Construction Project Status

Construction Project Status

THE STATE EDUCATION DEPARTMENT

FACILITIES PLANNING


UPDATED: 07/24/14 at 16:40:50




ELMIRA CITY SCHOOLS STATUS REPORT ON CAPITAL PROJECTS
District No.: 07-06-00-01
last updated on 07/24/14
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Coburn Elementary:
13-1250   Reconstruction               0-002-013  06/11/14     DONE    DONE       DONE      02/21/14   02/20/14   09/21/12   08/30/06   4,16                     182,800             0  DDJ             0           0           0 Hunt Engineers,Architects & l           0        /  /                           /  /             
  -       Reconstruction               0-002-014                                              /  /       /  /     02/14/14     /  /     4,7,8,9,155,16                 0             0  DDJ             0           0           0                                         0        /  /                           /  /             
09-0010SC Visual Structural Inspection 0-002-SC2  07/29/09     DONE    DONE       DONE      06/29/09   06/29/09     /  /       /  /     16                         7,000             0  JOD             0           0           0                                         0      06/01/09                         /  /             

          Booth Elementary:
09-0017SC Visual Structural Inspection 0-003-SC2  07/29/09     DONE    DONE       DONE      06/29/09   06/29/09     /  /       /  /     16                         7,000             0  JOD             0           0           0                                         0      06/01/09                         /  /             

          Beecher Elementary:
13-1251   Reconstruction               0-005-010  06/11/14     DONE    DONE       DONE      02/21/14   02/20/14   09/25/12   08/30/06   4,155                    120,700             0  DDJ             0           0           0 Hunt Engineers,Architects & l           0        /  /                           /  /             
  -       Reconstruction               0-005-011                                              /  /       /  /     02/14/14     /  /     4,7,8,155,15,16                0     8,352,015  DDJ             0           0           0                                         0        /  /                           /  /             
09-0013SC Visual Structural Inspection 0-005-SC2  07/29/09     DONE    DONE       DONE      06/29/09   06/29/09     /  /       /  /     16                         7,000             0  JOD             0           0           0                                         0      06/01/09                         /  /             

          Diven Elementary:
13-1252   Reconstruction               0-006-013  06/11/14     DONE    DONE       DONE      02/21/14   02/20/14   09/21/12   08/30/06   2,4                      257,800             0  DDJ             0           0           0 Hunt Engineers,Architects & l           0        /  /                           /  /             
  -       Reconstruction               0-006-014                                              /  /       /  /     02/14/14     /  /     4,7,9,15,16                    0    11,363,577  DDJ             0           0           0                                         0        /  /                           /  /             
09-0016SC Visual Structural Inspection 0-006-SC2  07/29/09     DONE    DONE       DONE      06/29/09   06/29/09     /  /       /  /     16                         7,000             0  JOD             0           0           0                                         0      06/01/09                         /  /             

          Fassett Elementary School:
13-1253   Reconstruction               0-008-006  06/11/14     DONE    DONE       DONE      02/21/14   02/20/14   09/25/12   08/30/06   4,155                    171,000             0  DDJ             0           0           0 Hunt Engineers,Architects & l           0        /  /                           /  /             
  -       Reconstruction               0-008-007                                              /  /       /  /     02/18/14     /  /     4,7,9,155,15,16                0     8,297,802  DDJ             0           0           0                                         0        /  /                           /  /             

          Riverside Elementary:
13-1254   Reconstruction               0-012-011  06/11/14     DONE    DONE       DONE      02/21/14   02/20/14   09/21/12   08/30/06   4                         96,500             0  DDJ             0           0           0 Hunt Engineers,Architects & l           0        /  /                           /  /             
  -       Reconstruction               0-012-012                                              /  /       /  /     02/18/14     /  /     2,4,7,8,155,16                 0     8,766,739  DDJ             0           0           0                                         0        /  /                           /  /             
09-0011SC Visual Structural Inspection 0-012-SC1  07/29/09     DONE    DONE       DONE      06/29/09   06/29/09     /  /       /  /     16                         7,000             0  JOD             0           0           0                                         0      06/01/09                         /  /             

          Washington Elementary:
09-0009SC Visual Structural Inspection 0-013-SC1  07/29/09     DONE    DONE       DONE      06/29/09   06/29/09     /  /       /  /     16                        10,500             0  JOD             0           0           0                                         0      06/01/09                         /  /             

          Hendy Avenue Elementary:
13-1255   Reconstruction               0-014-015  06/11/14     DONE    DONE       DONE      02/21/14   02/20/14   09/21/12   08/30/06   7                        130,700             0  DDJ             0           0           0 Hunt Engineers,Architects & l           0        /  /                           /  /             
  -       Reconstruction               0-014-016                                              /  /       /  /     02/14/14     /  /     2,4,7,8,16                     0             0  DDJ             0           0           0                                         0        /  /                           /  /             
09-0015SC Visual Structural Inspection 0-014-SC2  07/29/09     DONE    DONE       DONE      06/29/09   06/29/09     /  /       /  /     16                         7,000             0  JOD             0           0           0                                         0      06/01/09                         /  /             

          Ernie Davis Jr. High School:
09-0007SC Visual Structural Inspection 0-015-SC2  07/29/09     DONE    DONE       DONE      06/29/09   06/29/09     /  /       /  /     16                         9,550             0  JOD             0           0           0                                         0      06/01/09                         /  /             

          Southside HS (see files DEC issue):
09-0852   Reconstruction               0-016-017  02/25/10     DONE    DONE       DONE      02/03/10   02/01/10   12/16/09   10/19/06   2                        821,500       821,500  DDJ             0           0           0 Keystone Assoc Architects, En           0      08/13/10                         /  /             
12-0759SR Reconstruction               0-016-018  03/05/13     DONE    DONE       DONE      02/01/13   01/22/13   09/21/12   08/30/06   2,4,7,8,9,10,155,15,   6,122,925     4,640,889  DDJ             0           0           0                                         0        /  /                           /  /             
12-1227   Additions and Alterations    0-016-018  04/23/13     DONE    DONE       DONE      05/28/13   05/24/13     /  /     08/30/06   02 - 16                6,122,925     6,122,925  DDJ             0           0           0 Hunt Engineers,Architects & l           0        /  /                           /  /             
  -       Reconstruction               0-016-019                                              /  /       /  /     02/18/14     /  /     2,4,7,8,9,10,155,15,           0             0  DDJ             0           0           0                                         0        /  /                           /  /             
09-0005SC Visual Structural Inspection 0-016-SC2  07/29/09     DONE    DONE       DONE      06/29/09   06/29/09     /  /       /  /     16                         9,750             0  JOD             0           0           0                                         0      06/01/09                         /  /             

          Pine City Elementary:
13-1256   Reconstruction               0-033-015  06/11/14     DONE    DONE       DONE      02/21/14   02/20/14   09/21/12   08/30/06   4                         20,600             0  DDJ             0           0           0 Hunt Engineers,Architects & l           0        /  /                           /  /             
  -       Reconstruction               0-033-016                                              /  /       /  /     02/18/14     /  /     2,4,7,8,9,10,155,15,           0             0  DDJ             0           0           0                                         0        /  /                           /  /             
09-0012SC Visual Structural Inspection 0-033-SC2  07/29/09     DONE    DONE       DONE      06/29/09   06/29/09     /  /       /  /     16                         7,000             0  JOD             0           0           0                                         0      06/01/09                         /  /             

          Broadway ES(K-6)/MS(7-8):
13-1257   Reconstruction               0-034-017  06/11/14     DONE    DONE       DONE      02/21/14   02/20/14   09/21/12   08/30/06   2,4,9,16                  50,000             0  DDJ             0           0           0 Hunt Engineers,Architects & l           0        /  /                           /  /             
  -       Reconstruction               0-034-018                                              /  /       /  /     02/14/14     /  /     4,7,8,9,155,16                 0    32,019,174  DDJ             0           0           0                                         0        /  /                           /  /             
09-0008SC Visual Structural Inspection 0-034-SC2  07/29/09     DONE    DONE       DONE      06/29/09   06/29/09     /  /       /  /     16                        11,300             0  JOD             0           0           0                                         0      06/01/09                         /  /             

          Elmira Free Academy:
  -       Reconstruction               0-038-020                                              /  /       /  /     09/21/12     /  /     155,16                         0             0  DDJ             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-038-021                                              /  /       /  /     02/18/14     /  /     2,4,8,9,10,155,15,16           0             0  DDJ             0           0           0                                         0        /  /                           /  /             
09-0006SC Visual Structural Inspection 0-038-SC2  07/29/09     DONE    DONE       DONE      06/29/09   06/29/09     /  /       /  /     16                         9,550             0  JOD             0           0           0                                         0      06/01/09                         /  /             

          Administration Building:
13-1258   Reconstruction               1-007-007  06/11/14     DONE    DONE       DONE      02/21/14   02/20/14     /  /     08/30/06   7,16                     218,000             0  DDJ             0           0           0 Hunt Engineers,Architects & l           0        /  /                           /  /             
  -       Reconstruction               1-007-008                                              /  /       /  /     02/18/14     /  /     2,4,8,9,10,155,15,16           0             0  DDJ             0           0           0                                         0        /  /                           /  /             

          Maintenance Building:
  -       Reconstruction               3-028-003                                              /  /       /  /     09/21/12     /  /     4                              0             0  DDJ             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               3-028-004                                              /  /       /  /     02/18/14     /  /     4,7,8,10,155,15,16             0             0  DDJ             0           0           0                                         0        /  /                           /  /             

          Bus Garage:
13-0507   Reconstruction               5-017-011  03/05/13     DONE    DONE       DONE      10/10/13   10/07/13   09/04/13   01/09/13   14                       298,223       298,223  DDJ             0           0           0 Hunt Engineers,Architects & l           0      07/19/13                       10/07/13           
  -       Reconstruction               5-017-012                                              /  /       /  /     02/18/14     /  /     2,4,8,9,10,155,15,16           0             0  DDJ             0           0           0                                         0        /  /                           /  /             

          J Sloat Fassett School:
09-0014SC Visual Structural Inspection 7-008-SC1  07/29/09     DONE    DONE       DONE      06/29/09   06/29/09     /  /       /  /     16                         7,000             0  JOD             0           0           0                                         0      06/01/09                         /  /             

          District Wide:
09-1516   Reconstruction               7-999-010  09/30/10     DONE    DONE       DONE      06/09/10   06/03/10   03/24/10   03/17/10   16                       977,000       977,000  DDJ             0           0           0 Tetra Tech Architects And Eni           0      09/22/11                       06/27/13           
12-0906   Reconstruction               7-999-011  10/15/13     DONE    DONE       DONE      02/22/13   02/21/13   09/25/12   08/30/06   13,16                  3,662,235             0  DDJ             0           0           0 Hunt Engineers,Architects & l           0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




HORSEHEADS CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 07-09-01-06
last updated on 07/24/14
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Senior High School South Wing:
09-0513   Reconstruction               0-001-016  02/26/10     DONE    DONE       DONE      11/27/09   11/24/09   12/05/07   05/19/09   2,4,7,8,9,155,15,16       56,947        56,947  JOD             0           0           0 McDonald & Monterose LLP                0      04/27/11                         /  /             
10-0776   Reconstruction               0-001-017  05/24/11     DONE    DONE       DONE      01/26/11   01/26/11   04/07/10   05/18/10   2,4,8,9,16                88,726        88,726  JOD             0           0           0                                         0      10/20/11                         /  /             
12-0556   Reconstruction               0-001-018  05/17/13     DONE    DONE       DONE      12/14/12   12/12/12   11/27/12   05/21/12   155,15,16                346,600             0  JMB             0           0           0 Hunt Engineers,Architects & l           0        /  /                           /  /             
13-0495   Reconstruction               0-001-019  05/02/14     DONE    DONE       DONE      10/09/13   10/02/13   09/05/13   05/21/13   2,4,8,9,155,15,16        179,585             0  MFS             0           0           0 Hunt Engineers,Architects & l           0        /  /                           /  /             

          Center Street Elementary:
12-0557   Reconstruction               0-003-011  05/17/13     DONE    DONE       DONE      12/14/12   12/12/12   11/27/12   05/21/12   2,8,9,15,16              199,790       199,790  MFS             0           0           0 Hunt Engineers,Architects & l           0        /  /                           /  /             
09-0514   Reconstruction               0-003-016  02/26/10     DONE    DONE       DONE      11/27/09   11/24/09   07/31/09   05/19/09   2,4,7,9,13,155,15,16      77,473        77,473  JOD             0           0           0 McDonald & Monterose LLP                0      04/27/11                         /  /             
13-0496   Reconstruction               0-003-017  05/02/14     DONE    DONE       DONE      10/09/13   10/02/13   09/05/13   05/21/13   2,4,8,9,155,15,16        143,187             0  MFS             0           0           0 Hunt Engineers,Architects & l           0        /  /                           /  /             

          Broad Street Elementary:
  -       Reconstruction               0-004-013                                              /  /       /  /     04/07/10     /  /     7                              0             0  JOD             0           0           0                                         0        /  /                           /  /             
12-0558   Reconstruction               0-004-014  05/17/13     DONE    DONE       DONE      12/14/12   12/12/12   11/27/12   05/21/12   7,15,16                   49,531             0  MFS             0           0           0 Hunt Engineers,Architects & l           0        /  /                           /  /             

          Big Flats Elementary:
12-0559   Reconstruction               0-006-009  05/17/13     DONE    DONE       DONE      12/14/12   12/12/12   11/27/12   05/21/12   2,16                     178,999       178,999  MFS             0           0           0 Hunt Engineers,Architects & l           0        /  /                           /  /             
09-0515   Reconstruction               0-006-012  02/26/10     DONE    DONE       DONE      11/27/09   11/24/09   10/25/07   05/19/09   2,4,9,16                 160,554       160,554  JOD             0           0           0 McDonald & Monterose LLP                0      04/27/11                         /  /             
11-0651   Reconstruction               0-006-013  04/26/12     DONE    DONE       DONE      01/12/12   01/10/12   11/08/11   05/17/11   2,4,8,9,15,16             92,300        92,300  JOD             0           0           0 McDonald & Monterose LLP                0      08/15/13                       08/26/13           
13-0497   Reconstruction               0-006-014  05/02/14     DONE    DONE       DONE      10/09/13   10/02/13   09/05/13   05/21/13   2,4,8,9,155,15,16        200,817             0  MFS             0           0           0 Hunt Engineers,Architects & l           0        /  /                           /  /             

          Ridge Road Elementary:
12-0560   Reconstruction               0-008-012  05/17/13     DONE    DONE       DONE      12/14/12   12/12/12   11/27/12   05/21/12   2,8,16                   193,231       193,231  MFS             0           0           0 Hunt Engineers,Architects & l           0        /  /                           /  /             
11-0652   Reconstruction               0-008-015  04/26/12     DONE    DONE       DONE      01/12/12   01/10/12   11/08/11   05/17/11   15                        15,400        15,400  JOD             0           0           0 McDonald & Monterose LLP                0      10/25/12                       11/08/13           
13-0498   Reconstruction               0-008-016  05/02/14     DONE    DONE       DONE      10/09/13   10/02/13   09/05/13   05/21/13   4,8,9,155,16             160,896             0  MFS             0           0           0 Hunt Engineers,Architects & l           0        /  /                           /  /             

          Horseheads SHS North Wing:
12-0561   Reconstruction               0-009-013  05/17/13     DONE    DONE       DONE      12/14/12   12/12/12   11/27/12   05/21/12   2,8,9,155,16             442,060       442,060  MFS             0           0           0 Hunt Engineers,Architects & l           0        /  /                           /  /             
09-0516   Reconstruction               0-009-020  02/26/10     DONE    DONE       DONE      11/27/09   11/24/09   12/05/07   05/19/09   2,4,8,9,155,15,16        133,017       133,017  JOD             0           0           0 McDonald & Monterose LLP                0      08/25/11                         /  /             
10-0777   Reconstruction               0-009-021  05/24/11     DONE    DONE       DONE      01/26/11   01/26/11   12/06/10   05/18/10   2,4,155,15,16            312,986       312,986  JOD             0           0           0                                         0      10/12/11                         /  /             
11-0653   Reconstruction               0-009-022  04/26/12     DONE    DONE       DONE      01/12/12   01/10/12   11/08/11   05/17/11   155                       24,500        24,500  JOD             0           0           0 McDonald & Monterose LLP                0      10/25/12                       11/08/13           
13-0499   Reconstruction               0-009-023  05/02/14     DONE    DONE       DONE      10/09/13   10/02/13   09/05/13   05/21/13   2,4,8,9,155,16            89,793             0  MFS             0           0           0 Hunt Engineers,Architects & l           0        /  /                           /  /             
  -       Reconstruction               0-009-024                                              /  /       /  /     06/12/14     /  /     2,4,8,9,155,15,16              0             0  MFS             0           0           0                                         0        /  /                           /  /             

          Gardner Road Elementary:
12-0562   Reconstruction               0-012-011  05/17/13     DONE    DONE       DONE      12/14/12   12/12/12   11/27/12   05/21/12   155,15,16                 61,952        61,952  JMB             0           0           0 Hunt Engineers,Architects & l           0        /  /                           /  /             
11-0654   Reconstruction               0-012-014  04/26/12     DONE    DONE       DONE      01/12/12   01/10/12   12/05/07   05/17/11   7,155,15,16              849,400       849,400  JOD             0           0           0 McDonald & Monterose LLP                0      12/13/12                       11/08/13           
  -       Reconstruction               0-012-015                                              /  /       /  /     08/25/09     /  /     2,4,7,9,155,15,16              0             0  JOD             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-012-016                                              /  /       /  /     04/07/10     /  /     4,9,16                         0             0  JOD             0           0           0                                         0        /  /                           /  /             
13-0500   Reconstruction               0-012-017  05/02/14     DONE    DONE       DONE      10/09/13   10/02/13   09/05/13   05/21/13   2,4,8,9,155,16           120,427             0  MFS             0           0           0 Hunt Engineers,Architects & l           0        /  /                           /  /             

          Middle School:
09-0517   Reconstruction               0-013-021  02/26/10     DONE    DONE       DONE      11/27/09   11/24/09   12/05/07   05/19/09   10,155,15,16             233,662       233,662  JOD             0           0           0 McDonald & Monterose LLP                0      04/27/11                         /  /             
10-0778   Reconstruction               0-013-022  05/24/11     DONE    DONE       DONE      01/26/11   01/26/11   12/06/10   05/18/10   2,7,9,155,15,16          388,353       388,353  JOD             0           0           0                                         0      08/24/12                       09/14/12           
11-0655   Reconstruction               0-013-023  04/26/12     DONE    DONE       DONE      01/12/12   01/10/12   11/08/11   05/17/11   8,9,155,15,16            657,883       657,883  JOD             0           0           0 McDonald & Monterose LLP                0      08/15/13                       08/26/13           
13-0501   Reconstruction               0-013-024  05/02/14     DONE    DONE       DONE      10/09/13   10/02/13   09/05/13   05/21/13   2,4,8,9,155,16           405,295             0  MFS             0           0           0 Hunt Engineers,Architects & l           0        /  /                           /  /             
  -       Reconstruction               0-013-025                                              /  /       /  /     06/12/14     /  /     2,4,8,9,155,15,16              0             0  MFS             0           0           0                                         0        /  /                           /  /             

          Maintenance Dept:
12-0563   Reconstruction               3-007-001  05/17/13     DONE    DONE       DONE      12/14/12   12/12/12   11/27/12   05/21/12   2,4,7,8,9                 27,837             0  JMB             0           0           0 Hunt Engineers,Architects & l           0        /  /                           /  /             

          Bus Garage:
  -       Reconstruction               5-005-012                                              /  /       /  /     04/07/10     /  /     10,16                          0             0  JOD             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               5-005-013                                              /  /       /  /     02/11/14     /  /     14                             0             0  MFS             0           0           0                                         0        /  /                           /  /             

          Field House:
09-0518   Reconstruction               7-021-001  02/26/10     DONE    DONE       DONE      11/27/09   11/24/09   07/31/09   05/19/09   2,4,7,9,13,155,15,16     130,690             0  JOD             0           0           0 McDonald & Monterose LLP                0      04/27/11                         /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




ELMIRA HEIGHTS CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 07-09-02-06
last updated on 07/24/14
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Edison Jr/Sr High School:
09-0432   Reconstruction               0-001-009  03/23/10     DONE    DONE       DONE      11/18/09   11/13/09   07/17/09   03/20/07   2,7,8,9,10,155,15,16   1,633,880     1,633,880  JOD             0           0           0 Hunt Engineers,Architects & l           0      03/29/12                       04/27/12           
10-1114   Reconstruction               0-001-010  07/18/11     DONE    DONE       DONE      03/29/11   03/25/11   02/09/11   03/20/07   7,9,155,16               103,365       103,365  JOD             0           0           0 Hunt Engineers,Architects & l           0      06/30/12                       09/24/12           

          Dr. N. Cohen Elementary:
09-0433   Reconstruction               0-007-013  03/23/10     DONE    DONE       DONE      11/18/09   11/13/09   07/17/09   03/20/07   2,7,9,155,15,16          884,324       884,324  JOD             0           0           0 Hunt Engineers,Architects & l           0      03/29/12                       12/02/13           

          Bus Garage (lease @ horseheads):
12-1094   Reconstruction               5-014-L05  04/12/13     DONE    DONE       DONE      04/12/13   04/12/13     /  /     06/18/13                             16,881        16,881  JOB             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED