AFTON CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 08-01-01-04
last updated on 05/17/13
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Main Building:
09-1574 Reconstruction 0-001-009 02/10/11 DONE DONE DONE 07/02/10 06/22/10 10/07/08 01/09/09 2,4,7,8,9,155,15,16 10,750,000 10,750,000 JOD 0 0 533,858 0 / / 11/02/12
08-1600 Reconstruction 0-001-010 05/08/09 DONE DONE DONE 05/08/09 05/06/09 04/09/09 04/21/09 4,7,9,13,16 35,000 0 JOD 0 0 0 0 / / / /
11-1091 Reconstruction 0-001-011 06/29/12 DONE DONE DONE 04/06/12 04/05/12 02/02/12 01/09/09 2,4,8,9,155,15,16 3,458,480 3,458,480 JOD 0 0 273,220 0 / / / /
- Reconstruction 0-001-012 / / / / 03/07/13 / / 2,4,9,13 0 0 JOB 0 0 0 0 / / / /
Bus Garage Annex:
12-0618 Reconstruction 4-006-002 02/22/13 DONE DONE DONE 12/26/12 12/23/12 07/18/11 11/03/11 7,16 124,450 0 DDJ 0 0 0 BIVENS ARCHITECTS 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
BAINBRIDGE-GUILFORD CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 08-02-01-04
last updated on 05/17/13
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
High School:
08-0527 Additions and Alterations 0-001-017 07/21/09 DONE DONE DONE 10/15/08 10/14/08 02/13/07 11/27/07 02 - 16 1,486,122 1,486,122 HCM 0 0 110,000 0 / / / /
- Reconstruction 0-001-018 / / / / 06/30/11 / / 2,16 0 0 HCM 0 0 0 0 / / / /
12-0130 Reconstruction 0-001-019 08/20/11 DONE DONE DONE 08/30/12 07/30/12 08/21/12 07/30/07 15 46,375 46,375 JMB 0 0 0 0 / / / /
Greenlawn Elementary:
08-0528 Reconstruction 0-002-012 07/21/09 DONE DONE DONE 10/15/08 10/14/08 02/13/07 11/27/07 2,4,7,8,9,155,15,16 1,253,742 1,253,742 HCM 0 0 80,000 0 / / / /
- Reconstruction 0-002-013 / / / / 06/30/11 / / 2,15,16 0 0 HCM 0 0 0 0 / / / /
Elementary School:
08-0529 Reconstruction 0-003-010 07/21/09 DONE DONE DONE 10/15/08 10/14/08 02/13/07 11/27/07 2,4,7,8,9,155,15,16 1,538,999 1,538,999 HCM 0 0 110,591 0 / / / /
- Reconstruction 0-003-011 / / / / 07/18/11 / / 2 0 0 HCM 0 0 0 0 / / / /
Technology/Storage Building:
08-0530 Reconstruction 0-004-003 07/21/09 DONE DONE DONE 10/15/08 10/14/08 02/13/07 11/27/07 7 20,873 20,873 HCM 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
GREENE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 08-06-01-04
last updated on 05/17/13
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
MS/HS 6-12:
08-0366 Additions and Alterations 0-002-016 03/20/09 DONE DONE DONE 09/19/08 09/19/08 10/25/07 12/11/07 02 - 16 14,515,513 13,622,814 HCM 0 0 1,049,818 0 / / 09/12/12
08-0367 Reconstruction 0-002-017 03/20/09 DONE DONE DONE 09/19/08 09/19/08 08/14/08 12/11/07 2,16 2,511,124 2,511,124 HCM 0 0 0 0 / / 09/12/12
10-0544 Reconstruction 0-002-018 09/06/11 DONE DONE DONE 12/06/10 11/24/10 11/05/10 12/11/07 2,4,7,8,9,10,14,155, 1,961,980 1,961,980 HCM 0 0 0 Tetra Tech Architects And Eni 0 / / / /
11-0882 Reconstruction 0-002-019 04/17/12 DONE DONE DONE 03/06/12 03/02/12 02/07/12 12/11/07 7 231,000 231,000 HCM 0 0 0 Tetra Tech Architects And Eni 0 / / / /
Intermediate School:
08-0368 Additions and Alterations 0-003-014 03/20/09 DONE DONE DONE 09/19/08 09/19/08 10/25/07 12/11/07 02 - 16 8,642,585 6,033,298 HCM 0 0 0 0 / / 09/12/12
10-0545 Reconstruction 0-003-015 03/31/11 DONE DONE DONE 12/06/10 11/24/10 11/05/10 12/11/07 2,7,8,9,10,155,15,16 687,792 560,580 HCM 0 0 0 Tetra Tech Architects And Eni 0 / / / /
Primary School:
08-0369 Additions and Alterations 0-004-013 03/20/09 DONE DONE DONE 09/19/08 09/19/08 10/23/07 12/11/07 02 - 16 4,228,914 4,228,914 HCM 0 0 0 0 / / 09/12/12
10-0546 Reconstruction 0-004-015 03/31/11 DONE DONE DONE 12/06/10 11/24/10 11/05/10 12/11/07 2,4,8,9,10,155,15,16 1,283,299 1,067,693 HCM 0 0 0 Tetra Tech Architects And Eni 0 / / / /
10-1040 Reconstruction 0-004-016 04/14/11 DONE DONE DONE 03/15/11 03/10/11 02/16/11 12/22/10 2,8,9,16 140,000 0 HCM 0 0 0 Tetra Tech Architects And Eni 0 / / / /
Bus Garage:
08-0370 Additions and Alterations 5-005-010 03/20/09 DONE DONE DONE 09/19/08 09/19/08 10/25/07 12/11/07 02 - 16 1,244,038 1,244,038 HCM 0 0 0 0 / / 09/12/12
10-0547 Reconstruction 5-005-012 03/31/11 DONE DONE DONE 12/06/10 11/24/10 11/05/10 12/11/07 2,8,9,155,16 275,611 195,194 HCM 0 0 0 Tetra Tech Architects And Eni 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
OTSELIC VALLEY CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 08-14-01-04
last updated on 05/17/13
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
K-12 Bldg (frmrly Jr/Sr High School):
08-0141PR Additions and Alterations 0-001-006 UNREVIEWED 08/11/08 08/04/08 06/10/08 / / 02 - 16 0 14,713,364 DDJ 0 0 0 0 / / / /
11-0997PR Additions and Alterations 0-001-007 UNREVIEWED 03/20/12 03/20/12 04/22/11 / / 02 - 16 0 11,339,052 DDJ 0 0 0 Teitsch-Kent-Fay Architects 0 / / / /
11-0998SR Reconstruction 0-001-007 03/28/12 DONE DONE DONE 03/20/12 03/06/12 / / / / 12,650,900 11,365,123 DDJ 0 0 333,856 Teitsch-Kent-Fay Architects 0 / / / /
11-1335 Additions and Alterations 0-001-007 01/15/13 DONE DONE DONE 05/24/12 05/17/12 04/22/11 09/28/11 02 - 16 12,650,900 11,736,763 DDJ 0 0 333,856 Teitsch-Kent-Fay Architects 0 / / / /
11-1376 Reconstruction 0-001-008 08/09/12 DONE DONE DONE 06/01/12 05/25/12 05/01/12 09/28/11 7 308,000 308,000 DDJ 0 0 0 Teitsch-Kent-Fay Architects 0 / / / /
12-0192 Reconstruction 0-001-009 11/15/12 DONE DONE DONE 09/18/12 09/17/12 09/05/12 05/15/12 2,4,13,15,16 100,000 0 DDJ 0 0 0 Teitsch-Kent 0 / / / /
Agricultural Technology Building:
12-0205 New Construction 0-008-001 01/15/13 DONE DONE DONE 09/24/12 09/21/12 05/01/12 09/28/11 02 - 16 80,000 0 DDJ 0 0 0 Teitsch-Kent 0 / / / /
Storage Building:
12-0206 New Construction 2-009-001 01/15/13 DONE DONE DONE 09/24/12 09/21/12 05/01/12 09/28/11 02 - 16 52,000 0 DDJ 0 0 0 Teitsch-Kent 0 / / / /
Bus Garage (frmrly ES):
11-1336 Reconstruction 5-006-005 01/15/13 DONE DONE DONE 05/24/12 05/17/12 04/25/11 09/28/11 2,4,7,8,9,10,14,155, 3,517,000 0 DDJ 0 0 0 Teitsch-Kent 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
OXFORD ACADEMY & CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 08-15-01-04
last updated on 05/17/13
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Oxford Middle School:
08-0354 Reconstruction 0-002-015 09/29/08 DONE DONE DONE 09/18/08 09/15/08 09/18/08 05/20/08 7 146,216 146,216 HCM 0 0 0 Bernier Carr Associates 0 / / / /
08-1319 Additions and Alterations 0-002-016 04/07/09 DONE DONE DONE 03/03/09 03/02/09 02/23/09 05/20/08 02 - 16 204,422 204,422 HCM 0 0 0 Bernier Carr Associates 0 / / / /
09-1590 Reconstruction 0-002-017 12/16/10 DONE DONE DONE 07/06/10 06/30/10 01/11/10 09/24/09 2,4,7,8,9,10,155,15, 1,836,806 3,234,451 HCM 0 0 90,101 Bernier Carr Associates 0 / / / /
11-1307 Reconstruction 0-002-018 12/31/12 DONE DONE DONE 05/16/12 05/14/12 11/15/11 06/23/11 2,4,7,8,9,155,15,16 6,886,238 0 HCM 0 0 436,142 Bernier Carr Associates 0 / / / /
12-0269 Reconstruction 0-002-019 04/03/13 DONE DONE DONE 10/11/12 10/02/12 08/21/12 09/24/09 4,8,9,10,155,15,16 0 0 JMB 0 0 0 Bernier Carr Associates 0 / / / /
Oxford High School:
09-1591 Reconstruction 0-007-010 12/16/10 DONE DONE DONE 07/06/10 06/30/10 01/11/10 09/24/09 4,8,9,10,155,15,16 465,968 799,899 HCM 0 0 22,832 Bernier Carr Associates 0 / / / /
11-0994 Reconstruction 0-007-011 09/04/12 DONE DONE DONE 03/20/12 03/16/12 11/15/11 06/23/11 2,4,8,9,155,15,16 3,354,562 0 HCM 0 0 0 Bernier Carr Associates 0 / / / /
12-0270 Reconstruction 0-007-012 04/03/13 DONE DONE DONE 10/11/12 10/02/12 08/21/12 09/24/09 4,7,8,9,155,15,16 0 0 JMB 0 0 0 Bernier Carr Associates 0 / / / /
Primary School:
09-1592 Reconstruction 0-010-013 12/16/10 DONE DONE DONE 07/06/10 06/30/10 01/11/10 09/24/09 2,4,8,9,10,16 519,980 615,650 HCM 0 0 25,479 Bernier Carr Associates 0 / / / /
11-0995 Reconstruction 0-010-014 09/04/12 DONE DONE DONE 03/23/12 03/16/12 11/15/11 06/23/11 2,8,9,155,15,16 433,840 0 HCM 0 0 37,310 Bernier Carr Associates 0 / / / /
12-0271 Reconstruction 0-010-015 04/03/13 DONE DONE DONE 10/11/12 10/02/12 08/21/12 09/24/12 8,9,155,15,16 0 0 JMB 0 0 0 Bernier Carr Associates 0 / / / /
Concession Building:
11-0996 New Construction 7-019-001 09/12/12 DONE DONE DONE 03/23/12 03/16/12 02/07/12 06/23/11 02 - 16 310,230 0 HCM 0 0 0 Bernier Carr Associates 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
SHERBURNE EARLVILLE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 08-20-01-04
last updated on 05/17/13
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Jr/Sr High School:
09-0190 Reconstruction 0-012-010 01/15/10 DONE DONE DONE 09/04/09 09/02/09 11/16/07 12/18/07 2,4,7,8,9,10,155,15, 19,632,800 19,632,800 DDJ 0 0 0 0 / / / /
New Elementary School:
08-0234 Additions and Alterations 0-018-005 03/06/09 DONE DONE DONE 09/02/08 08/25/08 11/16/07 12/18/07 02 - 16 4,471,500 3,301,800 DDJ 0 0 1,304,296 0 / / / /
09-0191 Reconstruction 0-018-006 01/15/10 DONE DONE DONE 09/04/09 09/02/09 04/25/08 12/18/07 2,9,155,15,16 607,200 0 DDJ 0 0 0 0 / / / /
New Bus Maintenance:
08-0235 Reconstruction 5-019-003 03/06/09 DONE DONE DONE 09/02/08 08/25/08 11/16/07 12/18/07 2,7,9,13,155,15,16 635,900 0 MGL 0 0 0 0 / / / /
09-0129 Reconstruction 5-019-004 10/16/09 DONE DONE DONE 08/18/09 08/17/09 07/17/09 12/18/07 4,9,10,15,16 240,000 0 DDJ 0 0 0 0 / / / /
Concession/Restroom Building:
08-0236 New Construction 7-024-001 03/06/09 DONE DONE DONE 09/02/08 08/25/08 11/16/07 12/18/07 02 - 16 710,600 0 DDJ 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED