & l           0      09/05/13                       07/07/14           
  -    XX Reconstruction               0-001-015                         CANCELLED            /  /       /  /     02/02/12     /  /     2,4,7,8,9,10,155,15,           0    18,940,728  JOD             0           0           0                                         0        /  /                           /  /             
12-1240   Reconstruction               0-001-016  06/28/13     DONE    DONE       DONE      06/03/13   06/03/13   05/09/13   05/21/13   155,15,16                100,000       100,000  MFS             0           0           0 Hunt Engineers,Architects & l           0      03/14/14                       07/01/14           
14-1311   Reconstruction               0-001-017  05/28/15     DONE    DONE       DONE      03/20/15   03/16/15   01/30/15   05/20/14   16                       100,000       100,000  MFS             0           0           0 Hunt Engineers,Architects & l           0        /  /                           /  /             
14-1280   Reconstruction               0-001-018  05/28/15     DONE    DONE       DONE      03/18/15   03/16/15   02/10/15   05/19/15   16                       100,000             0  MFS             0           0           0 Hunt Engineers,Architects & l           0        /  /                           /  /             
16-0490   Reconstruction               0-001-019                         UNREVIEWED         09/22/16   09/22/16   08/15/16   05/17/16   155,16                         0             0  AAA             0           0           0 Hunt Engineers,Architects & l           0        /  /                           /  /             

          Athletic Field Storage Building:
13-1127XX Additions and Alterations    2-007-002                         CANCELLED          01/29/14   01/28/14   01/09/14   12/06/11   02 - 16                        0             0  MFS             0           0           0 Hunt Engineers,Architects & l           0        /  /                           /  /             

          Track Rest Room Facility:
13-0153   New Construction             2-008-001  02/27/14     DONE    DONE       DONE      08/07/13   08/06/13   07/19/13   12/06/11   02 - 16                   88,500             0  MFS             0           0           0 Hunt Engineers,Architects & l           0      12/12/14                       02/23/15           

          Maintenance Building:
13-1128XX New Construction             3-009-001                         CANCELLED          01/29/14   01/28/14   01/09/14   12/06/11   02 - 16                        0             0  MFS             0           0           0 Hunt Engineers,Architects & l           0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




ANDOVER CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 02-06-01-04
last updated on 09/27/16
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Main Building:
11-1284   Reconstruction               0-001-007  09/21/12     DONE    DONE       DONE      05/09/12   05/02/12   02/17/12   02/14/12   2,4,8,9,16             1,044,921     1,044,921  HCM             0           0      61,650 Habiterra Associates                    0      04/13/14                       06/01/15           
15-1986   Reconstruction               0-001-008  08/09/16     DONE    DONE       DONE      06/28/16   06/22/16   05/25/16   05/17/16   2,4,8                    100,000             0  MFS             0           0           0 Clark Patterson Lee                     0        /  /                           /  /             

          Bus Garage Maintenance:
11-1285   Reconstruction               5-002-003  09/21/12     DONE    DONE       DONE      05/09/12   05/02/12   02/17/12   02/14/12   7,16                      75,500        75,500  HCM             0           0           0 Habiterra Associates                    0      04/03/14                       04/09/14           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




GENESEE VALLEY CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 02-07-02-04
last updated on 09/27/16
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Pre-K-12 Main Campus:
12-0153   Additions and Alterations    0-012-003  03/04/13     DONE    DONE       DONE      09/05/12   09/05/12   02/21/08   02/16/12   02 - 16                5,679,804     5,679,804  DDJ             0           0     553,314 Clark Patterson Lee                     0      11/12/14                       11/10/14           
13-0718   Reconstruction               0-012-005  07/28/13     DONE    DONE       DONE      11/18/13   11/13/13   06/28/13   07/24/13   2,4,15                   164,714       164,714  DDJ             0           0           0 Clark Patterson Lee                     0      11/14/13                       03/28/14           
15-0743PR Reconstruction               0-012-006                         UNREVIEWED         11/19/15   11/19/15   07/02/13     /  /     2,4,15                         0             0  DDJ             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-012-007                                              /  /       /  /     11/16/15     /  /     2,4,7,8,9,10,155,15,           0             0  DDJ             0           0           0                                         0        /  /                           /  /             

          New Bus Garage:
12-0154   Reconstruction               5-011-003  03/04/13     DONE    DONE       DONE      09/13/12   09/05/12   09/13/12   02/16/12   2,4,7,8,9,10,13,155,   1,442,913     1,442,913  DDJ             0           0           0 Clark Patterson Lee                     0      11/12/14                       11/10/14           

          Consessions & Restroom:
12-0155   New Construction             7-018-001  03/04/13     DONE    DONE       DONE      09/05/12   09/05/12   05/27/08   02/16/12   02 - 16                  150,000             0  DDJ             0           0           0 Clark Patterson Lee                     0      11/12/14                       11/10/14           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




BELFAST CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 02-08-01-04
last updated on 09/27/16
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Main Building:
15-0461   Reconstruction               0-001-010  06/24/16     DONE    DONE       DONE      09/16/15   09/16/15   07/10/14   07/14/15   155,15,16                433,598             0  JMB             0           0           0 Clark Patterson Lee               433,598        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
14-1419   Reconstruction               0-001-011  05/01/15     DONE    DONE       DONE      04/20/15   04/20/15   03/20/15   06/21/07   4,7,15                   450,000       450,000  JMB             0           0           0 Clark Patterson Lee                     0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
15-0617   Reconstruction               0-001-012  12/02/15     DONE    DONE       DONE      10/27/15   10/23/15   06/15/15   06/21/07   7                        354,816             0  JMB             0           0           0 Clark Patterson Lee                     0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
15-0615   Reconstruction               0-001-013  07/19/16     DONE    DONE       DONE      10/27/15   10/23/15   06/15/15   06/21/07   155,15,16                152,460       152,460  JMB             0           0           0 Clark Patterson Lee                     0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
15-1114XX Reconstruction               0-001-014  06/29/16               CANCELLED          01/27/16   01/27/16   10/02/15   11/14/14   9                          8,195             0  JMB             0           0           0 Clark Patterson Lee                     0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
  -       Reconstruction               0-001-015                                              /  /       /  /     09/02/16     /  /     8,9,10,16                      0             0  AAA             0           0           0                                         0        /  /                           /  /             

          New Bus Garage:
15-0462   Reconstruction               5-007-003  06/24/16     DONE    DONE       DONE      09/16/15   09/16/15   07/10/14   07/14/15   155,15,16                 68,568             0  JMB             0           0           0 Clark Patterson Lee                68,568        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
15-0616   Reconstruction               5-007-004  07/19/16     DONE    DONE       DONE      10/27/15   10/23/15   06/15/15   06/21/07   155,15,16                 59,084        59,084  JMB             0           0           0 Clark Patterson Lee                     0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
15-0618   Reconstruction               5-007-005  12/02/15     DONE    DONE       DONE      10/27/15   10/23/15   10/02/15   06/21/07                             23,760        23,760  JMB             0           0           0 Clark Patterson Lee                     0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   

          Grandstand/Bleachers:
  -       Additions and Alterations    7-004-004                                              /  /       /  /     09/09/16     /  /     02 - 16                        0             0  SLC             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




CANASERAGA CENTRAL SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 02-11-02-04
last updated on 09/27/16
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Main Building:
12-0404   Reconstruction               0-001-007  02/25/13     DONE    DONE       DONE      11/07/12   11/07/12   09/26/12   06/15/10   2,4,7,8,9,10,155,15,   1,430,500     1,430,500  DDJ             0           0      69,354 SWBR Architects P.C.                    0      08/30/13                       09/24/13         YES
                                                                                                                                                                                                                                                                                                                                   

          Bus Garage(fmly Indust. Arts Bus Gar:
12-0405   Reconstruction               5-002-007  02/25/13     DONE    DONE       DONE      11/07/12   11/07/12   09/26/12   06/15/10   9,155,15,16               19,500        19,500  DDJ             0           0           0 SWBR Architects P.C.                    0      08/30/13                       09/24/13         YES
                                                                                                                                                                                                                                                                                                                                   


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




FILLMORE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 02-20-01-04
last updated on 09/27/16
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Fillmore Main Building:
13-0192   Reconstruction               0-001-008  01/09/14     DONE    DONE       DONE      08/14/13   08/14/13   06/14/13   07/11/13   16                       100,000       100,000  MFS             0           0           0 C&S Companies                           0      04/28/14                       06/03/14           
14-0936   Reconstruction               0-001-009  12/30/15     DONE    DONE       DONE      01/12/15   01/09/15   11/04/13   05/20/14   2,4,7,8,9,10,13,155,   6,868,100     6,868,100  MFS             0           0           0 Clark Patterson Lee                     0        /  /                           /  /             
14-0208   Reconstruction               0-001-010  09/16/14     DONE    DONE       DONE      08/21/14   08/18/14   07/10/14   05/20/14   7                      1,464,900     1,464,900  MFS             0           0           0 Clark Patterson Lee                     0      02/01/16                       02/12/16           
14-0465   Reconstruction               0-001-011  10/21/14     DONE    DONE       DONE      10/15/14   10/15/14   07/30/14   05/20/14   2                        474,250       474,250  MFS             0           0           0 Clark Patterson Lee                     0      02/18/16                       03/11/16           
  -    SB Reconstruction               0-001-BA1               DONE                           /  /       /  /       /  /       /  /     13                             0             0  MFS             0           0           0                                         0        /  /                           /  /             

          Bus Garage:
15-1256   Reconstruction               5-002-003  03/04/16     DONE    DONE       DONE      02/18/16   02/11/16   06/23/15   01/26/16   155,15,16                180,000       180,000  MFS             0           0           0 Clark Patterson Lee                     0      06/01/16                       06/16/16           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




WHITESVILLE CENTRAL SCHOOL STATUS REPORT ON CAPITAL PROJECTS
District No.: 02-21-01-04
last updated on 09/27/16
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Main Building:
13-1430   Reconstruction               0-001-009  08/14/14     DONE    DONE       DONE      04/02/14   04/02/14   02/21/14   05/20/14   2,8,9                    290,000       290,000  JMB             0           0           0 Hunt Engineers,Architects & l           0      04/01/15                       06/15/15         YES
                                                                                                                                                                                                                                                                                                                                   
15-0867   Reconstruction               0-001-010  03/02/16     DONE    DONE       DONE      12/11/15   12/10/15   08/11/15   05/19/15   155                      100,000             0  JMB             0           0           0 Clark Patterson Lee                     0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
15-1886   Reconstruction               0-001-011  08/15/16     DONE    DONE       DONE      06/09/16   06/06/16   04/26/16   04/19/16   2,4,8                    100,000             0  JMB             0           0           0 Clark Patterson Lee                     0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   

          Concession Building:
11-0949DB Discovered Building          7-010-001  04/16/12     DONE    DONE       DONE      ***ASBESTOS CERTIFICATION MISSING***                                                     0  HCM             0           0           0 Hunt Engineers,Architects & l           0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




CUBA-RUSHFORD CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 02-23-02-04
last updated on 09/27/16
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Cuba Campus K-5 Bldg:
10-1207   Reconstruction               0-001-010  02/02/12     DONE    DONE       DONE      04/20/11   04/15/11   02/26/10   12/07/10   7,8,9,10,155,15,16     4,521,640     4,521,640  HCM             0           0     371,600 Clark Patterson Lee                     0        /  /                           /  /             

          Rushford K-5 Building:
10-1208   Reconstruction               0-015-011  02/02/12     DONE    DONE       DONE      04/20/11   04/15/11   02/26/10   12/07/10   7,8,9,10,155,15,16     1,708,130     1,708,130  HCM             0           0     128,608 Clark Patterson Lee                     0        /  /                           /  /             

          MS/HS 6-12:
10-1209   Reconstruction               0-020-006  02/02/12     DONE    DONE       DONE      04/20/11   04/15/11   02/26/10   12/07/10   7,8,9,10,13,155,15,1   4,560,888     4,560,888  HCM             0           0     371,600 Clark Patterson Lee                     0        /  /                           /  /             
14-0193   Reconstruction               0-020-007  05/08/15     DONE    DONE       DONE      08/19/14   08/14/14   07/02/14   02/11/14   16                       100,000       100,000  MFS             0           0           0 INTELLIGENT CONVERTED ENERGY,           0      06/30/15                       07/10/15           
15-0818   Reconstruction               0-020-008  05/10/16     DONE    DONE       DONE      12/01/15   12/01/15   10/15/15   09/22/15   16                       100,000       100,000  MFS             0           0           0 C&S Companies                           0      06/30/16                       07/25/16           

          Storage Building:
12-0131   New Construction             2-026-001  05/28/13     DONE    DONE       DONE      08/31/12   08/31/12   06/07/11   12/07/10   02 - 16                   24,300             0  HCM             0           0           0 Clark Patterson Lee                     0        /  /                           /  /             

          New Bus Garage '96:
10-1210   Additions and Alterations    5-021-002  02/02/12     DONE    DONE       DONE      04/20/11   04/15/11   01/23/07   12/07/10   02 - 16                   85,042        85,042  HCM             0           0           0 Clark Patterson Lee                     0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




SCIO CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 02-24-01-04
last updated on 09/27/16
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Main Building:
11-0384   Additions and Alterations    0-001-015  07/07/11     DONE    DONE       DONE      11/15/11   11/14/11   07/21/11   06/15/11   02 - 16                  103,500       103,500  HCM             0           0           0 Clark Patterson Lee                     0      08/04/11                       06/29/12         YES
                                                                                                                                                                                                                                                                                                                                   
13-0168   Reconstruction               0-001-017  12/24/13     DONE    DONE       DONE      08/07/13   08/05/13   06/18/13   05/21/13   2,4,8,9                   99,999        99,999  JMB             0           0           0 Clark Patterson Lee                     0      05/15/15                       06/26/15         YES
                                                                                                                                                                                                                                                                                                                                   
13-0705   Reconstruction               0-001-018  07/31/14     DONE    DONE       DONE      11/14/13   11/12/13   08/12/13   05/21/13   2,4,8,9,155,15,16      2,950,000     2,950,000  JMB             0           0     137,154 Clark Patterson Lee                     0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   

          Bus Garage:
11-0385   Reconstruction               5-002-006  07/27/11     DONE    DONE       DONE      11/15/11   11/14/11   08/29/05   06/15/11   15                        59,880        59,880  HCM             0           0           0 Clark Patterson Lee                     0      08/04/11                       06/29/12         YES
                                                                                                                                                                                                                                                                                                                                   


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




WELLSVILLE CENTRAL SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 02-26-01-06
last updated on 09/27/16
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          High School/Middle School:
12-0351   Reconstruction               0-004-015  11/02/12     DONE    DONE       DONE      10/30/12   10/22/12   10/24/12   02/12/08   2,7,155,16               113,200       113,200  DDJ             0           0           0 Hunt Engineers,Architects & l           0      06/11/14                       06/26/14         YES
                                                                                                                                                                                                                                                                                                                                   


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




BOLIVAR-RICHBURG CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 02-29-02-04
last updated on 09/27/16
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Bolivar High School (Gr 6-12):
13-0581   Reconstruction               0-001-023  02/19/14     DONE    DONE       DONE      10/18/13   10/01/13   06/20/13   03/19/13   155                      270,000       270,000  MFS             0           0           0 Clark Patterson Lee                     0      06/01/16                       06/08/16           
13-0393   Reconstruction               0-001-024  12/18/13     DONE    DONE       DONE      09/20/13   03/19/13   09/06/13   03/19/13   155                      347,153       347,153  MFS             0           0           0 Clark Patterson Lee                     0      06/01/16                       06/08/16           
14-1179   Reconstruction               0-001-025  04/15/15     DONE    DONE       DONE      02/23/15   02/20/15   01/23/15   03/19/13   16                       120,000       120,000  MFS             0           0           0 Clark Patterson Lee                     0      06/01/16                       06/08/16           
15-0682   Reconstruction               0-001-026  11/30/15     DONE    DONE       DONE      11/02/15   10/30/15   10/29/15   10/06/15   2,9,10,16              1,551,779             0  MFS             0           0           0 Clark Patterson Lee                     0        /  /                           /  /             
16-0378   Reconstruction               0-001-027                         UNREVIEWED         09/06/16   09/06/16   10/29/15   10/06/15   8,155,15,16                    0             0  MFS             0           0           0 Clark Patterson Lee                     0        /  /                           /  /             
15-1757   Reconstruction               0-001-028               DONE    STARTED    STARTED   05/20/16   05/16/16   10/29/15   10/06/15   2,4,7,8,9,155,15,16            0             0  MFS             0           0           0 Clark Patterson Lee                     0        /  /                           /  /             

          Pre-K Bldg.(Demolished):
  -       Reconstruction               0-005-007                                              /  /       /  /     09/06/13     /  /     155                            0             0  MFS             0           0           0                                         0        /  /                           /  /             

          Richburg Elementary (Gr K-5):
11-0642   Reconstruction               0-011-013  04/24/12     DONE    DONE       DONE      01/11/12   01/09/12   03/25/11   05/15/07   2,15,16                  350,000       350,000  HCM             0           0           0 Clark Patterson Lee                     0      04/16/13                       06/03/13           
13-0582   Reconstruction               0-011-014  02/19/14     DONE    DONE       DONE      10/18/13   10/01/13   06/20/13   03/19/13   7,155                    270,000       270,000  MFS             0           0           0 Clark Patterson Lee                     0      06/01/16                       06/08/16           
13-0394   Reconstruction               0-011-015  12/18/13     DONE    DONE       DONE      09/20/13   09/19/13   09/06/13   03/19/13   155                      178,020       178,020  MFS             0           0           0 Clark Patterson Lee                     0      06/01/16                       06/08/16           
14-1180   Reconstruction               0-011-016  04/17/15     DONE    DONE       DONE      02/23/15   02/20/15   01/23/15   03/19/13   16                        60,000        60,000  MFS             0           0           0 Clark Patterson Lee                     0      06/01/16                       06/08/16           
15-0570XX Reconstruction               0-011-017                         CANCELLED          10/15/15   10/07/15   08/03/15   04/07/15   2,15                           0             0  MFS             0           0           0 Clark Patterson Lee                     0        /  /                           /  /             
15-1758   Reconstruction               0-011-018               DONE    STARTED    STARTED   05/20/16   05/16/16   10/29/15   10/06/15   2,4,8,9,155,15,16              0             0  MFS             0           0           0 Clark Patterson Lee                     0        /  /                           /  /             
15-0683   Reconstruction               0-011-019  11/30/15     DONE    DONE       DONE      11/02/15   10/30/15   10/29/15   10/06/15   2,9,10                   605,764             0  MFS             0           0      12,115 Clark Patterson Lee                     0        /  /                           /  /             
16-0379   Reconstruction               0-011-020                         UNREVIEWED         09/06/16   09/06/16   10/29/15   10/06/15   8,155,15,16                    0             0  MFS             0           0           0 Clark Patterson Lee                     0        /  /                           /  /             

          Pre-Kindergarten:
13-0395   Reconstruction               0-018-002  12/18/13     DONE    DONE       DONE      09/20/13   09/19/13   06/20/13   03/19/13   2,155                     32,967        32,967  MFS             0           0           0 Clark Patterson Lee                     0      06/01/16                       06/08/16           
13-1087   Reconstruction               0-018-003  02/19/14     DONE    DONE       DONE      01/24/14   01/24/14   01/24/14   03/19/13   2,8,16                    80,000        80,000  MFS             0           0           0 Clark Patterson Lee                     0      06/01/16                       06/08/16           
14-1181   Reconstruction               0-018-004  04/17/15     DONE    DONE       DONE      02/23/15   02/20/15   01/23/15   03/19/13   16                        10,000        10,000  MFS             0           0           0 Clark Patterson Lee                     0      06/01/16                       06/08/16           
15-1759   Reconstruction               0-018-005               DONE    STARTED    STARTED   05/20/16   05/16/16   10/29/15   10/06/15   7,8,9,155,15,16                0             0  MFS             0           0           0 Clark Patterson Lee                     0        /  /                           /  /             
16-0380   Reconstruction               0-018-006                         UNREVIEWED         09/06/16   09/06/16   10/29/15   10/06/15   8,155,15,16                    0             0  MFS             0           0           0 Clark Patterson Lee                     0        /  /                           /  /             
15-0684   Reconstruction               0-018-007  11/30/15     DONE    DONE       DONE      11/02/15   10/30/15   10/29/15   10/06/15   2,9                       25,530             0  MFS             0           0           0 Clark Patterson Lee                     0        /  /                           /  /             

          Bolivar Storage Bldg (prev 5-002):
15-1760   Reconstruction               2-002-001               DONE    STARTED    STARTED   05/20/16   05/16/16   10/29/15   10/06/15   16                             0             0  MFS             0           0           0 Clark Patterson Lee                     0        /  /                           /  /             

          Baseball Grandstand/Equipment Shed:
15-1761   Reconstruction               2-003-001               DONE    STARTED    STARTED   05/20/16   05/16/16   11/04/15   10/06/15   16                             0             0  MFS             0           0           0 Clark Patterson Lee                     0        /  /                           /  /             

          Athletic Storage Shed (Richburg):
15-1762   Reconstruction               2-013-002               DONE    STARTED    STARTED   05/19/16   05/16/16   11/04/15   10/06/15   16                             0             0  MFS             0           0           0 Clark Patterson Lee                     0        /  /                           /  /             

          Bus Storage (Richburg) (prev 5-012):
15-1763   Reconstruction               4-012-002               DONE    STARTED    STARTED   05/19/16   05/16/16   11/02/15   10/06/15   16                             0             0  MFS             0           0           0 Clark Patterson Lee                     0        /  /                           /  /             

          Bolivar Bus Garage (now 2-002):
13-0396XX Reconstruction               5-002-005                         CANCELLED          09/20/13   09/19/13   06/20/13   03/19/13   155                            0             0  MFS             0           0           0 Clark Patterson Lee                     0        /  /                           /  /             

          Bus Garage (Richburg) (see 4-012):
13-0583XX Reconstruction               5-012-009                         CANCELLED          10/18/13   10/01/13   06/20/13   03/19/13   155                            0             0  MFS             0           0           0 Clark Patterson Lee                     0        /  /                           /  /             
13-0397XX Reconstruction               5-012-010                         CANCELLED          09/20/13   09/19/13   09/06/13   03/19/13   16                             0             0  MFS             0           0           0 Clark Patterson Lee                     0        /  /                           /  /             

          Bus Garage (Bolivar):
13-0509   Reconstruction               5-016-004  02/19/14     DONE    DONE       DONE      10/10/13   10/07/13   06/20/13   05/21/13   155                       80,000        80,000  MFS             0           0           0 Clark Patterson Lee                     0      06/01/16                       06/08/16           
13-0510   Reconstruction               5-016-005  12/18/13     DONE    DONE       DONE      10/10/13   10/07/13   09/06/13   05/21/13   16                        72,525        72,525  MFS             0           0           0 Clark Patterson Lee                     0      06/01/16                       06/08/16           
14-1182   Reconstruction               5-016-006  04/17/15     DONE    DONE       DONE      02/23/15   02/20/15   01/27/15   03/19/13   16                        10,000        10,000  MFS             0           0           0 Clark Patterson Lee                     0      06/01/16                       06/08/16           
15-1764   Reconstruction               5-016-007               DONE    STARTED    STARTED   05/19/16   05/16/16   10/29/15   10/06/15   16                             0             0  MFS             0           0           0 Clark Patterson Lee                     0        /  /                           /  /             
16-0381   Reconstruction               5-016-008                         UNREVIEWED         09/06/16   09/06/16   11/06/15   10/06/15   8,155,15,16                    0             0  MFS             0           0           0 Clark Patterson Lee                     0        /  /                           /  /             

          Football Grandstand/Concession Bldg:
15-1765   Reconstruction               7-007-002               DONE    STARTED    STARTED   05/19/16   05/16/16   10/29/15   10/06/15   7                              0             0  MFS             0           0           0 Clark Patterson Lee                     0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED