Construction Project Status

Construction Project Status

THE STATE EDUCATION DEPARTMENT

FACILITIES PLANNING


UPDATED: 12/14/17 at 06:44:46




ALBION CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 45-01-01-06
last updated on 12/14/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Bergerson Middle School:
15-0521   Reconstruction               0-001-009  09/13/16     DONE    DONE       DONE      10/05/15   09/23/15   02/26/15   05/19/15   2,7,8,9,155,15,16      3,968,865     3,968,865  MFS             0           0           0 King & King Architects                  0        /  /                           /  /             
15-0665   Reconstruction               0-001-010  11/10/15     DONE    DONE       DONE      10/30/15   10/28/15   09/03/15   05/19/15   7,155,15,16            1,761,400     1,761,400  MFS             0           0           0 King & King Architects                  0        /  /                           /  /             

          Ronald D. Sodoma Primary School:
15-0522   Reconstruction               0-002-013  09/13/16     DONE    DONE       DONE      10/05/15   09/23/15   02/26/15   05/19/15   2,4,7,8,9,10,15,16     3,590,761     3,590,761  MFS             0           0           0 King & King Architects                  0        /  /                           /  /             
15-0666   Reconstruction               0-002-014  11/10/15     DONE    DONE       DONE      10/30/15   10/28/15   09/03/15   05/19/15   7,155,15,16            1,658,500     1,658,500  MFS             0           0           0 King & King Architects                  0        /  /                           /  /             

          Charles D. Amico High School:
15-0523   Reconstruction               0-004-007  09/13/16     DONE    DONE       DONE      10/05/15   09/23/15   02/26/15   05/19/15   2,8,9,10,155,15,16     2,307,853     2,307,853  MFS             0           0           0 King & King Architects                  0        /  /                           /  /             

          Bus Garage:
15-0524   Reconstruction               5-003-007  09/13/16     DONE    DONE       DONE      10/05/15   09/23/15   02/26/15   05/19/15   2,7,8,15,16              386,605       386,605  MFS             0           0           0 King & King Architects                  0        /  /                           /  /             
15-0667   Reconstruction               5-003-008  11/10/15     DONE    DONE       DONE      10/30/15   10/28/15   09/03/15   05/19/15   7,8,155,15,16            152,532       152,532  MFS             0           0           0 King & King Architects                  0        /  /                           /  /             

          Boiler Bldg.:
15-0525   Reconstruction               7-009-002  09/13/16     DONE    DONE       DONE      10/05/15   09/23/15   02/26/15   05/19/15   2,155,15,16              544,032             0  MFS             0           0           0 King & King Architects                  0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




KENDALL CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 45-06-07-04
last updated on 12/14/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Kendall Elementary:
12-1147   Reconstruction               0-001-006  03/27/14     DONE    DONE       DONE      04/30/13   04/30/13   05/10/12   01/22/13   8,155,16                 665,948       665,948  DDJ             0           0           0 M/E Engineering                   665,948      02/10/15                       03/18/15         YES
                                                                                                                                                                                                                                                                                                                                   
13-0964   Reconstruction               0-001-007  07/28/14     DONE    DONE       DONE      12/27/13   12/23/13   03/05/13   05/21/13   2,4,7,8,9,155,15,16   10,498,688     9,740,118  MFS             0           0      11,714 SWBR Architects P.C.                    0      12/01/16                       12/27/16         YES
                                                                                                                                                                                                                                                                                                                                   
  -       Reconstruction               0-001-008                                              /  /       /  /     11/08/17     /  /     2,8                            0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Jr/Sr High School:
12-1148   Reconstruction               0-004-006  03/27/14     DONE    DONE       DONE      04/30/13   04/30/13   05/10/12   01/22/13   8,155,16               1,039,923     1,039,923  DDJ             0           0           0 M/E Engineering                 1,039,923      02/10/15                       03/18/15         YES
                                                                                                                                                                                                                                                                                                                                   
12-0507   Reconstruction               0-004-007  03/21/13     DONE    DONE       DONE      12/05/12   12/05/12   10/09/12   09/11/12   2,10,16                  177,700       177,700  MFS             0           0      19,724 SWBR Architects P.C.                    0      04/21/14                       08/05/14         YES
                                                                                                                                                                                                                                                                                                                                   
13-0965   Additions and Alterations    0-004-008  07/28/14     DONE    DONE       DONE      12/27/13   12/23/13   03/05/13   05/21/13   02 - 16               13,218,393    12,365,041  MFS             0           0           0 SWBR Architects P.C.                    0      12/01/16                       12/27/16         YES
                                                                                                                                                                                                                                                                                                                                   

          Buildings & Grounds Shop:
  -       Reconstruction               2-002-002                                              /  /       /  /     03/05/13     /  /     2,4,7,8,9,155,15,16            0             0  MFS             0           0           0                                         0        /  /                           /  /             

          New Bus Garage:
12-1149   Reconstruction               5-005-003  03/27/14     DONE    DONE       DONE      04/30/13   04/30/13   05/17/12   01/22/13   8,155,16                  55,724        55,724  MFS             0           0           0 M/E Engineering                    55,724      02/10/15                       03/18/15         YES
                                                                                                                                                                                                                                                                                                                                   
13-0966   Reconstruction               5-005-004  07/28/14     DONE    DONE       DONE      12/27/13   12/23/13   03/22/13   05/21/13   2,155,16                  52,679        52,679  MFS             0           0           0 SWBR Architects P.C.                    0      12/01/16                       12/27/16         YES
                                                                                                                                                                                                                                                                                                                                   

          Field Toilet Facility:
  -       New Construction             7-009-001                                              /  /       /  /     03/27/13     /  /     02 - 16                        0             0  MFS             0           0           0                                         0        /  /                           /  /             

          District-Wide:
13-0967   Reconstruction               7-999-001  07/28/14     DONE    DONE       DONE      12/27/13   12/23/13   11/01/13   05/21/13   155,16                 1,029,253     1,029,253  MFS             0           0           0 SWBR Architects P.C.                    0      12/01/16                       12/27/16         YES
                                                                                                                                                                                                                                                                                                                                   
  -    SB Reconstruction               7-999-BA1               DONE                           /  /       /  /       /  /       /  /     13                             0             0  MFS             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




HOLLEY CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 45-07-04-04
last updated on 12/14/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Elementary School:
14-1023   Reconstruction               0-002-007  03/03/15     DONE    DONE       DONE      01/28/15   01/23/15   11/03/14   12/09/14   8,9                      561,441       561,441  DDJ             0           0           0 SEI Design Group                        0      08/22/16                       12/05/16         YES
                                                                                                                                                                                                                                                                                                                                   
15-1236   Reconstruction               0-002-008  11/16/16     DONE    DONE       DONE      02/10/16   02/10/16   12/15/15   12/19/15   2,4,7,8,9,155,15,16    4,507,130     4,507,130  DDJ             0           0           0 SEI Design Group                        0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   

          Jr-Sr High School:
12-0256   Reconstruction               0-008-007  03/30/13     DONE    DONE       DONE      10/04/12   10/04/12   05/11/11   12/10/07   4,7,8,9,10,155,15,16     420,700       420,700  DDJ             0           0           0 SEI Design Group                        0      09/06/13                       06/30/14         YES
                                                                                                                                                                                                                                                                                                                                   
15-1237   Reconstruction               0-008-008  11/16/16     DONE    DONE       DONE      02/12/16   02/10/16   12/15/15   12/19/15   2,7,9,155,15,16        3,839,270     3,839,270  DDJ             0           0           0 SEI Design Group                        0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   

          Storage Building - Holley Campus:
11-1388DB Discovered Building          2-021-001  12/13/13     DONE    DONE       DONE      06/08/12   06/07/12   06/08/12     /  /                                    0             0  HCM             0           0           0 SEI Design Group                        0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




MEDINA CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 45-08-01-06
last updated on 12/14/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Oak Orchard Elementary School:
12-0730   Reconstruction               0-002-009  09/16/13     DONE    DONE       DONE      01/29/13   01/28/13   01/08/13   05/15/07   16                        58,722        58,722  DDJ             0           0           0 Gordon W. Jones Associates              0      06/01/15                       06/09/15         YES
                                                                                                                                                                                                                                                                                                                                   
16-2118   Reconstruction               0-002-010               UNREVIEWED
                                                                       DONE       UNREVIEWED06/26/17   06/26/17   01/19/17   12/21/16   2,8,9,10,155,15,16             0             0  BMJ             0           0           0 Gordon W. Jones Associates              0        /  /                           /  /             

          Clifford H. Wise MS:
12-0731   Reconstruction               0-003-009  09/16/13     DONE    DONE       DONE      01/29/13   01/28/13   01/08/13   05/15/07   2,4,8,9,10,155,15,16     471,765       471,765  DDJ             0           0           0 Gordon W. Jones Associates              0      06/01/15                       06/09/15         YES
                                                                                                                                                                                                                                                                                                                                   
16-2119   Reconstruction               0-003-010               UNREVIEWED
                                                                       DONE       UNREVIEWED06/26/17   06/26/17   01/19/17   12/21/16   2,8,9,10,155,15,16             0             0  BMJ             0           0           0 Gordon W. Jones Associates              0        /  /                           /  /             

          Medina High School:
12-0732   Reconstruction               0-006-007  09/16/13     DONE    DONE       DONE      01/29/13   01/28/13   01/08/13   05/15/07   155,16                   299,729       299,729  DDJ             0           0           0 Gordon W. Jones Associates              0      06/01/15                       06/09/15         YES
                                                                                                                                                                                                                                                                                                                                   
  -       Reconstruction               0-006-008                                              /  /       /  /     01/08/13     /  /     155,16                         0    21,392,041  DDJ             0           0           0                                         0        /  /                           /  /             
16-2120   Reconstruction               0-006-009               UNREVIEWED
                                                                       DONE       UNREVIEWED06/26/17   06/26/17   01/19/17   12/21/16   2,8,9,10,155,15,16             0             0  BMJ             0           0           0 Gordon W. Jones Associates              0        /  /                           /  /             
16-1448   Reconstruction               0-006-010  04/03/17     DONE    DONE       DONE      02/28/17   02/28/17   01/26/17   12/21/16   2,9                    1,826,000     1,826,000  BMJ             0           0           0 Gordon W. Jones Associates              0      10/17/17                       12/04/17         YES
                                                                                                                                                                                                                                                                                                                                   

          Band Storage Bldg @ Medina High Sch:
16-2121   New Construction             2-015-001               UNREVIEWED
                                                                       DONE       UNREVIEWED06/26/17   06/26/17   01/19/17   12/21/16   02 - 16                        0             0  DDJ             0           0           0 Gordon W. Jones Associates              0        /  /                           /  /             

          Bus Garage:
12-0733   Reconstruction               5-005-005  09/16/13     DONE    DONE       DONE      01/29/13   01/28/13   01/08/13   05/15/07   16                        27,830        27,830  DDJ             0           0           0 Gordon W. Jones Associates              0      06/01/15                       06/09/15         YES
                                                                                                                                                                                                                                                                                                                                   
16-2122   Reconstruction               5-005-006               UNREVIEWED
                                                                       DONE       UNREVIEWED06/26/17   06/26/17   01/19/17   12/21/16   2,8,10,13,155,15,16            0             0  BMJ             0           0           0 Gordon W. Jones Associates              0        /  /                           /  /             

          Concession Stand:
16-2123   Reconstruction               7-013-003               UNREVIEWED
                                                                       DONE       UNREVIEWED06/26/17   06/26/17   01/19/17   12/21/16   8,10,16                        0             0  BMJ             0           0           0 Gordon W. Jones Associates              0        /  /                           /  /             

          XXPress Box (demo'd 2017):
16-2124   Reconstruction               7-014-003               UNREVIEWED
                                                                       DONE       UNREVIEWED06/26/17   06/26/17   01/20/17   12/21/16   2,16                           0             0  DDJ             0           0           0 Gordon W. Jones Associates              0        /  /                           /  /             

          Press Box @ Veterans Memorial Park:
16-2125   New Construction             7-016-001               UNREVIEWED
                                                                       DONE       UNREVIEWED06/26/17   06/26/17   01/19/17   12/21/16   02 - 16                        0             0  DDJ             0           0           0 Gordon W. Jones Associates              0        /  /                           /  /             

          District-Wide:
  -       Reconstruction               7-999-001                                              /  /       /  /     11/28/17     /  /     16                             0             0  SLC             0           0           0                                         0        /  /                           /  /             
17-0855SB Reconstruction               7-999-001               DONE                           /  /       /  /     11/28/17     /  /     16                             0             0  SLC             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               7-999-BA1               DONE                           /  /       /  /       /  /       /  /     16                             0             0  SLC             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




LYNDONVILLE CENTRAL SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 45-10-01-04
last updated on 12/14/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          L A Webber High School:
13-0749   Reconstruction               0-001-010  06/05/14     DONE    DONE       DONE      11/22/13   11/18/13   07/19/13   11/15/07   2,8,9,155,16             232,000       232,000  DDJ             0           0           0 SEI Design Group                        0      03/01/16                       08/22/16         YES
                                                                                                                                                                                                                                                                                                                                   
14-0954   Reconstruction               0-001-011  01/26/15     DONE    DONE       DONE      01/14/15   01/08/15   10/21/14   05/20/14   16                       100,000       100,000  DDJ             0           0           0 SEI Design Group                        0      01/29/16                       03/07/16         YES
                                                                                                                                                                                                                                                                                                                                   
  -       Reconstruction               0-001-012                         UNREVIEWED         05/13/16   05/13/16     /  /       /  /     13,16                          0    13,647,177  DDJ             0           0           0                                         0        /  /                           /  /             
15-1730SB Reconstruction               0-001-012               DONE                           /  /       /  /     05/13/16     /  /     13,16                          0    13,647,177  DDJ             0           0           0                                         0        /  /                           /  /             
17-0071   Reconstruction               0-001-013  12/13/17     DONE    DONE       DONE      07/17/17   07/17/17   03/16/17   02/13/17   16                        80,000             0  SLC             0           0           0 SEI Design Group                        0        /  /                           /  /             
16-1729   Reconstruction               0-001-014  05/08/17     DONE    DONE       DONE      04/25/17   04/25/17   03/16/17   02/13/17   2,7                      450,000       450,000  SLC             0           0           0 SEI Design Group                        0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
17-0614   Reconstruction               0-001-015                         UNREVIEWED         10/20/17   10/18/17   06/22/17   02/13/17   2,4,8,9,10,155,15,16           0             0  SLC             0           0           0 SEI Design Group                        0        /  /                           /  /             
  -    SB Reconstruction               0-001-BA1                                              /  /       /  /       /  /       /  /     13                             0    13,647,177  DDJ             0           0           0                                         0        /  /                           /  /             

          Sports Storage Shed:
14-0366DB Discovered Building          2-004-001  12/11/14     DONE    DONE       DONE      09/30/14   09/29/14   03/27/14     /  /                                    0             0  DDJ             0           0           0                                         0        /  /                           /  /             

          Bus Garage:
13-0750   Additions and Alterations    5-003-004  06/05/14     DONE    DONE       DONE      11/22/13   11/18/13   07/19/13   11/15/07   02 - 16                  238,000       238,000  DDJ             0           0           0 SEI Design Group                        0      03/01/16                       08/22/16         YES
                                                                                                                                                                                                                                                                                                                                   
16-0705   Reconstruction               5-003-005  03/09/17     DONE    DONE       DONE      11/02/16   11/02/16   09/29/16   05/17/16   15                       100,000             0  SLC             0           0           0 SEI Design Group                        0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
17-0615   Reconstruction               5-003-006                         UNREVIEWED         10/20/17   10/18/17   06/22/17   02/13/17   2,4,7,8,9,16                   0             0  SLC             0           0           0 SEI Design Group                        0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




BOCES ORLEANS-NIAGARA STATUS REPORT ON CAPITAL PROJECTS
District No.: 45-90-00-00
last updated on 12/14/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Special Ed. Building:
17-0733   Reconstruction               0-001-005                         UNREVIEWED         11/07/17   10/31/17   10/17/16   02/10/17   2,4,10,15,16                   0     4,059,300  MTM             0           0           0 LaBella Associates, P.C.                0        /  /                           /  /             

          Niagara Occ Ct 1:
14-1119   Reconstruction               0-005-004  02/25/16     DONE    DONE       DONE      02/11/15   02/10/15   08/15/14   09/10/14   2,7,155,16               894,000       894,000  MFS             0           0           0 LaBella Associates, P.C.                0      12/22/16                       05/12/17           

          Niagara Academy(fmlyNewEH Bldg):
13-0190   Reconstruction               0-009-007  02/07/14     DONE    DONE       DONE      08/14/13   08/14/13   08/23/12   05/08/13   155                      504,746       504,746  JMB             0           0           0 LaBella Associates, P.C.                0      04/30/15                       06/01/15           

          Orleans Area Center:
17-0734   Reconstruction               0-011-012                         UNREVIEWED         11/07/17   10/31/17   10/17/16   02/10/17   2,4,10,15,16                   0    14,105,720  MTM             0           0           0 LaBella Associates, P.C.                0        /  /                           /  /             

          Niagara Area Center:
13-0191   Reconstruction               0-012-012  02/07/14     DONE    DONE       DONE      08/14/13   08/14/13   08/23/12   05/08/13   13,155,16              1,494,942     1,494,942  JMB             0           0           0 LaBella Associates, P.C.                0      04/30/15                       06/01/15           

          Niagara Bldg 2 (fmly 0-006):
14-1120   Reconstruction               1-006-001  02/25/16     DONE    DONE       DONE      02/11/15   02/10/15   08/19/14   09/10/14   2,7,155,16               455,500             0  MFS             0           0           0 LaBella Associates, P.C.                0      12/22/16                       05/12/17           

          Niagara Bldg 3:
14-1121   Reconstruction               1-007-004  02/25/16     DONE    DONE       DONE      02/11/15   02/10/15   08/15/14   09/10/14   2,7,155,16               451,600             0  MFS             0           0           0 LaBella Associates, P.C.                0      12/22/16                       05/12/17           

          Pavilion @ Niagara Occ CT 1:
15-0451   New Construction             7-027-001  12/16/15     DONE    DONE       DONE      09/11/15   09/11/15   12/15/14   08/12/15   02 - 16                  298,900             0  MFS             0           0           0 LaBella Associates, P.C.                0      12/22/16                       05/12/17           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED