Construction Project Status

Construction Project Status

THE STATE EDUCATION DEPARTMENT

FACILITIES PLANNING


UPDATED: 04/19/24 at 06:55:10




AUBURN CITY SCHOOLS STATUS REPORT ON CAPITAL PROJECTS
District No.: 05-01-00-01
last updated on 04/19/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Genesee Street School:
18-0016   Reconstruction               0-001-016  10/31/19     DONE    DONE       DONE      07/09/18   07/02/18   11/24/17   02/28/12   9,155,16                 166,730       166,730  BMJ             0           0           0 SWBR ARCHITECTS                   166,730      01/20/21                       07/02/18           
19-0605   Reconstruction               0-001-017  01/09/20     DONE    DONE       DONE      10/23/19   10/17/19   07/25/19   01/19/19   2,8                       70,897        70,897  JSS             0           0           0 SWBR ARCHITECTS                         0      10/01/20                       10/17/19           
20-0317   Reconstruction               0-001-018  03/08/21     DONE    DONE       DONE      09/02/20   07/17/20   06/17/20   01/19/19   2,4,7,8,9,10,155,15,   5,350,815     5,350,815  JSS             0           0           0 SWBR ARCHITECTS                         0      05/04/22                       07/17/20           
23-0383   Reconstruction               0-001-019  03/08/24     DONE    DONE       DONE      09/06/23   09/05/23   07/26/23   01/09/19   2,4,7,9,155,15,16      1,149,287             0  JJH             0           0           0 SWBR ARCHITECTS                         0        /  /                         09/05/23           
  -       Reconstruction               0-001-020                                              /  /       /  /     07/26/23     /  /     2,4,7,9,155,15,16              0             0  JJH             0           0           0                                         0        /  /                           /  /             

          Herman Avenue School:
18-0017   Reconstruction               0-002-019  10/31/19     DONE    DONE       DONE      07/09/18   07/02/18   11/24/17   02/28/12   9,155,16                  46,048        46,048  BMJ             0           0           0 SWBR ARCHITECTS                    46,048      01/20/21                       07/02/18           
18-1324   Reconstruction               0-002-020  06/06/19     DONE    DONE       DONE      01/24/19   01/22/19   10/06/18   09/11/18   155,15,16                100,000       100,000  BMJ             0           0           0 C&S Companies                           0      06/30/19                       01/22/19           
19-0606   Reconstruction               0-002-021  01/09/20     DONE    DONE       DONE      10/23/19   10/17/19   07/25/19   01/19/19   2,8                      332,017       332,017  JSS             0           0           0 SWBR ARCHITECTS                         0      10/01/20                       10/17/19           
20-0318   Reconstruction               0-002-022  03/08/21     DONE    DONE       DONE      09/02/20   07/17/20   06/17/20   01/19/19   2,4,7,8,9,10,155,15,   3,862,676     3,862,676  JSS             0           0           0 SWBR ARCHITECTS                         0      03/07/22                       07/17/20           
  -       Reconstruction               0-002-023                                              /  /       /  /     01/11/23     /  /     4,8,9,155,15,16                0             0  JLB             0           0           0                                         0        /  /                           /  /             

          Auburn Junior High School:
18-0018   Reconstruction               0-004-032  10/31/19     DONE    DONE       DONE      07/09/18   07/02/18   11/24/17   02/28/12   9,155,16                 378,233       378,233  BMJ             0           0           0 SWBR ARCHITECTS                   378,233      01/20/21                       07/02/18           
18-1937   Reconstruction               0-004-033  05/13/19     DONE    DONE       DONE      05/10/19   05/10/19   03/05/19   02/26/19   2,7,9,16                 990,816       990,816  BMJ             0           0           0 SWBR ARCHITECTS                         0      11/11/19                       05/10/19           
19-0607   Reconstruction               0-004-034  01/09/20     DONE    DONE       DONE      10/23/19   10/17/19   07/25/19   01/19/19   4,8                      100,901       100,901  JSS             0           0           0 SWBR ARCHITECTS                         0      10/01/20                       10/17/19           
20-0319XX Reconstruction               0-004-035                         CANCELLED          09/02/20   07/17/20   06/17/20   01/19/19   2,4,7,8,9,10,155,15,   7,584,415             0  JSS             0           0           0 SWBR ARCHITECTS                         0        /  /                         07/17/20           
20-1896   Reconstruction               0-004-036  08/23/21     DONE    DONE       DONE      06/16/21   06/16/21   05/06/21   01/08/19   2,9,16                   566,000       566,000  JLB             0           0           0 SWBR ARCHITECTS                         0      12/05/22                       06/16/21           
23-0384   Reconstruction               0-004-037  03/08/24     DONE    DONE       DONE      09/06/23   09/05/23   07/26/23   01/09/19   2,4,7,8,9,10,13,155,   2,469,397             0  JJH             0           0           0 SWBR ARCHITECTS                         0        /  /                         09/05/23           
  -       Reconstruction               0-004-038                                              /  /       /  /     07/26/23     /  /     2,4,7,8,9,10,13,155,           0             0  JJH             0           0           0                                         0        /  /                           /  /             

          Owasco Elementary:
18-0019   Reconstruction               0-010-021  10/31/19     DONE    DONE       DONE      07/09/18   07/02/18   01/24/18   02/28/12   9,155,16                 100,335       100,335  BMJ             0           0           0 SWBR ARCHITECTS                   100,335      01/20/21                       07/02/18           
19-0608   Reconstruction               0-010-022  01/09/20     DONE    DONE       DONE      10/23/19   10/17/19   07/25/19   01/19/19   2,4,7,8,155,15,16      1,058,917     1,058,917  JSS             0           0           0 SWBR ARCHITECTS                         0      10/01/20                       10/17/19           
20-0320   Reconstruction               0-010-023  03/08/21     DONE    DONE       DONE      09/02/20   07/17/20   06/17/20   01/19/19   2,4,7,8,9,10,155,15,   2,451,192     2,310,543  JSS             0           0           0 SWBR ARCHITECTS                         0      04/11/22                       07/17/20           
  -       Reconstruction               0-010-024                                              /  /       /  /     01/07/22     /  /     2,4,8,9,155,15,16              0             0  JLB             0           0           0                                         0        /  /                           /  /             
23-0385   Reconstruction               0-010-025  03/08/24     DONE    DONE       DONE      09/06/23   09/05/23   07/26/23   01/09/19   2,4,9,16                 708,862             0  JJH             0           0           0 SWBR ARCHITECTS                         0        /  /                         09/05/23           
  -       Reconstruction               0-010-026                                              /  /       /  /     07/26/23     /  /     2,4,9,16                       0             0  JJH             0           0           0                                         0        /  /                           /  /             

          Casey Park Elementary:
18-0020   Reconstruction               0-012-017  10/31/19     DONE    DONE       DONE      07/09/18   07/02/18   11/24/17   02/28/12   9,155,16                 141,250       141,250  BMJ             0           0           0 SWBR ARCHITECTS                   141,250      01/20/21                       07/02/18           
19-0609   Reconstruction               0-012-018  01/09/20     DONE    DONE       DONE      10/23/19   10/17/19   07/25/19   01/19/19   8                         16,124        16,124  JSS             0           0           0 SWBR ARCHITECTS                         0      10/01/20                       10/17/19           
20-0321   Reconstruction               0-012-019  03/08/21     DONE    DONE       DONE      09/02/20   07/17/20   06/17/20   01/19/19   2,4,7,8,9,10,155,15,   3,760,476     3,760,476  JSS             0           0           0 SWBR ARCHITECTS                         0      02/21/22                       07/17/20           

          Auburn High School:
18-0021   Reconstruction               0-015-029  10/31/19     DONE    DONE       DONE      07/09/18   07/02/18   11/24/17   02/28/12   9,155,16                 937,840       937,840  BMJ             0           0           0 SWBR ARCHITECTS                   937,840      01/20/21                       07/02/18           
19-0610   Reconstruction               0-015-031  01/09/20     DONE    DONE       DONE      10/23/19   10/17/19   07/25/19   01/19/19   2,4,8,9,10             1,073,164     1,073,164  JSS             0           0           0 SWBR ARCHITECTS                         0      10/01/20                       10/17/19           
22-1661   Reconstruction               0-015-032  04/14/23     DONE    DONE       DONE      02/13/23   02/10/23   11/30/21   01/10/23   2,4,8,9,10,16            100,000       100,000  JJH             0           0           0 SWBR ARCHITECTS                         0        /  /                         02/10/23           
21-1155   Reconstruction               0-015-033  05/18/22     DONE    DONE       DONE      01/18/22   01/18/22   11/30/21   01/08/19   2,4,7,9,155,15,16      4,124,709     4,124,709  JLB             0           0           0 SWBR ARCHITECTS                         0      08/30/23                       01/18/22           
21-1791   Reconstruction               0-015-034  10/14/22     DONE    DONE       DONE      05/09/22   05/06/22   04/11/22   01/09/19   2,4,7,8,9,155,15,16    2,916,667     2,916,667  JLB             0           0           0 SWBR ARCHITECTS                         0      08/30/23                       05/06/22           
22-0318   Reconstruction               0-015-035  01/09/23     DONE    DONE       DONE      08/24/22   08/23/22   07/29/22   01/09/19   2,4,7,9,155,15,16      2,917,915     2,917,915  JLB             0           0           0 SWBR ARCHITECTS                         0        /  /                         08/23/22           
23-0386   Reconstruction               0-015-036  03/08/24     DONE    DONE       DONE      09/06/23   09/05/23   07/26/23   01/09/19   2,4,8,9                1,661,759             0  JJH             0           0           0 SWBR ARCHITECTS                         0        /  /                         09/05/23           
  -       Reconstruction               0-015-037                                              /  /       /  /     07/26/23     /  /     2,4,8,9                        0             0  JJH             0           0           0                                         0        /  /                           /  /             

          Seward Elementary:
18-0022   Reconstruction               0-017-020  10/31/19     DONE    DONE       DONE      07/09/18   07/02/18   11/24/17   02/28/12   9,155,16                 281,660       281,660  BMJ             0           0           0 SWBR ARCHITECTS                   281,660      01/20/21                       07/02/18           
19-0611   Reconstruction               0-017-021  01/09/20     DONE    DONE       DONE      10/23/19   10/17/19   07/25/19   01/19/19   8                         12,263        12,263  JSS             0           0           0 SWBR ARCHITECTS                         0      10/01/20                       10/17/19           
20-0322   Reconstruction               0-017-022  03/08/21     DONE    DONE       DONE      09/02/20   07/17/20   06/17/20   01/19/19   2,4,7,8,9,155,16       1,551,317     1,551,317  JSS             0           0           0 SWBR ARCHITECTS                         0      08/30/22                       07/17/20           
23-0387   Reconstruction               0-017-023  03/08/24     DONE    DONE       DONE      09/06/23   09/05/23   07/26/23   01/09/19   2,4,8,9,16             1,083,629             0  JJH             0           0           0 SWBR ARCHITECTS                         0        /  /                         09/05/23           
  -       Reconstruction               0-017-024                                              /  /       /  /     07/26/23     /  /     2,4,8,9,16                     0             0  JJH             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




WEEDSPORT CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 05-03-01-04
last updated on 04/19/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Elementary School:
21-1871   Reconstruction               0-001-024  11/28/22     DONE    DONE       DONE      05/23/22   05/23/22   01/18/22   05/18/21   2,9,10,16                320,000       320,000  WLC             0           0           0 King & King Architects                  0        /  /                         05/23/22           
22-1925   Reconstruction               0-001-025  05/09/23     DONE    DONE       DONE      03/22/23   03/21/23   01/04/23   12/13/22   8,9,14,16              1,214,000     1,214,000  WLC             0           0           0 King & King Architects                  0        /  /                         03/21/23           

          Junior/Senior High School:
19-1196   Reconstruction               0-002-031  01/30/20     DONE    DONE       DONE      01/13/20   01/08/20   09/30/19   05/21/19   9,10,16                  100,000       100,000  SLC             0           0           0 King & King Architects                  0      06/29/21                       01/08/20           
21-0838   Reconstruction               0-002-032  02/10/22     DONE    DONE       DONE      12/06/21   12/01/21   03/18/21   05/18/21   15                       100,000       100,000  SLC             0           0           0 King & King Architects                  0      06/16/22                       12/01/21           
21-0630   Reconstruction               0-002-033  02/26/22     DONE    DONE       DONE      11/03/21   11/02/21   08/19/21   05/18/21   4,7,8,155,15,16        1,617,000     1,617,000  SLC             0           0           0 King & King Architects                  0        /  /                         11/02/21           
21-1872   Reconstruction               0-002-034  11/28/22     DONE    DONE       DONE      05/23/22   05/23/22   01/18/22   05/18/21   2,4,8,9,10,155,15,16   5,329,909     5,329,909  WLC             0           0           0 King & King Architects                  0        /  /                         05/23/22           
22-1926   Reconstruction               0-002-035  05/09/23     DONE    DONE       DONE      03/22/23   03/21/23   01/04/23   12/13/22   9,10,16                  598,000       598,000  WLC             0           0           0 King & King Architects                  0        /  /                         03/21/23           
23-0222   Reconstruction               0-002-036  10/02/23     DONE    DONE       DONE      08/09/23   08/09/23   05/18/23   05/16/23   9                        100,000       100,000  WLC             0           0           0 King & King Architects                  0        /  /                         08/09/23           

          2002 Bus Garage Storage/Maint:
21-0631   Reconstruction               5-009-005  02/26/22     DONE    DONE       DONE      11/03/21   11/02/21   08/19/21   05/18/21   155,16                   105,000       105,000  SLC             0           0           0 King & King Architects                  0        /  /                         11/02/21           
22-1522   Reconstruction               5-009-006  03/07/23     DONE    DONE       DONE      01/20/23   01/19/23   09/14/22   05/17/22   16                       100,000       100,000  WLC             0           0           0 King & King Architects                  0      06/26/23                       01/19/23           

          Press Box (New):
21-1873   New Construction             7-013-001  11/28/22     DONE    DONE       DONE      05/23/22   05/23/22   01/18/22   05/18/21   02 - 16                  150,000             0  WLC             0           0           0 King & King Architects                  0        /  /                         05/23/22           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




CATO-MERIDIAN CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 05-04-01-04
last updated on 04/19/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Elementary School:
18-1040   Reconstruction               0-001-028  04/24/19     DONE    DONE       DONE      12/10/18   12/05/18   09/21/18   10/04/18   2,4,7,8,9,155,15,16    1,863,626     1,863,626  JLB             0           0           0 Teitsch-Kent                    1,866,626      10/14/20                       12/05/18           
19-0669   Reconstruction               0-001-031  01/14/20     DONE    DONE       DONE      11/04/19   10/24/19   06/12/19   05/21/19   2,4,8,9,16               100,000       100,000  JLB             0           0           0 Teitsch-Kent                            0      06/20/20                       10/24/19           
20-0391   Reconstruction               0-001-032  11/13/20     DONE    DONE       DONE      09/18/20   09/10/20   06/24/20   06/09/20   2,15,16                  100,000       100,000  JLB             0           0           0 Teitsch-Kent                            0        /  /                         09/10/20           
21-0466   Reconstruction               0-001-033  11/03/21     DONE    DONE       DONE      10/04/21   10/04/21   07/07/21   05/18/21   2,16                     100,000       100,000  JLB             0           0           0 BIVENS & ASSOCIATES ARCHITECT           0      05/24/22                       10/04/21           
21-1679XX Reconstruction               0-001-034  05/24/22               CANCELLED          04/20/22   04/15/22   09/30/21   12/13/21   2,4,9,155,15,16        1,624,000     1,624,000  FMJ             0           0           0 BIVENS ARCHITECTS                       0        /  /                         04/15/22           
23-0855   Reconstruction               0-001-035                         UNREVIEWED         11/01/23   10/30/23   08/26/22   01/10/23   2,4,7,8,9,10,14,155,           0             0  WLC             0           0           0 Tetra Tech Architects and Eng           0        /  /                         10/30/23           
22-1264   Reconstruction               0-001-036  02/27/23     DONE    DONE       DONE      12/15/22   12/15/22   11/16/22   12/12/22   2,4,9                     48,355        48,355  WLC             0           0           0 Tetra Tech Architects and Eng           0      04/17/23                       12/15/22           
23-0342   Reconstruction               0-001-037  02/23/24     DONE    DONE       DONE      08/29/23   08/28/23   07/24/23   07/24/23   155,15,16                200,000       200,000  WLC             0           0           0 Tetra Tech Architects and Eng           0        /  /                         08/28/23           
23-0859FA Reconstruction               0-001-038  11/09/23     DONE    DONE       DONE      11/03/23   09/22/23   08/08/23   09/11/23   2                        786,832             0  WLC             0           0           0 Tetra Tech Architects and Eng           0        /  /                         09/22/23           
23-0820   Reconstruction               0-001-039                         UNREVIEWED         10/27/23   10/23/23   10/05/23   01/10/23   2,15,16                        0    29,741,576  JLB             0           0           0 Tetra Tech Architects and Eng           0        /  /                         10/23/23           
23-1131   Reconstruction               0-001-040  01/18/24     DONE    DONE       DONE      12/06/23   12/04/23   10/25/23   05/16/23   2,4,9                    100,000       100,000  WLC             0           0           0 Tetra Tech Architects and Eng           0        /  /                         12/04/23           

          Jr/Sr High School:
18-1041   Reconstruction               0-004-020  04/24/19     DONE    DONE       DONE      12/10/18   12/05/18   09/21/18   10/04/18   2,4,8,9,155,15,16        580,897       580,897  JLB             0           0           0 Teitsch-Kent                      580,897      10/14/20                       12/05/18           
20-0392   Reconstruction               0-004-022  11/13/20     DONE    DONE       DONE      09/18/20   09/10/20   06/24/20   06/09/20   2,15,16                   48,000        48,000  JLB             0           0           0 Teitsch-Kent                            0        /  /                         09/10/20           
  -       Reconstruction               0-004-023                                              /  /       /  /     05/20/21     /  /     2                              0             0  JLB             0           0           0                                         0        /  /                           /  /             
  -    PR Additions and Alterations    0-004-024                                              /  /       /  /     08/26/22     /  /     02 - 16                        0             0  WLC             0           0           0                                         0        /  /                           /  /             
23-0856   Additions and Alterations    0-004-024                         UNREVIEWED         11/01/23   10/30/23   08/26/22   01/10/23   02 - 16                        0             0  WLC             0           0           0 Tetra Tech Architects and Eng           0        /  /                         10/30/23           
23-0821   Reconstruction               0-004-025                         UNREVIEWED         10/27/23   10/23/23   10/05/23   01/10/23   2,15,16                3,262,296             0  JLB             0           0           0 Tetra Tech Architects and Eng           0        /  /                         10/23/23           

          Bus Garage:
18-1042   Reconstruction               5-002-008  04/24/19     DONE    DONE       DONE      12/10/18   12/05/18   09/21/18   10/04/18   2,8,9,155,15,16           21,856        21,856  JLB             0           0           0 Teitsch-Kent                       21,856      10/14/20                       12/05/18           
22-0534   Reconstruction               5-002-009  11/30/22     DONE    DONE       DONE      09/21/22   09/19/22   08/09/22   05/17/22   2,4,9                    100,000       100,000  JJH             0           0           0 Tetra Tech Architects and Eng           0      06/17/23                       09/19/22           
23-0822   Reconstruction               5-002-010                         UNREVIEWED         10/27/23   10/23/23   10/05/23   01/10/23   2,15,16                2,019,098             0  JLB             0           0           0 Tetra Tech Architects and Eng           0        /  /                         10/23/23           

          District-Wide:
22-0653SB Reconstruction               7-999-003               DONE                           /  /       /  /     10/06/22     /  /     2,16                           0             0  WLC             0           0           0                                         0        /  /                           /  /             
22-1077   Reconstruction               7-999-003  04/04/23     DONE    DONE       DONE      11/28/22   11/22/22   10/06/22   11/04/14   2,16                     165,000             0  WLC             0           0           0 Tetra Tech Architects and Eng           0        /  /                         11/22/22           
  -       Reconstruction               7-999-004                                              /  /       /  /       /  /       /  /     2,16                           0             0  WLC             0           0           0                                         0        /  /                           /  /             
23-1580SB Reconstruction               7-999-004               DONE                           /  /       /  /     03/05/24     /  /     2,16                           0             0  WLC             0           0           0                                         0        /  /                           /  /             
  -    SB Reconstruction               7-999-BA2               DONE                           /  /       /  /       /  /       /  /                                    0             0  WLC             0           0           0                                         0        /  /                           /  /             
  -    XX Reconstruction               7-999-BA3                         CANCELLED            /  /       /  /       /  /       /  /     2,16                           0             0  WLC             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




SOUTHERN CAYUGA CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 05-07-01-04
last updated on 04/19/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Planetarium:
23-1455   Reconstruction               0-005-007                         UNREVIEWED         02/05/24   02/02/24   07/10/23   05/16/23   2,4,8,9,155,15                 0             0  JJH             0           0           0 Robertson Strong Apgar Archit           0        /  /                         02/02/24           

          Poplar Ridge School (fmly Jr/Sr HS):
19-0125   Reconstruction               0-007-029  09/06/19     DONE    DONE       DONE      07/19/19   07/10/19   05/07/19   05/21/19   8                        100,000       100,000  BMJ             0           0           0 King & King Architects                  0      03/11/20                       07/10/19           
20-0249   Reconstruction               0-007-030  09/29/20     DONE    DONE       DONE      08/21/20   08/11/20   02/27/20   06/09/20   8                        100,000       100,000  JLB             0           0           0 King & King Architects                  0      06/24/21                       08/11/20           
20-0874   Reconstruction               0-007-031  03/17/21     DONE    DONE       DONE      11/20/20   11/16/20   11/16/20   06/09/20   2,4,8,9,155,15,16      4,900,000     4,900,000  JLB             0           0           0 King & King Architects                  0      12/15/22                       11/16/20           
20-1920   Reconstruction               0-007-032  07/26/21     DONE    DONE       DONE      06/28/21   06/25/21   04/05/21   05/18/21   4                        100,000       100,000  JLB             0           0           0 King & King Architects                  0      06/07/22                       06/25/21           
21-1960   Reconstruction               0-007-033  07/21/22     DONE    DONE       DONE      06/10/22   06/10/22   03/07/22   05/17/22   8                        100,000       100,000  JLB             0           0           0 King & King Architects                  0      06/16/23                       06/10/22           
  -       Reconstruction               0-007-034                                              /  /       /  /     03/30/22     /  /     14                             0             0  JLB             0           0           0                                         0        /  /                           /  /             
22-2418   Reconstruction               0-007-035  07/27/23     DONE    DONE       DONE      06/20/23   06/20/23   04/10/23   05/16/23   2,8,9                    100,000       100,000  JJH             0           0           0 Robertson Strong Apgar Archit           0        /  /                         06/20/23           
23-1456   Reconstruction               0-007-036                         UNREVIEWED         02/05/24   02/02/24   07/10/23   05/16/23   2,4,7,8,9,10,155,15,           0             0  JJH             0           0           0 Robertson Strong Apgar Archit           0        /  /                         02/02/24           
23-1295   Reconstruction               0-007-037                         UNREVIEWED         12/28/23   12/26/23   11/07/23   05/16/23   7,155,15,16                    0             0  JJH             0           0           0 Robertson Strong Apgar Archit           0        /  /                         12/26/23           

          Greenhouse:
  -       Reconstruction               0-010-002                                              /  /       /  /     07/10/23     /  /     2,9                            0             0  JJH             0           0           0                                         0        /  /                           /  /             

          Storage/Service Building:
23-1457   Reconstruction               2-008-002                         UNREVIEWED         02/05/24   02/02/24   07/10/23   05/16/23   2,9,155,15,16                  0             0  JJH             0           0           0 Robertson Strong Apgar Archit           0        /  /                         02/02/24           

          Bus Garage @Elem School:
22-0186   Reconstruction               5-004-009  08/23/22     DONE    DONE       DONE      07/29/22   07/28/22   06/24/22   04/27/22   9,14,16                  400,000       400,000  JLB             0           0           0 King & King Architects                  0      09/28/22                       07/28/22           
23-1458   Reconstruction               5-004-010                         UNREVIEWED         02/05/24   02/02/24   07/10/23   05/16/23   2,7,8,9,155,15,16              0             0  JJH             0           0           0 Robertson Strong Apgar Archit           0        /  /                         02/02/24           
23-1296   Reconstruction               5-004-011                         UNREVIEWED         12/28/23   12/26/23   11/07/23   05/16/23   2,7,155,15,16                  0             0  JJH             0           0           0 Robertson Strong Apgar Archit           0        /  /                         12/26/23           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




PORT BYRON CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 05-11-01-04
last updated on 04/19/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Main School Building K-12:
19-0555XX Reconstruction               0-004-022                         CANCELLED          10/10/19   09/27/19   09/30/19   05/21/19   2,8,16                         0    35,868,045  JSS             0           0           0 Clark Patterson Lee                     0        /  /                         09/27/19           
21-0553   Reconstruction               0-004-023  11/29/21     DONE    DONE       DONE      10/20/21   10/20/21   09/23/21   05/18/21   2,9,10                   100,000       100,000  JLB             0           0           0 Clark Patterson Lee                     0      06/27/22                       10/20/21           
22-0001   Reconstruction               0-004-024  08/23/22     DONE    DONE       DONE      07/01/22   06/27/22   05/09/22   05/17/22   8,9,16                   100,000       100,000  JLB             0           0           0 Clark Patterson Lee Architect           0      06/25/23                       06/27/22           
22-2319   Reconstruction               0-004-025  10/25/23     DONE    DONE       DONE      06/05/23   06/02/23   12/22/22   12/13/22   2,4,7,8,9,10,14,155,  15,412,606    15,412,606  JJH             0           0           0 Clark Patterson Lee Architect           0        /  /                         06/02/23           
22-2391   Reconstruction               0-004-026  07/27/23     DONE    DONE       DONE      06/16/23   06/15/23   04/18/23   05/16/23   4,8,9,155,16             100,000       100,000  JJH             0           0           0 Clark Patterson Lee Architect           0        /  /                         06/15/23           
  -       Reconstruction               0-004-027                                              /  /       /  /     03/28/24     /  /     9,13,16                        0             0  JJH             0           0           0                                         0        /  /                           /  /             

          Bus Garage:
19-1173   Reconstruction               5-011-009  03/11/20     DONE    DONE       DONE      01/07/20   12/09/19   11/20/19   05/21/19   2,8                      100,000       100,000  JSS             0           0           0 Clark Patterson Lee                     0      06/15/20                       12/09/19           
20-1089   Reconstruction               5-011-010  04/08/21     DONE    DONE       DONE      01/06/21   12/30/20   04/09/20   06/01/20   2,8,16                   100,000       100,000  JSS             0           0           0 Clark Patterson Lee                     0      06/25/21                       12/30/20           
22-2320   Reconstruction               5-011-011  10/25/23     DONE    DONE       DONE      06/05/23   06/02/23   12/22/22   12/13/22   2,16                     487,394       487,394  JJH             0           0           0 Clark Patterson Lee Architect           0        /  /                         06/02/23           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




MORAVIA CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 05-13-01-04
last updated on 04/19/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Middle/High School:
19-0074   Reconstruction               0-002-015  09/26/19     DONE    DONE       DONE      07/15/19   07/12/19   04/25/19   12/05/18   2,4,7,8,9,155,15,16    5,762,230     5,762,230  JLB             0           0           0 King & King Architects                  0      12/15/21                       07/12/19           
19-0442   Reconstruction               0-002-016  01/24/20     DONE    DONE       DONE      09/19/19   09/10/19   07/16/19   12/05/18   2,8,155,15,16            887,582       887,582  JLB             0           0           0 King & King Architects            887,582      12/15/21                       09/10/19           
20-0065   Reconstruction               0-002-017  08/19/20     DONE    DONE       DONE      07/17/20   07/13/20   03/03/20   06/09/20   8,155                    100,000       100,000  JLB             0           0           0 King & King Architects                  0      05/15/21                       07/13/20           
  -       Reconstruction               0-002-018                                              /  /       /  /       /  /       /  /     2,4,8,9,155,15,16              0             0  JLB             0           0           0                                         0        /  /                           /  /             
23-0354   Reconstruction               0-002-019  03/13/24     DONE    DONE       DONE      08/30/23   08/30/23   01/03/23   12/13/22   2,4,8,9,14,155,15,16  19,350,000    19,350,000  JJH             0           0           0 King & King Architects                  0        /  /                         08/30/23           

          Fillmore Elementary:
19-0075   Reconstruction               0-012-012  09/26/19     DONE    DONE       DONE      07/15/19   07/12/19   03/15/19   12/05/18   16                     3,512,000     3,512,000  JLB             0           0           0 King & King Architects                  0      12/15/21                       07/12/19           
19-0352   Reconstruction               0-012-013  09/30/19     DONE    DONE       DONE      09/03/19   08/19/19   04/25/19   05/21/19   2,4,7,8,9,155,15,16      100,000       100,000  JLB             0           0           0 King & King Architects                  0      06/01/20                       08/19/19           
19-0443   Reconstruction               0-012-014  01/24/20     DONE    DONE       DONE      09/19/19   09/10/19   07/16/19   12/05/18   2,8,155,15,16            868,816       868,816  JLB             0           0           0 King & King Architects            868,816      12/15/21                       09/10/19           
20-1665   Reconstruction               0-012-015  06/10/21     DONE    DONE       DONE      05/03/21   04/23/21   03/16/21   05/18/21   7,8,155                  100,000       100,000  JLB             0           0           0 King & King Architects                  0      03/15/22                       04/23/21           
21-2024   Reconstruction               0-012-016  08/03/22     DONE    DONE       DONE      06/22/22   06/22/22   04/22/22   05/17/22   155                      100,000       100,000  JLB             0           0           0 King & King Architects                  0      05/01/23                       06/22/22           
22-2484   Reconstruction               0-012-017  08/09/23     DONE    DONE       DONE      06/30/23   06/29/23   12/22/22   05/16/23   2,4,8,9,14,155,15,16     100,000       100,000  JJH             0           0           0 King & King Architects                  0        /  /                         06/29/23           
23-0355   Reconstruction               0-012-018  03/13/24     DONE    DONE       DONE      08/30/23   08/30/23   01/03/23   12/13/22   2,4,8,9,14,155,15,16   5,500,000             0  JJH             0           0           0 King & King Architects                  0        /  /                         08/30/23           
22-2311FA Reconstruction               0-012-019  06/16/23     DONE    DONE       DONE      06/02/23   04/26/23   02/07/23   04/13/23   16                       425,000             0  JJH             0           0           0 King & King Architects                  0        /  /                         04/26/23           

          Ag Building Brick:
19-0444   Reconstruction               2-004-004  01/24/20     DONE    DONE       DONE      09/19/19   09/10/19   07/16/19   01/22/20   2,8,155,15,16             15,000             0  JLB             0           0           0 King & King Architects                  0      12/15/21                       09/10/19           

          Storage Building:
  -    PR New Construction             2-016-001                                              /  /       /  /       /  /       /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                           /  /             
22-1231FA New Construction             2-016-001  04/17/23     DONE    DONE       DONE      12/14/22   10/20/22     /  /     10/12/22   02 - 16                  500,000             0  JJH             0           0           0 King & King Architects                  0      12/01/23                       10/20/22           

          Bus Garage:
19-0445   Reconstruction               5-001-003  01/24/20     DONE    DONE       DONE      09/19/19   09/10/19   07/16/19   12/05/18   8,155,15,16               30,000        30,000  JLB             0           0           0 King & King Architects                  0      12/15/21                       09/10/19           

          Press Box:
  -    PR New Construction             7-017-001                                              /  /       /  /     08/17/23     /  /     02 - 16                        0             0  JJH             0           0           0                                         0        /  /                           /  /             
23-0356   New Construction             7-017-001  03/13/24     DONE    DONE       DONE      08/30/23   08/30/23   08/17/23   12/13/22   02 - 16                  150,000             0  JJH             0           0           0 King & King Architects                  0        /  /                         08/30/23           

          District-Wide:
19-1723SB Reconstruction               7-999-002               DONE                           /  /       /  /     05/07/20     /  /     16                             0             0  JLB             0           0           0                                         0        /  /                           /  /             
20-0230   Reconstruction               7-999-002  09/23/20     DONE    DONE       DONE      08/14/20   08/05/20   05/07/20   11/04/14   16                       165,000             0  JLB             0           0           0 King & King Architects                  0        /  /                         08/05/20           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




UNION SPRINGS CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 05-19-01-04
last updated on 04/19/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Middle/High School:
18-1899   Reconstruction               0-001-018  06/18/19     DONE    DONE       DONE      04/23/19   04/12/19   04/09/19   05/21/19   15                       100,000       100,000  SLC             0           0           0 Clark Patterson Lee                     0      11/26/19                       04/12/19           
19-0288   Reconstruction               0-001-019  11/04/19     DONE    DONE       DONE      08/23/19   08/02/19   07/09/19   05/21/19   7                      5,527,800     5,527,800  SLC             0           0           0 Clark Patterson Lee                     0      10/07/20                       08/02/19           
19-0966   Reconstruction               0-001-020  02/21/20     DONE    DONE       DONE      12/10/19   11/25/19   07/09/19   05/21/19   2,4,7,8,9,10,155,15,   7,492,291     7,492,291  SLC             0           0           0 Clark Patterson Lee                     0      12/09/20                       11/25/19           
21-0103   Reconstruction               0-001-021  10/08/21     DONE    DONE       DONE      07/28/21   07/27/21   06/24/21   05/21/19   8,9                      250,000       250,000  SLC             0           0           0 Clark Patterson Lee                     0      12/15/22                       07/27/21           
  -    XX Reconstruction               0-001-022                         CANCELLED            /  /       /  /     01/05/22     /  /     16                             0    27,591,915  SLC             0           0           0                                         0        /  /                           /  /             
21-1042SB Reconstruction               0-001-022               DONE                           /  /       /  /     01/05/22     /  /     16                             0    27,591,915  SLC             0           0           0                                         0        /  /                           /  /             
22-0512   Reconstruction               0-001-023  01/06/23     DONE    DONE       DONE      09/16/22   09/16/22   09/13/22   05/17/22   8,9,155,16               680,000       680,000  WLC             0           0           0 Clark Patterson Lee                     0        /  /                         09/16/22           
22-2026   Reconstruction               0-001-024  08/21/23     DONE    DONE       DONE      04/14/23   04/12/23   03/27/23   12/06/22   8,9,16                 2,009,421     2,009,421  WLC             0           0           0 Clark Patterson Lee Architect           0        /  /                         04/12/23           
23-0920   Reconstruction               0-001-025                         UNREVIEWED         11/08/23   11/06/23   09/15/23   05/16/23   2,8,9,10,155,15,16             0             0  WLC             0           0           0 Clark Patterson Lee Architect           0        /  /                         11/06/23           
  -    SB Reconstruction               0-001-BA1               DONE                           /  /       /  /       /  /       /  /                                    0             0  SLC             0           0           0                                         0        /  /                           /  /             

          A.J. Smith Elementary School:
19-0967   Reconstruction               0-006-015  02/21/20     DONE    DONE       DONE      12/10/19   11/25/19   11/07/19   05/21/19   2,4,7,8,9,155,15,16    1,102,000     1,102,000  SLC             0           0           0 Clark Patterson Lee                     0      12/09/20                       11/25/19           
22-0513   Reconstruction               0-006-016  01/06/23     DONE    DONE       DONE      09/16/22   09/16/22   09/13/22   05/17/22   155,16                   127,500       127,500  WLC             0           0           0 Clark Patterson Lee                     0        /  /                         09/16/22           
22-2027   Reconstruction               0-006-017  08/21/23     DONE    DONE       DONE      04/14/23   04/12/23   03/27/23   12/06/22   8,9,16                   805,579       805,579  WLC             0           0           0 Clark Patterson Lee Architect           0        /  /                         04/12/23           
23-0921   Reconstruction               0-006-018                         UNREVIEWED         11/08/23   11/06/23   09/15/23   05/16/23   2,155,15,16                    0             0  WLC             0           0           0 Clark Patterson Lee Architect           0        /  /                         11/06/23           

          Bus Garage:
20-0147   Reconstruction               5-003-005  08/14/19     DONE    DONE       DONE      08/03/20   08/03/20   07/29/19   08/12/19   2                        135,755       135,755  SLC             0           0           0 Clark Patterson Lee                     0      08/29/19                       08/03/20           
  -       Reconstruction               5-003-006                                              /  /       /  /     03/13/20     /  /     2,8,9                          0             0  SLC             0           0           0                                         0        /  /                           /  /             
22-0514   Reconstruction               5-003-007  01/06/23     DONE    DONE       DONE      09/16/22   09/16/22   09/13/22   05/17/22   155,16                    42,500        42,500  WLC             0           0           0 Clark Patterson Lee                     0        /  /                         09/16/22           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




BOCES CAYUGA-ONONDAGA STATUS REPORT ON CAPITAL PROJECTS
District No.: 05-90-00-00
last updated on 04/19/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Education Complex:
19-1576   Reconstruction               0-023-004  07/17/20     DONE    DONE       DONE      03/16/20   03/04/20   01/09/20   01/16/20   155,16                 2,680,968     2,680,968  JSS             0           0           0 King & King Architects          2,680,968      06/01/21                       03/04/20           
20-1880   Reconstruction               0-023-005  07/09/21     DONE    DONE       DONE      06/14/21   06/14/21   04/15/21   04/15/21   155,16                   291,670       291,670  JLB             0           0           0 King & King Architects                  0      01/02/23                       06/14/21           
21-1892   Reconstruction               0-023-006  08/08/22     DONE    DONE       DONE      05/31/22   05/27/22   07/21/21   10/21/21   155,15,16                810,000       810,000  JLB             0           0           0 King & King Architects                  0        /  /                         05/27/22           
21-1196   Reconstruction               0-023-007  05/11/22     DONE    DONE       DONE      01/26/22   01/26/22   08/03/21   10/21/21   155,16                   265,000       265,000  JLB             0           0           0 King & King Architects                  0      12/15/22                       01/26/22           
22-1830   Reconstruction               0-023-008  07/26/23     DONE    DONE       DONE      03/15/23   03/13/23   09/21/22   10/20/22   155                      572,537       572,537  WLC             0           0           0 King & King Architects                  0        /  /                         03/13/23           
23-1332   Reconstruction               0-023-009                         UNREVIEWED         01/11/24   01/08/24   06/22/23   08/17/23   155                            0             0  WLC             0           0           0 King & King Architects                  0        /  /                         01/08/24           

          Storage Building (New):
  -       New Construction             2-036-001                                              /  /       /  /     03/16/21     /  /     02 - 16                        0             0  JSS             0           0           0                                         0        /  /                           /  /             

          Alburn LDC / Access Center:
  -    PR Alterations                  8-020-003                                              /  /       /  /     01/09/20     /  /                                    0             0  JSS             0           0           0                                         0        /  /                           /  /             
19-1577   Reconstruction               8-020-004  07/17/20     DONE    DONE       DONE      03/16/20   03/04/20   01/09/20   01/16/20   16                        44,193             0  JSS             0           0           0 King & King Architects             44,193      06/01/21                       03/04/20           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED