Construction Project Status

Construction Project Status

THE STATE EDUCATION DEPARTMENT

FACILITIES PLANNING


UPDATED: 04/19/24 at 06:55:11




WEST CANADA VALLEY CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 21-03-02-04
last updated on 04/19/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Central School:
22-0979FB Reconstruction               0-003-017  04/04/23     DONE    DONE       DONE      11/16/22   09/14/22   01/05/22   11/09/21   2,4,7,8,9,10,155,15,   5,865,816     5,865,816  WLC             0           0           0 Synthesis Architects,L.L.P.             0      09/05/23           YES         09/14/22           
22-0593   Reconstruction               0-003-018  06/13/22     DONE    DONE       DONE      09/26/22   09/26/22   07/07/22   06/13/22   155                       81,000        81,000  WLC             0           0           0 Synthesis Architects,L.L.P.             0      02/24/23                       09/26/22           
23-0887   Reconstruction               0-003-019                         UNREVIEWED         11/06/23   11/03/23   06/01/23   05/16/23   2,4,8,9,13,16                  0             0  WLC             0           0           0 Synthesis Architects,L.L.P.             0        /  /                         11/03/23           
  -    SB Reconstruction               0-003-BA1               DONE                           /  /       /  /       /  /       /  /     10                             0             0  WLC             0           0           0                                         0        /  /                           /  /             

          High School Bus Garage:
22-0980FA Reconstruction               5-005-007  04/04/23     DONE    DONE       DONE      11/16/22   09/14/22   01/04/22   11/13/21   2,8,9,155,15,16          454,523       454,523  WLC             0           0           0 Synthesis Architects,L.L.P.             0        /  /                         09/14/22           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




FRANKFORT-SCHUYLER CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 21-04-02-06
last updated on 04/19/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Junior-Senior High School:
18-1685   Reconstruction               0-001-014  05/28/19     DONE    DONE       DONE      03/19/19   03/08/19     /  /     05/23/19   4,7                      197,900       197,900  SLC             0           0           0 Bonacci Architects                      0      06/13/20                       03/08/19           
  -    PR Reconstruction               0-001-015               DONE                           /  /       /  /     11/30/22     /  /     2,4,7,8,9,10,155,15,           0    21,826,713  SLC             0           0           0                                         0        /  /                           /  /             
23-0585   Reconstruction               0-001-015  03/26/24     DONE    DONE       DONE      10/02/23   09/27/23   11/30/22   10/18/22   2,4,7,8,9,10,155,15,   3,324,000     3,324,000  MSK             0           0           0 King & King Architects                  0        /  /                         09/27/23           
  -       Reconstruction               0-001-016                                              /  /       /  /     03/14/24     /  /     2,4,7,8,9,10,155,15,           0             0  MSK             0           0           0                                         0        /  /                           /  /             

          Reese Road Elementary School:
21-1424PR Additions and Alterations    0-002-012               DONE                         03/03/22     /  /     01/18/22     /  /     02 - 16                        0    13,155,318  SLC             0           0           0                                         0        /  /                           /  /             
23-0586   Additions and Alterations    0-002-012  03/26/24     DONE    DONE       DONE      10/02/23   09/27/23   01/18/22   10/18/22   02 - 16                1,182,000     1,182,000  MSK             0           0           0 King & King Architects                  0        /  /                         09/27/23           
  -    PR Additions and Alterations    0-002-013                                              /  /       /  /     03/14/24     /  /     02 - 16                        0             0  MSK             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




HERKIMER CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 21-06-01-06
last updated on 04/19/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Senior High School:
19-0916   Reconstruction               0-001-014  03/06/20     DONE    DONE       DONE      12/05/19   11/22/19   05/21/19   12/04/18   2,8,9,155              7,574,000     7,574,000  JLB             0           0           0 King & King Architects                  0      10/04/21                       11/22/19           
20-0873   Reconstruction               0-001-015  01/11/21     DONE    DONE       DONE      11/20/20   11/10/20   06/17/20   06/09/20   16                       100,000       100,000  JLB             0           0           0 King & King Architects                  0      05/10/21                       11/10/20           
21-1745   Reconstruction               0-001-016  07/29/22     DONE    DONE       DONE      05/03/22   04/29/22   12/16/21   12/04/18   2,4,8,9,10,155,15,16   4,470,000     4,470,000  JLB             0           0           0 King & King Architects                  0        /  /                         04/29/22           

          Herkimer Elementary:
19-0917   Reconstruction               0-006-013  03/06/20     DONE    DONE       DONE      12/05/19   11/22/19   05/21/19   12/04/18   2,8,9,155              4,265,000     4,265,000  JLB             0           0           0 King & King Architects                  0      10/04/21                       11/22/19           
19-0188   Reconstruction               0-006-014  09/16/19     DONE    DONE       DONE      07/30/19   07/25/19   06/17/19   05/21/19   16                       100,000       100,000  JLB             0           0           0 King & King Architects                  0      06/15/20                       07/25/19           
21-0652   Reconstruction               0-006-015  12/22/21     DONE    DONE       DONE      11/04/21   11/04/21   04/07/21   05/18/21   16                       100,000       100,000  JLB             0           0           0 King & King Architects                  0      06/03/22                       11/04/21           
21-1746   Reconstruction               0-006-016  07/29/22     DONE    DONE       DONE      05/03/22   04/29/22   12/16/21   12/04/18   2,8,9,10,155,15,16     1,452,000     1,452,000  JLB             0           0           0 King & King Architects                  0        /  /                         04/29/22           
22-0404   Reconstruction               0-006-017  10/14/22     DONE    DONE       DONE      09/07/22   09/02/22   08/03/22   05/17/22   16                       100,000       100,000  JLB             0           0           0 King & King Architects                  0      06/15/23                       09/02/22           
23-0221   Reconstruction               0-006-018  10/03/23     DONE    DONE       DONE      08/09/23   08/09/23   03/30/23   05/16/23   8,16                     100,000       100,000  JJH             0           0           0 King & King Architects                  0        /  /                         08/09/23           

          Bus Garage:
19-0918   Reconstruction               5-009-005  03/06/20     DONE    DONE       DONE      12/05/19   11/22/19   05/21/19   12/04/18   9,155                    135,000       135,000  JLB             0           0           0 King & King Architects                  0      10/04/21                       11/22/19           
21-1747   Reconstruction               5-009-006  07/29/22     DONE    DONE       DONE      05/03/22   04/29/22   12/16/21   12/07/18   8,9                       30,000        30,000  JLB             0           0           0 King & King Architects                  0        /  /                         04/29/22           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




LITTLE FALLS CITY SCHOOLS STATUS REPORT ON CAPITAL PROJECTS
District No.: 21-08-00-05
last updated on 04/19/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Benton Hall Elementary:
19-0155   Additions and Alterations    0-001-012  01/06/20     DONE    DONE       DONE      07/24/19   07/22/19   04/18/18   05/15/18   02 - 16                8,350,000     8,093,473  JSS             0           0           0 Synthesis Architects,L.L.P.             0      11/09/21                       07/22/19           

          Middle School/High School:
19-0156   Additions and Alterations    0-008-014  01/06/20     DONE    DONE       DONE      07/24/19   07/22/19   04/18/18   05/15/18   02 - 16               20,575,000    20,223,490  JSS             0           0     568,670 Synthesis Architects,L.L.P.             0      10/26/21                       07/22/19           

          School Bus Garage:
19-0157   Additions and Alterations    5-003-003  01/06/20     DONE    DONE       DONE      07/24/19   07/22/19   01/14/19   05/15/18   02 - 16                1,500,000     1,500,000  JSS             0           0           0 Synthesis Architects,L.L.P.             0      08/28/20                       07/22/19           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




DOLGEVILLE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 21-10-03-04
last updated on 04/19/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          James A Green School:
19-0646   Reconstruction               0-001-017  11/01/19     DONE    DONE       DONE      10/31/19   10/30/19   08/16/19   08/20/19   7,155,16                  25,000        25,000  SLC             0           0           0 SEI Design Group                        0      11/15/19                       10/30/19           
20-0553   Reconstruction               0-001-018  01/31/21     DONE    DONE       DONE      10/07/20   09/28/20   12/26/19   02/25/20   2,4,9,155,16           1,000,000     1,000,000  SLC             0           0           0 SEI Design Group                        0      10/15/21                       09/28/20           
21-0655   Reconstruction               0-001-019  02/10/22     DONE    DONE       DONE      11/04/21   11/04/21   04/16/21   06/16/20   7,9,10                    95,000        95,000  SLC             0           0           0 SEI Design Group                        0      08/23/22                       11/04/21           
21-0656   Reconstruction               0-001-020  03/29/22     DONE    DONE       DONE      11/04/21   11/04/21   09/09/21   02/25/20   2,4,9,155,16             100,000       100,000  MSK             0           0           0 SEI Design Group                        0      04/28/23                       11/04/21           
22-1410   Reconstruction               0-001-021  04/06/23     DONE    DONE       DONE      01/06/23   01/05/23   05/12/22   03/01/22   7                      1,173,800     1,173,800  JLB             0           0           0 SEI Design Group                        0        /  /                         01/05/23           
22-1411   Reconstruction               0-001-022  04/06/23     DONE    DONE       DONE      01/06/23   01/05/23   05/12/22   03/01/22   2,4,7,8,9,155,15,16   11,984,100    11,984,100  JLB             0           0           0 SEI Design Group                        0        /  /                         01/05/23           
22-1470FA Reconstruction               0-001-023  01/18/23     DONE    DONE       DONE      01/11/23   01/05/23   05/12/22   12/20/22   2                        893,025             0  SLC             0           0           0 SEI Design Group                        0        /  /                         01/05/23           
22-1471FC Reconstruction               0-001-024  02/07/23     DONE    DONE       DONE      01/11/23   12/20/22   05/12/22   12/20/22   7,155                    849,675             0  SLC             0           0           0 SEI Design Group                        0      09/13/23                       12/20/22           
  -       Reconstruction               0-001-025                                              /  /       /  /     08/25/22     /  /     155,15                         0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Bus Garage (fmly 4-004):
20-1356   Reconstruction               5-004-002  04/20/21     DONE    DONE       DONE      03/02/21   02/17/21   11/23/20   12/15/20   13                        35,000        35,000  SLC             0           0           0 SEI Design Group                        0      10/15/21                       02/17/21           
  -    PR Additions and Alterations    5-004-003                                              /  /       /  /     05/16/22     /  /     02 - 16                        0             0  SLC             0           0           0                                         0        /  /                           /  /             
22-1412   Additions and Alterations    5-004-003  04/06/23     DONE    DONE       DONE      01/06/23   01/05/23   05/16/22   03/01/22   02 - 16                  847,900       847,900  JLB             0           0           0 SEI Design Group                        0        /  /                         01/05/23           

          XXPress Box/Storage Demo:
22-1413   Reconstruction               7-005-002  04/06/23     DONE    DONE       DONE      01/06/23   01/05/23   11/18/22   03/01/22   2                         50,000             0  JLB             0           0           0 SEI Design Group                        0        /  /                         01/05/23           

          Dugout 1:
20-0554   New Construction             7-011-001  01/31/21     DONE    DONE       DONE      10/07/20   09/28/20   06/11/20   01/21/20   02 - 16                   18,600             0  SLC             0           0           0 SEI Design Group                        0      06/24/21                       09/28/20           

          XXDugout 2 - no storage - cancelled:
  -    XX New Construction             7-012-001                         CANCELLED            /  /       /  /     06/11/20     /  /     02 - 16                        0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Concession Stand:
  -    PR New Construction             7-013-001                                              /  /       /  /     05/18/22     /  /     02 - 16                        0             0  SLC             0           0           0                                         0        /  /                           /  /             
22-1414   New Construction             7-013-001  04/06/23     DONE    DONE       DONE      01/06/23   01/05/23   05/18/22   03/01/22   02 - 16                1,157,900             0  JLB             0           0           0 SEI Design Group                        0        /  /                         01/05/23           

          Press Box:
  -    PR New Construction             7-014-001                                              /  /       /  /     05/18/22     /  /     02 - 16                        0             0  SLC             0           0           0                                         0        /  /                           /  /             
22-1415   New Construction             7-014-001  04/06/23     DONE    DONE       DONE      01/06/23   01/05/23   05/18/22   03/01/22   02 - 16                   54,000             0  JLB             0           0           0 SEI Design Group                        0        /  /                         01/05/23           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




POLAND CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 21-11-03-04
last updated on 04/19/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Main Building:
19-0453   Reconstruction               0-002-026  11/22/19     DONE    DONE       DONE      09/20/19   09/16/19   06/13/19   05/16/17   2,16                     600,000             0  JSS             0           0           0 March Associates                        0      07/29/21                       09/16/19           
19-1267   Reconstruction               0-002-027  06/05/20     DONE    DONE       DONE      01/27/20   01/21/20   06/27/19   05/19/20   9,155,15,16              138,750       138,750  JSS             0           0           0 March Associates                        0      08/17/21                       01/21/20           
22-1861FB Reconstruction               0-002-028  05/19/23     DONE    DONE       DONE      03/17/23   01/27/23   11/07/22   01/06/21   2,4,8,9,10,155,15,16   1,538,579     1,538,579  JJH             0           0           0 March Associates                        0        /  /                         01/27/23           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




VAN HORNESVILLE-OWEN D YOUNG CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 21-17-01-04
last updated on 04/19/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          K-12 Main Building:
18-1700   Reconstruction               0-001-020  05/01/19     DONE    DONE       DONE      03/21/19   03/18/19   01/02/19   06/24/15   7                        265,000       265,000  JLB             0           0           0 King & King Architects                  0      08/01/20                       03/18/19           
19-1386   Reconstruction               0-001-021  03/13/20     DONE    DONE       DONE      02/07/20   01/30/20   12/09/19   05/21/19   7,9                      100,000       100,000  JLB             0           0           0 King & King Architects                  0      06/15/20                       01/30/20           
20-0830   Reconstruction               0-001-022  03/23/21     DONE    DONE       DONE      11/16/20   11/05/20   06/23/20   06/09/20   7,8,9                    100,000       100,000  JLB             0           0           0 King & King Architects                  0      06/24/21                       11/05/20           
21-0850   Reconstruction               0-001-023  01/26/22     DONE    DONE       DONE      12/06/21   12/06/21   11/03/21   05/18/21   7,8                      100,000       100,000  JLB             0           0           0 King & King Architects                  0      06/30/22                       12/06/21           
21-1965FA Reconstruction               0-001-024  11/15/22     DONE    DONE       DONE      06/13/22   06/10/22   06/13/22   01/26/22   13,16                    300,000       300,000  JLB             0           0           0 King & King Architects                  0        /  /                         06/10/22           
21-2019   Reconstruction               0-001-025  10/17/22     DONE    DONE       DONE      06/22/22   06/22/22   06/16/22   11/30/21   2,4,7,8,9,10,155,15,   3,500,000     3,500,000  JLB             0           0           0                                         0        /  /                         06/22/22           
22-0134   Reconstruction               0-001-026  11/15/22     DONE    DONE       DONE      07/22/22   07/08/22   07/12/22   05/17/22   10                       100,000       100,000  JLB             0           0           0 King & King Architects                  0      06/27/23                       07/08/22           
23-0667   Reconstruction               0-001-027  03/20/24     DONE    DONE       DONE      10/10/23   10/06/23   09/15/23   05/16/23   9,16                     100,000       100,000  JLB             0           0           0 King & King Architects                  0        /  /                         10/06/23           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




TOWN OF WEBB UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 21-19-01-02
last updated on 04/19/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Main Building:
19-0405   Reconstruction               0-001-026  12/06/19     DONE    DONE       DONE      09/12/19   09/09/19   05/23/19   05/21/19   8,9,155,15,16            100,000       100,000  SLC             0           0           0 Bernier Carr Associates                 0      04/24/20                       09/09/19           
19-0847   Reconstruction               0-001-027  03/16/20     DONE    DONE       DONE      11/21/19   11/14/19   09/06/19   10/22/19   4,8,9,155,15,16          275,000             0  JSS             0           0           0 Bernier Carr Associates                 0      08/31/20                       11/14/19           
  -       Reconstruction               0-001-028                                              /  /       /  /     08/04/20     /  /     4,9,15                         0             0  JSS             0           0           0                                         0        /  /                           /  /             
20-0757   Reconstruction               0-001-029  02/03/21     DONE    DONE       DONE      10/30/20   10/27/20   08/12/20   06/09/20   8                        100,000       100,000  JSS             0           0           0 Bernier Carr Associates                 0      06/18/21                       10/27/20           
21-0307   Reconstruction               0-001-030  03/09/22     DONE    DONE       DONE      09/08/21   09/08/21   06/11/21   05/18/21   4,8,9,155,15,16          250,000             0  SLC             0           0           0 Bernier Carr Associates                 0        /  /                         09/08/21           
21-0835   Reconstruction               0-001-031  02/17/22     DONE    DONE       DONE      12/03/21   11/23/21   10/27/21   05/18/21   16                       100,000       100,000  SLC             0           0           0 Bernier Carr Associates                 0      06/10/22                       11/23/21           
22-0392   Reconstruction               0-001-032  12/21/22     DONE    DONE       DONE      09/02/22   09/01/22   06/13/22   05/17/22   7                        460,000       460,000  WLC             0           0           0 Bernier Carr Associates                 0      09/13/23                       09/01/22           
22-0482   Reconstruction               0-001-033  10/14/22     DONE    DONE       DONE      09/14/22   09/12/22   07/18/22   05/17/22   8,9,155,15,16            100,000       100,000  WLC             0           0           0 Bernier Carr Associates                 0      05/11/23                       09/12/22           
23-0313   Reconstruction               0-001-034  11/03/23     DONE    DONE       DONE      08/23/23   08/23/23   07/28/23   05/16/23   9,10,15,16               100,000       100,000  WLC             0           0           0 Bernier Carr Associates                 0      04/12/24                       08/23/23           
  -    PR Additions and Alterations    0-001-035                                              /  /       /  /     03/06/24     /  /     02 - 16                        0             0  WLC             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-001-036                                              /  /       /  /     04/16/24     /  /     8,9,155,15,16                  0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Industrial Art Bld:
  -       Reconstruction               0-004-006                                              /  /       /  /     03/06/24     /  /     2,4,7,9,155,16                 0             0  WLC             0           0           0                                         0        /  /                           /  /             

          House at 139 Park Avenue Demolition:
  -    DB Discovered Building          7-011-001                                              /  /       /  /     11/13/19     /  /                                    0             0  JSS             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




MT. MARKHAM CSD (FMLYBRIDGWTRWWINFIE STATUS REPORT ON CAPITAL PROJECTS
District No.: 21-20-01-04
last updated on 04/19/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Mount Markham Middle School:
22-1134   Reconstruction               0-001-018  05/09/23     DONE    DONE       DONE      12/05/22   11/30/22   02/07/22   12/07/21   2,4,7,8,9,155,15,16    7,515,360     7,515,360  WLC             0           0           0 King & King Architects                  0        /  /                         11/30/22           
22-0864   Reconstruction               0-001-019  12/28/22     DONE    DONE       DONE      10/31/22   10/28/22   06/09/22   05/17/22   13,155                   100,000       100,000  WLC             0           0           0 King & King Architects                  0      06/15/23                       10/28/22           
  -       Reconstruction               0-001-020                                              /  /       /  /     03/01/24     /  /     2,4,8,9,155,15,16              0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Mount Markham Elementary:
22-1135   Reconstruction               0-004-013  05/09/23     DONE    DONE       DONE      12/05/22   11/30/22   02/07/22   12/07/21   2,4,7,8,9,155,15,16    6,339,560     6,339,560  WLC             0           0           0 King & King Architects                  0        /  /                         11/30/22           
23-0648   Reconstruction               0-004-014  12/14/23     DONE    DONE       DONE      10/06/23   10/05/23   06/23/23   05/16/23   9,16                     100,000       100,000  WLC             0           0           0 King & King Architects                  0        /  /                         10/05/23           
  -       Reconstruction               0-004-015                                              /  /       /  /     03/01/24     /  /     2,4,7,8,9,155,15,16            0             0  WLC             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-004-016                                              /  /       /  /     03/01/24     /  /     9,16                           0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Mt. Markham Sr. High:
19-1580   Reconstruction               0-011-016  05/13/20     DONE    DONE       DONE      03/16/20   03/12/20   02/27/20   05/21/19   9                        100,000       100,000  JSS             0           0           0 King & King Architects                  0      06/29/21                       03/12/20           
20-0831   Reconstruction               0-011-017  02/16/21     DONE    DONE       DONE      11/16/20   10/09/20   02/27/20   06/09/20   9                        100,000       100,000  JLB             0           0           0 King & King Architects                  0      06/29/21                       10/09/20           
20-1623   Reconstruction               0-011-018  06/02/21     DONE    DONE       DONE      04/23/21   04/21/21   03/17/21   05/18/21   8,9                      100,000       100,000  JLB             0           0           0 King & King Architects                  0      09/01/21                       04/21/21           
22-1136   Reconstruction               0-011-019  05/09/23     DONE    DONE       DONE      12/05/22   11/30/22   02/07/22   12/07/21   2,4,8,9,155,15,16      7,478,640     7,478,640  WLC             0           0           0 King & King Architects                  0        /  /                         11/30/22           
  -       Reconstruction               0-011-020                                              /  /       /  /     03/01/24     /  /     9,155,15,16                    0             0  WLC             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-011-021                                              /  /       /  /     03/01/24     /  /     2,4,7,8,9,155,15,16            0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Bus Garage:
22-1137   Reconstruction               5-009-011  05/09/23     DONE    DONE       DONE      12/05/22   11/30/22   02/07/22   12/07/21   2,4,8,9,14,155,15,16   4,561,440     4,561,440  WLC             0           0           0 King & King Architects                  0        /  /                         11/30/22           
  -       Reconstruction               5-009-012                                              /  /       /  /     03/01/24     /  /     4,7,8,9,155,15,16              0             0  WLC             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




CENTRAL VALLEY CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 21-21-01-04
last updated on 04/19/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Central Valley Academy:
20-0829   Reconstruction               0-001-014  02/10/21     DONE    DONE       DONE      11/16/20   10/29/20   07/01/20   06/09/20   9                        100,000       100,000  JSS             0           0           0 King & King Architects                  0      06/24/21                       10/29/20           
22-0063   Reconstruction               0-001-015  11/15/22     DONE    DONE       DONE      07/11/22   07/08/22   05/26/22   05/17/22   2,9                      490,000       490,000  SLC             0           0           0 King & King Architects                  0        /  /                         07/08/22           
22-1067   Reconstruction               0-001-016  12/06/22     DONE    DONE       DONE      11/28/22   11/25/22   11/10/22   05/17/22   13                        60,000        60,000  SLC             0           0           0 King & King Architects                  0        /  /                         11/25/22           
23-0540   Reconstruction               0-001-017               DONE    ADD. REQ'D DONE      09/22/23   09/21/23   07/11/23   05/17/22   2,4,7,8,9,10,155,15,  11,468,000    11,468,000  MSK             0           0           0 King & King Architects                  0        /  /                         09/21/23           
23-0878   Reconstruction               0-001-018                         UNREVIEWED         11/03/23   10/30/23   09/29/23   09/20/23   2,10,16                        0             0  MSK             0           0           0 King & King Architects                  0        /  /                         10/30/23           
  -       Reconstruction               0-001-019                                              /  /       /  /     10/05/23     /  /     2,10,16                        0             0  MSK             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-001-020                                              /  /       /  /     02/26/24     /  /     9                              0             0  MSK             0           0           0                                         0        /  /                           /  /             

          Fisher Elem School:
21-0653   Reconstruction               0-003-003  12/30/21     DONE    DONE       DONE      11/04/21   11/04/21   04/14/21   05/18/21   9,16                     100,000       100,000  SLC             0           0           0 King & King Architects                  0      06/24/22                       11/04/21           
23-0541   Reconstruction               0-003-004               DONE    ADD. REQ'D DONE      09/22/23   09/21/23   07/11/23   05/17/22   2,4,7,8,9,10,155,15,   2,982,000             0  MSK             0           0           0 King & King Architects                  0        /  /                         09/21/23           

          District-Wide:
23-0349   Reconstruction               7-999-001  10/11/23     DONE    DONE       DONE      08/30/23   08/29/23   05/25/23   05/16/23                            100,000       100,000  JLB             0           0           0 King & King Architects                  0        /  /                         08/29/23           
23-0780SB Reconstruction               7-999-002               DONE                           /  /       /  /     10/23/23     /  /                                    0             0  MSK             0           0           0                                         0        /  /                           /  /             
23-1138   Reconstruction               7-999-002                         UNREVIEWED         12/07/23   12/06/23     /  /     11/04/14                                  0             0  MSK             0           0           0 King & King Architects                  0        /  /                         12/06/23           
  -    SB Reconstruction               7-999-BA1               DONE                           /  /       /  /       /  /       /  /     16                             0             0  JSS             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




BOCES HERKIMER-FULTON-HAMILT-OTSEGO STATUS REPORT ON CAPITAL PROJECTS
District No.: 21-90-00-00
last updated on 04/19/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Busacker Educational Complex:
23-0099   Reconstruction               0-007-020  01/25/24     DONE    DONE       DONE      07/17/23   07/17/23   02/08/22   09/27/22   2,4,7,8,9,10,155,15,  23,972,000    23,972,000  WLC             0           0           0 King & King Architects                  0        /  /                         07/17/23           

          Remington Educational Complex:
21-0657DB Discovered Building          0-021-001  11/18/21     DONE    DONE       DONE      11/05/21     /  /     09/17/21     /  /     2,4,7,8,9,155,15,16            0    18,617,954  JLB             0           0           0                                         0        /  /                           /  /             
22-1302   Reconstruction               0-021-002  04/25/23     DONE    DONE       DONE      12/21/22   12/21/22   02/08/22   12/08/22   2,4,7,8,9,10,155,15,     175,000       175,000  WLC             0           0           0 King & King Architects                  0      02/01/24                       12/21/22           

          East German Street:
22-1299TQ Temporary Quarters           8-022-001               DONE    ADD. REQ'D DONE      12/21/22   12/15/22   02/08/22     /  /                                    0             0  WLC             0           0           0                                         0        /  /                         12/15/22           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED