WEST GENESEE CSD AT CAMILLUS STATUS REPORT ON CAPITAL PROJECTS
District No.: 42-01-01-06
last updated on 04/23/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
East Hill Elementary School:
19-1880 Reconstruction 0-002-011 11/09/20 DONE DONE DONE 06/29/20 06/12/20 12/31/19 05/21/19 155,16 284,924 284,924 JLB 0 0 0 King & King Architects 284,924 10/02/23 06/12/20
23-0544 Reconstruction 0-002-012 STARTED DONE DONE 09/25/23 09/22/23 05/05/23 12/06/21 8,9,155,15,16 965,000 0 JJH 0 0 0 King & King Architects 0 / / 09/22/23
Onondaga Road Elementary:
19-1887 Reconstruction 0-004-008 11/09/20 DONE DONE DONE 06/29/20 06/12/20 12/31/19 05/21/19 155,16 322,359 322,359 JLB 0 0 0 King & King Architects 322,359 10/02/23 06/12/20
23-0545 Reconstruction 0-004-009 STARTED DONE DONE 09/25/23 09/22/23 05/05/23 12/06/21 8,9,155,15,16 0 0 JJH 0 0 0 King & King Architects 0 / / 09/22/23
Split Rock Elementary School:
19-1886 Reconstruction 0-005-008 11/09/20 DONE DONE DONE 06/29/20 06/12/20 12/31/19 05/21/19 155,15,16 667,194 667,194 JLB 0 0 0 King & King Architects 667,194 10/02/23 06/12/20
21-0282 Reconstruction 0-005-009 09/23/21 DONE DONE DONE 09/03/21 09/03/21 05/26/21 05/18/21 155 100,000 100,000 JLB 0 0 0 King & King Architects 0 06/23/22 09/03/21
21-1067 Reconstruction 0-005-010 04/12/22 DONE DONE DONE 01/10/22 01/10/22 12/02/21 12/08/21 155,15,16 1,246,000 1,246,000 JLB 0 0 0 King & King Architects 0 09/15/23 01/10/22
22-0549 Reconstruction 0-005-011 01/30/23 DONE DONE DONE 09/23/22 09/22/22 03/17/22 12/06/21 2,9,155,15,16 2,264,000 2,264,000 JLB 0 0 0 King & King Architects 0 / / 09/22/22
High School:
19-1885 Reconstruction 0-007-012 11/09/20 DONE DONE DONE 06/29/20 06/12/20 12/31/19 05/21/19 13,155,16 1,061,899 1,061,899 JLB 0 0 0 King & King Architects 1,061,899 10/02/23 06/12/20
21-1068 Reconstruction 0-007-013 04/12/22 DONE DONE DONE 01/10/22 01/10/22 10/14/21 12/06/21 7,16 6,275,000 6,275,000 JLB 0 0 0 King & King Architects 0 09/15/23 01/10/22
22-0550 Reconstruction 0-007-014 01/30/23 DONE DONE DONE 09/23/22 09/22/22 03/17/22 12/06/21 2,8,9,155,15,16 8,631,200 8,631,200 JLB 0 0 0 King & King Architects 0 / / 09/22/22
23-0546 Reconstruction 0-007-015 STARTED DONE DONE 09/25/23 09/22/23 05/05/23 12/06/21 4,155 0 0 JJH 0 0 0 King & King Architects 0 / / 09/22/23
23-0913 Reconstruction 0-007-016 12/11/23 DONE DONE DONE 11/08/23 11/06/23 10/23/23 05/16/23 16 100,000 100,000 JJH 0 0 0 King & King Architects 0 / / 11/06/23
23-1633 Reconstruction 0-007-017 UNREVIEWED 03/15/24 03/04/24 02/01/24 12/11/23 2,8 0 0 JJH 0 0 0 King & King Architects 0 / / 03/04/24
West Genesee Middle School:
19-1884 Reconstruction 0-009-007 11/09/20 DONE DONE DONE 06/29/20 06/12/20 12/31/19 05/21/19 155,16 809,614 809,614 JLB 0 0 0 King & King Architects 809,614 10/02/23 06/12/20
23-0547 Reconstruction 0-009-008 STARTED DONE DONE 09/25/23 09/22/23 05/05/23 12/06/21 2,155,15,16 712,500 0 JJH 0 0 0 King & King Architects 0 / / 09/22/23
Stonehedge Elementary:
19-1883 Reconstruction 0-010-010 11/09/20 DONE DONE DONE 06/29/20 06/12/20 12/31/19 05/21/19 155,16 746,894 746,894 JLB 0 0 0 King & King Architects 746,894 10/02/23 06/12/20
22-0551 Reconstruction 0-010-011 01/30/23 DONE DONE DONE 09/23/22 09/22/22 03/17/22 12/06/21 7,9,14,155,15,16 5,167,000 5,167,000 JLB 0 0 0 King & King Architects 0 / / 09/22/22
23-0548 Reconstruction 0-010-012 STARTED DONE DONE 09/25/23 09/22/23 05/05/23 12/06/21 8,9,155,15,16 7,892,500 0 JJH 0 0 0 King & King Architects 0 / / 09/22/23
Camillus Middle School:
19-1882 Reconstruction 0-012-009 11/09/20 DONE DONE DONE 06/29/20 06/12/20 12/31/19 05/21/19 155,16 336,312 336,312 JLB 0 0 0 King & King Architects 336,312 10/02/23 06/12/20
21-1069 Reconstruction 0-012-010 04/12/22 DONE DONE DONE 01/10/22 01/10/22 10/14/21 12/06/21 2,4,8,9,155,15,16 2,850,000 2,850,000 JLB 0 0 0 King & King Architects 0 09/15/23 01/10/22
21-1894 Reconstruction 0-012-011 07/21/22 DONE DONE DONE 05/31/22 05/27/22 05/04/22 05/17/22 8,9,16 100,000 100,000 JLB 0 0 0 King & King Architects 0 06/27/23 05/27/22
23-0549 Reconstruction 0-012-012 STARTED DONE DONE 09/25/23 09/22/23 05/05/23 12/06/21 2,9,155,15,16 3,515,000 0 JJH 0 0 0 King & King Architects 0 / / 09/22/23
Field Storage @ HS Lower Stadium:
23-1634 New Construction 2-020-001 UNREVIEWED 03/15/24 03/04/24 02/01/24 12/11/23 02 - 16 0 0 JJH 0 0 0 King & King Architects 0 / / 03/04/24
New Transportation Center:
19-1879 Reconstruction 5-014-005 11/09/20 DONE DONE DONE 06/29/20 06/12/20 12/31/19 05/21/19 16 48,371 48,371 JLB 0 0 0 King & King Architects 48,371 10/02/23 06/12/20
22-0552 Reconstruction 5-014-006 01/30/23 DONE DONE DONE 09/23/22 09/22/22 03/17/22 12/06/21 8,15 349,000 349,000 JLB 0 0 0 King & King Architects 0 / / 09/22/22
XXPress Box@HS Lower Stad-OLD,DEMO:
23-1635 Reconstruction 7-008-002 UNREVIEWED 03/15/24 03/13/24 02/01/24 12/11/23 0 0 JJH 0 0 0 King & King Architects 0 / / 03/13/24
Adm. & Tech. Training Cntr.:
19-1881 Reconstruction 7-013-003 11/09/20 DONE DONE DONE 06/29/20 06/12/20 12/31/19 05/21/19 16 10,491 0 JLB 0 0 0 King & King Architects 10,491 10/02/23 06/12/20
22-0553 Reconstruction 7-013-004 01/30/23 DONE DONE DONE 09/23/22 09/22/22 03/17/22 12/06/21 7,8 416,000 0 JLB 0 0 0 King & King Architects 0 / / 09/22/22
Public Restrooms/Storage:
21-1070 Reconstruction 7-015-002 04/12/22 DONE DONE DONE 01/10/22 01/10/22 12/02/21 12/06/21 16 18,500 0 JLB 0 0 0 King & King Architects 0 09/15/23 01/10/22
22-0554 Reconstruction 7-015-003 01/30/23 DONE DONE DONE 09/23/22 09/22/22 03/17/22 12/06/21 155,15 221,000 0 JLB 0 0 0 King & King Architects 0 / / 09/22/22
Press Box @ HS New Field:
21-1071 Reconstruction 7-016-002 04/12/22 DONE DONE DONE 01/10/22 01/10/22 12/02/21 12/06/21 16 18,500 0 JLB 0 0 0 King & King Architects 0 09/15/23 01/10/22
22-0555 Reconstruction 7-016-003 01/30/23 DONE DONE DONE 09/23/22 09/22/22 03/17/22 12/06/21 7,8,155,15 143,000 0 JLB 0 0 0 King & King Architects 0 / / 09/22/22
Locker Rooms & Storage:
21-1072 Reconstruction 7-018-002 04/12/22 DONE DONE DONE 01/10/22 01/10/22 12/02/21 12/06/21 16 32,000 0 JLB 0 0 0 King & King Architects 0 09/15/23 01/10/22
22-0556 Reconstruction 7-018-003 01/30/23 DONE DONE DONE 09/23/22 09/22/22 03/17/22 12/06/21 2,4,7,8,9,155,15,16 508,800 0 JLB 0 0 0 King & King Architects 0 02/28/24 09/22/22
Press Box @ HS Lower Stadium:
23-1636 New Construction 7-019-001 UNREVIEWED 03/15/24 03/04/24 02/01/24 12/11/23 02 - 16 0 0 JJH 0 0 0 King & King Architects 0 / / 03/04/24
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
NORTH SYRACUSE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 42-03-03-06
last updated on 04/23/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Allen Road Elementary:
19-0775 Reconstruction 0-001-020 01/31/20 DONE DONE DONE 11/13/19 11/05/19 04/15/19 05/21/19 13 100,000 100,000 SLC 0 0 0 King & King Architects 0 04/05/21 11/05/19
20-1118 Reconstruction 0-001-021 09/07/21 DONE DONE DONE 01/08/21 12/28/20 09/28/20 09/28/17 7 450,000 450,000 SLC 0 0 0 Bell & Spina, P.C Architects- 0 11/29/22 12/28/20
23-0472 Reconstruction 0-001-022 ADDENDUM REQ'D 09/15/23 09/14/23 03/06/23 05/17/22 155,16 299,822 299,822 JLB 0 0 0 King & King Architects 299,822 / / 09/14/23
- Reconstruction 0-001-023 / / / / 03/06/23 / / 2,8,9,10,16 0 0 WLC 0 0 0 0 / / / /
Bear Road Elementary:
19-1019 Reconstruction 0-002-015 03/18/20 DONE DONE DONE 12/17/19 12/13/19 04/17/18 09/28/17 7 2,680,428 0 SLC 0 0 0 Bell & Spina, P.C Architects- 0 04/23/22 12/13/19
19-0651 Additions and Alterations 0-002-016 02/19/20 DONE DONE DONE 11/01/19 10/22/19 03/01/19 10/18/18 02 - 16 30,419,970 11,261,302 SLC 0 0 0 King & King Architects 0 08/26/22 10/22/19
- Reconstruction 0-002-017 / / / / 03/06/23 / / 10,16 0 0 WLC 0 0 0 0 / / / /
Cicero Elementary:
- Reconstruction 0-003-013 / / / / 08/25/21 / / 2,4,7,8,9,10,155,15, 0 0 SLC 0 0 0 0 / / / /
22-1670 Reconstruction 0-003-014 02/06/23 DONE DONE DONE 02/15/23 02/13/23 01/23/23 02/06/23 2,4,9,155,16 1,850,000 1,850,000 WLC 0 0 0 King & King Architects 0 / / 02/13/23
23-0473 Reconstruction 0-003-015 ADDENDUM REQ'D 09/15/23 09/14/23 03/06/23 05/17/22 155 31,052 31,052 JLB 0 0 0 King & King Architects 31,052 / / 09/14/23
Lakeshore Road Elementary:
23-0617 Reconstruction 0-004-019 ADDENDUM REQ'D 10/04/23 10/04/23 08/25/21 12/08/21 2,4,8,9,10,155,15,16 16,670,000 16,670,000 WLC 0 0 0 King & King Architects 0 / / 10/04/23
Main Street School:
23-0474 Reconstruction 0-005-017 ADDENDUM REQ'D 09/15/23 09/14/23 03/06/23 05/17/22 155,16 280,800 280,800 JLB 0 0 0 King & King Architects 280,800 / / 09/14/23
23-0520 Reconstruction 0-005-018 03/12/24 DONE DONE DONE 09/20/23 09/18/23 03/06/23 12/06/22 7,15 1,200,000 1,200,000 WLC 0 0 0 King & King Architects 0 / / 09/18/23
Roxboro Elementary School:
- Reconstruction 0-008-017 / / / / 09/29/22 / / 8,9,155,16 0 0 WLC 0 0 0 0 / / / /
23-0475 Reconstruction 0-008-018 ADDENDUM REQ'D 09/15/23 09/14/23 03/06/23 05/17/22 155,16 357,709 357,709 JLB 0 0 0 King & King Architects 357,709 / / 09/14/23
- Reconstruction 0-008-019 / / / / 03/06/23 / / 2,8,9,10,16 0 0 WLC 0 0 0 0 / / / /
Smith Rd. Elementary:
21-1659 Reconstruction 0-009-016 08/11/22 DONE DONE DONE 04/15/22 04/12/22 08/25/21 12/08/21 2,16 750,000 750,000 FMJ 0 0 0 King & King Architects 0 / / 04/12/22
- Reconstruction 0-009-017 / / / / 03/06/23 / / 8,9,10,16 0 0 WLC 0 0 0 0 / / / /
23-0476 Reconstruction 0-009-018 ADDENDUM REQ'D 09/15/23 09/14/23 03/06/23 05/17/22 155,16 222,886 222,886 JLB 0 0 0 King & King Architects 222,886 / / 09/14/23
Roxboro Middle School:
- PR Additions and Alterations 0-010-022 / / / / 03/06/23 / / 02 - 16 0 0 WLC 0 0 0 0 / / / /
23-0477 Reconstruction 0-010-023 ADDENDUM REQ'D 09/15/23 09/14/23 03/06/23 05/17/22 155,16 484,916 0 JLB 0 0 0 King & King Architects 484,916 / / 09/14/23
North Syracuse Jr. High School:
22-0004 Reconstruction 0-011-026 10/24/22 DONE DONE DONE 07/01/22 06/28/22 03/02/22 05/17/22 2,4,8,155,15,16 1,400,000 0 WLC 0 0 0 King & King Architects 0 / / 06/28/22
- Reconstruction 0-011-027 / / / / 03/06/23 / / 2,9,10,155,15,16 0 0 WLC 0 0 0 0 / / / /
23-0478 Reconstruction 0-011-028 ADDENDUM REQ'D 09/15/23 09/14/23 03/06/23 05/17/22 155,16 1,493,812 0 JLB 0 0 0 King & King Architects 1,493,812 / / 09/14/23
- Reconstruction 0-011-029 / / / / 11/06/23 / / 16 0 0 WLC 0 0 0 0 / / / /
Gillette Road Middle School:
- Reconstruction 0-012-021 / / / / 03/06/23 / / 2,7,8,9,10,155,15,16 0 0 WLC 0 0 0 0 / / / /
23-0479 Reconstruction 0-012-022 ADDENDUM REQ'D 09/15/23 09/14/23 03/06/23 05/17/22 155,16 673,170 0 JLB 0 0 0 King & King Architects 673,170 / / 09/14/23
Cicero-North Syracuse High School:
20-1119 Reconstruction 0-016-031 09/07/21 DONE DONE DONE 01/08/21 12/21/20 09/28/20 09/28/17 7 1,280,500 0 SLC 0 0 0 Bell & Spina, P.C Architects- 0 / / 12/21/20
21-0025 Reconstruction 0-016-032 08/26/21 DONE DONE DONE 07/08/21 07/08/21 04/14/21 05/18/21 4 100,000 100,000 SLC 0 0 0 King & King Architects 0 01/20/22 07/08/21
21-1137 Reconstruction 0-016-033 05/03/22 DONE DONE DONE 01/18/22 01/14/22 08/25/21 12/08/21 2,9,155,15,16 9,000,000 9,000,000 FMJ 0 0 0 King & King Architects 0 / / 01/14/22
22-1671 Reconstruction 0-016-034 08/01/23 DONE DONE DONE 02/15/23 02/13/23 08/25/21 12/08/21 2,4,7,9,10,155,15,16 28,400,000 28,400,000 WLC 0 0 0 King & King Architects 0 / / 02/13/23
22-1980PR Additions and Alterations 0-016-035 STARTED 04/03/23 / / 08/25/21 / / 02 - 16 0 0 WLC 0 0 0 0 / / / /
23-0725 Additions and Alterations 0-016-035 UNREVIEWED
ADD. REQ'D STARTED 10/18/23 10/12/23 08/25/21 12/08/21 02 - 16 0 0 WLC 0 0 0 King & King Architects 0 / / 10/12/23
- Reconstruction 0-016-036 / / / / 03/06/23 / / 2,8,9,10,16 0 0 WLC 0 0 0 0 / / / /
23-0480 Reconstruction 0-016-037 ADDENDUM REQ'D 09/15/23 09/14/23 03/06/23 05/17/22 155,16 1,175,590 0 JLB 0 0 0 King & King Architects 1,175,590 / / 09/14/23
23-0513 Reconstruction 0-016-038 10/26/23 DONE DONE DONE 09/18/23 09/18/23 06/22/23 05/16/23 7,8 100,000 100,000 WLC 0 0 0 King & King Architects 0 / / 09/18/23
23-0069 Reconstruction 0-016-039 07/14/23 DONE DONE DONE 07/14/23 07/12/23 07/07/23 09/26/17 7 1,280,500 1,280,500 WLC 0 0 0 King & King Architects 0 / / 07/12/23
District Office:
- Reconstruction 1-007-014 / / / / 03/06/23 / / 2,8,9,10,16 0 0 WLC 0 0 0 0 / / / /
23-0481 Reconstruction 1-007-015 ADDENDUM REQ'D 09/15/23 09/14/23 03/06/23 05/17/22 155,16 153,447 0 JLB 0 0 0 King & King Architects 153,447 / / 09/14/23
Storage Building 1 @ South Main:
- DB Discovered Building 2-054-001 / / / / 12/06/21 / / 0 0 SLC 0 0 0 0 / / / /
Storage Building 2 @ South Main:
- DB Discovered Building 2-055-001 / / / / 12/06/21 / / 0 0 SLC 0 0 0 0 / / / /
Storage Building 2 @ Route 31:
- DB Discovered Building 2-056-001 / / / / 12/06/21 / / 0 0 SLC 0 0 0 0 / / / /
Storage Building 3 @ Route 31:
- DB Discovered Building 2-057-001 / / / / 12/06/21 / / 0 0 SLC 0 0 0 0 / / / /
Storage Building @ 5979 Route 31:
- DB Discovered Building 2-058-001 / / / / 12/06/21 / / 0 0 SLC 0 0 0 0 / / / /
Storage Building @ Allen Road:
- DB Discovered Building 2-059-001 / / / / 12/06/21 / / 0 0 SLC 0 0 0 0 / / / /
Storage Building 2:
- DB Discovered Building 2-061-001 / / / / 01/10/22 / / 0 0 SLC 0 0 0 0 / / / /
Marching Band Storage:
- PR New Construction 2-063-001 / / / / 03/02/22 / / 02 - 16 0 0 SLC 0 0 0 0 / / / /
Jr High Storage 2:
- DB Discovered Building 2-064-001 / / / / 08/05/22 / / 0 0 WLC 0 0 0 0 / / / /
- DB Discovered Building 2-064-002 / / / / / / / / 0 0 WLC 0 0 0 0 / / / /
Maintenance Bldg 1:
23-0482 Reconstruction 3-033-010 ADDENDUM REQ'D 09/15/23 09/14/23 08/01/23 05/17/22 155 44,023 0 JLB 0 0 0 King & King Architects 44,023 / / 09/14/23
Transportation Center:
23-0483 Reconstruction 5-050-003 ADDENDUM REQ'D 09/15/23 09/14/23 03/06/23 05/17/22 155 87,366 0 JLB 0 0 0 King & King Architects 87,366 / / 09/14/23
Athletic Complex:
23-0484 Reconstruction 7-042-004 ADDENDUM REQ'D 09/15/23 09/14/23 03/06/23 05/17/22 16 54,628 0 JLB 0 0 0 King & King Architects 54,628 / / 09/14/23
Softball Dugout & Storage:
- DB Discovered Building 7-060-001 / / / / 12/06/21 / / 0 0 SLC 0 0 0 0 / / / /
Ticket Booth:
- DB Discovered Building 7-062-001 / / / / 01/10/22 / / 0 0 SLC 0 0 0 0 / / / /
Concession/Storage Bldg 2:
- DB Discovered Building 7-063-001 / / / / 08/05/22 / / 0 0 WLC 0 0 0 0 / / / /
St Margarets School:
23-0770SS Alterations 8-065-001 UNREVIEWED
STARTED STARTED 10/23/23 10/19/23 03/06/23 / / 0 0 WLC 0 0 0 0 / / 10/19/23
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
EAST SYRACUSE MINOA CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 42-04-01-06
last updated on 04/23/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
East Syracuse Elementary School:
20-0572 Reconstruction 0-002-010 02/03/21 DONE DONE DONE 10/13/20 09/28/20 09/12/18 12/11/18 2,4,8,9,10,155,15,16 2,000,000 2,000,000 SLC 0 0 0 King & King Architects 0 / / 09/28/20
22-0021FC Reconstruction 0-002-011 12/16/22 DONE DONE DONE 07/05/22 04/05/22 12/06/21 01/10/22 155,15,16 81,320 0 SLC 0 0 0 King & King Architects 0 09/30/23 04/05/22
Park Hill Elementary School:
20-0573 Reconstruction 0-003-010 02/03/21 DONE DONE DONE 10/13/20 09/28/20 09/12/18 12/11/18 2,4,7,8,9,10,155,15, 4,000,000 4,000,000 SLC 0 0 0 King & King Architects 0 08/19/22 09/28/20
22-0022FC Reconstruction 0-003-011 12/16/22 DONE DONE DONE 07/05/22 04/05/22 12/06/21 01/10/22 155,15,16 15,980 0 SLC 0 0 0 King & King Architects 0 09/30/23 04/05/22
23-0562 Reconstruction 0-003-012 03/20/24 DONE DONE DONE 09/27/23 09/27/23 08/18/23 12/11/18 2 150,000 150,000 MSK 0 0 0 King & King Architects 0 / / 09/27/23
Fremont Elementary School:
19-0522 Additions and Alterations 0-014-008 01/31/20 DONE DONE DONE 10/07/19 09/27/19 09/12/18 12/11/18 02 - 16 11,000,000 10,094,408 SLC 0 0 0 King & King Architects 0 08/01/21 09/27/19
22-0023FC Reconstruction 0-014-009 12/16/22 DONE DONE DONE 07/05/22 04/05/22 12/06/21 01/10/22 155,15,16 54,410 0 SLC 0 0 0 King & King Architects 0 09/30/23 04/05/22
Minoa Elementary School:
20-0574 Additions and Alterations 0-020-009 02/03/21 DONE DONE DONE 10/13/20 09/28/20 / / 12/11/18 02 - 16 13,000,000 11,894,325 SLC 0 0 0 King & King Architects 0 08/19/22 09/28/20
22-0024FC Reconstruction 0-020-010 12/16/22 DONE DONE DONE 07/05/22 04/05/22 12/06/21 01/10/22 155,15,16 54,410 0 SLC 0 0 0 King & King Architects 0 09/30/23 04/05/22
Central High School:
19-0670 Reconstruction 0-021-016 01/27/20 DONE DONE DONE 11/04/19 10/22/19 04/11/19 05/21/19 9 100,000 100,000 SLC 0 0 0 King & King Architects 0 06/29/20 10/22/19
20-0872 Reconstruction 0-021-017 03/01/21 DONE DONE DONE 11/20/20 11/16/20 11/05/20 06/16/20 9 100,000 100,000 SLC 0 0 0 King & King Architects 0 06/24/21 11/16/20
21-1588 Reconstruction 0-021-018 05/03/22 DONE DONE DONE 04/01/22 03/31/22 03/31/21 05/18/21 13,155 100,000 100,000 SLC 0 0 0 King & King Architects 0 06/30/22 03/31/22
22-0025FC Reconstruction 0-021-019 12/16/22 DONE DONE DONE 07/05/22 04/05/22 12/06/21 01/10/22 155,15,16 353,420 0 SLC 0 0 0 King & King Architects 0 09/30/23 04/05/22
- Reconstruction 0-021-020 / / / / 03/30/22 / / 9,155 0 0 SLC 0 0 0 0 / / / /
22-0376 Reconstruction 0-021-021 11/20/22 DONE DONE DONE 08/29/22 08/29/22 04/21/22 05/17/22 9 100,000 100,000 SLC 0 0 0 King & King Architects 0 06/30/23 08/29/22
22-2097 Reconstruction 0-021-022 06/13/23 DONE DONE DONE 04/26/23 04/24/23 03/29/23 05/16/23 2,4,7,8,9,155,15,16 100,000 100,000 MSK 0 0 0 King & King Architects 0 / / 04/24/23
22-2329 Reconstruction 0-021-023 07/31/23 DONE DONE DONE 06/05/23 06/05/23 04/10/23 05/08/23 155,16 350,000 0 MSK 0 0 0 King & King Architects 0 / / 06/05/23
23-0378 Reconstruction 0-021-024 03/15/24 DONE DONE DONE 09/05/23 09/05/23 08/18/23 01/12/23 2,4,7,8,9,155,15,16 17,427,000 17,427,000 MSK 0 0 0 King & King Architects 0 / / 09/05/23
- Reconstruction 0-021-025 / / / / 04/17/24 / / 9 0 0 MSK 0 0 0 0 / / / /
Woodland Elementary:
19-0523 Additions and Alterations 0-024-008 01/31/20 DONE DONE DONE 10/07/19 09/27/19 09/12/18 12/11/18 02 - 16 16,000,000 9,629,617 SLC 0 0 0 King & King Architects 0 08/01/21 09/27/19
22-0026FC Reconstruction 0-024-009 12/16/22 DONE DONE DONE 07/05/22 04/05/22 12/06/21 01/10/22 155,15,16 54,410 0 SLC 0 0 0 King & King Architects 0 09/30/23 04/05/22
23-0563 Reconstruction 0-024-010 03/21/24 DONE DONE DONE 09/27/23 09/27/23 08/18/23 12/11/18 2,9 750,000 0 MSK 0 0 0 King & King Architects 0 / / 09/27/23
Bus Garage:
22-1304 Reconstruction 5-005-011 02/14/23 DONE DONE DONE 12/21/22 12/21/22 11/18/22 12/12/22 15 50,000 50,000 SLC 0 0 0 King & King Architects 0 06/01/23 12/21/22
23-0379 Reconstruction 5-005-012 03/15/24 DONE DONE DONE 09/05/23 09/05/23 04/05/23 01/12/23 2,155,15,16 1,528,000 1,528,000 MSK 0 0 0 King & King Architects 0 / / 09/05/23
23-1864 Reconstruction 5-005-013 UNREVIEWED 04/18/24 04/18/24 03/12/24 03/12/24 13,16 0 0 MSK 0 0 0 King & King Architects 0 / / 04/18/24
Press Box @ Central HS:
23-0380 Reconstruction 7-025-002 03/15/24 DONE DONE DONE 09/05/23 09/05/23 08/08/23 01/12/23 8,9 50,000 0 MSK 0 0 0 King & King Architects 0 / / 09/05/23
Stadium Concession Stand:
23-0381 Reconstruction 7-027-002 03/15/24 DONE DONE DONE 09/05/23 09/05/23 03/29/23 01/12/23 4,8,9,155,15,16 95,000 0 MSK 0 0 0 King & King Architects 0 / / 09/05/23
XXSt. Matthews (lease ended 7/2022):
19-0396TQ Temporary Quarters 8-037-001 09/03/20 DONE DONE DONE 09/11/19 / / 04/17/19 / / 0 0 SLC 0 0 0 0 07/14/20 / /
19-1483 Reconstruction 8-037-L01 10/26/20 DONE DONE DONE 02/26/20 02/26/20 04/17/19 08/19/19 473,682 473,682 SLC 0 0 0 0 / / 02/26/20
Lake Street Elem-ConstSwingSpace:
19-0397TQ Temporary Quarters 8-038-001 02/25/20 DONE DONE DONE 09/11/19 / / 08/29/19 / / 0 0 SLC 0 0 0 0 07/14/20 / /
19-1484 Reconstruction 8-038-L01 02/26/20 DONE DONE DONE 02/26/20 02/26/20 08/29/19 08/19/19 507,320 276,720 SLC 0 0 0 0 / / 02/26/20
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
JAMESVILLE-DEWITT CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 42-04-11-06
last updated on 04/23/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Dewitt Jr/Sr High School:
19-0564 Reconstruction 0-002-022 12/12/19 DONE DONE DONE 10/16/19 10/01/19 06/18/19 05/21/19 8 100,000 100,000 JLB 0 0 0 Ashley McGraw 0 06/18/20 10/01/19
20-0851 Reconstruction 0-002-023 03/22/21 DONE DONE DONE 11/19/20 11/12/20 12/20/19 12/17/19 2,7,8,9,155,15,16 10,448,000 10,448,000 JLB 0 0 0 Ashley McGraw 0 10/31/23 11/12/20
20-0240 Reconstruction 0-002-024 10/06/20 DONE DONE DONE 08/20/20 08/19/20 06/30/20 06/09/20 8 100,000 100,000 JLB 0 0 0 Ashley McGraw 0 05/31/21 08/19/20
20-1283 Reconstruction 0-002-025 07/01/21 DONE DONE DONE 02/11/21 02/08/21 08/20/20 01/25/21 3,060,490 3,060,490 JLB 0 0 0 Ashley McGraw 3,060,490 04/08/22 02/08/21
21-0556 Reconstruction 0-002-026 12/13/21 DONE DONE DONE 10/22/21 09/15/21 10/21/21 05/18/21 8 100,000 100,000 JLB 0 0 0 Ashley McGraw 0 06/29/22 09/15/21
22-2400 Reconstruction 0-002-027 08/01/22 DONE DONE DONE 06/16/23 06/16/23 05/25/22 03/21/22 4,9,15,16 550,000 550,000 MSK 0 0 0 Ashley McGraw 0 12/23/22 06/16/23
22-0950 Reconstruction 0-002-028 01/10/23 DONE DONE DONE 11/09/22 11/09/22 06/02/22 05/17/22 8 100,000 100,000 WLC 0 0 0 Ashley McGraw 0 06/26/23 11/09/22
22-1043 Reconstruction 0-002-029 03/31/23 DONE DONE DONE 11/18/22 11/18/22 06/02/22 12/17/19 2,8,9,155,15,16 1,067,500 1,067,500 WLC 0 0 0 Ashley McGraw 0 01/30/24 11/18/22
23-0250 Reconstruction 0-002-030 10/03/23 DONE DONE DONE 08/14/23 08/07/23 05/19/23 05/16/23 8 100,000 100,000 JLB 0 0 0 Ashley McGraw 0 / / 08/07/23
23-1306 Reconstruction 0-002-031 01/30/24 DONE DONE DONE 12/28/23 12/28/23 12/20/23 10/16/23 4,8,9,14,16 250,000 250,000 MSK 0 0 0 Ashley McGraw 0 / / 12/28/23
- Reconstruction 0-002-032 / / / / 04/02/24 / / 8 0 0 MSK 0 0 0 0 / / / /
Moses Dewitt Elementary:
20-0852 Reconstruction 0-003-015 03/22/21 DONE DONE DONE 11/19/20 11/12/20 12/20/19 12/17/19 2,8,9,155,15,16 978,500 978,500 JLB 0 0 0 Ashley McGraw 0 10/31/23 11/12/20
20-1284 Reconstruction 0-003-016 07/01/21 DONE DONE DONE 02/11/21 02/08/21 08/20/20 01/25/21 13,15,16 235,500 235,500 JLB 0 0 0 Ashley McGraw 235,500 03/08/22 02/08/21
22-1838FC Reconstruction 0-003-017 05/26/23 DONE DONE DONE 03/15/23 03/03/23 02/14/23 02/27/23 10 337,000 0 WLC 0 0 0 Ashley McGraw 0 01/31/24 03/03/23
Jamesville Elementary School:
20-0853 Reconstruction 0-004-016 03/22/21 DONE DONE DONE 11/19/20 11/12/20 12/20/19 12/17/19 2,8,9,10,155,15,16 1,620,000 1,620,000 JLB 0 0 0 Ashley McGraw 0 10/31/23 11/12/20
20-1285 Reconstruction 0-004-017 07/01/21 DONE DONE DONE 02/11/21 02/08/21 08/20/20 01/25/21 13,15,16 234,108 234,108 JLB 0 0 0 Ashley McGraw 234,108 03/08/22 02/08/21
22-1839FC Reconstruction 0-004-018 05/26/23 DONE DONE DONE 03/15/23 03/03/23 02/14/23 02/27/23 10 385,000 0 WLC 0 0 0 Ashley McGraw 0 01/31/24 03/03/23
Tecumseh Elementary:
20-1286 Reconstruction 0-006-016 07/01/21 DONE DONE DONE 02/11/21 02/08/21 08/20/20 01/25/21 13,15,16 222,543 222,543 JLB 0 0 0 Ashley McGraw 222,543 04/08/22 02/08/21
22-1840FC Reconstruction 0-006-017 05/26/23 DONE DONE DONE 03/15/23 03/03/23 02/14/23 02/27/23 10 317,000 0 WLC 0 0 0 Ashley McGraw 0 01/31/24 03/03/23
JD Middle School:
20-0854 Reconstruction 0-007-017 03/22/21 DONE DONE DONE 11/19/20 11/12/20 12/20/19 12/17/19 2,8,9,155,15,16 19,180,000 19,180,000 JLB 0 0 0 Ashley McGraw 0 09/06/22 YES 11/12/20
21-0901 Reconstruction 0-007-018 03/01/21 DONE DONE DONE 12/15/21 12/14/21 08/17/20 08/24/20 155,16 148,848 148,848 JLB 0 0 0 Ashley McGraw 0 11/05/21 12/14/21
20-1287 Reconstruction 0-007-019 07/01/21 DONE DONE DONE 02/11/21 02/08/21 08/20/20 01/25/21 13,15,16 726,244 726,244 JLB 0 0 0 Ashley McGraw 726,244 10/10/22 02/08/21
Bus Garage (upper):
20-1288 Reconstruction 4-015-009 07/01/21 DONE DONE DONE 02/11/21 02/08/21 08/20/20 01/25/21 16 51,868 51,868 JLB 0 0 0 Ashley McGraw 51,868 01/17/22 02/08/21
Bus Garage:
20-0855 Reconstruction 5-014-012 03/22/21 DONE DONE DONE 11/19/20 11/12/20 12/20/19 12/17/19 2 773,500 773,500 JLB 0 0 0 Ashley McGraw 0 10/31/23 11/12/20
20-1289 Reconstruction 5-014-013 07/01/21 DONE DONE DONE 02/11/21 02/08/21 08/20/20 01/25/21 13,16 42,903 42,903 JLB 0 0 0 Ashley McGraw 42,903 01/17/22 02/08/21
Concession Stand:
- XX Reconstruction 7-009-003 CANCELLED / / / / 08/20/20 / / 16 0 0 JLB 0 0 0 0 / / / /
Concession/Restrooms-HS:
- XX Reconstruction 7-024-003 CANCELLED / / / / 08/20/20 / / 16 0 0 JLB 0 0 0 0 / / / /
High School Press Box:
- XX Reconstruction 7-027-002 CANCELLED / / / / 08/20/20 / / 16 0 0 JLB 0 0 0 0 / / / /
District Wide:
20-1877SB Reconstruction 7-999-001 DONE / / / / 06/14/21 / / 8,9,155,16 0 0 JLB 0 0 0 0 / / / /
22-0045 Reconstruction 7-999-001 11/28/22 DONE DONE DONE 07/06/22 07/05/22 06/14/21 11/04/14 8,9,155,16 697,000 0 WLC 0 0 0 Ashley McGraw 0 / / 07/05/22
23-0858FA Reconstruction 7-999-002 11/28/23 DONE DONE DONE 11/03/23 10/31/23 08/23/23 08/21/23 3,812,988 3,812,988 MSK 0 0 0 Ashley McGraw 0 / / 10/31/23
- SB Reconstruction 7-999-BA1 DONE / / / / / / / / 8,9,155,16 0 0 JLB 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
JORDAN ELBRIDGE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 42-05-01-06
last updated on 04/23/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Ramsdell Middle school:
19-0436 Reconstruction 0-001-017 01/27/20 DONE DONE DONE 09/19/19 09/05/19 11/02/18 10/02/18 2,8,9,10,155,15,16 1,059,046 1,059,046 JLB 0 0 0 Robertson Strong Apgar Archit 0 09/04/20 09/05/19
18-2174 Reconstruction 0-001-018 07/22/19 DONE DONE DONE 06/20/19 06/13/19 05/20/19 05/21/19 9 100,000 100,000 JLB 0 0 0 Robertson Strong Apgar Archit 0 02/11/20 06/13/19
19-1740 Reconstruction 0-001-019 08/14/20 DONE DONE DONE 05/22/20 05/07/20 04/03/20 06/09/19 9 100,000 100,000 JLB 0 0 0 RSA (Robertson Strong Apgar) 0 12/31/20 05/07/20
20-1780 Reconstruction 0-001-020 06/22/21 DONE DONE DONE 05/28/21 05/26/21 05/07/21 05/18/21 9 100,000 100,000 JLB 0 0 0 Robertson Strong Apgar Archit 0 03/08/22 05/26/21
- Reconstruction 0-001-021 / / / / 03/17/22 / / 2,4,8,9,10,14,155,15 0 0 JLB 0 0 0 0 / / / /
21-1957 Reconstruction 0-001-022 07/29/22 DONE DONE DONE 06/10/22 06/09/22 03/28/22 05/17/22 9 100,000 100,000 FMJ 0 0 0 Robertson Strong Apgar Archit 0 10/21/22 06/09/22
Elbridge Elementary:
19-0437 Reconstruction 0-004-020 01/27/20 DONE DONE DONE 09/19/19 09/05/19 11/02/18 10/02/18 2,8,9,10,155,15,16 2,086,076 2,086,076 JLB 0 0 0 Robertson Strong Apgar Archit 0 09/04/20 09/05/19
21-1920PR Additions and Alterations 0-004-021 STARTED 06/03/22 / / 07/02/21 / / 02 - 16 0 0 WLC 0 0 0 0 / / / /
22-1343 Reconstruction 0-004-022 10/19/22 DONE DONE DONE 12/28/22 12/27/22 10/03/22 10/12/22 16 259,205 259,205 WLC 0 0 0 Robertson Strong Apgar Archit 0 / / 12/27/22
High School:
19-0438 Reconstruction 0-009-028 01/27/20 DONE DONE DONE 09/19/19 09/05/19 11/02/18 10/02/18 2,8,9,10,155,15,16 401,877 401,877 JLB 0 0 0 Robertson Strong Apgar Archit 0 09/04/20 09/05/19
- Reconstruction 0-009-029 / / / / 03/17/22 / / 2,4,7,8,9,10,14,155, 0 0 JLB 0 0 0 0 / / / /
23-0001 Reconstruction 0-009-030 09/15/23 DONE DONE DONE 07/03/23 07/03/23 03/27/23 05/16/23 8 100,000 100,000 WLC 0 0 0 Robertson Strong Apgar Archit 0 / / 07/03/23
Bus Garage:
- Reconstruction 5-002-010 / / / / 07/02/21 / / 2,4,7,8,9,10,155,15, 0 0 JLB 0 0 0 0 / / / /
- Reconstruction 5-002-011 / / / / 11/21/23 / / 9,15,16 0 0 WLC 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
WESTHILL CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 42-07-01-06
last updated on 04/23/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Onondaga Hill Middle School:
19-0333 Reconstruction 0-001-012 10/22/19 DONE DONE DONE 08/30/19 08/21/19 01/31/19 05/21/19 16 100,000 100,000 SLC 0 0 0 King & King Architects 0 05/15/20 08/21/19
19-1489 Reconstruction 0-001-013 10/14/20 DONE DONE DONE 02/28/20 02/24/20 11/18/19 05/21/19 2,4,7,8,9,10,155,15, 1,850,332 1,850,332 SLC 0 0 0 Ashley McGraw 0 01/31/22 02/24/20
Walberta Park School:
19-1490 Reconstruction 0-002-010 10/14/20 DONE DONE DONE 02/28/20 02/24/20 11/18/19 05/21/19 7,8,9,155,16 634,893 634,893 SLC 0 0 0 Ashley McGraw 0 01/31/22 02/24/20
22-1597 Reconstruction 0-002-011 05/02/23 DONE DONE DONE 02/01/23 01/23/23 06/24/22 05/17/22 7 625,000 625,000 WLC 0 0 0 Ashley McGraw 0 10/31/23 01/23/23
22-1595 Reconstruction 0-002-012 10/03/22 DONE DONE DONE 02/01/23 01/23/23 10/11/22 10/03/22 2,9,155,16 248,000 248,000 WLC 0 0 0 Ashley McGraw 0 09/01/23 01/23/23
23-0298 Reconstruction 0-002-013 09/28/23 DONE DONE DONE 08/21/23 08/21/23 07/31/23 05/16/23 8 100,000 0 WLC 0 0 0 Ashley McGraw 0 / / 08/21/23
Cherry Road School:
18-1889 Reconstruction 0-003-010 04/25/19 DONE DONE DONE 04/22/19 04/19/19 01/31/19 02/04/19 2,9,155,15,16 650,000 650,000 SLC 0 0 0 King & King Architects 0 09/04/19 04/19/19
19-1491 Reconstruction 0-003-011 10/14/20 DONE DONE DONE 02/28/20 02/24/20 11/18/19 05/21/19 2,4,7,8,9,10,155,16 1,468,654 1,468,654 SLC 0 0 0 Ashley McGraw 0 01/31/22 02/24/20
20-0577 Reconstruction 0-003-012 12/19/20 DONE DONE DONE 10/13/20 10/09/20 07/15/20 06/16/20 16 100,000 100,000 SLC 0 0 0 King & King Architects 0 06/15/21 10/09/20
22-1598 Reconstruction 0-003-013 05/02/23 DONE DONE DONE 02/01/23 01/23/23 06/24/22 05/17/22 4,7 625,000 625,000 WLC 0 0 0 Ashley McGraw 0 10/31/23 01/23/23
22-1596 Reconstruction 0-003-014 10/03/22 DONE DONE DONE 02/01/23 01/23/23 10/11/22 10/03/22 2,9,155,16 243,000 243,000 WLC 0 0 0 Ashley McGraw 0 09/01/23 01/23/23
- Reconstruction 0-003-015 / / / / 04/18/24 / / 2,7,155 0 0 WLC 0 0 0 0 / / / /
Westhill High School:
19-1492 Reconstruction 0-004-010 10/14/20 DONE DONE DONE 02/28/20 02/24/20 11/18/19 05/21/19 2,4,7,8,9,10,13,155, 1,936,797 1,936,797 SLC 0 0 0 Ashley McGraw 0 01/31/22 02/24/20
20-1236 Reconstruction 0-004-011 02/15/22 DONE DONE DONE 02/02/21 01/26/21 11/18/19 05/21/19 2,4,8,9,10,155,15,16 14,170,789 14,170,789 SLC 0 0 0 Ashley McGraw 0 10/31/23 01/26/21
20-1851 Reconstruction 0-004-012 07/16/21 DONE DONE DONE 06/09/21 06/04/21 02/25/21 05/18/21 7 100,000 100,000 SLC 0 0 0 King & King Architects 0 06/30/22 06/04/21
21-0775FC Reconstruction 0-004-013 01/06/22 DONE DONE DONE 11/22/21 10/28/21 09/24/21 09/27/21 2,7 175,900 0 SLC 0 0 0 King & King Architects 0 11/15/22 10/28/21
22-1241 Reconstruction 0-004-014 02/08/23 DONE DONE DONE 12/14/22 12/13/22 06/24/22 05/17/22 8 100,000 100,000 WLC 0 0 0 Ashley McGraw 0 06/26/23 12/13/22
- Reconstruction 0-004-015 / / / / 04/18/24 / / 2,7,8,155 0 0 WLC 0 0 0 0 / / / /
Outbuilding North:
- DB Discovered Building 1-011-001 / / / / / / / / 0 0 WLC 0 0 0 0 / / / /
Outbuilding South:
- DB Discovered Building 1-012-001 / / / / / / / / 0 0 WLC 0 0 0 0 / / / /
Westhill Annex:
- DB Discovered Building 1-013-001 / / / / / / / / 0 0 WLC 0 0 0 0 / / / /
WHS Storage Building:
19-0808DB Discovered Building 2-007-001 02/27/20 DONE DONE DONE 11/15/19 / / 05/23/11 / / 0 0 JOD 0 0 0 0 / / / /
Concession Building - Westhill HS:
19-0809DB Discovered Building 7-008-001 02/27/20 DONE DONE DONE 11/15/19 / / 06/23/11 / / 0 0 JOD 0 0 0 0 / / / /
Press Box @ Westhill HS:
19-1493 New Construction 7-010-001 10/14/20 DONE DONE DONE 02/28/20 02/24/20 11/18/19 05/21/19 02 - 16 122,235 0 SLC 0 0 0 Ashley McGraw 0 09/03/21 02/24/20
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
SOLVAY UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 42-07-02-03
last updated on 04/23/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Senior High School:
19-0364 Reconstruction 0-006-015 01/24/20 DONE DONE DONE 09/04/19 08/28/19 10/11/17 11/28/17 2,4,7,8,9,10,155,15, 10,469,000 10,469,000 JSS 0 0 0 King & King Architects 0 05/13/22 08/28/19
22-0741 Reconstruction 0-006-016 12/07/22 DONE DONE DONE 10/17/22 10/17/22 03/28/22 05/17/22 9,16 100,000 100,000 SLC 0 0 0 King & King Architects 0 03/10/23 10/17/22
22-1552 Reconstruction 0-006-017 07/21/23 DONE DONE DONE 01/25/23 01/23/23 05/05/22 11/28/17 15,16 402,000 402,000 MSK 0 0 0 King & King Architects 0 / / 01/23/23
22-2443 Reconstruction 0-006-018 09/05/23 DONE DONE DONE 06/23/23 06/22/23 05/03/23 05/16/23 9,16 100,000 100,000 MSK 0 0 0 King & King Architects 0 / / 06/22/23
Solvay Middle Schl (fmly LakelandES):
20-1187 Reconstruction 0-007-015 02/04/21 DONE DONE DONE 01/25/21 01/08/21 07/24/20 06/09/20 8,9,16 100,000 100,000 JSS 0 0 0 King & King Architects 0 06/11/21 01/08/21
21-0044 Reconstruction 0-007-016 10/02/21 DONE DONE DONE 07/14/21 07/14/21 04/28/21 05/18/21 15,16 100,000 100,000 SLC 0 0 0 King & King Architects 0 04/15/22 07/14/21
22-1553 Reconstruction 0-007-017 07/21/23 DONE DONE DONE 01/25/23 01/23/23 05/05/22 11/28/17 16 735,000 735,000 MSK 0 0 0 King & King Architects 0 / / 01/23/23
- Reconstruction 0-007-018 / / / / 10/30/23 / / 155,15,16 0 0 MSK 0 0 0 0 / / / /
- Reconstruction 0-007-019 / / / / 04/02/24 / / 15,16 0 0 MSK 0 0 0 0 / / / /
Solvay Elementary School:
19-0365 Reconstruction 0-008-012 01/24/20 DONE DONE DONE 09/04/19 08/28/19 10/11/17 11/28/17 2,4,7,8,9,10,155,15, 7,505,000 7,505,000 JSS 0 0 0 King & King Architects 0 05/13/22 08/28/19
19-0666 Reconstruction 0-008-014 01/14/20 DONE DONE DONE 11/01/19 10/23/19 / / 05/21/19 9,16 100,000 100,000 JSS 0 0 0 King & King Architects 0 04/29/20 10/23/19
20-0865 Reconstruction 0-008-015 03/30/21 DONE DONE DONE 11/20/20 11/12/20 10/21/19 11/13/14 2,9 174,000 174,000 JSS 0 0 0 King & King Architects 0 10/29/21 11/12/20
District-Wide:
- Reconstruction 7-999-004 / / / / 04/02/24 / / 8,16 0 0 MSK 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
LAFAYETTE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 42-08-07-04
last updated on 04/23/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
C. Grant Grimshaw Elementary:
18-2021 Reconstruction 0-001-016 08/26/19 DONE DONE DONE 05/30/19 05/17/19 03/20/19 01/11/19 2,4,8,9,16 1,376,100 1,376,100 JLB 0 0 0 Ashley McGraw 0 12/22/20 05/17/19
21-0403 Reconstruction 0-001-017 12/17/21 DONE DONE DONE 09/23/21 09/17/21 02/12/21 12/10/20 2,8,9,155,15,16 4,060,000 4,060,000 JLB 0 0 0 Ashley McGraw 0 09/06/23 09/17/21
21-0961 Reconstruction 0-001-018 10/31/21 DONE DONE DONE 12/27/21 12/23/21 06/21/21 05/18/21 15 30,000 30,000 JLB 0 0 0 Ashley McGraw 0 11/15/21 12/23/21
22-1985 Reconstruction 0-001-019 09/27/23 DONE DONE DONE 04/03/23 03/31/23 11/03/22 03/29/23 2,13 21,459 0 WLC 0 0 0 Ashley McGraw 0 / / 03/31/23
23-1689 Reconstruction 0-001-020 UNREVIEWED 03/27/24 02/16/24 07/25/23 06/14/23 15 450,000 0 WLC 0 0 0 Ashley McGraw 0 / / 02/16/24
Senior High School:
18-2022 Reconstruction 0-006-016 08/26/19 DONE DONE DONE 05/30/19 05/17/19 03/20/19 01/11/19 2,4,8,9,10,16 1,411,900 1,411,900 JLB 0 0 0 Ashley McGraw 0 12/22/20 05/17/19
18-1865 Reconstruction 0-006-017 05/28/19 DONE DONE DONE 04/16/19 04/15/19 04/09/19 05/21/19 9 100,000 100,000 JLB 0 0 0 Ashley McGraw 0 08/26/19 04/15/19
19-1664 Reconstruction 0-006-018 07/10/20 DONE DONE DONE 04/07/20 04/07/20 02/21/20 06/09/20 9 100,000 100,000 JLB 0 0 0 Ashley McGraw 0 07/30/20 04/07/20
21-0404 Reconstruction 0-006-019 12/17/21 DONE DONE DONE 09/23/21 09/17/21 02/12/21 12/10/20 2,4,8,9,155,15,16 4,540,000 4,540,000 JLB 0 0 0 Ashley McGraw 0 10/31/23 09/17/21
20-1697 Reconstruction 0-006-020 06/24/21 DONE DONE DONE 05/11/21 05/07/21 02/12/21 05/18/21 16 100,000 100,000 JLB 0 0 0 Ashley McGraw 0 08/31/21 05/07/21
21-1927 Reconstruction 0-006-021 08/03/22 DONE DONE DONE 06/06/22 06/06/22 04/06/22 05/17/22 16 100,000 100,000 WLC 0 0 0 Ashley McGraw 0 12/06/22 06/06/22
22-2409 Reconstruction 0-006-022 08/15/23 DONE DONE DONE 06/20/23 06/16/23 01/05/23 05/16/23 16 100,000 100,000 WLC 0 0 0 Ashley McGraw 0 / / 06/16/23
- Reconstruction 0-006-023 / / / / 03/12/24 / / 155 0 0 WLC 0 0 0 0 / / / /
- Reconstruction 0-006-024 / / / / 03/22/24 / / 16 0 0 WLC 0 0 0 0 / / / /
Bus Garage:
18-2023 Reconstruction 5-002-006 08/26/19 DONE DONE DONE 05/30/19 05/17/19 / / 01/11/19 16 312,000 312,000 JLB 0 0 0 Ashley McGraw 0 08/28/20 05/17/19
22-0105 Reconstruction 5-002-007 08/23/22 DONE DONE DONE 07/18/22 07/15/22 06/21/21 03/25/21 14,15,16 278,330 278,330 JLB 0 0 0 Ashley McGraw 0 10/15/21 07/15/22
Jr/Sr Baseball Dugout #1:
22-1580DB Discovered Building 7-014-001 ADDENDUM REQ'D 01/30/23 01/27/23 10/31/22 / / 0 0 WLC 0 0 0 0 / / 01/27/23
Jr.Sr Baseball Dugout #2:
22-1581DB Discovered Building 7-015-001 ADDENDUM REQ'D 01/30/23 01/27/23 10/31/22 / / 0 0 WLC 0 0 0 0 / / 01/27/23
High School Press Box:
22-1582DB Discovered Building 7-016-001 ADDENDUM REQ'D 01/30/23 01/27/23 10/31/22 / / 0 0 WLC 0 0 0 0 / / 01/27/23
Press Box @Grant Grim Elem:
22-1583DB Discovered Building 7-017-001 ADDENDUM REQ'D 01/30/23 01/27/23 / / / / 0 0 WLC 0 0 0 0 / / 01/27/23
Jr/Sr Softball Dugout #1:
22-2133DB Discovered Building 7-018-001 ADDENDUM REQ'D 05/03/23 01/27/23 05/03/23 / / 0 0 WLC 0 0 0 0 / / 01/27/23
Jr/Sr Softball Dugout #2:
22-2134DB Discovered Building 7-019-001 ADDENDUM REQ'D 05/03/23 01/27/23 05/03/23 / / 0 0 WLC 0 0 0 0 / / 01/27/23
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
BALDWINSVILLE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 42-09-01-06
last updated on 04/23/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Harry E. Elden Elementary:
18-1378 Reconstruction 0-001-014 04/30/19 DONE DONE DONE 02/04/19 01/28/19 11/01/18 05/15/18 8,9,155,15,16 292,500 292,500 BMJ 0 0 0 King & King Architects 0 04/02/21 01/28/19
19-0973 Reconstruction 0-001-015 06/03/20 DONE DONE DONE 12/10/19 11/26/19 04/09/19 05/15/18 8,9,155,15,16 175,000 175,000 JSS 0 0 0 King & King Architects 0 09/03/21 11/26/19
- Reconstruction 0-001-016 / / / / 09/17/21 / / 0 0 SLC 0 0 0 0 / / / /
23-1258 Reconstruction 0-001-017 UNREVIEWED 12/21/23 12/21/23 08/17/23 05/16/23 2,8,16 0 0 WLC 0 0 0 King & King Architects 0 / / 12/21/23
Van Buren Elementary:
18-1379 Reconstruction 0-005-015 04/30/19 DONE DONE DONE 02/04/19 01/28/19 11/01/18 05/15/18 8,9,155,15,16 292,500 292,500 BMJ 0 0 0 King & King Architects 0 04/02/21 01/28/19
19-0974 Reconstruction 0-005-016 06/03/20 DONE DONE DONE 12/10/19 11/26/19 04/09/19 05/15/18 8,9,155,15,16 690,000 690,000 JSS 0 0 0 King & King Architects 0 09/03/21 11/26/19
- Reconstruction 0-005-017 / / / / 09/17/21 / / 0 0 SLC 0 0 0 0 / / / /
Theo R Durgee Jr High:
18-1380 Reconstruction 0-006-015 04/30/19 DONE DONE DONE 02/04/19 01/28/19 11/01/18 05/15/18 8,9,16 277,500 277,500 BMJ 0 0 0 King & King Architects 0 04/02/21 01/28/19
- Reconstruction 0-006-017 / / / / 06/23/21 / / 2,7,8,9,10,155,15,16 0 31,396,620 SLC 0 0 0 0 / / / /
21-1025 Reconstruction 0-006-018 07/25/22 DONE DONE DONE 01/03/22 01/03/22 06/23/21 05/18/21 2,9,15,16 1,119,000 1,119,000 WLC 0 0 0 King & King Architects 0 11/01/23 01/03/22
21-1397PR Additions and Alterations 0-006-019 DONE 02/28/22 / / 09/17/21 / / 02 - 16 0 33,467,175 WLC 0 0 0 0 / / / /
- PR Additions and Alterations 0-006-020 / / / / 05/09/23 / / 02 - 16 0 0 WLC 0 0 0 0 / / / /
22-2475 Additions and Alterations 0-006-020 01/05/24 DONE DONE DONE 06/28/23 06/28/23 05/09/23 05/17/22 02 - 16 32,800,000 31,036,085 WLC 0 0 0 King & King Architects 0 / / 06/28/23
23-1260 Reconstruction 0-006-021 UNREVIEWED 12/21/23 12/21/23 08/17/23 05/16/23 2,8,16 0 0 WLC 0 0 0 King & King Architects 0 / / 12/21/23
Charles W. Baker High School:
18-1381 Reconstruction 0-007-022 04/30/19 DONE DONE DONE 02/04/19 01/28/19 11/01/18 05/15/18 8,9,16 372,500 372,500 BMJ 0 0 0 King & King Architects 0 04/02/21 01/28/19
19-0975 Reconstruction 0-007-023 06/03/20 DONE DONE DONE 12/10/19 11/26/19 04/09/19 05/15/18 8,9,155,15,16 285,000 285,000 JSS 0 0 0 King & King Architects 0 09/03/21 11/26/19
20-0371 Reconstruction 0-007-024 12/08/20 DONE DONE DONE 09/14/20 08/20/20 07/09/20 06/16/20 2,9 100,000 100,000 JSS 0 0 0 King & King Architects 0 06/01/21 08/20/20
20-1659 Reconstruction 0-007-025 06/09/21 DONE DONE DONE 04/30/21 04/29/21 03/23/21 05/18/21 8,10 100,000 100,000 JSS 0 0 0 King & King Architects 0 06/30/22 04/29/21
21-1030 Reconstruction 0-007-026 04/12/22 DONE DONE DONE 01/03/22 01/03/22 11/16/21 02/09/16 2,8,9 280,000 280,000 SLC 0 0 0 King & King Architects 0 06/30/23 01/03/22
23-1259 Reconstruction 0-007-027 UNREVIEWED 12/21/23 12/21/23 08/17/23 05/16/23 2,8,16 0 0 WLC 0 0 0 King & King Architects 0 / / 12/21/23
- Reconstruction 0-007-028 / / / / 08/17/23 / / 2,4,7,8,9,10,155,15, 0 0 WLC 0 0 0 0 / / / /
Pearl Palmer Elementary:
18-1382 Reconstruction 0-009-013 04/30/19 DONE DONE DONE 02/04/19 01/28/19 11/01/18 05/15/18 8,9,155,16 342,500 342,500 BMJ 0 0 0 King & King Architects 0 04/02/21 01/28/19
- Reconstruction 0-009-015 / / / / 06/23/21 / / 15 0 0 SLC 0 0 0 0 / / / /
- Reconstruction 0-009-016 / / / / 09/17/21 / / 0 0 SLC 0 0 0 0 / / / /
Catherine McNamara Elem.:
18-1383 Reconstruction 0-010-012 04/30/19 DONE DONE DONE 02/04/19 01/28/19 11/01/18 05/15/18 8,9,155,16 342,500 342,500 BMJ 0 0 0 King & King Architects 0 04/02/21 01/28/19
- Reconstruction 0-010-014 / / / / 06/23/21 / / 2,9,15 0 0 SLC 0 0 0 0 / / / /
22-0559 Reconstruction 0-010-015 01/17/23 DONE DONE DONE 09/23/22 09/22/22 09/17/21 05/18/21 749,000 749,000 WLC 0 0 0 King & King Architects 0 / / 09/22/22
22-2316 Reconstruction 0-010-016 07/05/23 DONE DONE DONE 06/02/23 06/01/23 11/10/22 05/16/23 2,9,155,16 100,000 100,000 WLC 0 0 0 King & King Architects 0 / / 06/01/23
Mae E. Reynolds Elem.:
18-1384 Reconstruction 0-011-012 04/30/19 DONE DONE DONE 02/04/19 01/28/19 11/02/18 05/15/18 8,9,155,15,16 192,500 192,500 BMJ 0 0 0 King & King Architects 0 04/02/21 01/28/19
19-0976 Reconstruction 0-011-013 06/03/20 DONE DONE DONE 12/10/19 11/26/19 04/09/19 05/15/18 8,9,155,15,16 720,000 720,000 JSS 0 0 0 King & King Architects 0 09/03/21 11/26/19
21-1026 Reconstruction 0-011-014 07/25/22 DONE DONE DONE 01/03/22 01/03/22 06/23/21 05/18/21 2,7,9,10,155,15,16 900,000 900,000 FMJ 0 0 0 King & King Architects 0 / / 01/03/22
22-0558 Reconstruction 0-011-015 01/19/23 DONE DONE DONE 09/23/22 09/22/22 09/17/21 05/17/22 100,000 100,000 WLC 0 0 0 King & King Architects 0 06/30/23 09/22/22
Donald S. Ray Middle School:
18-1385 Reconstruction 0-012-017 04/30/19 DONE DONE DONE 02/04/19 01/28/19 11/02/18 05/15/18 8,9,16 222,500 222,500 BMJ 0 0 0 King & King Architects 0 04/02/21 01/28/19
19-0977 Reconstruction 0-012-018 06/03/20 DONE DONE DONE 12/10/19 11/26/19 04/09/19 05/15/18 8,9,155,15,16 105,000 0 JSS 0 0 0 King & King Architects 0 / / 11/26/19
21-1027 Reconstruction 0-012-019 07/25/22 DONE DONE DONE 01/03/22 01/03/22 06/23/21 05/18/21 9,15 135,000 135,000 FMJ 0 0 0 King & King Architects 0 / / 01/03/22
- Reconstruction 0-012-020 / / / / 09/17/21 / / 2,4,7,8,9,10,155,15, 0 0 SLC 0 0 0 0 / / / /
- Reconstruction 0-012-021 / / / / 08/17/23 / / 2,4,7,8,9,10,155,15, 0 0 WLC 0 0 0 0 / / / /
Baker HS Storage Building:
- New Construction 2-030-001 / / / / 01/26/22 / / 02 - 16 0 0 SLC 0 0 0 0 / / / /
Baldwinsville Public Library:
19-0441 Reconstruction 6-021-005 02/12/20 DONE DONE DONE 09/19/19 09/13/19 08/26/19 08/14/19 2 350,000 0 JSS 0 0 0 King & King Architects 0 / / 09/13/19
22-0560 Reconstruction 6-021-006 01/19/23 DONE DONE DONE 09/23/22 09/22/22 03/21/22 06/14/22 8,9,16 105,000 0 WLC 0 0 0 King & King Architects 0 / / 09/22/22
22-0543 Reconstruction 6-021-007 01/30/23 DONE DONE DONE 09/21/22 09/20/22 09/06/22 08/14/19 155 99,000 0 WLC 0 0 0 King & King Architects 0 / / 09/20/22
District-Wide:
19-1079 Reconstruction 7-999-004 03/05/20 DONE DONE DONE 12/27/19 12/17/19 10/05/18 12/17/18 13,16 1,198,890 1,198,890 SLC 0 0 0 King & King Architects 0 / / 12/17/19
- Reconstruction 7-999-005 / / / / 12/19/22 / / 8,16 0 0 WLC 0 0 0 0 / / / /
22-1279SB Reconstruction 7-999-005 DONE / / / / 12/19/22 / / 8,16 0 0 WLC 0 0 0 0 / / / /
- SB Reconstruction 7-999-BA3 DONE / / / / / / / / 8,16 0 0 WLC 0 0 0 0 / / / /
- SB Reconstruction 7-999-BA4 DONE / / / / / / / / 8,16 0 0 WLC 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
FAYETTEVILLE-MANLIUS CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 42-10-01-06
last updated on 04/23/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Wellwood Middle School:
19-0059 Additions and Alterations 0-003-020 11/12/19 DONE DONE DONE 07/12/19 07/02/19 06/28/17 12/05/17 02 - 16 35,000,000 28,690,779 JLB 0 0 0 King & King Architects 0 10/28/22 07/02/19
Fayetteville Elementary:
18-2144 Reconstruction 0-004-020 08/28/19 DONE DONE DONE 06/18/19 06/11/19 04/30/18 12/05/17 2,8,155,15,16 127,951 127,951 JLB 0 0 0 King & King Architects 127,951 05/01/21 06/11/19
18-2192 Reconstruction 0-004-021 08/28/19 DONE DONE DONE 06/24/19 06/18/19 05/02/19 05/21/19 2,8,16 450,000 450,000 JLB 0 0 0 King & King Architects 0 08/12/20 06/18/19
20-1178 Reconstruction 0-004-022 01/28/21 DONE DONE DONE 01/25/21 01/21/21 10/29/20 11/18/20 4 88,000 88,000 JLB 0 0 0 King & King Architects 0 08/06/21 01/21/21
22-0285 Reconstruction 0-004-023 10/27/22 DONE DONE DONE 08/17/22 08/16/22 07/11/22 05/17/22 4,7,9,155 1,395,000 1,395,000 WLC 0 0 0 King & King Architects 0 09/26/23 08/16/22
Mott Road Elementary:
18-2145 Reconstruction 0-006-020 08/28/19 DONE DONE DONE 06/18/19 06/11/19 04/30/18 12/05/17 8,155,15,16 121,397 121,397 JLB 0 0 0 King & King Architects 121,397 05/01/20 06/11/19
18-1302 Reconstruction 0-006-021 05/28/19 DONE DONE DONE 01/22/19 01/17/19 01/04/19 05/15/18 16 350,000 350,000 JLB 0 0 0 King & King Architects 0 10/07/20 01/17/19
23-0143 Reconstruction 0-006-022 12/07/23 DONE DONE DONE 07/26/23 07/26/23 05/30/23 05/16/23 2,9,155,15,16 2,000,000 2,000,000 WLC 0 0 0 King & King Architects 0 / / 07/26/23
Fayetteville-Manlius High School:
18-2146 Reconstruction 0-007-037 08/28/19 DONE DONE DONE 06/18/19 06/11/19 04/30/18 12/05/17 2,8,155,15,16 1,602,967 1,602,967 JLB 0 0 0 King & King Architects 1,602,967 05/01/20 06/11/19
20-0059 Reconstruction 0-007-040 08/13/20 DONE DONE DONE 07/15/20 07/01/20 / / 06/09/20 2,9 395,000 395,000 JLB 0 0 0 King & King Architects 0 10/20/21 07/01/20
20-0325 Reconstruction 0-007-041 10/23/20 DONE DONE DONE 09/02/20 08/20/20 07/28/20 05/18/18 8,16 100,000 100,000 JLB 0 0 0 King & King Architects 0 02/21/22 08/20/20
21-0071PR Additions and Alterations 0-007-042 DONE 07/20/21 / / 04/27/21 / / 02 - 16 0 51,734,575 JLB 0 0 0 0 / / / /
20-1803 Reconstruction 0-007-043 07/29/21 DONE DONE DONE 05/28/21 05/21/21 04/27/21 05/18/21 2,9 195,000 195,000 JLB 0 0 0 King & King Architects 0 09/02/22 05/21/21
22-0730 Reconstruction 0-007-044 02/07/23 DONE DONE DONE 10/14/22 10/14/22 02/18/22 12/07/21 2,4,7,8,9,10,14,155, 51,750,000 43,928,304 JLB 0 0 0 King & King Architects 0 / / 10/14/22
Enders Road Elementary:
20-0060 Reconstruction 0-009-021 08/31/20 DONE DONE DONE 07/15/20 07/01/20 06/01/20 06/09/20 2,9 55,000 55,000 JLB 0 0 0 King & King Architects 0 07/30/21 07/01/20
20-1804 Reconstruction 0-009-022 07/29/21 DONE DONE DONE 05/28/21 05/21/21 04/27/21 05/18/21 2,9 255,000 255,000 JLB 0 0 0 King & King Architects 0 09/02/22 05/21/21
22-0286 Reconstruction 0-009-023 10/27/22 DONE DONE DONE 08/17/22 08/16/22 07/11/22 05/17/22 8 105,000 105,000 WLC 0 0 0 King & King Architects 0 09/26/23 08/16/22
Eagle Hill Middle School:
18-2147 Reconstruction 0-010-021 08/28/19 DONE DONE DONE 06/18/19 06/11/19 04/30/18 12/05/17 2,8,155,15,16 1,036,530 1,036,530 JLB 0 0 0 King & King Architects 1,036,530 05/01/21 06/11/19
22-1088 Reconstruction 0-010-022 10/03/22 DONE DONE DONE 11/29/22 11/21/22 10/12/22 10/03/22 10,155 200,000 200,000 WLC 0 0 0 King & King Architects 0 08/18/23 11/21/22
District Office Bldg:
18-2148 Reconstruction 1-014-008 08/28/19 DONE DONE DONE 06/18/19 06/11/19 04/30/18 12/05/17 2,8,155,15,16 114,183 0 JLB 0 0 0 King & King Architects 114,183 05/01/20 06/11/19
SUPPORT SERVICES BLDG MAINTENANCE:
18-2149 Reconstruction 5-024-002 08/28/19 DONE DONE DONE 06/18/19 06/11/19 04/30/18 12/05/17 8,155,15,16 195,353 195,353 JLB 0 0 0 King & King Architects 195,353 05/01/21 06/11/19
Transportation Office:
18-2150 Reconstruction 7-001-007 08/28/19 DONE DONE DONE 06/18/19 06/11/19 04/30/18 12/05/17 8,16 1,619 0 JLB 0 0 0 King & King Architects 1,619 12/01/20 06/11/19
Wellwood Classroom Swing Space:
19-0060SS Reconstruction 8-032-001 12/23/19 DONE DONE DONE 07/12/19 07/02/19 11/30/18 12/05/17 0 0 MTM 0 0 0 King & King Architects 0 / / 07/02/19
22-0731SS New Construction 8-032-002 02/07/23 DONE DONE DONE 10/14/22 10/14/22 01/27/22 12/07/21 02 - 16 250,000 0 WLC 0 0 0 King & King Architects 0 / / 10/14/22
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
MARCELLUS CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 42-11-01-06
last updated on 04/23/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Chester S Driver Middle School:
18-2073 Reconstruction 0-001-021 09/10/19 DONE DONE DONE 06/07/19 06/04/19 01/22/19 12/11/18 2,4,8,9,155,15,16 7,277,000 7,277,000 JLB 0 0 0 King & King Architects 0 09/03/21 06/04/19
21-1643 Reconstruction 0-001-022 07/27/22 DONE DONE DONE 04/11/22 04/07/22 01/13/22 12/07/21 2,7,8,9,10,155,15,16 2,311,200 2,311,200 JLB 0 0 0 King & King Architects 0 / / 04/07/22
K C Heffernan Elementary:
18-2074 Reconstruction 0-002-013 09/10/19 DONE DONE DONE 06/07/19 06/04/19 01/22/19 12/11/18 2,8,9,155,15,16 40,000 40,000 JLB 0 0 0 King & King Architects 0 / / 06/04/19
- Reconstruction 0-002-014 / / / / 05/06/19 / / 7 0 0 JLB 0 0 0 0 / / / /
20-1374 Reconstruction 0-002-015 05/19/21 DONE DONE DONE 03/05/21 03/04/21 12/18/20 12/11/18 8,9,155,15,16 575,000 575,000 JLB 0 0 0 King & King Architects 0 11/01/22 03/04/21
21-1644 Reconstruction 0-002-016 07/27/22 DONE DONE DONE 04/11/22 04/07/22 01/13/22 12/07/21 7,155,15,16 2,139,600 2,139,600 JLB 0 0 0 King & King Architects 0 / / 04/07/22
22-0940 Reconstruction 0-002-017 03/29/23 DONE DONE DONE 11/09/22 11/07/22 10/25/22 12/07/21 2,8,16 1,874,938 1,874,938 JJH 0 0 0 King & King Architects 0 / / 11/07/22
Senior High School:
19-1356 Reconstruction 0-005-022 04/24/20 DONE DONE DONE 02/04/20 01/30/20 01/22/19 12/11/18 2,155,15,16 2,678,000 2,678,000 JLB 0 0 0 King & King Architects 0 09/03/21 01/30/20
21-1645 Reconstruction 0-005-023 07/27/22 DONE DONE DONE 04/11/22 04/07/22 01/13/22 12/07/21 2,7,155,15,16 4,392,000 4,392,000 JLB 0 0 0 King & King Architects 0 / / 04/07/22
22-0941 Reconstruction 0-005-024 03/29/23 DONE DONE DONE 11/09/22 11/07/22 10/25/22 12/07/21 2,8,16 3,734,062 3,734,062 JJH 0 0 0 King & King Architects 0 / / 11/07/22
- Reconstruction 0-005-025 / / / / 01/19/24 / / 15 0 0 JJH 0 0 0 0 / / / /
A G Greenhouse:
23-0123 Reconstruction 0-018-001 01/30/24 DONE DONE DONE 07/24/23 07/24/23 02/15/22 12/07/21 2,4,7,8,9,155,15,16 100,000 100,000 JJH 0 0 0 King & King Architects 0 / / 07/24/23
A G Sugar Shack:
- PR New Construction 7-016-001 / / / / 02/15/22 / / 02 - 16 0 0 JLB 0 0 0 0 / / / /
23-0122 New Construction 7-016-001 01/30/24 DONE DONE DONE 07/24/23 07/24/23 02/15/22 12/07/21 02 - 16 1,500,000 0 JJH 0 0 0 King & King Architects 0 / / 07/24/23
A G Sawmill:
- PR New Construction 7-017-001 / / / / 02/15/22 / / 02 - 16 0 0 JLB 0 0 0 0 / / / /
XXA G Greenhouse:
- PR New Construction 7-018-001 / / / / 02/15/22 / / 02 - 16 0 0 JLB 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
ONONDAGA CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 42-12-01-04
last updated on 04/23/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Junior Senior High School:
20-0444 Reconstruction 0-001-015 12/23/20 DONE DONE DONE 09/25/20 09/03/20 06/24/20 03/03/20 2,4,7,8,9,10,155,15, 9,983,000 9,983,000 SLC 0 0 0 King & King Architects 0 11/17/22 09/03/20
21-0482 Reconstruction 0-001-016 03/07/22 DONE DONE DONE 10/06/21 10/06/21 05/24/21 03/03/20 2,4,7,8,9,10,155,15, 1,907,054 1,907,054 SLC 0 0 0 King & King Architects 0 11/15/23 10/06/21
- Reconstruction 0-001-017 / / / / 02/09/24 / / 2,7,155,16 0 0 MSK 0 0 0 0 / / / /
Wheeler ES (3-6):
20-0445 Reconstruction 0-002-014 12/23/20 DONE DONE DONE 09/25/20 09/03/20 06/24/20 03/03/20 2,4,8,9,10,155,15,16 4,995,000 4,893,389 SLC 0 0 0 King & King Architects 0 11/17/22 09/03/20
21-0483 Reconstruction 0-002-015 03/07/22 DONE DONE DONE 10/06/21 10/06/21 05/24/21 03/03/20 2,8,9,155,15,16 412,712 412,712 SLC 0 0 0 King & King Architects 0 11/15/23 10/06/21
- Reconstruction 0-002-016 / / / / 02/09/24 / / 2,9 0 0 MSK 0 0 0 0 / / / /
Industrial Arts Bldg:
20-0446 Reconstruction 0-003-007 12/23/20 DONE DONE DONE 09/25/20 09/03/20 06/24/20 03/03/20 8,16 655,000 655,000 SLC 0 0 0 King & King Architects 0 11/17/22 09/03/20
21-0484 Reconstruction 0-003-008 03/07/22 DONE DONE DONE 10/06/21 10/06/21 05/24/21 03/03/20 2,9,155,15,16 69,202 69,202 SLC 0 0 0 King & King Architects 0 11/15/23 10/06/21
Rockwell ES (K-2):
18-1921 Reconstruction 0-004-014 05/08/19 DONE DONE DONE 05/02/19 05/02/19 04/02/19 04/22/19 16 150,000 0 SLC 0 0 0 King & King Architects 0 / / 05/02/19
20-0447 Reconstruction 0-004-015 12/23/20 DONE DONE DONE 09/25/20 09/03/20 06/24/20 03/03/20 2,4,7,8,9,10,155,15, 5,858,000 5,621,757 SLC 0 0 0 King & King Architects 0 11/17/22 09/03/20
21-0485 Reconstruction 0-004-016 03/07/22 DONE DONE DONE 10/06/21 10/06/21 05/24/21 03/03/20 2,8,9,155,15,16 1,131,032 1,131,032 SLC 0 0 0 King & King Architects 0 11/15/23 10/06/21
Bus Garage:
- Reconstruction 5-005-008 / / / / / / / / 2,7,155,15,16 0 0 MSK 0 0 0 0 / / / /
Press Box @ HS:
20-0448 Reconstruction 7-007-002 12/23/20 DONE DONE DONE 09/25/20 09/03/20 06/24/20 03/03/20 7 9,000 0 SLC 0 0 0 King & King Architects 0 11/17/22 09/03/20
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
LIVERPOOL CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 42-15-01-06
last updated on 04/23/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Liverpool Elementary:
20-0301 Reconstruction 0-004-008 12/30/20 DONE DONE DONE 09/01/20 08/28/20 11/30/18 05/15/18 8,13,16 42,000 42,000 JLB 0 0 0 Ashley McGraw 0 / / 08/28/20
23-0702 Reconstruction 0-004-009 STARTED DONE DONE 10/13/23 10/11/23 06/05/23 03/14/22 10 0 0 WLC 0 0 0 Ashley McGraw 0 / / 10/11/23
Liverpool Middle School:
20-0302 Reconstruction 0-005-012 12/30/20 DONE DONE DONE 09/01/20 08/28/20 11/30/18 05/15/18 8,13,16 67,600 0 JLB 0 0 0 Ashley McGraw 0 / / 08/28/20
23-0703 Reconstruction 0-005-013 STARTED DONE DONE 10/13/23 10/11/23 06/05/23 03/14/22 10 1,031,000 0 WLC 0 0 0 Ashley McGraw 0 / / 10/11/23
XXNate Perry Elem-Sold080322.2022Lsd:
20-0303 Reconstruction 0-007-010 12/30/20 DONE DONE DONE 09/01/20 08/28/20 05/03/19 05/15/18 8 29,750 29,750 JLB 0 0 0 Ashley McGraw 0 / / 08/28/20
Long Branch Elementary:
20-0304 Reconstruction 0-009-011 12/30/20 DONE DONE DONE 09/01/20 08/28/20 05/03/19 05/15/18 8 62,500 0 JLB 0 0 0 Ashley McGraw 0 / / 08/28/20
22-1244 Reconstruction 0-009-012 03/29/23 DONE DONE DONE 12/15/22 12/14/22 05/12/22 03/14/22 2,15,16 2,217,000 2,217,000 WLC 0 0 0 Ashley McGraw 0 / / 12/14/22
22-1579 Reconstruction 0-009-013 08/30/22 DONE DONE DONE 01/30/23 01/27/23 09/01/22 08/30/22 2 100,000 100,000 WLC 0 0 0 Ashley McGraw 0 12/08/23 01/27/23
Donlin Drive Elementary:
20-0305 Reconstruction 0-010-012 12/30/20 DONE DONE DONE 09/01/20 08/28/20 05/03/19 05/15/18 8 71,500 0 JLB 0 0 0 Ashley McGraw 0 / / 08/28/20
XXAlt.Ed@CravenCrawfordAdminSee1-012:
20-0306 Reconstruction 0-012-007 12/30/20 DONE DONE DONE 09/01/20 08/28/20 05/03/19 05/15/18 8 34,800 0 JLB 0 0 0 Ashley McGraw 0 / / 08/28/20
Wetzel Road Elementary:
20-0307 Reconstruction 0-014-011 12/30/20 DONE DONE DONE 09/01/20 08/28/20 11/30/18 05/15/18 8,13,16 62,000 62,000 JLB 0 0 0 Ashley McGraw 0 / / 08/28/20
19-0594 Reconstruction 0-014-012 02/06/20 DONE DONE DONE 10/21/19 10/08/19 05/20/19 12/14/17 2,13 1,164,000 1,164,000 JLB 0 0 0 Ashley McGraw 0 09/28/20 10/08/19
22-1654PR Additions and Alterations 0-014-013 UNREVIEWED 02/10/23 02/08/23 05/12/22 / / 02 - 16 0 11,219,472 WLC 0 0 0 0 / / 02/08/23
23-0144 Additions and Alterations 0-014-013 STARTED DONE DONE 07/26/23 07/25/23 05/12/22 03/14/22 02 - 16 15,832,500 0 WLC 0 0 0 Ashley McGraw 0 / / 07/25/23
Elmcrest Elementary:
20-0308 Reconstruction 0-015-007 12/30/20 DONE DONE DONE 09/01/20 08/28/20 05/03/19 05/15/18 8 33,500 0 JLB 0 0 0 Ashley McGraw 0 / / 08/28/20
Senior High School:
19-0158 Reconstruction 0-016-026 10/04/19 DONE DONE DONE 07/25/19 07/24/19 09/27/18 09/01/21 2,4,7,8,9,10,14,155, 17,300,000 17,300,000 JLB 0 0 0 Ashley McGraw 0 01/20/22 07/24/19
19-0475 Reconstruction 0-016-027 10/15/19 DONE DONE DONE 09/23/19 09/19/19 08/06/19 05/21/19 13 100,000 100,000 JLB 0 0 0 Ashley McGraw 0 06/23/20 09/19/19
19-1294 Reconstruction 0-016-028 02/03/20 DONE DONE DONE 01/28/20 01/24/20 11/06/19 11/18/19 9,13 1,550,000 1,550,000 JLB 0 0 0 Ashley McGraw 0 12/15/20 01/24/20
20-0309 Reconstruction 0-016-029 12/30/20 DONE DONE DONE 09/01/20 08/28/20 02/12/20 05/15/18 8,13,16 226,550 226,550 JLB 0 0 0 Ashley McGraw 0 / / 08/28/20
19-1812 Reconstruction 0-016-030 06/26/20 DONE DONE DONE 06/03/20 05/18/20 03/05/20 06/09/20 13 100,000 100,000 JLB 0 0 0 Ashley McGraw 0 06/09/21 05/18/20
21-0260 Reconstruction 0-016-031 10/15/21 DONE DONE DONE 09/01/21 08/31/21 06/17/21 05/18/21 13 100,000 100,000 JLB 0 0 0 Ashley McGraw 0 06/16/22 08/31/21
23-0145 Reconstruction 0-016-032 STARTED DONE DONE 07/26/23 07/25/23 05/12/22 03/14/22 2,4,7,8,9,10,155,15, 12,549,000 0 WLC 0 0 0 Ashley McGraw 0 / / 07/25/23
22-0883 Reconstruction 0-016-033 12/28/22 DONE DONE DONE 11/02/22 11/01/22 05/24/22 05/17/22 13 100,000 100,000 JLB 0 0 0 Ashley McGraw 0 06/26/23 11/01/22
23-1674PR Additions and Alterations 0-016-034 UNREVIEWED 03/25/24 03/25/24 03/25/24 / / 02 - 16 0 0 WLC 0 0 0 0 / / 03/25/24
Morgan Road Complex:
20-0310 Reconstruction 0-018-015 12/30/20 DONE DONE DONE 09/01/20 08/28/20 05/03/19 05/15/18 8 120,000 120,000 JLB 0 0 0 Ashley McGraw 0 / / 08/28/20
23-0146 Reconstruction 0-018-016 STARTED DONE DONE 07/26/23 07/25/23 10/06/22 03/14/22 2,8 1,212,500 0 WLC 0 0 0 Ashley McGraw 0 / / 07/25/23
23-0416 Reconstruction 0-018-017 10/04/23 DONE DONE DONE 09/06/23 08/29/23 05/24/23 05/16/23 9 100,000 100,000 WLC 0 0 0 Ashley McGraw 0 / / 08/29/23
- Reconstruction 0-018-018 / / / / 08/11/23 / / 16 0 0 WLC 0 0 0 0 / / / /
- Reconstruction 0-018-019 / / / / 03/01/24 / / 9 0 0 WLC 0 0 0 0 / / / /
Soule Road Complex:
18-1838 Reconstruction 0-019-015 05/07/19 DONE DONE DONE 04/11/19 04/09/19 04/01/19 12/14/17 2,8,10 267,000 267,000 JLB 0 0 0 Ashley McGraw 0 03/17/20 04/09/19
23-0704 Reconstruction 0-019-016 STARTED DONE DONE 10/13/23 10/11/23 06/05/23 03/14/22 10 0 0 WLC 0 0 0 Ashley McGraw 0 / / 10/11/23
Willow Field Elementary:
20-0311 Reconstruction 0-024-010 12/30/20 DONE DONE DONE 09/01/20 08/28/20 11/30/18 05/15/18 8,13,16 62,000 0 JLB 0 0 0 Ashley McGraw 0 / / 08/28/20
Athletic Storage Building:
- PR New Construction 2-042-001 / / / / 05/18/22 / / 02 - 16 0 0 JLB 0 0 0 0 / / / /
Band Storage Building:
- DB Discovered Building 2-044-001 / / / / / / / / 0 0 WLC 0 0 0 0 / / / /
Shed 1:
- DB Discovered Building 2-045-001 / / / / / / / / 0 0 WLC 0 0 0 0 / / / /
Shed 2:
- DB Discovered Building 2-046-001 / / / / / / / / 0 0 WLC 0 0 0 0 / / / /
Shed at SRC:
- DB Discovered Building 2-047-001 / / / / / / / / 0 0 WLC 0 0 0 0 / / / /
LMS Shed:
- DB Discovered Building 2-048-001 / / / / / / / / 0 0 WLC 0 0 0 0 / / / /
Educational Communication Center:
23-0705 Reconstruction 3-006-008 STARTED DONE DONE 10/13/23 10/11/23 06/05/23 03/14/22 10 121,700 0 WLC 0 0 0 Ashley McGraw 0 / / 10/11/23
TC Bus Svc. & Office Bldg.:
19-0879 Reconstruction 5-008-008 01/28/20 DONE DONE DONE 11/27/19 11/19/19 08/06/19 05/21/19 2,10,15,16 180,000 180,000 JLB 0 0 0 Ashley McGraw 0 08/12/20 11/19/19
22-1245 Reconstruction 5-008-009 03/29/23 DONE DONE DONE 12/15/22 12/14/22 05/12/22 03/14/22 2,8,15,16 923,500 923,500 WLC 0 0 0 Ashley McGraw 0 / / 12/14/22
Stadium Press Box:
23-0147 Reconstruction 7-041-002 STARTED DONE DONE 07/26/23 07/25/23 05/19/22 03/14/22 2,7,8,9,155,16 32,250 0 WLC 0 0 0 Ashley McGraw 0 / / 07/25/23
New Press Box:
23-0148 New Construction 7-043-001 STARTED DONE DONE 07/26/23 07/25/23 05/19/23 03/14/22 02 - 16 332,500 0 WLC 0 0 0 Ashley McGraw 0 / / 07/25/23
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
LYNCOURT UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 42-15-04-02
last updated on 04/23/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
K-8 School:
19-0187 Reconstruction 0-002-015 09/28/19 DONE DONE DONE 07/30/19 07/26/19 06/11/19 05/21/19 4,8,9,155,16 99,000 0 JLB 0 0 0 King & King Architects 0 05/06/20 07/26/19
20-0057PR Additions and Alterations 0-002-016 DONE 07/15/20 / / 08/21/19 / / 02 - 16 0 12,213,052 JLB 0 0 0 0 / / / /
21-0279 Additions and Alterations 0-002-016 11/18/21 DONE DONE DONE 09/03/21 09/03/21 08/21/19 12/08/20 02 - 16 6,400,000 6,400,000 JLB 0 0 0 King & King Architects 0 12/30/22 09/03/21
20-0046 Reconstruction 0-002-017 08/12/20 DONE DONE DONE 07/10/20 07/09/20 03/10/20 06/09/20 8,9,16 100,000 100,000 JLB 0 0 0 King & King Architects 0 03/01/21 07/09/20
21-0045 Reconstruction 0-002-018 08/10/21 DONE DONE DONE 07/14/21 07/14/21 05/04/21 05/18/21 2,9,155,16 100,000 100,000 JLB 0 0 0 King & King Architects 0 04/29/22 07/14/21
22-0079 Reconstruction 0-002-019 09/12/22 DONE DONE DONE 07/13/22 07/12/22 05/10/22 05/17/22 8,9 100,000 100,000 JLB 0 0 0 King & King Architects 0 06/16/23 07/12/22
23-0223 Reconstruction 0-002-020 10/02/23 DONE DONE DONE 08/09/23 08/09/23 05/03/23 05/16/23 8,9 100,000 100,000 JJH 0 0 0 King & King Architects 0 / / 08/09/23
- Reconstruction 0-002-021 / / / / 02/26/24 / / 2,9,155,15,16 0 0 JJH 0 0 0 0 / / / /
- SB Reconstruction 0-002-BA3 DONE / / / / / / / / 16 0 0 JLB 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
SKANEATELES CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 42-16-01-06
last updated on 04/23/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
High School/Middle School:
18-1154 Reconstruction 0-001-027 07/30/19 DONE DONE DONE 12/28/18 12/17/18 07/03/18 11/14/17 2,4,7,8,9,10,13,14,1 28,678,521 28,678,521 MTM 0 0 0 Ashley McGraw 0 11/08/22 12/17/18
18-2124 Reconstruction 0-001-028 07/09/19 DONE DONE DONE 06/13/19 06/10/19 04/05/19 05/21/19 8 100,000 100,000 JLB 0 0 0 Ashley McGraw 0 03/13/20 06/10/19
20-0144 Reconstruction 0-001-029 09/03/20 DONE DONE DONE 07/31/20 07/28/20 07/09/20 06/09/20 2,8 100,000 100,000 JLB 0 0 0 Ashley McGraw 0 06/18/21 07/28/20
20-1562 Reconstruction 0-001-030 06/17/21 DONE DONE DONE 04/06/21 03/31/21 03/09/21 11/14/17 2,4,7,8,9,10,155,15, 986,750 986,750 JLB 0 0 0 Ashley McGraw 0 11/28/22 03/31/21
20-1924 Reconstruction 0-001-031 07/26/21 DONE DONE DONE 06/29/21 06/18/21 05/13/21 05/18/21 2,8 100,000 100,000 JLB 0 0 0 Ashley McGraw 0 05/31/22 06/18/21
21-1268 Reconstruction 0-001-032 09/08/22 DONE DONE DONE 02/11/22 02/09/22 08/27/21 12/08/20 2,4,7,8,9,10,14,155, 13,093,101 13,093,101 JLB 0 0 0 Ashley McGraw 0 / / 02/09/22
22-0343 Reconstruction 0-001-033 10/21/22 DONE DONE DONE 08/26/22 08/24/22 06/24/22 05/17/22 9 100,000 100,000 JLB 0 0 0 Ashley McGraw 0 04/19/23 08/24/22
23-0026 Reconstruction 0-001-034 09/12/23 DONE DONE DONE 07/07/23 07/05/23 05/22/23 05/16/23 8 100,000 100,000 JJH 0 0 0 Ashley McGraw 0 / / 07/05/23
23-0184 Reconstruction 0-001-035 01/10/24 DONE DONE DONE 08/01/23 07/31/23 05/22/23 12/08/23 2,4,16 2,293,456 2,293,456 JJH 0 0 0 Ashley McGraw 0 / / 07/31/23
State Street Elementary School:
18-1155 Reconstruction 0-002-016 07/30/19 DONE DONE DONE 12/28/18 12/17/18 07/03/18 11/14/17 2,4,7,8,9,10,155,15, 1,721,396 1,721,396 MTM 0 0 0 Ashley McGraw 0 08/12/22 12/17/18
21-1269 Reconstruction 0-002-018 09/08/22 DONE DONE DONE 02/11/22 02/09/22 08/27/21 12/08/20 2,4,7,8,9,10,155,15, 2,595,896 2,595,896 JLB 0 0 0 Ashley McGraw 0 / / 02/09/22
- Reconstruction 0-002-019 / / / / 04/09/24 / / 8,16 0 0 JJH 0 0 0 0 / / / /
Waterman Elementary School:
18-1156 Reconstruction 0-007-019 07/31/19 DONE DONE DONE 12/28/18 12/17/18 07/03/18 11/14/17 2,4,7,8,9,10,155,15, 3,441,350 3,441,350 MTM 0 0 0 Ashley McGraw 0 09/02/22 12/17/18
20-0797 Reconstruction 0-007-020 02/05/21 DONE DONE DONE 11/10/20 11/03/20 09/24/20 11/14/17 2,7,8,9,155,15,16 493,025 493,025 JLB 0 0 0 Ashley McGraw 0 09/15/21 11/03/20
21-1270 Reconstruction 0-007-021 09/08/22 DONE DONE DONE 02/11/22 02/09/22 08/27/21 12/08/20 2,7,8,9,10,155,15,16 546,666 546,666 JLB 0 0 0 Ashley McGraw 0 / / 02/09/22
District Office (fmly 5-003):
21-1271 Reconstruction 1-003-001 09/08/22 DONE DONE DONE 02/11/22 02/09/22 08/27/21 12/08/20 2,4,7,8,9,155,15,16 796,622 0 JLB 0 0 0 Ashley McGraw 0 / / 02/09/22
Maintenance/Storage Bldg:
21-1272 Reconstruction 2-015-002 09/08/22 DONE DONE DONE 02/11/22 02/09/22 08/27/21 12/08/20 155,15,16 124,757 0 JLB 0 0 0 Ashley McGraw 0 / / 02/09/22
Transportation Facility:
18-1157 Reconstruction 5-013-003 07/31/19 DONE DONE DONE 12/28/18 12/17/18 07/03/18 11/14/17 2,4,7,8,9,10,14,155, 685,429 685,429 MTM 0 0 0 Ashley McGraw 0 09/06/21 12/17/18
20-1563 Reconstruction 5-013-004 06/17/21 DONE DONE DONE 04/06/21 03/31/21 03/09/21 11/14/17 7 1,072,000 1,072,000 JLB 0 0 0 Ashley McGraw 0 11/28/22 03/31/21
21-1273 Reconstruction 5-013-005 09/08/22 DONE DONE DONE 02/11/22 02/09/22 08/27/21 12/06/20 2,4,8,9,10,14,155,15 2,049,502 2,049,502 JLB 0 0 0 Ashley McGraw 0 / / 02/09/22
Press Box:
18-1158 New Construction 7-017-001 07/31/19 DONE DONE DONE 12/28/18 12/17/18 07/05/18 11/14/17 02 - 16 363,303 0 MTM 0 0 0 Ashley McGraw 0 09/06/21 12/17/18
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
SYRACUSE CITY SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 42-18-00-01
last updated on 04/23/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
King Elementary School:
23-1173 Reconstruction 0-004-011 02/14/24 DONE DONE DONE 12/13/23 12/12/23 06/07/23 05/10/23 2,8 1,300,000 1,300,000 WLC 0 0 0 N.K. Bhandari Architecture & 0 / / 12/12/23
Oasis Academy (frmly Elmwood):
- Reconstruction 0-007-010 / / / / 02/06/24 / / 8 0 0 WLC 0 0 0 0 / / / /
Franklin Elementary School:
23-0630FA Reconstruction 0-008-008 11/22/23 DONE DONE DONE 10/06/23 09/28/23 02/22/23 03/08/23 8 3,100,000 3,100,000 WLC 0 0 0 Kideney Architects, P.C. 0 / / 09/28/23
- Reconstruction 0-008-009 / / / / 02/02/24 / / 7 0 0 WLC 0 0 0 0 / / / /
Salem Hyde Elementary:
22-1439FA Reconstruction 0-010-006 03/14/23 DONE DONE DONE 01/09/23 11/15/22 04/27/22 06/09/22 8 1,595,390 1,595,390 WLC 0 0 0 Kideney Architects, P.C. 0 / / 11/15/22
- Reconstruction 0-010-007 / / / / 01/17/24 / / 7 0 0 WLC 0 0 0 0 / / / /
LeMoyne Elementary School:
22-1440FA Reconstruction 0-013-008 03/14/23 DONE DONE DONE 01/09/23 11/15/22 04/27/22 06/09/22 8 1,530,390 1,530,390 WLC 0 0 0 Kideney Architects, P.C. 0 / / 11/15/22
Meachem School:
22-1441FA Reconstruction 0-016-009 03/14/23 DONE DONE DONE 01/09/23 11/15/22 04/27/22 06/09/22 8 1,640,790 1,640,790 WLC 0 0 0 Kideney Architects, P.C. 0 / / 11/15/22
- Reconstruction 0-016-010 / / / / 02/02/24 / / 7 0 0 WLC 0 0 0 0 / / / /
Seymour School:
19-0063 Reconstruction 0-021-007 07/19/19 DONE DONE DONE 07/12/19 07/05/19 / / 10/10/18 2,4,9,15,16 400,000 400,000 MTM 0 0 0 Building Energy Solutions LLC 0 04/01/20 07/05/19
Van Duyn Elementary:
23-0631FA Reconstruction 0-025-007 11/22/23 DONE DONE DONE 10/06/23 09/28/23 02/22/23 03/08/23 8 2,600,000 2,600,000 WLC 0 0 0 Kideney Architects, P.C. 0 / / 09/28/23
Blodgett School:
20-1950 Reconstruction 0-101-022 11/19/21 DONE DONE DONE 06/30/21 06/29/21 03/17/21 12/20/17 2,8,9,155,15,16 3,376,352 3,376,352 JLB 0 0 0 King & King Architects 0 / / 06/29/21
Clary Middle School:
- Reconstruction 0-102-015 / / / / 01/04/24 / / 2 0 0 MSK 0 0 0 0 / / / /
Brighton Academy (frmly Danforth MS):
- Reconstruction 0-108-014 / / / / 01/25/24 / / 2,8,9,15,16 0 0 MSK 0 0 0 0 / / / /
Porter Elementary School:
23-0632FA Reconstruction 0-110-011 11/22/23 DONE DONE DONE 10/06/23 09/28/23 02/22/23 03/08/23 8 4,500,000 4,500,000 WLC 0 0 0 Kideney Architects, P.C. 0 / / 09/28/23
- Reconstruction 0-110-012 / / / / 02/02/24 / / 4,7 0 0 WLC 0 0 0 0 / / / /
Bellevue MS Academy (was Shea MS):
21-0246 Reconstruction 0-111-015 02/03/22 DONE DONE DONE 08/30/21 08/27/21 08/30/18 11/04/14 2,8,9,13,155,16 6,576,426 6,576,426 JLB 0 0 0 C&S Companies 0 / / 08/27/21
Corcoran High School:
21-0387 Reconstruction 0-120-025 12/09/21 DONE DONE DONE 09/20/21 09/20/21 02/09/21 04/14/21 2 3,000,000 3,000,000 JLB 0 0 0 Kideney Architects, P.C. 0 08/24/22 09/20/21
Henninger High School:
18-0714 Reconstruction 0-121-020 07/23/19 DONE DONE DONE 10/25/18 10/25/18 04/21/17 08/08/18 2,4,8,9,10,13,14,155 30,981,872 30,717,754 MTM 0 0 0 Stieglitz Snyder Architecture 0 02/01/23 10/25/18
18-0715 Reconstruction 0-121-021 07/23/19 DONE DONE DONE 10/25/18 10/25/18 04/21/17 08/08/18 2,8,9,155,16 3,932,560 2,856,994 MTM 0 0 0 Stieglitz Snyder Architecture 0 02/01/23 10/25/18
- Reconstruction 0-121-023 / / / / 01/04/24 / / 2 0 0 MSK 0 0 0 0 / / / /
Nottingham High School:
22-1632 Reconstruction 0-123-036 05/09/23 DONE DONE DONE 02/06/23 02/06/23 11/01/22 11/09/22 2,15,16 1,812,098 1,812,098 WLC 0 0 0 N.K. Bhandari Architecture & 0 09/29/23 02/06/23
Central Tech Voc Ctr:
- PR Alterations 0-125-013 / / / / 11/29/22 / / 0 0 JLB 0 0 0 0 / / / /
Field Storage@Inst of Tech:
- PR New Construction 2-163-001 / / / / 12/05/22 / / 02 - 16 0 0 JLB 0 0 0 0 / / / /
Concession/Storage @Brighton Academy:
- New Construction 2-165-001 / / / / 01/25/24 / / 02 - 16 0 0 MSK 0 0 0 0 / / / /
Press Box@Institute of Tech:
- PR New Construction 7-161-001 / / / / 11/29/22 / / 02 - 16 0 0 JLB 0 0 0 0 / / / /
Concession/Storage@Inst of Tech:
- PR New Construction 7-162-001 / / / / 11/29/22 / / 02 - 16 0 0 JLB 0 0 0 0 / / / /
Press Box @ Brighton Academy:
- New Construction 7-164-001 / / / / 01/25/24 / / 02 - 16 0 0 MSK 0 0 0 0 / / / /
District-Wide:
- Reconstruction 7-999-BA2 / / / / / / / / 10 0 0 JLB 0 0 0 0 / / / /
- Reconstruction 7-999-BA3 DONE / / / / 05/20/22 / / 16 0 0 JLB 0 0 0 0 / / / /
Syracuse STEAM School:
23-0865TQ Temporary Quarters 8-163-001 ADDENDUM REQ'D 11/03/23 11/01/23 10/05/23 / / 0 43,128,800 WLC 0 0 0 0 / / 11/01/23
OnTech Charter-High School Building:
17-1835 Reconstruction 0-002-001 05/13/19 DONE DONE DONE 05/07/18 05/07/18 04/02/18 / / 0 0 SLC 0 0 0 0 / / 05/07/18
OnTech Charter-Annex Bldg-OldChurch:
17-1944TQ Temporary Quarters 0-003-001 08/10/21 DONE DONE DONE 06/07/18 06/07/18 06/07/18 / / 0 0 SLC 0 0 0 0 / / 06/07/18
- Reconstruction 0-003-002 / / / / 12/23/21 / / 8,9,155,15,16 0 0 SLC 0 0 0 0 / / / /
OnTech Charter-Admin. Building:
21-1815DB Discovered Building 1-004-001 05/16/22 / / 06/07/18 / / 0 0 SLC 0 0 0 0 / / / /
CSA of Syracuse Charter Middle Sch:
22-0139TQ Temporary Quarters 8-002-001 08/15/22 DONE DONE DONE 07/25/22 / / 05/31/22 / / 0 0 SLC 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
TULLY CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 42-19-02-04
last updated on 04/23/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Tully ES (frmrly Main Bldg):
19-0936 Reconstruction 0-001-012 02/07/20 DONE DONE DONE 12/09/19 11/26/19 07/02/19 10/21/19 2,4,8,9,10,155,15,16 559,500 559,500 JLB 0 0 0 Robertson Strong Apgar Archit 0 11/30/20 11/26/19
20-0968 Reconstruction 0-001-013 04/16/21 DONE DONE DONE 12/15/20 12/08/20 11/17/20 10/28/19 2,4,8,9,10,155,15,16 2,368,000 2,368,000 JLB 0 0 0 Robertson Strong Apgar Archit 0 09/28/23 12/08/20
Jr/Sr High School:
19-0937 Reconstruction 0-006-011 02/07/20 DONE DONE DONE 12/09/19 11/26/19 07/02/19 10/28/19 2,4,8,9,10,155,15,16 1,095,500 1,095,500 JLB 0 0 0 Robertson Strong Apgar Archit 0 11/30/20 11/26/19
20-0969 Reconstruction 0-006-012 04/16/21 DONE DONE DONE 12/15/20 12/08/20 11/17/20 10/28/19 2,4,8,9,10,155,15,16 5,807,795 5,807,795 JLB 0 0 80,472 Robertson Strong Apgar Archit 0 09/29/23 12/08/20
Field Storage Building (New):
20-0970 New Construction 2-010-001 04/16/21 DONE DONE DONE 12/15/20 12/08/20 11/17/20 10/28/19 02 - 16 132,000 0 JLB 0 0 0 Robertson Strong Apgar Archit 0 09/29/23 12/08/20
Elem. Maint. (frmly Gar/IA Shop):
- Reconstruction 3-002-003 / / / / 07/02/19 / / 2,4,8,9,155,15,16 0 0 JLB 0 0 0 0 / / / /
Bus Storage(HS):
23-0462 Reconstruction 4-004-009 03/07/24 DONE DONE DONE 09/13/23 09/11/23 07/02/19 05/16/23 2,4,8,9,15,16 825,000 825,000 JJH 0 0 0 Robertson Strong Apgar Archit 0 / / 09/11/23
Concession Stand:
20-0971 New Construction 7-009-001 04/16/21 DONE DONE DONE 12/15/20 12/08/20 11/17/20 10/28/19 02 - 16 450,000 0 JLB 0 0 0 Robertson Strong Apgar Archit 0 09/29/23 12/08/20
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
BOCES ONONDAGA-CORTLAND-MADISON STATUS REPORT ON CAPITAL PROJECTS
District No.: 42-90-00-00
last updated on 04/23/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
McEvoy Education Center:
19-0938 Reconstruction 0-001-023 03/20/20 DONE DONE DONE 12/09/19 11/25/19 02/11/19 04/25/19 2,8,9,155,15,16 600,000 600,000 JSS 0 0 0 Tetra Tech Architects and Eng 0 09/01/21 11/25/19
18-1939 Reconstruction 0-001-024 06/07/19 DONE DONE DONE 05/13/19 05/08/19 02/11/19 02/14/19 8 550,000 550,000 JLB 0 0 0 Tetra Tech Architects and Eng 0 / / 05/08/19
20-0135 Reconstruction 0-001-025 10/26/20 DONE DONE DONE 07/29/20 07/27/20 04/14/20 07/09/20 7,155,16 492,400 492,400 JSS 0 0 0 Tetra Tech Architects and Eng 0 / / 07/27/20
21-1084 Reconstruction 0-001-026 08/04/22 DONE DONE DONE 01/12/22 12/27/21 10/22/21 07/09/20 2,8,155,15,16 1,291,828 1,291,828 JLB 0 0 0 IPD Engineering 1,291,828 11/30/23 12/27/21
21-1996 Reconstruction 0-001-027 10/11/22 DONE DONE DONE 06/17/22 06/16/22 03/09/22 04/21/22 8 700,000 700,000 JLB 0 0 0 King & King Architects 0 / / 06/16/22
23-1073 Reconstruction 0-001-028 UNREVIEWED 11/30/23 11/27/23 / / 02/16/23 7,155,15,16 0 0 WLC 0 0 0 King & King Architects 0 / / 11/27/23
Crown Road Campus (fmly 8-003):
19-0812DB Discovered Building 0-003-001 01/06/20 DONE DONE DONE 11/15/19 11/07/19 12/24/19 / / 12,850,000 0 JSS 0 0 0 Tetra Tech Architects and Eng 0 / / 11/07/19
21-1085 Reconstruction 0-003-002 08/04/22 DONE DONE DONE 01/12/22 12/27/21 10/22/21 07/09/20 8,155,15,16 339,826 339,826 JLB 0 0 0 IPD Engineering 339,826 11/30/23 12/27/21
Henry Center Bldg. A:
21-1086 Reconstruction 0-008-020 08/04/22 DONE DONE DONE 01/12/22 12/27/21 10/22/21 07/09/20 155,15,16 718,471 718,471 JLB 0 0 0 IPD Engineering 718,471 11/30/23 12/27/21
23-0485 Reconstruction 0-008-021 10/12/23 DONE DONE DONE 09/15/23 09/15/23 03/10/23 09/21/23 16 298,000 298,000 WLC 0 0 0 King & King Architects 0 / / 09/15/23
- Reconstruction 0-008-022 / / / / 04/05/24 / / 8,9,155,16 0 0 WLC 0 0 0 0 / / / /
Henry Center Building B:
21-1087 Reconstruction 0-014-008 08/04/22 DONE DONE DONE 01/12/22 12/27/21 10/22/21 07/09/20 8,155,15,16 51,713 51,713 JLB 0 0 0 IPD Engineering 51,713 11/30/23 12/27/21
Education Center:
20-1798 Reconstruction 0-036-002 08/16/21 DONE DONE DONE 05/28/21 05/28/21 04/19/21 05/20/21 2,7,9,14,155,15,16 739,600 0 JLB 0 0 0 King & King Architects 0 09/30/22 05/28/21
21-1089 Reconstruction 0-036-003 08/04/22 DONE DONE DONE 01/12/22 12/27/21 10/22/21 07/09/20 8,155,15,16 57,747 0 JLB 0 0 0 IPD Engineering 57,747 11/30/23 12/27/21
O & M Bldg. #1:
21-1090 Reconstruction 3-009-002 08/04/22 DONE DONE DONE 01/12/22 12/27/21 10/22/21 07/09/20 16 22,294 0 JLB 0 0 0 IPD Engineering 22,294 11/30/23 12/27/21
Building D:
21-1088 Reconstruction 7-030-002 08/04/22 DONE DONE DONE 01/12/22 12/27/21 10/22/21 07/09/20 16 10,576 0 JLB 0 0 0 IPD Engineering 10,576 11/30/23 12/27/21
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED