Construction Project Status

Construction Project Status

THE STATE EDUCATION DEPARTMENT

FACILITIES PLANNING


UPDATED: 04/22/14 at 17:04:21




ALBION CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 45-01-01-06
last updated on 04/22/14
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Bergerson Middle School:
08-1217   Reconstruction               0-001-007  06/24/09     DONE    DONE       DONE      02/18/09   02/09/09   01/29/09   05/15/07   2,9,10,16                123,499       123,499  HCM             0           0           0 King & King, Architects                 0      03/14/10                         /  /             

          Primary School:
08-1218   Reconstruction               0-002-011  06/24/09     DONE    DONE       DONE      02/18/09   02/09/09   01/29/09   05/15/07   2,10,16                  681,955       681,955  HCM             0           0           0 King & King, Architects                 0      03/04/10                       04/02/11           

          Charles D'Amico High School:
08-1219   Reconstruction               0-004-005  06/24/09     DONE    DONE       DONE      02/18/09   02/09/09   01/29/09   05/15/07   8,16                      30,950        30,950  HCM             0           0           0 King & King, Architects                 0      03/04/10                         /  /             

          Bus Garage:
08-1220   Reconstruction               5-003-005  06/24/09     DONE    DONE       DONE      02/18/09   02/09/09   01/29/09   05/15/07   2,4                       52,430        52,430  HCM             0           0           0 King & King, Architects                 0      03/10/10                         /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




KENDALL CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 45-06-07-04
last updated on 04/22/14
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Kendall Elementary:
12-1147   Reconstruction               0-001-006  03/27/14     DONE    DONE       DONE      04/30/13   04/30/13   05/10/12   01/22/13   8,155,16                 665,948             0  DDJ             0           0           0 M/E Engineering                   665,948        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
13-0964   Reconstruction               0-001-007               DONE    STARTED    UNREVIEWED12/27/13   12/23/13   03/05/13   05/21/13   2,4,7,8,9,155,15,16            0    10,574,892  MFS             0           0           0 SWBR Architects P.C.                    0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   

          Jr/Sr High School:
12-1148   Reconstruction               0-004-006  03/27/14     DONE    DONE       DONE      04/30/13   04/30/13   05/10/12   01/22/13   8,155,16               1,039,923             0  DDJ             0           0           0 M/E Engineering                 1,039,923        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
12-0507   Reconstruction               0-004-007  03/21/13     DONE    DONE       DONE      12/05/12   12/05/12   10/09/12   09/11/12   2,10,16                  177,700       177,700  MFS             0           0      19,724 SWBR Architects P.C.                    0      11/21/13                       12/11/13         YES
                                                                                                                                                                                                                                                                                                                                   
13-0965   Additions and Alterations    0-004-008               DONE    STARTED    UNREVIEWED12/27/13   12/23/13   03/05/13   05/21/13   02 - 16                        0    12,555,312  MFS             0           0           0 SWBR Architects P.C.                    0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   

          Buildings & Grounds Shop:
  -       Reconstruction               2-002-002                                              /  /       /  /     03/05/13     /  /     2,4,7,8,9,155,15,16            0             0  MFS             0           0           0                                         0        /  /                           /  /             

          New Bus Garage:
12-1149   Reconstruction               5-005-003  03/27/14     DONE    DONE       DONE      04/30/13   04/30/13   05/17/12   01/22/13   8,155,16                  55,724             0  MFS             0           0           0 M/E Engineering                    55,724        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
13-0966   Reconstruction               5-005-004               DONE    STARTED    UNREVIEWED12/27/13   12/23/13   03/22/13   05/21/13   2,155,16                       0             0  MFS             0           0           0 SWBR Architects P.C.                    0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   

          Announcer's Booth/Storage:
  -       New Construction             7-008-001                                              /  /       /  /     07/22/09     /  /     02 - 16                        0             0  JOD             0           0           0                                         0        /  /                           /  /             

          Field Toilet Facility:
  -       New Construction             7-009-001                                              /  /       /  /     03/27/13     /  /     02 - 16                        0             0  MFS             0           0           0                                         0        /  /                           /  /             

          District-Wide:
13-0967   Reconstruction               7-999-001               DONE    STARTED    UNREVIEWED12/27/13   12/23/13   11/01/13   05/21/13   155,16                         0             0  MFS             0           0           0 SWBR Architects P.C.                    0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




HOLLEY CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 45-07-04-04
last updated on 04/22/14
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Elementary School:
10-1254   Reconstruction               0-002-005  10/20/11     DONE    DONE       DONE      05/10/11   05/03/11   03/19/10   05/18/10   2,4,7,9,10,14,155,15   5,885,989     5,855,410  HCM             0           0     101,152 SEI Design Group                        0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
10-0711   Reconstruction               0-002-006  02/03/11     DONE    DONE       DONE      01/03/11   12/29/10   12/14/10   12/20/10   8,9,10,155,15,16          48,276        48,276  HCM             0           0           0 SEI Design Group                        0      07/09/11                       03/06/13           

          Jr-Sr High School:
10-1255   Additions and Alterations    0-008-005  10/20/11     DONE    DONE       DONE      05/10/11   05/03/11   03/19/10   05/18/10   02 - 16               15,073,855    15,049,629  HCM             0           0           0 SEI Design Group                        0      12/28/12           YES           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
  -       Reconstruction               0-008-006                                              /  /       /  /     05/11/11     /  /     7,8,10,155,15,16               0    20,773,869  HCM             0           0           0                                         0        /  /                           /  /             
12-0256   Reconstruction               0-008-007  03/30/13     DONE    DONE       DONE      10/04/12   10/04/12   05/11/11   12/10/07   4,7,8,9,10,155,15,16     420,700             0  DDJ             0           0           0 SEI Design Group                        0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   

          Storage Building:
10-1256   New Construction             2-020-001  10/20/11     DONE    DONE       DONE      05/10/11   05/03/11   05/09/11   05/18/10   02 - 16                   61,126             0  HCM             0           0           0 SEI Design Group                        0      03/19/13                       05/16/13           

          Storage Building - Holley Campus:
11-1388DB Discovered Building          2-021-001               UNREVIEWED
                                                                       DONE       DONE      06/08/12   06/07/12   06/08/12     /  /                                    0             0  HCM             0           0           0 SEI Design Group                        0        /  /                           /  /             

          Bus Garage:
10-1257   Reconstruction               5-001-003  10/20/11     DONE    DONE       DONE      05/10/11   05/03/11   03/19/10   05/18/10   2,13                     105,284       105,284  HCM             0           0           0 SEI Design Group                        0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
10-1258   New Construction             5-019-001  10/20/11     DONE    DONE       DONE      05/10/11   05/03/11   03/18/10   05/18/10   02 - 16                6,205,846     6,205,846  HCM             0           0           0 SEI Design Group                        0      02/19/13                       02/19/13         YES
                                                                                                                                                                                                                                                                                                                                   

          Pump House:
09-0193   New Construction             7-016-001               STARTED DONE       DONE      ***SHPO RESPONSE***                                                                      0  HCM             0           0           0 Hunt Engineers,Architects & l           0        /  /                           /  /             

          Concession Stand:
  -    PR New Construction             7-017-001                                              /  /       /  /     02/15/11     /  /     02 - 16                        0             0  HCM             0           0           0                                         0        /  /                           /  /             

          Press Box:
10-1259   New Construction             7-018-001  10/20/11     DONE    DONE       DONE      05/10/11   05/03/11   02/15/11   05/18/10   02 - 16                   27,900             0  HCM             0           0           0 SEI Design Group                        0      03/19/13                       05/16/13           

          Leased Classroom Space (St. Mary's):
  -    XX Alterations                  8-009-001  NEED AUTH              CANCELLED          09/01/10   09/01/10   01/16/91     /  /                                    0             0  HCM             0           0           0                                         0        /  /                           /  /             

          Leased Program Space (St. Mary's):
10-0189TQ Temporary Quarters           8-017-001  09/07/10     DONE    DONE       DONE      09/13/10   08/27/10   09/13/10     /  /     02 - 16                        0             0  HCM             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




MEDINA CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 45-08-01-06
last updated on 04/22/14
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Oak Orchard Elementary School:
10-0700   Reconstruction               0-002-008  05/13/11     DONE    DONE       DONE      12/31/10   12/24/10   11/22/10   05/15/07   9,155,16                 470,981       470,981  DDJ             0           0           0 Gordon W. Jones Associates              0      03/01/13                       03/29/13         YES
                                                                                                                                                                                                                                                                                                                                   
12-0730   Reconstruction               0-002-009  09/16/13     DONE    DONE       DONE      01/29/13   01/28/13   01/08/13   05/15/07   16                        58,722             0  DDJ             0           0           0 Gordon W. Jones Associates              0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   

          Clifford H. Wise MS:
10-0701   Reconstruction               0-003-008  05/13/11     DONE    DONE       DONE      12/31/10   12/24/10   11/22/10   05/15/07   2,9,16                   534,774       534,774  DDJ             0           0           0 Gordon W. Jones Associates              0      03/01/13                       03/29/13         YES
                                                                                                                                                                                                                                                                                                                                   
12-0731   Reconstruction               0-003-009  09/16/13     DONE    DONE       DONE      01/29/13   01/28/13   01/08/13   05/15/07   2,4,8,9,10,155,15,16     471,765             0  DDJ             0           0           0 Gordon W. Jones Associates              0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   

          Medina High School:
10-0702   Reconstruction               0-006-006  05/13/11     DONE    DONE       DONE      12/31/10   12/24/10   11/22/10   05/15/07   9,155,16               1,036,059     1,036,059  DDJ             0           0   1,036,059 Gordon W. Jones Associates              0      03/01/13                       03/29/13         YES
                                                                                                                                                                                                                                                                                                                                   
12-0732   Reconstruction               0-006-007  09/16/13     DONE    DONE       DONE      01/29/13   01/28/13   01/08/13   05/15/07   155,16                   299,729             0  DDJ             0           0           0 Gordon W. Jones Associates              0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
  -       Reconstruction               0-006-008                                              /  /       /  /     01/08/13     /  /     155,16                         0             0  DDJ             0           0           0                                         0        /  /                           /  /             

          Warren P.Towne Primary School:
10-0703XX Reconstruction               0-009-005                         CANCELLED          12/31/10   12/24/10   11/22/10   05/15/07   2,9,155,15,16                  0     9,290,382  DDJ             0           0           0 Gordon W. Jones Associates              0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   

          Bus Garage:
12-0733   Reconstruction               5-005-005  09/16/13     DONE    DONE       DONE      01/29/13   01/28/13   01/08/13   05/15/07   16                        27,830             0  DDJ             0           0           0 Gordon W. Jones Associates              0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   

          The Press Box:
10-0699DB Discovered Building          7-014-001  02/03/11     DONE    DONE       DONE      12/31/10   12/24/10   11/22/10     /  /                                    0             0  DDJ             0           0           0 Gordon W. Jones Associates              0        /  /                           /  /             
10-0716   Reconstruction               7-014-002  05/13/11     DONE    DONE       DONE      01/06/11   12/24/10     /  /     05/15/07                             10,110             0  DDJ             0           0           0 Gordon W. Jones Associates              0      03/01/13                       04/29/13           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




LYNDONVILLE CENTRAL SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 45-10-01-04
last updated on 04/22/14
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          L A Webber High School:
13-0749   Reconstruction               0-001-010               DONE    STARTED    UNREVIEWED11/22/13   11/18/13   07/19/13   11/15/07   2,8,9,155,16                   0    13,671,374  DDJ             0           0           0 SEI Design Group                        0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   

          Sports Storage Shed:
  -    DB Discovered Building          2-004-001                                              /  /       /  /     03/27/14     /  /                                    0             0  DDJ             0           0           0                                         0        /  /                           /  /             

          Bus Garage:
13-0750   Additions and Alterations    5-003-004               STARTED STARTED    UNREVIEWED11/22/13   11/18/13   07/19/13   11/15/07   02 - 16                        0             0  DDJ             0           0           0 SEI Design Group                        0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




BOCES ORLEANS-NIAGARA STATUS REPORT ON CAPITAL PROJECTS
District No.: 45-90-00-00
last updated on 04/22/14
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Special Ed. Building:
11-0821   Reconstruction               0-001-004  04/02/12     DONE    DONE       DONE      02/16/12   02/16/12   06/29/11   02/08/12   2,155                    149,850       135,000  JOD             0           0           0 LaBella Associates, P.C.                0        /  /                           /  /             

          Niagara Academy(fmlyNewEH Bldg):
10-0367   Reconstruction               0-009-006  01/28/11     DONE    DONE       DONE      10/14/10   10/06/10   07/31/09   09/08/10   7                      1,086,757     1,086,757  JOD             0           0           0 LaBella Associates, P.C.                0      02/23/12                         /  /             
13-0190   Reconstruction               0-009-007  02/07/14     DONE    DONE       DONE      08/14/13   08/14/13   08/23/12   05/08/13   155                      420,000             0  JMB             0           0           0 LaBella Associates, P.C.                0        /  /                           /  /             

          Orleans Area Center:
11-0822   Reconstruction               0-011-011  04/02/12     DONE    DONE       DONE      02/16/12   02/16/12   06/29/11   02/08/12   2,10,155                 981,808       981,808  JOD             0           0           0 LaBella Associates, P.C.                0      11/06/12                       03/27/13           

          Niagara Area Center:
13-0191   Reconstruction               0-012-012  02/07/14     DONE    DONE       DONE      08/14/13   08/14/13   08/23/12   05/08/13   13,155,16              2,075,500             0  JMB             0           0           0 LaBella Associates, P.C.                0        /  /                           /  /             

          Gersh Academy:
  -    TQ Temporary Quarters           8-019-001                                              /  /       /  /     07/09/10     /  /                                    0             0  JOD             0           0           0                                         0        /  /                           /  /             

          YQCA of Niagara:
  -    TQ Temporary Quarters           8-020-001                                              /  /       /  /     07/09/10     /  /                                    0             0  JOD             0           0           0                                         0        /  /                           /  /             

          St. Mary's Parish Hall:
  -    TQ Temporary Quarters           8-021-001                                              /  /       /  /     07/09/10     /  /                                    0             0  JOD             0           0           0                                         0        /  /                           /  /             

          LaSalle Middle School:
  -    TQ Temporary Quarters           8-022-001                                              /  /       /  /     07/09/10     /  /                                    0             0  JOD             0           0           0                                         0        /  /                           /  /             

          Niagara Falls High School:
  -    TQ Temporary Quarters           8-023-001                                              /  /       /  /     07/09/10     /  /                                    0             0  JOD             0           0           0                                         0        /  /                           /  /             

          Niagara Falls Alternative School:
  -    TQ Temporary Quarters           8-024-001                                              /  /       /  /     07/09/10     /  /                                    0             0  JOD             0           0           0                                         0        /  /                           /  /             

          Emmet Belknap Middle School:
  -    TQ Temporary Quarters           8-025-001                                              /  /       /  /     07/09/10     /  /                                    0             0  JOD             0           0           0                                         0        /  /                           /  /             

          Charlotte Cross Elementary School:
  -    TQ Temporary Quarters           8-026-001                                              /  /       /  /     07/09/10     /  /                                    0             0  JOD             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED