Construction Project Status

Construction Project Status

THE STATE EDUCATION DEPARTMENT

FACILITIES PLANNING


UPDATED: 12/18/18 at 09:04:32




AVON CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 24-01-01-04
last updated on 12/18/18
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Primary School:
14-0059   Reconstruction               0-001-014  03/16/15     DONE    DONE       DONE      07/25/14   07/21/14   04/01/14   01/21/14   2,9,155,16               584,930       584,930  MFS             0           0           0 Hunt Engineers & Architects &           0      07/05/16                       12/29/16           
15-0972   Reconstruction               0-001-015  02/10/16     DONE    DONE       DONE      12/28/15   12/28/15   10/15/15   01/21/14   2,7,155                  200,000       200,000  MFS             0           0           0 Hunt Engineers,Architects & l           0      08/31/16                       12/14/17           
17-0381   Reconstruction               0-001-016  02/20/18     DONE    DONE       DONE      09/12/17   09/11/17   06/30/17   05/16/17   16                       100,000       100,000  BMJ             0           0           0 Ashley McGraw                           0      04/27/18                       05/07/18           
17-1670   Reconstruction               0-001-017  05/22/18     DONE    DONE       DONE      04/09/18   04/06/18   03/14/18   05/15/18   7                        165,000       165,000  BMJ             0           0           0 Ashley McGraw                           0      09/18/18                       11/28/18           
18-0910   Reconstruction               0-001-018                         UNREVIEWED         11/21/18   11/19/18   10/26/18     /  /     7                              0             0  BMJ             0           0           0 Ashley McGraw                           0        /  /                           /  /             

          Middle/High School:
14-0060   Reconstruction               0-002-016  03/16/15     DONE    DONE       DONE      07/25/14   07/21/14   04/01/14   01/21/14   2,4,7,8,9,10,155,15,   9,076,719     9,076,719  MFS             0           0           0 Hunt Engineers & Architects &           0      07/05/16                       12/29/16           
15-0973   Reconstruction               0-002-017  02/10/16     DONE    DONE       DONE      12/28/15   12/28/15   10/15/15   01/21/14   8,15,16                  100,000       100,000  MFS             0           0           0 Hunt Engineers,Architects & l           0      08/31/16                       12/22/17           
15-1653   Reconstruction               0-002-018  05/09/16     DONE    DONE       DONE      05/02/16   04/27/16   03/22/16   01/21/14   7                        479,500       479,500  MFS             0           0           0 Ashley McGraw                           0      10/15/17                       11/10/17           
16-0491   Reconstruction               0-002-019  11/02/16     DONE    DONE       DONE      09/23/16   09/23/16   07/12/16   05/17/16   16                       100,000       100,000  BMJ             0           0           0 Ashley McGraw                           0      05/26/17                       06/21/17           
16-1509   Reconstruction               0-002-020  10/30/17     DONE    DONE       DONE      03/15/17   03/15/17   01/26/17   01/21/14   7,155,16                 261,000       261,000  BMJ             0           0           0 Ashley McGraw                           0      05/18/18                       06/13/18           
17-1671   Reconstruction               0-002-021  05/22/18     DONE    DONE       DONE      04/09/18   04/06/18   03/14/18   05/15/18   7                        100,000       100,000  BMJ             0           0           0 Ashley McGraw                           0      09/18/18                       11/28/18           
18-0911   Reconstruction               0-002-022                         UNREVIEWED         11/21/18   11/19/18   10/26/18     /  /     2,7                            0             0  BMJ             0           0           0 Ashley McGraw                           0        /  /                           /  /             

          Track Storage Facility:
14-0272   New Construction             2-012-001  03/16/15     DONE    DONE       DONE      09/10/14   09/09/14   06/25/14     /  /     02 - 16                   50,000             0  MFS             0           0           0 Hunt Engineers & Architects &           0      09/01/15                       10/13/15           

          PPA Solar Array:
14-1325   New Construction             7-013-001  09/28/15     DONE    DONE       DONE      03/25/15   03/25/15   10/01/14     /  /     02 - 16                        0             0  MFS             0           0           0 Hunt Engineers,Architects & l           0        /  /                           /  /             

          District-Wide:
  -       Reconstruction               7-999-002                                              /  /       /  /       /  /       /  /     16                             0             0  BMJ             0           0           0                                         0        /  /                           /  /             
16-1985SB Reconstruction               7-999-002               DONE                           /  /       /  /     06/05/17     /  /     16                             0             0  BMJ             0           0           0                                         0        /  /                           /  /             
  -    SB Reconstruction               7-999-BA1                                              /  /       /  /       /  /       /  /     16                             0             0  BMJ             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




CALEDONIA MUMFORD CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 24-02-01-04
last updated on 12/18/18
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Jr/Sr High School:
14-1646   Reconstruction               0-001-008  02/29/16     DONE    DONE       DONE      06/12/15   06/11/15   04/08/14   10/14/14   2,4,7,8,9,10,155,15,   3,097,134     3,097,134  DDJ             0           0           0 Hunt Engineers,Architects & l           0      08/19/16                       12/15/17           
14-1488   Reconstruction               0-001-009  05/21/15     DONE    DONE       DONE      05/06/15   05/06/15   12/04/14   05/19/15   8,16                     100,000       100,000  DDJ             0           0           0 Hunt Engineers & Architects &           0      05/20/16                       06/13/16           
16-2008   Reconstruction               0-001-010  09/11/17     DONE    DONE       DONE      06/08/17   06/08/17   02/16/17   05/16/17   2,16                     100,000       100,000  BMJ             0           0           0 Hunt Engineers,Architects & l           0        /  /                           /  /             
  -       Reconstruction               0-001-011                                              /  /       /  /     04/02/18     /  /     2                              0             0  BMJ             0           0           0                                         0        /  /                           /  /             
18-0011   Reconstruction               0-001-012  08/10/18     DONE    DONE       DONE      07/03/18   06/28/18   04/02/18   05/15/18   155                      100,000             0  BMJ             0           0           0 Hunt Engineers,Architects & l           0        /  /                           /  /             
18-0644   Reconstruction               0-001-013  11/21/18     DONE    DONE       DONE      10/16/18   10/01/18   05/24/18   09/18/18   2,4,7,155,16           3,018,822             0  BMJ             0           0           0 Hunt Engineers,Architects & l           0        /  /                           /  /             

          Elementary School:
14-1647   Reconstruction               0-003-010  02/29/16     DONE    DONE       DONE      06/12/15   06/11/15   04/08/14   10/14/14   2,4,7,8,9,10,15,16     4,003,213     4,003,213  DDJ             0           0       2,506 Hunt Engineers,Architects & l           0      08/19/16                       12/15/17           
15-1867   Reconstruction               0-003-011  06/15/16     DONE    DONE       DONE      06/03/16   06/02/16   03/17/16   05/17/16   15,16                    100,000       100,000  DDJ             0           0           0 Hunt Engineers & Architects &           0        /  /                           /  /             
18-0645   Reconstruction               0-003-012  11/21/18     DONE    DONE       DONE      10/16/18   10/01/18   05/24/18   09/18/18   7,10,155,16              623,336             0  BMJ             0           0           0 Hunt Engineers,Architects & l           0        /  /                           /  /             

          District Office:
14-1648XX Reconstruction               1-002-005  02/29/16               CANCELLED          06/12/15   06/11/15   04/08/14   10/14/14   7,10                     114,370             0  DDJ             0           0           0 Hunt Engineers,Architects & l           0      08/19/16                       12/15/17           

          New Bus Garage:
14-1649XX Reconstruction               5-006-004  02/29/16               CANCELLED          06/12/15   06/11/15   04/08/14   10/14/14   10,16                     60,708        60,708  DDJ             0           0           0 Hunt Engineers,Architects & l           0      08/19/16                       12/15/17           

          Press Box #2:
18-0646   Reconstruction               7-013-002  11/21/18     DONE    DONE       DONE      10/16/18   10/01/18   05/24/18   09/18/18   8                         22,842             0  BMJ             0           0           0 Hunt Engineers,Architects & l           0        /  /                           /  /             

          Dugout-Baseball #1:
15-0354   New Construction             7-015-001  02/29/16     DONE    DONE       DONE      08/27/15   08/26/15   07/24/15   10/14/14   02 - 16                   10,000             0  DDJ             0           0           0 Hunt Engineers & Architects &           0      08/19/16                       12/15/17           

          Dugout-Baseball #2:
15-0355   New Construction             7-016-001  02/29/16     DONE    DONE       DONE      08/27/15   08/26/15   07/24/15   10/14/14   02 - 16                   10,000             0  DDJ             0           0           0 Hunt Engineers & Architects &           0      08/19/16                       12/15/17           

          Dugout-Softball #1:
15-0356   New Construction             7-017-001  02/29/16     DONE    DONE       DONE      08/27/15   08/26/15   07/24/15   10/14/14   02 - 16                   10,000             0  DDJ             0           0           0 Hunt Engineers & Architects &           0      08/19/16                       12/15/17           

          Dugout-Softball #2:
15-0357   New Construction             7-018-001  02/29/16     DONE    DONE       DONE      08/27/15   08/26/15   07/24/15   10/14/14   02 - 16                   10,000             0  DDJ             0           0           0 Hunt Engineers & Architects &           0      08/19/16                       12/15/17           

          District-Wide:
15-0611SB Reconstruction               7-999-001               DONE                           /  /       /  /     08/28/15     /  /     13,16                          0             0  DDJ             0           0           0 Hunt Engineers,Architects & l           0        /  /                           /  /             
16-0198   Reconstruction               7-999-001  09/06/16     DONE    DONE       DONE      08/03/16   08/02/16   08/28/15   10/14/14   13,16                    230,808       230,808  DDJ             0           0           0 Hunt Engineers,Architects & l           0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




GENESEO CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 24-04-01-04
last updated on 12/18/18
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Main Building:
  -    SB Visual Structural Inspection 0-005-SB1               DONE                           /  /       /  /       /  /       /  /                                    0             0  JMB             0           0           0                                         0        /  /                           /  /             

          Transportation Facility:
15-1518   New Construction             5-010-001  10/21/16     DONE    DONE       DONE      03/31/16   03/31/16   01/14/15   10/01/15   02 - 16                2,490,000     2,490,000  JMB             0           0           0 Hunt Engineers,Architects & l           0      11/30/17                       06/22/18         YES
                                                                                                                                                                                                                                                                                                                                   


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




LIVONIA CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 24-08-01-06
last updated on 12/18/18
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Connell Bldg (frmrly Intermed.Sch):
14-1463   Reconstruction               0-001-010  05/11/16     DONE    DONE       DONE      05/01/15   04/30/15   09/02/14   01/12/15   155,16                   601,833       601,833  DDJ             0           0           0 M/E Engineering                   627,394      11/28/16                       12/23/16           

          Livonia Elementary:
13-0778   Reconstruction               0-002-009  04/01/14     DONE    DONE       DONE      11/27/13   11/22/13   10/03/13   10/20/11   10,16                     30,844        30,844  DDJ             0           0           0 Gordon W. Jones Associates              0        /  /                           /  /             
14-1464   Reconstruction               0-002-010  05/11/16     DONE    DONE       DONE      05/01/15   04/30/15   09/02/14   01/12/15   155,16                 1,124,382     1,124,382  DDJ             0           0           0 M/E Engineering                 1,194,856      11/28/16                       12/27/16           
17-1848   Reconstruction               0-002-011  10/23/18     DONE    DONE       DONE      05/11/18   05/04/18   12/15/17   12/14/17   2,4,8,9,155,15,16      1,846,489             0  MTM             0           0           0 Hunt Engineers,Architects & l           0        /  /                           /  /             

          Livonia MS/HS(frmrly High School):
13-0779   Reconstruction               0-007-009  04/01/14     DONE    DONE       DONE      11/27/13   11/22/13   10/03/13   10/20/13   2,16                     286,125       286,125  DDJ             0           0           0 Gordon W. Jones Associates              0      06/01/15                       06/25/15           
14-1465   Reconstruction               0-007-010  05/11/16     DONE    DONE       DONE      05/01/15   04/30/15   09/02/14   01/12/15   155,16                 2,380,277     2,380,277  DDJ             0           0           0 M/E Engineering                 2,552,007      11/28/16                       12/27/16           
  -    PR Additions and Alterations    0-007-011                                              /  /       /  /     12/15/17     /  /     02 - 16                        0             0  MTM             0           0           0                                         0        /  /                           /  /             
17-1849   Additions and Alterations    0-007-011  10/23/18     DONE    DONE       DONE      05/11/18   05/04/18   12/15/17   12/14/17   02 - 16                5,053,511             0  MTM             0           0           0 Hunt Engineers,Architects & l           0        /  /                           /  /             
18-0039   Reconstruction               0-007-012  10/24/18     DONE    DONE       DONE      07/09/18   07/02/18   05/16/18   05/15/18   16                       100,000             0  MTM             0           0           0 Hunt Engineers & Architects &           0        /  /                           /  /             

          Gym/Locker Facility @ High School:
14-1466   Reconstruction               0-008-005  05/11/16     DONE    DONE       DONE      05/01/15   04/30/15   09/02/14   01/12/15   155,16                    65,075        65,075  DDJ             0           0           0 M/E Engineering                    65,075      11/28/16                       12/27/16           
  -       Reconstruction               0-008-006                                              /  /       /  /     12/15/17     /  /     7                              0             0  MTM             0           0           0                                         0        /  /                           /  /             

          Bus Garage:
14-1467   Reconstruction               5-009-002  05/11/16     DONE    DONE       DONE      05/01/15   04/30/15   01/28/15   01/12/15   155,16                    58,001        58,001  DDJ             0           0           0 M/E Engineering                    58,001      11/28/16                       12/27/16           

          STA Transporation Facility:
17-0655   Reconstruction               5-010-L03  10/25/17     DONE    DONE       DONE      10/25/17   10/25/17   09/02/14   03/13/17   155,16                   435,000       435,000  MTM             0           0           0                                         0        /  /                           /  /             

          District-Wide:
15-1453SB Reconstruction               7-999-002               DONE                           /  /       /  /     03/21/16     /  /     13,16                          0             0  DDJ             0           0           0                                         0        /  /                           /  /             
16-0749   Reconstruction               7-999-002  11/14/16     DONE    DONE       DONE      11/10/16   11/09/16     /  /     02/29/16   13,16                  1,514,812             0  DDJ             0           0           0 Tetra Tech Architects and Eng           0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




MOUNT MORRIS CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 24-09-01-04
last updated on 12/18/18
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Mt Morris Central:
14-0077   Reconstruction               0-001-010  07/31/14     DONE    DONE       DONE      07/29/14   07/25/14   03/26/10   05/20/14   4,8,9,10,155,15,16       100,000       100,000  JOD             0           0           0 SEI Design Group                        0      06/29/15                       06/29/15         YES
                                                                                                                                                                                                                                                                                                                                   
14-0103   Reconstruction               0-001-011  03/26/15     DONE    DONE       DONE      08/06/14   08/04/14   11/13/13   12/17/13   2,4,7,8,9,155,15,16    3,816,551     3,816,551  MFS             0           0           0 SEI Design Group                        0      06/09/16                       07/11/16         YES
                                                                                                                                                                                                                                                                                                                                   
14-0078   Reconstruction               0-001-012  08/01/14     DONE    DONE       DONE      07/29/14   07/25/14   07/09/14   12/17/13   155,16                   100,000       100,000  MFS             0           0           0 SEI Design Group                        0      03/06/15                       10/28/15         YES
                                                                                                                                                                                                                                                                                                                                   
15-0480   Reconstruction               0-001-013  03/22/16     DONE    DONE       DONE      09/21/15   09/15/15   05/13/15   05/19/15   8,155                    100,000       100,000  MFS             0           0           0 SEI Design Group                        0      06/14/16                       07/11/16         YES
                                                                                                                                                                                                                                                                                                                                   
16-1010   Reconstruction               0-001-014  05/05/17     DONE    DONE       DONE      12/20/16   12/19/16   11/15/16   05/17/16   155                      100,000       100,000  SLC             0           0           0 SEI Design Group                        0      06/23/17                       07/03/17         YES
                                                                                                                                                                                                                                                                                                                                   
17-0418   Reconstruction               0-001-015  12/31/17     DONE    DONE       DONE      09/18/17   09/18/17   08/29/17   05/16/17   8,155,16                 100,000       100,000  SLC             0           0           0 SEI Design Group                        0      06/04/18                       08/08/18         YES
                                                                                                                                                                                                                                                                                                                                   
17-2046   Reconstruction               0-001-016  08/01/18     DONE    DONE       DONE      06/26/18   06/25/18   03/12/18   05/15/18   8,155                    100,000             0  SLC             0           0           0 SEI Design Group                        0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
18-0245   Reconstruction               0-001-017  09/18/18     DONE    DONE       DONE      08/15/18   08/13/18   03/14/18   05/15/18   8,16                     160,000             0  SLC             0           0           0 SEI Design Group                        0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
17-2096   Reconstruction               0-001-018  08/03/18     DONE    DONE       DONE      06/29/18   06/29/18   03/23/18   05/15/18   2,8,9                    525,000             0  SLC             0           0           0 SEI Design Group                        0        /  /                           /  /             
18-0598   Reconstruction               0-001-019                       ADDENDUM REQ'D       10/11/18   10/03/18   03/28/18   05/15/18   155,15,16                      0             0  SLC             0           0           0 SEI Design Group                        0        /  /                           /  /             
  -       Reconstruction               0-001-020                                              /  /       /  /     04/03/18     /  /     2,4,7,8,9,10,155,15,           0             0  SLC             0           0           0                                         0        /  /                           /  /             
17-1972   Reconstruction               0-001-021  06/20/18     DONE    DONE       DONE      06/13/18   06/12/18   05/21/18   05/15/18   7                        200,000       200,000  SLC             0           0           0 SEI Design Group                        0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
  -    SB Reconstruction               0-001-BA1               DONE                           /  /       /  /       /  /       /  /     13                             0    17,826,670  MFS             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




DANSVILLE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 24-10-01-06
last updated on 12/18/18
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Ellis B Hyde Elementary:
13-0610   Reconstruction               0-001-013  04/09/14     DONE    DONE       DONE      10/23/13   10/18/13   03/14/13   12/17/12   2,4,8,9,155,15,16        746,915       746,915  DDJ             0           0           0 LaBella Associates, P.C.                0      12/01/15                       12/21/15           
  -       Reconstruction               0-001-014                                              /  /       /  /     12/12/18     /  /     2,4,8,9,10,13,155,15           0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Dansville Senior High School:
13-0611   Reconstruction               0-003-014  04/09/14     DONE    DONE       DONE      10/23/13   10/18/13   03/14/13   12/17/12   2,4,8,9,155,15,16      1,870,492     1,870,492  DDJ             0           0           0 LaBella Associates, P.C.                0      12/01/15                       12/21/15           
  -       Reconstruction               0-003-015                                              /  /       /  /     12/12/18     /  /     2,4,8,9,10,13,155,15           0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Primary School:
13-0612   Reconstruction               0-005-010  04/09/14     DONE    DONE       DONE      10/23/13   10/18/13   03/14/13   12/17/12   2,4,8,9,155,15,16        933,644       933,644  DDJ             0           0           0 LaBella Associates, P.C.                0      12/01/15                       12/21/15           
16-0275   Reconstruction               0-005-011  10/31/16     DONE    DONE       DONE      08/17/16   08/17/16   04/12/16   12/17/12   2,15                     104,000       104,000  DDJ             0           0           0 LaBella Associates, P.C.                0      11/05/18                       11/08/18           
  -       Reconstruction               0-005-012                                              /  /       /  /     05/06/16     /  /     2,8,9,10,155,15,16             0     8,365,554  DDJ             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-005-013                                              /  /       /  /     12/12/18     /  /     4,8,9,10,13,155,15,1           0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Manufactured Building @ HS:
  -    DB Discovered Building          0-023-001                                              /  /       /  /     02/23/17     /  /                                    0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Storage Building @ HS:
16-0315   New Construction             2-022-001  03/02/17     DONE    DONE       DONE      08/25/16   08/25/16   05/06/16   12/17/12   02 - 16                  129,000             0  DDJ             0           0           0 LaBella Associates, P.C.                0      11/05/18                       11/08/18           

          Transportation Building:
16-0276   Reconstruction               5-006-005  11/01/16     DONE    DONE       DONE      08/17/16   08/17/16   05/06/16   06/19/16   7                         97,000        97,000  DDJ             0           0           0 LaBella Associates, P.C.                0      11/05/18                       11/08/18           
  -       Reconstruction               5-006-006                                              /  /       /  /     12/12/18     /  /     2,4,7,8,9,10,13,155,           0             0  SLC             0           0           0                                         0        /  /                           /  /             

          District-Wide:
  -       Reconstruction               7-999-001                                              /  /       /  /     01/21/17     /  /     10                             0             0  SLC             0           0           0                                         0        /  /                           /  /             
16-1229SB Reconstruction               7-999-001               DONE                           /  /       /  /     01/21/17     /  /     10                             0             0  SLC             0           0           0                                         0        /  /                           /  /             
  -    SB Reconstruction               7-999-BA2               DONE                           /  /       /  /       /  /       /  /     16                             0             0  SLC             0           0           0                                         0        /  /                           /  /             
  -    SB Visual Structural Inspection 7-999-SB1                                              /  /       /  /       /  /       /  /     13,16                          0             0  DDJ             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




DALTON-NUNDA CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 24-11-01-04
last updated on 12/18/18
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Nunda Central (Jr/Sr High):
13-0256   Reconstruction               0-001-011  03/25/14     DONE    DONE       DONE      08/23/13   08/22/13   05/23/13   04/09/13   2,155,16               2,117,265     2,117,265  MFS             0           0           0 Clark Patterson Lee                     0      09/04/15                       12/18/15           
14-0920   Reconstruction               0-001-012  07/28/14     DONE    DONE       DONE      01/05/15   01/02/15   07/24/14   07/28/14   155,15,16                 93,000        93,000  MFS             0           0           0 Clark Patterson Lee                     0      12/16/14                       11/04/15           

          Dalton Central (Elementary):
13-0257   Reconstruction               0-003-008  03/25/14     DONE    DONE       DONE      08/23/13   08/22/13   05/23/13   04/09/13   2,16                     260,154       260,154  MFS             0           0      15,923 Clark Patterson Lee                     0      12/16/14                       02/09/15           
17-1287   Reconstruction               0-003-009  09/21/16     DONE    DONE       DONE      02/01/18   02/01/18   07/28/16   05/26/16   15                       100,000       100,000  BMJ             0           0           0 Clark Patterson Lee                     0      10/17/16                       05/21/18           

          New Bus Garage(Alt. Site):
13-0258   Reconstruction               5-008-002  03/25/14     DONE    DONE       DONE      08/23/13   08/22/13   03/01/13   04/09/13   155,15                    35,500        35,500  MFS             0           0           0                                         0      12/16/14                       03/20/15           
13-0259   Reconstruction               5-008-003  03/25/14     DONE    DONE       DONE      08/23/13   08/22/13   05/23/13   04/09/13   2,16                      16,200        16,200  MFS             0           0           0 Clark Patterson Lee                     0      12/16/14                       03/20/15           
17-0681   Reconstruction               5-008-004  05/08/17     DONE    DONE       DONE      10/31/17   10/23/17   03/22/17   03/16/17   2,10,16                  198,330       198,330  BMJ             0           0           0 Clark Patterson Lee                     0      02/27/18                       10/05/18           

          District-Wide Connectivity:
  -    SB Reconstruction               7-999-BA1                                              /  /       /  /     04/06/05     /  /     16                             0             0  BMJ             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




YORK CENTRAL SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 24-17-01-04
last updated on 12/18/18
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Main Building:
13-0911   Reconstruction               0-001-010  04/10/14     DONE    DONE       DONE      12/19/13   12/18/13   10/03/12   02/11/14   2,7,8,9,10,155,15,16   2,491,767     2,491,767  DDJ             0           0           0 Clark Patterson Lee                     0      09/16/14                       12/16/15         YES
                                                                                                                                                                                                                                                                                                                                   
14-0243   Reconstruction               0-001-011  05/11/15     DONE    DONE       DONE      09/04/14   09/02/14   06/12/14   02/11/14   2,8,9,10,155,15,16     2,361,793     2,361,793  DDJ             0           0           0 Clark Patterson Lee                     0      09/20/16                       12/14/16         YES
                                                                                                                                                                                                                                                                                                                                   
14-1008   Reconstruction               0-001-012  10/15/14     DONE    DONE       DONE      01/23/15   01/22/15   12/17/14   02/11/14   8,9                      219,000       219,000  DDJ             0           0           0 Clark Patterson Lee                     0      11/05/15                       02/08/16         YES
                                                                                                                                                                                                                                                                                                                                   
16-1415   Reconstruction               0-001-013  05/24/17     DONE    DONE       DONE      02/22/17   02/21/17   12/20/16   12/09/13   2,13,155,16              311,000       311,000  DDJ             0           0           0 Clark Patterson Lee                     0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
17-0730   Reconstruction               0-001-014  03/01/18     DONE    DONE       DONE      11/07/17   11/02/17   08/29/17   05/16/17   155,15,16                100,000       100,000  MTM             0           0           0 Clark Patterson Lee                     0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
18-0276   Reconstruction               0-001-015  10/18/18     DONE    DONE       DONE      08/22/18   08/02/18   07/24/18   05/15/18   2,9,15                   100,000       100,000  MTM             0           0           0 Clark Patterson Lee                     0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
  -       Reconstruction               0-001-016                                              /  /       /  /     07/24/18     /  /     2,4,8,9                        0    30,540,007  MTM             0           0           0                                         0        /  /                           /  /             
18-0488   Reconstruction               0-001-017  11/01/18     DONE    DONE       DONE      09/20/18   09/17/18   07/24/18   02/11/14   2,9,15,16                144,000             0  MTM             0           0           0 Clark Patterson Lee                     0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
  -    SB Reconstruction               0-001-BA1                                              /  /       /  /       /  /       /  /     13,16                          0    24,656,816  DDJ             0           0           0                                         0        /  /                           /  /             

          Bus Garage:
14-0244   Reconstruction               5-002-005  05/11/15     DONE    DONE       DONE      09/04/14   09/02/14   10/03/12   02/11/14   2,10,16                   16,208        16,208  DDJ             0           0           0 Clark Patterson Lee                     0      09/20/16                       12/14/16         YES
                                                                                                                                                                                                                                                                                                                                   
18-0489   Reconstruction               5-002-006  11/01/18     DONE    DONE       DONE      09/20/18   09/17/18   07/24/18   02/11/14   2,9,13,16                156,000             0  MTM             0           0           0 Clark Patterson Lee                     0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   

          District-Wide:
15-1566SB Reconstruction               7-999-001               DONE                           /  /       /  /     04/14/16     /  /     8,16                           0             0  DDJ             0           0           0                                         0        /  /                           /  /             
16-1226   Reconstruction               7-999-001  03/02/17     DONE    DONE       DONE      01/20/17   01/20/17     /  /     11/04/14   8,16                     528,080             0  DDJ             0           0           0 Clark Patterson Lee                     0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




BOCES GENESEE VALLEY (GEN-LIV-STEU-) STATUS REPORT ON CAPITAL PROJECTS
District No.: 24-90-00-00
last updated on 12/18/18
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Container #1-Batavia Bldg Trades:
14-1621TQ Temporary Quarters           2-047-001  06/29/15     DONE    DONE       DONE      06/10/15   06/03/15   03/06/15     /  /                                    0             0  MFS             0           0           0                                         0        /  /                           /  /             

          Container #2-Batavia Bldg Trades:
14-1622TQ Temporary Quarters           2-048-001  06/29/15     DONE    DONE       DONE      06/29/15   06/03/15   03/06/15     /  /                                    0             0  MFS             0           0           0                                         0        /  /                           /  /             

          Container #3-Batavia Bldg Trades:
14-1623TQ Temporary Quarters           2-049-001  06/29/15     DONE    DONE       DONE      06/10/15   06/03/15   03/06/15     /  /                                    0             0  MFS             0           0           0                                         0        /  /                           /  /             

          Container #4-Mt Morris Metal Trades:
14-1624TQ Temporary Quarters           2-050-001  06/29/15     DONE    DONE       DONE      06/10/15   06/03/15   03/06/15     /  /                                    0             0  MFS             0           0           0                                         0        /  /                           /  /             

          Container #5-Mt Morris Metal Trades:
14-1625TQ Temporary Quarters           2-051-001  06/29/15     DONE    DONE       DONE      06/10/15   06/03/15   03/06/15     /  /                                    0             0  MFS             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED