FRANKLIN COUNTY

FRANKLIN COUNTY

TUPPER LAKE 160101
CHATEAUGAY 160801
SALMON RIVER 161201
SARANAC LAKE 161401
MALONE 161501
BRUSHTON MOIRA 161601
ST REGIS FALLS 161801
FRANKLIN BOCES 169000
















Construction Project Status

Construction Project Status

THE STATE EDUCATION DEPARTMENT

FACILITIES PLANNING


UPDATED: 07/01/15 at 09:53:16




TUPPER LAKE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 16-01-01-06
last updated on 07/01/15
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Junior/Senior High School:
11-0395   Reconstruction               0-001-007  04/04/12     DONE    DONE       DONE      11/17/11   11/10/11   05/27/11   11/08/11   155,16                   636,325       636,325  HCM             0           0           0 Turner Engineering                175,825      02/13/14                       03/06/15           
14-1348   Reconstruction               0-001-008  05/14/15     DONE    DONE       DONE      04/02/15   03/20/15   01/20/15   11/18/14   2,4,7,8,9,155,15,16      912,000             0  JMB             0           0           0 SEI Design Group                        0        /  /                           /  /             
  -       Reconstruction               0-001-009                                              /  /       /  /     01/20/15     /  /     2,7                            0             0  JMB             0           0           0                                         0        /  /                           /  /             

          L.P. Quinn Elementary School:
11-0396   Reconstruction               0-006-007  04/04/12     DONE    DONE       DONE      11/17/11   11/10/11   05/27/11   11/08/11   155,16                   777,014       777,014  HCM             0           0           0 Turner Engineering                345,514      02/13/14                       03/05/15           
14-1349   Reconstruction               0-006-008  05/14/15     DONE    DONE       DONE      04/02/15   03/20/15   12/17/14   11/18/14   2,7                       50,000             0  JMB             0           0           0 SEI Design Group                        0        /  /                           /  /             
  -       Reconstruction               0-006-009                                              /  /       /  /     01/20/15     /  /     2,4,7,8,9,155,15,16            0             0  JMB             0           0           0                                         0        /  /                           /  /             

          Bus Garage:
11-0397   Reconstruction               5-002-005  04/04/12     DONE    DONE       DONE      11/17/11   11/10/11   05/27/11   11/08/11   155,16                   136,320       136,320  HCM             0           0           0 Turner Engineering                 71,321      02/13/14                       03/06/15           
13-0803   Reconstruction               5-002-006  12/16/13     DONE    DONE       DONE      12/02/13   11/26/13   09/16/13   10/07/13   4,13                     100,000       100,000  JMB             0           0           0 SEI Design Group                        0      04/08/14                       04/23/14           
  -       Reconstruction               5-002-007                                              /  /       /  /     01/20/15     /  /     2,8,9,15,16                    0             0  JMB             0           0           0                                         0        /  /                           /  /             

          Goff Nelson Memorial Library:
  -       Reconstruction               6-004-004                                              /  /       /  /     11/05/13     /  /     9,15,16                        0             0  JMB             0           0           0                                         0        /  /                           /  /             

          District-Wide:
14-1353   Reconstruction               7-999-002                         UNREVIEWED         04/02/15   04/02/15   03/02/15   11/18/14   10,16                    759,360             0  JMB             0           0           0 SEI Design Group                        0        /  /                           /  /             

          Gym @ Civic Center:
11-0398   Reconstruction               8-007-003  04/04/12     DONE    DONE       DONE      11/17/11   11/10/11   05/27/11   11/08/11   155,16                    70,805             0  HCM             0           0           0 Turner Engineering                 27,805      02/13/14                       03/06/15           
  -       Reconstruction               8-007-004                                              /  /       /  /     01/20/15     /  /     2,7,8,9,14,155,15,16           0             0  JMB             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




CHATEAUGAY CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 16-08-01-04
last updated on 07/01/15
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Main Building:
10-0806   Additions and Alterations    0-001-009  06/17/11     DONE    DONE       DONE      02/07/11   01/26/11   09/01/09   11/17/09   02 - 16                7,100,201     7,082,208  HCM             0           0     406,666 Bernier Carr Associates                 0      02/21/13                       06/17/14           
  -       Reconstruction               0-001-011                                              /  /       /  /     06/25/13     /  /     2,4,7,8,9,155,15,16            0             0  JMB             0           0           0                                         0        /  /                           /  /             

          Bus Garage:
10-0807   Reconstruction               5-002-006  01/26/11     DONE    DONE       DONE      02/07/11   01/26/11   08/27/10   11/17/09   2,15                      60,000        60,000  HCM             0           0           0 Bernier Carr Associates                 0      03/26/12                       06/17/14           
  -       Reconstruction               5-002-007                                              /  /       /  /     06/25/13     /  /     2,4,7,8,9,155,15,16            0             0  JMB             0           0           0                                         0        /  /                           /  /             

          New Bus Garage with Maint.:
12-1324   Reconstruction               5-003-002  06/28/13     DONE    DONE       DONE      06/26/13   06/26/13   05/03/13   03/25/13   2,4,9,14,15,16           200,000       200,000  JMB             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               5-003-003                                              /  /       /  /     06/25/13     /  /     2,4,7,8,9,155,15,16            0             0  JMB             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




SALMON RIVER CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 16-12-01-04
last updated on 07/01/15
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Main Bldg. Campus:
11-0140   Reconstruction               0-001-018  08/19/11     DONE    DONE       DONE      08/25/11   08/18/11   08/24/11   08/24/11   2                              0             0  DDJ             0           0           0 Spectra Engineering, Architec           0        /  /                           /  /             
14-0129   Reconstruction               0-001-019  04/09/15     DONE    DONE       DONE      08/12/14   08/12/14   12/07/12   10/22/13   2,4,7,8,9,10,14,155,  35,343,000             0  DDJ             0           0     704,660 March Associates                        0        /  /                           /  /             
13-0469   Reconstruction               0-001-020  03/24/13     DONE    DONE       DONE      10/07/13   10/04/13   03/06/13   03/25/13   2,15                   1,400,000     1,400,000  DDJ             0           0           0 March Associates                        0      11/24/14                       12/15/14           
14-0803   Reconstruction               0-001-021  04/07/15     DONE    DONE       DONE      12/19/14   12/18/14   10/23/14   12/01/14   2,4,8,9,10,155,16        100,000             0  DDJ             0           0           0 March Associates                        0        /  /                           /  /             

          Sewage Treatment Plant(frmrly 7-009):
11-1342   Reconstruction               0-009-002  06/26/12     DONE    DONE       DONE      05/24/12   05/22/12   03/20/12   05/17/11   2                        100,000       100,000  DDJ             0           0           0 Bernier Carr Associates                 0      09/27/12                       03/22/13           
12-1242   Reconstruction               0-009-003  06/07/13     DONE    DONE       DONE      06/04/13   06/04/13   12/18/12   05/17/11   2                         99,999        99,999  DDJ             0           0           0 Bernier Carr Associates                 0      10/10/13                       03/28/14           

          Tire Storage Building:
14-0130   New Construction             2-017-001  04/09/15     DONE    DONE       DONE      08/12/14   08/12/14   07/03/14   10/22/13   02 - 16                   25,000             0  DDJ             0           0           0 March Associates                        0        /  /                           /  /             

          Garage @ Mohawk School:
13-0472DB Discovered Building          3-013-001                       ADDENDUM REQ'D       10/08/13   10/04/13   10/08/13     /  /                                    0             0  DDJ             0           0           0                                         0        /  /                           /  /             

          Bus Garage:
  -    PR Additions and Alterations    5-008-006                                              /  /       /  /     12/07/12     /  /     02 - 16                        0             0  DDJ             0           0           0                                         0        /  /                           /  /             
14-0131   Additions and Alterations    5-008-006  04/09/15     DONE    DONE       DONE      08/12/14   08/12/14   12/07/12   10/22/13   02 - 16                1,100,000             0  DDJ             0           0           0 March Associates                        0        /  /                           /  /             

          Booster Pump Station:
14-0132   New Construction             7-014-001  04/09/15     DONE    DONE       DONE      08/12/14   08/12/14   06/03/14   10/22/13   02 - 16                        0             0  DDJ             0           0           0 March Associates                        0        /  /                           /  /             

          Dugout #1:
14-0133   New Construction             7-015-001  04/09/15     DONE    DONE       DONE      08/12/14   08/12/14   06/26/14   10/22/13   02 - 16                   16,000             0  DDJ             0           0           0 March Associates                        0        /  /                           /  /             

          Dugout #2:
14-0134   New Construction             7-016-001  04/09/15     DONE    DONE       DONE      08/12/14   08/12/14   06/26/14   10/22/13   02 - 16                   16,000             0  DDJ             0           0           0 March Associates                        0        /  /                           /  /             

          Press Box:
  -       New Construction             7-018-001                       DONE                   /  /       /  /     10/07/14     /  /     02 - 16                        0             0  DDJ             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




SARANAC LAKE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 16-14-01-06
last updated on 07/01/15
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Petrova Avenue School:
10-0950   Reconstruction               0-002-016  05/26/11     DONE    DONE       DONE      03/07/11   02/25/11     /  /     05/17/11   2,155,15,16              494,303       494,303  JOD             0           0           0 Bernier Carr Associates                 0      12/29/11                       06/28/13           
  -       Reconstruction               0-002-017                                              /  /       /  /     01/06/11     /  /     2,155,15,16                    0             0  JOD             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




MALONE CENTRAL SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 16-15-01-06
last updated on 07/01/15
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Malone Junior High School:
  -    XX Reconstruction               0-001-011                         CANCELLED            /  /       /  /     01/19/11     /  /     2,9                            0    18,745,332  JOD             0           0           0                                         0        /  /                           /  /             
11-0809   Reconstruction               0-001-012  06/19/12     DONE    DONE       DONE      02/14/12   02/13/12   02/10/11   04/07/09   2,9,10,16              1,201,627     1,201,627  JOD             0           0           0 Collins & Scoville Architects           0      10/15/12                       09/23/13           
14-0812   Reconstruction               0-001-013               DONE    DONE       ADD. REQ'D12/23/14   12/22/14   12/03/14   05/20/14   4                              0    18,745,332  JMB             0           0           0 Collins & Scoville Architects           0        /  /                           /  /             

          Harrison Gymnasium:
14-0813   Reconstruction               0-002-001               DONE    DONE       ADD. REQ'D12/23/14   12/22/14   12/03/14   05/20/14   2,4,8,9,155,15,16              0       782,610  JMB             0           0           0 Collins & Scoville Architects           0        /  /                           /  /             

          St.Joseph's Elem. School:
11-0810   Reconstruction               0-011-006  06/19/12     DONE    DONE       DONE      02/14/12   02/13/12   02/10/11   04/07/09   2,4,9,10,16              718,277       718,277  JOD             0           0           0 Collins & Scoville Architects           0      10/15/12                       09/23/13           

          Flanders Elementary School:
11-0811   Reconstruction               0-017-007  06/18/12     DONE    DONE       DONE      02/14/12   02/13/12   02/10/11   04/07/09   2,4,9,10,13,16           866,023       866,023  JOD             0           0           0 Collins & Scoville Architects           0      10/15/12                       09/23/13           
12-0989   Reconstruction               0-017-008  04/29/13     DONE    DONE       DONE      03/19/13   03/19/13   01/23/13   01/22/13   10,155,15,16             120,000       120,000  JOB             0           0           0 Tisdel Associates consulting            0      11/07/13                       03/17/14           
14-0814   Reconstruction               0-017-009               DONE    DONE       ADD. REQ'D12/23/14   12/22/14   12/03/14   05/20/14   4                              0     6,287,337  JMB             0           0           0 Collins & Scoville Architects           0        /  /                           /  /             

          Davis Elementary School Pre - K - 2:
10-0917   Reconstruction               0-018-004  05/10/11     DONE    DONE       DONE      02/28/11   02/24/11   04/26/10   04/07/09   2,8,9,16               1,463,912     1,463,912  JOD             0           0           0 Collins & Scoville Architects           0      09/05/12                       09/23/13           
11-0812   Reconstruction               0-018-005  06/19/12     DONE    DONE       DONE      02/14/12   02/13/12   02/14/12   04/07/09   9,16                     329,635       329,635  JOD             0           0           0 Collins & Scoville Architects           0      10/15/12                       09/23/13           

          Franklin Acad:HS 9-12:
11-0813   Reconstruction               0-019-014  06/18/12     DONE    DONE       DONE      02/14/12   02/13/12   01/31/12   04/07/09   2,9,15,16                142,318       142,318  JOD             0           0           0 Collins & Scoville Architects           0      10/15/12                       09/23/13           
  -    XX Reconstruction               0-019-015                         CANCELLED            /  /       /  /     02/14/12     /  /     2,9,15,16                      0    27,576,705  JOD             0           0           0                                         0        /  /                           /  /             
13-0894   Reconstruction               0-019-016  02/27/14     DONE    DONE       DONE      12/13/13   12/12/13   10/21/13   05/21/13   14,155,15,16              98,500        98,500  JMB             0           0           0 Tisdel Associates consulting            0        /  /                           /  /             
14-0815   Reconstruction               0-019-017               DONE    DONE       ADD. REQ'D12/23/14   12/22/14   12/03/14   05/20/14   2,16                           0    27,576,705  JMB             0           0           0 Collins & Scoville Architects           0        /  /                           /  /             

          Bus Garage:
11-1289   Reconstruction               5-006-006  08/03/12     DONE    DONE       DONE      05/10/12   05/09/12   03/28/12   05/17/11   2,13,16                  189,400       189,400  JOD             0           0           0 Collins & Scoville Architects           0      10/15/12                       09/23/13           
14-0816   Additions and Alterations    5-006-007               DONE    DONE       ADD. REQ'D12/23/14   12/22/14   12/03/14   05/20/14   02 - 16                        0             0  JMB             0           0           0 Collins & Scoville Architects           0        /  /                           /  /             

          Media Tower:
  -    XX New Construction             7-014-001                         CANCELLED            /  /       /  /     03/25/11     /  /     02 - 16                        0             0  JOD             0           0           0                                         0        /  /                           /  /             
11-0814   New Construction             7-014-001  06/19/12     DONE    DONE       DONE      02/14/12   02/13/12   03/25/11   04/07/09   02 - 16                  239,270             0  JOD             0           0           0 Collins & Scoville Architects           0      10/15/12                       09/23/13           

          District-Wide:
  -    XX Reconstruction               7-999-001                         CANCELLED            /  /       /  /     04/14/11     /  /     13,16                          0             0  JOD             0           0           0                                         0        /  /                           /  /             
14-0205   Reconstruction               7-999-002  05/08/15     DONE    DONE       DONE      08/21/14   08/18/14   10/21/13   05/20/14   2,155,15,16              234,000             0  JMB             0           0           0 M/E ENGINEERIN, P.C                     0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




BRUSHTON-MOIRA CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 16-16-01-04
last updated on 07/01/15
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Central School Building:
09-1294   Reconstruction               0-001-009  08/27/10     DONE    DONE       DONE      04/14/10   04/07/10   03/02/09   11/17/09   2,4,7,9,155,15,16      1,544,194     1,544,194  DDJ             0           0      27,638 SEI Design Group                        0      01/24/14                       02/23/15           
10-0312   Additions and Alterations    0-001-010  02/25/11     DONE    DONE       DONE      10/04/10   09/22/10   08/26/10   11/17/09   02 - 16                4,963,099     4,655,472  DDJ             0           0     395,830 SEI Design Group                        0      01/03/14                       03/05/14           

          Storage Building #1:
14-1677   New Construction             2-007-001                         UNREVIEWED         06/17/15   06/12/15   12/02/14   05/19/15   02 - 16                        0             0  DDJ             0           0           0 SEI Design Group                        0        /  /                           /  /             

          Storage Building #2:
14-1678   New Construction             2-008-001                         UNREVIEWED         06/17/15   06/12/15   12/02/14   05/19/15   02 - 16                        0             0  DDJ             0           0           0 SEI Design Group                        0        /  /                           /  /             

          Storage Building #3:
14-1679   New Construction             2-009-001                         UNREVIEWED         06/17/15   06/12/15   12/02/14   05/19/15   02 - 16                        0             0  DDJ             0           0           0 SEI Design Group                        0        /  /                           /  /             

          Storage Building #4:
14-1680   New Construction             2-010-001                         UNREVIEWED         06/17/15   06/12/15   12/02/14   05/19/15   02 - 16                        0             0  DDJ             0           0           0 SEI Design Group                        0        /  /                           /  /             

          Bus Garage:
09-1295   Additions and Alterations    5-003-009  08/27/10     DONE    DONE       DONE      04/14/10   04/07/10   03/02/09   11/17/09   02 - 16                  125,000       125,000  DDJ             0           0           0 SEI Design Group                        0      01/24/14                       02/23/15           
10-0313   Additions and Alterations    5-003-011  02/25/11     DONE    DONE       DONE      10/05/10   09/20/10   08/26/10   11/17/09   02 - 16                1,989,631     1,989,631  DDJ             0           0           0 SEI Design Group                        0      01/03/14                       03/05/14           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




BOCES FRANKLIN-ESSEX-HAMILTON STATUS REPORT ON CAPITAL PROJECTS
District No.: 16-90-00-00
last updated on 07/01/15
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          North Franklin Educ. Ctr.:
11-0831   Reconstruction               0-002-008  05/22/12     DONE    DONE       DONE      02/22/12   02/21/12   11/21/11   04/16/11   2,10,155                 533,847       533,847  JOD             0           0           0 Beardsley Design Associates             0      10/02/12                       04/25/13           
14-0693   Reconstruction               0-002-009                         UNREVIEWED         12/01/14   11/28/14   08/27/14   08/21/14   10,155,15,16                   0             0  MFS             0           0           0 Tisdel Associates consulting            0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED