Construction Project Status

Construction Project Status

THE STATE EDUCATION DEPARTMENT

FACILITIES PLANNING


UPDATED: 04/22/24 at 07:51:31




WASHINGTONVILLE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 44-01-02-06
last updated on 04/22/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Middle School:
20-1960   Reconstruction               0-001-021  08/17/21     DONE    DONE       DONE      06/30/21   06/30/21   05/10/21   03/22/21   2,155,16               2,334,656     2,334,656  JLB             0           0           0 ECG Engineering, LLC            2,334,656        /  /                         06/30/21           
22-1442FA Reconstruction               0-001-022  05/03/23     DONE    DONE       DONE      01/09/23   12/12/22   04/20/22   03/23/23   9                        526,654             0  WLC             0           0           0 Keystone Assoc Architects, En           0        /  /                         12/12/22           

          Taft Elementary School:
20-1961   Reconstruction               0-002-017  08/17/21     DONE    DONE       DONE      06/30/21   06/30/21   05/10/21   03/22/21   2,155,16                 408,472       408,472  JLB             0           0           0 ECG Engineering, LLC              408,472        /  /                         06/30/21           
22-1443FA Reconstruction               0-002-018  05/03/23     DONE    DONE       DONE      01/09/23   12/12/22   04/20/22   03/23/23   8,9,155,16               302,328             0  WLC             0           0           0 Keystone Assoc Architects, En           0        /  /                         12/12/22           

          Little Britain Elementary:
18-2179   Reconstruction               0-004-017  08/02/19     DONE    DONE       DONE      06/20/19   06/07/19   04/04/19   10/20/15   2,8                      195,000       195,000  JLB             0           0           0 Keystone Assoc Architects, En           0      08/24/20                       06/07/19           
19-0077   Reconstruction               0-004-018  07/07/19     DONE    DONE       DONE      07/15/19   07/15/19   06/11/19   10/20/15   4,8,155,16               765,650       765,650  JLB             0           0           0 Keystone Assoc Architects, En           0      06/03/20                       07/15/19           
20-1962   Reconstruction               0-004-019  08/17/21     DONE    DONE       DONE      06/30/21   06/30/21   05/10/21   03/22/21   2,7,155,16             1,456,840             0  JLB             0           0           0 ECG Engineering, LLC            1,456,840        /  /                         06/30/21           
22-1444FA Reconstruction               0-004-020  05/03/23     DONE    DONE       DONE      01/09/23   12/12/22   04/20/22   03/23/23   8,9,155,16               237,989             0  WLC             0           0           0 Keystone Assoc Architects, En           0        /  /                         12/12/22           

          Senior High School:
19-1080   Reconstruction               0-007-025  01/22/20     DONE    DONE       DONE      12/30/19   12/20/19   07/30/19   05/21/19   7,8                      100,000       100,000  JLB             0           0           0 Keystone Assoc Architects, En           0      08/24/20                       12/20/19           
20-1963   Reconstruction               0-007-026  08/17/21     DONE    DONE       DONE      06/30/21   06/30/21   05/10/21   03/22/21   2,155,16               1,778,308     1,778,308  JLB             0           0           0 ECG Engineering, LLC            1,778,308        /  /                         06/30/21           
22-1445FA Reconstruction               0-007-027  05/03/23     DONE    DONE       DONE      01/09/23   12/12/22   04/20/22   03/23/23   9,155,16                 622,409             0  WLC             0           0           0 Keystone Assoc Architects, En           0        /  /                         12/12/22           
22-1123   Reconstruction               0-007-028  02/07/23     DONE    DONE       DONE      12/02/22   11/30/22   08/03/22   05/17/22   2,4,7,8,9                100,000       100,000  WLC             0           0           0 Keystone Assoc Architects, En           0        /  /                         11/30/22           
23-1314   Reconstruction               0-007-029                         UNREVIEWED         01/03/24   12/26/23   07/19/23     /  /     2,4,8,9,155,15,16              0             0  WLC             0           0           0 Keystone Assoc Architects, En           0        /  /                         12/26/23           
  -       Reconstruction               0-007-030                                              /  /       /  /     12/22/23     /  /     16                             0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Round Hill Elementary:
20-1945   Reconstruction               0-008-016  11/18/21     DONE    DONE       DONE      06/30/21   06/28/21   05/05/21   05/18/21   4,7,8,9,155,15,16        187,000       187,000  JLB             0           0           0 Keystone Assoc Architects, En           0      01/16/23                       06/28/21           
20-1964   Reconstruction               0-008-017  08/17/21     DONE    DONE       DONE      06/30/21   06/30/21   05/10/21   03/22/21   2,16                   1,107,471     1,107,471  JLB             0           0           0 ECG Engineering, LLC            1,107,471        /  /                         06/30/21           
22-1446FA Reconstruction               0-008-018  05/03/23     DONE    DONE       DONE      01/09/23   12/12/22   04/20/22   03/23/23   8,9,155,16               466,188             0  WLC             0           0           0 Keystone Assoc Architects, En           0        /  /                         12/12/22           

          Administration:
20-1965   Reconstruction               1-016-007  08/17/21     DONE    DONE       DONE      06/30/21   06/30/21   05/10/21   03/22/21   2,16                      91,721             0  JLB             0           0           0 ECG Engineering, LLC               91,721        /  /                         06/30/21           
22-1447FA Reconstruction               1-016-008  05/03/23     DONE    DONE       DONE      01/09/23   12/12/22   07/12/22   03/23/22   8,9,155,16                20,442             0  WLC             0           0           0 Keystone Assoc Architects, En           0        /  /                         12/12/22           

          Bldg Mainte Garage:
20-1966   Reconstruction               3-012-001  08/17/21     DONE    DONE       DONE      06/30/21   06/30/21   05/10/21   03/22/21   2,16                       5,008             0  JLB             0           0           0 ECG Engineering, LLC                5,008        /  /                         06/30/21           

          Bus Garage:
20-1967   Reconstruction               5-013-010  08/17/21     DONE    DONE       DONE      06/30/21   06/30/21   05/10/21   03/22/21   2,16                      73,522        73,522  JLB             0           0           0 ECG Engineering, LLC               73,522        /  /                         06/30/21           
22-1448FA Reconstruction               5-013-011  05/03/23     DONE    DONE       DONE      01/09/23   12/12/22   09/19/22   03/23/23   155,16                     2,690             0  WLC             0           0           0 Keystone Assoc Architects, En           0        /  /                         12/12/22           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




CHESTER UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 44-02-01-02
last updated on 04/22/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Elementary School:
23-0202   Reconstruction               0-001-009  01/12/24     DONE    DONE       DONE      08/04/23   08/02/23   03/24/22   05/17/22   9,155,15,16            1,940,000     1,940,000  JJH             0           0           0 Kaeyer, Garment & Davidson              0        /  /                         08/02/23           

          Maple Avenue School (fmly HS):
  -    PR Additions and Alterations    0-002-009                                              /  /       /  /     12/12/19     /  /     02 - 16                        0             0  JSS             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-002-010                                              /  /       /  /     09/27/23     /  /     2,7                            0             0  JJH             0           0           0                                         0        /  /                           /  /             

          Chester Academy (MS/HS):
21-1877   Reconstruction               0-009-004  09/28/22     DONE    DONE       DONE      05/25/22   05/24/22   06/22/21   05/18/22   8,9                      116,362       116,362  JLB             0           0           0 LAN Associates                          0        /  /                         05/24/22           
  -       Reconstruction               0-009-005                                              /  /       /  /     06/22/21     /  /     8,9,16                         0             0  JLB             0           0           0                                         0        /  /                           /  /             
21-1896   Reconstruction               0-009-006  09/26/22     DONE    DONE       DONE      05/31/22   05/27/22   03/24/22   05/17/22   8,9,10,155,16            993,000       993,000  JLB             0           0           0 Kaeyer, Garment & Davidson              0        /  /                         05/27/22           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




CORNWALL CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 44-03-01-06
last updated on 04/22/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Cornwall M.S.(fmly HS):
19-1748   Reconstruction               0-001-027  12/16/20     DONE    DONE       DONE      05/22/20   03/06/20   04/02/19   02/10/20   2,8,9,155,16              55,985             0  SLC             0           0           0 CS Arch                                 0        /  /                         03/06/20           
21-1213   Reconstruction               0-001-028  04/11/22     DONE    DONE       DONE      01/31/22   01/28/22   11/23/21   05/18/21   2,9                      131,875       131,875  SLC             0           0           0 Tetra Tech Engineers, Archite           0      09/13/22                       01/28/22           
21-1814   Reconstruction               0-001-029  10/03/22     DONE    DONE       DONE      05/16/22   05/12/22   03/03/22   05/17/22   155,16                 1,210,000     1,210,000  SLC             0           0           0 Blake Engineering PLLC                  0        /  /                         05/12/22           
22-1164   Reconstruction               0-001-030  03/06/23     DONE    DONE       DONE      12/05/22   12/05/22   08/16/22   05/17/22   2,4,7,8,9,10,155,15,   1,208,893     1,208,893  SLC             0           0           0 Tetra Tech Architects and Eng           0        /  /                         12/05/22           
23-0152   Reconstruction               0-001-031  02/15/24     DONE    DONE       DONE      07/28/23   07/27/23   05/22/23   05/17/22   2,4,7,8,9,10,155,15,   3,896,990     3,896,990  MSK             0           0           0 Tetra Tech Architects and Eng           0        /  /                         07/27/23           

          Cornwall-On-Hudson ES (Hudson St):
19-1749   Reconstruction               0-002-016  12/16/20     DONE    DONE       DONE      05/22/20   03/06/20   04/02/19   02/10/20   2,4,8,9,155,15,16         60,879             0  SLC             0           0           0 CS Arch                                 0        /  /                         03/06/20           
22-1165   Reconstruction               0-002-017  03/06/23     DONE    DONE       DONE      12/05/22   12/05/22   08/16/22   05/17/22   2,4,7,8,9,10,155,15,   1,493,711     1,493,711  SLC             0           0           0 Tetra Tech Architects and Eng           0        /  /                         12/05/22           

          Willow Ave Elementary School:
19-1750   Reconstruction               0-004-016  12/16/20     DONE    DONE       DONE      05/22/20   03/06/20   04/02/19   02/10/20   2,4,8,9,155,16            57,034             0  SLC             0           0           0 CS Arch                                 0        /  /                         03/06/20           
22-1167   Reconstruction               0-004-017  03/06/23     DONE    DONE       DONE      12/05/22   12/05/22   08/16/22   05/17/22   2,4,7,8,9,10,155,15,   1,415,861     1,415,861  SLC             0           0           0 Tetra Tech Architects and Eng           0        /  /                         12/05/22           

          Cornwall Elementary (Lee Rd):
19-1751   Reconstruction               0-006-014  12/16/20     DONE    DONE       DONE      05/22/20   03/06/20   04/02/19   02/10/20   2,8,9,155,16              65,641             0  SLC             0           0           0 CS Arch                                 0        /  /                         03/06/20           
22-1166   Reconstruction               0-006-015  03/06/23     DONE    DONE       DONE      12/05/22   12/05/22   08/16/22   05/17/22   2,4,7,8,9,10,155,15,   1,470,126     1,470,126  SLC             0           0           0 Tetra Tech Architects and Eng           0        /  /                         12/05/22           
23-0153   Reconstruction               0-006-016  02/15/24     DONE    DONE       DONE      07/28/23   07/27/23   05/22/23   05/17/22   2,9,155,16             2,805,660     2,805,660  MSK             0           0           0 Tetra Tech Architects and Eng           0        /  /                         07/27/23           

          Cornwall Central High School:
19-1846   Reconstruction               0-012-007  12/16/20     DONE    DONE       DONE      06/15/20   03/06/20   10/23/19   02/10/20   4,8,9,16                  34,461             0  SLC             0           0           0 CS Arch                                 0        /  /                         03/06/20           
21-0966   Reconstruction               0-012-008  04/15/22     DONE    DONE       DONE      12/27/21   12/24/21   06/14/21   05/18/21   7,155,16                 750,000       750,000  SLC             0           0           0 Blake Engineering PLLC                  0        /  /                         12/24/21           
22-1168   Reconstruction               0-012-009  03/06/23     DONE    DONE       DONE      12/05/22   12/05/22   08/16/22   05/17/22   4,7                      172,709       172,709  SLC             0           0           0 Tetra Tech Architects and Eng           0        /  /                         12/05/22           
23-0154   Reconstruction               0-012-010  02/15/24     DONE    DONE       DONE      07/28/23   07/27/23   05/22/23   05/17/22   2,9,10,155,15,16       9,829,469     9,829,469  MSK             0           0           0 Tetra Tech Architects and Eng           0        /  /                         07/27/23           

          District Administration (fmly 6-007):
22-0293   Reconstruction               1-007-001  11/30/22     DONE    DONE       DONE      08/17/22   08/17/22   07/19/22   05/17/22   2,7                      262,000             0  SLC             0           0           0 Tetra Tech Architects and Eng           0      09/21/23                       08/17/22           

          Storage Shed - Garden Club @ CHS:
18-1942DB Discovered Building          2-026-001                       ADDENDUM REQ'D       05/13/19   05/06/19   04/25/17     /  /                                    0             0  SLC             0           0           0                                         0        /  /                         05/06/19           

          Cargo Container - Drama Club @ CHS:
18-1943DB Discovered Building          2-027-001                       ADDENDUM REQ'D       05/13/19   05/06/19   04/25/17     /  /                                    0             0  SLC             0           0           0                                         0        /  /                         05/06/19           

          Shed #2 @ Cornwall Public Library:
18-1944DB Discovered Building          2-035-001                       ADDENDUM REQ'D       05/13/19   05/06/19   05/08/17     /  /     02 - 16                        0             0  SLC             0           0           0                                         0        /  /                         05/06/19           

          P.E. Shipping Storage Container:
18-1945DB Discovered Building          2-036-001                       ADDENDUM REQ'D       05/13/19   05/06/19   04/21/20     /  /                                    0             0  SLC             0           0           0                                         0        /  /                         05/06/19           

          Track & Field Shipping Container@HS:
19-1728DB Discovered Building          2-037-001                       ADDENDUM REQ'D       05/13/20   05/08/20   12/03/19     /  /                                    0             0  SLC             0           0           0                                         0        /  /                         05/08/20           

          Baseball Field Storage Shed:
21-1337DB Discovered Building          2-038-001  05/03/22     DONE    DONE       DONE      02/18/22   02/15/22   12/04/20     /  /                                    0             0  SLC             0           0           0                                         0        /  /                         02/15/22           

          Youth Football Field Storage #2:
21-1338DB Discovered Building          2-039-001  05/03/22     DONE    DONE       DONE      02/18/22   02/15/22   12/15/21     /  /                                    0             0  SLC             0           0           0                                         0        /  /                         02/15/22           

          Youth Football Field Storage #1:
21-1339DB Discovered Building          2-040-001  05/03/22     DONE    DONE       DONE      02/18/22   02/15/22   12/15/21     /  /                                    0             0  SLC             0           0           0                                         0        /  /                         02/15/22           

          Athletic Shipping Storage Cont #2:
21-1340DB Discovered Building          2-041-001  05/03/22     DONE    DONE       DONE      02/18/22   02/15/22   12/16/21     /  /                                    0             0  SLC             0           0           0                                         0        /  /                         02/15/22           

          Cornwall Public Library:
21-0499   Reconstruction               6-009-005  12/16/21     DONE    DONE       DONE      10/08/21   10/08/21   09/09/21   05/09/17   16                       105,000             0  SLC             0           0           0 Blake Engineering PLLC                  0        /  /                         10/08/21           
22-0304   Reconstruction               6-009-006  08/23/22     DONE    DONE       DONE      08/19/22   08/19/22     /  /     07/20/22   9,155,15,16            1,074,517             0  SLC             0           0           0 Blake Engineering PLLC                  0        /  /                         08/19/22           

          HS Stadium Pressbox:
23-0155   New Construction             7-042-001  02/15/24     DONE    DONE       DONE      07/28/23   07/27/23   05/22/23   05/17/22   02 - 16                  141,571             0  MSK             0           0           0 Tetra Tech Architects and Eng           0        /  /                         07/27/23           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




PINE BUSH CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 44-04-01-06
last updated on 04/22/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Crispell SHOP:
18-0139   Reconstruction               0-001-008  06/24/19     DONE    DONE       DONE      07/27/18   07/26/18   03/23/17   10/11/16   16                        35,522        35,522  MTM             0           0           0 ECG Engineering, LLC               35,522        /  /                         07/26/18           

          E.J. Russell School:
18-0140   Reconstruction               0-002-013  06/24/19     DONE    DONE       DONE      07/27/18   07/26/18   03/23/17   10/11/16   16                       973,120       973,120  MTM             0           0           0 ECG Engineering, LLC              973,120        /  /                         07/26/18           
19-0978   Reconstruction               0-002-014  05/08/20     DONE    DONE       DONE      12/10/19   11/26/19   10/22/19   05/21/19   7                        463,945       463,945  JLB             0           0           0 Clark Patterson Lee                     0      11/06/20                       11/26/19           
  -    PR Additions and Alterations    0-002-015                                              /  /       /  /     08/30/21     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                           /  /             
21-0518   Additions and Alterations    0-002-015  02/09/22     DONE    DONE       DONE      10/13/21   10/13/21   08/30/21   05/21/19   02 - 16                5,720,692     5,623,788  JLB             0           0           0 Clark Patterson Lee                     0        /  /                         10/13/21           

          Senior High School:
18-0141   Reconstruction               0-007-024  06/24/19     DONE    DONE       DONE      07/27/18   07/26/18   03/23/17   10/11/16   155,15,16              2,564,691             0  MTM             0           0           0 ECG Engineering, LLC            2,564,691        /  /                         07/26/18           
19-0979   Reconstruction               0-007-025  05/08/20     DONE    DONE       DONE      12/10/19   11/26/19   10/22/19   05/21/19   7                      1,147,255     1,147,255  JLB             0           0           0 Clark Patterson Lee                     0      09/29/20                       11/26/19           
19-1553   Reconstruction               0-007-026  05/08/20     DONE    DONE       DONE      03/11/20   03/02/20   02/06/20   05/21/19   16                       576,000       576,000  JLB             0           0           0 Clark Patterson Lee                     0      12/16/22                       03/02/20           
20-0686   Reconstruction               0-007-027  02/25/21     DONE    DONE       DONE      10/23/20   10/15/20   08/11/20   05/21/19   2,4,8,9,10,155,15,16  11,025,405    11,025,405  JLB             0           0           0 Clark Patterson Lee                     0        /  /                         10/15/20           
21-0519   Reconstruction               0-007-028  02/09/22     DONE    DONE       DONE      10/13/21   10/13/21   08/30/21   05/21/19   2,4,8,9,155,15,16        387,098       387,098  JLB             0           0           0 Clark Patterson Lee                     0        /  /                         10/13/21           
22-0907FA Reconstruction               0-007-029  02/22/23     DONE    DONE       DONE      11/07/22   10/31/22     /  /     05/21/19   2,16                   3,975,000             0  WLC             0           0           0 Clark Patterson Lee                     0        /  /                         10/31/22           

          Circleville Primary:
18-0142   Reconstruction               0-009-015  06/24/19     DONE    DONE       DONE      07/27/18   07/26/18   03/23/17   10/11/16   16                       661,167       661,167  MTM             0           0           0 ECG Engineering, LLC              661,167        /  /                         07/26/18           
20-0687   Reconstruction               0-009-016  02/25/21     DONE    DONE       DONE      10/23/20   10/15/20   08/11/20   05/21/19   2,4,8,9,10,155,15,16   4,325,915             0  JLB             0           0           0 Clark Patterson Lee                     0        /  /                         10/15/20           

          Pakanasink Elementary:
18-0143   Reconstruction               0-012-013  06/24/19     DONE    DONE       DONE      07/27/18   07/26/18   03/23/17   10/11/16   16                       293,004       293,004  MTM             0           0           0 ECG Engineering, LLC              293,004        /  /                         07/26/18           
19-0980   Reconstruction               0-012-014  05/08/20     DONE    DONE       DONE      12/10/19   11/26/19   10/22/19   05/21/19   7                      1,643,759     1,643,759  JLB             0           0           0 Clark Patterson Lee                     0      09/25/20                       11/26/19           
20-0688   Reconstruction               0-012-015  02/25/21     DONE    DONE       DONE      10/23/20   10/15/20   08/11/20   05/21/19   2,4,8,9,10,155,15,16   3,697,601             0  JLB             0           0           0 Clark Patterson Lee                     0        /  /                         10/15/20           

          Crispell Middle School:
18-0144   Reconstruction               0-013-011  06/24/19     DONE    DONE       DONE      07/27/18   07/26/18   03/23/17   10/11/16   16                       312,874       312,874  MTM             0           0           0 ECG Engineering, LLC              312,874        /  /                         07/26/18           
18-2127   Reconstruction               0-013-012  02/22/18     DONE    DONE       DONE      06/14/19   06/12/19     /  /     02/27/18   16                        53,600        53,600  MTM             0           0           0 Clark Patterson Lee                     0      03/27/18                       06/12/19           
21-0586   Reconstruction               0-013-014  08/05/20     DONE    DONE       DONE      10/25/21   10/22/21   07/28/20   07/28/20   2,9                      156,846       156,846  JLB             0           0           0 Clark Patterson Lee                     0      09/04/20                       10/22/21           
  -    PR Additions and Alterations    0-013-015                                              /  /       /  /     08/30/21     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                           /  /             
21-0520   Additions and Alterations    0-013-015  02/09/22     DONE    DONE       DONE      10/13/21   10/13/21   08/30/21   05/21/19   02 - 16                3,116,144     3,089,761  JLB             0           0           0 Clark Patterson Lee                     0        /  /                         10/13/21           

          Circleville Middle School:
18-0145   Reconstruction               0-014-013  06/24/19     DONE    DONE       DONE      07/27/18   07/26/18   03/23/17   10/11/16   16                     1,706,774     1,706,774  MTM             0           0           0 ECG Engineering, LLC            1,706,774        /  /                         07/26/18           
19-0981   Reconstruction               0-014-014  05/08/20     DONE    DONE       DONE      12/10/19   11/26/19   10/22/19   05/21/19   7                      1,312,838     1,312,838  JLB             0           0           0 Clark Patterson Lee                     0      09/29/20                       11/26/19           
20-0689   Reconstruction               0-014-015  02/25/21     DONE    DONE       DONE      10/23/20   10/15/20   08/11/20   05/21/19   2,4,8,9,10,155,15,16   5,380,030             0  JLB             0           0           0 Clark Patterson Lee                     0        /  /                         10/15/20           
  -       Reconstruction               0-014-016                                              /  /       /  /     09/21/21     /  /     13                             0             0  JLB             0           0           0                                         0        /  /                           /  /             

          Pine Bush Elementary School:
18-0146   Reconstruction               0-015-014  06/24/19     DONE    DONE       DONE      07/27/18   07/26/18   03/23/17   10/11/16   16                       542,187       542,187  MTM             0           0           0 ECG Engineering, LLC              542,187        /  /                         07/26/18           
18-2128   Reconstruction               0-015-015  06/17/18     DONE    DONE       DONE      06/14/19   06/12/19   11/19/18   03/06/18   9                      1,597,341     1,597,341  JLB             0           0           0 Clark Patterson Lee                     0      10/11/18                       06/12/19           
19-1554   Reconstruction               0-015-016  05/08/20     DONE    DONE       DONE      03/11/20   03/02/20   02/06/20   05/21/19   4,7,16                   360,000       360,000  JLB             0           0           0 Clark Patterson Lee                     0      12/16/22                       03/02/20           
  -    PR Additions and Alterations    0-015-017                                              /  /       /  /     08/30/21     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                           /  /             
21-0521   Additions and Alterations    0-015-017  02/09/22     DONE    DONE       DONE      10/13/21   10/13/21   08/30/21   05/21/19   02 - 16                3,323,010     3,255,603  JLB             0           0           0 Clark Patterson Lee                     0        /  /                         10/13/21           

          District Offices:
18-0147   Reconstruction               1-004-006  06/24/19     DONE    DONE       DONE      07/27/18   07/26/18   03/23/17   10/11/16   16                        73,037             0  MTM             0           0           0 ECG Engineering, LLC               73,037        /  /                         07/26/18           

          District Storage:
18-0148   Reconstruction               2-008-004  06/24/19     DONE    DONE       DONE      07/27/18   07/26/18   03/23/17   10/11/16   16                        71,617             0  MTM             0           0           0 ECG Engineering, LLC               71,617        /  /                         07/26/18           

          Verizon Cell Tower @ CVMS:
  -       New Construction             7-022-001                                              /  /       /  /     02/24/22     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                           /  /             

          District-Wide:
21-0552SB Reconstruction               7-999-009               DONE                           /  /       /  /     10/20/21     /  /     16                             0             0  JLB             0           0           0                                         0        /  /                           /  /             
21-0924   Reconstruction               7-999-009  03/10/22     DONE    DONE       DONE      12/17/21   12/17/21   10/20/21   11/04/14   16                     2,096,503             0  JLB             0           0           0 Bernier Carr Associates                 0        /  /                         12/17/21           

          Tent @ Crispell MS:
20-1598TQ Temporary Quarters           8-021-001  04/22/21     DONE    DONE       DONE      04/19/21   04/16/21   04/15/21     /  /                               17,500             0  JLB             0           0           0                                         0      04/21/21                       04/16/21           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




GOSHEN CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 44-06-01-04
last updated on 04/22/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Charles J. Hooker Middle School:
23-0911   Reconstruction               0-001-016                         UNREVIEWED         11/08/23   11/06/23   06/08/23   05/16/23   2,9                            0             0  MSK             0           0           0 LAN Associates                          0        /  /                         11/06/23           
  -       Reconstruction               0-001-017                                              /  /       /  /     01/02/24     /  /     2,9                            0             0  MSK             0           0           0                                         0        /  /                           /  /             

          Scotchtown Ave. Elementary School:
22-0580   Reconstruction               0-003-008  01/12/23     DONE    DONE       DONE      09/26/22   09/02/22   06/15/22   08/27/21   7                      1,647,935     1,543,335  SLC             0           0           0 LAN Associates                          0      05/25/23                       09/02/22           
22-2013   Reconstruction               0-003-009  06/20/22     DONE    DONE       DONE      04/10/23   04/06/23   06/23/22   06/13/22   2                        391,375       391,375  MSK             0           0           0 LAN Associates                          0      08/29/22                       04/06/23           
22-1407FB Reconstruction               0-003-010  04/05/23     DONE    DONE       DONE      01/04/23   12/19/22   07/22/22   08/27/21   2,9,155,15,16          7,434,623     7,434,623  JLB             0           0           0 LAN Associates                          0        /  /                         12/19/22           

          Intermediate School:
23-0517   Reconstruction               0-006-009  03/11/24     DONE    DONE       DONE      09/18/23   09/18/23   06/09/23   05/16/23   7                      2,190,400     2,190,400  MSK             0           0           0 LAN Associates                          0        /  /                         09/18/23           

          Bus Garage:
23-1657   Reconstruction               5-007-006  04/18/24     DONE    DONE       DONE      03/21/24   03/21/24   01/02/24   05/16/23   2,16                      27,600        27,600  MSK             0           0           0 LAN Associates                          0        /  /                         03/21/24           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




HIGHLAND FALLS CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 44-09-01-04
last updated on 04/22/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Highland Falls Intermediate Sch G3-8:
23-0874   Reconstruction               0-004-015                         UNREVIEWED         11/03/23   10/30/23   06/14/23   03/28/23   2,7                    2,933,966             0  MSK             0           0           0 Bernier Carr & Associates Arc           0        /  /                         10/30/23           
  -       Reconstruction               0-004-016                                              /  /       /  /     12/20/23     /  /     2,4,7,8,9,155,15,16            0             0  MSK             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-004-017                                              /  /       /  /     02/05/24     /  /     2,7,8,9,155,16                 0             0  MSK             0           0           0                                         0        /  /                           /  /             

          Ft. Montgomery Elem G K-2:
21-0954   Reconstruction               0-005-007  12/16/21     DONE    DONE       DONE      12/27/21   12/23/21   12/20/21   12/18/21   16                        40,000             0  SLC             0           0           0 Bernier Carr Associates                 0      12/30/21                       12/23/21           
23-0927   Reconstruction               0-005-008                         UNREVIEWED         11/08/23   11/02/23   06/05/23   03/28/23   2,4,7,8,9,10,14,155,           0             0  MSK             0           0           0 Bernier Carr Associates                 0        /  /                         11/02/23           
  -       Reconstruction               0-005-009                                              /  /       /  /     02/05/24     /  /     2,7,155,16                     0             0  MSK             0           0           0                                         0        /  /                           /  /             

          James O'Neill High Sch G 9-12:
20-1332   Reconstruction               0-008-017  03/25/21     DONE    DONE       DONE      02/19/21   02/08/21   12/15/20   10/17/17   2,9,14,16                960,000       960,000  SLC             0           0           0 Bernier Carr Associates                 0      10/26/22                       02/08/21           
23-0875   Reconstruction               0-008-018                         UNREVIEWED         11/03/23   10/30/23   06/14/23   03/28/23   2,7                    4,670,483             0  MSK             0           0           0 Bernier Carr & Associates Arc           0        /  /                         10/30/23           
  -       Reconstruction               0-008-019                                              /  /       /  /     12/20/23     /  /     2,4,7,8,9,10,155,15,           0             0  MSK             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-008-020                                              /  /       /  /     02/05/24     /  /     2,7,9,16                       0             0  MSK             0           0           0                                         0        /  /                           /  /             

          District-Wide:
21-0132SB Reconstruction               7-999-005               DONE                           /  /       /  /     08/03/21     /  /     13,16                          0             0  SLC             0           0           0                                         0        /  /                           /  /             
21-0574   Reconstruction               7-999-005  02/08/22     DONE    DONE       DONE      10/22/21   10/22/21   08/03/21   11/04/14   13,16                    582,661             0  SLC             0           0           0 Bernier Carr Associates                 0        /  /                         10/22/21           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




MIDDLETOWN CITY SCHOOLS STATUS REPORT ON CAPITAL PROJECTS
District No.: 44-10-00-01
last updated on 04/22/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Twin Towers Middle School (JHS):
19-1608   Reconstruction               0-001-037  05/29/20     DONE    DONE       DONE      03/20/20   03/18/20   01/31/20   12/10/19   2,9                      760,000       760,000  JLB             0           0           0 Kaeyer, Garment & Davidson              0      08/23/21                       03/18/20           
  -    XX Reconstruction               0-001-038                         CANCELLED            /  /       /  /     10/02/20     /  /     8,9,16                         0    27,297,095  JSS             0           0           0                                         0        /  /                           /  /             
20-1865   Reconstruction               0-001-039  07/07/21     DONE    DONE       DONE      06/11/21   06/08/21   05/27/21   06/16/20   10,16                    100,000       100,000  SLC             0           0           0 Kaeyer, Garment & Davidson              0      04/20/21                       06/08/21           
21-1157   Reconstruction               0-001-040  02/07/22     DONE    DONE       DONE      01/18/22   01/18/22   12/23/21   05/18/21   4,7                      100,000       100,000  SLC             0           0           0 Kaeyer, Garment & Davidson              0      07/29/22                       01/18/22           
21-1740PR Reconstruction               0-001-041               DONE                         05/02/22     /  /     03/15/22     /  /     2,4,7,8,9,10,14,155,           0    40,175,293  SLC             0           0           0                                         0        /  /                           /  /             
23-0256FA Reconstruction               0-001-041  03/15/24     DONE    DONE       DONE      08/14/23   08/03/23   03/15/22   12/14/21   2,4,7,8,9,10,14,155,  66,616,870    39,998,074  MSK             0           0           0 Kaeyer, Garment & Davidson              0        /  /                         08/03/23           
22-1735   Reconstruction               0-001-042  03/27/23     DONE    DONE       DONE      02/21/23   02/21/23   07/26/22   05/17/22   16                       500,000             0  JLB             0           0           0 Kaeyer, Garment & Davidson              0        /  /                         02/21/23           
22-1527FC Reconstruction               0-001-043  02/16/23     DONE    DONE       DONE      01/23/23   12/20/22   11/30/22   12/14/21   2,4,8,155,16          13,091,500    13,091,500  SLC             0           0           0 Kaeyer, Garment & Davidson              0      12/11/23           YES         12/20/22           

          Middletown High School:
18-1956   Additions and Alterations    0-002-033  11/19/19     DONE    DONE       DONE      05/15/19   05/08/19   12/06/18   05/15/18   02 - 16               13,500,000     6,095,170  JLB             0           0           0 Kaeyer, Garment & Davidson              0      08/24/21                       05/08/19           
19-0509   Reconstruction               0-002-034  11/21/19     DONE    DONE       DONE      09/30/19   09/25/19   06/14/19   05/21/19   9,155,16               4,800,000     4,800,000  JLB             0           0           0 Kaeyer, Garment & Davidson              0      09/01/20                       09/25/19           
20-0923   Reconstruction               0-002-035  03/03/21     DONE    DONE       DONE      12/04/20   11/20/20   09/24/20   05/21/19   2,9,155,16               365,000       365,000  JSS             0           0           0 Kaeyer, Garment & Davidson              0      10/13/21                       11/20/20           
21-1535   Reconstruction               0-002-036  05/09/22     DONE    DONE       DONE      03/18/22   03/18/22   07/23/21   06/16/20   2,8                      345,000             0  SLC             0           0           0 Kaeyer, Garment & Davidson              0      08/25/22                       03/18/22           
  -       Reconstruction               0-002-037                                              /  /       /  /     11/01/21     /  /     155,16                         0    79,977,754  SLC             0           0           0                                         0        /  /                           /  /             
22-0296   Reconstruction               0-002-038  12/29/22     DONE    DONE       DONE      08/19/22   08/18/22   07/13/22   05/17/22   16                     1,335,000     1,335,000  SLC             0           0           0 Kaeyer, Garment & Davidson              0      10/17/23                       08/18/22           
22-0931   Reconstruction               0-002-039  12/07/22     DONE    DONE       DONE      11/09/22   11/04/22   07/22/22   05/17/22   4,7                      750,000       750,000  SLC             0           0           0 Kaeyer, Garment & Davidson              0      10/24/23                       11/04/22           
22-1736   Reconstruction               0-002-040  03/27/23     DONE    DONE       DONE      02/22/23   02/21/23   07/26/22   05/17/22   2,4,10,16              4,200,000     4,200,000  JLB             0           0           0 Kaeyer, Garment & Davidson              0      02/02/24                       02/21/23           
23-1622   Reconstruction               0-002-041                         UNREVIEWED         03/14/24   03/13/24   07/18/23   07/06/23   155,15,16              3,000,000             0  MSK             0           0           0 Kaeyer, Garment & Davidson              0        /  /                         03/13/24           
23-1591   Reconstruction               0-002-042                         UNREVIEWED         03/06/24   03/04/24     /  /     01/18/24   8,9                            0             0  MSK             0           0           0 Kaeyer, Garment & Davidson              0        /  /                         03/04/24           

          Truman Moon Elementary School:
19-0510   Reconstruction               0-010-031  11/21/19     DONE    DONE       DONE      09/30/19   09/25/19   06/14/19   05/21/19   9,155,16               2,200,000     1,051,680  JLB             0           0           0 Kaeyer, Garment & Davidson              0      09/01/20                       09/25/19           
19-1875   Reconstruction               0-010-032  08/31/20     DONE    DONE       DONE      06/29/20   06/17/20   01/31/20   12/10/19   2,8,16                 2,255,000       280,500  JSS             0           0           0 Kaeyer, Garment & Davidson              0      09/23/21                       06/17/20           
20-0924   Reconstruction               0-010-033  03/03/21     DONE    DONE       DONE      12/04/20   11/20/20   09/24/20   05/21/19   2,9,155,16             1,415,000     1,145,420  JSS             0           0           0 Kaeyer, Garment & Davidson              0      11/10/22           YES         11/20/20           
20-1220   Reconstruction               0-010-034  03/04/21     DONE    DONE       DONE      01/29/21   01/19/21   11/17/20   11/05/20   2,16                     250,000       250,000  SLC             0           0           0 Kaeyer, Garment & Davidson              0      09/09/21                       01/19/21           
21-1736   Reconstruction               0-010-035  06/08/22     DONE    DONE       DONE      05/02/22   04/29/22   03/15/22   12/14/21   2,4,7                  1,415,000     1,275,573  SLC             0           0           0 Kaeyer, Garment & Davidson              0      08/31/23                       04/29/22           

          William A. Carter Elementary School:
19-0511   Reconstruction               0-012-023  11/21/19     DONE    DONE       DONE      09/30/19   09/25/19   06/14/19   05/21/19   9,155,16               2,000,000     2,000,000  JLB             0           0           0 Kaeyer, Garment & Davidson              0      09/01/20                       09/25/19           
19-1609   Reconstruction               0-012-024  05/29/20     DONE    DONE       DONE      03/20/20   03/18/20   01/31/20   12/06/16   9                        347,200       347,200  JSS             0           0           0 Kaeyer, Garment & Davidson              0      08/31/21                       03/18/20           
20-0925   Reconstruction               0-012-025  03/03/21     DONE    DONE       DONE      12/04/20   11/20/20   09/24/20   05/21/19   9,15                     645,000       645,000  JSS             0           0           0 Kaeyer, Garment & Davidson              0      11/10/22           YES         11/20/20           
  -       Reconstruction               0-012-026                                              /  /       /  /     11/01/21     /  /     155,16                         0             0  SLC             0           0           0                                         0        /  /                           /  /             
22-0932   Reconstruction               0-012-027  12/07/22     DONE    DONE       DONE      11/09/22   11/04/22   07/22/22   05/17/22   2,4,7                  1,890,000     1,890,000  SLC             0           0           0 Kaeyer, Garment & Davidson              0      10/24/23           YES         11/04/22           

          Monhagen Middle School:
19-1876   Reconstruction               0-030-015  08/31/20     DONE    DONE       DONE      06/29/20   06/17/20   01/31/20   12/10/19   2,8,16                 1,680,000     1,680,000  JSS             0           0           0 Kaeyer, Garment & Davidson              0      09/23/21                       06/17/20           
19-1636   Reconstruction               0-030-016  05/27/20     DONE    DONE       DONE      03/27/20   03/13/20   01/31/20   12/10/19   155,16                   400,000       400,000  JSS             0           0           0 Kaeyer, Garment & Davidson              0        /  /                         03/13/20           
  -       Reconstruction               0-030-017                                              /  /       /  /     07/13/22     /  /     16                             0             0  SLC             0           0           0                                         0        /  /                           /  /             
22-1737   Reconstruction               0-030-018  03/27/23     DONE    DONE       DONE      02/22/23   02/21/23   07/26/22   05/17/22   9,16                   1,865,000     1,865,000  JLB             0           0           0 Kaeyer, Garment & Davidson              0        /  /                         02/21/23           

          Maple Hill Elementary School:
19-0374   Reconstruction               0-032-016  10/04/19     DONE    DONE       DONE      09/06/19   08/28/19   06/14/19   12/06/16   155,16                   500,000       500,000  JSS             0           0           0 Kaeyer, Garment & Davidson              0      06/30/21                       08/28/19           
19-1637   Reconstruction               0-032-017  05/27/20     DONE    DONE       DONE      03/27/20     /  /     01/31/20   12/10/19   155,16                   540,000       540,000  JSS             0           0           0 Kaeyer, Garment & Davidson              0      06/21/22                         /  /             
20-0926   Reconstruction               0-032-018  03/03/21     DONE    DONE       DONE      12/04/20   11/20/20   09/24/20   05/21/19   7                        280,000       280,000  JSS             0           0           0 Kaeyer, Garment & Davidson              0      09/28/21                       11/20/20           
22-1738   Reconstruction               0-032-019  03/27/23     DONE    DONE       DONE      02/22/23   02/21/23   07/26/22   05/17/22   2,10,16                2,290,000     2,290,000  JLB             0           0           0 Kaeyer, Garment & Davidson              0      08/31/23           YES         02/21/23           

          Presidential Park Elementary School:
19-1877   Reconstruction               0-041-005  08/31/20     DONE    DONE       DONE      06/29/20   06/17/20   01/31/20   12/10/19   2,8,16                 3,375,000     3,375,000  JSS             0           0           0 Kaeyer, Garment & Davidson              0      10/15/21                       06/17/20           
22-1116   Reconstruction               0-041-006  10/03/22     DONE    DONE       DONE      12/02/22   12/01/22   07/13/22   06/02/22   2,4,9,15,16              500,000       500,000  JLB             0           0           0 Kaeyer, Garment & Davidson              0        /  /                         12/01/22           
22-1739   Reconstruction               0-041-007  03/27/23     DONE    DONE       DONE      02/22/23   02/21/23   07/26/22   05/17/22   2,4,9,10,16            2,125,000       343,104  JLB             0           0           0 Kaeyer, Garment & Davidson              0        /  /                         02/21/23           

          Clemson Park House:
21-1328   Reconstruction               1-043-003  05/28/22     DONE    DONE       DONE      02/17/22   02/11/22   12/23/21   01/06/22   7,9                      220,000             0  SLC             0           0           0 Kaeyer, Garment & Davidson              0      07/29/22                       02/11/22           

          Food Storage Building:
23-1378   Reconstruction               2-021-007                         UNREVIEWED         01/17/24   01/16/24   09/12/23   05/16/23   2,13,16                        0             0  MSK             0           0           0 Kaeyer, Garment & Davidson              0        /  /                         01/16/24           

          Bulk Material Storage Shed:
21-1692   New Construction             2-044-001  12/07/22     DONE    DONE       DONE      04/22/22   04/20/22   02/24/22   05/18/21   02 - 16                   25,000             0  SLC             0           0           0 Kaeyer, Garment & Davidson              0      08/30/23                       04/20/22           

          High School Field House:
22-1740   Reconstruction               7-040-004  03/27/23     DONE    DONE       DONE      02/22/23   02/21/23   07/26/22   05/17/22   2,4,7,8,9,14,155,15,     375,000             0  JLB             0           0           0 Kaeyer, Garment & Davidson              0        /  /                         02/21/23           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




MINISINK VALLEY CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 44-11-01-04
last updated on 04/22/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Slate Hill ES/MS:
19-0256   Reconstruction               0-001-011  01/27/20     DONE    DONE       DONE      08/15/19   08/12/19   10/19/18   02/07/17   2,4,9,155,15,16        3,234,386             0  JSS             0           0           0 Tetra Tech Architects & Engin           0        /  /                         08/12/19           
22-2020FC Reconstruction               0-001-012  04/27/23     DONE    DONE       DONE      04/12/23   03/01/23   11/10/22   02/02/23   2,4,9,16               1,000,000     1,000,000  JJH             0           0           0 Tetra Tech Architects & Engin           0        /  /                         03/01/23           

          Otisville Elementary School:
19-0257   Reconstruction               0-004-008  01/27/20     DONE    DONE       DONE      08/15/19   08/12/19   07/13/17   02/07/17   155,15,16                209,795             0  JSS             0           0           0 Tetra Tech Architects & Engin           0        /  /                         08/12/19           
21-1868FC Reconstruction               0-004-009  09/06/22     DONE    DONE       DONE      05/23/22   05/10/22   03/15/22   03/24/22   2,7,155,16               125,000       125,000  JLB             0           0           0 Tetra Tech Architects & Engin           0        /  /                         05/10/22           

          High School:
21-1869FC Reconstruction               0-005-014  09/06/22     DONE    DONE       DONE      05/23/22   05/10/22   03/15/22   03/24/22   2,7,155,16               939,000       939,000  JLB             0           0           0 Tetra Tech Architects & Engin           0        /  /                         05/10/22           
22-1298FC Reconstruction               0-005-015  02/16/23     DONE    DONE       DONE      12/21/22   12/05/22   09/19/22   11/17/22   2,16                     104,000       104,000  JJH             0           0           0 Tetra Tech Architects & Engin           0        /  /                         12/05/22           
  -    PR Additions and Alterations    0-005-016                                              /  /       /  /     10/24/23     /  /     02 - 16                        0             0  JJH             0           0           0                                         0        /  /                           /  /             
23-1670   Additions and Alterations    0-005-016                         UNREVIEWED         03/25/24   03/25/24   10/24/23   02/07/17   02 - 16                        0             0  JJH             0           0           0 Tetra Tech Architects & Engin           0        /  /                         03/25/24           

          Middle School:
19-0258   Reconstruction               0-012-013  01/27/20     DONE    DONE       DONE      08/15/19   08/12/19   07/13/17   02/07/17   2,4,8,9,155,15,16      8,325,238             0  JSS             0           0           0 Tetra Tech Architects & Engin           0        /  /                         08/12/19           

          New Pole Barn #2:
19-0259   Reconstruction               2-022-002  01/27/20     DONE    DONE       DONE      08/15/19   08/12/19   10/19/18   02/07/17   9,15,16                   28,200             0  JSS             0           0           0 Tetra Tech Architects & Engin           0        /  /                         08/12/19           

          New Bus Garage:
19-0260   Reconstruction               5-025-002  01/27/20     DONE    DONE       DONE      08/15/19   08/12/19   07/13/17   02/07/17   2,15,16                   92,380             0  JSS             0           0           0 Tetra Tech Architects & Engin           0        /  /                         08/12/19           

          New Sewer Treatment Facility:
20-1897   New Construction             7-047-001  08/19/21     DONE    DONE       DONE      06/18/21   06/16/21   04/29/21   02/07/17   02 - 16                4,618,000             0  JLB             0           0           0 Tetra Tech Architects & Engin           0        /  /                         06/16/21           

          District Wide:
18-0858   Reconstruction               7-999-003  05/21/19     DONE    DONE       DONE      11/16/18   11/13/18   09/18/17   07/13/17   13,16                  3,571,363             0  BMJ             0           0           0 Tetra Tech Architects & Engin           0        /  /                         11/13/18           
22-2021FC Reconstruction               7-999-004  04/27/23     DONE    DONE       DONE      04/12/23   03/01/23   02/01/23   12/29/22                            115,000             0  JJH             0           0           0 Tetra Tech Architects & Engin           0        /  /                         03/01/23           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




MONROE-WOODBURY CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 44-12-01-06
last updated on 04/22/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Central Valley Elem.(fmly Middle):
23-1595   Reconstruction               0-004-012                         UNREVIEWED         03/06/24   03/06/24   12/19/23   05/16/23   8,9,10                         0             0  JJH             0           0           0 CLARK PATTERSON LEE                     0        /  /                         03/06/24           

          Middle School (fmly Sr. High):
23-0257FA Reconstruction               0-009-016  10/10/23     DONE    DONE       DONE      08/14/23   07/19/23   02/24/23   03/29/23   8,9,10,155,16            698,255             0  JJH             0           0           0 CLARK PATTERSON LEE                     0        /  /                         07/19/23           

          Concession Stand:
  -    DB Discovered Building          7-032-001                                              /  /       /  /     08/10/22     /  /                                    0             0  JLB             0           0           0                                         0        /  /                           /  /             

          Tent @ Sapphire ES:
20-1592TQ Temporary Quarters           8-023-001  04/28/21     DONE    DONE       DONE      04/16/21   04/16/21   04/07/21     /  /                                    0             0  JSS             0           0           0                                         0      05/17/21                       04/16/21           

          Tent @ Smith Clove ES:
20-1593TQ Temporary Quarters           8-024-001  04/28/21     DONE    DONE       DONE      04/16/21   04/16/21   04/07/21     /  /                                    0             0  JSS             0           0           0                                         0      05/17/21                       04/16/21           

          Tent @ Monroe-Woodbury MS:
20-1594TQ Temporary Quarters           8-025-001  04/28/21     DONE    DONE       DONE      04/16/21   04/16/21   04/07/21     /  /                                    0             0  JSS             0           0           0                                         0      05/17/21                       04/16/21           

          Tent @ Central Valley ES:
20-1595TQ Temporary Quarters           8-026-001  04/28/21     DONE    DONE       DONE      04/16/21   04/16/21   04/07/21     /  /                                    0             0  JSS             0           0           0                                         0      05/17/21                       04/16/21           

          Tent @ North Main ES:
20-1596TQ Temporary Quarters           8-027-001  04/28/21     DONE    DONE       DONE      04/16/21   04/16/21   04/07/21     /  /                                    0             0  JSS             0           0           0                                         0      05/17/21                       04/16/21           

          Tent@Pine Tree ES:
20-1597TQ Temporary Quarters           8-028-001  04/28/21     DONE    DONE       DONE      04/16/21   04/16/21   04/07/21     /  /                                    0             0  JSS             0           0           0                                         0      05/17/21                       04/16/21           

          Temp. Tent 2 @ Pine Tree Elem.:
20-1811TQ Temporary Quarters           8-029-001  04/28/21     DONE    DONE       DONE      06/01/21   06/01/21   04/27/21     /  /                                    0             0  JLB             0           0           0                                         0        /  /                         06/01/21           

          Tent 2 @ Central Valley ES:
20-1812TQ Temporary Quarters           8-030-001  04/28/21     DONE    DONE       DONE      06/01/21   06/01/21   04/28/21     /  /                                    0             0  JLB             0           0           0                                         0        /  /                         06/01/21           

          Tent 2 @ MS:
20-1813TQ Temporary Quarters           8-031-001  04/28/21     DONE    DONE       DONE      06/01/21   06/01/21   04/28/21     /  /                                    0             0  JLB             0           0           0                                         0        /  /                         06/01/21           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




KIRYAS JOEL VILLAGE UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 44-12-02-02
last updated on 04/22/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Therapy Van #1:
23-1391FA New Construction             7-017-001  01/29/24     DONE    DONE       DONE      01/18/24   01/18/24   06/01/23   09/07/23   02 - 16                  370,000             0  MSK             0           0           0 LAN Associates                          0        /  /                         01/18/24           

          Therapy Van #2:
23-1392FA New Construction             7-018-001  01/29/24     DONE    DONE       DONE      01/18/24   01/18/24   06/01/23   09/07/23   02 - 16                  360,000             0  MSK             0           0           0 LAN Associates                          0        /  /                         01/18/24           

          Kiryas Joel Public School (leased):
22-0203FC Reconstruction               8-012-001  10/03/22     DONE    DONE       DONE      08/03/22   08/01/22   03/15/22   12/23/21   9,155,15,16            5,968,916             0  SLC             0           0           0 LAN Associates                          0        /  /                         08/01/22           
23-1413FA Reconstruction               8-012-002               STARTED DONE       ADD. REQ'D01/24/24   09/27/23   07/03/23   12/23/21   2,8,9,10,15,16         3,558,977             0  MSK             0           0           0 LAN Associates                          0        /  /                         09/27/23           
  -    PR Additions and Alterations    8-012-003                                              /  /       /  /     07/03/23     /  /     02 - 16                        0             0  MSK             0           0           0                                         0        /  /                           /  /             
23-0771FA Additions and Alterations    8-012-003  02/27/24     DONE    DONE       DONE      10/23/23   09/27/23   07/03/23   12/23/22   02 - 16                2,996,750             0  MSK             0           0           0 LAN Associates                          0        /  /                         09/27/23           

          Vocational Training Center:
18-1616TQ Temporary Quarters           8-013-001  07/08/19     DONE    DONE       DONE      03/11/19   03/11/19   10/26/18   05/15/18                                  0             0  SLC             0           0           0                                         0        /  /                         03/11/19           

          Kiryas Joel Early Childhood Edu. Cnt:
20-0789TQ Temporary Quarters           8-015-001  12/23/20     DONE    DONE       DONE        /  /       /  /     09/02/20   11/05/20                            265,320             0  SLC             0           0           0                                         0        /  /                           /  /             
20-1876TQ Temporary Quarters           8-015-002  02/01/22     DONE    DONE       DONE      06/14/21   06/14/21   04/30/21   05/11/21                            397,980             0  SLC             0           0           0                                         0        /  /                         06/14/21           
22-2274FA Reconstruction               8-015-003  12/19/23     DONE    DONE       DONE      05/24/23   05/08/23   12/30/22   12/23/21   9,155,15,16                    0             0  MSK             0           0           0 LAN Associates                          0        /  /                         05/08/23           
23-1414FA Reconstruction               8-015-004                       ADDENDUM REQ'D       01/24/24   09/27/23   04/24/23   12/23/21   2,4,7,8,9,10,13,155,   1,083,341             0  MSK             0           0           0 LAN Associates                          0        /  /                         09/27/23           
  -       Reconstruction               8-015-005                                              /  /       /  /     07/03/23     /  /     2,4,7,16                       0             0  MSK             0           0           0                                         0        /  /                           /  /             

          Learning Center II:
23-0125TQ Temporary Quarters           8-016-001  02/05/24     DONE    DONE       DONE      07/24/23   07/24/23   02/24/22     /  /                                    0             0  JLB             0           0           0                                         0        /  /                         07/24/23           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




VALLEY CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 44-13-01-06
last updated on 04/22/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Maybrook ES-AltEd-NoFutureAid 010417:
23-1163   Reconstruction               0-002-013                         UNREVIEWED         12/13/23   12/06/23   11/02/23   05/16/23   2,4,8,9,10,155,16              0             0  MSK             0           0           0 CS Arch                                 0        /  /                         12/06/23           
23-1740   Reconstruction               0-002-014                         UNREVIEWED         04/03/24   04/02/24   11/02/23   05/16/23   2,4,16                         0             0  MSK             0           0           0 CS Arch                                 0        /  /                         04/02/24           

          Montgomery Elementary:
23-1164   Reconstruction               0-004-015                         UNREVIEWED         12/13/23   12/06/23   11/02/23   05/16/23   2,4,8,9,10,155,16              0             0  MSK             0           0           0 CS Arch                                 0        /  /                         12/06/23           
23-1741   Reconstruction               0-004-016                         UNREVIEWED         04/03/24   04/02/24   11/02/23   05/16/23   2,9,10,155,15,16               0             0  MSK             0           0           0 CS Arch                                 0        /  /                         04/02/24           
  -       Reconstruction               0-004-017                                              /  /       /  /     11/02/23     /  /     2,8,9,10,155,16                0             0  MSK             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-004-018                                              /  /       /  /     12/12/23     /  /     15,16                          0             0  MSK             0           0           0                                         0        /  /                           /  /             

          Walden Elementary School:
21-0695   Reconstruction               0-009-019  04/07/22     DONE    DONE       DONE      11/12/21   11/12/21   10/28/21   05/18/21   4,7                      213,110       213,110  FMJ             0           0           0 Collins & Scoville Architects           0        /  /                         11/12/21           
22-1272FC Reconstruction               0-009-020  02/09/23     DONE    DONE       DONE      12/19/22   11/01/22   01/31/22   05/23/22   2,8,9,155,16           1,456,107             0  SLC             0           0           0 Collins & Scoville Architects           0      10/10/23                       11/01/22           
23-1165   Reconstruction               0-009-021                         UNREVIEWED         12/13/23   12/06/23   11/02/23   05/16/23   2,4,8,9,10,155,16              0             0  MSK             0           0           0 CS Arch                                 0        /  /                         12/06/23           
23-1742   Reconstruction               0-009-022                         UNREVIEWED         04/03/24   04/02/24   11/02/23   05/16/23   2,16                           0             0  MSK             0           0           0 CS Arch                                 0        /  /                         04/02/24           

          East Coldenham Elementary:
23-1166   Reconstruction               0-013-019                         UNREVIEWED         12/13/23   12/06/23   11/02/23   05/16/23   2,4,8,9,10,155,16              0             0  MSK             0           0           0 CS Arch                                 0        /  /                         12/06/23           
23-1743   Reconstruction               0-013-020                         UNREVIEWED         04/03/24   04/02/24   11/02/23   05/16/23   2,9,10,155,15,16               0             0  MSK             0           0           0 CS Arch                                 0        /  /                         04/02/24           
  -       Reconstruction               0-013-021                                              /  /       /  /     11/02/23     /  /     2,8,9,10,155,15,16             0             0  MSK             0           0           0                                         0        /  /                           /  /             

          Valley Central High School:
  -    XX Reconstruction               0-015-028                         CANCELLED            /  /       /  /     06/25/19     /  /     16                             0    40,165,886  SLC             0           0           0                                         0        /  /                           /  /             
20-0758   Reconstruction               0-015-029  01/22/21     DONE    DONE       DONE      10/30/20   10/28/20   04/09/20   05/21/19   16                       258,000       258,000  JSS             0           0           0 CS Arch                                 0      11/03/22                       10/28/20           
21-0696   Reconstruction               0-015-030  04/07/22     DONE    DONE       DONE      11/12/21   11/12/21   10/28/21   05/18/21   2,14,16                7,223,600     7,223,600  MSK             0           0           0 Collins & Scoville Architects           0        /  /                         11/12/21           
22-1271FC Reconstruction               0-015-031  04/17/23     DONE    DONE       DONE      12/19/22   11/01/22   01/13/22   05/23/22   4,8,9,155,15,16          335,868             0  JLB             0           0           0 Collins & Scoville Architects           0        /  /                         11/01/22           
22-1266   Reconstruction               0-015-032  03/15/23     DONE    DONE       DONE      12/15/22   12/15/22   11/15/22   05/17/22   2,16                     192,000             0  JLB             0           0           0 Collins & Scoville Architects           0        /  /                         12/15/22           
23-1167   Reconstruction               0-015-033                         UNREVIEWED         12/13/23   12/06/23   11/02/23   05/16/23   2,4,8,9,10,155,15,16           0             0  MSK             0           0           0 CS Arch                                 0        /  /                         12/06/23           
23-1744   Reconstruction               0-015-034                         UNREVIEWED         04/03/24   04/02/24   11/02/23   05/16/23   2,4,8,9,10,155,15,16           0             0  MSK             0           0           0 CS Arch                                 0        /  /                         04/02/24           

          Valley Middle School:
21-0697   Reconstruction               0-016-020  04/07/22     DONE    DONE       DONE      11/12/21   11/12/21   10/28/21   05/18/21   2,7,9,155,16           6,406,400     6,406,400  MSK             0           0           0 Collins & Scoville Architects           0        /  /                         11/12/21           
22-1505FC Reconstruction               0-016-021  04/06/23     DONE    DONE       DONE      01/18/23   01/10/23   01/31/22   05/23/22   9,155,16                 458,980       458,980  JLB             0           0           0 Collins & Scoville Architects           0        /  /                         01/10/23           
23-0397   Reconstruction               0-016-022                       ADDENDUM REQ'D       09/06/23   09/01/23   03/22/23   05/18/21   2,10,16                        0             0  MSK             0           0           0 Collins & Scoville Architects           0        /  /                         09/01/23           
23-1168   Reconstruction               0-016-023                         UNREVIEWED         12/13/23   12/06/23   11/02/23   05/16/23   2,8,9,10,155,16                0             0  MSK             0           0           0 CS Arch                                 0        /  /                         12/06/23           
  -       Reconstruction               0-016-024                                              /  /       /  /     11/02/23     /  /     2,8,9,10,155,15,16             0             0  MSK             0           0           0                                         0        /  /                           /  /             

          Berea Elementary:
23-1169   Reconstruction               0-017-014                         UNREVIEWED         12/13/23   12/06/23   11/02/23   05/16/23   2,4,8,9,10,155,15,16           0             0  MSK             0           0           0 CS Arch                                 0        /  /                         12/06/23           
23-1745   Reconstruction               0-017-015                         UNREVIEWED         04/03/24   04/02/24   11/02/23   05/16/23   2,9,10,155,16                  0             0  MSK             0           0           0 CS Arch                                 0        /  /                         04/02/24           

          Main Admin. Bldg.:
22-1267   Reconstruction               1-005-005  03/15/23     DONE    DONE       DONE      12/15/22   12/15/22   11/15/22   05/17/22   8,9,16                   188,000             0  JLB             0           0           0 Collins & Scoville Architects           0        /  /                         12/15/22           
23-1170   Reconstruction               1-005-006                         UNREVIEWED         12/13/23   12/06/23   11/02/23   05/16/23   2,9,155,16                     0             0  MSK             0           0           0 CS Arch                                 0        /  /                         12/06/23           

          Toilet-Concession Building:
21-0698   New Construction             7-024-001  04/07/22     DONE    DONE       DONE      11/12/21   11/12/21   10/28/21   05/18/21   02 - 16                  656,812             0  MSK             0           0           0 Collins & Scoville Architects           0      06/05/23                       11/12/21           

          Pavilion @ Walden Elementary School:
  -    PR New Construction             7-025-001                                              /  /       /  /     01/31/22     /  /     02 - 16                        0             0  SLC             0           0           0                                         0        /  /                           /  /             
22-1057FC New Construction             7-025-001  02/03/23     DONE    DONE       DONE      11/28/22   11/15/22   01/31/22   05/23/22   02 - 16                  199,418             0  SLC             0           0           0 Collins & Scoville Architects           0        /  /                         11/15/22           

          Pavilion @ Middle School:
  -    PR New Construction             7-026-001                                              /  /       /  /     01/31/22     /  /     02 - 16                        0             0  SLC             0           0           0                                         0        /  /                           /  /             
22-1273FC New Construction             7-026-001  02/09/23     DONE    DONE       DONE      12/19/22   11/01/22   01/31/22   05/23/22   02 - 16                  199,418             0  SLC             0           0           0 Collins & Scoville Architects           0        /  /                         11/01/22           

          Pavilion @ Mongomery ES:
  -    PR New Construction             7-027-001                                              /  /       /  /     01/31/22     /  /     02 - 16                        0             0  SLC             0           0           0                                         0        /  /                           /  /             
22-1274FC New Construction             7-027-001  02/09/23     DONE    DONE       DONE      12/19/22   11/01/22   01/31/22   05/23/22   02 - 16                  199,418             0  SLC             0           0           0 Collins & Scoville Architects           0        /  /                         11/01/22           

          Pavilion @ Maybrook ALC:
  -    PR New Construction             7-028-001                                              /  /       /  /     01/31/22     /  /     02 - 16                        0             0  SLC             0           0           0                                         0        /  /                           /  /             
22-1275FC New Construction             7-028-001  02/09/23     DONE    DONE       DONE      12/19/22   11/01/22   01/31/22   05/23/22   02 - 16                  199,418             0  SLC             0           0           0 Collins & Scoville Architects           0        /  /                         11/01/22           

          Pavilion @ Berea Elementary School:
  -    PR New Construction             7-029-001                                              /  /       /  /     01/31/22     /  /     02 - 16                        0             0  SLC             0           0           0                                         0        /  /                           /  /             
22-1276FC New Construction             7-029-001  02/09/23     DONE    DONE       DONE      12/19/22   11/01/22   01/31/22   05/23/22   02 - 16                  199,418             0  SLC             0           0           0 Collins & Scoville Architects           0        /  /                         11/01/22           

          Pavilion @ High School:
  -    PR New Construction             7-030-001                                              /  /       /  /     01/31/22     /  /     02 - 16                        0             0  SLC             0           0           0                                         0        /  /                           /  /             
22-1277FC New Construction             7-030-001  02/09/23     DONE    DONE       DONE      12/19/22   11/01/22   01/31/22   05/23/22   02 - 16                  199,418             0  SLC             0           0           0 Collins & Scoville Architects           0        /  /                         11/01/22           

          Pavilion @ East Coldenham ES:
  -    PR New Construction             7-031-001                                              /  /       /  /     03/24/22     /  /     02 - 16                        0             0  SLC             0           0           0                                         0        /  /                           /  /             
22-1278FC New Construction             7-031-001  02/09/23     DONE    DONE       DONE      12/19/22   11/01/22   03/24/22   05/23/22   02 - 16                  199,418             0  SLC             0           0           0 Collins & Scoville Architects           0        /  /                         11/01/22           

          District-Wide:
  -    SB Reconstruction               7-999-002                                              /  /       /  /       /  /       /  /     16                             0             0  MSK             0           0           0                                         0        /  /                           /  /             
23-1222SB Reconstruction               7-999-002               DONE                           /  /       /  /     12/19/23     /  /     16                             0             0  MSK             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




NEWBURGH CITY SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 44-16-00-01
last updated on 04/22/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Newburgh Free Academy:
19-1342   Reconstruction               0-001-026  03/19/20     DONE    DONE       DONE      02/03/20   01/27/20   10/25/19   05/21/19   2,4,7,8,9,10,13,155,   2,886,750     2,886,750  JLB             0           0           0 Clark Patterson Lee                     0      04/27/21                       01/27/20           
20-0824PR Reconstruction               0-001-027               STARTED                      11/16/20     /  /     02/25/20     /  /     2,4,8,9,10,155,15,16           0             0  JLB             0           0           0                                         0        /  /                           /  /             
23-1506   Reconstruction               0-001-028                         UNREVIEWED         02/16/24   02/07/24   03/27/23   05/16/23   2,4,8,9,10,155,15,16           0             0  WLC             0           0           0 CS Arch                                 0        /  /                         02/07/24           
22-2290   Reconstruction               0-001-029                       ADDENDUM REQ'D       05/30/23   05/25/23   03/27/23   05/21/19   2,4,8,9,16                     0             0  WLC             0           0           0 CS Arch                                 0        /  /                         05/25/23           

          North Junior High School:
20-0825PR Reconstruction               0-002-015               STARTED                      11/16/20     /  /     02/25/20     /  /     2,4,8,9,10,155,15,16           0             0  JLB             0           0           0                                         0        /  /                           /  /             

          Gidney Ave Memorial School:
  -       Reconstruction               0-006-014                                              /  /       /  /     04/28/21     /  /     2,4,7,8,9,10,155,15,           0             0  JLB             0           0           0                                         0        /  /                           /  /             
23-1298   Reconstruction               0-006-015                         UNREVIEWED         12/28/23   12/26/23   11/30/23   05/21/19   2,9,155,16                     0             0  WLC             0           0           0 LaBella Associates                      0        /  /                         12/26/23           

          Horizons on the Hudson:
19-1384   Reconstruction               0-017-014  03/05/20     DONE    DONE       DONE      02/06/20   01/31/20   11/30/18   11/13/18   2,10                     278,000             0  JLB             0           0           0 Clark Patterson Lee                     0        /  /                         01/31/20           

          Vails Gate Elementary:
20-1255PR Additions and Alterations    0-018-009               DONE                         02/08/21     /  /     06/05/20     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                           /  /             
20-1474   Additions and Alterations    0-018-009  09/07/21     DONE    DONE       DONE      03/24/21   03/15/21   06/05/20   05/21/19   02 - 16                4,758,174     2,966,677  JLB             0           0           0 Clark Patterson Lee                     0        /  /                         03/15/21           

          Gardnertown Elementary:
  -       Reconstruction               0-019-011                                              /  /       /  /     04/28/21     /  /     2,4,7,8,9,10,155,15,           0             0  JLB             0           0           0                                         0        /  /                           /  /             

          New Windsor School:
  -    PR Additions and Alterations    0-022-008                                              /  /       /  /     06/05/20     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                           /  /             
20-1333   Additions and Alterations    0-022-008  05/21/21     DONE    DONE       DONE      02/19/21   02/05/21   06/05/20   05/21/19   02 - 16                  500,500       500,500  JLB             0           0           0 Clark Patterson Lee                     0      10/01/21                       02/05/21           
02-0529   Reconstruction               0-022-009  11/21/02     DONE    DONE       DONE      11/08/02     /  /     02/05/91   10/22/02   2,4,7,8,9,155,15,16       27,600        27,600  JLB             0           0           0 Silverman & Cosentino, Assoc.           0      06/01/03                         /  /             
21-1653   Additions and Alterations    0-022-010  05/02/23     DONE    DONE       DONE      04/13/22   04/08/22   08/06/21   05/21/19   02 - 16               13,496,436     6,384,247  WLC             0           0           0 Clark Patterson Lee                     0        /  /                         04/08/22           
21-1737PR Additions and Alterations    0-022-010               DONE                         05/02/22     /  /     08/06/21     /  /     02 - 16                        0    16,258,648  WLC             0           0           0                                         0        /  /                           /  /             

          Old Balmville School Demolition:
21-0887   Reconstruction               0-024-002  02/10/22     DONE    DONE       DONE      12/13/21   12/10/21   04/14/21   10/12/21   2,16                     527,300             0  JLB             0           0           0 Clark Patterson Lee                     0        /  /                         12/10/21           

          Meadow Hill School:
23-1299   Reconstruction               0-035-014                         UNREVIEWED         12/28/23   12/26/23   11/30/23   05/21/19   2,9,155,16                     0             0  WLC             0           0           0 LaBella Associates                      0        /  /                         12/26/23           

          Temple Hill School:
23-1300   Reconstruction               0-036-015                         UNREVIEWED         12/28/23   12/26/23   11/30/23   05/21/19   2,9,155,16                     0             0  WLC             0           0           0 LaBella Associates                      0        /  /                         12/26/23           

          Heritage Junior High School:
20-1130PR Additions and Alterations    0-039-011               DONE                         01/13/21     /  /     06/05/20     /  /     02 - 16                        0    16,131,645  JLB             0           0           0                                         0        /  /                           /  /             
20-1273   Additions and Alterations    0-039-011  06/22/21     DONE    DONE       DONE      02/10/21   02/05/21   06/05/20   05/21/19   02 - 16                7,231,061     6,809,283  JLB             0           0           0 Clark Patterson Lee                     0        /  /                         02/05/21           
22-2073   Reconstruction               0-039-012  03/15/24     DONE    DONE       DONE      04/19/23   04/18/23   03/20/23   05/21/19   2                      3,784,617     3,784,617  WLC             0           0           0 CS Arch                                 0        /  /                         04/18/23           

          CTE Building:
20-0826PR New Construction             0-053-001                         UNREVIEWED         02/04/20   02/03/20   02/26/20     /  /     02 - 16                        0    26,487,780  JLB             0           0           0                                         0        /  /                         02/03/20           
20-1421SR New Construction             0-053-001  06/15/21     DONE    DONE       DONE      03/10/21   02/05/21   02/26/20   05/21/19   02 - 16                2,220,800             0  JLB             0           0           0 Clark Patterson Lee                     0        /  /                         02/05/21           
22-2392   New Construction             0-053-001               STARTED DONE       ADD. REQ'D06/16/23   06/15/23   02/26/20   05/21/19   02 - 16              100,435,000             0  WLC             0           0           0 Collins & Scoville Architects           0        /  /                         06/15/23           

          Bd of Ed/Public Library:
  -       Reconstruction               1-007-008                                              /  /       /  /     08/19/20     /  /     2,8,9,16                       0             0  JLB             0           0           0                                         0        /  /                           /  /             
21-0243   Reconstruction               1-007-009  08/31/21     DONE    DONE       DONE      08/27/21   08/27/21   05/24/21   08/05/21   8,9,155,16               866,378             0  SLC             0           0           0 CS Arch                                 0        /  /                         08/27/21           
  -       Reconstruction               1-007-010                                              /  /       /  /     07/17/23     /  /     8,9,155,15,16                  0             0  WLC             0           0           0                                         0        /  /                           /  /             

          O'Dell Office Building (Demolition):
20-1422   Reconstruction               1-016-002  06/15/21     DONE    DONE       DONE      03/10/21   02/05/21   12/04/20   05/21/19   2                        120,100             0  JLB             0           0           0 Clark Patterson Lee                     0        /  /                         02/05/21           

          XXMaintenance Shop (Demo- 2/2023):
20-1423   Reconstruction               3-011-002  06/15/21     DONE    DONE       DONE      03/10/21   02/05/21   12/04/20   05/21/19   2                         88,900             0  JLB             0           0           0 Clark Patterson Lee                     0        /  /                         02/05/21           

          Sacred Heart School:
22-0397TQ Temporary Quarters           8-054-001  09/16/22     DONE    DONE       DONE      09/02/22     /  /       /  /       /  /                                    0             0  SLC             0           0           0                                         0        /  /                           /  /             

          XXNewburgh Free Library Town Branch:
23-1221XX Alterations                  8-055-001                         CANCELLED          12/19/23   12/04/23   11/10/23     /  /                                    0             0  WLC             0           0           0                                         0        /  /                         12/04/23           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




PORT JERVIS CITY SCHOOLS STATUS REPORT ON CAPITAL PROJECTS
District No.: 44-18-00-05
last updated on 04/22/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Middle School 7-8:
20-1052   Reconstruction               0-005-015  03/23/21     DONE    DONE       DONE      12/28/20   12/21/20   07/10/19   03/11/20   8,10                   1,255,884     1,255,884  JLB             0           0           0 Bernier Carr Associates                 0      08/28/21                       12/21/20           
  -    PR Additions and Alterations    0-005-016                                              /  /       /  /     08/26/20     /  /     02 - 16                        0             0  JSS             0           0           0                                         0        /  /                           /  /             
21-0111   Additions and Alterations    0-005-016  12/06/21     DONE    DONE       DONE      07/30/21   07/29/21   08/26/20   03/11/20   02 - 16               39,033,307    25,927,887  JLB             0           0           0 Bernier Carr Associates                 0        /  /                         07/29/21           
21-0684   Reconstruction               0-005-017  10/25/21     DONE    DONE       DONE      11/12/21   11/10/21   11/03/21   10/25/21   155,16                   250,000       250,000  JLB             0           0           0 Bernier Carr Associates                 0      01/04/23                       11/10/21           
23-0798   Reconstruction               0-005-018               UNREVIEWED
                                                                       DONE       UNREVIEWED10/25/23   10/19/23   10/13/23   05/16/23   2,4,10,15,16                   0             0  JJH             0           0           0 Bernier Carr & Associates               0        /  /                         10/19/23           

          Hamilton Bicentennial ES K-6:
  -       Reconstruction               0-011-020                                              /  /       /  /     08/26/20     /  /     2,4,7,8,9,155,15,16            0             0  JSS             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-011-021                                              /  /       /  /     02/28/24     /  /     4,7,155,15,16                  0             0  JJH             0           0           0                                         0        /  /                           /  /             

          Kuhl ES K-6/PJHS 9-12:
22-0875   Reconstruction               0-012-040  03/23/23     DONE    DONE       DONE      11/02/22   10/31/22   08/26/20   03/11/20   2,4,7,8,9,155,15,16   13,776,702    13,776,702  JJH             0           0           0 Bernier Carr & Associates               0        /  /                         10/31/22           
23-0799   Reconstruction               0-012-041               UNREVIEWED
                                                                       DONE       UNREVIEWED10/25/23   10/19/23   10/13/23   05/16/23   2,4,7,8,9,10,155,15,           0             0  JJH             0           0           0 Bernier Carr & Associates               0        /  /                         10/19/23           
  -    PR Additions and Alterations    0-012-042                                              /  /       /  /     02/28/24     /  /     02 - 16                        0             0  JJH             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-012-043                                              /  /       /  /     02/28/24     /  /     2,4,7,155,15,16                0             0  JJH             0           0           0                                         0        /  /                           /  /             

          Varsity Softball Dugout Demolition:
  -       Reconstruction               7-054-002                                              /  /       /  /     08/26/20     /  /     2                              0             0  JSS             0           0           0                                         0        /  /                           /  /             

          Varsity Baseball Dugout Demolition:
  -       Reconstruction               7-055-002                                              /  /       /  /     08/26/20     /  /     2                              0             0  JSS             0           0           0                                         0        /  /                           /  /             

          B&G Pole Barn:
  -       Reconstruction               7-056-002                                              /  /       /  /     08/26/20     /  /     155,16                         0             0  JSS             0           0           0                                         0        /  /                           /  /             

          New Varsity Baseball Dugout/Storage:
22-0876   New Construction             7-057-001  03/23/23     DONE    DONE       DONE      11/02/22   10/31/22   08/26/20   03/11/20   02 - 16                   50,000             0  JJH             0           0           0 Bernier Carr & Associates               0        /  /                         10/31/22           

          New Varsity Softball Dugout/Storage:
22-0877   New Construction             7-058-001  03/23/23     DONE    DONE       DONE      11/02/22   10/31/22   08/26/20   03/11/20   02 - 16                   50,000             0  JJH             0           0           0 Bernier Carr & Associates               0        /  /                         10/31/22           

          Pike St Office:
22-1235TQ Temporary Quarters           8-059-001  02/03/23     DONE    DONE       DONE      12/14/22   12/12/22   11/10/22     /  /                                    0             0  JLB             0           0           0                                         0        /  /                         12/12/22           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




TUXEDO UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 44-19-03-02
last updated on 04/22/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          George Grant Mason Elementary:
22-0048   Reconstruction               0-001-008  09/22/22     DONE    DONE       DONE      07/06/22   07/05/22   03/28/22   12/07/21   16                       342,853       342,853  JLB             0           0           0 ECG Engineering, LLC              342,853      11/16/23                       07/05/22           
  -       Reconstruction               0-001-009                                              /  /       /  /     04/15/24     /  /     8,9,155,16                     0             0  JJH             0           0           0                                         0        /  /                           /  /             

          George F. Baker High School:
22-0049   Reconstruction               0-002-008  09/22/22     DONE    DONE       DONE      07/06/22   07/05/22   03/28/22   12/07/21   155,16                 1,008,827     1,008,827  JLB             0           0           0 ECG Engineering, LLC            1,008,827      11/16/23                       07/05/22           
22-2100   Reconstruction               0-002-009  08/11/23     DONE    DONE       DONE      04/26/23   04/25/23   03/24/23   05/17/22   2,7                    1,038,786     1,038,786  JJH             0           0           0 CS Arch                                 0        /  /                         04/25/23           
  -       Reconstruction               0-002-010                                              /  /       /  /     04/15/24     /  /     2,8,9,155,16                   0             0  JJH             0           0           0                                         0        /  /                           /  /             

          District-Wide:
  -    SB Reconstruction               7-999-BA1               DONE                           /  /       /  /       /  /       /  /     16                             0             0  JLB             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




WARWICK VALLEY CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 44-21-01-06
last updated on 04/22/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Warwick High School:
18-1328   Reconstruction               0-001-033  01/09/20     DONE    DONE       DONE      01/24/19   01/22/19   03/01/18   03/12/18   8,9,10,155,16            200,000             0  BMJ             0           0           0 Eisenbach & Ruhnke Engineerin           0      01/25/19                       01/22/19           
18-1872   Reconstruction               0-001-035  04/23/20     DONE    DONE       DONE      04/17/19   04/17/19   01/22/19   10/16/17   2,155,16                 395,274             0  BMJ             0           0           0 Eisenbach & Ruhnke Engineerin           0        /  /                         04/17/19           
20-0364   Reconstruction               0-001-036  11/05/20     DONE    DONE       DONE      09/10/20   07/30/20   02/24/20   06/22/20   4                        200,000       200,000  JSS             0           0           0 Eisenbach & Ruhnke Engineerin           0      08/27/21                       07/30/20           
  -       Reconstruction               0-001-037                                              /  /       /  /     06/23/20     /  /     4                              0             0  JSS             0           0           0                                         0        /  /                           /  /             
20-1657   Reconstruction               0-001-038  06/29/21     DONE    DONE       DONE      04/30/21   04/29/21   08/31/20   09/03/20   2,9,155,16               157,500       157,500  JSS             0           0           0 Eisenbach & Ruhnke Engineerin           0      09/01/21                       04/29/21           
20-1856   Reconstruction               0-001-039  07/09/21     DONE    DONE       DONE      06/11/21   06/04/21   02/25/21   03/04/21   155                      100,000       100,000  JLB             0           0           0 Eisenbach & Ruhnke Engineerin           0      12/21/21                       06/04/21           
21-1323FB Reconstruction               0-001-040  04/06/22     DONE    DONE       DONE      02/17/22   02/11/22   01/03/22   12/02/21   2,7,16                 6,506,734     6,506,734  JLB             0           0           0 Eisenbach & Ruhnke Engineerin           0        /  /                         02/11/22           
22-1019   Reconstruction               0-001-041  04/04/23     DONE    DONE       DONE      11/18/22   11/15/22   01/03/22   10/07/21   9,10,155,16              833,000       833,000  WLC             0           0           0 Eisenbach & Ruhnke Engineerin           0        /  /                         11/15/22           
22-0814FA Reconstruction               0-001-042  01/04/23     DONE    DONE       DONE      10/26/22   10/21/22   01/13/22   12/02/21   7,9,155,16               700,000       700,000  WLC             0           0           0 Eisenbach & Ruhnke Engineerin           0        /  /                         10/21/22           
  -       Reconstruction               0-001-043                                              /  /       /  /     01/13/22     /  /     7,9,155,16                     0             0  JLB             0           0           0                                         0        /  /                           /  /             
22-0680   Reconstruction               0-001-044  02/02/23     DONE    DONE       DONE      10/07/22   10/07/22   09/13/22   09/15/22   16                       250,000       250,000  WLC             0           0           0 Eisenbach & Ruhnke Engineerin           0        /  /                         10/07/22           
  -       Reconstruction               0-001-045                                              /  /       /  /     01/31/23     /  /     10,16                          0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Park Avenue Elementary:
  -       Reconstruction               0-002-026                                              /  /       /  /     08/31/20     /  /     2,9,155,16                     0             0  JSS             0           0           0                                         0        /  /                           /  /             
22-0901   Reconstruction               0-002-027  03/24/23     DONE    DONE       DONE      11/04/22   11/02/22   01/03/22   12/02/21   8,15                   1,019,220     1,019,220  WLC             0           0           0 Eisenbach & Ruhnke Engineerin           0        /  /                         11/02/22           
21-1292FC Reconstruction               0-002-028  04/07/22     DONE    DONE       DONE      02/16/22   02/09/22   01/13/22   02/03/22   155,15                   224,439       224,439  JLB             0           0           0 Eisenbach & Ruhnke Engineerin           0        /  /                         02/09/22           
  -       Reconstruction               0-002-029                                              /  /       /  /     12/07/23     /  /     8,9,15,16                      0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Pine Island Elementary:
20-0170   Reconstruction               0-004-013  09/01/20     DONE    DONE       DONE      08/10/20   08/10/20   06/26/20   08/06/20   13                        60,000             0  JSS             0           0           0 Eisenbach & Ruhnke Engineerin           0        /  /                         08/10/20           
21-0832   Reconstruction               0-004-014  03/01/22     DONE    DONE       DONE      12/03/21   11/22/21   07/30/21   08/05/21   16                       100,000       100,000  JLB             0           0           0 Eisenbach & Ruhnke Engineerin           0      08/31/22                       11/22/21           

          Warwick Middle School:
20-1658   Reconstruction               0-006-021  06/29/21     DONE    DONE       DONE      04/30/21   04/29/21   08/31/20   09/03/20   2,9,155,16                90,000        90,000  JSS             0           0           0 Eisenbach & Ruhnke Engineerin           0      09/01/21                       04/29/21           
21-0247   Reconstruction               0-006-022  10/04/21     DONE    DONE       DONE      08/30/21   08/27/21   07/02/21   05/18/21   10,16                    100,000       100,000  JLB             0           0           0 Eisenbach & Ruhnke Engineerin           0      04/11/22                       08/27/21           
  -    PR Additions and Alterations    0-006-023                                              /  /       /  /     01/03/22     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                           /  /             
22-1516   Additions and Alterations    0-006-023  05/23/23     DONE    DONE       DONE      01/20/23   01/18/23   01/03/22   12/02/21   02 - 16                  200,000             0  WLC             0           0           0 Eisenbach & Ruhnke Engineerin           0        /  /                         01/18/23           

          Sanfordville Elementary School:
19-0674   Reconstruction               0-019-012  02/12/20     DONE    DONE       DONE      11/04/19   10/24/19     /  /     02/25/19   155,16                   150,000       150,000  JSS             0           0           0 Eisenbach & Ruhnke Engineerin           0      11/22/19                       10/24/19           
  -       Reconstruction               0-019-013                                              /  /       /  /     08/31/20     /  /     2,9,155,16                     0             0  JSS             0           0           0                                         0        /  /                           /  /             
21-0857   Reconstruction               0-019-014  02/24/22     DONE    DONE       DONE      12/07/21   12/07/21   09/13/21   09/23/21   13,155                   400,000       400,000  JLB             0           0           0 Eisenbach & Ruhnke Engineerin           0        /  /                         12/07/21           
21-1351   Reconstruction               0-019-015  07/25/22     DONE    DONE       DONE      02/23/22   02/18/22   01/13/22   10/07/21   7,155,16               3,389,486     2,549,412  FMJ             0           0           0 Eisenbach & Ruhnke Engineerin           0        /  /                         02/18/22           
21-1293FC Reconstruction               0-019-016  04/07/22     DONE    DONE       DONE      02/16/22   02/09/22   01/13/22   12/02/21   155                      336,659       336,659  JLB             0           0           0 Eisenbach & Ruhnke Engineerin           0        /  /                         02/09/22           
  -       Reconstruction               0-019-017                                              /  /       /  /     01/31/23     /  /     10,16                          0             0  WLC             0           0           0                                         0        /  /                           /  /             
23-1619   Reconstruction               0-019-018                         UNREVIEWED         03/13/24   03/13/24   10/25/23     /  /     8                              0             0  WLC             0           0           0 Eisenbach & Ruhnke Engineerin           0        /  /                         03/13/24           

          Classroom 1 @ Sanfordville Rd:
21-1294FC New Construction             0-035-001  04/07/22     DONE    DONE       DONE      02/16/22   02/09/22   01/03/22   02/03/22   02 - 16                  115,000             0  JLB             0           0           0 Eisenbach & Ruhnke Engineerin           0        /  /                         02/09/22           

          Classroom 2 @ Sanfordville Rd:
21-1295FC New Construction             0-036-001  04/07/22     DONE    DONE       DONE      02/16/22   02/09/22   01/03/22   02/03/22   02 - 16                  115,000             0  JLB             0           0           0 Eisenbach & Ruhnke Engineerin           0        /  /                         02/09/22           

          Classroom 1 @ W. Street:
21-1296FC New Construction             0-037-001  04/07/22     DONE    DONE       DONE      02/16/22   02/09/22   01/03/22   02/03/22   02 - 16                  115,000             0  JLB             0           0           0 Eisenbach & Ruhnke Engineerin           0        /  /                         02/09/22           

          Classroom 2 @ W. Street:
21-1297FC New Construction             0-038-001  04/07/22     DONE    DONE       DONE      02/16/22   02/09/22   01/03/22   02/03/22   02 - 16                  115,000             0  JLB             0           0           0 Eisenbach & Ruhnke Engineerin           0        /  /                         02/09/22           

          Classroom 1 @ Park Ave:
21-1298FC New Construction             0-039-001  04/07/22     DONE    DONE       DONE      02/16/22   02/09/22   01/03/22   02/03/22   02 - 16                  115,000             0  JLB             0           0           0 Eisenbach & Ruhnke Engineerin           0        /  /                         02/09/22           

          Classroom 3@ Sanfordville Rd:
21-1299FC New Construction             0-040-001  04/07/22     DONE    DONE       DONE      02/16/22   02/09/22   01/03/22   02/03/22   02 - 16                  103,431             0  JLB             0           0           0 Eisenbach & Ruhnke Engineerin           0        /  /                         02/09/22           

          Pine Island Water Treatment Bldg:
  -    PR New Construction             0-044-001                                              /  /       /  /       /  /       /  /     02 - 16                        0             0  WLC             0           0           0                                         0        /  /                           /  /             
22-0740   New Construction             0-044-001  03/23/23     DONE    DONE       DONE      10/17/22   10/17/22     /  /     06/02/22   02 - 16                  200,000       197,988  WLC             0           0           0 Eisenbach & Ruhnke Engineerin           0        /  /                         10/17/22           

          Storage Shed #2 @ Park Ave ES:
18-0688DB Discovered Building          2-030-001  06/10/19     DONE    DONE       DONE      10/22/18   10/22/18   08/28/15     /  /     02 - 16                        0             0  MFS             0           0           0                                         0        /  /                         10/22/18           

          Park Avenue Storage Building:
  -    DB Discovered Building          2-047-001                                              /  /       /  /     02/14/24     /  /                                    0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Storage Container #1:
  -    DB Discovered Building          2-048-001                                              /  /       /  /     02/14/24     /  /                                    0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Storage Container #2:
  -    DB Discovered Building          2-049-001                                              /  /       /  /     02/14/24     /  /                                    0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Storage Container #3:
  -    DB Discovered Building          2-050-001                                              /  /       /  /       /  /       /  /                                    0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Storage Container #4:
  -    DB Discovered Building          2-051-001                                              /  /       /  /     02/14/24     /  /                                    0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Storage Container #5:
  -    DB Discovered Building          2-052-001                                              /  /       /  /     02/14/24     /  /                                    0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Storage Container #6:
  -    DB Discovered Building          2-053-001                                              /  /       /  /     02/14/24     /  /                                    0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Storage Container #7:
  -    DB Discovered Building          2-054-001                                              /  /       /  /       /  /       /  /                                    0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Storage Container #8:
  -    DB Discovered Building          2-055-001                                              /  /       /  /       /  /       /  /                                    0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Storage Container #9:
  -    DB Discovered Building          2-056-001                                              /  /       /  /       /  /       /  /                                    0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Storage Container #10:
  -    DB Discovered Building          2-057-001                                              /  /       /  /       /  /       /  /                                    0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Storage Container #11:
  -    DB Discovered Building          2-058-001                                              /  /       /  /       /  /       /  /                                    0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Storage Container #12:
  -    DB Discovered Building          2-059-001                                              /  /       /  /       /  /       /  /                                    0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Storage Building #2:
  -    DB Discovered Building          2-060-001                                              /  /       /  /       /  /       /  /                                    0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Storage Building #3:
  -    DB Discovered Building          2-061-001                                              /  /       /  /       /  /       /  /                                    0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Storage Building #4:
  -    DB Discovered Building          2-062-001                                              /  /       /  /       /  /       /  /                                    0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Storage Building #5:
  -    DB Discovered Building          2-063-001                                              /  /       /  /       /  /       /  /                                    0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Storage Container #13:
  -    DB Discovered Building          2-064-001                                              /  /       /  /       /  /       /  /                                    0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Storage Container #14:
  -    DB Discovered Building          2-065-001                                              /  /       /  /       /  /       /  /                                    0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Sanfordville Storage 7:
  -    DB Discovered Building          2-066-001                                              /  /       /  /     02/29/24     /  /                                    0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Bus Garage:
21-1680   Reconstruction               5-012-009  06/07/22     DONE    DONE       DONE      04/20/22   04/15/22   06/24/20     /  /     2,13                           0             0  JLB             0           0           0 Eisenbach & Ruhnke Engineerin           0        /  /                         04/15/22           

          Albert Wisner Public Library:
19-0371   Reconstruction               6-024-005  09/11/19     DONE    DONE       DONE      09/04/19   08/30/19   08/09/19   07/16/19   9,10,15,16               200,000             0  JSS             0           0           0 Eisenbach & Ruhnke Engineerin           0      02/28/20                       08/30/19           
  -    XX Reconstruction               6-024-006                         CANCELLED            /  /       /  /     08/03/22     /  /     10,16                          0             0  WLC             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               6-024-007                                              /  /       /  /     03/15/24     /  /     9,155,16                       0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Bathroom/ Field Irrigation:
21-1324   New Construction             7-041-001  04/06/22     DONE    DONE       DONE      02/17/22   02/11/22   01/03/22   12/02/21   02 - 16                  649,651             0  FMJ             0           0           0 Eisenbach & Ruhnke Engineerin           0        /  /                         02/11/22           

          Bathroom:
22-1517   New Construction             7-042-001  05/23/23     DONE    DONE       DONE      01/20/23   01/18/23   01/03/22   12/02/21   02 - 16                  325,000             0  WLC             0           0           0 Eisenbach & Ruhnke Engineerin           0        /  /                         01/18/23           

          Canopy-Football Field:
21-1300   New Construction             7-043-001  04/07/22     DONE    DONE       DONE      02/16/22   02/09/22   01/07/22   12/02/21   02 - 16                   56,491             0  FMJ             0           0           0 Eisenbach & Ruhnke Engineerin           0        /  /                         02/09/22           

          Water Pump House:
  -    DB Discovered Building          7-045-001                                              /  /       /  /       /  /       /  /                                    0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Athletic Field Support Bldg.:
  -    DB Discovered Building          7-046-001                                              /  /       /  /       /  /       /  /                                    0             0  WLC             0           0           0                                         0        /  /                           /  /             

          District-Wide:
  -       Reconstruction               7-999-BA2               DONE                           /  /       /  /       /  /       /  /     16                             0             0  JSS             0           0           0                                         0        /  /                           /  /             

          Covid 19 Tent Building:
  -    XX Reconstruction               8-034-001                         CANCELLED            /  /       /  /     08/03/20     /  /                                    0             0  JSS             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




GREENWOOD LAKE UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 44-21-11-02
last updated on 04/22/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Middle School:
18-0599   Additions and Alterations    0-001-021  05/21/19     DONE    DONE       DONE      10/11/18   08/13/18   02/21/17   11/29/16   02 - 16                  895,306       895,306  MTM             0           0           0 Kaeyer, Garment & Davidson              0      10/17/22                       08/13/18           
19-0527   Additions and Alterations    0-001-022  02/13/20     DONE    DONE       DONE      10/07/19   09/24/19   04/11/19   11/29/16   02 - 16                1,056,420       704,155  JLB             0           0           0 Kaeyer, Garment & Davidson              0      11/01/21                       09/24/19           
22-0634   Reconstruction               0-001-023  11/18/22     DONE    DONE       DONE      10/05/22   10/04/22   06/16/22   11/29/16   7                        862,034       862,034  JLB             0           0           0 Fellenzer Engineering                   0        /  /                         10/04/22           
22-1860FA Reconstruction               0-001-024  07/11/23     DONE    DONE       DONE      03/17/23   03/10/23   10/17/22   09/12/22   8                        147,290             0  JJH             0           0           0 Fellenzer Engineering                   0        /  /                         03/10/23           
22-1072   Reconstruction               0-001-025  01/10/23     DONE    DONE       DONE      11/28/22   11/23/22   10/31/22   11/29/16   15,16                    180,453       180,453  JLB             0           0           0 Fellenzer Engineering                   0        /  /                         11/23/22           
23-0977   Reconstruction               0-001-026  12/20/23     DONE    DONE       DONE      11/13/23   11/07/23   09/29/23   10/06/23   155                    1,650,000     1,650,000  JJH             0           0           0 Clark Patterson Lee                     0        /  /                         11/07/23           
23-1245   Reconstruction               0-001-027                         UNREVIEWED         12/20/23   12/20/23   09/29/23   05/17/22   2,4,7,8,9,10,155,15,           0             0  JJH             0           0           0 Clark Patterson Lee                     0        /  /                         12/20/23           

          Elementary School:
18-0600   Additions and Alterations    0-002-013  05/21/19     DONE    DONE       DONE      10/11/18   08/13/18   02/16/17   11/29/16   02 - 16                  961,884       961,884  MTM             0           0           0 Kaeyer, Garment & Davidson              0      10/17/22                       08/13/18           
19-0528   Reconstruction               0-002-014  02/13/20     DONE    DONE       DONE      10/07/19   09/24/19   04/11/19   11/29/16   8,9,155,15,16            413,337       413,337  JLB             0           0           0 Kaeyer, Garment & Davidson              0      11/01/21                       09/24/19           
20-1233   Reconstruction               0-002-015  05/04/21     DONE    DONE       DONE      02/02/21   01/18/21   08/27/19   11/29/16   2,4,7,8,9,10,13,155,   2,057,961     2,057,961  JLB             0           0           0 Fellenzer Engineering                   0      10/31/22                       01/18/21           
23-1246   Reconstruction               0-002-016                         UNREVIEWED         12/20/23   12/20/23   09/29/23   05/17/22   2,7,8,9,10,155,15,16           0             0  JJH             0           0           0 Clark Patterson Lee                     0        /  /                         12/20/23           

          MS Campus Storage Building:
21-0925DB Discovered Building          2-012-001  10/25/23     DONE    DONE       DONE      12/17/21   12/17/21   07/21/17     /  /                                    0             0  MTM             0           0           0                                         0        /  /                         12/17/21           

          Public Library:
19-0563   Reconstruction               6-008-005  11/29/19     DONE    DONE       DONE      10/16/19   10/03/19   08/12/19   07/18/19   2,8,9,155,15,16        1,150,290             0  JLB             0           0           0 LAN Associates                          0      10/05/20                       10/03/19           
  -       Reconstruction               6-008-006                                              /  /       /  /     03/05/24     /  /     7                              0             0  JJH             0           0           0                                         0        /  /                           /  /             

          District-Wide:
  -    SB Reconstruction               7-999-BA1               DONE                           /  /       /  /       /  /       /  /     16                             0             0  JLB             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




FLORIDA UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 44-21-15-02
last updated on 04/22/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          SS Seward Institute:
19-0766   Reconstruction               0-001-013  03/30/20     DONE    DONE       DONE      11/12/19   10/28/19   04/18/19   02/26/19   2,4,8,9,155,15,16      1,738,800     1,738,800  JSS             0           0           0 Burton Behrendt Smith                   0      11/12/21                       10/28/19           
20-0963   Reconstruction               0-001-014  05/09/22     DONE    DONE       DONE      12/15/20   12/09/20   08/26/20   03/19/20   13,155,15,16           1,853,274     1,853,274  JLB             0           0           0 Burton Behrendt Smith           1,766,373      11/22/23                       12/09/20           
20-0919   Reconstruction               0-001-015  03/24/21     DONE    DONE       DONE      12/03/20   12/01/20   08/26/20   02/26/19   2,8,9,155,15,16        1,858,504     1,858,504  JSS             0           0           0 Burton Behrendt Smith                   0      10/13/22                       12/01/20           
  -       Reconstruction               0-001-016                                              /  /       /  /     11/17/23     /  /     8                              0             0  JJH             0           0           0                                         0        /  /                           /  /             

          Samuel S Seward Memorial Building:
19-0767   Additions and Alterations    0-003-008  03/30/20     DONE    DONE       DONE      11/12/19   10/28/19   04/18/19   02/26/19   02 - 16                   56,000             0  JSS             0           0           0 Burton Behrendt Smith                   0      07/01/21                       10/28/19           
20-0964   Reconstruction               0-003-009  05/09/22     DONE    DONE       DONE      12/15/20   12/09/20   08/26/20   03/19/20   13,155,15,16             115,467       115,467  JLB             0           0           0 Burton Behrendt Smith             115,467      11/22/23                       12/09/20           
20-0920   Reconstruction               0-003-010  03/24/21     DONE    DONE       DONE      12/03/20   12/01/20   08/26/20   02/25/19   2                         85,000        85,000  JSS             0           0           0 Burton Behrendt Smith                   0      05/25/22                       12/01/20           
  -       Reconstruction               0-003-011                                              /  /       /  /     11/17/23     /  /     8                              0             0  JJH             0           0           0                                         0        /  /                           /  /             

          Golden Hill Elementary:
19-0768   Reconstruction               0-004-011  03/30/20     DONE    DONE       DONE      11/12/19   10/28/19   04/18/19   02/26/19   2,4,8,9,155,15,16      2,599,750     2,432,440  JSS             0           0           0 Burton Behrendt Smith                   0      05/25/22                       10/28/19           
20-0965   Reconstruction               0-004-012  05/09/22     DONE    DONE       DONE      12/15/20   12/09/20   08/26/20   03/19/20   13,155,15,16           1,384,922     1,384,922  JLB             0           0           0 Burton Behrendt Smith           1,335,683      11/22/23                       12/09/20           
20-0921   Reconstruction               0-004-013  03/24/21     DONE    DONE       DONE      12/03/20   12/01/20   08/26/20   02/25/19   2,9,10,155,15,16       1,322,750     1,322,750  JSS             0           0           0 Burton Behrendt Smith                   0      10/13/22                       12/01/20           
  -       Reconstruction               0-004-014                                              /  /       /  /     11/17/23     /  /     8                              0             0  JJH             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-004-015                                              /  /       /  /     03/18/24     /  /     2                              0             0  JJH             0           0           0                                         0        /  /                           /  /             

          Temporary Structure 1:
  -    PR New Construction             7-009-001                                              /  /       /  /     05/19/22     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                           /  /             
21-1958TQ Temporary Quarters           7-009-001  06/23/22     DONE    DONE       DONE      06/10/22     /  /     05/19/22     /  /     02 - 16                        0             0  JJH             0           0           0                                         0        /  /                           /  /             

          Temporary Structure 2:
  -    PR New Construction             7-010-001                                              /  /       /  /     05/19/22     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                           /  /             
21-1959TQ Temporary Quarters           7-010-001  06/23/22     DONE    DONE       DONE      06/10/22     /  /     05/19/22     /  /     02 - 16                        0             0  JJH             0           0           0                                         0        /  /                           /  /             

          District-Wide:
18-1641   Reconstruction               7-999-002  05/13/19     DONE    DONE       DONE      03/14/19   03/06/19   11/05/18   05/15/18                            100,000       100,000  JLB             0           0           0 Burton Behrendt Smith                   0      07/10/20                       03/06/19           

          Temp Struct-Grad Tent:
22-2199TQ Temporary Quarters           8-011-001  05/23/23     DONE    DONE       DONE      05/12/23   05/11/23   03/21/23     /  /                                    0             0  JJH             0           0           0                                         0        /  /                         05/11/23           

          2024 Graduation Tent:
  -    TQ Temporary Quarters           8-012-001                                              /  /       /  /       /  /       /  /                                    0             0  JJH             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




BOCES ORANGE - ULSTER STATUS REPORT ON CAPITAL PROJECTS
District No.: 44-90-00-00
last updated on 04/22/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Occupational Bldg #400 (DEMO):
22-0187XX Reconstruction               0-004-006                         CANCELLED          07/29/22   07/28/22   02/07/22   05/12/22   13                             0     5,249,880  WLC             0           0           0 Gerard Associates                       0        /  /                         07/28/22           
  -       Reconstruction               0-004-007                                              /  /       /  /     06/14/23     /  /     2,7,8,9,155,15,16              0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Special Ed Building:
21-1348TQ Temporary Quarters           0-009-034  03/01/22     DONE    DONE       DONE      02/23/22   02/22/22   02/07/22     /  /     13                             0    31,687,700  JLB             0           0           0                                         0      03/03/22                       02/22/22           
22-0188XX Reconstruction               0-009-035                         CANCELLED          07/29/22   07/28/22   09/29/22   05/12/22   13                             0             0  WLC             0           0           0 Gerard Associates                       0        /  /                         07/28/22           
  -    PR Additions and Alterations    0-009-036                                              /  /       /  /     06/14/23     /  /     02 - 16                        0             0  WLC             0           0           0                                         0        /  /                           /  /             
23-1313   Additions and Alterations    0-009-036                         UNREVIEWED         01/03/24   12/22/23   06/14/23   10/25/22   02 - 16                        0             0  WLC             0           0           0 Kaeyer, Garment & Davidson              0        /  /                         12/22/23           

          Occ.Ed.Bldg(Career&Tech Cntr):
  -    PR Additions and Alterations    0-010-022                                              /  /       /  /     06/14/23     /  /     02 - 16                        0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Arden Hill Main Bldg (Fmr. 8-035):
23-0428   Reconstruction               0-035-009  03/21/24     DONE    DONE       DONE      09/11/23   09/08/23     /  /     10/25/22   2,4,7,8,9,10,14,155,  12,250,700    11,746,700  WLC             0           0           0 Kaeyer, Garment & Davidson              0        /  /                         09/08/23           
  -       Reconstruction               0-035-010                                              /  /       /  /       /  /       /  /                                    0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Building #2 Arden Hill (Fmr 8-038):
23-0430DB Discovered Building          0-038-003  03/21/24     DONE    DONE       DONE      09/11/23   09/08/23   03/20/24     /  /                                    0             0  WLC             0           0           0 Kaeyer, Garment & Davidson              0        /  /                         09/08/23           

          Building #3 Arden Hill (Fmr. 8-039):
23-0431DB Discovered Building          0-039-003  03/21/24     DONE    DONE       DONE      09/11/23   09/08/23     /  /       /  /                                    0             0  WLC             0           0           0 Kaeyer, Garment & Davidson              0        /  /                         09/08/23           

          Wastewater Treatment Facility:
18-0519   New Construction             0-047-001  04/25/19     DONE    DONE       DONE      09/28/18   09/19/18   09/20/18   07/14/16   02 - 16                1,679,258     1,679,258  JLB             0           0           0 LAN Associates                          0        /  /                         09/19/18           

          The Center for Youth Programs:
  -    TQ Temporary Quarters           0-058-001                                              /  /       /  /     02/14/24     /  /                                    0             0  WLC             0           0           0                                         0        /  /                           /  /             

          (DEMO) Storage Warehouse:
  -       Reconstruction               2-001-001                                              /  /       /  /     10/11/23     /  /     2,7,8,9,155,15,16              0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Picnic Tent #1:
22-0307TQ Temporary Quarters           7-046-001  08/29/22     DONE    DONE       DONE      08/22/22     /  /     07/27/22     /  /     02 - 16                        0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Picnic Tent #2:
22-0308TQ Temporary Quarters           7-047-001  08/29/22     DONE    DONE       DONE      08/22/22     /  /     07/27/22     /  /     02 - 16                        0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Picnic Tent #3:
22-0309TQ Temporary Quarters           7-048-001  08/29/22     DONE    DONE       DONE      08/22/22     /  /     07/27/22     /  /     02 - 16                        0             0  WLC             0           0           0                                         0        /  /                           /  /             

          XXTent 1:
  -    PR New Construction             7-049-001                                              /  /       /  /     10/26/22     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                           /  /             
22-0880TQ Temporary Quarters           7-049-001  11/07/22     DONE    DONE       DONE      11/02/22   11/02/22   10/26/22     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                         11/02/22           

          XXTent 2:
  -    PR New Construction             7-050-001                                              /  /       /  /     10/26/22     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                           /  /             
22-0881TQ Temporary Quarters           7-050-001  11/07/22     DONE    DONE       DONE      11/02/22   11/02/22   10/26/22     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                         11/02/22           

          XXTent 3:
  -    PR New Construction             7-051-001                                              /  /       /  /     10/26/22     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                           /  /             
22-0882TQ Temporary Quarters           7-051-001  11/07/22     DONE    DONE       DONE      11/02/22   11/02/22   10/26/22     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                         11/02/22           

          Mind Comp Tent 1:
22-1710TQ Temporary Quarters           7-052-001                       ADDENDUM REQ'D       02/21/23   02/21/23   02/10/23     /  /     02 - 16                        0             0  WLC             0           0           0                                         0        /  /                         02/21/23           

          Mind Comp Tent 2:
22-1711TQ Temporary Quarters           7-053-001                       ADDENDUM REQ'D       02/21/23   02/21/23   02/10/23     /  /     02 - 16                        0             0  WLC             0           0           0                                         0        /  /                         02/21/23           

          Tent 1 (2023):
23-0235TQ Temporary Quarters           7-054-001  11/17/23     DONE    DONE       DONE      08/11/23   08/11/23   08/01/23     /  /     02 - 16                        0             0  WLC             0           0           0                                         0        /  /                         08/11/23           

          Tent 2 (2023):
23-0236TQ Temporary Quarters           7-055-001  11/17/23     DONE    DONE       DONE      08/11/23   08/11/23   08/01/23     /  /     02 - 16                        0             0  WLC             0           0           0                                         0        /  /                         08/11/23           

          Tent 3 (2023):
23-0237TQ Temporary Quarters           7-056-001  11/17/23     DONE    DONE       DONE      08/11/23   08/11/23   08/01/23     /  /     02 - 16                        0             0  WLC             0           0           0                                         0        /  /                         08/11/23           

          Arden Hill-Main Building (see 0-035):
19-1634   Reconstruction               8-035-007  06/15/20     DONE    DONE       DONE      03/27/20   03/14/20   09/25/18     /  /     4,155,15,16            1,885,110     1,885,110  JSS             0           0           0 Gerard Associates                       0      07/13/22                       03/14/20           
22-1971   Reconstruction               8-035-008  05/09/23     DONE    DONE       DONE      03/31/23   03/31/23   03/21/23   10/25/22   8,9,10,155,15,16       2,528,988     2,528,988  WLC             0           0           0 Kaeyer, Garment & Davidson              0        /  /                         03/31/23           
23-0428XX Reconstruction               8-035-009                         CANCELLED          09/11/23   09/08/23   06/14/23   10/25/22   2,4,7,8,9,10,14,155,  12,250,700             0  WLC             0           0           0 Kaeyer, Garment & Davidson              0        /  /                         09/08/23           
  -    PR Additions and Alterations    8-035-010                                              /  /       /  /     06/14/23     /  /     02 - 16                        0             0  WLC             0           0           0                                         0        /  /                           /  /             
23-0429   Additions and Alterations    8-035-010               STARTED DONE       DONE      09/11/23   09/08/23   06/14/23   10/25/22   02 - 16                1,238,685     1,238,685  WLC             0           0           0 Kaeyer, Garment & Davidson              0        /  /                         09/08/23           

          Building #1 - Arden Hill:
  -       Reconstruction               8-037-003                                              /  /       /  /     06/14/23     /  /     2,4,7,8,9,10,14,155,           0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Building#2-Arden Hill (see 0-038):
23-0430XX Reconstruction               8-038-003                         CANCELLED          09/11/23   09/08/23   06/14/23   10/25/22   2,7,8,9,155,15,16              0             0  WLC             0           0           0 Kaeyer, Garment & Davidson              0        /  /                         09/08/23           

          Building#3-Arden Hill (see 0-039):
23-0431XX Reconstruction               8-039-003                         CANCELLED          09/11/23   09/08/23   06/14/23   10/25/22   2,7,8,9,155,15,16              0             0  WLC             0           0           0 Kaeyer, Garment & Davidson              0        /  /                         09/08/23           

          Middletown Parks & Rec Building:
23-1172TQ Temporary Quarters           8-057-001                         UNREVIEWED         12/13/23   12/12/23   12/08/23     /  /                                    0             0  WLC             0           0           0                                         0        /  /                         12/12/23           

          Newburgh Adult Learning Center:
  -    TQ Temporary Quarters           8-059-001                                              /  /       /  /     02/15/24     /  /                                    0             0  WLC             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED