REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Middle School:
07-1865 Reconstruction 0-003-009 09/08/08 DONE DONE DONE 03/25/08 03/20/08 12/14/05 03/10/08 10,16 21,750 21,750 MGL 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
09-1372 Reconstruction 0-003-010 12/01/10 DONE DONE DONE 05/03/10 04/26/10 10/20/08 05/19/09 2,4,8,9,10,155,15,16 85,625 0 DDJ 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
- Reconstruction 0-003-011 / / / / 08/10/10 / / 2,10,15 0 0 DDJ 0 0 0 0 / / / /
- Reconstruction 0-003-012 / / / / 08/10/10 / / 2,4,8,9,10,155,15,16 0 0 DDJ 0 0 0 0 / / / /
11-0054 Reconstruction 0-003-013 08/01/11 DONE DONE DONE 07/21/11 07/15/11 07/07/11 07/06/11 4 349,275 349,275 DDJ 0 0 0 Wiedersum Associates Architec 0 / / 02/09/12
Deasy School:
09-0565 Additions and Alterations 0-005-008 01/27/10 DONE DONE DONE 12/09/09 12/07/09 10/20/08 05/19/09 02 - 16 375,000 375,000 DDJ 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
Connolly Elementary School:
07-1866 Reconstruction 0-007-013 09/08/08 DONE DONE DONE 03/25/08 03/20/08 12/14/05 03/10/08 10,16 12,300 12,300 DDJ 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
- Reconstruction 0-007-014 / / / / 10/20/08 / / 2,4,8,9,155,15,16 0 0 DDJ 0 0 0 0 / / / /
Landing Elementary School:
- Reconstruction 0-008-013 / / / / 10/20/08 / / 2,9,10,155,15,16 0 0 DDJ 0 0 0 0 / / / /
Glen Cove High School:
07-1867 Reconstruction 0-010-009 09/08/08 DONE DONE DONE 03/25/08 03/20/08 12/14/05 03/10/08 10,16 63,750 63,750 MGL 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
08-1338 Reconstruction 0-010-010 05/11/09 DONE DONE DONE 03/12/09 03/06/09 05/25/07 05/15/07 2,7,8 285,199 285,199 MGL 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
08-0882 Reconstruction 0-010-012 03/30/09 DONE DONE DONE 12/08/08 12/05/08 08/12/08 05/17/08 2,4,8,9,155,15,16 65,000 0 DDJ 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
09-0912 Reconstruction 0-010-013 02/22/10 DONE DONE DONE 02/19/10 02/16/10 10/20/08 05/19/09 2,4,7,8,9,10,155,15, 1,250,000 1,250,000 DDJ 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / 09/04/12
08-0876 Reconstruction 0-010-014 01/20/09 DONE DONE DONE 12/05/08 12/03/08 / / 09/17/08 7 965,096 965,096 DDJ 0 0 948,561 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
- Reconstruction 0-010-015 / / / / 12/18/09 / / 2,4,8,9,10,155,15,16 0 0 DDJ 0 0 0 0 / / / /
- Reconstruction 0-010-016 / / / / 08/10/10 / / 2,4,8,9,10,155,15,16 0 0 DDJ 0 0 0 0 / / / /
11-0741 Reconstruction 0-010-017 05/24/12 DONE DONE DONE 01/31/12 01/31/12 11/18/11 05/19/09 2,4,8,9,10,155,15,16 1,280,100 0 DDJ 0 0 0 Wiedersum Associates Architec 0 / / / /
Eugene J. Gribbin Elementary:
07-1868 Reconstruction 0-013-008 09/08/08 DONE DONE DONE 03/25/08 03/20/08 12/14/05 03/10/08 10,16 27,750 27,750 MGL 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
09-0615 Reconstruction 0-013-009 04/16/10 DONE DONE DONE 12/23/09 12/16/09 10/20/08 05/19/09 2,4,7,14,155,15,16 1,240,000 1,240,000 DDJ 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
Thayer House:
08-1720 Reconstruction 1-001-006 06/24/09 DONE DONE DONE 06/22/09 06/10/09 10/20/08 05/19/09 2,155,15,16 36,995 0 DDJ 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
Carriage House:
- Reconstruction 1-002-003 / / / / 10/20/08 / / 155,16 0 0 DDJ 0 0 0 0 / / / /
New Concession Stand at Highschool:
10-0101 New Construction 7-021-001 04/19/11 DONE DONE DONE 08/11/10 07/30/10 10/05/09 03/08/10 02 - 16 50,000 0 DDJ 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Middle School:
10-0023 Reconstruction 0-001-023 07/22/10 DONE DONE DONE 07/22/10 07/07/10 04/07/10 06/13/06 10,155 161,500 161,500 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
Prospect School:
11-0068PR Reconstruction 0-008-012 UNREVIEWED 07/26/11 07/25/11 04/14/11 03/15/11 2,4,7,8,9,10,14,155, 0 10,874,542 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
11-0355 Reconstruction 0-008-012 01/24/12 DONE DONE DONE 11/08/11 11/08/11 04/14/11 05/17/11 2,4,7,8,9,10,14,155, 18,135,084 15,560,027 JOD 0 0 4,877,104 Burton Behrendt Smith 0 / / / /
Senior High School:
08-1497 Reconstruction 0-020-023 04/07/09 DONE DONE DONE 04/07/09 04/07/09 03/27/09 / / 2,4,10 40,000 0 JOD 0 0 0 Cannon Design 0 / / / /
10-0041 Reconstruction 0-020-024 07/27/10 DONE DONE DONE 07/22/10 07/12/10 04/07/10 06/13/06 9,10 208,185 208,185 JOD 0 0 0 Cannon Design 0 / / 02/21/13
10-1344 Reconstruction 0-020-025 06/10/11 DONE DONE DONE 05/27/11 05/25/11 06/16/10 05/17/11 10 994,110 994,110 JOD 0 0 0 Cannon Design 0 / / 03/15/13
- Reconstruction 0-020-026 / / / / 06/17/10 / / 2,13 0 0 JOD 0 0 0 0 / / / /
- Reconstruction 0-020-027 / / / / 12/28/10 / / 2,9 0 0 JOD 0 0 0 0 / / / /
Hempstead UFSD PPS Offices:
- TQ Temporary Quarters 1-089-001 / / / / 07/27/10 / / 0 0 JOD 0 0 0 0 / / / /
HempsteadUFSD Hagedorn Pre K:
- TQ Temporary Quarters 1-090-001 / / / / 07/27/10 / / 0 0 JOD 0 0 0 0 / / / /
Hemstead UFSD ECC Kindergarten Schoo:
- TQ Temporary Quarters 8-088-001 / / / / 07/27/10 / / 0 0 JOD 0 0 0 0 / / / /
- TQ Temporary Quarters 8-088-002 / / / / / / / / 0 0 JOD 0 0 0 0 / / / /
Hempstead High School Annex:
10-1289 Reconstruction 8-091-L01 08/18/11 DONE DONE DONE 05/12/11 03/31/11 05/10/11 / / 1,606,500 1,606,500 JOD 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Northern Parkway School:
09-0494 Reconstruction 0-002-030 03/17/10 DONE DONE DONE 11/27/09 11/23/09 06/30/09 06/02/09 9,16 202,075 202,075 JOD 0 0 0 Fuller And D'angelo 0 / / / /
10-0992 Reconstruction 0-002-031 06/13/11 DONE DONE DONE 03/08/11 03/02/11 10/25/10 05/18/10 2,4,9 105,000 105,000 JOD 0 0 0 H2M Group 0 / / / /
11-1432 Reconstruction 0-002-032 01/15/13 DONE DONE DONE 06/28/12 06/22/12 12/05/11 09/20/11 2,4,7,8,10,155,15,16 683,363 683,363 JOD 0 0 0 H2M Group 683,363 / / / /
- XX Reconstruction 0-002-033 CANCELLED / / / / 12/08/11 / / 2,4,7,8,10,155,15,16 0 9,302,040 JOD 0 0 0 0 / / / /
- Reconstruction 0-002-034 / / / / 02/27/13 / / 2,13 0 0 JOB 0 0 0 0 / / / /
- Reconstruction 0-002-035 / / / / 03/26/13 / / 2,4,16 0 0 JOB 0 0 0 0 / / / /
California Avenue Elementary:
07-1826 Reconstruction 0-003-030 10/08/08 DONE DONE DONE 03/19/08 03/12/08 12/27/07 05/15/07 2,9,155,16 407,955 407,955 MGL 0 0 0 Fuller And D'angelo 0 / / / /
09-0495 Reconstruction 0-003-031 03/17/10 DONE DONE DONE 11/27/09 11/23/09 06/30/09 06/02/09 8,10 147,685 147,685 JOD 0 0 0 Fuller And D'angelo 0 / / / /
10-0993 Reconstruction 0-003-032 06/13/11 DONE DONE DONE 03/08/11 03/02/11 10/25/10 05/18/10 2,9,16 80,000 80,000 JOD 0 0 0 H2M Group 0 / / 03/15/13
11-1433 Reconstruction 0-003-033 01/15/13 DONE DONE DONE 06/28/12 06/22/12 12/05/11 09/20/11 2,4,7,8,10,155,15,16 564,337 564,337 JOD 0 0 0 H2M Group 564,337 / / / /
- XX Reconstruction 0-003-034 CANCELLED / / / / 12/08/11 / / 2,4,7,8,10,155,15,16 0 8,019,000 JOD 0 0 0 0 / / / /
- Reconstruction 0-003-035 / / / / 03/26/13 / / 2,9,16 0 0 JOB 0 0 0 0 / / / /
Smith Street School:
07-1827 Reconstruction 0-004-024 10/08/08 DONE DONE DONE 03/19/08 03/12/08 01/18/08 05/15/07 2 212,456 212,456 MGL 0 0 0 Fuller And D'angelo 0 / / / /
09-0496 Reconstruction 0-004-025 03/17/10 DONE DONE DONE 11/27/09 11/23/09 06/30/09 06/02/09 155 114,750 114,750 JOD 0 0 0 Fuller And D'angelo 0 / / / /
10-0994 Reconstruction 0-004-026 06/13/11 DONE DONE DONE 03/08/11 03/02/11 10/25/10 05/18/10 2,9,16 80,000 80,000 JOD 0 0 0 H2M Group 0 / / / /
11-1434 Reconstruction 0-004-027 01/15/13 DONE DONE DONE 06/28/12 06/22/12 12/05/11 09/20/11 2,4,7,8,10,155,15,16 311,866 311,866 JOD 0 0 0 H2M Group 311,866 / / / /
- XX Reconstruction 0-004-028 CANCELLED / / / / 12/08/11 / / 2,4,7,8,10,155,15,16 0 7,038,960 JOD 0 0 0 0 / / / /
- Reconstruction 0-004-029 / / / / 02/27/13 / / 2,13 0 0 JOB 0 0 0 0 / / / /
- Reconstruction 0-004-030 / / / / 03/26/13 / / 2,9,16 0 0 JOB 0 0 0 0 / / / /
Cornelius Court School:
07-1828 Reconstruction 0-005-013 10/08/08 DONE DONE DONE 03/19/08 03/12/08 01/18/08 05/15/07 9,16 90,850 90,850 MGL 0 0 0 Fuller And D'angelo 0 / / / /
09-0497 Reconstruction 0-005-014 03/17/10 DONE DONE DONE 11/27/09 11/23/09 06/30/09 06/02/09 2 128,625 0 JOD 0 0 0 Fuller And D'angelo 0 / / / /
10-1166 Reconstruction 0-005-015 06/16/11 DONE DONE DONE 04/11/11 04/06/11 10/25/10 05/18/10 2,9,15 98,000 98,000 JOD 0 0 0 H2M Group 0 / / 03/15/13
11-1435 Reconstruction 0-005-016 01/15/13 DONE DONE DONE 06/28/12 06/22/12 12/05/11 09/20/11 2,4,7,8,10,155,15,16 88,755 88,755 JOD 0 0 0 H2M Group 88,755 / / / /
- XX Reconstruction 0-005-017 CANCELLED / / / / 12/08/11 / / 2,4,7,8,10,155,15,16 0 4,169,880 JOD 0 0 0 0 / / / /
- Reconstruction 0-005-018 / / / / 02/27/13 / / 2,13 0 0 JOB 0 0 0 0 / / / /
Grand Avenue School:
07-1829XX Reconstruction 0-006-021 10/08/08 CANCELLED 03/19/08 03/12/08 01/18/08 05/15/07 2,155 79,900 79,900 MGL 0 0 0 Fuller And D'angelo 0 / / / /
09-0498 Reconstruction 0-006-022 03/17/10 DONE DONE DONE 11/27/09 11/23/09 06/30/09 06/02/09 8,9,15,16 96,590 96,590 JOD 0 0 0 Fuller And D'angelo 0 / / 10/17/12
10-0995 Reconstruction 0-006-023 06/13/11 DONE DONE DONE 03/08/11 03/02/11 10/25/10 05/18/10 2,9,16 80,000 80,000 JOD 0 0 0 H2M Group 0 / / / /
11-1436 Reconstruction 0-006-024 01/15/13 DONE DONE DONE 06/28/12 06/22/12 12/05/11 09/20/11 2,4,7,8,10,155,15,16 325,111 325,111 JOD 0 0 0 H2M Group 325,111 / / / /
- XX Reconstruction 0-006-025 CANCELLED / / / / 12/08/11 / / 2,4,7,8,10,155,15,16 0 7,038,960 JOD 0 0 0 0 / / / /
- Reconstruction 0-006-026 / / / / 02/27/13 / / 2,13 0 0 JOB 0 0 0 0 / / / /
- Reconstruction 0-006-027 / / / / 03/26/13 / / 2,9,16 0 0 JOB 0 0 0 0 / / / /
Walnut Street Elementary:
07-1830 Reconstruction 0-007-024 10/08/08 DONE DONE DONE 03/19/08 03/12/08 01/18/08 05/15/07 8,9,16 183,680 183,680 MGL 0 0 0 Fuller And D'angelo 0 / / / /
08-0841 Reconstruction 0-007-025 05/07/09 DONE DONE DONE 12/03/08 12/01/08 08/12/08 05/20/08 2,7 227,818 227,818 JOD 0 0 0 Fuller And D'angelo 0 / / / /
10-0996 Reconstruction 0-007-026 06/13/11 DONE DONE DONE 03/08/11 03/02/11 08/12/08 05/18/10 2,7,9 60,000 60,000 JOD 0 0 0 H2M Group 0 / / / /
09-0499 Reconstruction 0-007-027 03/17/10 DONE DONE DONE 11/27/09 11/23/09 06/30/09 06/02/09 8,9,15,16 94,900 94,900 JOD 0 0 0 Fuller And D'angelo 0 / / / /
11-1437 Reconstruction 0-007-028 01/15/13 DONE DONE DONE 06/28/12 06/22/12 12/05/11 09/20/11 2,4,7,8,10,155,15,16 392,196 392,196 JOD 0 0 0 H2M Group 392,196 / / / /
- XX Reconstruction 0-007-029 CANCELLED / / / / 12/08/11 / / 2,4,7,8,10,155,15,16 0 8,339,760 JOD 0 0 0 0 / / / /
- Reconstruction 0-007-030 / / / / 02/27/13 / / 2,13 0 0 JOB 0 0 0 0 / / / /
- Reconstruction 0-007-031 / / / / 03/26/13 / / 2,9,16 0 0 JOB 0 0 0 0 / / / /
Lawrence Road Junior High:
07-1831 Reconstruction 0-008-028 10/08/08 DONE DONE DONE 03/19/08 03/12/08 01/18/08 05/15/07 9,16 135,600 135,600 MGL 0 0 0 Fuller And D'angelo 0 / / / /
08-0842 Reconstruction 0-008-029 05/07/09 DONE DONE DONE 12/03/08 12/01/08 08/12/08 05/20/08 16 116,830 116,830 JOD 0 0 0 Fuller And D'angelo 0 / / / /
10-0997 Reconstruction 0-008-030 06/13/11 DONE DONE DONE 03/08/11 03/02/11 08/12/08 05/18/10 2,9,16 30,000 30,000 JOD 0 0 0 H2M Group 0 / / / /
09-0500 Reconstruction 0-008-031 03/17/10 DONE DONE DONE 11/27/09 11/23/09 06/30/09 06/02/09 13 181,500 181,500 JOD 0 0 0 Fuller And D'angelo 0 / / / /
11-1438 Reconstruction 0-008-032 01/15/13 DONE DONE DONE 06/28/12 06/22/12 12/05/11 09/20/11 2,4,7,8,10,155,15,16 508,138 508,138 JOD 0 0 0 H2M Group 508,138 / / / /
- XX Reconstruction 0-008-033 CANCELLED / / / / 12/08/11 / / 2,4,7,8,10,155,15,16 0 13,761,760 JOD 0 0 0 0 / / / /
- Reconstruction 0-008-034 / / / / 02/27/13 / / 2,4,13 0 0 JOB 0 0 0 0 / / / /
- Reconstruction 0-008-035 / / / / 03/26/13 / / 2,9,155,15,16 0 0 JOB 0 0 0 0 / / / /
Uniondale High School:
07-1832 Reconstruction 0-009-044 10/08/08 DONE DONE DONE 03/19/08 03/12/08 01/18/08 05/15/07 7,9,16 245,223 245,223 MGL 0 0 0 Fuller And D'angelo 0 / / / /
07-2276 Reconstruction 0-009-047 06/27/08 DONE DONE DONE 06/27/08 06/20/08 06/27/08 05/20/08 10 275,945 275,945 JOD 0 0 0 Fuller And D'angelo 0 / / / /
08-0843 Reconstruction 0-009-048 05/07/09 DONE DONE DONE 12/03/08 12/01/08 08/12/08 05/20/08 9,16 391,291 391,291 JOD 0 0 0 Fuller And D'angelo 0 / / / /
10-0998 Reconstruction 0-009-049 06/13/11 DONE DONE DONE 03/08/11 03/02/11 08/12/08 05/18/10 2,9,16 99,000 99,000 JOD 0 0 0 H2M Group 0 / / 03/15/13
08-0951 Reconstruction 0-009-050 12/19/08 DONE DONE DONE 12/19/08 12/19/08 12/16/08 12/15/08 2,9 221,627 221,627 JOD 0 0 0 Fuller And D'angelo 0 / / / /
09-0501 Reconstruction 0-009-051 03/17/10 DONE DONE DONE 11/27/09 11/23/09 06/30/09 06/02/09 2,10 292,325 0 JOD 0 0 0 Fuller And D'angelo 0 / / / /
10-1409 Reconstruction 0-009-052 08/26/11 DONE DONE DONE 06/20/11 06/14/11 05/19/11 04/26/11 4,8 120,000 120,000 JOD 0 0 0 H2M Group 0 / / 09/26/12
- Reconstruction 0-009-053 / / / / 06/17/11 / / 9,155,15,16 0 0 JOD 0 0 0 0 / / / /
11-1439 Reconstruction 0-009-054 01/15/13 DONE DONE DONE 06/28/12 06/22/12 12/05/11 09/20/11 2,4,7,8,10,155,15,16 2,031,615 2,031,615 JOD 0 0 0 H2M Group 2,031,615 / / / /
- XX Reconstruction 0-009-055 CANCELLED / / / / 12/08/11 / / 2,4,7,8,9,10,155,15, 0 3,896,640 JOD 0 0 0 0 / / / /
- Reconstruction 0-009-056 / / / / 03/26/13 / / 2,9 0 0 JOB 0 0 0 0 / / / /
- Reconstruction 0-009-057 / / / / 05/23/13 / / 2,13,15,16 0 0 JOB 0 0 0 0 / / / /
Turtle Hook Junior High:
07-1833 Reconstruction 0-010-024 10/08/08 DONE DONE DONE 03/19/08 03/12/08 01/18/08 05/15/07 9,10,16 598,607 598,607 MGL 0 0 0 Fuller And D'angelo 0 / / / /
08-0844 Reconstruction 0-010-025 05/07/09 DONE DONE DONE 12/03/08 12/01/08 08/12/08 05/20/08 16 111,903 111,903 JOD 0 0 0 Fuller And D'angelo 0 / / / /
10-0999 Reconstruction 0-010-026 06/13/11 DONE DONE DONE 03/08/11 03/02/11 08/12/08 05/18/10 2,9,16 80,000 80,000 JOD 0 0 0 H2M Group 0 / / 03/15/13
09-0502 Reconstruction 0-010-027 03/17/10 DONE DONE DONE 11/27/09 11/23/09 06/30/09 06/02/09 155,15,16 892,000 892,000 JOD 0 0 0 Fuller And D'angelo 0 / / / /
11-1440 Reconstruction 0-010-028 01/15/13 DONE DONE DONE 06/28/12 06/22/12 12/05/11 09/20/11 2,4,7,8,10,155,15,16 1,075,956 1,075,956 JOD 0 0 0 H2M Group 1,075,956 / / / /
- XX Reconstruction 0-010-029 CANCELLED / / / / 12/08/11 / / 2,4,7,8,10 0 12,440,068 JOD 0 0 0 0 / / / /
- Reconstruction 0-010-030 / / / / 02/27/13 / / 2,4,13 0 0 JOB 0 0 0 0 / / / /
- Reconstruction 0-010-031 / / / / 03/26/13 / / 2,9 0 0 JOB 0 0 0 0 / / / /
Press Box:
07-1834 New Construction 7-035-001 10/08/08 DONE DONE DONE 03/19/08 03/12/08 01/18/08 05/15/07 02 - 16 576,628 0 MGL 0 0 0 Fuller And D'angelo 0 / / / /
District Wide:
- Reconstruction 7-999-005 / / / / 05/07/09 / / 10,16 0 0 JOD 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Parkway Elementary:
07-2322 Reconstruction 0-001-029 11/26/08 DONE DONE DONE 07/08/08 06/23/08 10/10/07 05/15/07 2,10 89,633 89,633 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
08-0940 Reconstruction 0-001-030 07/03/09 DONE DONE DONE 12/17/08 12/12/08 08/12/08 12/21/07 9,10,16 42,770 42,770 DDJ 0 0 37,904 John A Grillo-ARCHITECTS PC 0 / / / /
10-0571 Reconstruction 0-001-031 04/18/11 DONE DONE DONE 12/09/10 12/03/10 05/28/10 05/18/10 155,16 50,000 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
11-0294 Reconstruction 0-001-032 12/08/11 DONE DONE DONE 10/28/11 10/26/11 06/29/11 12/27/07 2 169,801 0 DDJ 0 0 139,801 John A Grillo-ARCHITECTS PC 0 / / / /
Meadowbrook Elementary:
07-2323 Reconstruction 0-002-027 11/26/08 DONE DONE DONE 07/08/08 06/23/08 10/10/07 05/15/07 8,15 34,586 34,586 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
08-0941 Reconstruction 0-002-028 07/03/09 DONE DONE DONE 12/17/08 12/12/08 08/12/08 12/21/06 9,10,16 57,726 57,726 DDJ 0 0 27,708 John A Grillo-ARCHITECTS PC 0 / / / /
10-0572 Reconstruction 0-002-029 04/18/11 DONE DONE DONE 12/09/10 12/03/10 05/28/10 05/18/10 155,16 50,000 50,000 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
11-0295 Reconstruction 0-002-030 12/08/11 DONE DONE DONE 10/31/11 10/26/11 06/29/11 12/27/07 2 139,801 0 DDJ 0 0 139,801 John A Grillo-ARCHITECTS PC 0 / / / /
W T Clarke Middle/High School:
07-2324 Reconstruction 0-004-038 11/26/08 DONE DONE DONE 07/08/08 06/23/08 10/10/07 05/15/07 2,13,155 153,149 153,149 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
08-0942 Reconstruction 0-004-039 07/03/09 DONE DONE DONE 12/17/08 12/12/07 08/12/08 12/21/06 4,8,9,10,13,155,15,1 172,670 172,670 DDJ 0 0 82,881 John A Grillo-ARCHITECTS PC 0 / / / /
09-0218 Reconstruction 0-004-040 09/21/09 DONE DONE DONE 09/15/09 09/14/09 08/10/09 08/06/09 16 206,449 206,449 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
11-0296 Reconstruction 0-004-041 12/08/11 DONE DONE DONE 10/31/11 10/26/11 06/29/11 12/27/07 2,8,10 65,000 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
- Reconstruction 0-004-042 / / / / 06/06/12 / / 16 0 0 DDJ 0 0 0 0 / / / /
Barnum Woods Elementary:
07-2325 Reconstruction 0-006-028 11/26/08 DONE DONE DONE 07/08/08 06/23/08 10/10/07 05/15/07 2,8,13,16 16,223 16,223 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
08-0943 Reconstruction 0-006-029 07/03/09 DONE DONE DONE 12/17/08 12/12/08 08/12/08 12/21/06 9,10,16 87,418 87,418 DDJ 0 0 41,961 John A Grillo-ARCHITECTS PC 0 / / / /
11-0297 Reconstruction 0-006-030 12/08/11 DONE DONE DONE 10/31/11 10/26/11 06/29/11 12/27/07 2 139,801 0 DDJ 0 0 139,801 John A Grillo-ARCHITECTS PC 0 / / / /
12-0811 Reconstruction 0-006-031 DONE DONE UNREVIEWED02/12/13 01/24/13 06/14/12 05/15/12 2 0 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
East Meadow High School:
07-2326 Reconstruction 0-007-039 11/26/08 DONE DONE DONE 07/08/08 06/23/08 10/10/07 05/15/07 2,8,13,15 445,949 445,949 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
08-0944 Reconstruction 0-007-040 07/03/09 DONE DONE DONE 12/17/08 12/12/08 08/12/08 12/21/07 4,8,9,10,13,155,15,1 75,634 75,634 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
10-0573 Reconstruction 0-007-041 04/18/11 DONE DONE DONE 12/09/10 12/03/10 05/28/10 05/18/10 2,4,7,15 66,520 66,520 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 02/22/13
11-0298 Reconstruction 0-007-042 12/08/11 DONE DONE DONE 11/01/11 10/26/11 06/29/11 12/27/07 2,8 20,000 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
12-0812 Reconstruction 0-007-043 DONE DONE UNREVIEWED02/12/13 01/24/13 06/06/12 05/15/12 16 0 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Green House:
- Reconstruction 0-008-001 / / / / / / / / 2,4 0 0 DDJ 0 0 0 0 / / / /
Woodland Middle School:
07-2327 Reconstruction 0-009-032 11/26/08 DONE DONE DONE 07/08/08 06/23/08 10/10/07 05/15/07 2 23,198 23,198 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
08-0945 Reconstruction 0-009-033 07/03/09 DONE DONE DONE 12/17/08 12/12/08 08/22/08 12/21/06 4,8,9,10,155,15,16 102,178 102,178 DDJ 0 0 49,045 John A Grillo-ARCHITECTS PC 0 / / / /
10-0574 Reconstruction 0-009-034 04/18/11 DONE DONE DONE 12/09/10 12/03/10 / / 05/18/10 2,4 50,000 50,000 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 02/22/13
11-0299 Reconstruction 0-009-035 12/08/11 DONE DONE DONE 11/01/11 10/26/11 06/29/11 12/27/07 16 60,000 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
George McVey Elementary:
07-2328 Reconstruction 0-011-024 11/26/08 DONE DONE DONE 07/08/08 06/23/08 10/10/07 05/15/07 10,13 31,491 31,491 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
08-0946 Reconstruction 0-011-025 07/03/09 DONE DONE DONE 12/17/08 12/12/08 08/12/08 12/21/06 9,10,16 122,848 122,848 DDJ 0 0 41,998 John A Grillo-ARCHITECTS PC 0 / / / /
11-0300 Reconstruction 0-011-026 12/08/11 DONE DONE DONE 11/01/11 10/26/11 06/29/11 12/27/07 2,8 181,801 0 DDJ 0 0 139,801 John A Grillo-ARCHITECTS PC 0 / / / /
12-0813 Reconstruction 0-011-027 DONE DONE UNREVIEWED02/12/13 01/24/13 06/14/12 05/15/12 2,16 0 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Bowling Green Elementary:
07-2329 Reconstruction 0-012-026 11/26/08 DONE DONE DONE 07/08/08 06/23/08 10/10/07 05/15/07 10,13 31,215 31,215 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
08-0947 Reconstruction 0-012-027 07/03/09 DONE DONE DONE 12/17/08 12/12/07 08/12/08 12/21/06 9,10,16 55,871 55,871 DDJ 0 0 26,818 John A Grillo-ARCHITECTS PC 0 / / / /
11-0301 Reconstruction 0-012-028 12/08/11 DONE DONE DONE 11/01/11 10/26/11 06/29/11 12/27/07 2,16 199,801 0 DDJ 0 0 139,801 John A Grillo-ARCHITECTS PC 0 / / / /
- Reconstruction 0-012-029 / / / / 06/06/12 / / 16 0 0 DDJ 0 0 0 0 / / / /
Bowling Green #2 (combined w/0012):
- Reconstruction 0-013-004 / / / / 08/12/08 / / 9,10,16 0 0 DDJ 0 0 0 0 / / / /
Salisbury Center:
07-2330 Reconstruction 1-019-010 11/26/08 DONE DONE DONE 07/08/08 06/23/08 10/10/07 05/15/07 155 165,932 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Public Library:
12-0012 Reconstruction 6-016-005 07/24/12 DONE DONE DONE 07/09/12 07/06/12 04/11/12 02/01/12 155,15,16 109,000 0 DDJ 0 0 0 EMTEC Consultants, P.C. 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Jacob Gunther Elementary:
08-0381 Reconstruction 0-001-020 02/05/09 DONE DONE DONE 09/24/08 08/20/08 07/19/07 12/04/07 2,4,8,9,155,15,16 302,208 302,208 HCM 0 0 132,615 John A Grillo-ARCHITECTS PC 0 / / / /
07-1844 Reconstruction 0-001-021 02/27/09 DONE DONE DONE 03/19/08 03/14/08 01/30/08 09/13/07 15,16 1,077,649 1,077,649 HCM 0 0 0 John A Grillo-ARCHITECTS PC 1,077,649 / / 09/12/12
09-1042 Reconstruction 0-001-022 04/15/10 DONE DONE DONE 03/10/10 03/05/10 01/15/10 12/04/07 4 32,271 32,271 HCM 0 0 14,683 John A Grillo-ARCHITECTS PC 0 / / / /
09-1337 Reconstruction 0-001-023 05/19/10 DONE DONE DONE 04/16/10 04/15/10 04/07/10 03/24/10 2,9 182,434 182,434 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
10-0648 Reconstruction 0-001-024 03/15/11 DONE DONE DONE 12/29/10 12/13/10 12/29/10 03/24/10 8,16 210,164 210,164 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 04/26/12
11-0236 Reconstruction 0-001-025 10/24/11 DONE DONE DONE 10/06/11 09/23/11 10/06/11 03/24/10 2,15 61,360 61,360 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 10/12/12
12-0994 Reconstruction 0-001-026 04/01/13 DONE DONE DONE 03/20/13 03/15/13 03/20/13 03/24/10 2,9 38,640 0 JOB 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Martin Avenue (Administration):
08-0382 Reconstruction 0-002-012 02/05/09 DONE DONE DONE 09/24/08 08/20/08 03/22/07 12/04/07 8 163,588 163,588 HCM 0 0 72,251 John A Grillo-ARCHITECTS PC 0 / / / /
09-1338 Additions and Alterations 0-002-014 05/19/10 DONE DONE DONE 04/16/10 04/15/10 07/19/07 03/24/10 02 - 16 135,700 0 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
07-1845 Reconstruction 0-002-015 02/27/09 DONE DONE DONE 03/19/08 03/14/08 01/30/08 09/13/07 15,16 373,936 373,936 HCM 0 0 0 John A Grillo-ARCHITECTS PC 373,936 / / 09/12/12
10-0649 Reconstruction 0-002-016 03/15/11 DONE DONE DONE 12/29/10 12/13/10 12/29/10 03/24/10 8,9,155,15,16 961,169 961,169 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 04/26/12
11-0237 Reconstruction 0-002-017 10/24/11 DONE DONE DONE 10/06/11 09/23/11 10/06/11 03/24/10 2,15 61,360 61,360 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 10/12/12
Newbridge Road School:
08-0383 Additions and Alterations 0-003-023 02/05/09 DONE DONE DONE 09/24/08 08/20/08 07/19/07 12/04/07 02 - 16 153,745 153,745 HCM 0 0 66,848 John A Grillo-ARCHITECTS PC 0 / / / /
07-1847 Reconstruction 0-003-025 02/27/09 DONE DONE DONE 03/19/08 03/14/08 04/10/08 09/13/07 16 289,037 289,037 HCM 0 0 0 John A Grillo-ARCHITECTS PC 289,037 / / 09/12/12
08-0211 Reconstruction 0-003-026 07/10/06 DONE DONE DONE 08/25/08 08/14/08 08/25/08 07/02/07 10,13 18,845 18,845 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
- Reconstruction 0-003-027 / / / / 09/16/08 / / 8,155,16 0 0 HCM 0 0 0 0 / / / /
09-1043 Reconstruction 0-003-028 04/15/10 DONE DONE DONE 03/10/10 03/05/10 01/15/10 12/04/07 8 22,271 22,271 HCM 0 0 10,133 John A Grillo-ARCHITECTS PC 0 / / / /
09-1369 Reconstruction 0-003-029 06/02/10 DONE DONE DONE 05/03/10 04/23/10 04/07/10 05/18/10 2,4,8,9,10,155,15,16 100,000 100,000 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
10-0650 Reconstruction 0-003-030 03/15/11 DONE DONE DONE 12/29/10 12/13/10 12/29/10 03/24/10 2,4,7,8,9,155,15,16 4,554,661 4,554,661 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 04/26/12
11-0238 Reconstruction 0-003-031 10/21/11 DONE DONE DONE 10/06/11 09/23/11 10/06/11 03/24/10 2,9 332,760 332,760 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 10/12/12
12-0995 Reconstruction 0-003-032 04/01/13 DONE DONE DONE 03/20/13 03/15/13 03/20/13 03/24/10 2,9 100,016 0 JOB 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Park Avenue School:
08-0384 Reconstruction 0-004-019 02/05/09 DONE DONE DONE 09/24/08 08/20/08 07/19/07 12/04/07 2,4,8,9,155,15,16 215,668 215,668 HCM 0 0 56,141 John A Grillo-ARCHITECTS PC 0 / / / /
07-1846 Reconstruction 0-004-020 02/27/09 DONE DONE DONE 03/19/08 03/14/08 01/30/08 09/13/07 15,16 295,987 295,987 HCM 0 0 0 John A Grillo-ARCHITECTS PC 295,987 / / 09/12/12
09-1339 Reconstruction 0-004-021 05/19/10 DONE DONE DONE 04/16/10 04/15/10 09/16/08 03/24/10 8,155,16 244,522 244,522 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
09-1044 Reconstruction 0-004-022 04/15/10 DONE DONE DONE 03/10/10 03/05/10 01/15/10 12/04/07 4 32,271 32,271 HCM 0 0 14,683 John A Grillo-ARCHITECTS PC 0 / / / /
10-0651 Reconstruction 0-004-023 03/15/11 DONE DONE DONE 12/29/10 12/13/10 12/29/10 03/24/10 8,155,15,16 918,736 918,736 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 04/26/12
11-0239 Reconstruction 0-004-024 10/21/11 DONE DONE DONE 10/06/11 09/23/11 10/06/11 03/24/10 2,15 61,360 61,360 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 10/12/12
12-0996 Reconstruction 0-004-025 04/01/13 DONE DONE DONE 03/20/13 03/15/13 03/20/13 03/24/10 2,9 21,560 0 JOB 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Saw Mill Road School:
08-0385 Reconstruction 0-005-023 02/05/09 DONE DONE DONE 09/24/08 08/20/08 03/22/07 12/04/07 8 250,110 250,110 HCM 0 0 109,361 John A Grillo-ARCHITECTS PC 0 / / / /
- Reconstruction 0-005-025 UNREVIEWED 12/29/10 12/13/10 07/19/07 03/24/10 2,4,8,9,155,15,16 0 0 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
07-1848 Reconstruction 0-005-026 02/27/09 DONE DONE DONE 03/19/08 03/14/08 01/30/08 09/13/07 7,15,16 643,241 643,241 HCM 0 0 0 John A Grillo-ARCHITECTS PC 643,241 / / 09/12/12
08-0896 Reconstruction 0-005-027 03/31/09 DONE DONE DONE 12/09/08 12/08/08 10/07/08 12/13/08 16 250,000 250,000 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
10-0652 Reconstruction 0-005-028 03/15/11 DONE DONE DONE 12/29/10 12/13/10 12/29/10 03/24/10 8,155,15,16 1,000,081 1,000,081 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 04/26/12
11-0240 Reconstruction 0-005-029 10/21/11 DONE DONE DONE 10/06/11 09/23/11 10/06/11 03/24/10 2,15 61,360 61,360 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 10/12/12
12-0077 Reconstruction 0-005-030 10/11/12 DONE DONE DONE 08/02/12 07/26/12 05/23/12 05/15/12 2,9 100,000 0 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
12-0997 Reconstruction 0-005-031 04/01/13 DONE DONE DONE 03/20/13 03/15/13 03/20/13 03/24/10 2,9 221,760 0 JOB 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
J.G. Dinkelmeyer Elementary:
08-0386 Additions and Alterations 0-006-021 02/05/09 DONE DONE DONE 09/24/08 08/20/08 07/19/07 12/04/07 02 - 16 387,627 387,627 HCM 0 0 167,989 John A Grillo-ARCHITECTS PC 0 / / / /
07-1849 Reconstruction 0-006-022 02/27/09 DONE DONE DONE 03/19/08 03/14/08 01/30/08 09/13/07 15,16 601,813 601,813 HCM 0 0 0 John A Grillo-ARCHITECTS PC 601,813 / / 09/12/12
09-1340 Reconstruction 0-006-023 05/19/10 DONE DONE DONE 04/16/10 04/15/10 02/11/08 03/24/10 9,16 67,113 67,113 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
11-0144 Reconstruction 0-006-024 09/06/11 DONE DONE DONE 08/25/11 08/25/11 03/25/08 05/17/11 9,16 100,000 100,000 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 09/17/12
10-0653 Reconstruction 0-006-026 03/15/11 DONE DONE DONE 12/29/10 12/13/10 12/29/10 03/24/10 2,8,9,16 535,779 535,779 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 04/26/12
11-0241 Reconstruction 0-006-027 10/21/11 DONE DONE DONE 10/06/11 09/23/11 10/06/11 03/24/10 2,15 61,360 61,360 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 10/12/12
12-0998 Reconstruction 0-006-028 04/01/13 DONE DONE DONE 03/20/13 03/15/13 03/20/13 03/24/10 2,9 175,840 175,840 JOB 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Garage Newbridge Roads:
07-1850 Reconstruction 4-011-001 02/27/09 DONE DONE DONE 03/19/08 03/14/08 02/12/08 09/13/07 16 2,077 0 HCM 0 0 0 John A Grillo-ARCHITECTS PC 2,077 / / 09/12/12
North Bellmore Public Library:
10-1408 Reconstruction 6-013-006 09/20/11 DONE DONE DONE 06/17/11 06/14/11 03/29/10 07/10/10 7 400,000 0 HCM 0 0 0 BEATTY HARVEY COCO 0 / / / /
- Reconstruction 6-013-007 / / / / 03/13/13 / / 155 0 0 JOB 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Memorial Education Center:
12-1042 Reconstruction 0-001-018 ADDENDUM REQ'D 03/29/13 03/21/13 08/07/12 11/07/12 4 0 0 DDJ 0 0 0 Lucchesi Engineering, P.C. 0 / / / /
12-1037 Reconstruction 0-001-019 04/22/13 DONE DONE DONE 03/28/13 03/21/13 08/07/12 11/07/12 7 1,635,186 0 DDJ 0 0 0 Lucchesi Engineering, P.C. 0 / / / /
Jonas E. Salk Middle School/High Ssc:
08-1017 Reconstruction 0-002-020 04/28/09 DONE DONE DONE 01/05/09 12/29/08 12/06/07 11/16/07 155,16 533,333 533,333 DDJ 0 0 187,199 John A Grillo-ARCHITECTS PC 0 / / / /
12-1043 Reconstruction 0-002-021 ADDENDUM REQ'D 03/29/13 03/21/13 08/07/12 11/07/12 4 0 0 DDJ 0 0 0 Lucchesi Engineering, P.C. 0 / / / /
Division Avenue High School:
08-1018 Reconstruction 0-003-020 04/28/09 DONE DONE DONE 01/05/09 12/29/08 01/17/08 11/16/07 155,16 533,333 533,333 DDJ 0 0 187,199 John A Grillo-ARCHITECTS PC 0 / / / /
11-0942 Reconstruction 0-003-021 11/29/12 DONE DONE DONE 03/13/12 03/07/12 02/13/12 02/29/12 8,9,10,155,15,16 2,043,683 0 DDJ 0 0 0 Lucchesi Engineering, P.C. 0 / / / /
12-1038 Reconstruction 0-003-022 04/22/13 DONE DONE DONE 03/28/13 03/21/13 08/07/12 11/07/12 7 49,892 0 DDJ 0 0 0 Lucchesi Engineering, P.C. 0 / / / /
Summit Lane School:
08-0862PR Additions and Alterations 0-005-013 UNREVIEWED 12/04/08 12/03/08 12/05/07 / / 02 - 16 0 10,769,376 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
08-0990 Additions and Alterations 0-005-013 04/22/09 DONE DONE DONE 12/31/08 12/19/08 12/05/07 11/16/07 02 - 16 1,500,000 1,500,000 DDJ 0 0 660,259 John A Grillo-ARCHITECTS PC 0 / / / /
12-1044 Reconstruction 0-005-014 ADDENDUM REQ'D 03/29/13 03/21/13 08/07/12 11/07/12 4 0 11,958,288 DDJ 0 0 0 Lucchesi Engineering, P.C. 0 / / / /
Northside School:
12-1045 Reconstruction 0-008-013 ADDENDUM REQ'D 03/29/13 03/21/13 08/07/12 11/07/12 4 0 0 DDJ 0 0 0 Lucchesi Engineering, P.C. 0 / / / /
Lee Road School:
08-1019 Reconstruction 0-009-010 04/28/09 DONE DONE DONE 01/05/09 12/29/08 12/06/07 11/16/07 155,15,16 500,000 500,000 DDJ 0 0 175,500 John A Grillo-ARCHITECTS PC 0 / / / /
12-1039 Reconstruction 0-009-011 04/22/13 DONE DONE DONE 03/28/13 03/21/13 08/07/12 11/07/12 7 836,709 0 DDJ 0 0 0 Lucchesi Engineering, P.C. 0 / / / /
Wisdom Lane Middle School:
08-1020 Reconstruction 0-011-017 04/28/09 DONE DONE DONE 01/05/09 12/29/08 12/06/07 11/16/07 2,9,10,155,15,16 400,000 400,000 DDJ 0 0 140,000 John A Grillo-ARCHITECTS PC 0 / / / /
12-1040 Reconstruction 0-011-018 04/22/13 DONE DONE DONE 03/28/13 03/21/13 08/07/12 11/07/12 7 515,052 0 DDJ 0 0 0 Lucchesi Engineering, P.C. 0 / / / /
Gardiners Avenue School:
10-0142 Reconstruction 0-013-012 08/30/10 DONE DONE DONE 08/24/10 08/19/10 06/18/10 05/18/10 16 70,000 70,000 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
- Reconstruction 0-013-013 / / / / 06/23/10 / / 16 0 11,616,047 DDJ 0 0 0 0 / / / /
12-0009 Reconstruction 0-013-013 07/18/12 DONE DONE DONE 07/09/12 07/06/12 05/16/12 05/15/12 2,9 344,417 344,417 DDJ 0 0 0 Lucchesi Engineering, P.C. 0 / / 12/05/12
East Broadway:
08-0227PR Additions and Alterations 0-014-013 UNREVIEWED 08/29/08 08/22/08 02/21/06 / / 02 - 16 0 11,280,504 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
08-0315 Additions and Alterations 0-014-013 02/25/09 DONE DONE DONE 09/11/08 09/10/08 02/21/06 05/15/07 02 - 16 2,000,000 2,000,000 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
12-1041 Reconstruction 0-014-015 04/22/13 DONE DONE DONE 03/28/13 03/21/13 08/07/12 11/07/12 7 1,717,362 0 DDJ 0 0 0 Lucchesi Engineering, P.C. 0 / / / /
Douglas MacArthur HighSchool:
08-1021 Reconstruction 0-018-025 04/28/09 DONE DONE DONE 01/05/09 12/29/08 12/06/07 11/16/07 155,15,16 709,445 709,445 DDJ 0 0 249,015 John A Grillo-ARCHITECTS PC 0 / / / /
12-0831 Reconstruction 0-018-026 STARTED STARTED UNREVIEWED02/14/13 02/13/13 08/07/12 05/01/01 8,9,10,155,15,16 0 0 DDJ 0 0 0 Lucchesi Engineering, P.C. 0 / / / /
Container @ Maint.:
- PR New Construction 2-057-001 / / / / 03/25/11 / / 02 - 16 0 0 DDJ 0 0 0 0 / / / /
macArthur High School Container:
- PR New Construction 2-058-001 / / / / 03/25/11 / / 02 - 16 0 0 DDJ 0 0 0 0 / / / /
Containter 1 @ Divison:
- PR New Construction 2-059-001 / / / / 03/25/11 / / 02 - 16 0 0 DDJ 0 0 0 0 / / / /
Container 2 @ Divison:
- PR New Construction 2-060-001 / / / / 03/25/11 / / 02 - 16 0 0 DDJ 0 0 0 0 / / / /
Levittown Public Library:
- PR Additions and Alterations 6-019-006 / / / / 08/12/08 / / 02 - 16 0 0 DDJ 0 0 0 0 / / / /
08-1737 Reconstruction 6-019-007 07/07/09 DONE DONE DONE 06/26/09 06/17/09 04/23/09 03/04/09 8,9,10,155,16 259,000 0 DDJ 0 0 0 LAS Associates 0 / / / /
11-0095 Additions and Alterations 6-019-008 08/18/11 DONE DONE DONE 08/15/11 08/10/11 10/25/10 10/06/10 02 - 16 774,600 0 DDJ 0 0 0 Las Associates, Architects 0 / / / /
12-0125 Reconstruction 6-019-009 08/28/12 DONE DONE DONE 08/27/12 08/23/12 07/13/12 07/11/12 155 624,642 0 DDJ 0 0 0 Las Associates, Architects 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Seaford High School:
07-2254 Additions and Alterations 0-001-020 01/30/09 DONE DONE DONE 06/13/08 06/05/08 03/07/08 12/04/07 02 - 16 7,405,619 6,988,687 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
08-0672 Reconstruction 0-001-021 03/27/09 DONE DONE DONE 11/04/08 11/03/08 08/27/08 12/04/07 2,4,8,9,10,155,15,16 1,056,467 1,056,467 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
08-1395 Reconstruction 0-001-022 09/21/09 DONE DONE DONE 03/19/09 03/12/09 01/21/09 12/04/07 155,15,16 829,619 829,619 JOD 0 0 64,365 Burton Behrendt Smith 0 / / / /
08-1254 Reconstruction 0-001-023 05/29/09 DONE DONE DONE 02/23/09 02/12/09 01/21/09 12/04/07 2,4,9,10 214,182 214,182 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
09-0395 Reconstruction 0-001-024 03/17/10 DONE DONE DONE 11/06/09 11/04/09 04/23/09 10/01/09 155,15,16 250,000 250,000 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
09-0420 Reconstruction 0-001-025 01/29/10 DONE DONE DONE 11/18/09 11/09/09 / / 12/04/07 8 1,601,600 1,601,600 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
11-0603 Reconstruction 0-001-026 04/09/12 DONE DONE DONE 01/06/12 01/05/12 11/09/11 05/05/11 10,16 28,250 0 JOD 0 0 0 H2M Group 0 / / / /
12-0675 Reconstruction 0-001-027 STARTED STARTED UNREVIEWED01/16/13 01/14/13 09/06/12 05/06/12 8,9,155,15,16 0 0 DDJ 0 0 0 H2M Group 0 / / / /
- Reconstruction 0-001-028 / / / / 05/09/13 / / 2,9 0 0 JOB 0 0 0 0 / / / /
- Reconstruction 0-001-029 / / / / 05/20/13 / / 8,9,155,15,16 0 0 JOB 0 0 0 0 / / / /
Seaford Manor Elementary:
08-1396 Reconstruction 0-002-014 09/21/09 DONE DONE DONE 03/19/09 03/12/09 01/21/09 12/04/07 155,15,16 255,789 255,789 JOD 0 0 64,365 Burton Behrendt Smith 0 / / / /
08-1255 Reconstruction 0-002-015 05/29/09 DONE DONE DONE 02/23/09 02/12/09 01/21/09 12/04/07 2,4,9,10 599,757 599,757 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
Seaford Harbor Elementary:
08-0059 Reconstruction 0-005-017 10/14/08 DONE DONE DONE 07/21/08 07/09/08 05/29/08 12/04/07 2,8,10 1,129,056 1,129,056 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
08-1397 Reconstruction 0-005-018 09/21/09 DONE DONE DONE 03/19/09 03/12/09 01/21/09 12/04/07 155,15,16 341,544 341,544 JOD 0 0 64,365 Burton Behrendt Smith 0 / / / /
08-1256 Reconstruction 0-005-019 05/29/09 DONE DONE DONE 02/23/09 02/12/09 01/21/09 12/04/07 2,4,9,10 283,100 283,100 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
10-0447 Reconstruction 0-005-020 STARTED DONE DONE 11/09/10 11/04/10 07/20/10 / / 2 0 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
11-0418 Reconstruction 0-005-021 01/17/12 DONE DONE DONE 11/21/11 11/21/11 06/17/11 05/05/11 13,16 34,250 34,250 JOD 0 0 0 H2M Group 0 / / 09/28/12
Seaford Middle School:
08-0060 Reconstruction 0-006-018 10/14/08 DONE DONE DONE 07/21/08 07/09/08 05/29/08 12/04/07 2,8,10 3,153,408 3,153,408 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
08-0673 Reconstruction 0-006-019 03/27/09 DONE DONE DONE 11/04/08 11/03/08 08/27/08 12/04/07 2,4,8,9,10,155,15,16 1,006,942 1,006,942 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
08-1398 Reconstruction 0-006-020 09/21/09 DONE DONE DONE 03/19/09 03/12/09 01/21/09 12/04/07 155,15,16 499,006 499,006 JOD 0 0 64,365 Burton Behrendt Smith 0 / / / /
08-1257 Reconstruction 0-006-021 05/29/09 DONE DONE DONE 02/23/09 02/12/09 01/21/09 12/04/07 2,4,9,10 136,730 136,730 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
11-0419 Reconstruction 0-006-022 01/17/12 DONE DONE DONE 11/21/11 11/21/11 06/20/11 05/05/11 13,16 34,250 34,250 JOD 0 0 0 H2M Group 0 / / 09/28/12
12-0829 Reconstruction 0-006-023 STARTED DONE DONE 02/14/13 02/11/13 07/21/11 05/04/12 2,15 0 19,426,176 JOB 0 0 0 H2M Group 0 / / / /
Press Box:
11-0574DB Discovered Building 7-015-001 03/22/12 DONE DONE DONE 01/04/12 01/03/12 06/24/11 / / 0 0 JOD 0 0 0 H2M Group 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Winthrop Avenue School:
08-1455 Reconstruction 0-001-017 06/25/09 DONE DONE DONE 04/02/09 04/01/09 12/29/08 10/07/08 16 250,000 250,000 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
12-0973 Reconstruction 0-001-018 DONE STARTED UNREVIEWED03/14/13 03/14/13 02/13/13 02/12/13 2,155,16 646,683 0 MFS 0 0 0 ECG Eninering, LLC 646,683 / / / /
08-1343SC Visual Structural Inspection 0-001-SC1 03/16/09 DONE DONE DONE 10/20/08 10/20/08 / / / / 16 4,848 0 JOD 0 0 0 0 / / / /
Shore Road School:
12-0974 Reconstruction 0-002-015 DONE STARTED UNREVIEWED03/14/13 03/14/13 02/13/13 02/12/13 155,16 440,646 0 MFS 0 0 0 ECG Eninering, LLC 440,646 / / / /
08-1342SC Visual Structural Inspection 0-002-SC1 03/16/09 DONE DONE DONE 10/20/08 10/20/08 / / / / 16 4,848 0 JOD 0 0 0 0 / / / /
Charles A Reinhard Early Chldhd Ctr:
12-0975 Reconstruction 0-003-020 DONE STARTED UNREVIEWED03/14/13 03/14/13 02/13/13 02/12/13 2,155,16 645,450 645,450 MFS 0 0 0 ECG Eninering, LLC 645,450 / / / /
08-1344SC Visual Structural Inspection 0-003-SC1 03/16/09 DONE DONE DONE 10/20/08 10/20/08 / / / / 16 4,848 0 JOD 0 0 0 0 / / / /
Storage Shed Reinhard School:
08-1333DB Discovered Building 2-007-001 04/10/09 DONE DONE DONE 03/10/09 03/06/09 04/09/08 / / 0 0 HCM 0 0 0 Joseph J.Chearmonte 0 / / / /
Bellmore Memorial Library:
10-1324 Reconstruction 6-006-005 07/21/11 DONE DONE DONE 05/20/11 05/18/11 03/30/11 / / 7 199,200 0 HCM 0 0 0 H2M Group 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
High School Renovation:
08-1770 Reconstruction 0-005-020 06/19/09 DONE DONE DONE 06/30/09 06/24/09 03/26/09 06/15/04 2,4,7,13,155,15,16 10,357,666 10,357,666 HCM 0 0 925,527 Cannon Design 0 / / / /
10-0617 Reconstruction 0-005-021 12/30/10 DONE DONE DONE 12/23/10 12/15/10 09/13/10 06/15/04 2,4,7,8,9,10,14,155, 66,932,433 64,339,086 HCM 0 0 1,340,649 Cannon Design 0 / / 09/20/12
Press Box:
- New Construction 7-034-001 12/30/10 DONE DONE DONE 12/23/10 12/15/10 01/04/11 06/15/04 02 - 16 0 0 HCM 0 0 0 Cannon Design 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Freeport Senior High School:
11-0218 Reconstruction 0-001-022 12/08/11 DONE DONE DONE 09/30/11 09/29/11 10/17/06 09/20/11 155 2,176,550 0 HCM 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
07-1623 Reconstruction 0-001-023 07/21/08 DONE DONE DONE 02/14/08 02/12/08 01/11/07 11/15/07 2,4,7,8,9,10,14,155, 5,006,000 5,006,000 HCM 0 0 1,500,000 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
07-0446 Reconstruction 0-001-024 05/30/08 DONE DONE DONE 10/01/07 09/27/07 03/30/07 06/28/07 2,155,15,16 942,158 942,158 HCM 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 942,158 / / / /
09-0559 Reconstruction 0-001-026 05/10/10 DONE DONE DONE 12/07/09 12/04/09 05/29/08 05/20/08 2,4,8,9,10,155,15,16 391,770 391,770 HCM 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / 12/26/12
08-0873 Reconstruction 0-001-027 06/22/09 DONE DONE DONE 12/05/08 12/04/08 08/27/08 05/15/07 2,4,9,10 389,146 389,146 HCM 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
09-0896 Reconstruction 0-001-028 06/04/10 DONE DONE DONE 02/18/10 02/10/10 06/11/09 05/19/09 2,9,10,155,15,16 1,222,776 1,222,776 HCM 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / 12/26/12
11-0406 Reconstruction 0-001-029 03/15/12 DONE DONE DONE 11/17/11 11/14/11 11/15/11 09/20/11 8,9,155,16 602,200 0 HCM 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
- Reconstruction 0-001-030 / / / / 03/12/13 / / 8,16 0 0 JMB 0 0 0 0 / / / /
John W.Dodd Junior High:
07-1384 Reconstruction 0-002-015 06/30/08 DONE DONE DONE 01/16/08 01/16/08 01/11/07 11/15/07 2,4,7,8,9,10,14,155, 1,968,000 1,968,000 HCM 0 0 590,000 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
07-0447 Reconstruction 0-002-016 05/30/08 DONE DONE DONE 10/01/07 09/27/07 03/30/07 06/28/07 2,155,16 530,331 530,331 HCM 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 530,331 / / / /
08-1574 Reconstruction 0-002-018 09/14/09 DONE DONE DONE 04/29/09 04/24/09 05/29/08 08/06/08 2,10,155,15,16 425,000 425,000 HCM 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / 12/26/12
- Reconstruction 0-002-019 / / / / 06/11/09 / / 2,9,10,155,15,16 0 0 HCM 0 0 0 0 / / / /
10-0569 Reconstruction 0-002-020 03/25/11 DONE DONE DONE 12/09/10 12/03/10 07/07/10 05/18/10 2,9,155,15,16 188,799 0 HCM 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
11-0529 Reconstruction 0-002-021 03/20/12 DONE DONE DONE 12/22/11 12/16/11 11/15/11 05/17/11 4,7,9,10,15,16 1,581,850 0 HCM 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
- Reconstruction 0-002-022 / / / / 03/12/13 / / 2,8,155,15,16 0 0 JMB 0 0 0 0 / / / /
Archer St School:
07-1773 Reconstruction 0-004-015 10/06/08 DONE DONE DONE 03/08/08 03/06/08 01/11/07 11/15/07 2,4,7,8,9,14,155,15, 2,202,000 2,202,000 HCM 0 0 660,000 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
07-0448 Reconstruction 0-004-016 05/30/08 DONE DONE DONE 10/01/07 09/27/07 03/30/07 06/28/07 2,155,16 861,847 861,847 HCM 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 864,847 / / / /
11-0718 Reconstruction 0-004-017 06/26/12 DONE DONE DONE 01/25/12 01/24/12 11/15/11 05/17/11 10,155,16 816,215 0 HCM 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
- Reconstruction 0-004-018 / / / / 03/12/13 / / 8,16 0 0 JMB 0 0 0 0 / / / /
Field House:
07-0449 Reconstruction 0-005-004 05/30/08 DONE DONE DONE 10/01/07 09/27/07 03/30/07 06/28/07 2,155,16 17,479 0 HCM 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 17,479 / / / /
08-0996 Reconstruction 0-005-005 08/27/09 DONE DONE DONE 01/02/09 12/22/08 05/29/08 05/20/08 2,4,8,9,10,155,15,16 258,140 0 HCM 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / 12/26/12
Caroline Atkinson Elementary:
07-1894 Additions and Alterations 0-006-017 10/27/08 DONE DONE DONE 03/31/08 03/21/08 01/11/07 11/15/07 02 - 16 4,772,000 4,772,000 HCM 0 0 1,430,000 BJLJ ENGINEERS & ARCHITECTS, 0 / / 12/26/12
07-0450 Reconstruction 0-006-018 05/30/08 DONE DONE DONE 10/01/07 09/27/07 03/30/07 06/28/07 2,155,15,16 615,321 615,321 HCM 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 615,321 / / / /
08-0874 Reconstruction 0-006-020 04/08/09 DONE DONE DONE 12/05/08 12/04/08 05/29/08 05/20/08 2,15,16 235,000 235,000 HCM 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
10-0870 Reconstruction 0-006-021 03/01/11 DONE DONE DONE 02/17/11 02/11/11 06/11/09 12/22/10 2,4,9,10,155,15,16 700,000 700,000 HCM 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / 03/25/13
- Reconstruction 0-006-022 / / / / 01/19/11 / / 2,155,15,16 0 0 HCM 0 0 0 0 / / / /
11-0388 Reconstruction 0-006-023 12/29/11 DONE DONE DONE 11/15/11 11/14/11 11/15/11 09/20/11 2,15,16 472,225 472,225 HCM 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
- Reconstruction 0-006-024 / / / / 03/12/13 / / 8,16 0 0 JMB 0 0 0 0 / / / /
Bayview Ave School:
07-1941 Reconstruction 0-007-017 09/22/08 DONE DONE DONE 04/08/08 03/02/08 01/11/07 11/15/07 2,4,7,8,9,14,155,15, 1,011,000 1,011,000 HCM 0 0 300,000 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
07-0451 Reconstruction 0-007-018 05/30/08 DONE DONE DONE 10/01/07 09/27/07 03/30/07 06/28/07 2,155,16 1,218,880 1,218,880 HCM 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 1,218,880 / / / /
09-0102 Reconstruction 0-007-020 10/08/09 DONE DONE DONE 08/06/09 08/05/09 05/29/08 05/20/08 2,9,10,15,16 160,000 160,000 HCM 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
11-0400 Reconstruction 0-007-021 02/08/12 DONE DONE DONE 11/17/11 11/16/11 11/15/11 05/17/11 2,10,155,15,16 878,268 878,268 HCM 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
- Reconstruction 0-007-022 / / / / 03/12/13 / / 8,16 0 0 JMB 0 0 0 0 / / / /
Columbus Avenue School:
07-1613 Reconstruction 0-009-013 07/21/08 DONE DONE DONE 02/14/08 02/11/08 01/11/07 11/15/07 2,4,7,8,9,14,155,15, 1,602,000 1,602,000 HCM 0 0 480,000 BJLJ ENGINEERS & ARCHITECTS, 0 / / 10/16/12
07-0452 Reconstruction 0-009-014 05/30/08 DONE DONE DONE 10/01/07 09/27/07 03/30/07 06/28/07 2,155,16 309,691 309,691 HCM 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 309,691 / / / /
08-1071 Reconstruction 0-009-016 05/19/09 DONE DONE DONE 01/09/09 01/08/09 05/29/08 05/20/08 2,9 105,000 105,000 HCM 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
11-0719 Reconstruction 0-009-017 06/13/12 DONE DONE DONE 01/25/12 01/24/12 11/15/11 09/20/11 13,155,15,16 550,125 0 HCM 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
- Reconstruction 0-009-018 / / / / / / / / 8,16 0 0 JMB 0 0 0 0 / / / /
Leo F. Giblyn Elementary:
07-1839 Reconstruction 0-010-018 09/12/08 DONE DONE DONE 03/19/08 03/14/08 01/11/07 11/15/07 2,4,7,8,9,14,155,15, 432,000 432,000 HCM 0 0 123,000 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
07-0453 Reconstruction 0-010-019 05/30/08 DONE DONE DONE 10/01/07 09/27/07 03/30/07 06/28/07 2,7,8,155,16 2,539,718 2,539,718 HCM 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 2,539,718 / / / /
09-0524 Reconstruction 0-010-021 02/26/10 DONE DONE DONE 11/30/09 11/27/09 05/29/08 05/20/08 2,9,15 75,000 0 HCM 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
11-0530 Reconstruction 0-010-022 03/26/12 DONE DONE DONE 12/22/11 12/16/11 11/15/11 05/17/11 13,155,15,16 910,510 0 HCM 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
- Reconstruction 0-010-023 / / / / 03/12/13 / / 8,16 0 0 JMB 0 0 0 0 / / / /
New Visions School @ Raynor Field:
07-0454 Reconstruction 0-016-004 05/30/08 DONE DONE DONE 10/01/07 09/27/07 03/30/07 06/28/07 155,16 155,558 155,558 HCM 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 155,558 / / / /
11-0528 Reconstruction 0-016-005 02/23/12 DONE DONE DONE 12/22/11 12/16/11 11/15/11 09/20/11 10,13 167,650 0 HCM 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
- Reconstruction 0-016-006 / / / / 03/12/13 / / 8,16 0 0 JMB 0 0 0 0 / / / /
Freeport Admin. Bldg.:
07-0455 Reconstruction 1-003-009 05/30/08 DONE DONE DONE 10/01/07 09/27/07 03/30/07 06/28/07 2,7,8,155,16 1,438,505 0 HCM 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 1,438,505 / / / /
- Reconstruction 1-003-010 / / / / 06/11/09 / / 2,4,10 0 0 HCM 0 0 0 0 / / / /
Freeport Memorial Library:
- XX Reconstruction 6-008-007 CANCELLED / / / / 06/05/08 / / 13,16 0 0 HCM 0 0 0 0 / / / /
- XX Reconstruction 6-008-009 CANCELLED / / / / 06/10/08 / / 13,16 0 0 HCM 0 0 0 0 / / / /
- XX Reconstruction 6-008-010 CANCELLED / / / / 06/05/09 / / 2 0 0 HCM 0 0 0 0 / / / /
09-0094 Reconstruction 6-008-011 08/03/09 DONE DONE DONE 07/30/09 07/28/09 07/13/09 / / 10,16 645,004 0 HCM 0 0 0 LAS Associates 0 / / / /
Concession Stand at High School:
09-0577 New Construction 7-022-001 11/23/10 DONE DONE DONE 12/15/09 12/09/09 06/11/09 05/19/09 02 - 16 3,000 0 HCM 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
Holy Redeemer School:
08-0245TQ Temporary Quarters 8-020-001 ADDENDUM REQ'D 09/04/08 08/12/08 07/14/08 / / 0 0 HCM 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
Congregation B'Nai Israel Temple:
09-0046TQ Temporary Quarters 8-021-001 01/07/10 DONE DONE DONE 07/17/09 07/10/09 05/14/09 / / 0 0 HCM 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Brookside Elementary:
08-0604 Reconstruction 0-001-016 12/11/08 DONE DONE DONE 10/27/08 10/27/08 07/15/08 03/12/08 2,4,9,16 100,000 100,000 DDJ 0 0 100,000 H2M Group 0 / / / /
10-1080 Reconstruction 0-001-017 06/02/11 DONE DONE DONE 03/18/11 03/15/11 11/29/10 05/18/10 2,16 79,929 79,929 DDJ 0 0 0 H2M Group 0 / / 03/15/13
11-0785 Reconstruction 0-001-018 07/11/12 DONE DONE DONE 02/13/12 02/09/12 09/14/11 05/17/11 16 29,750 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Lenox School:
08-0665 Reconstruction 0-005-018 01/05/09 DONE DONE DONE 11/04/08 10/30/08 07/15/08 03/12/08 4,8,9,10,15,16 128,400 128,400 DDJ 0 0 128,400 H2M Group 0 / / 02/04/13
10-1083 Reconstruction 0-005-019 06/02/11 DONE DONE DONE 03/18/11 03/15/11 11/29/10 05/18/10 2,16 79,929 79,929 DDJ 0 0 0 H2M Group 0 / / 03/18/13
11-0786 Reconstruction 0-005-020 07/11/12 DONE DONE DONE 02/13/12 02/09/12 09/14/11 05/17/11 16 29,750 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Milburn School:
08-0704 Reconstruction 0-006-019 01/05/09 DONE DONE DONE 11/07/08 11/06/08 07/15/08 03/12/08 2,9,16 148,000 148,000 DDJ 0 0 148,000 H2M Group 0 / / / /
10-1077 Reconstruction 0-006-020 06/02/11 DONE DONE DONE 03/18/11 03/15/11 11/29/10 05/18/10 16 35,500 35,500 DDJ 0 0 0 H2M Group 0 / / 03/18/13
11-0787 Reconstruction 0-006-021 07/11/12 DONE DONE DONE 02/13/12 02/09/12 09/14/11 05/17/11 16 29,750 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Plaza Elementary:
08-0742 Reconstruction 0-007-018 01/07/09 DONE DONE DONE 11/10/08 11/10/08 07/15/08 03/12/08 2,8,9,16 112,350 112,350 DDJ 0 0 112,350 H2M Group 0 / / 05/21/12
09-1121 Reconstruction 0-007-019 05/11/10 DONE DONE DONE 03/24/10 03/15/10 06/01/09 04/22/09 4,8 100,640 100,640 DDJ 0 0 0 H2M Group 0 / / / /
10-1079 Reconstruction 0-007-020 06/02/11 DONE DONE DONE 03/18/11 03/15/11 11/29/10 05/18/10 4,16 122,400 122,400 DDJ 0 0 0 H2M Group 0 / / 03/13/13
11-0788 Reconstruction 0-007-021 07/11/12 DONE DONE DONE 02/13/12 02/09/12 09/14/11 05/17/11 16 29,750 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Baldwin Senior High School:
08-0069 Reconstruction 0-009-031 09/09/08 DONE DONE DONE 07/21/08 07/14/08 06/19/07 02/04/04 9,10,13 322,000 322,000 DDJ 0 0 0 H2M Group 0 / / / /
08-1212 Reconstruction 0-009-032 10/06/09 DONE DONE DONE 02/18/09 02/06/09 07/15/08 03/12/08 4,9,10,16 304,950 304,950 DDJ 0 0 304,950 H2M Group 0 / / / /
08-0789 Reconstruction 0-009-033 04/13/09 DONE DONE DONE 11/24/08 11/24/08 08/22/08 02/04/04 155 267,500 267,500 DDJ 0 0 0 H2M Group 0 / / / /
10-1078 Reconstruction 0-009-034 06/02/11 DONE DONE DONE 03/18/11 03/15/11 11/29/10 05/18/10 10 21,400 21,400 DDJ 0 0 0 H2M Group 0 / / 03/18/13
11-0789 Reconstruction 0-009-035 07/11/12 DONE DONE DONE 02/13/12 02/09/12 09/14/11 05/17/11 2,9,16 59,500 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
12-0744 Reconstruction 0-009-036 STARTED DONE ADD. REQ'D01/31/13 01/30/13 11/20/12 12/12/12 7,155,16 0 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Shubert Elementary:
08-1412 Reconstruction 0-010-018 06/18/09 DONE DONE DONE 03/23/09 03/20/09 07/15/08 03/12/08 2,4,8,13,16 219,350 219,350 DDJ 0 0 219,350 H2M Group 0 / / 02/04/13
11-0790 Reconstruction 0-010-019 07/11/12 DONE DONE DONE 02/13/12 02/09/12 09/14/11 05/17/11 2,4,7,16 315,350 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Steele Elementary:
08-1235 Reconstruction 0-011-021 05/27/09 DONE DONE DONE 02/19/09 02/12/09 07/15/08 03/12/08 2,4,8,13,16 256,800 256,800 DDJ 0 0 256,800 H2M Group 0 / / 02/04/13
09-1122 Reconstruction 0-011-022 05/11/10 DONE DONE DONE 03/24/10 03/15/10 06/01/09 04/22/09 4,8 166,640 166,640 DDJ 0 0 0 H2M Group 0 / / / /
10-1081 Reconstruction 0-011-023 06/02/11 DONE DONE DONE 03/18/11 03/15/11 11/29/10 05/10/10 2,9,16 74,700 74,700 DDJ 0 0 0 H2M Group 0 / / 03/13/13
11-0791 Reconstruction 0-011-024 07/11/12 DONE DONE DONE 02/13/12 02/09/12 09/14/11 05/17/11 16 29,750 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Baldwin Middle School:
08-1293 Reconstruction 0-012-023 05/06/09 DONE DONE DONE 02/25/09 02/20/09 07/15/08 03/12/08 4,155,16 270,710 270,710 DDJ 0 0 270,710 H2M Group 0 / / / /
08-1278 Reconstruction 0-012-024 06/22/09 DONE DONE DONE 02/24/09 02/18/09 10/22/08 03/26/08 2,9,10,155,15,16 94,600 94,600 DDJ 0 0 0 H2M Group 0 / / / /
09-0681 Reconstruction 0-012-025 04/13/10 DONE DONE DONE 01/05/10 12/30/09 06/01/09 03/26/08 2,9,10,15,16 279,550 279,550 DDJ 0 0 0 H2M Group 0 / / / /
09-1279 Reconstruction 0-012-026 03/09/11 DONE DONE DONE 04/13/10 04/05/10 07/13/09 04/22/09 10,16 80,910 80,910 DDJ 0 0 0 H2M Group 0 / / 05/03/13
10-1082 Reconstruction 0-012-027 06/02/11 DONE DONE DONE 03/18/11 03/15/11 11/29/10 05/18/10 16 25,000 25,000 DDJ 0 0 0 H2M Group 0 / / 03/15/13
- Reconstruction 0-012-028 / / / / 09/14/11 / / 8,9,10,15,16 0 0 DDJ 0 0 0 0 / / / /
11-0792 Reconstruction 0-012-028 07/11/12 DONE DONE DONE 02/13/12 02/09/12 / / 05/17/11 395,913 0 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
- Reconstruction 0-012-029 / / / / 10/19/11 / / 13,16 0 0 DDJ 0 0 0 0 / / / /
Meadow Elementary School:
08-0670 Reconstruction 0-013-020 03/23/09 DONE DONE DONE 11/04/08 10/30/08 07/15/08 08/12/08 4,9,10,16 133,750 133,750 DDJ 0 0 133,750 H2M Group 0 / / 02/04/13
10-1076 Reconstruction 0-013-021 06/02/11 DONE DONE DONE 03/18/11 03/15/11 11/29/10 05/18/10 16 18,600 18,600 DDJ 0 0 0 H2M Group 0 / / 03/18/13
11-0793 Reconstruction 0-013-022 07/11/12 DONE DONE DONE 02/13/12 02/09/12 09/14/11 05/17/11 16 29,750 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
District Office:
11-0794 Reconstruction 1-002-010 07/11/12 DONE DONE DONE 02/13/12 02/09/12 09/14/11 05/17/11 16 29,750 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Public Library:
08-0911 Reconstruction 6-023-005 01/22/09 DONE DONE DONE 12/15/08 12/11/08 10/27/08 05/21/08 2,4,7,8,9,10,155,16 489,000 0 DDJ 0 0 0 H2M Group 0 / / / /
Baldwin Sr High Guard Booth:
11-0795 New Construction 7-033-001 07/11/12 DONE DONE DONE 02/13/12 02/09/12 09/16/11 05/17/11 02 - 16 148,750 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Oaks Road School #3:
09-0720 Reconstruction 0-003-017 02/11/10 DONE DONE DONE 01/08/10 01/07/10 12/10/09 05/20/09 2,155,16 395,000 395,000 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Oceanside School #4:
- Reconstruction 0-004-013 / / / / 04/26/13 / / 2,9,10 0 0 JOB 0 0 0 0 / / / /
School #5:
10-1245 Reconstruction 0-006-018 05/24/11 DONE DONE DONE 04/29/11 04/28/11 04/13/11 05/18/10 2,8 590,500 590,500 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 10/22/12
Senior High School #7:
08-1134 Reconstruction 0-008-027 06/16/09 DONE DONE DONE 01/27/09 01/26/09 09/10/08 05/20/08 13,16 580,500 0 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Fulton Ave. Elementary #8:
- Reconstruction 0-009-018 / / / / 04/26/13 / / 2,9,10,155,15,16 0 0 JOB 0 0 0 0 / / / /
School #9 Middle/Elementary:
- Reconstruction 0-010-020 / / / / 04/26/13 / / 2,9,10 0 0 JOB 0 0 0 0 / / / /
Florence Smith School #2:
08-1135 Reconstruction 0-011-017 06/16/09 DONE DONE DONE 01/27/09 01/26/09 09/23/08 05/20/08 16 125,000 125,000 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Storage shed @ school #9:
09-0114DB Discovered Building 2-033-001 09/18/09 DONE DONE DONE 08/12/09 08/11/09 05/27/09 / / 0 0 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Press Box @ Oceanside High School:
08-1136 New Construction 7-032-001 06/16/09 DONE DONE DONE 01/27/09 01/26/09 09/23/08 05/20/08 02 - 16 150,000 0 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Malverne Senior High:
07-2227 Reconstruction 0-001-016 09/05/08 DONE DONE DONE 06/06/08 05/30/08 11/14/07 05/15/07 2,9,155,15,16 100,000 0 DDJ 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
10-0877 Reconstruction 0-001-017 05/12/11 DONE DONE DONE 02/18/11 02/14/11 04/19/10 11/16/10 2,4,7,8,9,155,15,16 4,107,810 4,107,810 DDJ 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / 01/22/13
12-0925 Reconstruction 0-001-018 DONE DONE UNREVIEWED02/28/13 02/25/13 11/04/11 05/17/11 2,4,8,9,10,155,15,16 0 0 DDJ 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
12-0044 Reconstruction 0-001-019 07/26/12 DONE DONE DONE 07/20/12 07/20/12 04/26/12 05/15/12 2,4,7 312,000 0 DDJ 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
- Reconstruction 0-001-020 / / / / 05/01/13 / / 2,8,9,155,15,16 0 0 DDJ 0 0 0 0 / / / /
H.T. Herber Middle School:
- Reconstruction 0-002-014 / / / / 02/22/10 / / 2,4,8,15,16 0 0 DDJ 0 0 0 0 / / / /
10-0878 Reconstruction 0-002-015 05/03/11 DONE DONE DONE 02/18/11 02/14/11 04/19/10 11/16/10 2,4,7,8,9,155,15,16 333,772 333,772 DDJ 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / 01/14/13
12-0924 Reconstruction 0-002-016 DONE DONE UNREVIEWED02/28/13 02/25/13 11/04/11 05/17/11 2,4,8,9,10,155,15,16 0 0 DDJ 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
- Reconstruction 0-002-017 / / / / 05/01/13 / / 2,8,9,155,15,16 0 0 DDJ 0 0 0 0 / / / /
M W Downing School:
- Additions and Alterations 0-003-011 UNREVIEWED 07/08/10 07/08/10 04/20/10 / / 02 - 16 0 5,930,194 DDJ 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
10-0027PR Additions and Alterations 0-003-011 UNREVIEWED 07/22/10 07/08/10 04/20/10 / / 02 - 16 0 5,926,178 DDJ 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
10-1054 Additions and Alterations 0-003-011 08/03/11 DONE DONE DONE 03/15/11 03/10/11 04/20/10 11/16/10 02 - 16 3,794,549 3,794,549 DDJ 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
- Reconstruction 0-003-012 / / / / 05/01/13 / / 2,8,9,155,15,16 0 0 DDJ 0 0 0 0 / / / /
Davison Ave School:
10-0026PR Additions and Alterations 0-004-010 UNREVIEWED 07/22/10 07/08/10 04/19/10 / / 02 - 16 0 5,988,756 DDJ 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
10-1129 Additions and Alterations 0-004-010 06/23/11 DONE DONE DONE 04/05/11 03/31/11 04/19/10 11/16/10 02 - 16 6,094,089 6,094,089 DDJ 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / 09/05/12
Administration Office:
- Reconstruction 1-007-005 / / / / 02/22/10 / / 2,16 0 0 DDJ 0 0 0 0 / / / /
Pressbox:
10-1284 New Construction 7-029-001 05/12/11 DONE DONE DONE 05/13/11 05/09/11 10/03/05 11/16/10 02 - 16 149,500 0 DDJ 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
Concession Stand @ Malverne HS:
- New Construction 7-030-001 / / / / 11/04/11 / / 02 - 16 0 0 DDJ 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
James A. Dever School:
12-0207 Reconstruction 0-001-027 04/26/13 DONE DONE DONE 09/25/12 09/25/12 04/17/12 03/27/12 13 1,229,764 0 DDJ 0 0 0 Burton Behrendt Smith 1,229,764 / / / /
12-0959 Reconstruction 0-001-028 DONE STARTED STARTED 03/12/13 03/08/13 05/17/12 05/15/12 8 0 8,514,450 MFS 0 0 0 Burton Behrendt Smith 0 / / / /
12-0275 Reconstruction 0-001-029 10/29/12 DONE DONE DONE 10/12/12 10/12/12 07/30/12 08/21/12 4 60,000 60,000 JMB 0 0 0 Burton Behrendt Smith 0 / / 04/08/13
Howell Road School:
09-0109 Reconstruction 0-002-016 08/11/09 DONE DONE DONE 08/11/09 08/03/09 08/07/09 05/20/09 155,15,16 474,000 474,000 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
12-0208 Reconstruction 0-002-017 04/26/13 DONE DONE DONE 09/25/12 09/25/12 04/17/12 03/27/12 13 1,406,363 0 JOD 0 0 0 Burton Behrendt Smith 1,406,363 / / / /
12-0960 Reconstruction 0-002-018 DONE STARTED STARTED 03/12/13 03/08/13 05/17/12 05/15/12 8,10 0 8,514,450 MFS 0 0 0 Burton Behrendt Smith 0 / / / /
Wheeler Avenue School:
08-0271 Reconstruction 0-003-018 10/31/08 DONE DONE DONE 09/08/08 09/03/08 07/16/08 05/20/08 8 56,640 56,640 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
12-0209 Reconstruction 0-003-019 04/26/13 DONE DONE DONE 09/25/12 09/25/12 04/17/12 03/27/12 13 1,450,599 0 JOD 0 0 0 Burton Behrendt Smith 1,450,599 / / / /
12-0961 Reconstruction 0-003-020 DONE STARTED STARTED 03/12/13 03/08/13 05/17/12 05/15/12 7,8,10 0 11,239,074 MFS 0 0 0 Burton Behrendt Smith 0 / / / /
Willow Road School:
09-1281 Reconstruction 0-004-012 05/12/10 DONE DONE DONE 04/13/10 04/05/10 07/16/08 05/20/08 7 285,000 285,000 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
11-1116 Reconstruction 0-004-013 04/17/12 DONE DONE DONE 04/12/12 03/30/12 06/01/11 05/18/10 7 281,000 281,000 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
12-0210 Reconstruction 0-004-014 04/26/13 DONE DONE DONE 09/25/12 09/25/12 04/17/12 03/27/12 13 1,384,117 0 JOD 0 0 0 Burton Behrendt Smith 1,384,117 / / / /
Shed @ Howell Road School:
09-1454 New Construction 2-012-001 06/18/10 DONE DONE DONE 05/20/10 05/18/10 12/22/09 11/17/09 02 - 16 6,400 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Franklin Early Childhood Center:
08-1372 Reconstruction 0-001-013 12/10/09 DONE DONE DONE 03/13/09 03/04/09 12/20/07 12/12/06 2,4,8,9,10,155,15,16 1,047,516 1,047,516 MGL 0 0 0 H2M Group 0 / / / /
08-1400 Reconstruction 0-001-014 04/28/09 DONE DONE DONE 03/19/09 03/12/09 12/20/07 12/12/06 8 840,193 840,193 MGL 0 0 90,896 H2M Group 0 / / / /
07-1680 Reconstruction 0-001-015 11/25/08 DONE DONE DONE 02/23/08 02/19/08 01/17/08 12/12/06 13,155,15,16 388,106 388,106 MGL 0 0 0 H2M Group 388,106 / / / /
- Reconstruction 0-001-016 / / / / 01/10/13 / / 155,15 0 0 JMB 0 0 0 0 / / / /
Hewlett Elementary School:
08-1205 Reconstruction 0-002-010 06/10/09 DONE DONE DONE 02/05/09 02/05/09 12/17/07 12/12/07 2,13,155,15,16 1,550,000 1,550,000 MGL 0 0 175,000 H2M Group 0 / / / /
07-1681 Reconstruction 0-002-011 11/25/08 DONE DONE DONE 08/19/08 08/19/08 01/17/08 12/12/06 13,155,15,16 198,744 198,744 MGL 0 0 0 H2M Group 198,744 / / / /
- PR Additions and Alterations 0-002-012 / / / / 06/17/10 / / 02 - 16 0 0 JOD 0 0 0 0 / / / /
- Reconstruction 0-002-013 / / / / 01/10/13 / / 10 0 0 JMB 0 0 0 0 / / / /
Ogden Elementary School:
07-2319 Reconstruction 0-003-011 08/05/08 DONE DONE DONE 07/07/08 06/19/08 06/27/07 12/12/06 2,4,7,8,155,15,16 862,000 862,000 MGL 0 0 0 H2M Group 0 / / / /
07-1682 Reconstruction 0-003-012 11/25/08 DONE DONE DONE 02/23/08 02/19/08 01/17/08 12/12/06 9,13,155,15,16 949,857 949,857 MGL 0 0 0 H2M Group 949,857 / / / /
08-1253 Reconstruction 0-003-013 09/23/09 DONE DONE DONE 02/23/09 02/12/09 06/20/08 12/12/06 4,7,8,9,155,15,16 4,819,834 4,819,834 JOD 0 0 489,000 H2M Group 0 / / / /
10-0663 Additions and Alterations 0-003-014 04/29/11 DONE DONE DONE 12/30/10 12/23/10 06/21/10 12/12/06 02 - 16 830,700 830,700 JOD 0 0 0 H2M Group 0 / / 10/19/12
- Reconstruction 0-003-015 / / / / 01/10/13 / / 16 0 0 JMB 0 0 0 0 / / / /
George W. Hewlett High School:
07-1683 Reconstruction 0-006-020 11/25/08 DONE DONE DONE 02/23/08 02/19/08 01/17/08 12/12/06 10,13,155,15,16 638,526 638,526 MGL 0 0 0 H2M Group 638,526 / / / /
10-1095 Reconstruction 0-006-021 06/28/11 DONE DONE DONE 03/21/11 03/18/11 04/03/08 05/18/10 2,8,9,13,15,16 955,157 955,157 JOD 0 0 0 H2M Group 0 / / / /
10-1096 Reconstruction 0-006-023 06/28/11 DONE DONE DONE 03/21/11 03/18/11 02/04/09 04/27/11 2,155,15,16 1,230,698 1,230,698 JOD 0 0 100,000 H2M Group 0 / / / /
- Reconstruction 0-006-024 / / / / 01/10/13 / / 8,16 0 0 JMB 0 0 0 0 / / / /
Recreation Building:
07-1684 Reconstruction 0-007-006 11/25/08 DONE DONE DONE 02/23/08 02/19/08 01/17/08 12/12/06 13,155,16 41,627 0 MGL 0 0 0 H2M Group 41,627 / / / /
Woodmere Middle School:
07-1621 Reconstruction 0-008-011 10/17/08 DONE DONE DONE 02/14/08 02/12/08 02/13/07 12/12/06 4,7,8,9,155,15,16 5,830,000 5,830,000 MGL 0 0 0 H2M Group 0 / / / /
07-2344 Reconstruction 0-008-012 01/26/09 DONE DONE DONE 07/09/08 06/27/08 05/01/07 12/12/06 2,4,155,15,16 14,332,247 7,309,446 MGL 0 0 154,000 H2M Group 0 / / / /
07-1685 Reconstruction 0-008-013 11/25/08 DONE DONE DONE 02/23/08 02/19/08 01/17/08 12/12/06 9,155,15,16 2,754,381 2,754,381 MGL 0 0 0 H2M Group 2,754,381 / / / /
11-1094 Reconstruction 0-008-015 08/16/12 DONE DONE DONE 04/06/12 04/05/12 01/10/12 03/21/12 9,155,15,16 220,000 220,000 JOD 0 0 0 H2M Group 0 / / 12/10/12
11-1257 Reconstruction 0-008-016 09/14/12 DONE DONE DONE 05/03/12 05/01/12 02/02/12 03/21/12 495,225 0 JOD 0 0 0 H2M Group 0 / / / /
12-0990 Reconstruction 0-008-017 DONE STARTED UNREVIEWED03/19/13 03/19/13 10/18/12 02/27/13 4,10,155,15,16 282,225 0 JMB 0 0 0 H2M Group 0 / / / /
Woodmere Educational Center:
07-1686 Reconstruction 1-004-017 11/25/08 DONE DONE DONE 02/23/08 02/19/08 01/17/08 12/12/06 13,155,16 205,195 0 MGL 0 0 0 H2M Group 205,195 / / / /
11-1006 Reconstruction 1-004-018 08/28/12 DONE DONE DONE 03/22/12 03/22/12 08/04/11 05/17/11 8,155,15 405,000 0 JOD 0 0 0 H2M Group 0 / / / /
Maintenance Building:
07-1687 Reconstruction 3-018-002 11/25/08 DONE DONE DONE 02/23/08 02/19/08 01/17/08 12/12/06 16 6,094 0 MGL 0 0 0 H2M Group 6,094 / / / /
Field House @ Woodmere Middle School:
- PR New Construction 7-026-001 / / / / 08/14/08 / / 02 - 16 0 0 JOD 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Public School 2:
08-1631 Reconstruction 0-002-027 08/21/09 DONE DONE DONE 05/18/09 05/11/09 08/21/08 05/20/08 2,4,7,155,15,16 2,194,196 2,194,196 HCM 0 0 0 Wiedersum Associates Architec 0 / / / /
08-1162 Reconstruction 0-002-028 03/31/09 DONE DONE DONE 02/03/09 01/29/09 01/14/09 05/20/08 2,7 646,775 646,775 HCM 0 0 0 Wiedersum Associates Architec 0 / / / /
Public School 4:
09-0120 Reconstruction 0-004-026 12/08/09 DONE DONE DONE 08/13/09 08/12/09 08/21/08 05/20/09 2,4,7,155,15,16 1,781,124 1,781,124 HCM 0 0 0 Wiedersum Associates Architec 0 / / / /
08-1163 Reconstruction 0-004-027 03/31/09 DONE DONE DONE 02/03/09 01/29/09 01/14/09 05/20/08 7 115,035 115,035 HCM 0 0 0 Wiedersum Associates Architec 0 / / / /
Public School 5:
09-0121 Reconstruction 0-005-026 12/08/09 DONE DONE DONE 08/13/09 08/12/09 08/21/08 05/20/09 2,4,7,155,15 765,963 765,963 HCM 0 0 0 Wiedersum Associates Architec 0 / / 03/11/13
08-1164 Reconstruction 0-005-027 03/31/09 DONE DONE DONE 02/03/09 01/29/09 01/14/09 05/20/08 7 116,516 116,516 HCM 0 0 0 Wiedersum Associates Architec 0 / / / /
Public School 6:
- XX Reconstruction 0-006-022 CANCELLED / / / / 08/21/08 / / 2,4,7,155,15,16 0 8,598,438 HCM 0 0 0 0 / / / /
08-1394XX Reconstruction 0-006-023 CANCELLED 03/19/09 03/18/09 01/14/09 05/20/08 2,7 0 8,598,438 HCM 0 0 0 Wiedersum Associates Architec 0 / / / /
Lawrence Jr. High School:
08-0219 Reconstruction 0-007-036 02/19/09 DONE DONE DONE 08/28/08 08/19/08 10/30/07 05/20/08 2,4,9,155,15 369,954 369,954 HCM 0 0 0 Wiedersum Associates Architec 0 / / / /
08-1590 Reconstruction 0-007-037 12/15/09 DONE DONE DONE 05/05/09 05/01/09 08/21/08 05/20/08 2,8,9,10,155,15,16 2,850,716 2,850,716 HCM 0 0 0 Wiedersum Associates Architec 0 / / 10/03/12
09-0126 Reconstruction 0-007-038 12/10/09 DONE DONE DONE 08/17/09 08/17/09 01/14/09 05/20/08 8,9,10,155,15,16 1,114,163 703,500 HCM 0 0 0 Wiedersum Associates Architec 0 / / / /
Lawrence Senior High School:
08-0220 Reconstruction 0-008-036 02/19/09 DONE DONE DONE 08/28/08 08/19/08 10/29/07 05/20/08 2,4,9,155,15 196,773 196,773 HCM 0 0 0 Wiedersum Associates Architec 0 / / / /
08-1409 Reconstruction 0-008-037 05/22/09 DONE DONE DONE 03/23/09 03/20/09 08/14/08 05/20/08 2,4,8,9,10,155,15,16 5,605,200 0 HCM 0 0 0 Wiedersum Associates Architec 0 / / / /
09-0127 Reconstruction 0-008-038 12/10/09 DONE DONE DONE 08/17/09 08/17/09 01/14/09 05/20/08 8,9,10,155,15,16 1,413,190 766,000 HCM 0 0 0 Wiedersum Associates Architec 0 / / / /
- Reconstruction 0-008-039 / / / / 12/07/09 / / 4,8,9,155,15,16 0 0 HCM 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Alden Terrace School:
11-0450 Reconstruction 0-001-014 01/05/12 DONE DONE DONE 12/01/11 11/28/11 05/19/11 05/17/11 2,4,7,8,9 1,494,000 0 HCM 0 0 0 H2M Group 0 / / / /
- Reconstruction 0-001-015 / / / / 03/14/13 / / 2,8,9 0 0 JMB 0 0 0 0 / / / /
Covert Ave School:
08-0174 Reconstruction 0-003-017 08/15/08 DONE DONE DONE 08/14/08 08/14/08 07/15/08 06/17/08 2 160,000 160,000 HCM 0 0 0 JC Broderick and Associates 0 / / / /
09-0982 Reconstruction 0-003-018 04/22/10 DONE DONE DONE 03/02/10 02/22/10 09/08/09 05/19/09 7 2,475,911 2,475,911 HCM 0 0 519,082 H2M Group 0 / / 12/20/10
- Reconstruction 0-003-019 / / / / 10/01/09 / / 4 0 0 HCM 0 0 0 0 / / / /
- Reconstruction 0-003-020 / / / / 01/14/10 / / 2,8 0 0 HCM 0 0 0 0 / / / /
Dutch Broadway School:
08-1088 Reconstruction 0-004-017 03/17/09 DONE DONE DONE 01/20/09 01/12/09 01/03/07 05/15/07 8 1,403,990 1,403,990 HCM 0 0 547,761 James M. Campbell Architects 0 / / / /
08-1305 Reconstruction 0-004-018 04/15/09 DONE DONE DONE 03/02/09 02/26/09 12/29/08 05/15/07 4 530,109 530,109 HCM 0 0 210,983 James M. Campbell Architects 0 / / / /
10-0419 Reconstruction 0-004-019 03/16/11 DONE DONE DONE 11/04/10 10/22/10 09/08/09 05/22/07 16 125,000 125,000 HCM 0 0 0 H2M Group 0 / / / /
Gotham Avenue School:
10-0741 Reconstruction 0-006-023 04/01/11 DONE DONE DONE 01/25/11 01/12/11 07/28/10 05/18/10 2,4,8,9 1,565,619 1,565,619 HCM 0 0 0 H2M Group 0 / / 01/20/12
DUTCH BROADWAY STORAGE SHED:
11-0750DB Discovered Building 2-023-001 04/20/12 DONE DONE DONE 02/01/12 01/30/12 09/16/08 / / 0 0 HCM 0 0 0 H2M Group 0 / / / /
New Library Site:
- Reconstruction 6-022-003 / / / / 10/01/09 / / 9,155,16 0 0 HCM 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Washington Street School:
11-1445 Reconstruction 0-002-014 11/26/12 DONE DONE DONE 06/29/12 06/21/12 01/05/12 05/17/11 9,16 260,000 260,000 JOD 0 0 0 McClave Engineering,P.C 0 / / / /
John Street School:
09-0033 Reconstruction 0-003-015 07/23/09 DONE DONE DONE 07/16/09 07/09/09 10/07/08 05/19/08 155,15,16 97,500 97,500 JOD 0 0 0 McClave Engineering,P.C 0 / / 03/18/13
- Reconstruction 0-003-016 / / / / / / / / 2 0 0 JOD 0 0 0 0 / / / /
Polk Street School:
09-1104 Reconstruction 0-004-014 07/29/10 DONE DONE DONE 03/18/10 03/10/10 07/08/09 05/19/08 9,16 127,500 127,500 JOD 0 0 0 McClave Engineering,P.C 0 / / 12/20/12
- Reconstruction 0-004-015 / / / / 02/10/11 / / 7 0 0 JOD 0 0 0 0 / / / /
Franklin Square Public Library:
09-0381 Reconstruction 6-006-002 02/19/10 DONE DONE DONE 11/03/09 11/02/09 12/27/07 04/30/08 7,16 77,500 0 JOD 0 0 0 E.S. KALOGERAS,P.E 0 / / / /
10-0365 Reconstruction 6-006-003 11/10/10 DONE DONE DONE 10/14/10 10/06/10 05/18/10 08/31/10 2,4,7,8,9,15 182,328 0 JOD 0 0 0 BEATTY HARVEY COCO 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Homestead School:
09-0887 Reconstruction 0-001-005 06/18/10 DONE DONE DONE 02/12/10 02/08/10 11/10/09 05/19/09 16 65,000 65,000 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
10-0731 Additions and Alterations 0-001-006 06/09/11 DONE DONE DONE 01/24/11 01/11/11 09/07/10 10/27/09 02 - 16 3,431,956 1,498,781 JOD 0 0 0 Burton Behrendt Smith 0 / / 08/30/12
10-0975 Reconstruction 0-001-007 05/19/11 DONE DONE DONE 03/08/11 03/01/11 12/28/10 10/27/09 9,16 127,500 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
10-1042 Reconstruction 0-001-008 02/23/12 DONE DONE DONE 03/11/11 03/09/11 01/27/11 01/26/10 2,155,15,16 955,971 0 JOD 0 0 0 Burton Behrendt Smith 955,971 / / / /
10-0912 Reconstruction 0-001-009 05/04/11 DONE DONE DONE 02/22/11 02/22/11 01/26/11 10/27/10 2,8,155,16 1,212,525 1,212,525 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
- Reconstruction 0-001-010 / / / / 02/18/11 / / 8,9 0 0 JOD 0 0 0 0 / / / /
Locust School:
09-0888 Reconstruction 0-003-004 06/18/10 DONE DONE DONE 02/12/10 02/08/10 11/10/09 05/19/09 16 65,000 65,000 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
10-0913 Reconstruction 0-003-005 05/04/11 DONE DONE DONE 02/24/11 02/22/11 09/27/10 10/27/09 8,9 1,212,525 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
10-0976 Reconstruction 0-003-006 05/19/11 DONE DONE DONE 03/08/11 03/01/11 12/28/10 10/27/09 9,16 122,400 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
10-1043 Reconstruction 0-003-007 02/23/12 DONE DONE DONE 03/11/11 03/09/11 / / 01/26/10 2,155,15,16 988,887 0 JOD 0 0 0 Burton Behrendt Smith 988,887 / / / /
10-1224 Reconstruction 0-003-008 06/28/11 DONE DONE DONE 04/26/11 04/22/11 03/25/11 10/27/10 2 270,300 270,300 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
11-0593 Reconstruction 0-003-009 06/04/12 DONE DONE DONE 01/06/12 12/30/11 04/15/11 10/27/09 2,4,7,8,9,155 121,191 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
11-1088 Reconstruction 0-003-010 05/01/12 DONE DONE DONE 04/04/12 04/04/12 03/14/12 10/27/09 7 647,190 647,190 JOD 0 0 0 Burton Behrendt Smith 0 / / 04/08/13
Stewart Avenue School:
10-1044 Reconstruction 0-004-008 02/23/12 DONE DONE DONE 03/11/11 03/09/11 01/26/11 01/26/10 2,155,15,16 993,057 0 JOD 0 0 0 Burton Behrendt Smith 993,057 / / / /
- Reconstruction 0-004-009 / / / / 01/27/11 / / 2,155,15,16 0 0 JOD 0 0 0 0 / / / /
11-0594 Reconstruction 0-004-009 06/04/12 DONE DONE DONE 01/06/12 12/30/11 04/15/11 10/27/09 2,4,8,9,155,16 719,524 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
11-0862 Reconstruction 0-004-010 05/16/12 DONE DONE DONE 03/02/12 03/01/12 12/14/11 10/27/09 4 730,754 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
12-0225 Reconstruction 0-004-011 05/03/13 DONE DONE DONE 10/01/12 09/18/12 04/11/12 10/27/09 16 83,755 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
Stratford Ave. School:
- Reconstruction 0-005-009 / / / / 08/07/09 / / 4 0 0 JOD 0 0 0 0 / / / /
09-0889 Reconstruction 0-005-010 06/18/10 DONE DONE DONE 02/12/10 02/08/10 11/10/09 05/19/09 4,9,16 32,500 32,500 JOD 0 0 0 Burton Behrendt Smith 0 / / 05/14/13
10-1045 Reconstruction 0-005-011 02/23/12 DONE DONE DONE 03/11/11 03/09/11 01/26/11 01/26/11 2,155,15,16 1,112,441 0 JOD 0 0 0 Burton Behrendt Smith 1,112,441 / / / /
- Reconstruction 0-005-012 / / / / 01/27/11 / / 2,155,15,16 0 0 JOD 0 0 0 0 / / / /
11-0595 Reconstruction 0-005-012 06/04/12 DONE DONE DONE 01/06/12 12/30/11 04/15/11 10/27/09 2,4,8,9,155,16 583,106 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
11-0863 Reconstruction 0-005-013 05/16/12 DONE DONE DONE 03/02/12 03/01/12 12/14/11 10/27/09 4 725,171 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
12-0226 Reconstruction 0-005-014 05/03/13 DONE DONE DONE 10/01/12 09/18/12 04/11/12 10/27/09 155,16 406,080 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
Garden City Jr. High:
- Reconstruction 0-006-009 / / / / 01/26/11 / / 2,155,15,16 0 0 JOD 0 0 0 0 / / / /
09-0890 Reconstruction 0-006-015 06/18/10 DONE DONE DONE 02/12/10 02/08/10 11/10/09 05/19/09 4,8,9,10,155,15,16 445,000 445,000 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
09-1204PR Additions and Alterations 0-006-016 UNREVIEWED 04/02/10 03/29/10 12/08/09 / / 02 - 16 0 24,091,748 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
09-1205SR Additions and Alterations 0-006-016 05/13/10 DONE DONE DONE 04/02/10 03/29/10 / / 10/27/09 02 - 16 0 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
10-0136 Additions and Alterations 0-006-016 02/18/11 DONE DONE DONE 08/20/10 08/10/10 12/08/09 10/27/09 02 - 16 10,768,708 2,235,215 JOD 0 0 0 Burton Behrendt Smith 0 / / 08/30/12
10-1046 Reconstruction 0-006-017 02/23/12 DONE DONE DONE 03/11/11 03/09/11 01/27/11 01/26/11 2,155,15,16 2,773,623 0 JOD 0 0 0 Burton Behrendt Smith 2,773,623 / / / /
11-0864 Reconstruction 0-006-018 05/16/12 DONE DONE DONE 03/02/12 03/01/12 01/10/12 10/27/09 4 484,377 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
12-0227 Reconstruction 0-006-019 05/03/13 DONE DONE DONE 10/01/12 09/18/12 04/11/12 10/27/09 155,16 174,491 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
Garden City Sr. High:
09-0891 Reconstruction 0-007-014 06/18/10 DONE DONE DONE 02/12/10 02/08/10 11/10/09 05/19/09 4,7,155,16 99,500 99,500 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
09-0792 Reconstruction 0-007-015 04/15/10 DONE DONE DONE 01/25/10 01/22/10 12/08/09 10/27/09 7 3,155,625 3,155,625 JOD 0 0 1,354,584 Burton Behrendt Smith 0 / / / /
10-1058 Additions and Alterations 0-007-016 07/29/11 DONE DONE DONE 03/17/11 03/14/11 09/07/10 10/27/09 02 - 16 7,279,289 7,279,289 JOD 0 0 0 Burton Behrendt Smith 0 / / 09/06/12
10-1047 Reconstruction 0-007-017 02/23/12 DONE DONE DONE 03/11/11 03/09/11 01/26/11 01/26/11 2,155,15,16 2,273,274 0 JOD 0 0 0 Burton Behrendt Smith 2,273,274 / / / /
10-0977 Reconstruction 0-007-018 05/19/11 DONE DONE DONE 03/08/11 03/01/11 01/27/11 10/27/09 2,9 390,150 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
10-0963 Reconstruction 0-007-019 05/19/11 DONE DONE DONE 03/08/11 03/02/11 02/15/11 10/27/09 2,4,7,16 700,845 700,845 JOD 0 0 0 Burton Behrendt Smith 0 / / 01/04/13
- Reconstruction 0-007-020 / / / / 02/18/11 / / 9,16 0 0 JOD 0 0 0 0 / / / /
12-0228 Reconstruction 0-007-021 05/03/13 DONE DONE DONE 10/01/12 09/18/12 04/11/12 10/27/09 2,8,9,10,155,15,16 369,456 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
Hemlock School:
09-0892 Reconstruction 0-018-006 06/18/10 DONE DONE DONE 02/12/10 02/08/10 11/10/09 05/19/09 16 65,000 65,000 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
10-0978 Reconstruction 0-018-007 05/19/11 DONE DONE DONE 03/08/11 03/01/11 12/28/10 10/27/09 9,16 127,500 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
10-1048 Reconstruction 0-018-008 02/23/12 DONE DONE DONE 03/11/11 03/09/11 / / 01/26/10 2,8,155,15,16 2,460,903 0 JOD 0 0 0 Burton Behrendt Smith 2,460,903 / / / /
11-0596 Reconstruction 0-018-009 06/04/12 DONE DONE DONE 01/06/12 12/30/11 04/15/11 10/27/09 2,7,9 139,590 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
Administration Building:
10-1049 Reconstruction 1-008-005 02/23/12 DONE DONE DONE 03/11/11 03/09/11 01/26/11 01/26/10 2,155,15,16 733,796 0 JOD 0 0 0 Burton Behrendt Smith 733,796 / / / /
- Reconstruction 1-008-006 / / / / 01/27/11 / / 2,155,15,16 0 0 JOD 0 0 0 0 / / / /
11-0597 Reconstruction 1-008-006 06/04/12 DONE DONE DONE 01/06/12 12/30/11 04/15/11 10/27/09 2,4,7,8,9,15,16 664,955 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
11-0865 Reconstruction 1-008-007 05/16/12 DONE DONE DONE 03/02/12 03/01/12 12/14/11 10/27/09 4 272,899 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
Bus Driver's Office:
10-1050 Reconstruction 1-019-002 02/23/12 DONE DONE DONE 03/11/11 03/09/11 01/26/11 01/26/11 2,155,15,16 304,079 0 JOD 0 0 0 Burton Behrendt Smith 304,079 / / / /
Office Bldg. @ Bus Garage:
10-0046 New Construction 1-034-001 12/07/10 DONE DONE DONE 07/28/10 07/13/10 12/04/09 10/27/09 02 - 16 637,500 0 JOD 0 0 0 Burton Behrendt Smith 0 / / 01/04/13
Storage Container #1 @ High School:
- DB Discovered Building 2-021-001 / / / / 01/08/09 / / 0 0 JOD 0 0 0 0 / / / /
Storage Container #2 @ High School:
- DB Discovered Building 2-022-001 / / / / 01/08/09 / / 0 0 JOD 0 0 0 0 / / / /
Storage Container #3 @ High School:
- DB Discovered Building 2-023-001 / / / / 01/08/09 / / 0 0 JOD 0 0 0 0 / / / /
Storage Container #4 @ High School:
- DB Discovered Building 2-024-001 / / / / 01/08/09 / / 0 0 JOD 0 0 0 0 / / / /
Storage Container #5 @ High School:
- DB Discovered Building 2-025-001 / / / / 01/08/09 / / 0 0 JOD 0 0 0 0 / / / /
Storage Container #6 @ High School:
- DB Discovered Building 2-026-001 / / / / 01/08/09 / / 0 0 JOD 0 0 0 0 / / / /
Storage Container #1 @ CMS:
- DB Discovered Building 2-028-001 / / / / 01/08/09 / / 0 0 JOD 0 0 0 0 / / / /
Storage Container #2 @ Middle School:
- DB Discovered Building 2-029-001 / / / / 01/08/09 / / 0 0 JOD 0 0 0 0 / / / /
Storage Container #3 @ Middle School:
- DB Discovered Building 2-030-001 / / / / 01/08/09 / / 0 0 JOD 0 0 0 0 / / / /
Storage Building 1 @ Middle School:
- DB Discovered Building 2-031-001 / / / / 01/08/09 / / 0 0 JOD 0 0 0 0 / / / /
Storage Building @ Stewart:
- DB Discovered Building 2-032-001 / / / / 01/08/09 / / 0 0 JOD 0 0 0 0 / / / /
Storage Building @ Stratford:
- DB Discovered Building 2-033-001 / / / / 01/08/09 / / 0 0 JOD 0 0 0 0 / / / /
Bus Garage:
08-0752 Reconstruction 5-009-005 01/12/09 DONE DONE DONE 11/12/08 11/10/08 09/16/08 05/20/08 2,7 260,000 260,000 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
09-0022 Reconstruction 5-009-006 07/21/09 DONE DONE DONE 07/03/09 07/02/09 01/08/09 05/20/08 4,8,9,15,16 80,000 80,000 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
- Reconstruction 5-009-007 / / / / 03/24/09 / / 4,8,9,10,15,16 0 0 JOD 0 0 0 0 / / / /
10-0553 Reconstruction 5-009-008 12/07/10 DONE DONE DONE 12/07/10 12/07/10 / / 10/27/09 2,15,16 102,000 102,000 JOD 0 0 0 Burton Behrendt Smith 0 / / 01/04/13
11-0598 Reconstruction 5-009-009 06/04/12 DONE DONE DONE 01/06/12 12/30/11 04/15/11 10/27/09 2,4,7,8,9,155,15,16 76,140 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
11-0866 Reconstruction 5-009-010 05/16/12 DONE DONE DONE 03/02/12 03/01/12 12/14/11 10/27/09 4 321,754 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
Concession Trailer #1 @ High School:
- DB Discovered Building 7-027-001 / / / / 01/08/09 / / 0 0 JOD 0 0 0 0 / / / /
Press Box & Grandstand @ Garden City:
09-1249 New Construction 7-035-001 08/18/10 DONE DONE DONE 04/06/10 04/02/10 12/08/09 10/27/09 02 - 16 1,209,469 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
District Wide:
10-0817 Reconstruction 7-999-001 05/24/11 DONE DONE DONE 02/07/11 01/31/11 12/08/09 10/27/09 13,16 420,750 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Junior Senior High School:
- Reconstruction 0-001-027 / / / / 12/03/12 / / 2,8,9,10,155,15,16 0 13,706,700 DDJ 0 0 0 0 / / / /
- Reconstruction 0-001-028 / / / / 12/09/08 / / 2,15,16 0 13,706,700 DDJ 0 0 0 0 / / / /
09-0286 Reconstruction 0-001-029 11/18/09 DONE DONE DONE 10/06/09 10/05/09 07/13/09 05/18/09 155 40,000 40,000 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
10-0515 Reconstruction 0-001-030 03/21/11 DONE DONE DONE 12/03/10 11/19/10 10/05/10 05/18/10 8,15,16 59,360 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
11-0624 Reconstruction 0-001-031 03/22/12 DONE DONE DONE 01/09/12 01/09/12 11/21/11 05/17/11 155,15,16 82,600 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
11-1317 Reconstruction 0-001-032 05/22/12 DONE DONE DONE 05/22/12 05/16/12 03/06/12 05/15/12 8 57,877 57,877 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
12-1121 Reconstruction 0-001-033 05/01/13 DONE DONE DONE 04/22/13 04/22/13 07/31/12 05/15/12 7,8 59,000 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Rhame Avenue Elementary School:
- Reconstruction 0-002-004 / / / / 12/03/12 / / 2,8,9,10,155,15,16 0 5,558,445 DDJ 0 0 0 0 / / / /
09-1517 Reconstruction 0-002-006 06/22/10 DONE DONE DONE 06/14/10 06/11/10 10/23/07 05/19/09 2,8 100,000 100,000 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
10-0516 Reconstruction 0-002-007 03/21/11 DONE DONE DONE 12/03/10 11/19/10 10/05/10 05/18/10 8 100,000 100,000 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
11-0443 Reconstruction 0-002-008 12/23/11 DONE DONE DONE 11/29/11 11/29/11 06/07/11 05/17/11 8 60,000 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
- Reconstruction 0-002-009 / / / / 10/18/11 / / 8 0 0 DDJ 0 0 0 0 / / / /
Centre Ave School:
09-0287 Reconstruction 0-003-014 11/18/09 DONE DONE DONE 10/06/09 10/05/09 07/13/09 05/18/09 155 26,080 26,080 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
12-1122 Reconstruction 0-003-015 05/01/13 DONE DONE DONE 04/22/13 04/22/13 07/31/12 05/15/12 8,10 41,300 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Lynbrook Senior High:
08-1064 Reconstruction 0-001-018 03/05/09 DONE DONE DONE 01/08/09 01/06/09 05/29/08 05/20/08 7,155,16 1,385,000 1,385,000 DDJ 0 0 400,000 John A Grillo-ARCHITECTS PC 0 / / / /
08-0226 Reconstruction 0-001-019 10/23/08 DONE DONE DONE 08/28/08 08/21/08 06/10/08 05/20/08 16 72,801 72,801 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
10-0450 Reconstruction 0-001-020 12/15/10 DONE DONE DONE 11/12/10 11/09/10 11/05/10 05/18/10 8 1,114,334 1,114,334 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
11-0132 Reconstruction 0-001-021 08/26/11 DONE DONE DONE 08/19/11 08/18/11 07/05/11 05/21/11 8,9,10,155,15,16 90,000 90,000 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 10/12/12
South Lynbrook Middle:
08-1065 Reconstruction 0-002-015 03/05/09 DONE DONE DONE 01/08/09 01/06/09 05/29/08 05/20/08 8 1,183,525 1,183,525 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
12-0685 Reconstruction 0-002-016 DONE DONE UNREVIEWED01/17/13 01/14/13 05/23/12 05/15/12 2,16 0 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
- Reconstruction 0-002-017 / / / / 05/23/13 / / 2,10,16 0 0 DDJ 0 0 0 0 / / / /
ATLANTIC AVE K CENTER:
09-0267 Reconstruction 0-003-017 11/13/09 DONE DONE DONE 09/28/09 09/25/09 07/14/09 05/19/09 155,16 165,048 165,048 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Marion Elementary School:
12-0686 Reconstruction 0-004-017 DONE DONE UNREVIEWED01/17/13 01/14/13 05/23/12 05/15/12 2,16 0 6,307,000 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
West End Elementary:
12-0634 Reconstruction 0-006-020 05/22/13 DONE DONE DONE 01/07/13 01/03/13 07/11/12 05/15/12 8,9,10,155,15,16 0 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
North Lynbrook Middle:
09-0268 Reconstruction 0-007-014 11/13/09 DONE DONE DONE 09/28/09 09/25/09 07/14/09 05/19/09 7,155,16 833,714 833,714 DDJ 0 0 140,000 John A Grillo-ARCHITECTS PC 0 / / / /
12-0079PR Additions and Alterations 0-007-015 UNREVIEWED 08/02/12 07/31/12 05/23/12 / / 02 - 16 0 6,509,082 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
12-0687 Additions and Alterations 0-007-015 STARTED DONE UNREVIEWED01/17/13 01/14/13 05/23/12 05/15/12 02 - 16 0 6,509,082 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
- Reconstruction 0-007-016 / / / / 05/23/13 / / 10,16 0 0 DDJ 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Riverside School:
11-1033 Reconstruction 0-001-017 08/29/12 DONE DONE DONE 04/02/12 03/20/12 01/25/12 06/30/10 2,155,15,16 210,217 0 JOD 0 0 0 ECG Eninering, LLC 210,217 / / / /
12-0962 Reconstruction 0-001-018 03/20/13 DONE DONE DONE 03/12/13 03/11/13 02/08/13 05/15/12 2,8,9 180,000 0 JOB 0 0 0 Burton Behrendt Smith 0 / / / /
- Reconstruction 0-001-019 / / / / 04/16/13 / / 2,4,7,8,10,155,15,16 0 0 JOB 0 0 0 0 / / / /
Southside Middle:
09-0349 Reconstruction 0-002-020 01/14/10 DONE DONE DONE 10/27/09 10/23/09 06/01/09 05/20/08 2,9 79,578 79,578 JOD 0 0 54,670 Burton Behrendt Smith 0 / / / /
10-1191 Reconstruction 0-002-021 12/23/11 DONE DONE DONE 04/19/11 04/12/11 12/29/10 05/20/08 4,8 264,234 264,234 JOD 0 0 181,529 Burton Behrendt Smith 0 / / 10/23/12
11-1034 Reconstruction 0-002-022 08/29/12 DONE DONE DONE 04/02/12 03/20/12 01/25/12 06/30/10 2,155,15,16 482,519 0 JOD 0 0 0 ECG Eninering, LLC 482,519 / / / /
- Reconstruction 0-002-023 / / / / 04/16/13 / / 2,4,7,8,9,155,15,16 0 0 JOB 0 0 0 0 / / / /
Floyd B Watson Elementary:
11-1035 Reconstruction 0-003-014 08/29/12 DONE DONE DONE 04/02/12 03/20/12 01/25/12 06/30/10 2,155,15,16 259,450 0 JOD 0 0 0 ECG Eninering, LLC 259,450 / / / /
- Reconstruction 0-003-015 / / / / 04/16/13 / / 2,7 0 0 JOB 0 0 0 0 / / / /
- Reconstruction 0-003-016 / / / / 04/16/13 / / 2,4,7,8,9,10,155,15, 0 0 JOB 0 0 0 0 / / / /
Wilson Elementary:
09-0350 Reconstruction 0-004-020 01/14/10 DONE DONE DONE 10/27/09 10/23/09 06/01/09 05/20/08 4 97,340 97,340 JOD 0 0 66,873 Burton Behrendt Smith 0 / / / /
10-1192 Reconstruction 0-004-021 12/23/11 DONE DONE DONE 04/19/11 04/12/11 12/29/10 05/20/08 8,9,155,15,16 44,433 44,433 JOD 0 0 30,525 Burton Behrendt Smith 0 / / 10/23/12
11-1036 Reconstruction 0-004-022 08/29/12 DONE DONE DONE 04/02/12 03/20/12 01/25/12 06/30/10 2,155,15,16 215,310 0 JOD 0 0 0 ECG Eninering, LLC 215,310 / / / /
- Reconstruction 0-004-023 / / / / 04/16/13 / / 2,4,7,8,10,155,16 0 0 JOB 0 0 0 0 / / / /
South Side Senior High:
11-1037 Reconstruction 0-005-024 08/29/12 DONE DONE DONE 04/02/12 03/20/12 01/25/12 06/30/10 2,155,15,16 885,948 0 JOD 0 0 0 ECG Eninering, LLC 885,948 / / / /
12-0950 Reconstruction 0-005-025 05/16/13 DONE DONE DONE 03/11/13 03/05/13 02/08/13 01/16/07 15,16 350,000 0 JOB 0 0 0 Burton Behrendt Smith 0 / / / /
- Reconstruction 0-005-026 / / / / 04/16/13 / / 2 0 0 JOB 0 0 0 0 / / / /
- Reconstruction 0-005-027 / / / / 04/16/13 / / 2,4,7,8,9,10,155,15, 0 0 JOB 0 0 0 0 / / / /
Hewitt School:
08-1575 Reconstruction 0-007-017 05/13/09 DONE DONE DONE 04/30/09 04/24/09 01/26/09 12/14/04 8,9 28,310 28,310 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
10-1194 Reconstruction 0-007-018 12/23/11 DONE DONE DONE 04/19/11 04/12/11 12/29/10 05/20/08 9,10 276,028 276,028 JOD 0 0 189,631 Burton Behrendt Smith 0 / / 10/23/12
11-1038 Reconstruction 0-007-019 08/29/12 DONE DONE DONE 04/02/12 03/20/12 01/25/12 06/30/10 2,155,15,16 633,220 0 JOD 0 0 0 ECG Eninering, LLC 633,220 / / / /
- Reconstruction 0-007-020 / / / / 04/16/13 / / 2,4,7,8,10,155,16 0 0 JOB 0 0 0 0 / / / /
William Covert:
10-1193 Reconstruction 0-008-015 12/23/11 DONE DONE DONE 04/19/11 04/12/11 12/29/10 05/20/08 4,8,9,155,15,16 99,908 99,908 JOD 0 0 68,637 Burton Behrendt Smith 0 / / 10/23/12
11-1039 Reconstruction 0-008-016 08/29/12 DONE DONE DONE 04/02/12 03/20/12 01/25/12 06/30/10 2,155,15,16 194,915 0 JOD 0 0 0 ECG Eninering, LLC 194,915 / / / /
- Reconstruction 0-008-017 / / / / 04/16/13 / / 2,7 0 0 JOB 0 0 0 0 / / / /
- Reconstruction 0-008-018 / / / / 04/16/13 / / 2,4,8,10,155,16 0 0 JOB 0 0 0 0 / / / /
Administration Bldg:
11-1040 Reconstruction 1-006-007 08/29/12 DONE DONE DONE 04/02/12 03/20/12 01/25/12 06/30/10 2,16 153,655 0 JOD 0 0 0 ECG Eninering, LLC 153,655 / / / /
- Reconstruction 1-006-008 / / / / 02/08/13 / / 15,16 0 0 JOB 0 0 0 0 / / / /
- Reconstruction 1-006-009 / / / / 04/16/13 / / 2,4,7,8,155,16 0 0 JOB 0 0 0 0 / / / /
Rockville Ctr Public Library:
10-0715 Reconstruction 6-022-007 05/10/11 DONE DONE DONE 01/03/11 12/22/10 01/03/11 10/12/10 9,16 501,000 0 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
12-1106 Reconstruction 6-022-008 05/09/13 DONE DONE DONE 04/15/13 04/15/13 11/21/12 10/15/12 8,16 90,950 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
District Wide:
09-0348 Reconstruction 7-999-004 01/15/10 DONE DONE DONE 10/23/09 10/23/09 08/19/09 05/20/08 16 826,900 0 JOD 0 0 568,080 Burton Behrendt Smith 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
John Lewis Childs School:
07-1988 Reconstruction 0-001-025 05/22/08 DONE DONE DONE 04/17/08 04/09/08 01/31/08 05/15/07 2,9 20,996 20,996 HCM 0 0 11,653 0 / / 10/28/10
08-0340 Reconstruction 0-001-026 01/26/09 DONE DONE DONE 09/16/08 09/15/08 01/31/08 05/15/07 4 94,000 94,000 HCM 0 0 0 James M. Campbell Architects 0 / / 10/22/12
08-0341 Reconstruction 0-001-027 01/26/09 DONE DONE DONE 09/16/08 09/15/08 01/31/08 05/15/07 9,16 60,166 60,166 HCM 0 0 33,392 James M. Campbell Architects 0 / / 10/22/12
08-1437 Reconstruction 0-001-028 09/03/09 DONE DONE DONE 03/27/09 03/26/09 09/15/08 05/20/08 2,9,16 64,600 64,600 HCM 0 0 35,853 James M. Campbell Architects 0 / / 10/22/12
08-0887 Reconstruction 0-001-029 12/10/08 DONE DONE DONE 12/09/08 12/08/08 12/09/08 12/04/08 2,9,16 50,000 50,000 HCM 0 0 0 James M. Campbell Architects 0 / / 10/22/12
09-1347 Reconstruction 0-001-030 06/25/10 DONE DONE DONE 04/20/10 04/19/10 08/07/09 05/19/09 2,4,7,8,9,155,15,16 287,000 287,000 HCM 0 0 0 James M. Campbell Architects 0 / / 10/22/12
09-1352 Reconstruction 0-001-031 08/19/10 DONE DONE DONE 04/22/10 04/19/10 04/02/10 05/19/09 15,16 47,000 47,000 HCM 0 0 26,085 James M. Campbell Architects 0 / / 10/22/12
11-0267 Reconstruction 0-001-032 01/27/12 DONE DONE DONE 10/18/11 10/12/11 06/10/10 05/17/11 2,8,9,16 100,000 100,000 HCM 0 0 0 James M. Campbell Architects 0 / / / /
10-0440 Reconstruction 0-001-033 05/12/11 DONE DONE DONE 11/05/10 11/01/10 07/22/10 05/18/10 4,8,9,16 87,075 87,075 HCM 0 0 0 James M. Campbell Architects 0 / / / /
- Reconstruction 0-001-034 / / / / 11/03/10 / / 2,155 0 7,152,138 HCM 0 0 0 0 / / / /
11-0848 Reconstruction 0-001-035 07/18/12 DONE DONE DONE 02/23/12 02/22/12 01/31/12 01/09/12 2,155,16 590,766 590,766 HCM 0 0 0 ECG Eninering, LLC 590,766 / / / /
12-0613 Reconstruction 0-001-036 04/26/13 DONE DONE DONE 12/26/12 12/23/12 07/13/12 06/19/12 7,16 1,490,000 1,490,000 HCM 0 0 0 James M. Campbell Architects 0 / / / /
12-1184 Reconstruction 0-001-037 STARTED STARTED STARTED 05/10/13 05/10/13 04/16/13 / / 155 0 0 JMB 0 0 0 James M. Campbell Architects 0 / / / /
Floral Pk-Bellerose School:
07-1989 Reconstruction 0-002-025 05/22/08 DONE DONE DONE 04/17/08 04/09/08 01/31/08 05/15/07 2,9 123,539 123,539 HCM 0 0 58,830 James M. Campbell Architects 0 / / 10/22/12
08-0342 Reconstruction 0-002-026 01/26/09 DONE DONE DONE 09/16/08 09/15/08 01/31/08 05/15/07 4,7,9,16 88,000 88,000 HCM 0 0 48,840 James M. Campbell Architects 0 / / 10/22/12
08-1438 Reconstruction 0-002-027 09/03/09 DONE DONE DONE 03/27/09 03/26/09 09/15/08 05/20/08 2,9,16 115,400 115,400 HCM 0 0 64,047 James M. Campbell Architects 0 / / 10/22/12
09-1348 Reconstruction 0-002-028 06/25/10 DONE DONE DONE 04/20/10 04/19/10 08/07/09 05/19/09 2,4,7,8,9,155,15 377,000 377,000 HCM 0 0 0 James M. Campbell Architects 0 / / 10/22/12
09-1357 Reconstruction 0-002-029 07/16/10 DONE DONE DONE 04/22/10 04/21/10 01/20/10 01/21/10 7 89,990 89,990 HCM 0 0 0 James M. Campbell Architects 0 / / 10/22/12
- Reconstruction 0-002-030 / / / / 04/06/10 / / 15,16 0 0 HCM 0 0 0 0 / / / /
09-1353 Reconstruction 0-002-030 08/19/10 DONE DONE DONE 04/22/10 04/19/10 / / 05/19/09 59,000 59,000 HCM 0 0 32,745 James M. Campbell Architects 0 / / 10/22/12
11-0268 Reconstruction 0-002-031 01/27/12 DONE DONE DONE 10/18/11 10/12/11 06/10/10 05/17/11 8,9 402,532 402,532 HCM 0 0 0 James M. Campbell Architects 0 / / / /
- Reconstruction 0-002-032 / / / / 11/03/10 / / 2,155 0 0 HCM 0 0 0 0 / / / /
11-0849 Reconstruction 0-002-033 07/18/12 DONE DONE DONE 02/23/12 02/22/12 01/31/12 01/09/12 2,155,15,16 1,506,343 0 HCM 0 0 0 ECG Eninering, LLC 1,506,343 / / / /
12-0614 Reconstruction 0-002-034 04/26/13 DONE DONE DONE 12/26/12 12/23/12 07/13/12 06/16/12 2,4,7,16 1,910,000 0 HCM 0 0 0 James M. Campbell Architects 0 / / / /
12-0238 Reconstruction 0-002-035 11/06/12 DONE DONE DONE 10/02/12 10/02/12 07/13/12 06/19/12 2,4 300,000 300,000 HCM 0 0 0 James M. Campbell Architects 0 / / / /
Administration:
11-0850 Reconstruction 1-003-002 07/18/12 DONE DONE DONE 02/23/12 02/22/12 01/31/12 01/09/12 2,16 32,891 0 HCM 0 0 0 ECG Eninering, LLC 32,891 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Wantagh Senior High:
- Reconstruction 0-001-029 / / / / 07/20/12 / / 4 0 0 DDJ 0 0 0 0 / / / /
Mandalay School:
12-0508 Reconstruction 0-004-011 01/03/13 DONE DONE DONE 12/05/12 12/05/12 07/20/12 05/15/12 155,15,16 173,800 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Forest Lake School:
12-0509 Reconstruction 0-005-013 01/03/13 DONE DONE DONE 12/05/12 12/05/12 07/20/12 05/15/12 155,15,16 162,800 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Middle School:
12-0510 Reconstruction 0-006-020 01/03/13 DONE DONE DONE 12/05/12 12/05/12 07/20/12 05/15/12 9,10 80,400 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Wantagh Elementary:
07-1876 Reconstruction 0-008-018 09/16/08 DONE DONE DONE 03/29/08 03/21/08 01/30/08 05/15/07 2,9,155,15,16 80,000 80,000 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
12-0511 Reconstruction 0-008-019 01/03/13 DONE DONE DONE 12/05/12 12/05/12 07/20/12 05/15/12 2,4,7,9,10,155,15,16 130,000 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
We Friends School:
- DB Discovered Building 0-019-001 / / / / 03/08/13 / / 0 0 DDJ 0 0 0 0 / / / /
Wantagh Public Library:
09-1589 Reconstruction 6-010-005 07/14/10 DONE DONE DONE 07/06/10 06/30/10 06/17/10 09/21/09 7,8 454,000 0 DDJ 0 0 0 BEATTY HARVEY COCO 0 / / / /
10-1116 Reconstruction 6-010-006 06/22/11 DONE DONE DONE 03/29/11 03/28/11 06/17/10 02/28/11 4,8,9,155,15,16 627,500 0 DDJ 0 0 0 BEATTY HARVEY COCO 0 / / / /
11-0153 Reconstruction 6-010-007 11/29/11 DONE DONE DONE 09/02/11 08/30/11 03/23/11 02/28/11 73,000 0 DDJ 0 0 0 BEATTY HARVEY COCO 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
W.L Buck:
08-0078 Reconstruction 0-001-013 01/20/09 DONE DONE DONE 07/22/08 07/16/08 07/14/08 05/29/08 2,4,10,155,15,16 1,240,071 1,240,071 JOD 0 0 0 H2M Group 1,228,611 / / / /
08-1772 Reconstruction 0-001-014 07/10/09 DONE DONE DONE 06/30/09 06/26/09 04/14/09 03/26/09 2,155 252,250 252,250 JOD 0 0 0 H2M Group 0 / / / /
- Reconstruction 0-001-015 / / / / 04/14/09 / / 4,8,16 0 0 JOD 0 0 0 0 / / / /
11-1086 Reconstruction 0-001-016 05/16/12 DONE DONE DONE 04/05/12 04/02/12 03/14/12 02/09/11 4 107,500 107,500 JOD 0 0 0 H2M Group 0 / / 02/04/13
12-0531 Reconstruction 0-001-017 01/08/13 DONE DONE DONE 12/11/12 12/11/12 09/13/12 10/17/12 16 266,250 0 DDJ 0 0 0 H2M Group 0 / / / /
Brooklyn Avenue School:
08-0079 Reconstruction 0-002-013 01/20/09 DONE DONE DONE 07/22/08 07/16/08 07/14/08 05/29/08 155,15,16 230,334 230,334 JOD 0 0 0 H2M Group 213,294 / / / /
- PR Additions and Alterations 0-002-014 / / / / 04/14/09 / / 02 - 16 0 0 JOD 0 0 0 0 / / / /
09-0464 Reconstruction 0-002-015 12/28/09 DONE DONE DONE 11/25/09 11/19/09 07/31/09 09/23/09 2 104,050 104,050 JOD 0 0 0 H2M Group 0 / / / /
10-0586 Reconstruction 0-002-016 03/30/11 DONE DONE DONE 12/21/10 12/09/10 10/06/10 10/27/10 155 569,625 569,625 JOD 0 0 0 H2M Group 0 / / 01/07/13
11-1084 Reconstruction 0-002-017 05/16/12 DONE DONE DONE 04/05/12 04/02/12 03/14/12 02/09/11 4 107,500 107,500 JOD 0 0 0 H2M Group 0 / / 02/04/13
Robert W. Carbonaro:
08-0543 Reconstruction 0-004-015 10/21/08 DONE DONE DONE 10/15/08 10/14/08 07/14/08 05/29/08 2,4,10,155,15,16 732,375 732,375 JOD 0 0 0 H2M Group 0 / / / /
08-0080 Reconstruction 0-004-016 01/20/09 DONE DONE DONE 07/22/08 07/16/08 07/14/08 05/29/08 155,15,16 503,925 503,925 JOD 0 0 0 H2M Group 490,265 / / / /
- Reconstruction 0-004-017 / / / / 04/14/09 / / 4,8,16 0 0 JOD 0 0 0 0 / / / /
09-0086 Reconstruction 0-004-018 10/01/09 DONE DONE DONE 07/24/09 07/21/09 04/14/09 03/24/09 16 322,500 322,500 JOD 0 0 0 H2M Group 0 / / / /
11-1085 Reconstruction 0-004-019 05/16/12 DONE DONE DONE 04/05/12 04/02/12 03/14/12 02/09/11 4 107,500 107,500 JOD 0 0 0 H2M Group 0 / / 02/04/13
District Facilities & Operations:
08-0605XX Additions and Alterations 3-005-002 CANCELLED 10/27/08 10/27/08 06/11/08 09/06/07 02 - 16 0 0 JOD 0 0 0 H2M Group 0 / / / /
11-1004 Additions and Alterations 3-005-003 10/19/12 DONE DONE DONE 03/21/12 03/21/12 03/14/12 08/28/08 02 - 16 265,825 0 JOD 0 0 0 H2M Group 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Norman J. Levy Lakeside School (ES):
07-2337 Reconstruction 0-001-025 10/23/08 DONE DONE DONE 07/08/08 06/23/08 02/27/08 05/15/07 10 110,000 110,000 DDJ 0 0 110,000 Burton Behrendt Smith 0 / / / /
12-0789 Reconstruction 0-001-026 02/22/13 DONE DONE DONE 02/07/13 01/29/13 05/29/12 05/13/12 7,8 53,000 0 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
- Reconstruction 0-001-027 / / / / 04/04/13 / / 4,8,15,16 0 0 DDJ 0 0 0 0 / / / /
- Reconstruction 0-001-028 / / / / 05/06/13 / / 8,16 0 0 DDJ 0 0 0 0 / / / /
Chatterton Elementary:
- Reconstruction 0-002-028 / / / / 04/04/13 / / 4,7,8,155,15,16 0 0 DDJ 0 0 0 0 / / / /
- Reconstruction 0-002-029 / / / / 05/06/13 / / 7,8,9,16 0 0 DDJ 0 0 0 0 / / / /
Birch Elementary:
09-0001 Reconstruction 0-003-024 11/02/09 DONE DONE DONE 07/01/09 07/01/09 02/06/09 07/22/09 10 250,000 0 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
- Reconstruction 0-003-025 / / / / 04/04/13 / / 8,16 0 0 DDJ 0 0 0 0 / / / /
- Reconstruction 0-003-026 / / / / 05/06/13 / / 7,8,9,16 0 0 DDJ 0 0 0 0 / / / /
Merrick Public Library:
09-0063 Reconstruction 6-010-002 07/28/09 DONE DONE DONE 07/22/09 07/20/09 06/29/09 04/22/09 16 75,000 0 DDJ 0 0 0 H2M Group 0 / / / /
12-0087 Reconstruction 6-010-003 08/09/12 DONE DONE DONE 08/08/12 07/16/12 06/20/12 03/20/12 9,16 49,750 0 DDJ 0 0 0 H2M Group 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Stokes Elementary:
07-1765 Reconstruction 0-001-019 12/16/08 DONE DONE DONE 03/06/08 03/05/08 01/17/08 11/15/07 2,16 553,857 553,857 JOD 0 0 200,000 H2M Group 0 / / / /
08-0087 Reconstruction 0-001-020 12/17/08 DONE DONE DONE 07/22/08 07/18/08 01/17/08 11/15/07 2,8,9 273,000 273,000 JOD 0 0 0 H2M Group 0 / / / /
10-0554 Reconstruction 0-001-021 06/02/11 DONE DONE DONE 12/08/10 11/24/10 08/20/10 08/04/10 2,7,155,15,16 686,635 686,635 JOD 0 0 0 ECG Eninering, LLC 686,635 / / 03/25/13
11-0737 Reconstruction 0-001-022 06/06/12 DONE DONE DONE 01/31/12 01/31/12 11/08/11 05/17/11 2,16 150,000 150,000 JOD 0 0 0 Burton Behrendt Smith 0 / / 05/14/13
Sparke Elementary:
07-1479 Reconstruction 0-002-013 06/12/08 DONE DONE DONE 01/30/08 01/28/08 10/11/07 11/15/07 2,4,9,155,16 709,324 709,324 JOD 0 0 295,079 H2M Group 0 / / / /
07-1767 Reconstruction 0-002-014 12/05/08 DONE DONE DONE 03/07/08 03/06/08 01/17/08 11/15/07 2,16 518,910 518,910 JOD 0 0 175,000 H2M Group 0 / / / /
08-0088 Reconstruction 0-002-015 12/17/08 DONE DONE DONE 07/22/08 07/18/08 01/17/08 11/15/07 2,8,9 159,000 159,000 JOD 0 0 0 H2M Group 0 / / / /
10-0555 Reconstruction 0-002-016 06/02/11 DONE DONE DONE 12/08/10 11/24/10 08/20/10 08/04/10 2,155,15,16 588,571 588,571 JOD 0 0 0 ECG Eninering, LLC 588,571 / / 02/17/12
11-0738 Reconstruction 0-002-017 06/06/12 DONE DONE DONE 01/31/12 01/31/12 11/17/11 05/17/11 2,16 135,000 135,000 JOD 0 0 0 Burton Behrendt Smith 0 / / 05/14/13
Island Trees High School:
08-0139 Reconstruction 0-003-029 01/20/09 DONE DONE DONE 08/11/08 08/04/08 10/11/07 11/15/07 2,4,9,155,16 2,388,878 2,388,878 JOD 0 0 0 H2M Group 0 / / / /
09-1015 Reconstruction 0-003-031 04/05/10 DONE DONE DONE 03/04/10 03/02/10 03/27/09 01/27/10 13 291,225 291,225 JOD 0 0 0 H2M Group 0 / / 12/26/12
10-0556 Reconstruction 0-003-032 06/02/11 DONE DONE DONE 12/08/10 11/24/10 08/20/10 08/04/10 2,155,15,16 1,787,399 1,787,399 JOD 0 0 0 ECG Eninering, LLC 1,787,399 / / 03/25/13
10-0960 Reconstruction 0-003-033 03/24/11 DONE DONE DONE 03/08/11 03/02/11 02/10/11 01/26/11 2 65,000 0 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
10-1249 Reconstruction 0-003-034 06/03/11 DONE DONE DONE 05/03/11 04/29/11 04/14/11 04/13/11 2,155,16 97,538 97,538 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
11-0739 Reconstruction 0-003-035 06/06/12 DONE DONE DONE 01/31/12 01/31/12 11/08/11 05/17/11 2,16 210,000 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
- Reconstruction 0-003-036 / / / / 11/08/11 / / 16 0 0 JOD 0 0 0 0 / / / /
Island Trees Memorial Middle School:
07-1768 Reconstruction 0-004-030 12/05/08 DONE DONE DONE 03/07/08 03/06/08 10/11/07 11/15/07 2,4,9,155,16 659,280 659,280 JOD 0 0 0 H2M Group 0 / / / /
08-1272 Reconstruction 0-004-031 06/16/09 DONE DONE DONE 02/23/09 02/19/09 01/17/08 11/15/07 2,8,9 120,000 0 JOD 0 0 0 H2M Group 0 / / / /
07-2219 Reconstruction 0-004-032 06/20/08 DONE DONE DONE 06/05/08 05/29/08 04/03/08 05/20/08 16 55,000 55,000 JOD 0 0 0 H2M Group 0 / / / /
10-0557 Reconstruction 0-004-033 06/02/11 DONE DONE DONE 12/08/10 11/24/10 08/20/10 08/04/10 2,155,16 1,677,998 1,677,998 JOD 0 0 0 ECG Eninering, LLC 1,677,998 / / 03/25/13
Stephen E. Karopczyc School:
10-0558 Reconstruction 0-008-004 06/02/11 DONE DONE DONE 12/08/10 11/24/10 08/20/10 08/04/10 2,7,155,16 306,094 306,094 JOD 0 0 0 ECG Eninering, LLC 306,094 / / 03/25/13
Storage Building:
08-1031 New Construction 2-015-001 07/13/09 DONE DONE DONE 01/05/09 01/02/09 04/03/08 11/15/07 02 - 16 960,000 0 JOD 0 0 0 H2M Group 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
George Washington Elementary School:
09-0826 Reconstruction 0-001-016 10/25/10 DONE DONE DONE 01/28/10 01/26/10 07/14/09 07/07/09 2,155,16 848,847 848,847 DDJ 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 848,847 / / / /
- Reconstruction 0-001-017 / / / / 11/23/09 / / 2,16 0 0 DDJ 0 0 0 0 / / / /
Chestnut Street School:
09-0827 Reconstruction 0-002-005 10/25/10 DONE DONE DONE 01/28/10 01/26/10 07/14/09 07/07/09 2,155,16 282,292 282,292 DDJ 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 282,292 / / / /
- Reconstruction 0-002-006 / / / / 11/23/09 / / 2,16 0 0 DDJ 0 0 0 0 / / / /
Cornwell Avenue Elementary:
09-0828 Reconstruction 0-004-008 10/25/10 DONE DONE DONE 01/28/10 01/26/10 07/14/09 07/07/09 2,155,16 950,934 950,934 DDJ 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 950,934 / / / /
- Reconstruction 0-004-009 / / / / 11/23/09 / / 2,16 0 0 DDJ 0 0 0 0 / / / /
Junior/Senior High:
09-0829 Reconstruction 0-005-021 10/25/10 DONE DONE DONE 01/28/10 01/26/10 07/14/09 07/07/09 2,155,15,16 820,158 820,158 DDJ 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 820,158 / / / /
11-1212 Reconstruction 0-005-022 05/24/12 DONE DONE DONE 04/26/12 04/24/12 11/23/09 05/17/11 2,4,16 956,880 0 DDJ 0 0 706,880 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
09-1515 Reconstruction 0-005-023 06/10/10 DONE DONE DONE 06/09/10 06/03/10 05/07/10 05/11/10 4 150,000 150,000 DDJ 0 0 107,250 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
- Reconstruction 0-005-024 / / / / 04/23/13 / / 2,4,7 0 0 DDJ 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Fayette Elementary:
07-1945 Reconstruction 0-001-017 08/13/09 DONE DONE DONE 04/14/08 04/03/08 01/18/08 03/04/08 10,16 214,760 214,760 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
08-1727 Reconstruction 0-001-018 02/01/11 DONE DONE DONE 06/22/09 06/12/09 02/02/09 05/20/08 211,220 211,220 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
09-1393 Reconstruction 0-001-019 07/15/10 DONE DONE DONE 05/07/10 05/03/10 02/12/10 03/30/09 2,8 138,591 138,591 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
11-1002 Reconstruction 0-001-021 05/07/12 DONE DONE DONE 03/21/12 03/21/12 12/19/11 12/12/11 2,8,9,10,155,15,16 282,444 282,444 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 10/12/11
12-0257 Reconstruction 0-001-022 ADDENDUM REQ'D 10/04/12 10/04/12 08/14/12 04/27/11 155,15,16 0 0 JMB 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Old Mill Road Elementary:
07-1946 Reconstruction 0-002-016 08/13/09 DONE DONE DONE 04/14/08 04/03/08 01/18/08 03/04/08 10,16 214,760 214,760 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
08-1728 Additions and Alterations 0-002-017 02/01/11 DONE DONE DONE 06/22/09 06/12/09 02/02/09 05/20/08 02 - 16 272,580 272,580 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
09-1394 Reconstruction 0-002-018 07/15/10 DONE DONE DONE 05/07/10 05/03/10 02/12/10 03/30/09 2,8 138,591 138,591 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
10-1277 Reconstruction 0-002-019 09/08/11 DONE DONE DONE 05/10/11 05/04/11 03/29/10 04/07/11 13,16 250,000 250,000 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 01/02/13
11-1003 Reconstruction 0-002-020 05/07/12 DONE DONE DONE 03/21/12 03/21/12 12/19/11 12/12/11 2,8,9,10,155,15,16 345,952 345,952 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 10/12/12
Camp Avenue Elementary:
07-1947 Reconstruction 0-004-016 08/13/09 DONE DONE DONE 04/14/08 04/03/08 01/18/08 03/04/08 10,16 214,760 214,760 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
08-1729 Additions and Alterations 0-004-017 02/01/11 DONE DONE DONE 06/22/09 06/12/09 02/02/09 05/20/09 02 - 16 69,620 69,620 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
09-1395 Reconstruction 0-004-018 07/15/10 DONE DONE DONE 05/07/10 05/03/10 02/12/10 03/30/09 2,8 138,591 138,591 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 04/01/13
11-1371 Reconstruction 0-004-019 06/12/12 DONE DONE DONE 05/31/12 05/25/12 03/23/11 05/20/08 4 236,000 236,000 HCM 0 0 0 TEtra Tech Engineers, Archite 0 / / 05/06/13
11-0782 Reconstruction 0-004-020 02/17/12 DONE DONE DONE 02/13/12 02/09/12 12/19/11 12/12/11 2 571,604 571,604 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 10/12/12
- Reconstruction 0-004-021 / / / / 03/16/12 / / 4 0 0 HCM 0 0 0 0 / / / /
Old Mill Grounds/Garage:
00-1646DB Discovered Building 2-005-001 04/28/10 DONE DONE DONE 04/18/01 / / 09/16/92 / / 0 0 MAC 0 0 0 0 / / / /
10-1248 Reconstruction 2-005-002 05/31/12 DONE DONE DONE 05/03/11 04/29/11 03/23/11 05/15/12 2,7 36,580 0 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Old Mill Storage Container #1:
00-1647DB Discovered Building 2-006-001 04/28/10 DONE DONE DONE 04/18/01 / / 09/16/92 / / 0 0 MAC 0 0 0 0 / / / /
Fayette Portable Container #1:
00-1648DB Discovered Building 2-007-001 04/28/10 DONE DONE DONE 04/18/01 / / 09/16/92 / / 0 0 MAC 0 0 0 0 / / / /
Fayette Portable Container #2:
00-1649DB Discovered Building 2-008-001 04/28/10 DONE DONE DONE 04/18/01 / / / / / / 02 - 16 0 0 MAC 0 0 0 0 / / / /
Fayette Grounds Storage Shed:
00-1650DB Discovered Building 2-009-001 04/28/10 DONE DONE DONE 04/18/01 / / 02/04/99 / / 0 0 MAC 0 0 0 0 / / / /
Fayette Storage Container #3:
01-0048DB Discovered Building 2-010-001 04/28/10 DONE DONE DONE 07/11/01 / / 04/10/00 / / 0 0 MAC 0 0 0 0 / / / /
Fayette Storage Container #4:
01-0049DB Discovered Building 2-011-001 04/28/10 DONE DONE DONE 07/11/01 / / 04/10/00 / / 0 0 MAC 0 0 0 0 / / / /
Fayette Storage Container #5:
01-0050DB Discovered Building 2-012-001 04/28/10 DONE DONE DONE 07/11/01 / / 04/10/00 / / 0 0 MAC 0 0 0 0 / / / /
Camp Ave Storage Trailer #1:
01-0051DB Discovered Building 2-013-001 04/28/10 DONE DONE DONE 07/11/01 / / 04/10/00 / / 0 0 MAC 0 0 0 0 / / / /
Storage Container#6 at Fayette:
09-1360DB Discovered Building 2-016-001 04/28/10 DONE DONE DONE 12/07/09 12/07/09 / / / / 0 0 HCM 0 0 0 0 / / / /
Storage Container#2 at Old Mill:
09-1361DB Discovered Building 2-017-001 04/28/10 DONE DONE DONE 12/07/09 12/07/09 / / / / 0 0 HCM 0 0 0 0 / / / /
North Merrick Public Library:
11-0292 Reconstruction 6-003-006 10/27/11 DONE DONE DONE 10/27/11 10/26/11 09/28/11 07/19/11 7 379,000 0 HCM 0 0 0 Beatty, Harvey & Associates 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Forest Road ES:
09-1330 Reconstruction 0-002-011 05/24/10 DONE DONE DONE 04/16/10 04/14/10 02/02/10 05/19/09 4,9,10 76,004 76,004 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
10-0798 Reconstruction 0-002-012 03/24/11 DONE DONE DONE 02/07/11 02/03/11 02/02/10 05/18/10 8 238,202 238,202 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 11/26/12
11-0844 Reconstruction 0-002-013 05/10/12 DONE DONE DONE 02/23/12 02/22/12 01/20/11 05/17/11 8,10,13,155,15,16 356,360 356,360 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 03/04/13
Shaw Avenue Elementary:
08-0500 Reconstruction 0-003-009 11/26/08 DONE DONE DONE 10/09/08 10/07/08 02/12/07 05/20/08 2,7 1,335,519 1,335,519 JOD 0 0 611 John A Grillo-ARCHITECTS PC 0 / / / /
09-1331 Reconstruction 0-003-010 05/24/10 DONE DONE DONE 04/16/10 04/14/10 02/02/10 05/19/09 4,8,9,10 148,892 148,892 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
10-0500 Reconstruction 0-003-011 12/10/10 DONE DONE DONE 11/19/10 11/16/10 02/02/10 05/18/10 8,9 556,707 556,707 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 11/26/12
11-0845 Reconstruction 0-003-012 05/10/12 DONE DONE DONE 02/23/12 02/22/12 01/20/11 05/17/11 8,10,13,155,15,16 714,372 714,372 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 03/04/13
12-0344 Reconstruction 0-003-013 02/26/13 DONE DONE DONE 10/29/12 10/23/12 03/23/12 05/15/12 2,4,7,9,155,15,16 2,006,000 0 MFS 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Clearstream Avenue School:
09-1332 Reconstruction 0-005-011 05/24/10 DONE DONE DONE 04/16/10 04/14/10 11/09/09 05/19/09 4,7,8,10 508,203 508,203 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
10-0799 Reconstruction 0-005-012 03/24/11 DONE DONE DONE 02/07/11 02/03/11 02/02/10 05/18/10 8 216,157 216,157 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 11/26/12
11-0846 Reconstruction 0-005-013 05/10/12 DONE DONE DONE 02/23/12 02/22/12 01/20/11 05/17/11 8,10,13,155,15,16 359,900 359,900 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 03/04/13
Washington Avenue School:
- Reconstruction 0-007-003 / / / / 01/20/11 / / 8,10,13,155,15,16 0 0 JOD 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Francis X Hegarty:
09-1225 Reconstruction 0-001-009 STARTED DONE DONE 04/05/10 03/31/10 09/11/09 08/31/09 2,9,16 0 0 DDJ 0 0 0 RICHARD SEARLES ARCHITECTS 0 / / / /
Lincoln Orens School:
10-0726 Reconstruction 0-002-007 01/25/11 DONE DONE DONE 01/24/11 01/04/11 04/28/10 10/30/07 13 240,375 240,375 DDJ 0 0 0 Burton Behrendt Smith 0 / / 04/08/13
Lincoln Orens:
08-0976 Reconstruction 0-003-002 05/01/09 DONE DONE DONE 12/30/08 12/18/08 11/23/07 10/30/07 2,155,16 2,155,000 2,155,000 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
09-1198 Reconstruction 0-003-003 03/25/11 DONE DONE DONE 04/01/10 03/26/10 03/26/10 04/20/10 155,15 640,000 640,000 DDJ 0 0 0 Burton Behrendt Smith 0 / / 02/19/13
Conference Center(frmly library):
09-1224 Reconstruction 6-002-004 01/26/11 DONE DONE DONE 04/05/10 03/21/10 04/27/09 04/21/09 2,7,8,15,16 390,000 0 DDJ 0 0 0 RICHARD SEARLES ARCHITECTS 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Central High School:
07-1880 Reconstruction 0-001-033 12/03/08 DONE DONE DONE 03/31/08 03/21/08 01/24/07 05/15/07 2,4,7,9,155,16 548,230 548,230 HCM 0 0 548,230 Burton Behrendt Smith 0 / / / /
08-1158 Reconstruction 0-001-034 03/24/09 DONE DONE DONE 02/02/09 01/29/09 04/10/08 05/15/07 155,16 481,792 481,792 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
09-0351 Reconstruction 0-001-036 03/22/10 DONE DONE DONE 10/27/09 10/23/09 08/19/09 05/19/09 2,9,16 435,125 435,125 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
11-0856 Reconstruction 0-001-037 06/20/12 DONE DONE DONE 03/02/12 03/01/12 08/19/11 05/17/11 8,155,16 75,280 0 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
Memorial Junior High School:
07-1877 Reconstruction 0-002-028 11/10/08 DONE DONE DONE 03/29/08 03/21/08 01/24/07 05/15/07 2,4,9,155,16 240,356 240,356 HCM 0 0 240,356 Burton Behrendt Smith 0 / / / /
08-1159 Reconstruction 0-002-029 03/24/09 DONE DONE DONE 02/02/09 01/29/09 05/01/08 05/15/07 4,155,16 38,698 38,698 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
08-0786 Additions and Alterations 0-002-030 04/22/09 DONE DONE DONE 11/21/08 11/20/08 06/20/08 05/20/08 02 - 16 873,121 873,121 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
09-0352 Reconstruction 0-002-031 03/22/10 DONE DONE DONE 10/27/09 10/23/09 08/19/09 05/19/09 2,9,16 583,988 583,988 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
11-0857 Reconstruction 0-002-032 06/20/12 DONE DONE DONE 03/02/12 03/01/12 08/19/11 05/17/11 155,16 83,450 0 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
North High School:
07-1878 Reconstruction 0-003-029 11/10/08 DONE DONE DONE 03/29/08 03/21/08 01/24/07 05/15/07 2,4,7,9,155,15,16 183,770 183,770 HCM 0 0 183,770 Burton Behrendt Smith 0 / / / /
08-1160 Reconstruction 0-003-030 03/24/09 DONE DONE DONE 02/02/09 01/29/09 04/10/08 05/15/07 155,16 38,241 38,241 HCM 0 0 38,241 Burton Behrendt Smith 0 / / / /
09-0353 Reconstruction 0-003-031 03/22/10 DONE DONE DONE 10/27/09 10/23/09 08/19/09 05/19/09 2,9,16 390,875 390,875 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
11-0858 Reconstruction 0-003-032 06/20/12 DONE DONE DONE 03/02/12 03/01/12 08/19/11 05/17/11 13,155,16 291,880 0 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
South High School:
07-1879 Reconstruction 0-004-027 11/10/08 DONE DONE DONE 03/29/08 03/21/08 01/24/07 05/15/07 2,4,7,9,155,16 90,505 90,505 HCM 0 0 90,505 Burton Behrendt Smith 0 / / / /
08-1161 Reconstruction 0-004-028 03/24/09 DONE DONE DONE 02/02/09 01/29/09 04/10/08 05/15/07 155,16 103,098 103,098 HCM 0 0 103,098 Burton Behrendt Smith 0 / / / /
09-0354 Reconstruction 0-004-029 03/22/10 DONE DONE DONE 10/27/09 10/23/09 08/19/09 05/19/09 2,9,16 302,375 302,375 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
11-0859 Reconstruction 0-004-030 06/20/12 DONE DONE DONE 03/02/12 03/01/12 08/19/11 05/17/11 155,16 114,500 0 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
Auto Shop Chs:
11-0860 Reconstruction 0-005-002 06/20/12 DONE DONE DONE 03/02/12 03/01/12 08/19/11 05/17/11 4,7,8 338,560 0 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
Storage Garage N High School:
11-0861 Reconstruction 2-007-001 06/20/12 DONE DONE DONE 03/02/12 03/01/12 08/19/11 05/17/11 7 83,720 0 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
Maintenance Shop Jr. High Schools:
08-1124 Reconstruction 3-006-003 03/18/09 DONE DONE DONE 01/26/09 01/21/09 01/24/07 05/20/08 2,4,7,9,10,155,16 268,433 0 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
- Reconstruction 3-006-004 / / / / 06/20/08 / / 4,7 0 0 HCM 0 0 0 0 / / / /
District Wide:
08-1099 Reconstruction 7-999-004 06/10/09 DONE DONE DONE 01/21/09 01/13/09 06/20/08 05/20/08 10,13,16 418,851 418,851 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Sewanhaka High School:
07-1655 Reconstruction 0-002-034 10/15/08 DONE DONE DONE 02/21/08 02/15/08 06/20/07 05/15/07 13,15,16 386,596 386,596 MGL 0 0 77,517 James M. Campbell Architects 0 / / / /
08-1119 Reconstruction 0-002-035 06/23/09 DONE DONE DONE 01/26/09 01/20/09 07/10/08 05/20/08 7,8,9,15,16 421,000 421,000 DDJ 0 0 0 Lucchesi Engineering, P.C. 0 / / 12/23/12
08-1115 Reconstruction 0-002-036 05/05/09 DONE DONE DONE 01/23/09 01/20/09 07/10/08 05/20/08 15,16 894,625 894,625 DDJ 0 0 0 Lucchesi Engineering, P.C. 0 / / 12/23/12
08-0765 Reconstruction 0-002-037 02/24/09 DONE DONE DONE 11/18/08 11/17/08 09/23/08 05/20/08 10,16 263,125 263,125 DDJ 0 0 0 Lucchesi Engineering, P.C. 0 / / 12/23/12
09-1219 Reconstruction 0-002-038 05/19/10 DONE DONE DONE 04/02/10 03/31/10 06/23/09 05/19/09 10,16 214,184 214,184 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
09-1501 Reconstruction 0-002-039 04/18/11 DONE DONE DONE 06/09/10 06/01/10 03/02/10 05/19/09 16 156,296 0 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
10-0957 Reconstruction 0-002-040 05/13/11 DONE DONE DONE 03/07/11 02/28/11 10/06/10 05/18/10 10 87,450 87,450 DDJ 0 0 0 James M Campbell 0 / / 12/10/12
11-0784 Reconstruction 0-002-041 05/01/12 DONE DONE DONE 02/13/12 02/09/12 07/08/11 05/17/11 13 259,613 0 DDJ 0 0 0 James M. Campbell Architects 0 / / / /
12-0722 Reconstruction 0-002-042 04/30/13 DONE DONE DONE 01/23/13 01/18/13 06/21/12 05/15/12 2 192,500 0 DDJ 0 0 0 Wiedersum Associates Architec 0 / / / /
Floral Park Memorial High:
07-1656 Reconstruction 0-003-034 10/15/08 DONE DONE DONE 02/21/08 02/15/08 06/20/07 05/15/07 2,10,15 293,475 293,475 MGL 0 0 0 James M. Campbell Architects 0 / / / /
08-1120 Reconstruction 0-003-035 06/23/09 DONE DONE DONE 01/26/09 01/20/09 07/10/08 05/20/08 8,9,16 210,500 210,500 DDJ 0 0 0 Lucchesi Engineering, P.C. 0 / / 12/23/12
09-1502 Reconstruction 0-003-036 04/18/11 DONE DONE DONE 06/09/10 06/01/10 07/08/09 05/19/09 155 75,254 0 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
12-0721 Reconstruction 0-003-037 04/24/13 DONE DONE DONE 01/23/13 01/18/13 06/21/12 05/15/12 155 99,700 0 DDJ 0 0 0 Wiedersum Associates Architec 0 / / / /
07-2171SC Visual Structural Inspection 0-003-SC1 06/04/08 DONE DONE DONE 05/16/08 05/16/08 / / / / 16 19,578 0 JOD 0 0 0 0 / / / /
Hyde Park Memorial High:
07-1657 Reconstruction 0-004-032 10/15/08 DONE DONE DONE 02/21/08 02/15/08 06/20/07 05/15/07 13,155,15,16 451,500 451,500 MGL 0 0 0 James M. Campbell Architects 0 / / / /
08-1121 Reconstruction 0-004-033 06/23/09 DONE DONE DONE 01/26/09 01/20/09 07/10/08 05/20/08 8,9,13,16 326,275 326,275 DDJ 0 0 0 Lucchesi Engineering, P.C. 0 / / 12/23/12
09-1220 Reconstruction 0-004-034 05/19/10 DONE DONE DONE 04/02/10 03/31/10 06/23/09 05/19/09 10,16 115,775 115,775 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
09-1503 Reconstruction 0-004-035 04/18/11 DONE DONE DONE 06/09/10 06/01/10 03/02/10 05/19/09 155,16 393,635 0 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
10-0958 Reconstruction 0-004-036 05/13/11 DONE DONE DONE 03/07/11 02/28/11 10/06/10 05/18/10 16 102,608 102,608 DDJ 0 0 0 James M Campbell 0 / / 12/10/12
11-0360 Reconstruction 0-004-037 02/08/12 DONE DONE DONE 11/08/11 11/08/11 07/08/11 05/17/11 14 169,312 0 DDJ 0 0 0 James M. Campbell Architects 0 / / / /
11-0361 Reconstruction 0-004-038 02/08/12 DONE DONE DONE 11/08/11 11/08/11 07/08/11 05/17/11 13,16 265,257 0 DDJ 0 0 0 James M. Campbell Architects 0 / / / /
07-2170SC Visual Structural Inspection 0-004-SC1 06/04/08 DONE DONE DONE 05/16/08 05/16/08 / / / / 16 28,510 0 JOD 0 0 0 0 / / / /
H. Frank Carey HS:
07-1658 Reconstruction 0-005-032 10/15/08 DONE DONE DONE 02/21/08 02/15/08 06/20/07 05/15/07 13,15,16 699,825 699,825 MGL 0 0 0 James M. Campbell Architects 0 / / / /
08-1122 Reconstruction 0-005-033 06/23/09 DONE DONE DONE 01/26/09 01/20/09 07/10/08 05/20/08 8,9,10,15,16 563,087 563,087 DDJ 0 0 0 Lucchesi Engineering, P.C. 0 / / 12/23/12
09-1221 Reconstruction 0-005-034 05/19/10 DONE DONE DONE 04/02/10 03/31/10 06/23/09 05/19/09 10,16 318,381 318,381 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
09-1504 Reconstruction 0-005-035 04/18/11 DONE DONE DONE 06/09/10 06/01/10 03/02/10 05/19/09 16 156,296 0 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
11-0648 Reconstruction 0-005-036 03/14/12 DONE DONE DONE 01/12/12 01/09/12 07/08/11 05/17/11 4 338,625 0 DDJ 0 0 0 James M. Campbell Architects 0 / / / /
07-2172SC Visual Structural Inspection 0-005-SC1 06/04/08 DONE DONE DONE 05/16/08 05/16/08 / / / / 16 31,049 0 JOD 0 0 0 0 / / / /
Elmont Memorial High School:
07-1659 Reconstruction 0-006-038 10/15/08 DONE DONE DONE 02/21/08 02/15/08 06/08/06 05/15/07 7,8 293,475 293,475 MGL 0 0 0 James M. Campbell Architects 0 / / / /
08-1123 Reconstruction 0-006-039 06/23/09 DONE DONE DONE 01/26/09 01/20/09 07/10/08 05/20/08 9,15,16 660,191 660,191 DDJ 0 0 0 Lucchesi Engineering, P.C. 0 / / 12/23/12
09-1222 Reconstruction 0-006-040 05/19/10 DONE DONE DONE 04/02/10 03/31/10 06/23/09 05/19/09 10,13 405,213 405,213 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
10-0282 Reconstruction 0-006-041 02/08/11 DONE DONE DONE 09/28/10 09/20/10 05/06/10 05/20/08 7 505,200 505,200 DDJ 0 0 0 Lucchesi Engineering, P.C. 0 / / 04/22/13
10-0959 Reconstruction 0-006-042 05/13/11 DONE DONE DONE 03/07/11 02/28/11 10/06/10 05/18/10 16 58,300 58,300 DDJ 0 0 0 James M Campbell 0 / / 12/10/12
11-0649 Reconstruction 0-006-043 02/17/12 DONE DONE DONE 01/12/12 01/09/12 07/08/11 05/17/11 13 129,806 0 DDJ 0 0 0 James M. Campbell Architects 0 / / / /
Flaherty Building:
07-1660 Reconstruction 0-008-003 10/15/08 DONE DONE DONE 02/21/08 02/15/08 12/17/07 05/15/07 10,15 47,972 47,972 MGL 0 0 0 James M. Campbell Architects 0 / / / /
- Reconstruction 0-008-004 / / / / 01/13/09 / / 16 0 0 DDJ 0 0 0 0 / / / /
Vocational Bldg.:
- Reconstruction 0-010-002 / / / / 01/12/09 / / 16 0 0 DDJ 0 0 0 0 / / / /
Carpentry Classroom at HS site:
- Reconstruction 0-036-002 / / / / 01/12/09 / / 16 0 0 DDJ 0 0 0 0 / / / /
Central Maintenance:
11-0650 Reconstruction 3-013-001 05/10/12 DONE DONE DONE 01/12/12 01/09/12 07/14/11 05/17/11 2,13 225,750 0 DDJ 0 0 0 James M. Campbell Architects 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Grand Ave Jr. High School:
07-1426 Reconstruction 0-001-027 08/04/08 DONE DONE DONE 01/24/08 01/18/08 10/11/07 05/15/07 2,8,9,10,155,15,16 470,000 470,000 MGL 0 0 470,000 Burton Behrendt Smith 0 / / / /
09-1508 Reconstruction 0-001-028 11/12/10 DONE DONE DONE 06/09/10 06/03/10 04/06/09 05/20/08 2,16 249,000 0 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
10-1385 Reconstruction 0-001-029 06/15/11 DONE DONE DONE 06/08/11 06/06/11 04/15/11 05/04/11 2 75,000 75,000 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
11-0293 Reconstruction 0-001-030 10/28/11 DONE DONE DONE 10/27/11 10/26/11 10/12/11 05/18/10 2 105,000 105,000 HCM 0 0 0 Burton Behrendt Smith 0 / / 10/23/12
Jerusalem Avenue Junior High:
12-0945 Reconstruction 0-002-024 04/04/13 DONE DONE DONE 03/06/13 03/04/13 12/05/12 02/06/13 2 114,829 0 JMB 0 0 0 Burton Behrendt Smith 0 / / / /
Merrick Ave Jr. High School:
07-1427 Reconstruction 0-003-034 08/04/08 DONE DONE DONE 01/24/08 01/18/08 10/11/07 05/15/07 2,8,10 329,851 329,851 MGL 0 0 0 Burton Behrendt Smith 0 / / / /
09-1509 Reconstruction 0-003-035 11/12/10 DONE DONE DONE 06/09/10 06/03/10 04/06/09 05/20/08 9,16 249,000 0 HCM 0 0 104,787 Burton Behrendt Smith 0 / / / /
09-0425 Reconstruction 0-003-036 02/12/10 DONE DONE DONE 11/18/09 11/10/09 07/13/09 05/20/08 9,16 24,000 24,000 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
10-1285 Reconstruction 0-003-037 07/29/11 DONE DONE DONE 05/12/11 05/02/11 05/11/11 05/18/10 7 585,300 585,300 HCM 0 0 0 Burton Behrendt Smith 0 / / 08/06/12
Calhoun High School:
07-1428 Reconstruction 0-004-044 08/04/08 DONE DONE DONE 01/24/08 01/18/08 10/11/07 05/15/07 2,8,9,10,155,15,16 502,667 502,667 MGL 0 0 228,195 Burton Behrendt Smith 0 / / / /
09-1510 Reconstruction 0-004-045 11/12/10 DONE DONE DONE 06/09/10 06/03/10 04/06/09 05/20/08 2,16 275,000 0 HCM 0 0 104,787 Burton Behrendt Smith 0 / / / /
10-1286 Reconstruction 0-004-046 07/29/11 DONE DONE DONE 05/12/11 05/02/11 05/11/11 05/18/10 7 585,000 585,000 HCM 0 0 0 Burton Behrendt Smith 0 / / 08/27/12
Mepham High School:
07-1429 Reconstruction 0-005-043 08/04/08 DONE DONE DONE 01/24/08 01/18/08 10/11/07 05/15/07 2,8,9,10,155,15,16 619,925 619,925 MGL 0 0 262,770 Burton Behrendt Smith 0 / / / /
09-1511 Reconstruction 0-005-044 11/12/10 DONE DONE DONE 06/09/10 06/01/10 04/06/09 05/20/08 2,16 777,000 0 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
10-1287 Reconstruction 0-005-045 07/29/11 DONE DONE DONE 05/12/11 05/02/11 05/11/11 05/18/10 7,10 360,000 360,000 HCM 0 0 0 Burton Behrendt Smith 0 / / 08/06/12
Brookside Jr. High School:
- XX Reconstruction 0-006-017 CANCELLED / / / / 12/07/12 / / 2 0 26,249,244 JMB 0 0 0 0 / / / /
09-1512 Reconstruction 0-006-021 11/12/10 DONE DONE DONE 06/09/10 06/01/10 04/06/09 05/20/08 16 249,000 0 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
Kennedy High School:
08-1107 Reconstruction 0-007-031 03/20/09 DONE DONE DONE 01/21/09 01/15/09 12/29/06 05/20/08 16 251,850 251,850 MGL 0 0 0 Burton Behrendt Smith 0 / / / /
07-1430 Reconstruction 0-007-032 08/04/08 DONE DONE DONE 01/24/08 01/18/08 10/11/07 05/15/07 2,8,9,10,155,15,16 580,500 580,500 MGL 0 0 262,770 Burton Behrendt Smith 0 / / / /
08-0424 Reconstruction 0-007-033 12/17/08 DONE DONE DONE 09/29/08 09/26/08 09/15/08 05/20/08 2,10,16 77,250 77,250 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
09-1513 Reconstruction 0-007-034 11/12/10 DONE DONE DONE 06/09/10 06/01/10 04/06/09 05/20/08 16 275,000 0 HCM 0 0 104,787 Burton Behrendt Smith 0 / / / /
10-1288 Reconstruction 0-007-035 07/29/11 DONE DONE DONE 05/12/11 05/02/11 05/05/11 05/18/10 2 205,000 205,000 HCM 0 0 0 Burton Behrendt Smith 0 / / 10/23/12
Press Box Kennedy High School:
08-0952 New Construction 7-013-001 01/12/09 DONE DONE DONE 12/19/08 12/15/08 / / 05/20/08 02 - 16 68,997 0 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
Press Box @ J.F. Kennedy High School:
- New Construction 7-022-001 / / / / 12/04/08 / / 02 - 16 0 0 HCM 0 0 0 0 / / / /
Press Box:
08-1041DB Discovered Building 7-023-001 01/26/09 DONE DONE DONE 01/06/09 01/02/09 12/29/08 / / 0 0 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
Snack Shack:
08-1042DB Discovered Building 7-024-001 01/26/09 DONE DONE DONE 01/06/09 01/02/09 01/02/09 / / 0 0 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Lido School:
07-2084 Reconstruction 0-001-030 05/29/08 DONE DONE DONE 05/05/08 05/01/08 06/22/07 05/15/07 4,7,16 663,155 663,155 DDJ 0 0 0 Collins & Scoville Architects 0 / / / /
09-0047 Reconstruction 0-001-033 10/20/09 DONE DONE DONE 07/17/09 07/13/09 06/02/09 05/19/09 7 1,280,000 1,280,000 DDJ 0 0 0 Collins & Scoville Architects 0 / / / /
09-0657SR Additions and Alterations 0-001-034 04/23/10 DONE DONE DONE 12/30/09 12/30/09 06/23/09 05/19/09 02 - 16 4,366,600 2,185,269 DDJ 0 0 0 Collins & Scoville Architects 0 / / / /
09-1440PR Additions and Alterations 0-001-034 UNREVIEWED 05/13/10 05/11/10 / / / / 02 - 16 40,469,600 23,736,460 DDJ 0 0 0 Collins & Scoville Architects 0 / / / /
10-0094 Additions and Alterations 0-001-034 12/22/10 DONE DONE DONE 08/11/10 07/26/10 / / 05/19/09 02 - 16 40,469,600 28,015,952 DDJ 0 0 0 Collins & Scoville Architects 0 / / 09/06/12
- XX Reconstruction 0-001-035 CANCELLED / / / / 07/17/09 / / 2,9,10,155,15,16 0 7,034,742 DDJ 0 0 0 0 / / / /
10-0369 Reconstruction 0-001-036 12/01/10 DONE DONE DONE 10/14/10 10/06/10 09/27/10 05/19/09 2,4,7,155,15,16 2,852,400 2,852,400 DDJ 0 0 438,186 Collins & Scoville Architects 0 / / / /
- Reconstruction 0-001-037 / / / / 02/26/13 / / 8,9,155,15,16 0 0 DDJ 0 0 0 0 / / / /
West Elementary School:
09-0048 Reconstruction 0-003-019 04/16/10 DONE DONE DONE 07/17/09 07/13/09 06/02/09 05/19/09 4,155,15,16 914,000 0 DDJ 0 0 0 Collins & Scoville Architects 0 / / / /
09-0669 Additions and Alterations 0-003-020 07/09/10 DONE DONE DONE 01/04/10 12/29/09 06/22/09 05/19/08 02 - 16 1,246,182 0 DDJ 0 0 0 Collins & Scoville Architects 0 / / / /
- Reconstruction 0-003-021 / / / / 09/27/10 / / 2 0 0 DDJ 0 0 0 0 / / / /
- Reconstruction 0-003-022 / / / / 02/26/13 / / 8,9,155,15,16 0 0 DDJ 0 0 0 0 / / / /
East School:
- XX Reconstruction 0-004-020 CANCELLED / / / / 02/10/09 / / 2,4,7,8,14,155,15,16 0 6,333,390 DDJ 0 0 0 0 / / / /
09-0049 Reconstruction 0-004-021 04/16/10 DONE DONE DONE 07/17/09 07/13/09 02/10/09 05/19/09 2,4,7,8,14,155,15,16 3,467,200 0 DDJ 0 0 0 Collins & Scoville Architects 0 / / / /
- Reconstruction 0-004-022 / / / / 02/26/13 / / 2,9,155,15,16 0 0 DDJ 0 0 0 0 / / / /
Lindell School:
08-1551 Reconstruction 0-005-024 06/09/09 DONE DONE DONE 04/28/09 04/28/09 01/08/07 05/19/09 4 8,223,825 8,223,825 DDJ 0 0 573,000 Collins & Scoville Architects 0 / / / /
08-1466 Reconstruction 0-005-025 12/12/07 DONE DONE DONE 04/09/09 04/08/09 10/22/07 05/19/09 7,8,9,155,15,16 5,349,175 5,349,175 DDJ 0 0 0 Collins & Scoville Architects 0 / / / /
09-0050 Reconstruction 0-005-026 04/16/10 DONE DONE DONE 07/17/09 07/13/09 02/10/09 05/19/09 155,15,16 313,000 0 DDJ 0 0 0 Collins & Scoville Architects 0 / / / /
09-0670 Additions and Alterations 0-005-027 07/09/10 DONE DONE DONE 01/04/10 12/29/09 06/23/09 05/19/08 02 - 16 3,662,542 0 DDJ 0 0 0 Collins & Scoville Architects 0 / / / /
09-0671 Reconstruction 0-005-028 01/29/10 DONE DONE DONE 01/04/10 12/29/09 11/24/09 05/19/09 2,4,7,8,9,155,15,16 900,000 900,000 DDJ 0 0 0 Collins & Scoville Architects 0 / / 02/26/13
- Reconstruction 0-005-029 / / / / 02/26/13 / / 7,8,9,155,15,16 0 0 DDJ 0 0 0 0 / / / /
Blackheath A (demolish #008):
- XX Reconstruction 0-006-007 CANCELLED / / / / 02/10/09 / / 7 0 446,800 DDJ 0 0 0 0 / / / /
- Reconstruction 0-006-008 / / / / 08/31/10 / / 2 0 473,720 DDJ 0 0 0 0 / / / /
10-0294 Reconstruction 0-006-008 03/10/11 DONE DONE DONE 09/29/10 09/22/10 / / 05/19/09 88,100 88,100 0 0 0 Collins & Scoville Architects 0 / / / /
Blackheath Bldg. B(demolish #007):
- XX Reconstruction 0-008-006 CANCELLED / / / / 02/10/09 / / 4,155,15,16 0 1,206,360 DDJ 0 0 0 0 / / / /
10-0295 Reconstruction 0-008-007 03/10/11 DONE DONE DONE 09/29/10 09/22/10 08/31/10 05/19/09 2 88,100 0 DDJ 0 0 0 Collins & Scoville Architects 0 / / / /
Blackheath Bldg. C(demo #007):
10-0296 Reconstruction 0-009-007 03/10/11 DONE DONE DONE 09/29/10 09/22/10 08/31/10 05/19/09 2 88,100 0 DDJ 0 0 0 Collins & Scoville Architects 0 / / / /
Blackheath Bldg. D-demo #005:
10-0297 Reconstruction 0-010-005 03/10/11 DONE DONE DONE 09/29/10 09/22/10 08/31/10 05/19/09 2 88,100 0 DDJ 0 0 0 Collins & Scoville Architects 0 / / / /
High School:
08-1480 Reconstruction 0-011-035 04/22/09 DONE DONE DONE 04/10/09 04/08/09 06/22/07 05/15/07 155,15,16 127,500 127,500 DDJ 0 0 0 Collins & Scoville Architects 0 / / / /
07-2085 Reconstruction 0-011-036 06/06/08 DONE DONE DONE 05/05/08 05/01/08 01/17/08 05/15/07 4,7,10,14,16 165,000 165,000 DDJ 0 0 0 Collins & Scoville Architects 0 / / / /
09-0051 Reconstruction 0-011-038 04/16/10 DONE DONE DONE 07/17/09 07/13/09 06/02/09 05/19/09 4,155,15,16 1,270,000 1,270,000 DDJ 0 0 0 Collins & Scoville Architects 0 / / / /
08-1483 Reconstruction 0-011-039 04/23/09 DONE DONE DONE 04/13/09 04/08/09 04/09/09 03/25/08 2,4,10 364,500 364,500 DDJ 0 0 0 Collins & Scoville Architects 0 / / / /
- Reconstruction 0-011-040 / / / / 06/22/09 / / 10,155,15,16 0 0 DDJ 0 0 0 0 / / / /
10-0298 Additions and Alterations 0-011-041 03/10/11 DONE DONE DONE 09/29/10 09/22/10 07/17/09 05/19/09 02 - 16 27,683,675 27,097,823 DDJ 0 0 0 Collins & Scoville Architects 0 / / 01/08/13
09-1506 Reconstruction 0-011-042 09/15/10 DONE DONE DONE 06/09/10 06/01/10 04/14/10 05/18/10 10,15,16 550,000 0 DDJ 0 0 316,800 Collins & Scoville Architects 0 / / / /
12-0015 Reconstruction 0-011-043 02/26/13 DONE DONE DONE 07/09/12 07/06/12 06/06/12 04/12/12 7,16 3,030,518 0 DDJ 0 0 0 Collins & Scoville Architects 0 / / / /
- Reconstruction 0-011-044 / / / / 02/26/13 / / 8,9,155,15,16 0 0 DDJ 0 0 0 0 / / / /
07-2198SC Visual Structural Inspection 0-011-SC1 09/30/08 DONE DONE DONE 05/16/08 05/16/08 / / / / 16 274,872 0 JOD 0 0 0 0 / / / /
Administration Building:
- PR Additions and Alterations 1-002-003 / / / / 08/20/10 / / 02 - 16 0 0 DDJ 0 0 0 0 / / / /
Bus Maint. Garage (Transp. Facility:
08-1481 Reconstruction 5-013-003 04/22/09 DONE DONE DONE 04/13/09 04/08/09 06/22/07 02/27/08 2,8,15,16 295,600 295,600 DDJ 0 0 0 Collins & Scoville Architects 0 / / / /
Lowenstein Library:
09-0062 Reconstruction 6-021-002 07/28/09 DONE DONE DONE 07/22/09 07/20/09 06/01/09 06/01/09 13 125,000 0 DDJ 0 0 0 H2M Group 0 / / / /
Press Box @ Middle School:
09-0658 New Construction 7-033-001 04/23/10 DONE DONE DONE 12/30/09 12/30/09 12/21/09 05/19/09 02 - 16 63,825 0 DDJ 0 0 0 Collins & Scoville Architects 0 / / / /
Press Box @ High School:
10-0299 New Construction 7-034-001 03/10/11 DONE DONE DONE 09/29/10 09/22/10 06/01/10 05/19/09 02 - 16 63,825 0 DDJ 0 0 0 Collins & Scoville Architects 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Drexel Elementary:
07-1730 Additions and Alterations 0-001-015 04/28/09 DONE DONE DONE 03/04/08 02/28/08 03/09/07 04/26/07 02 - 16 940,110 940,110 MGL 0 0 498,590 Spector Group 0 / / / /
Westbury Middle/Jr High 6-8:
07-2033 Reconstruction 0-002-020 05/28/08 DONE DONE DONE 04/29/08 04/18/08 12/26/07 07/13/07 4,7 300,000 300,000 MGL 0 0 0 Wiedersum Associates Architec 0 / / / /
11-0871 Reconstruction 0-002-021 04/12/12 DONE DONE DONE 03/05/12 03/01/12 09/21/11 10/20/11 4,13 2,070,000 0 JOD 0 0 193,060 Wiedersum Associates Architec 0 / / / /
08-0445SC Visual Structural Inspection 0-002-SC2 10/02/08 DONE DONE DONE 07/01/08 07/01/08 / / / / 16 15,712 0 JOD 0 0 0 0 / / / /
Powell's Lane Elementary:
07-1731 Additions and Alterations 0-005-015 04/28/09 DONE DONE DONE 03/04/08 02/28/08 03/09/07 04/26/07 02 - 16 940,110 940,110 MGL 0 0 498,590 SPECTOR GROUP 0 / / / /
Westbury High School:
07-1999 Additions and Alterations 0-007-021 11/23/09 DONE DONE DONE 04/21/08 04/10/08 03/09/07 04/26/07 02 - 16 2,172,930 2,172,930 MGL 0 0 1,152,419 SPECTOR GROUP 0 / / / /
07-2275 Reconstruction 0-007-022 12/23/08 DONE DONE DONE 06/27/08 06/12/08 12/26/07 07/13/07 155,15,16 130,000 0 MGL 0 0 0 Wiedersum Associates Architec 0 / / / /
Park Avenue School:
07-1732 Additions and Alterations 0-010-015 04/28/09 DONE DONE DONE 03/04/08 02/28/08 03/09/07 04/26/07 02 - 16 1,566,850 1,566,850 MGL 0 0 830,983 SPECTOR GROUP 0 / / / /
07-1991 Reconstruction 0-010-016 05/22/08 DONE DONE DONE 04/18/08 04/09/08 12/26/07 08/29/07 7 1,300,000 1,300,000 MGL 0 0 0 Wiedersum Associates Architec 0 / / / /
08-0444SC Visual Structural Inspection 0-010-SC2 10/02/08 DONE DONE DONE 07/01/08 07/01/08 / / / / 16 2,699 0 JOD 0 0 0 0 / / / /
Administration Building:
08-0075 Reconstruction 1-003-008 09/16/08 DONE DONE DONE 07/22/08 07/16/08 12/26/07 08/29/07 155,16 35,000 0 MGL 0 0 0 Wiedersum Associates Architec 0 / / / /
Facilities Building Annex:
06-1541DB Discovered Building 1-028-001 08/25/10 DONE DONE DONE 05/25/07 05/25/07 01/04/07 / / 0 0 MGL 0 0 0 0 / / / /
08-0076 Reconstruction 1-028-002 09/16/08 DONE DONE DONE 07/22/08 07/16/08 12/26/07 08/29/07 155,16 65,000 0 MGL 0 0 0 Wiedersum Associates Architec 0 / / / /
Westbury Memorial Public Library:
09-1080 Reconstruction 6-013-002 03/23/10 DONE DONE DONE 03/16/10 03/08/10 09/03/96 02/10/10 7,15,16 225,000 0 JOD 0 0 0 Las Associates, Architects 0 / / / /
Press Box at High School:
08-1675 New Construction 7-030-001 07/08/09 DONE DONE DONE 06/09/09 06/04/09 05/14/09 01/21/09 02 - 16 120,000 0 JOD 0 0 0 Wiedersum Associates Architec 0 / / / /
Saint Francis de Chantel School@Pari:
08-0091TQ Temporary Quarters 8-029-001 05/14/09 DONE DONE DONE 07/24/08 07/17/08 07/15/08 / / 0 0 JOD 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Wheatley High School:
- Reconstruction 0-001-017 / / / / 01/04/13 / / 4,8 0 17,973,570 JMB 0 0 0 0 / / / /
07-2162 Reconstruction 0-001-019 02/05/09 DONE DONE DONE 05/27/08 05/20/08 / / 11/19/07 165,250 165,250 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
08-0570 Reconstruction 0-001-020 03/20/09 DONE DONE DONE 10/22/08 10/20/08 04/25/08 05/20/08 4,9,10,155,16 364,371 364,371 HCM 0 0 364,371 John A Grillo-ARCHITECTS PC 0 / / / /
08-1445 Reconstruction 0-001-021 04/28/09 DONE DONE DONE 03/31/09 03/30/09 12/09/08 02/03/09 7,8,9,155,16 3,318,868 3,318,868 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
09-0721 Reconstruction 0-001-022 05/06/10 DONE DONE DONE 01/08/10 01/07/10 01/07/10 02/03/09 4,8,9,10,15,16 944,159 831,310 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
09-1384 Reconstruction 0-001-023 06/02/10 DONE DONE DONE 05/06/10 04/30/10 01/26/10 12/21/09 2,16 210,000 210,000 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 03/19/13
10-0930 Reconstruction 0-001-024 07/14/11 DONE DONE DONE 03/04/11 02/18/11 02/23/11 02/04/11 8,155,15,16 0 20,392,959 HCM 0 0 0 H2M Group 0 / / 08/20/12
11-0513 Reconstruction 0-001-025 02/17/12 DONE DONE DONE 12/22/11 12/21/11 07/21/11 02/03/09 2,4,8,9,10,155,15,16 210,040 210,040 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 11/01/12
11-0527 Reconstruction 0-001-026 04/26/12 DONE DONE DONE 12/22/11 12/16/11 10/21/11 05/20/08 4 107,000 107,000 HCM 0 0 107,000 H2M Group 0 / / 12/17/12
12-0985 Reconstruction 0-001-027 03/21/13 DONE DONE DONE 03/18/13 03/15/13 06/06/12 05/20/08 8,9,10,155,15,16 54,226 0 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
- Reconstruction 0-001-028 / / / / 01/24/13 / / 4,8 0 0 JMB 0 0 0 0 / / / /
North Side Elementary School:
07-1788 Reconstruction 0-002-017 08/26/08 DONE DONE DONE 03/15/08 03/06/08 12/20/07 05/16/06 9,155,15,16 339,509 339,509 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
08-0571 Reconstruction 0-002-018 03/20/09 DONE DONE DONE 10/22/08 10/20/08 04/22/08 05/20/08 2,4,10,16 130,200 130,200 HCM 0 0 130,200 John A Grillo-ARCHITECTS PC 0 / / 03/19/13
09-0722 Reconstruction 0-002-019 05/06/10 DONE DONE DONE 01/11/10 01/07/10 12/09/08 02/03/09 4,7,9,155,16 790,566 690,300 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
09-1385 Reconstruction 0-002-020 06/02/10 DONE DONE DONE 05/06/10 04/30/10 01/26/10 12/21/09 2 230,000 230,000 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
10-0931 Reconstruction 0-002-021 07/14/11 DONE DONE DONE 03/04/11 02/18/11 02/23/11 02/04/11 8,155,15,16 0 10,199,724 HCM 0 0 0 H2M Group 0 / / 08/20/12
11-0514 Reconstruction 0-002-022 02/17/12 DONE DONE DONE 12/22/11 12/21/11 07/21/11 02/03/09 7,8,9,155,15,16 295,000 295,000 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 11/01/12
Willets Road Middle School:
08-0572 Reconstruction 0-003-014 03/20/09 DONE DONE DONE 10/22/08 10/22/08 / / 05/20/08 10,155,16 98,599 98,599 HCM 0 0 98,600 John A Grillo-ARCHITECTS PC 0 / / 03/19/13
09-0723 Reconstruction 0-003-015 05/06/10 DONE DONE DONE 01/11/10 01/07/10 12/09/08 02/03/09 9,155,16 127,121 159,522 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
- Reconstruction 0-003-016 / / / / 01/26/10 / / 2 0 0 HCM 0 0 0 0 / / / /
10-0932 Reconstruction 0-003-017 07/14/11 DONE DONE DONE 03/04/11 02/18/11 02/23/11 02/04/11 8,15,16 0 12,641,196 HCM 0 0 0 H2M Group 0 / / 08/20/12
11-0515 Reconstruction 0-003-018 02/17/12 DONE DONE DONE 12/22/11 12/21/11 07/21/11 02/03/09 2,4,8,9,10,155,15,16 389,400 389,400 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 11/01/12
12-0418 Reconstruction 0-003-019 DONE DONE UNREVIEWED11/14/12 11/08/12 06/06/12 05/12/12 2,8,9,13,155,15,16 0 13,085,140 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
- Reconstruction 0-003-020 / / / / 06/06/12 / / 8 0 0 HCM 0 0 0 0 / / / /
Wheatley Garage:
10-0086 New Construction 3-004-001 11/02/10 DONE DONE DONE 08/04/10 07/22/10 06/16/10 10/29/10 02 - 16 40,000 0 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
10-0902 Reconstruction 3-004-002 04/25/11 DONE DONE DONE 02/23/11 02/17/11 02/23/11 10/25/10 7 43,870 0 HCM 0 0 0 H2M Group 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
East Hills School:
07-0826 Reconstruction 0-001-019 12/14/08 DONE DONE DONE 11/16/07 11/15/07 09/11/07 11/02/07 2,10,155,15,16 344,997 344,997 DDJ 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 344,997 / / / /
10-0951 Reconstruction 0-001-020 07/07/11 DONE DONE DONE 03/07/11 02/28/11 05/05/08 05/18/10 2,4,9,155,15,16 311,724 311,724 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
10-1450 Reconstruction 0-001-021 09/13/11 DONE DONE DONE 07/01/11 06/30/11 06/20/08 05/17/11 155 4,750 0 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
11-0436 Reconstruction 0-001-022 02/22/12 DONE DONE DONE 11/22/11 11/17/11 02/14/11 05/17/11 155 210,000 0 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
12-0196 Reconstruction 0-001-023 01/17/13 DONE DONE DONE 09/19/12 09/19/12 12/27/11 05/17/11 2,4,8,9,155,15,16 87,120 0 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
Roslyn High School:
08-0094 Reconstruction 0-002-022 09/05/08 DONE DONE DONE 07/25/08 07/22/08 03/24/05 05/19/08 4 203,500 203,500 DDJ 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
07-0827 Reconstruction 0-002-029 12/14/08 DONE DONE DONE 11/16/07 11/15/07 09/11/07 11/02/07 2,8,10,155,15,16 2,307,370 2,307,370 DDJ 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 2,307,370 / / / /
10-1336 Reconstruction 0-002-030 06/29/11 DONE DONE DONE 05/27/11 05/24/11 12/26/07 09/02/10 2,4,8 40,320 40,320 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
08-0093 Reconstruction 0-002-031 09/22/08 DONE DONE DONE 07/25/08 07/22/08 02/21/08 05/19/08 2,16 87,012 87,012 DDJ 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
08-0671 Reconstruction 0-002-032 12/18/08 DONE DONE DONE 11/04/08 10/31/08 05/05/08 05/19/08 2,4,8,9,10,13,155,15 383,635 383,635 DDJ 0 0 0 0 / / / /
11-0437 Reconstruction 0-002-033 02/22/12 DONE DONE DONE 11/22/11 11/17/11 06/20/08 05/17/11 155 336,120 0 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
10-0952 Reconstruction 0-002-034 07/07/11 DONE DONE DONE 03/07/11 02/28/11 09/23/08 05/18/10 2,4,8,9,13,155,15,16 311,724 0 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
08-1378 Reconstruction 0-002-035 05/08/09 DONE DONE DONE 03/16/09 03/16/09 11/12/08 05/19/08 2,4,8 1,536,300 1,536,300 DDJ 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
10-0332 Reconstruction 0-002-036 02/01/11 DONE DONE DONE 10/06/10 10/01/10 / / 05/18/10 2,4,8,9,15,16 1,850,000 1,850,000 DDJ 0 0 0 Kaeyer, Garment & Davidson 0 / / / /
10-1107 Reconstruction 0-002-037 06/16/11 DONE DONE DONE 03/23/11 03/22/11 02/14/11 05/15/07 9,10 109,148 109,148 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
11-0407 Reconstruction 0-002-038 04/19/12 DONE DONE DONE 11/18/11 11/14/11 11/22/11 05/17/11 2,4,8,9,155,15,16 760,176 0 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
12-0197 Reconstruction 0-002-039 01/17/13 DONE DONE DONE 09/19/12 09/19/12 12/27/11 05/17/11 2,4,8,9,155,15,16 316,800 0 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
Roslyn Middle School:
07-0828 Reconstruction 0-006-022 12/14/08 DONE DONE DONE 11/16/07 11/15/07 09/11/07 11/02/07 2,10,155,15,16 530,611 530,611 DDJ 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 530,611 / / / /
08-0625XX Reconstruction 0-006-023 01/07/09 CANCELLED 10/30/08 10/29/08 12/20/07 05/19/08 2,15 0 15,988,193 DDJ 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
10-0953 Reconstruction 0-006-025 07/07/11 DONE DONE DONE 03/07/11 02/28/11 05/05/08 05/18/10 2,4,8,9,155,15,16 155,872 0 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
08-0595 Reconstruction 0-006-026 01/07/09 DONE DONE DONE 10/27/08 10/23/08 05/05/08 05/19/08 2,9,10,16 1,811,149 1,811,149 DDJ 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
11-0438 Reconstruction 0-006-027 02/22/12 DONE DONE DONE 11/22/11 11/17/11 07/10/08 05/17/11 155 34,000 0 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
11-0408 Reconstruction 0-006-028 04/19/12 DONE DONE DONE 11/18/11 11/14/11 07/16/08 05/07/11 155 143,955 0 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
12-0198 Reconstruction 0-006-029 01/17/13 DONE DONE DONE 09/19/12 09/19/12 12/27/11 05/17/11 2,4,8,9,155,15,16 304,128 304,128 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
Roslyn Heights Elementary:
07-0829 Reconstruction 0-007-017 12/14/08 DONE DONE DONE 11/16/07 11/15/07 09/11/07 11/02/07 2,10,155,15,16 191,985 191,985 DDJ 0 0 0 191,985 / / / /
08-0092 Reconstruction 0-007-018 08/07/08 DONE DONE DONE 07/24/08 07/22/08 05/05/08 05/19/08 2,15 88,472 88,472 DDJ 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
10-0954 Reconstruction 0-007-019 07/07/11 DONE DONE DONE 03/07/11 02/28/11 05/05/08 05/18/10 2,4,8,9,155,15,16 189,694 0 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
11-0439 Reconstruction 0-007-020 02/22/12 DONE DONE DONE 11/22/11 11/17/11 06/20/08 05/17/11 155 69,000 0 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
11-0409 Reconstruction 0-007-021 04/19/12 DONE DONE DONE 11/18/11 11/14/11 07/10/08 05/07/11 155 123,165 0 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
12-0199 Reconstruction 0-007-022 01/17/13 DONE DONE DONE 09/19/12 09/19/12 12/27/11 05/17/11 2,4,8,9,155,15,16 75,636 75,636 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
Harbor Hill Elementary:
07-0830 Reconstruction 0-009-018 12/14/08 DONE DONE DONE 11/16/07 11/15/07 09/11/07 11/02/07 2,10,155,15,16 332,414 332,414 DDJ 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 332,414 / / / /
10-0955 Reconstruction 0-009-019 07/07/11 DONE DONE DONE 03/07/11 02/28/11 05/05/08 05/18/10 2,4,8,9,155,15,16 155,872 0 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
10-1451 Reconstruction 0-009-020 09/13/11 DONE DONE DONE 07/01/11 06/30/11 06/20/08 05/17/11 155 4,750 0 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
11-0440 Reconstruction 0-009-021 02/22/12 DONE DONE DONE 11/22/11 11/17/11 06/20/08 05/17/11 155 150,000 0 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
- Reconstruction 0-009-022 / / / / 03/24/11 / / 155 0 0 DDJ 0 0 0 0 / / / /
12-0200 Reconstruction 0-009-023 01/17/13 DONE DONE DONE 09/19/12 09/19/12 12/27/11 05/17/11 2,4,8,9,155,15,16 435,600 435,600 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
Administration Bldg:
07-0831 Reconstruction 0-010-007 12/14/08 DONE DONE DONE 11/16/07 11/15/07 09/11/07 11/02/07 2,10,15,16 42,974 0 DDJ 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 42,974 / / / /
08-0720 Reconstruction 0-010-008 01/06/09 DONE DONE DONE 11/07/08 11/06/08 05/05/08 05/19/08 2,4 21,512 0 DDJ 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
10-0821 Reconstruction 0-010-009 06/10/11 DONE DONE DONE 02/07/11 01/31/11 08/07/09 05/19/09 2,8,9,155,15,16 400,000 0 DDJ 0 0 0 Burton Behrendt Smith 0 / / 04/08/13
Athletic Storage Shd:
12-0419 Additions and Alterations 2-012-002 01/29/13 DONE DONE DONE 11/14/12 11/08/12 05/18/10 05/18/10 02 - 16 162,900 0 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
Maintenance Building:
07-0832 Reconstruction 3-003-005 12/14/08 DONE DONE DONE 11/16/07 11/15/07 09/11/07 11/02/07 2,10,16 41,708 0 DDJ 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 41,708 / / / /
Bus Garage:
07-0833 Reconstruction 5-004-005 12/14/08 DONE DONE DONE 11/16/07 11/15/07 09/11/07 11/02/07 2,10,16 9,088 0 DDJ 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 9,088 / / / /
Home Economics Bldg.:
07-0834 Reconstruction 7-005-003 12/14/08 DONE DONE DONE 11/16/07 11/15/07 09/11/07 11/02/07 2,10,16 12,346 0 DDJ 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 12,346 / / / /
08-0144 Reconstruction 7-005-004 08/21/08 DONE DONE DONE 08/12/08 08/05/08 05/05/08 05/19/08 2,15 50,000 0 DDJ 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
08-1773 Reconstruction 7-005-005 07/14/09 DONE DONE DONE 06/30/09 06/30/09 05/05/08 05/19/08 2,4,8 43,150 0 DDJ 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
Athletic Locker Room Bldg.:
12-0728 New Construction 7-020-001 01/29/13 DONE DONE DONE 01/28/13 01/23/13 11/28/12 05/18/10 02 - 16 237,100 0 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
St. Mary's Elementary School:
09-1535TQ Temporary Quarters 8-019-001 06/22/10 DONE DONE DONE 06/15/10 06/08/10 04/26/10 / / 0 0 DDJ 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Paul D Schreiber High School:
08-0052 Reconstruction 0-001-026 12/22/08 DONE DONE DONE 07/21/08 07/08/08 08/09/07 03/20/01 2,10 1,175,753 1,175,753 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
- Reconstruction 0-001-027 / / / / 05/07/09 / / 2 0 35,046,117 HCM 0 0 0 0 / / / /
- PR Additions and Alterations 0-001-028 / / / / 01/15/10 / / 02 - 16 0 0 HCM 0 0 0 0 / / / /
11-0824 Reconstruction 0-001-029 05/31/12 DONE DONE DONE 02/21/12 02/17/12 04/15/11 05/15/12 2 264,655 264,655 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
- Reconstruction 0-001-030 / / / / 05/19/11 / / 2 0 35,046,117 HCM 0 0 0 0 / / / /
12-0552 Reconstruction 0-001-031 04/08/13 DONE DONE DONE 12/13/12 12/03/12 01/17/12 05/15/12 4,7,8,10,155,15,16 1,618,928 0 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
John Philip Sousa Elementary:
09-0024 Reconstruction 0-003-022 07/16/09 DONE DONE DONE 07/03/09 07/03/09 05/07/09 05/19/09 2,9 99,725 99,725 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
09-1019 Reconstruction 0-003-023 06/03/10 DONE DONE DONE 03/09/10 03/04/10 05/13/09 05/20/09 7 787,611 787,611 HCM 0 0 0 Burton Behrendt Smith 0 / / 09/25/12
12-0553 Reconstruction 0-003-024 04/08/13 DONE DONE DONE 12/13/12 12/03/12 01/17/12 05/15/12 4,7,8,10,155,15,16 462,506 0 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
Manorhaven Elementary School:
- Reconstruction 0-005-023 / / / / 05/07/09 / / 2 0 0 HCM 0 0 0 0 / / / /
Carrie P. Weber Junior High:
11-0825 Reconstruction 0-006-029 05/31/12 DONE DONE DONE 02/21/12 02/17/12 05/07/09 05/19/09 2 412,555 412,555 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
12-0554 Reconstruction 0-006-030 04/08/13 DONE DONE DONE 12/13/12 12/03/12 01/20/11 05/15/12 2,4,7,8,9,10,155,15, 2,664,956 0 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
F.E. Guggenheim Elementary:
12-0555 Reconstruction 0-010-025 04/08/13 DONE DONE DONE 12/13/12 12/03/12 01/17/12 05/15/12 4,7,8,155,15,16 898,846 0 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
Storage Building at Admin. Site:
- New Construction 2-050-001 / / / / 05/26/11 / / 02 - 16 0 0 HCM 0 0 0 0 / / / /
HS Turf Field A Storage:
- DB Discovered Building 2-051-001 / / / / 06/20/11 / / 0 0 HCM 0 0 0 0 / / / /
HS Turf Field B Storage:
- DB Discovered Building 2-052-001 / / / / 06/20/11 / / 0 0 HCM 0 0 0 0 / / / /
HS Upper Field Storage:
- DB Discovered Building 2-053-001 / / / / 06/20/11 / / 0 0 HCM 0 0 0 0 / / / /
HS Running Track Storage:
- DB Discovered Building 2-054-001 / / / / 06/20/11 / / 0 0 HCM 0 0 0 0 / / / /
HS Bleacher Storage:
- DB Discovered Building 2-055-001 / / / / 06/20/11 / / 0 0 HCM 0 0 0 0 / / / /
Port Washington Public Library:
09-0084 Reconstruction 6-032-004 07/28/09 DONE DONE DONE 07/24/09 07/22/09 07/13/09 07/08/09 14 96,000 0 HCM 0 0 0 Donald and Liisa Sclare Archi 0 / / / /
10-1188 Reconstruction 6-032-005 08/08/11 DONE DONE DONE 04/13/11 04/11/11 04/08/10 04/01/11 7 609,999 0 HCM 0 0 0 Donald & Liisa Sclare Archite 0 / / / /
- Reconstruction 6-032-006 / / / / 03/24/11 / / 7 0 0 HCM 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Garden City Park School:
- XX Reconstruction 0-001-018 CANCELLED / / / / 02/06/09 / / 8,10 0 0 DDJ 0 0 0 0 / / / /
- XX Reconstruction 0-001-019 CANCELLED / / / / 04/26/10 / / 9,10,155 0 4,039,200 DDJ 0 0 0 0 / / / /
10-0813 Reconstruction 0-001-020 06/29/11 DONE DONE DONE 02/07/11 01/28/11 01/19/11 10/12/10 2,4,8,9,155,15,16 2,140,257 2,140,257 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 08/20/12
11-0410 Reconstruction 0-001-021 01/18/12 DONE DONE DONE 11/17/11 11/07/11 11/15/11 10/12/10 2,4,8,9,14,155,15,16 1,003,000 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Hillside Grade School:
10-0814 Reconstruction 0-002-023 06/29/11 DONE DONE DONE 02/07/11 01/28/11 01/19/11 10/12/10 2,4,8,155,15,16 1,568,999 1,568,999 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 08/20/12
11-0411 Reconstruction 0-002-024 01/18/12 DONE DONE DONE 11/17/11 11/07/11 11/15/11 10/12/10 2,4,7,8,9,14,155,15, 1,180,590 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Manor Oaks Elementary School:
- XX Reconstruction 0-003-020 CANCELLED / / / / 02/06/09 / / 4,8,13 0 0 DDJ 0 0 0 0 / / / /
09-0589 Reconstruction 0-003-021 12/31/09 DONE DONE DONE 12/21/09 12/14/09 11/06/09 11/09/09 2,16 100,000 100,000 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 10/12/11
10-0815 Reconstruction 0-003-022 06/29/11 DONE DONE DONE 02/07/11 01/28/11 01/19/11 10/12/10 2,8,10,155,15,16 1,001,973 1,001,973 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 03/07/13
New Hyde Park Road School:
11-0412 Reconstruction 0-004-017 01/18/12 DONE DONE DONE 11/17/11 11/07/11 01/20/11 10/12/10 2,4,8,9,10,155,15,16 1,605,181 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
- XX Reconstruction 0-004-018 CANCELLED / / / / 11/15/11 / / 2,4,7,8,9,14,155,15, 0 6,869,655 DDJ 0 0 0 0 / / / /
Hillside Public Library:
09-1117 Reconstruction 6-007-002 04/27/10 DONE DONE DONE 03/24/10 03/12/10 11/06/09 12/10/09 2,16 118,000 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Munsey Park Elementary School:
07-1371 Reconstruction 0-001-020 05/29/08 DONE DONE DONE 01/15/08 01/14/08 08/08/07 02/07/07 2,4,8,9,155,15,16 1,787,452 1,787,452 MGL 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
08-0156 Reconstruction 0-001-021 02/26/09 DONE DONE DONE 08/13/08 08/06/08 05/29/08 11/29/07 155,15,16 615,934 615,934 JOD 0 0 0 John A Grillo-ARCHITECTS PC 615,934 / / / /
11-0925 Reconstruction 0-001-022 04/17/12 DONE DONE DONE 03/09/12 03/09/12 12/18/09 05/17/11 2,4 580,658 0 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Manhasset Jr/Sr High School:
07-1372 Reconstruction 0-004-032 05/29/08 DONE DONE DONE 01/15/08 01/14/08 06/29/07 02/07/07 2,4,8,9,155,15,16 2,757,365 2,757,365 MGL 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
08-0157 Reconstruction 0-004-034 02/26/09 DONE DONE DONE 08/13/08 08/06/08 05/29/08 11/29/07 155,15,16 2,125,045 2,125,045 JOD 0 0 0 John A Grillo-ARCHITECTS PC 2,125,045 / / / /
- Reconstruction 0-004-035 / / / / 11/06/08 / / 2 0 39,953,440 JOD 0 0 0 0 / / / /
- Reconstruction 0-004-036 / / / / 11/14/08 / / 9,10,15,16 0 39,953,440 JOD 0 0 0 0 / / / /
09-0821 Additions and Alterations 0-004-037 05/11/10 DONE DONE DONE 01/26/10 01/25/10 04/06/09 05/18/09 02 - 16 3,295,386 0 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
11-0880 Reconstruction 0-004-038 06/15/12 DONE DONE DONE 03/06/12 02/24/12 12/18/09 05/17/11 2,4,10,15,16 1,201,633 0 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
09-1481 Reconstruction 0-004-039 06/24/10 DONE DONE DONE 06/01/10 05/26/10 04/21/10 04/18/10 2 542,000 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
10-1216 Reconstruction 0-004-040 05/18/11 DONE DONE DONE 04/21/11 04/18/11 03/31/11 05/17/10 2 182,900 182,900 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
- XX Reconstruction 0-004-041 CANCELLED / / / / 01/12/12 / / 16 0 39,801,216 JOD 0 0 0 0 / / / /
11-1017 Reconstruction 0-004-042 07/18/12 DONE DONE DONE 03/16/12 03/16/12 01/17/12 01/19/12 9,10,16 150,000 150,000 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 03/21/13
12-1009 Reconstruction 0-004-043 DONE STARTED UNREVIEWED03/21/13 03/18/13 01/23/13 01/24/13 8,9,10,16 241,500 0 MFS 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Shelter Rock Elementary:
07-1373 Reconstruction 0-005-020 05/29/08 DONE DONE DONE 01/15/08 01/14/08 06/29/07 02/07/07 2,8,9,155,16 756,933 756,933 MGL 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
11-0881 Reconstruction 0-005-021 06/15/12 DONE DONE DONE 03/06/12 02/24/12 08/03/07 05/17/11 2,16 440,534 0 MGL 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
08-0158 Reconstruction 0-005-022 02/26/09 DONE DONE DONE 08/13/08 08/06/08 05/29/08 11/29/07 155,15,16 563,263 563,263 JOD 0 0 0 John A Grillo-ARCHITECTS PC 563,263 / / / /
Concession Stand:
11-0973 Reconstruction 7-029-002 06/11/12 DONE DONE DONE 03/16/12 03/14/12 02/03/12 01/19/12 16 38,915 0 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
E. M. Baker Annex:
- Reconstruction 0-002-005 / / / / 07/16/08 / / 8,9,15,16 0 8,050,725 HCM 0 0 0 0 / / / /
11-0303 Reconstruction 0-002-006 06/08/12 DONE DONE DONE 10/28/11 10/28/11 09/21/11 05/17/11 15,16 195,000 0 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
Clover Drive School:
08-0294 Reconstruction 0-005-007 09/29/08 DONE DONE DONE 09/10/08 09/05/08 12/26/07 05/20/08 7 600,000 0 HCM 0 0 0 Emteque Corporation 0 / / / /
- Reconstruction 0-005-008 / / / / 04/25/11 / / 2,4,7,16 0 0 HCM 0 0 0 0 / / / /
11-0304 Reconstruction 0-005-009 06/08/12 DONE DONE DONE 10/28/11 10/28/11 09/21/11 05/17/11 15,16 115,000 115,000 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
Cumberland School:
09-0386 Reconstruction 0-006-007 ADDENDUM REQ'D ***FINAL APPLICATION FORM INCOMPLETE/INCORRECT*** 0 HCM 0 0 0 Emteque Corporation 0 / / / /
11-0249 Reconstruction 0-006-008 06/26/12 DONE DONE DONE 10/11/11 10/07/11 08/12/11 03/24/10 7,155,16 30,000 0 HCM 0 0 0 Collins & Scoville Architects 0 / / / /
11-0305 Reconstruction 0-006-009 06/08/12 DONE DONE DONE 10/28/11 10/28/11 09/21/11 05/17/11 15,16 145,000 0 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
11-0352 Reconstruction 0-006-010 03/23/12 DONE DONE DONE 11/07/07 11/04/07 11/02/11 04/12/11 2 601,000 0 HCM 0 0 0 Burton Behrendt Smith 0 / / 04/08/13
- Reconstruction 0-006-011 / / / / 05/17/12 / / 2,9,15,16 0 0 HCM 0 0 0 0 / / / /
Lakeville Elementary:
11-1147 Reconstruction 0-010-016 04/20/12 DONE DONE DONE 04/18/12 04/16/12 11/18/05 02/14/12 10,16 1,353,000 0 HCM 0 0 0 Collins & Scoville Architects 0 / / / /
11-0193 Reconstruction 0-010-018 06/14/12 DONE DONE DONE 09/23/11 09/23/11 01/17/08 03/08/10 9 105,600 105,600 HCM 0 0 0 Collins & Scoville Architects 0 / / 04/26/13
11-1387 Additions and Alterations 0-010-020 06/21/12 DONE DONE DONE 06/08/12 05/31/12 07/16/08 02/14/12 02 - 16 1,755,000 0 HCM 0 0 0 Collins & Scoville Architects 0 / / / /
11-0306 Reconstruction 0-010-021 06/08/12 DONE DONE DONE 10/28/11 10/28/11 09/21/11 05/17/11 15,16 205,000 0 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
North Middle School:
11-0250 Reconstruction 0-011-020 06/26/12 DONE DONE DONE 10/11/11 10/07/11 11/18/05 03/24/10 10,16 65,000 0 HCM 0 0 0 Collins & Scoville Architects 0 / / / /
11-0978 Reconstruction 0-011-023 05/24/12 DONE DONE DONE 03/16/12 03/15/12 07/20/11 02/14/12 2,4,14 1,796,009 0 HCM 0 0 0 Wiedersum Associates Architec 0 / / / /
11-0353 Reconstruction 0-011-024 03/23/12 DONE DONE DONE 11/07/11 11/04/11 09/21/11 05/17/11 2,4,8,9,155,15,16 900,000 0 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
11-0307 Reconstruction 0-011-025 06/08/12 DONE DONE DONE 10/28/11 10/28/11 09/21/11 05/17/11 15,16 230,000 0 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
12-0455 Reconstruction 0-011-026 01/23/13 DONE DONE DONE 11/19/12 11/16/12 10/11/12 02/14/12 4,8 640,000 0 JMB 0 0 0 Wiedersum Associates Architec 0 / / / /
North Senior High:
07-1807 Reconstruction 0-012-012 12/16/08 DONE DONE DONE 03/15/08 03/11/08 01/30/07 09/18/06 4,8,9,15,16 983,620 983,620 HCM 0 0 0 SPECTOR GROUP 0 / / / /
11-0194 Reconstruction 0-012-013 10/03/11 DONE DONE DONE 09/23/11 09/23/11 12/19/07 03/08/10 10 180,000 180,000 HCM 0 0 0 Collins & Scoville Architects 0 / / 04/26/13
09-0512 Reconstruction 0-012-014 03/03/10 DONE DONE DONE 11/27/09 11/24/09 10/05/09 06/07/10 7 67,000 67,000 HCM 0 0 0 Emteque Corp. 0 / / / /
11-0969 Reconstruction 0-012-015 03/21/12 DONE DONE DONE 03/16/12 03/14/12 07/20/11 02/14/12 2,4 270,825 0 HCM 0 0 0 Wiedersum Associates Architec 0 / / / /
11-0308 Reconstruction 0-012-016 06/08/12 DONE DONE DONE 10/28/11 10/28/11 09/21/11 05/17/11 15,16 490,000 0 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
11-0484 Reconstruction 0-012-017 02/10/12 DONE DONE DONE 12/12/11 12/12/11 09/29/11 04/12/11 2,9 25,894 25,894 HCM 0 0 0 Burton Behrendt Smith 0 / / 10/23/12
08-1691SC Visual Structural Inspection 0-012-SC1 06/18/09 DONE DONE DONE 04/13/09 04/13/09 / / / / 16 58,574 0 JOD 0 0 0 0 / / / /
Parkville Annex Pub Lib/leased:
11-0251 Additions and Alterations 0-013-005 06/26/12 DONE DONE DONE 10/11/11 10/07/11 04/25/11 03/24/10 02 - 16 35,600 0 HCM 0 0 0 Collins & Scoville Architects 0 / / 04/29/13
11-0309 Reconstruction 0-013-006 06/08/12 DONE DONE DONE 10/28/11 10/28/11 09/21/11 05/17/11 15,16 25,000 0 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
Parkville School:
11-0310 Reconstruction 0-014-012 06/08/12 DONE DONE DONE 10/28/11 10/28/11 09/21/11 05/17/11 15,16 150,000 0 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
Saddle Rock School:
08-1177 Reconstruction 0-015-019 05/26/09 DONE DONE DONE 02/09/09 02/02/09 07/16/08 05/20/08 8,9,155,16 106,100 106,100 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
11-0354 Reconstruction 0-015-020 03/23/12 DONE DONE DONE 11/07/11 11/04/11 08/12/11 05/17/11 2,16 240,930 0 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
11-0311 Reconstruction 0-015-021 06/08/12 DONE DONE DONE 10/28/11 10/28/11 09/21/11 05/17/11 15,16 195,000 0 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
J.F.Kennedy Elementary:
08-1178 Reconstruction 0-016-014 05/26/09 DONE DONE DONE 02/09/09 02/02/08 07/16/08 05/20/08 155,16 80,800 80,800 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
11-0312 Reconstruction 0-016-015 06/08/12 DONE DONE DONE 10/28/11 10/28/11 09/21/11 05/17/11 15,16 65,000 0 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
South Senior High:
08-1332 Reconstruction 0-018-017 06/10/09 DONE DONE DONE 03/10/09 03/06/09 10/22/07 05/20/08 13 1,250,000 1,250,000 HCM 0 0 0 Spector Group 0 / / / /
11-0110 Additions and Alterations 0-018-018 04/19/12 DONE DONE DONE 08/16/11 08/15/11 10/24/07 03/08/10 02 - 16 210,000 210,000 HCM 0 0 0 Collins & Scoville Architects 0 / / / /
11-1266 Reconstruction 0-018-019 09/18/12 DONE DONE DONE 05/04/12 05/03/12 12/19/07 02/14/12 2,9,10,155,15,16 316,600 316,600 HCM 0 0 0 Collins & Scoville Architects 0 / / / /
11-1264 Reconstruction 0-018-020 12/21/12 DONE DONE DONE 05/04/12 05/03/12 10/22/09 02/14/12 9,10 55,000 55,000 HCM 0 0 0 Collins & Scoville Architects 0 / / / /
10-0766 Additions and Alterations 0-018-021 03/30/11 DONE DONE DONE 01/28/11 01/14/11 11/22/10 03/22/10 02 - 16 210,000 210,000 HCM 0 0 0 H2M Group 0 / / / /
11-1016 Reconstruction 0-018-022 05/21/12 DONE DONE DONE 03/26/12 03/16/12 07/20/11 02/14/12 2,9 2,099,552 2,099,552 HCM 0 0 0 Wiedersum Associates Architec 0 / / / /
12-0503 Reconstruction 0-018-023 UNREVIEWED 12/05/12 12/04/12 08/17/12 02/14/12 2 0 21,583,545 JMB 0 0 0 Collins & Scoville Architects 0 / / / /
South Middle School:
11-0111 Reconstruction 0-019-018 04/19/12 DONE DONE DONE 08/16/11 08/15/11 12/19/07 05/17/10 10 210,000 0 HCM 0 0 0 Collins & Scoville Architects 0 / / / /
09-0419XX Reconstruction 0-019-019 02/04/10 CANCELLED 11/18/09 11/09/09 08/26/09 05/19/09 2 965,943 0 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
11-1265 Reconstruction 0-019-020 12/21/12 DONE DONE DONE 05/09/12 05/03/12 12/16/09 02/14/12 10 55,000 0 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
11-0981 Reconstruction 0-019-021 10/25/12 DONE DONE DONE 03/16/12 03/13/12 07/20/11 02/14/12 2,9,16 718,520 0 HCM 0 0 0 Wiedersum Associates Architec 0 / / / /
12-0504 Reconstruction 0-019-022 UNREVIEWED 12/05/12 12/04/12 08/17/12 02/14/12 2 0 0 JMB 0 0 0 Collins & Scoville Architects 0 / / / /
Administration Building:
- PR Additions and Alterations 1-001-008 / / / / 07/07/10 / / 02 - 16 0 0 HCM 0 0 0 0 / / / /
11-0195 Additions and Alterations 1-001-008 06/14/12 DONE DONE DONE 09/23/11 09/23/11 07/07/10 03/08/10 02 - 16 438,000 0 HCM 0 0 0 Collins & Scoville Architects 0 / / 04/26/13
Security Building:
- Reconstruction 1-004-002 / / / / 09/21/11 / / 15,16 0 0 HCM 0 0 0 0 / / / /
Grounds Garage 2:
11-0586 Reconstruction 3-020-001 01/24/12 DONE DONE DONE 01/04/12 01/04/12 07/08/11 03/08/10 2,4,8,9,16 67,400 0 HCM 0 0 0 Collins & Scoville Architects 0 / / 07/02/12
Inland Building:
09-0071 Additions and Alterations 3-021-002 07/30/09 DONE DONE DONE 07/22/09 07/17/09 07/16/08 / / 02 - 16 175,000 0 HCM 0 0 0 MJM ENGINEERING,PLLC 0 / / / /
Southland Building:
11-0252 Reconstruction 3-022-001 06/26/12 DONE DONE DONE 10/11/11 10/07/11 04/25/11 03/24/10 2,7,155,16 78,000 0 HCM 0 0 0 Collins & Scoville Architects 0 / / / /
Grace Avenue Senior Center:
07-1726 Reconstruction 7-040-011 09/17/08 DONE DONE DONE 03/03/08 02/26/08 04/18/07 07/02/07 8,9,15,16 116,368 0 HCM 0 0 0 Emteque Corporation 0 / / / /
08-0295 Reconstruction 7-040-012 09/29/08 DONE DONE DONE 09/10/08 09/05/08 12/26/07 05/20/08 7 600,000 0 HCM 0 0 0 Emteque Corporation 0 / / / /
- XX Reconstruction 7-040-013 CANCELLED / / / / 10/15/09 / / 10,16 0 0 HCM 0 0 0 0 / / / /
09-0747 Reconstruction 7-040-014 04/20/10 DONE DONE DONE 01/21/10 01/19/10 10/22/09 05/20/08 10 75,000 0 HCM 0 0 0 Emteque Corporation 0 / / / /
09-0748XX Reconstruction 7-040-015 05/13/10 CANCELLED 01/21/10 01/19/10 11/05/09 05/20/08 10,16 14,500 0 HCM 0 0 0 Emteque Corporation 0 / / / /
- Reconstruction 7-040-016 ***SHPO RESPONSE*** 0 HCM 0 0 0 0 / / / /
10-0133 Reconstruction 7-040-017 08/25/10 DONE DONE DONE 08/20/10 08/06/10 06/16/10 05/20/08 10 50,000 0 HCM 0 0 0 Emteque Corporation 0 / / / /
11-0313 Reconstruction 7-040-018 06/08/12 DONE DONE DONE 10/28/11 10/28/11 09/21/11 05/17/11 15,16 40,000 0 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
Districtwide:
- Reconstruction 7-999-003 / / / / 07/09/08 / / 10,13,16 0 0 HCM 0 0 0 0 / / / /
- Reconstruction 7-999-004 / / / / 09/10/08 / / 10,13,16 0 0 HCM 0 0 0 0 / / / /
- Reconstruction 7-999-005 / / / / 10/22/09 / / 16 0 0 HCM 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Shelter Rock Academy:
08-0626 Reconstruction 0-001-003 05/04/09 DONE DONE DONE 10/30/08 10/29/08 01/31/08 05/15/08 2,155,15,16 54,925 0 DDJ 0 0 0 McDonald & Monterose LLP 0 / / / /
Center Street Elementary:
08-0627 Reconstruction 0-002-018 05/04/09 DONE DONE DONE 10/30/08 10/29/08 01/31/08 05/15/08 2,7,8,9,155,15,16 619,267 619,267 DDJ 0 0 260,000 McDonald & Monterose LLP 0 / / / /
09-1039 Reconstruction 0-002-019 07/19/10 DONE DONE DONE 03/09/10 03/05/10 10/15/09 05/15/08 13,16 41,667 41,667 DDJ 0 0 0 McDonald & Monterose LLP 0 / / 03/04/13
Denton Avenue Elementary:
08-0628 Reconstruction 0-003-016 05/04/09 DONE DONE DONE 10/30/08 10/29/08 01/31/08 05/15/08 2,4,7,8,9,155,15,16 660,301 660,301 DDJ 0 0 260,000 McDonald & Monterose LLP 0 / / / /
09-1040 Reconstruction 0-003-017 07/19/10 DONE DONE DONE 03/09/10 03/05/10 10/15/09 10/15/09 10,16 41,666 41,666 DDJ 0 0 0 McDonald & Monterose LLP 0 / / 03/04/13
Searington Elementary:
08-0629 Reconstruction 0-005-020 05/04/09 DONE DONE DONE 10/30/08 10/29/08 01/31/08 05/15/08 2,7,8,155,15,16 1,412,248 1,412,248 DDJ 0 0 260,000 McDonald & Monterose LLP 0 / / / /
09-1041 Reconstruction 0-005-021 07/19/10 DONE DONE DONE 03/09/10 03/05/10 10/15/09 10/15/09 10,16 41,666 41,666 DDJ 0 0 0 McDonald & Monterose LLP 0 / / 03/04/13
Herricks Senior High School:
08-0630 Reconstruction 0-008-029 05/04/09 DONE DONE DONE 10/30/08 10/29/08 01/31/08 05/15/08 2,8,9,10,14,155,15,1 2,472,624 2,472,624 DDJ 0 0 260,000 McDonald & Monterose LLP 0 / / / /
- Reconstruction 0-008-030 / / / / 08/25/11 / / 13,15 0 0 DDJ 0 0 0 0 / / / /
Herricks Middle School:
08-0631 Reconstruction 0-011-019 05/04/09 DONE DONE DONE 10/30/08 10/29/08 01/31/08 05/15/08 2,9,10,155,15,16 1,237,608 1,237,608 DDJ 0 0 260,000 McDonald & Monterose LLP 0 / / 03/19/12
Herricks Community Center:
08-0632 Reconstruction 7-007-004 05/04/09 DONE DONE DONE 10/30/08 10/29/08 01/31/08 05/15/08 2,4,7,8,10,155,15,16 1,338,027 0 DDJ 0 0 0 McDonald & Monterose LLP 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Meadow Drive School:
11-0943 Reconstruction 0-001-011 09/05/12 DONE DONE DONE ***MULTIPLE PROBLEMS*** 20,670 HCM 0 0 0 H2M Group 0 / / / /
Hampton St. Elementary:
10-1133PR Additions and Alterations 0-003-018 UNREVIEWED 04/07/11 03/30/11 02/18/11 / / 02 - 16 0 0 HCM 0 0 0 H2M Group 0 / / / /
11-0092 Additions and Alterations 0-003-018 11/21/11 DONE DONE DONE 08/09/11 03/30/11 02/18/11 05/17/11 02 - 16 2,115,350 35,457 HCM 0 0 0 H2M Group 0 / / 02/01/13
Jackson Ave. Elementary:
- PR Additions and Alterations 0-004-019 / / / / 02/18/11 / / 02 - 16 0 0 HCM 0 0 0 0 / / / /
12-0869 Reconstruction 0-004-020 DONE DONE UNREVIEWED12/20/12 12/19/12 01/17/13 05/16/13 4,7,8,9,155,15,16 0 0 JMB 0 0 0 H2M Group 0 / / / /
Mineola High School:
- Reconstruction 0-007-014 / / / / 06/30/11 / / 2 0 0 HCM 0 0 0 0 / / / /
- Reconstruction 0-007-015 / / / / 06/30/11 / / 2 0 0 HCM 0 0 0 0 / / / /
- Reconstruction 0-007-016 / / / / 07/01/11 / / 2,16 0 0 HCM 0 0 0 0 / / / /
Cross Street Elementary:
10-1281 Reconstruction 0-015-017 07/25/11 DONE DONE DONE 05/13/11 05/09/11 02/18/11 05/17/11 4,8,9,155,15,16 325,412 325,412 HCM 0 0 0 H2M Group 0 / / / /
Athletic Storage @ High School:
08-0792DB Discovered Building 2-018-001 12/19/08 DONE DONE DONE 11/25/08 11/24/08 10/20/08 / / 02 - 16 0 0 HCM 0 0 0 Dodge Chamberlin Luzine Weber 0 / / / /
Press Box @ Hampton Street School:
09-1566 New Construction 7-019-001 09/08/10 DONE DONE DONE 06/22/10 06/15/10 06/02/10 05/19/09 02 - 16 50,000 0 HCM 0 0 0 H2M Group 0 / / / /
District Wide:
07-2340 Reconstruction 7-999-001 10/03/08 DONE DONE DONE 07/08/08 06/26/08 04/23/08 05/20/08 10,13,16 143,000 0 HCM 0 0 0 Dodge Chamberlin Luzine Weber 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Middle/High School:
- Reconstruction 0-001-034 / / / / 04/04/13 / / 2,4,7,8,9,10,155,15, 0 0 JOB 0 0 0 0 / / / /
12-1141 Reconstruction 0-001-035 UNREVIEWED 04/30/13 04/29/13 04/04/13 03/05/13 2,4,10,16 0 25,860,832 JOB 0 0 0 H2M Group 0 / / / /
12-1201 Reconstruction 0-001-036 UNREVIEWED 05/16/13 05/14/13 04/23/13 03/05/13 2 0 25,860,832 JOB 0 0 0 H2M Group 0 / / / /
Rushmore Ave. School:
12-1209 Reconstruction 0-002-022 UNREVIEWED 05/17/13 05/17/13 04/04/13 03/05/13 2,4 0 0 JOB 0 0 0 H2M Group 0 / / / /
Cherry Lane Elementary:
11-0975 Reconstruction 0-003-018 04/16/12 DONE DONE DONE 03/16/12 03/15/12 02/07/12 02/09/12 7,8,9 240,000 240,000 DDJ 0 0 0 Burton Behrendt Smith 0 / / 05/01/13
- Reconstruction 0-003-019 / / / / 04/04/13 / / 4,7 0 0 JOB 0 0 0 0 / / / /
Storage Container #1:
09-0461DB Discovered Building 2-007-001 02/19/10 DONE DONE DONE 11/25/09 11/18/09 04/23/09 / / 0 0 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
Storage Container #2:
09-0462DB Discovered Building 2-008-001 02/19/10 DONE DONE DONE 11/25/09 11/18/09 04/23/09 / / 0 0 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
Storage Container #3:
09-0463DB Discovered Building 2-009-001 02/19/10 DONE DONE DONE 11/25/09 11/18/09 04/23/09 / / 0 0 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
North Shore Middle School:
08-0477 Reconstruction 0-001-021 03/04/09 DONE DONE DONE 10/06/08 10/03/08 08/13/07 08/23/07 2,9 546,382 546,382 MGL 0 0 0 Burton Behrendt Smith 0 / / / /
08-0095 Reconstruction 0-001-023 09/17/08 DONE DONE DONE 07/25/08 07/23/08 09/11/07 05/20/08 9,155,16 90,000 90,000 MGL 0 0 0 Burton Behrendt Smith 0 / / / /
08-1573 Reconstruction 0-001-024 05/13/09 DONE DONE DONE 04/29/09 04/24/09 04/06/09 05/19/09 2,7 243,631 243,631 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
09-0652 Reconstruction 0-001-025 02/26/10 DONE DONE DONE 12/30/09 12/22/09 11/06/09 05/19/09 2,4,155,15,16 954,975 954,975 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
10-1373 Reconstruction 0-001-026 08/02/11 DONE DONE DONE 06/07/11 05/23/11 06/07/11 05/05/11 10 25,000 25,000 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
11-0758 Reconstruction 0-001-027 06/13/12 DONE DONE DONE 02/07/12 02/06/12 11/21/11 05/17/11 2,4,8,9,10,155,15,16 236,672 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
Glen Head Elementary School:
08-0478 Reconstruction 0-002-017 03/04/09 DONE DONE DONE 10/06/08 10/03/08 08/13/07 08/23/07 2,9 365,250 365,250 MGL 0 0 0 Burton Behrendt Smith 0 / / / /
07-2249 Reconstruction 0-002-018 07/25/07 DONE DONE DONE 06/11/08 06/03/08 04/24/08 05/15/07 16 117,068 117,068 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
10-1374 Reconstruction 0-002-019 08/02/11 DONE DONE DONE 06/07/11 05/23/11 06/07/11 05/05/11 10 12,700 12,700 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
11-0984 Reconstruction 0-002-020 04/26/12 DONE DONE DONE 03/16/12 03/14/12 12/07/11 12/15/11 4 190,000 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
Glenwood Landing School:
08-0479 Reconstruction 0-003-018 03/04/09 DONE DONE DONE 10/06/08 10/03/08 08/13/07 08/23/07 2,9 282,405 282,405 MGL 0 0 0 Burton Behrendt Smith 0 / / / /
10-1375 Reconstruction 0-003-019 08/02/11 DONE DONE DONE 06/07/11 05/23/11 06/07/11 05/05/11 10 35,000 35,000 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
North Shore High School:
08-0480 Reconstruction 0-004-023 03/04/09 DONE DONE DONE 10/06/08 10/03/08 08/13/07 08/23/07 2,9 722,948 722,948 MGL 0 0 0 Burton Behrendt Smith 0 / / / /
08-0937 Reconstruction 0-004-025 04/21/09 DONE DONE DONE 12/16/08 12/12/08 12/02/08 05/20/08 2,4,9,10,155,15,16 198,079 198,079 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
10-1178 Reconstruction 0-004-026 06/16/11 DONE DONE DONE 04/12/11 04/08/11 12/29/10 05/17/10 2 3,079,750 3,079,750 JOD 0 0 0 Burton Behrendt Smith 0 / / 09/25/12
10-1376 Reconstruction 0-004-027 08/02/11 DONE DONE DONE 06/07/11 05/23/11 06/07/11 05/05/11 10 305,000 305,000 JOD 0 0 0 Burton Behrendt Smith 0 / / 09/10/12
11-0985 Reconstruction 0-004-028 04/26/12 DONE DONE DONE 03/16/12 03/14/12 12/07/11 12/15/11 4 149,875 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
12-1177 Reconstruction 0-004-029 UNREVIEWED 05/10/13 05/07/13 01/10/13 / / 16 0 21,149,903 JOB 0 0 0 Burton Behrendt Smith 0 / / / /
Sea Cliff School:
10-1377 Reconstruction 0-005-014 08/02/11 DONE DONE DONE 06/07/11 05/23/11 06/07/11 05/05/11 10 45,000 45,000 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
11-0986 Reconstruction 0-005-015 04/26/12 DONE DONE DONE 03/16/12 03/14/12 12/07/11 12/15/11 4 160,125 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
New Transportation/Maintenance Bldg:
09-0598 Reconstruction 5-040-002 03/08/10 DONE DONE DONE 12/22/09 12/15/09 11/17/09 09/10/09 2,10,15 35,000 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
- Reconstruction 5-040-003 / / / / 11/19/09 / / 15,16 0 0 JOD 0 0 0 0 / / / /
New Field House at High School:
10-1275 New Construction 7-050-001 08/17/11 DONE DONE DONE 05/10/11 05/04/11 03/02/11 / / 02 - 16 806,450 0 JOD 0 0 0 Burton Behrendt Smith 0 / / 09/01/12
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
South Grove Elem. Annex:
- Reconstruction 0-002-011 / / / / 02/15/11 / / 2,15 0 0 HCM 0 0 0 0 / / / /
Willits Elementary:
- Reconstruction 0-004-018 / / / / 02/15/11 / / 2,15 0 0 HCM 0 0 0 0 / / / /
South Woods Middle School:
- Reconstruction 0-006-022 / / / / 10/21/09 / / 16 0 0 HCM 0 0 0 0 / / / /
Syosset High School:
10-1163 Reconstruction 0-010-036 06/22/11 DONE DONE DONE 04/07/11 04/05/11 02/15/11 05/18/10 2,4,9,16 237,940 237,940 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 11/10/11
10-1334 Reconstruction 0-010-037 06/20/11 DONE DONE DONE 05/26/11 05/24/11 05/19/11 05/19/09 7 105,000 105,000 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 05/08/12
11-0130 Reconstruction 0-010-038 05/06/13 DONE DONE DONE 08/19/11 08/18/11 06/22/11 05/18/10 16 88,500 88,500 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 05/23/13
12-0119 Reconstruction 0-010-039 10/16/12 DONE DONE DONE 08/21/12 08/17/12 06/06/12 06/04/12 14 63,000 63,000 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 05/23/13
12-0502 Reconstruction 0-010-040 03/04/13 DONE DONE DONE 11/30/12 11/30/12 11/21/12 12/17/12 2,7 441,000 441,000 JMB 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Robbins Lane Elementary:
10-1164 Reconstruction 0-015-017 06/22/11 DONE DONE DONE 04/07/11 04/05/11 03/25/11 05/18/10 2,9 12,000 12,000 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 08/17/12
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Bayville Intermediate School:
07-1811 Reconstruction 0-002-011 02/19/09 DONE DONE DONE 03/17/08 03/10/08 01/16/08 10/19/06 2,15,16 310,673 0 MGL 0 0 0 EISENBACH-& RUUHNKE ENGINERIN 310,673 / / / /
10-0598 Reconstruction 0-002-012 02/23/11 DONE DONE DONE 12/22/10 12/13/10 12/29/09 05/18/10 2,7,8,9 460,000 0 JOD 0 0 0 H2M Group 0 / / / /
09-1022 Reconstruction 0-002-013 07/30/10 DONE DONE DONE 03/09/10 03/04/10 01/06/10 05/18/10 2,8,9,155,15,16 891,770 0 JOD 0 0 0 H2M Group 0 / / / /
- Reconstruction 0-002-014 / / / / 11/13/12 / / 2,16 0 0 DDJ 0 0 0 0 / / / /
12-1208 Reconstruction 0-002-015 UNREVIEWED 05/17/13 05/17/13 03/08/13 05/01/12 4,155 0 0 MFS 0 0 0 H2M Group 0 / / / /
Locust Valley Intermediate:
07-1812 Reconstruction 0-003-014 02/19/09 DONE DONE DONE 03/17/08 03/10/08 01/16/08 10/19/06 2,16 242,098 0 MGL 0 0 0 EISENBACH-& RUUHNKE ENGINERIN 242,098 / / / /
12-1128 Reconstruction 0-003-015 UNREVIEWED 04/25/13 04/19/13 03/08/13 / / 8 850,000 0 MFS 0 0 0 H2M Group 0 / / / /
- Reconstruction 0-003-016 / / / / 03/08/13 / / 2,15,16 0 0 MFS 0 0 0 0 / / / /
12-1129 Reconstruction 0-003-017 UNREVIEWED 04/25/13 04/19/13 03/08/13 / / 9,155,16 0 0 MFS 0 0 0 H2M Group 0 / / / /
Bayville Primary:
07-1813 Reconstruction 0-009-009 02/19/09 DONE DONE DONE 03/17/08 03/10/08 01/17/08 10/19/06 2,8,16 178,950 0 MGL 0 0 0 EISENBACH-& RUUHNKE ENGINERIN 178,950 / / / /
09-1232 Reconstruction 0-009-010 05/20/10 DONE DONE DONE 04/05/10 04/01/10 01/06/10 05/18/10 2,9 110,588 72,624 JOD 0 0 0 H2M Group 0 / / / /
- Reconstruction 0-009-011 / / / / 06/24/11 / / 8 0 0 JOD 0 0 0 0 / / / /
Ann M MacArthur School:
07-1814 Reconstruction 0-010-011 02/19/09 DONE DONE DONE 03/17/08 03/10/08 01/16/08 10/19/06 2,16 157,438 0 MGL 0 0 0 EISENBACH-& RUUHNKE ENGINERIN 157,438 / / / /
09-0165 Reconstruction 0-010-012 10/07/09 DONE DONE DONE 08/27/09 08/24/09 08/07/09 05/20/08 2 179,866 270,750 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
09-1231 Reconstruction 0-010-013 05/20/10 DONE DONE DONE 04/05/10 04/01/10 01/06/10 05/18/10 9 224,911 195,066 JOD 0 0 0 H2M Group 0 / / / /
- Reconstruction 0-010-014 / / / / 11/13/12 / / 4,7,9 0 0 DDJ 0 0 0 0 / / / /
- Reconstruction 0-010-015 / / / / 06/24/11 / / 8 0 0 JOD 0 0 0 0 / / / /
- Reconstruction 0-010-016 / / / / 09/21/11 / / 4,9 0 0 JOD 0 0 0 0 / / / /
- Reconstruction 0-010-017 / / / / 11/14/12 / / 0 0 DDJ 0 0 0 0 / / / /
Locust Valley High:
07-1679 Reconstruction 0-012-022 06/11/08 DONE DONE DONE 02/23/08 02/20/08 08/20/07 05/15/07 2,9,10,155,15,16 432,500 432,500 MGL 0 0 0 Burton Behrendt Smith 0 / / / /
08-1444 Reconstruction 0-012-025 04/02/09 DONE DONE DONE 03/31/09 03/30/09 11/21/07 05/20/08 2,15,16 1,277,898 1,277,898 MGL 0 0 0 Burton Behrendt Smith 0 / / / /
08-1052 Reconstruction 0-012-026 01/27/09 DONE DONE DONE 01/06/09 01/02/09 12/05/07 05/20/08 2,15,16 1,156,894 1,156,894 MGL 0 0 0 Burton Behrendt Smith 0 / / / /
07-1815 Reconstruction 0-012-027 02/19/09 DONE DONE DONE 03/17/08 03/10/08 01/16/08 10/19/06 2,8,16 2,797,925 2,797,925 MGL 0 0 0 EISENBACH-& RUUHNKE ENGINERIN 2,797,925 / / / /
- Reconstruction 0-012-028 / / / / 06/19/09 / / 155,15,16 0 0 JOD 0 0 0 0 / / / /
- Reconstruction 0-012-029 / / / / 06/22/09 / / 155,15,16 0 0 JOD 0 0 0 0 / / / /
09-1103 Reconstruction 0-012-030 09/30/10 DONE DONE DONE 03/18/10 03/10/10 12/29/09 05/19/09 2,7,8,9,155,15,16 577,348 577,348 JOD 0 0 0 H2M Group 0 / / / /
- PR Additions and Alterations 0-012-031 / / / / 01/06/10 / / 02 - 16 0 0 JOD 0 0 0 0 / / / /
10-0664 Reconstruction 0-012-032 05/23/11 DONE DONE DONE 12/31/10 12/23/10 11/04/10 05/18/10 16 200,000 200,000 JOD 0 0 0 H2M Group 0 / / / /
10-0665 Reconstruction 0-012-033 05/23/11 DONE DONE DONE 12/30/10 12/23/10 11/04/10 05/18/10 7,8 400,000 0 JOD 0 0 0 H2M Group 0 / / / /
- Reconstruction 0-012-034 / / / / 06/24/11 / / 8 0 0 JOD 0 0 0 0 / / / /
11-1093 Reconstruction 0-012-035 07/20/12 DONE DONE DONE 04/06/12 04/05/12 09/21/11 05/17/11 2,4 160,500 0 JOD 0 0 0 H2M Group 0 / / / /
- Reconstruction 0-012-036 / / / / 09/21/11 / / 10 0 0 JOD 0 0 0 0 / / / /
- Reconstruction 0-012-037 / / / / 10/21/11 / / 2,15 0 27,338,520 JOD 0 0 0 0 / / / /
11-1260 Reconstruction 0-012-038 05/29/12 DONE DONE DONE 05/03/12 05/03/12 04/17/12 05/15/12 155 369,500 0 JOD 0 0 0 0 / / / /
- Reconstruction 0-012-039 / / / / 04/17/12 / / 155 0 0 JOD 0 0 0 0 / / / /
Administration Bldg.:
07-1816 Reconstruction 1-001-005 02/19/09 DONE DONE DONE 03/17/08 03/10/08 01/17/08 10/19/06 2,16 24,835 0 MGL 0 0 0 EISENBACH-& RUUHNKE ENGINERIN 24,835 / / / /
- Reconstruction 1-001-006 / / / / 09/21/11 / / 16 0 0 JOD 0 0 0 0 / / / /
Plumbing Storage Building@Bus Garage:
08-0187DB Discovered Building 2-018-001 08/28/08 DONE DONE DONE 08/19/08 06/25/08 06/10/08 / / 0 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
Storage Building @ Administration:
08-0188DB Discovered Building 2-019-001 08/28/08 DONE DONE DONE 08/19/08 06/25/08 06/10/08 / / 0 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
Bayvill Intermediate School Storage:
11-1204DB Discovered Building 2-020-001 05/17/12 DONE DONE DONE 04/24/12 04/24/12 02/15/11 / / 0 0 JOD 0 0 0 H2M Group 0 / / / /
IS Storage shed:
11-1205DB Discovered Building 2-021-001 05/17/12 DONE DONE DONE 04/24/12 04/24/12 05/26/11 / / 0 0 JOD 0 0 0 H2M Group 0 / / / /
Maintenance/Bus Garage Storage Shed:
11-1206DB Discovered Building 2-022-001 05/17/12 DONE DONE DONE 04/24/12 04/24/12 05/26/11 / / 0 0 JOD 0 0 0 H2M Group 0 / / / /
Admin Bldg 2 Storage Shed:
11-1207DB Discovered Building 2-023-001 05/17/12 DONE DONE DONE 04/24/12 04/24/12 05/26/11 / / 0 0 JOD 0 0 0 H2M Group 0 / / / /
Bus Garage:
07-1817 Reconstruction 5-004-006 02/19/09 DONE DONE DONE 03/17/08 03/10/08 01/17/08 10/19/06 2,16 45,093 0 MGL 0 0 0 EISENBACH-& RUUHNKE ENGINERIN 45,093 / / / /
- PR Additions and Alterations 5-004-007 / / / / 09/21/11 / / 02 - 16 0 0 JOD 0 0 0 0 / / / /
Bus Garage New Building Extension:
- Additions and Alterations 5-017-002 / / / / 09/28/11 / / 02 - 16 0 0 JOD 0 0 0 0 / / / /
Concession Stand @ High School:
00-1289 New Construction 7-018-001 09/05/08 DONE DONE DONE 03/20/01 / / 10/13/00 02/01/99 02 - 16 50,000 0 RDR 0 0 0 0 / / 01/04/13
Upper Field Restroom:
12-0774DB Discovered Building 7-024-001 03/19/13 DONE DONE DONE 02/05/13 02/05/13 10/24/12 / / 0 0 DDJ 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Old Bethpage Elementary:
11-0770 Reconstruction 0-002-021 06/14/12 DONE DONE DONE 02/09/12 02/07/12 08/10/10 05/16/11 2,7,10,155,15,16 295,000 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
Jamaica Avenue Elementary:
07-1875 Reconstruction 0-004-015 06/11/08 DONE DONE DONE 03/29/08 03/21/08 11/09/07 05/15/07 16 45,000 45,000 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
10-0636 Reconstruction 0-004-016 03/18/11 DONE DONE DONE 12/28/10 10/20/10 09/07/10 11/01/10 2,4,7,9,155,15,16 683,000 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
11-0771 Reconstruction 0-004-017 06/14/12 DONE DONE DONE 02/09/12 02/07/12 11/02/11 05/26/11 2,4,7,10,155,15,16 10,000 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
Parkway Elementary:
08-0134 Reconstruction 0-008-019 09/12/08 DONE DONE DONE 08/08/08 08/04/08 04/03/08 12/18/06 2,7,10,155 174,323 174,323 JOD 0 0 106,337 Burton Behrendt Smith 0 / / / /
08-1273 Reconstruction 0-008-020 03/18/09 DONE DONE DONE 02/23/09 02/18/09 06/11/08 05/20/08 2,4,7,9,16 42,250 42,250 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
10-0637 Reconstruction 0-008-021 03/18/11 DONE DONE DONE 12/28/10 12/20/10 09/07/10 11/01/10 2,4,7,9,16 52,250 52,250 JOD 0 0 0 Burton Behrendt Smith 0 / / 10/17/12
11-0772 Reconstruction 0-008-022 06/14/12 DONE DONE DONE 02/09/12 02/07/12 11/02/11 05/26/11 2,4,7,8,9,10,155,15, 363,000 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
Stratford Road School:
11-0773 Reconstruction 0-011-023 06/14/12 DONE DONE DONE 02/09/12 02/07/12 08/10/10 05/26/11 2,7,10,155,15,16 407,500 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
Plainview Old Bethpage Middle Sch.:
08-1274 Reconstruction 0-012-027 03/18/09 DONE DONE DONE 02/23/09 02/18/09 06/11/08 05/20/08 2,4,7,9,16 217,974 217,974 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
09-0552 Reconstruction 0-012-028 02/18/10 DONE DONE DONE 12/07/09 12/03/09 08/25/09 05/19/09 2,4,7,8,9,16 250,000 250,000 JOD 0 0 0 Burton Behrendt Smith 0 / / 10/17/12
09-1150 Reconstruction 0-012-029 07/06/10 DONE DONE DONE 03/26/10 03/19/10 11/20/09 05/19/09 2,4,7,8,9,10,14,155, 165,000 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
11-0774 Reconstruction 0-012-030 06/14/12 DONE DONE DONE 02/09/12 02/07/12 08/10/10 05/26/11 2,7,10,155,15,16 1,013,000 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
- XX Reconstruction 0-012-031 CANCELLED / / / / 08/10/10 / / 2,4,7,8,9,16 0 33,416,955 JOD 0 0 0 0 / / / /
10-0638 Reconstruction 0-012-032 03/18/11 DONE DONE DONE 12/28/10 12/20/10 09/07/10 11/01/10 2,4,7,9,155,15,16 175,000 175,000 JOD 0 0 0 Burton Behrendt Smith 0 / / 10/17/12
Mattlin Middle School:
09-1151 Reconstruction 0-014-028 07/06/10 DONE DONE DONE 03/26/10 03/19/10 11/20/09 05/19/09 2,4,7,8,9,10,14,155, 165,000 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
11-0775 Reconstruction 0-014-029 06/14/12 DONE DONE DONE 02/09/12 02/07/12 11/02/11 05/26/11 2,4,7,10,155,15,16 797,000 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
John F. Kennedy High School:
07-1969 Reconstruction 0-015-037 12/17/08 DONE DONE DONE 04/15/08 04/07/08 06/06/07 05/15/07 2,155 325,000 325,000 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
- Reconstruction 0-015-038 / / / / 11/06/08 / / 2,8,9,155,16 0 0 JOD 0 0 0 0 / / / /
08-1549 Reconstruction 0-015-039 06/09/09 DONE DONE DONE 04/27/09 04/22/09 03/24/09 05/15/07 2,4,9,16 40,000 40,000 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
09-1152 Reconstruction 0-015-040 07/06/10 DONE DONE DONE 03/26/10 03/19/10 11/20/09 05/19/09 2,4,7,8,9,10,14,155, 115,000 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
11-0776 Reconstruction 0-015-041 06/14/12 DONE DONE DONE 02/09/12 02/07/12 08/10/10 05/26/11 2,7,10,155,15,16 869,000 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
10-0639 Reconstruction 0-015-042 03/18/11 DONE DONE DONE 12/28/10 12/20/10 09/07/10 11/01/10 2,4,7,9,155,15,16 50,000 50,000 JOD 0 0 0 Burton Behrendt Smith 0 / / 10/17/12
- Reconstruction 0-015-043 / / / / 09/08/11 / / 2,4,8,9,10,155,15,16 0 0 JOD 0 0 0 0 / / / /
- Reconstruction 0-015-044 / / / / 09/08/11 / / 2,4,8,9,10,155,15,16 0 0 JOD 0 0 0 0 / / / /
12-1115 Reconstruction 0-015-044 04/25/13 DONE DONE DONE 04/17/13 04/17/13 01/24/13 03/11/13 2,15,16 0 0 JOB 0 0 0 Nassau Suffolk Engineering & 0 / / / /
Fern Place School Boces:
08-0135 Reconstruction 0-020-008 09/12/08 DONE DONE DONE 08/08/08 08/04/08 06/11/08 12/18/06 2,7,10,155,16 350,000 350,000 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
11-0777 Reconstruction 0-020-009 06/14/12 DONE DONE DONE 02/09/12 02/07/12 11/02/11 05/26/11 2,4,7,10,155,15,16 38,000 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
Passadena School:
08-1275 Reconstruction 0-021-009 03/18/09 DONE DONE DONE 02/23/09 02/18/09 06/11/08 05/20/08 2,4,7,9,16 42,250 42,250 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
10-0640 Reconstruction 0-021-010 03/18/11 DONE DONE DONE 12/28/10 12/20/10 09/07/10 11/01/10 2,4,7,9,16 52,250 52,250 JOD 0 0 0 Burton Behrendt Smith 0 / / 10/17/12
11-0778 Reconstruction 0-021-011 06/14/12 DONE DONE DONE 02/09/12 02/07/12 11/02/11 05/26/11 2,4,7,8,9,10,155,15, 498,000 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
Plainview/Bethpage Pub.Library:
09-0263 Reconstruction 6-007-008 09/29/09 DONE DONE DONE 09/23/09 09/23/09 07/08/09 05/20/09 10 80,000 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
12-0004 Reconstruction 6-007-009 07/23/12 DONE DONE DONE 07/09/12 07/05/12 05/01/12 04/18/12 2,155,16 63,000 0 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
- Reconstruction 6-007-010 / / / / 03/29/13 / / 8,9,155,16 0 0 JOB 0 0 0 0 / / / /
District Wide:
11-0757 Reconstruction 7-999-002 06/06/12 DONE DONE DONE 02/07/12 02/06/12 09/08/11 05/26/11 16 584,000 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Oyster Bay High School:
08-0877 Reconstruction 0-001-029 03/19/09 DONE DONE DONE 12/05/08 12/04/08 / / 05/17/07 16 284,280 284,280 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
08-1087 Reconstruction 0-001-030 03/09/09 DONE DONE DONE 01/20/09 01/12/09 10/10/08 05/15/07 2,4,8 550,000 550,000 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
09-0374 Reconstruction 0-001-031 11/05/09 DONE DONE DONE 10/30/09 10/29/09 08/25/09 05/19/09 2,4,7 170,000 170,000 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
10-0659 Reconstruction 0-001-032 01/26/11 DONE DONE DONE 12/30/10 12/23/10 10/25/10 05/18/10 2 375,000 375,000 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
12-0749 Reconstruction 0-001-033 DONE DONE UNREVIEWED01/31/13 01/30/13 09/19/12 05/15/12 2,4,8,9,155,15,16 0 0 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
Vernon Elementary School:
11-0869 Reconstruction 0-003-017 06/15/12 DONE DONE DONE 03/02/12 03/01/12 11/08/11 05/15/11 4,9,15,16 190,000 0 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
Theodore Roosevelt Elementary:
08-0878 Reconstruction 0-005-013 03/19/09 DONE DONE DONE 12/05/08 12/04/08 05/27/08 05/17/07 16 118,450 118,450 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
Administration Building:
09-0867 Reconstruction 1-006-005 03/03/10 DONE DONE DONE 02/09/10 02/03/10 09/04/09 05/19/09 2 130,000 0 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
12-0696 Reconstruction 1-006-006 01/29/13 DONE DONE DONE 01/18/13 01/17/13 09/19/12 05/15/12 2,8,15 95,000 0 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
Container 1 @ Roosevelt:
02-1127DB Discovered Building 2-018-001 06/04/08 DONE DONE DONE 01/22/03 / / 04/10/02 / / 02 - 16 0 0 HCM 0 0 0 0 / / / /
Container 2 @ Roosevelt:
02-1128DB Discovered Building 2-019-001 06/04/08 DONE DONE DONE 01/22/03 / / 04/10/02 / / 02 - 16 0 0 HCM 0 0 0 0 / / / /
Vernon Shed:
02-1129DB Discovered Building 2-020-001 06/04/08 DONE DONE DONE 01/22/03 / / 04/10/02 / / 02 - 16 0 0 HCM 0 0 0 0 / / / /
O. Bay-E. Norwich Library:
12-1210 Reconstruction 6-014-002 UNREVIEWED 05/21/13 05/20/13 01/29/13 02/27/13 155,16 0 0 DDJ 0 0 0 McClave Engineering,P.C 0 / / / /
Stadium / Locker:
10-0675 Additions and Alterations 7-009-005 05/13/11 DONE DONE DONE 12/30/10 12/23/10 10/06/10 06/18/10 02 - 16 950,000 0 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
District Wide:
07-2005 Reconstruction 7-999-001 06/20/08 DONE DONE DONE 04/21/08 04/14/08 07/16/07 05/15/07 8,16 408,553 408,553 DDJ 0 0 367,698 Burton Behrendt Smith 0 / / / /
08-0703 Reconstruction 7-999-002 12/09/08 DONE DONE DONE 11/07/08 11/05/08 01/18/08 05/15/07 8,16 144,774 144,774 DDJ 0 0 130,296 Burton Behrendt Smith 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
George Jackson ES K-5:
09-1282 Reconstruction 0-001-012 05/12/10 DONE DONE DONE 04/13/10 04/05/10 10/05/09 05/19/09 2,7 1,500,000 0 JOD 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
12-0276 Reconstruction 0-001-013 04/19/13 DONE DONE DONE 10/12/12 10/12/12 11/02/11 05/15/12 2,155,16 395,562 0 DDJ 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
Jericho MS/HS:
11-0082 Reconstruction 0-003-035 08/23/11 DONE DONE DONE 08/04/11 08/04/11 12/26/07 05/18/10 2 1,000,000 0 JOD 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
12-1139 Reconstruction 0-003-036 UNREVIEWED 04/30/13 04/29/13 03/10/09 05/15/12 2,16 0 41,373,389 MFS 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
Robert Williams ES-(Leased to..):
12-0277 Reconstruction 0-004-010 04/19/13 DONE DONE DONE 10/12/12 10/12/12 10/14/11 05/15/11 2,9,155,16 780,912 0 JOD 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
Cantiague ES K-5:
08-1023 Reconstruction 0-005-014 05/11/09 DONE DONE DONE 01/05/09 12/30/08 10/20/08 05/20/08 2,7 1,100,000 1,100,000 JOD 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
12-0750 Reconstruction 0-005-015 DONE DONE UNREVIEWED02/01/13 01/30/13 04/17/12 05/15/12 2,4,8,9,16 0 9,876,762 MFS 0 0 0 BJLJ ENGINEERS & ARCHITECTS, 0 / / / /
Robert Seaman ES-K-5:
12-1055 Reconstruction 0-014-011 DONE / / / / 04/17/12 / / 2,4,7,16 0 2,724,624 MFS 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Burns Avenue Elementary:
08-0915 Reconstruction 0-001-020 03/11/09 DONE DONE DONE 12/16/08 12/10/08 04/09/08 05/20/08 2,4,7,8,9,10,16 507,500 507,500 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
09-1486 Reconstruction 0-001-021 06/21/10 DONE DONE DONE 06/04/10 05/27/10 04/12/10 05/20/08 2,9,16 50,000 50,000 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
10-1228 Reconstruction 0-001-022 06/24/11 DONE DONE DONE 04/29/11 04/28/11 03/25/11 05/18/10 7,8 10,000 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
10-1455 Reconstruction 0-001-023 08/11/11 DONE DONE DONE 07/05/11 06/30/11 05/19/11 05/18/10 9,16 22,833 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Dutch Lane School:
08-0916 Reconstruction 0-002-019 03/11/09 DONE DONE DONE 12/16/08 12/10/08 04/09/08 05/20/08 2,4,8,16 103,840 103,840 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
09-1487 Reconstruction 0-002-020 06/21/10 DONE DONE DONE 06/04/10 05/27/10 04/12/10 05/20/08 9,16 50,000 50,000 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
10-1456 Reconstruction 0-002-021 08/11/11 DONE DONE DONE 07/05/11 06/30/11 05/19/11 05/18/10 9,16 22,833 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
12-0709 Reconstruction 0-002-022 DONE DONE UNREVIEWED01/23/13 01/18/13 08/23/12 05/15/12 4,8 0 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
East Street Elementary:
08-0917XX Reconstruction 0-003-018 03/11/09 CANCELLED 12/16/08 12/10/08 04/09/08 05/20/08 4,8 27,288 27,288 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
08-0918 Reconstruction 0-003-019 03/11/09 DONE DONE DONE 12/16/08 12/10/08 04/09/08 05/20/08 4,7 235,856 235,856 DDJ 0 0 235,856 John A Grillo-ARCHITECTS PC 0 / / / /
09-1478 Reconstruction 0-003-020 06/04/10 DONE DONE DONE 06/01/10 05/26/10 04/12/10 05/20/08 7 152,770 152,770 DDJ 0 0 152,770 John A Grillo-ARCHITECTS PC 0 / / / /
10-1229 Reconstruction 0-003-021 06/24/11 DONE DONE DONE 04/29/11 04/28/11 03/25/11 05/18/10 8 10,000 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
10-1457 Reconstruction 0-003-022 08/11/11 DONE DONE DONE 07/05/11 06/30/11 05/19/11 05/18/10 9,16 30,000 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
12-0710 Reconstruction 0-003-023 DONE DONE UNREVIEWED01/23/13 01/18/13 08/23/12 05/15/12 4,8 0 8,691,046 MFS 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Fork Lane School:
09-1488 Reconstruction 0-004-019 06/21/10 DONE DONE DONE 06/04/10 05/27/10 04/12/10 05/20/08 9,16 50,000 50,000 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
10-1230 Reconstruction 0-004-020 06/24/11 DONE DONE DONE 04/29/11 04/28/11 03/25/11 05/18/10 7,8 290,000 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
10-1458 Reconstruction 0-004-021 08/11/11 DONE DONE DONE 07/05/11 06/30/11 05/19/11 05/18/10 9,16 25,087 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
12-0711 Reconstruction 0-004-022 DONE DONE UNREVIEWED01/23/13 01/18/13 08/23/12 05/15/12 4,7,8 0 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Lee Avenue School:
08-0919XX Reconstruction 0-005-019 03/11/09 CANCELLED 12/16/08 12/10/08 04/09/08 05/20/08 4,8 59,000 59,000 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
08-0920 Reconstruction 0-005-020 03/11/09 DONE DONE DONE 12/16/08 12/10/08 04/09/08 05/20/08 4 48,000 48,000 DDJ 0 0 48,000 John A Grillo-ARCHITECTS PC 0 / / / /
09-1479 Reconstruction 0-005-021 06/04/10 DONE DONE DONE 06/01/10 05/26/10 04/12/10 05/20/08 9,16 100,000 100,000 DDJ 0 0 100,000 John A Grillo-ARCHITECTS PC 0 / / / /
09-1489 Reconstruction 0-005-022 06/21/10 DONE DONE DONE 06/04/10 05/27/10 04/12/10 05/20/08 7 50,000 50,000 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
10-1231 Reconstruction 0-005-023 06/24/11 DONE DONE DONE 04/29/11 04/28/11 03/25/11 05/18/10 7,8 20,000 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
10-1459 Reconstruction 0-005-024 08/11/11 DONE DONE DONE 07/05/11 06/30/11 05/19/11 05/18/10 9,16 22,833 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
12-0712 Reconstruction 0-005-025 DONE DONE UNREVIEWED01/23/13 01/18/13 08/23/12 05/15/12 4,8 0 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Old Country Rd Elem School:
08-0921 Reconstruction 0-007-018 03/11/09 DONE DONE DONE 12/16/08 12/10/08 04/09/08 05/20/08 4,7,8,16 65,000 65,000 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
08-0922 Reconstruction 0-007-019 03/11/09 DONE DONE DONE 12/16/08 12/10/08 04/09/08 05/20/08 4,7 443,385 443,385 DDJ 0 0 443,385 John A Grillo-ARCHITECTS PC 0 / / / /
09-1490 Reconstruction 0-007-020 06/21/10 DONE DONE DONE 06/04/10 05/27/10 04/12/10 05/20/08 2,9,16 66,634 66,634 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
10-1232 Reconstruction 0-007-021 06/24/11 DONE DONE DONE 04/29/11 04/28/11 03/25/11 05/18/10 7,8 283,000 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
10-1460 Reconstruction 0-007-022 08/11/11 DONE DONE DONE 07/05/11 06/30/11 05/19/11 05/18/10 9,16 22,833 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
12-0713 Reconstruction 0-007-023 DONE DONE UNREVIEWED01/23/13 01/18/13 08/23/12 05/15/12 2,4,7,8,9,16 0 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Woodland Avenue School:
08-0923 Reconstruction 0-008-019 03/11/09 DONE DONE DONE 12/16/08 12/10/08 04/09/08 05/20/08 4 95,138 95,138 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
08-0924 Reconstruction 0-008-020 03/11/09 DONE DONE DONE 12/16/08 12/10/08 04/09/08 05/20/08 2,4,8,16 49,000 49,000 DDJ 0 0 49,000 John A Grillo-ARCHITECTS PC 0 / / / /
09-1491 Reconstruction 0-008-021 06/21/10 DONE DONE DONE 06/04/10 05/27/10 04/12/10 05/20/08 9,16 50,000 50,000 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
10-1461 Reconstruction 0-008-022 08/11/11 DONE DONE DONE 07/05/11 06/30/11 05/19/11 05/18/10 9,16 22,833 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Hicksville Middle School:
08-1109 Reconstruction 0-009-030 03/17/09 DONE DONE DONE 01/21/09 01/20/09 04/09/08 05/20/08 4 1,264,660 1,264,660 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
08-1125 Reconstruction 0-009-031 03/17/09 DONE DONE DONE 01/26/09 01/20/09 04/09/08 05/20/08 2,4,8,9,10,15,16 296,180 296,180 DDJ 0 0 296,180 John A Grillo-ARCHITECTS PC 0 / / / /
09-1423 Reconstruction 0-009-032 06/07/10 DONE DONE DONE 05/11/10 05/04/10 07/01/09 05/19/09 2,9,16 950,000 950,000 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
09-1480 Reconstruction 0-009-033 06/04/10 DONE DONE DONE 06/01/10 05/26/10 04/12/10 05/20/08 7 100,000 100,000 DDJ 0 0 100,000 John A Grillo-ARCHITECTS PC 0 / / / /
10-1233 Reconstruction 0-009-034 06/24/11 DONE DONE DONE 04/29/11 04/28/11 03/25/11 05/18/10 8 50,000 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
10-1462 Reconstruction 0-009-035 08/11/11 DONE DONE DONE 07/05/11 06/30/11 05/19/11 05/18/10 9,16 95,610 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
12-0714 Reconstruction 0-009-036 DONE DONE UNREVIEWED01/23/13 01/18/13 08/23/12 01/15/12 7,8,9,16 0 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Hicksville High School:
08-0925 Reconstruction 0-010-032 03/11/09 DONE DONE DONE 12/16/08 12/10/08 04/09/08 05/20/08 2,9,10,16 71,530 71,530 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
08-0926 Reconstruction 0-010-033 03/11/09 DONE DONE DONE 12/16/08 12/10/08 04/09/08 05/20/08 2,4,8,9,10,155,15,16 523,153 523,153 DDJ 0 0 523,153 John A Grillo-ARCHITECTS PC 0 / / / /
- Reconstruction 0-010-034 DONE DONE / / / / 03/04/09 / / 7,155,15,16 0 34,384,815 DDJ 0 0 0 0 / / / /
10-1234 Reconstruction 0-010-035 06/24/11 DONE DONE DONE 04/29/11 04/28/11 03/25/11 05/18/10 8 20,000 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
10-1463 Reconstruction 0-010-036 08/11/11 DONE DONE DONE 07/05/11 06/30/11 05/19/11 05/18/10 9,16 30,138 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
12-0715 Reconstruction 0-010-037 UNREVIEWED
DONE UNREVIEWED01/23/13 01/18/13 08/23/12 05/15/12 4,7,8,9,16 0 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Willet Avenue Primary:
12-0716 Reconstruction 0-011-011 DONE DONE UNREVIEWED01/23/13 01/18/13 08/24/12 05/15/12 4 0 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Administration Building:
12-0717 Reconstruction 1-006-009 DONE DONE UNREVIEWED01/23/13 01/18/13 08/23/12 05/15/12 4,8 0 0 MFS 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Maintenance Garage:
12-1138 Reconstruction 3-015-001 05/07/13 DONE DONE DONE 04/30/13 04/25/13 03/15/13 03/15/13 7 122,850 0 MFS 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Hicksville Public Library:
- Reconstruction 6-018-010 / / / / 08/26/08 / / 4,8,155,16 0 0 DDJ 0 0 0 0 / / / /
Library Administrative Building:
10-1425 New Construction 6-028-001 08/25/11 DONE DONE DONE 06/30/11 06/24/11 04/13/11 10/20/10 02 - 16 403,600 0 DDJ 0 0 0 H2M Group 0 / / / /
12-0076 Reconstruction 6-028-002 08/28/12 DONE DONE DONE 07/23/12 07/23/12 06/21/12 05/15/12 2,7,8,9,10,155,15,16 400,328 0 DDJ 0 0 0 H2M Group 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Schwarting Elementary:
12-1155 Reconstruction 0-002-014 UNREVIEWED 05/02/13 04/29/13 01/24/13 02/14/13 2,8,155,15,16 0 12,081,126 MFS 0 0 0 ECG Eninering, LLC 0 / / / /
Plainedge High School:
09-0744 Reconstruction 0-003-020 05/21/10 DONE DONE DONE 01/15/10 01/15/10 08/25/09 02/12/09 2,4,7,8,9,10,155,15, 1,181,110 1,181,110 JOD 0 0 494,868 Burton Behrendt Smith 0 / / / /
10-0442 Reconstruction 0-003-021 03/02/11 DONE DONE DONE 11/08/10 11/02/10 08/25/09 06/29/09 2,4,8,9,155,15,16 446,952 0 JOD 0 0 0 Burton Behrendt Smith 0 / / 02/27/13
12-1156 Reconstruction 0-003-022 UNREVIEWED 05/02/13 04/29/13 01/24/13 02/14/13 2,155,15,16 0 0 MFS 0 0 0 ECG Eninering, LLC 0 / / / /
Eastplain Elementary School:
12-1157 Reconstruction 0-004-016 UNREVIEWED 05/02/13 04/29/13 01/24/13 02/14/13 2,8,155,15,16 0 9,485,764 MFS 0 0 0 ECG Eninering, LLC 0 / / / /
Plainedge M.S.(formerly Northedge ES:
12-1158 Reconstruction 0-009-007 UNREVIEWED 05/02/13 04/29/13 01/24/13 02/14/13 2,155,15,16 0 0 MFS 0 0 0 ECG Eninering, LLC 0 / / / /
John H. West Elementary:
12-1159 Reconstruction 0-011-014 UNREVIEWED 05/02/13 04/29/13 01/24/13 02/14/13 2,155,15,16 0 11,310,129 MFS 0 0 0 ECG Eninering, LLC 0 / / / /
Sylvia Packard Jr High School:
- Reconstruction 0-012-012 / / / / 02/12/10 / / 2 0 0 JOD 0 0 0 0 / / / /
Plainedge Athletic Facility:
09-0391 New Construction 7-027-001 02/23/10 DONE DONE DONE 11/05/09 11/04/09 08/25/09 06/29/09 02 - 16 4,254,015 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Bethpage High School:
08-0150 Reconstruction 0-001-027 12/24/08 DONE DONE DONE 08/13/08 08/06/08 07/16/08 05/20/08 2,9,155,15,16 125,000 125,000 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
10-0961 Reconstruction 0-001-028 05/17/11 DONE DONE DONE 03/08/11 03/02/11 08/29/08 11/17/09 2,9,155,15,16 233,000 233,000 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
08-1515 Reconstruction 0-001-029 05/08/09 DONE DONE DONE 04/16/09 04/16/09 02/25/09 05/19/09 7,9,155,16 41,641 41,641 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
08-1485 Reconstruction 0-001-030 05/05/09 DONE DONE DONE 04/13/09 04/08/09 02/25/09 05/19/09 2 680,546 680,546 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
08-1587 Reconstruction 0-001-031 06/04/09 DONE DONE DONE 05/05/09 04/27/09 03/26/09 04/21/09 2 2,747,000 0 JOD 0 0 0 Nassau Suffolk Engineering & 0 / / 02/15/13
09-0505 Reconstruction 0-001-032 08/19/10 DONE DONE DONE 11/27/09 11/24/09 06/29/09 01/05/06 15,16 435,748 435,748 JOD 0 0 0 John A Grillo-ARCHITECTS PC 342,040 / / / /
09-0738 Reconstruction 0-001-033 01/21/10 DONE DONE DONE 01/13/10 01/13/10 07/17/09 05/19/09 13 823,900 0 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
09-0955 Reconstruction 0-001-034 05/13/10 DONE DONE DONE 02/22/10 02/18/10 12/16/09 11/17/09 2,4,8,9,10,14,155,15 2,230,620 2,230,620 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
11-0160 Reconstruction 0-001-035 09/22/11 DONE DONE DONE 09/07/11 09/07/11 07/07/11 05/17/11 2,9,16 140,000 140,000 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 02/15/13
11-0953 Reconstruction 0-001-036 07/12/12 DONE DONE DONE 03/14/12 03/07/12 11/21/11 11/15/11 2,4,8,9,10,155,15,16 1,151,208 0 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
11-1399 Reconstruction 0-001-037 06/18/12 DONE DONE DONE 06/12/12 06/06/12 03/08/12 11/09/09 155,16 135,932 0 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
John F. Kennedy Middle School:
07-1784 Reconstruction 0-002-022 05/22/08 DONE DONE DONE 03/14/08 03/06/08 03/05/07 05/15/07 2,9,10,16 50,371 50,371 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
07-0131 Reconstruction 0-002-023 10/20/08 DONE DONE DONE 08/06/07 08/02/07 / / 06/26/07 2,10 31,866 0 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
08-0151 Reconstruction 0-002-024 12/24/08 DONE DONE DONE 08/13/08 08/06/08 07/16/08 05/20/08 2,9,155,15,16 125,000 125,000 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
08-1516 Reconstruction 0-002-025 05/08/09 DONE DONE DONE 04/16/09 04/16/09 02/25/09 05/19/09 7,9,155,16 44,784 44,784 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
08-1486 Reconstruction 0-002-026 05/05/09 DONE DONE DONE 04/13/09 04/08/09 02/25/09 05/19/09 2 195,683 195,683 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
09-0101 Reconstruction 0-002-027 10/07/09 DONE DONE DONE 08/06/09 08/03/09 05/28/09 05/19/09 2,8,9,10,155,15,16 250,000 250,000 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
09-0506 Reconstruction 0-002-028 08/19/10 DONE DONE DONE 11/27/09 11/24/09 06/29/09 01/05/06 15,16 253,387 253,387 JOD 0 0 0 John A Grillo-ARCHITECTS PC 221,012 / / / /
09-0956 Additions and Alterations 0-002-029 05/13/10 DONE DONE DONE 02/22/10 02/18/10 12/16/09 11/17/09 02 - 16 1,873,246 1,873,246 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
10-0231 Reconstruction 0-002-030 10/06/10 DONE DONE DONE 09/17/10 09/15/10 06/22/10 05/15/10 2,4,8,9,10,15,16 160,417 160,417 JOD 0 0 10,417 John A Grillo-ARCHITECTS PC 0 / / / /
11-0056 Reconstruction 0-002-031 08/02/11 DONE DONE DONE 07/22/11 07/22/11 06/08/11 05/17/11 2,15 136,320 136,320 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 09/12/12
11-0954 Reconstruction 0-002-032 07/12/12 DONE DONE DONE 03/14/12 03/08/12 11/21/11 11/15/11 2,4,8,9,155,15,16 87,674 0 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Central Blvd Elementary:
09-0507 Reconstruction 0-003-019 08/19/10 DONE DONE DONE 11/27/09 11/24/09 06/29/09 01/05/06 16 174,557 174,557 JOD 0 0 0 John A Grillo-ARCHITECTS PC 149,282 / / / /
09-0957 Reconstruction 0-003-020 05/13/10 DONE DONE DONE 02/22/10 02/18/10 12/16/09 11/17/09 2,4,9,13,155,15,16 564,320 564,320 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
11-0057 Reconstruction 0-003-021 08/02/11 DONE DONE DONE 07/22/11 07/22/11 06/08/11 05/17/11 2,15 233,857 233,857 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 09/12/12
11-0955 Reconstruction 0-003-022 07/12/12 DONE DONE DONE 03/14/12 03/07/12 11/21/11 11/15/11 2,4,8,9,155,16 683,220 0 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Kramer Lane Elementary:
08-1487 Reconstruction 0-004-014 05/05/09 DONE DONE DONE 04/13/09 04/08/09 02/25/09 05/19/09 2 237,346 237,346 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
09-0508 Reconstruction 0-004-015 08/19/10 DONE DONE DONE 11/27/09 11/24/09 06/29/09 01/05/06 15,16 155,714 155,714 JOD 0 0 0 John A Grillo-ARCHITECTS PC 135,064 / / / /
09-0958 Additions and Alterations 0-004-016 05/13/10 DONE DONE DONE 02/22/10 02/18/10 12/16/09 11/17/09 02 - 16 212,164 212,164 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
11-0058 Reconstruction 0-004-017 08/02/11 DONE DONE DONE 07/22/11 07/22/11 06/08/11 05/17/11 2,15 71,248 71,248 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 09/12/12
11-0161 Reconstruction 0-004-018 09/22/11 DONE DONE DONE 09/07/11 09/07/11 07/07/11 11/17/09 2,4,8,9,10,15,16 158,000 158,000 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 02/15/13
11-0956 Reconstruction 0-004-019 07/12/12 DONE DONE DONE 03/14/12 03/07/12 11/21/11 11/15/11 2,4,8,9,155,16 94,400 0 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Charles Campagne Elementary:
09-0509 Reconstruction 0-007-017 08/19/10 DONE DONE DONE 11/27/09 11/24/09 07/13/09 01/05/06 155,15,16 868,068 868,068 JOD 0 0 0 John A Grillo-ARCHITECTS PC 843,158 / / / /
09-0959 Additions and Alterations 0-007-018 05/13/10 DONE DONE DONE 02/22/10 02/18/10 12/16/09 11/17/09 02 - 16 287,524 287,524 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
11-0059 Reconstruction 0-007-019 08/02/11 DONE DONE DONE 07/22/11 07/22/11 06/08/11 05/17/11 2,15 58,575 58,575 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 09/12/12
11-0957 Reconstruction 0-007-020 07/12/12 DONE DONE DONE 03/14/12 03/07/12 11/21/11 11/15/11 2,4,7,8,9,155,16 23,600 0 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Administration Building:
09-0510 Reconstruction 1-005-005 08/19/10 DONE DONE DONE 11/27/09 11/24/09 07/03/09 01/05/06 15,16 18,165 0 JOD 0 0 0 John A Grillo-ARCHITECTS PC 18,165 / / / /
Bethpage Public Library:
- Reconstruction 6-011-004 / / / / 06/04/08 / / 9 0 0 JOD 0 0 0 0 / / / /
09-0073 Reconstruction 6-011-005 07/29/09 DONE DONE DONE 07/22/09 07/20/09 06/29/09 06/24/09 7,16 276,000 0 JOD 0 0 0 Beatty, Harvey & Associates 0 / / / /
11-0129 Reconstruction 6-011-006 08/26/11 DONE DONE DONE 08/19/11 08/17/11 07/21/11 07/25/11 155,16 250,000 0 JOD 0 0 0 Beatty, Harvey & Associates 0 / / / /
12-0092 Reconstruction 6-011-007 09/05/12 DONE DONE DONE 08/08/12 08/08/12 07/19/12 06/11/12 16 245,000 0 JOD 0 0 0 BEATTY HARVEY COCO 0 / / / /
Press Box @ High School:
09-0739 New Construction 7-013-001 01/21/10 DONE DONE DONE 01/13/10 01/13/10 07/20/09 05/19/09 02 - 16 90,950 0 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Concession Stand @ HS:
09-0740 New Construction 7-014-001 01/21/10 DONE DONE DONE 01/13/10 01/13/10 07/20/09 05/19/09 02 - 16 450,150 0 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
District Wide:
12-0470 Reconstruction 7-999-002 12/07/12 DONE DONE DONE 11/20/12 11/20/12 / / 11/15/11 16 290,000 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Weldon E.Howitt Jr.High-East:
12-0061 Reconstruction 0-001-026 11/30/12 DONE DONE DONE 07/27/12 07/19/12 12/22/11 05/18/10 2,8,9 938,415 0 DDJ 0 0 0 H2M Group 0 / / / /
- Reconstruction 0-001-027 / / / / 04/16/13 / / 2,4,7,8,9,10,155,15, 0 0 DDJ 0 0 0 0 / / / /
Albany Ave. Elementary School:
12-0062 Reconstruction 0-003-025 11/30/12 DONE DONE DONE 07/27/12 07/19/12 12/22/11 05/18/10 2,8,9 1,390,779 0 DDJ 0 0 0 H2M Group 0 / / / /
Farmingdale High School:
12-1142 Reconstruction 0-007-036 05/17/13 DONE DONE DONE 04/30/13 04/29/13 01/09/13 05/17/11 8,9,15,16 0 43,482,162 DDJ 0 0 0 H2M Group 0 / / / /
07-1840 Reconstruction 0-007-038 08/01/08 DONE DONE DONE 03/19/08 03/14/08 05/24/07 05/15/07 155 940,405 940,405 DDJ 0 0 493,713 ThomasAssociates, PC 0 / / / /
08-1413 Reconstruction 0-007-039 04/02/09 DONE DONE DONE 03/23/09 03/19/09 05/24/07 12/08/08 8 800,000 800,000 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
09-1197 Reconstruction 0-007-040 05/26/10 DONE DONE DONE 04/01/10 03/26/10 12/21/09 05/19/09 8 4,582,200 0 DDJ 0 0 0 H2M Group 0 / / / /
Northside Elementary School:
07-1841 Reconstruction 0-008-021 08/01/08 DONE DONE DONE 03/19/08 03/14/08 05/24/07 05/15/07 155 783,202 783,202 DDJ 0 0 411,181 ThomasAssociates, PC 0 / / / /
East Memorial at Mill Lane:
07-1842 Reconstruction 0-009-023 08/01/08 DONE DONE DONE 03/19/08 03/14/08 05/24/07 05/15/07 155 1,049,108 1,049,108 DDJ 0 0 550,782 ThomasAssociates, PC 0 / / / /
12-0063 Reconstruction 0-009-024 11/30/12 DONE DONE DONE 07/27/12 07/19/12 12/22/11 05/18/12 2,8,9 1,407,550 0 DDJ 0 0 0 H2M Group 0 / / / /
Weldon E.Howitt Jr.High-West:
07-1843 Reconstruction 0-010-025 08/01/08 DONE DONE DONE 03/19/08 03/14/08 05/24/07 05/15/07 155 875,051 875,051 DDJ 0 0 459,402 ThomasAssociates, PC 0 / / / /
12-0064 Reconstruction 0-010-026 11/30/12 DONE DONE DONE 07/27/12 07/19/12 12/22/11 05/18/10 2,8,9 2,399,265 2,399,265 DDJ 0 0 0 H2M Group 0 / / / /
New Farmingdale Public Library:
- Reconstruction 6-017-003 / / / / 03/27/09 / / 2,8,9,155,15,16 0 0 DDJ 0 0 0 0 / / / /
09-0060 Reconstruction 6-017-004 09/01/09 DONE DONE DONE 07/21/09 07/15/09 05/20/09 02/17/09 2,4,8,9,10,155,15,16 2,012,505 0 DDJ 0 0 0 Beatty, Harvey & Associates 0 / / / /
12-0142 Reconstruction 6-017-005 04/30/13 DONE DONE DONE 09/04/12 09/04/12 08/28/12 / / 2,16 351,000 0 DDJ 0 0 0 Stephen Fellman - Architect 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Birch Lane School:
08-0927 Reconstruction 0-001-021 04/06/09 DONE DONE DONE 12/16/08 12/11/08 11/27/07 05/15/07 4,7,8,9,14,155,16 520,000 520,000 JOD 0 0 242,840 Wiedersum Associates Architec 0 / / / /
11-0114 Reconstruction 0-001-022 01/30/12 DONE DONE DONE 08/18/11 08/15/11 05/09/11 11/18/10 10,13,15,16 1,155,998 0 JOD 0 0 0 H2M Group 1,155,998 / / / /
East Lake Elementary:
09-0323 Reconstruction 0-003-020 11/02/09 DONE DONE DONE 10/20/09 10/16/09 11/27/07 05/15/07 2 240,695 240,695 JOD 0 0 117,614 Wiedersum Associates Architec 0 / / / /
08-0928 Reconstruction 0-003-021 04/06/09 DONE DONE DONE 12/16/08 12/11/08 11/27/07 05/15/07 4,7,8,9,14,155,15,16 520,000 520,000 JOD 0 0 242,840 Wiedersum Associates Architec 0 / / / /
08-1577 Reconstruction 0-003-022 08/26/09 DONE DONE DONE 04/30/09 04/24/09 04/14/09 05/15/07 155,15 50,000 50,000 JOD 0 0 0 Wiedersum Associates Architec 0 / / / /
11-0115 Reconstruction 0-003-023 01/30/12 DONE DONE DONE 08/18/11 08/15/11 05/09/11 11/18/10 10,13,15,16 1,059,746 0 JOD 0 0 0 H2M Group 1,059,746 / / / /
Fairfield Elementary:
08-0929 Reconstruction 0-004-026 04/06/09 DONE DONE DONE 12/16/08 12/11/08 11/27/07 05/15/07 4,7,8,9,14,155,15,16 520,000 520,000 JOD 0 0 242,840 Wiedersum Associates Architec 0 / / / /
11-0116 Reconstruction 0-004-027 01/30/12 DONE DONE DONE 08/18/11 08/15/11 05/09/11 11/18/10 10,13,15,16 1,253,575 0 JOD 0 0 0 H2M Group 1,263,575 / / / /
R. Lockhart Elementary School:
08-0930 Reconstruction 0-006-017 04/06/09 DONE DONE DONE 12/16/08 12/11/08 11/27/07 05/15/07 4,7,8,9,14,155,16 520,000 520,000 JOD 0 0 242,840 Wiedersum Associates Architec 0 / / / /
11-0117 Reconstruction 0-006-018 01/30/12 DONE DONE DONE 08/18/11 08/15/11 05/09/11 11/18/10 10,13,15,16 396,694 0 JOD 0 0 0 H2M Group 396,694 / / / /
Unqua Elementary School:
08-0931 Reconstruction 0-007-024 04/06/09 DONE DONE DONE 12/16/08 12/11/08 11/27/07 05/15/07 4,7,8,9,14,155,16 769,950 769,950 JOD 0 0 359,567 Wiedersum Associates Architec 0 / / 12/26/12
08-1578 Reconstruction 0-007-025 08/26/09 DONE DONE DONE 04/30/09 04/24/09 04/14/09 05/15/07 155,15 66,000 66,000 JOD 0 0 0 Wiedersum Associates Architec 0 / / / /
11-0118 Reconstruction 0-007-026 01/30/12 DONE DONE DONE 08/18/11 08/15/11 05/11/11 11/18/10 10,13,15,16 1,045,166 1,045,166 JOD 0 0 0 H2M Group 1,045,166 / / / /
McKenna Elem. (f'ly JHS):
08-1579 Reconstruction 0-008-027 08/26/09 DONE DONE DONE 04/30/09 04/24/09 04/14/09 05/15/07 155,15 50,000 50,000 JOD 0 0 0 Wiedersum Associates Architec 0 / / / /
11-0119 Reconstruction 0-008-028 01/30/12 DONE DONE DONE 08/18/11 08/15/11 05/09/11 11/18/10 10,13,15,16 950,903 0 JOD 0 0 0 H2M Group 950,903 / / / /
Ames Campus:
09-0324 Reconstruction 0-009-017 11/02/09 DONE DONE DONE 10/20/09 10/16/09 11/27/07 05/15/07 2 275,000 275,000 JOD 0 0 128,000 Wiedersum Associates Architec 0 / / / /
11-0820 Reconstruction 0-009-018 06/13/12 DONE DONE DONE 02/15/12 02/10/12 04/13/11 11/02/06 2,4,8,9,10,15,16 603,291 603,291 JOD 0 0 0 H2M Group 0 / / 03/18/13
11-0120 Reconstruction 0-009-019 01/30/12 DONE DONE DONE 08/18/11 08/15/11 05/09/11 11/18/10 10,13,15,16 883,830 0 JOD 0 0 0 H2M Group 883,830 / / / /
Massapequa High School:
08-1522 Reconstruction 0-010-028 08/20/09 DONE DONE DONE 04/20/09 04/17/09 02/01/05 05/15/07 2,4,7,8,9,155,15,16 250,000 250,000 JOD 0 0 0 Wiedersum Associates Architec 0 / / / /
09-0596 Reconstruction 0-010-030 01/14/10 DONE DONE DONE 12/22/09 12/15/09 11/27/07 05/15/07 2 350,000 350,000 JOD 0 0 163,450 Wiedersum Associates Architec 0 / / / /
- PR Additions and Alterations 0-010-032 / / / / 01/02/09 / / 02 - 16 0 0 JOD 0 0 0 0 / / / /
09-0683 Reconstruction 0-010-033 04/30/10 DONE DONE DONE 01/05/10 12/30/09 11/06/09 11/12/09 2,4,7,8,9,10,13,155, 2,185,259 2,185,259 JOD 0 0 0 H2M Group 0 / / / /
11-0121 Reconstruction 0-010-034 01/30/12 DONE DONE DONE 08/18/11 08/15/11 05/09/11 11/18/10 10,13,15,16 3,140,846 0 JOD 0 0 0 H2M Group 3,140,846 / / / /
Berner Junior High:
11-0122 Reconstruction 0-011-025 01/30/12 DONE DONE DONE 08/18/11 08/15/11 05/09/11 11/18/10 10,13,15,16 2,751,560 0 JOD 0 0 0 H2M Group 2,751,560 / / / /
Bus Garage:
11-0123 Reconstruction 5-012-003 01/30/12 DONE DONE DONE 07/18/11 07/15/11 07/19/11 11/18/10 10,155,15,16 7,664 0 JOD 0 0 0 H2M Group 7,664 / / / /
District Wide:
08-1069 Reconstruction 7-999-002 03/18/09 DONE DONE DONE 01/08/09 01/06/09 11/27/07 05/15/07 10,13,16 1,000,000 1,000,000 JOD 0 0 467,000 Wiedersum Associates Architec 0 / / / /
08-1186 Reconstruction 7-999-003 06/05/09 DONE DONE DONE 02/10/09 02/03/09 12/02/08 05/15/07 10,16 1,545,450 1,545,450 JOD 0 0 721,725 Wiedersum Associates Architec 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Cultural Arts Ctr Bldg A:
09-1439 Reconstruction 0-007-013 08/26/10 DONE DONE DONE 05/13/10 05/11/10 04/02/10 05/13/10 4,7,8,9,155,15,16 343,000 343,000 JOD 0 0 0 H2M Group 0 / / / /
11-0912 Reconstruction 0-007-014 04/17/12 DONE DONE DONE 03/07/12 02/23/12 09/15/11 06/30/11 7 295,000 0 JOD 0 0 0 H2M Group 0 / / / /
Residence Bldg:
06-1147 Reconstruction 0-013-002 03/28/13 DONE DONE DONE 03/19/07 03/09/07 / / 12/08/05 7 39,303 0 JOD 0 0 0 H2M Group 0 / / / /
Rosemary Kennedy Ctr Bldg:
12-0140 Reconstruction 0-017-019 03/04/13 DONE DONE DONE 09/04/12 08/30/12 09/28/11 / / 2,8,9,155,15,16 1,676,250 0 JOD 0 0 0 H2M Group 0 / / / /
12-1196 Reconstruction 0-017-020 UNREVIEWED 05/15/13 05/15/13 03/15/13 / / 8 0 0 MFS 0 0 0 H2M Group 0 / / / /
J.M.Barry Tech-Westbury (Cty Ctr):
10-0939 Reconstruction 0-030-021 05/10/11 DONE DONE DONE 03/04/11 02/18/11 03/02/11 12/16/10 4,14,16 115,000 115,000 JOD 0 0 0 H2M Group 0 / / / /
12-0113 Reconstruction 0-030-022 01/30/13 DONE DONE DONE 08/17/12 08/16/12 08/09/12 03/01/12 2,4,7,8,9,155,15,16 4,013,950 4,013,950 JMB 0 0 0 Ehasz Giacalone Architects 0 / / / /
Baldwin Harbor Park School:
07-2077 Reconstruction 0-047-007 05/22/08 DONE DONE DONE 05/05/08 04/29/08 02/16/07 02/06/02 2 2,000,000 2,000,000 JOD 0 0 0 Ehasz Giacalone Architects 0 / / / /
Greenvale Center (fmly 8-105):
07-1852 Additions and Alterations 0-105-003 02/04/09 DONE DONE DONE 03/19/08 03/14/08 03/08/07 02/12/08 02 - 16 14,900,000 14,406,704 JOD 0 0 0 Ehasz Giacalone Architects 0 / / / /
Career Development Ctr.(Curriculum):
09-1473 Reconstruction 0-131-004 06/29/10 DONE DONE DONE 05/28/10 05/21/10 01/06/10 02/24/10 14 125,646 125,646 JOD 0 0 0 H2M Group 0 / / / /
Rosemary Kennedy Ctr. Garage/shop ad:
11-0260 Reconstruction 1-014-001 11/08/11 DONE DONE DONE 10/17/11 10/13/11 03/24/11 12/01/10 2,8,9,155,15,16 976,250 0 JOD 0 0 0 H2M Group 0 / / / /
Admin. Headquarters Bldg.:
08-0822 Reconstruction 1-137-003 04/09/09 DONE DONE DONE 11/26/08 11/26/08 10/02/06 12/08/05 4,7 489,000 0 JOD 0 0 0 H2M Group 0 / / / /
11-1113 Reconstruction 1-137-005 05/10/12 DONE DONE DONE 04/11/12 04/09/12 09/15/11 06/30/11 155,15 502,403 0 JOD 0 0 0 H2M Group 0 / / / /
- Reconstruction 1-137-006 / / / / 01/06/12 / / 2,8,9,155,15,16 0 0 JOD 0 0 0 0 / / / /
CIT Center:
08-1628 New Construction 1-155-001 05/13/09 DONE DONE DONE 05/13/09 05/13/09 05/13/09 / / 02 - 16 0 0 JOD 0 0 0 0 / / / /
Haskett Drive-Complex Bldg. E:
12-0117 Reconstruction 2-003-003 DONE DONE ADD. REQ'D08/21/12 08/15/12 12/01/11 06/30/11 2,7,8,9,16 0 0 JOD 0 0 0 H2M Group 0 / / / /
Utility Shed:
10-1190DB Discovered Building 2-160-001 05/31/11 DONE DONE DONE 04/14/11 04/06/11 03/23/11 / / 0 0 JOD 0 0 0 Ehasz Giacalone Architects 0 / / / /
Haskett Dr.Complex-Bldg D:
11-0226 Reconstruction 3-002-002 12/20/11 DONE DONE DONE 09/30/11 09/30/11 03/02/11 03/24/11 16 56,000 0 JOD 0 0 0 H2M Group 0 / / 04/01/13
Haskett Dr.Complex-Bldg A:
10-0081 Reconstruction 5-040-004 12/08/10 DONE DONE DONE 08/03/10 07/19/10 01/06/10 02/24/10 16 79,430 0 JOD 0 0 0 H2M Group 0 / / / /
Eagle Avenue Middle School:
10-0568 Reconstruction 8-083-007 09/12/11 DONE DONE DONE 12/09/10 12/02/10 03/10/10 01/28/10 2,4,7,9,14,155,16 105,000 0 JOD 0 0 0 H2M Group 0 / / 01/08/13
CIT Center (Westbury):
08-1252TQ Temporary Quarters 8-155-001 02/20/09 DONE DONE DONE 02/13/09 02/13/09 09/25/08 / / 0 0 JOD 0 0 0 0 / / / /
11-0232 Reconstruction 8-155-002 12/08/11 DONE DONE DONE 10/05/11 10/05/11 04/02/10 / / 7,8,9,10,13,155,15,1 1,982,110 0 JOD 0 0 0 H2M Group 0 / / / /
10-1010 Reconstruction 8-155-003 07/12/11 DONE DONE DONE 03/09/11 03/07/11 11/18/10 10/27/10 7 717,890 0 JOD 0 0 0 H2M Group 0 / / 04/01/13
Willet Avenue School-Hicksville CSD:
08-1138TQ Temporary Quarters 8-156-001 02/05/09 DONE DONE DONE 01/27/09 01/26/09 11/13/08 / / 0 0 JOD 0 0 0 Ehasz Giacalone Architects 0 / / / /
08-1141 Reconstruction 8-156-002 02/06/09 DONE DONE DONE 01/28/09 01/26/09 11/14/08 10/23/08 2,9,16 450,500 450,500 JOD 0 0 0 Ehasz Giacalone Architects 0 / / / /
12-0912 Reconstruction 8-156-003 04/10/13 DONE DONE DONE 02/27/13 02/26/13 07/31/12 01/30/13 8,155 1,303,905 0 MFS 0 0 0 Ehasz Giacalone Architects 0 / / / /
Roosevelt High School:
09-0087XX Reconstruction 8-157-001 07/24/09 CANCELLED 07/10/09 07/10/09 06/19/09 / / 0 0 JOD 0 0 0 0 / / / /
St. Cathrine of Sienna School:
09-0273TQ Temporary Quarters 8-158-001 10/06/09 DONE DONE DONE 10/01/09 09/18/09 06/19/09 / / 0 0 JOD 0 0 0 JMS ARCHITECT AND PLANNING,PC 0 / / / /
Micahel F. Stokes Elementary School:
- TQ Temporary Quarters 8-159-001 / / / / 08/27/10 / / 0 0 JOD 0 0 0 0 / / / /
Hasket Dr. Building B:
12-0118 Reconstruction 9-010-002 DONE DONE ADD. REQ'D08/15/12 08/15/12 12/01/11 06/30/11 2 0 0 JOD 0 0 0 H2M Group 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED