Construction Project Status

Construction Project Status

THE STATE EDUCATION DEPARTMENT

FACILITIES PLANNING


UPDATED: 03/28/24 at 08:21:23




CLARKSTOWN CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 50-01-01-06
last updated on 03/28/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Congers Elem - Community Learning:
19-0171   Reconstruction               0-001-016  12/27/19     DONE    DONE       DONE      07/30/19   06/28/19   10/30/18   05/16/17   155,16                    22,621             0  JSS             0           0           0 Collins & Scoville Architects           0      01/07/21                       06/28/19           

          Birchwood School:
19-0172   Reconstruction               0-002-014  12/27/19     DONE    DONE       DONE      07/30/19   06/21/19   10/30/18   05/16/17   2,8,9,155,15,16          220,861       173,613  JSS             0           0           0 Collins & Scoville Architects           0      08/28/20                       06/21/19           
20-1781   Reconstruction               0-002-015  10/03/21     DONE    DONE       DONE      05/28/21   05/26/21   03/18/21   05/21/19   2,4                      343,378             0  SLC             0           0           0 CS Arch                                 0      07/27/23                       05/26/21           
22-0047   Reconstruction               0-002-016  01/24/23     DONE    DONE       DONE      07/06/22   07/05/22   11/12/21   05/21/19   2,9                       61,499             0  SLC             0           0           0 CS Arch                                 0        /  /                         07/05/22           

          New City Elementary:
19-0173   Reconstruction               0-003-015  12/27/19     DONE    DONE       DONE      07/30/19   06/21/19   10/30/18   05/16/17   2,9,155,15,16             39,997        39,997  JSS             0           0           0 Collins & Scoville Architects           0      10/16/20                       06/21/19           
20-1782   Reconstruction               0-003-016  10/03/21     DONE    DONE       DONE      05/28/21   05/26/21   03/18/21   05/21/19   2,4                      395,888       395,888  SLC             0           0           0 CS Arch                                 0      07/27/23                       05/26/21           

          Little Tor Elementary School:
19-0174   Reconstruction               0-004-016  12/27/19     DONE    DONE       DONE      07/30/19   06/21/19   10/30/18   05/16/17   2,9,155,15,16             29,225        29,225  JSS             0           0           0 Collins & Scoville Architects           0      08/28/20                       06/21/19           
20-1783   Reconstruction               0-004-017  10/03/21     DONE    DONE       DONE      05/28/21   05/26/21   03/18/21   05/21/19   4                        331,516       331,516  SLC             0           0           0 CS Arch                                 0      07/27/23                       05/26/21           

          Chestnut Grove(Data Center):
19-0175   Reconstruction               0-005-013  12/27/19     DONE    DONE       DONE      07/30/19   06/21/19   10/30/18   05/16/17   155,16                     4,847             0  JSS             0           0           0 Collins & Scoville Architects           0      01/07/21                       06/21/19           

          West Nyack Elementary School:
19-0176   Reconstruction               0-006-019  12/27/19     DONE    DONE       DONE      07/30/19   06/21/19   10/30/18   05/16/17   2,9,155,15,16             37,304        37,304  JSS             0           0           0 Collins & Scoville Architects           0      10/16/20                       06/21/19           
20-1784   Reconstruction               0-006-020  10/03/21     DONE    DONE       DONE      05/28/21   05/26/21   03/18/21   05/21/19   2,4                      351,966       351,966  SLC             0           0           0 CS Arch                                 0      07/27/23                       05/26/21           

          Bardonia Elementary School:
19-0177   Reconstruction               0-007-021  12/27/19     DONE    DONE       DONE      07/30/19   06/21/19   10/30/18   05/16/17   2,9,155,15,16            285,451       285,451  JSS             0           0           0 Collins & Scoville Architects           0      10/16/20                       06/21/19           
20-1785   Reconstruction               0-007-022  10/03/21     DONE    DONE       DONE      05/28/21   05/26/21   03/18/21   05/21/19   2                        465,893       465,893  SLC             0           0           0 CS Arch                                 0      07/27/23                       05/26/21           
  -       Reconstruction               0-007-023                                              /  /       /  /     01/23/24     /  /     2,4,7                          0             0  MSK             0           0           0                                         0        /  /                           /  /             

          Senior High School North:
19-0178   Reconstruction               0-010-024  12/27/19     DONE    DONE       DONE      07/30/19   06/21/19   10/30/18   05/16/17   2,9,10,14,155,15,16    1,827,214     1,827,214  JSS             0           0           0 Collins & Scoville Architects           0      08/28/20                       06/21/19           
22-0698   Reconstruction               0-010-025  01/24/23     DONE    DONE       DONE      10/12/22   10/11/22   11/12/21   05/21/19   2,15,16                3,070,000     3,070,000  SLC             0           0           0 CS Arch                                 0        /  /                         10/11/22           

          Laurel Plains Elementary:
19-0179   Reconstruction               0-011-014  12/27/19     DONE    DONE       DONE      07/30/19   06/21/19   10/30/18   05/16/17   2,9,10,155,15,16       1,177,238     1,177,238  JSS             0           0           0 Collins & Scoville Architects           0      10/30/20           YES         06/21/19           

          Felix Festa Junior High:
19-0180   Reconstruction               0-012-033  12/27/19     DONE    DONE       DONE      07/30/19   06/21/19   10/30/18   05/17/16   2,8,9,155,15,16        3,275,712     3,275,712  JSS             0           0           0 Collins & Scoville Architects           0      08/28/20                       06/21/19           
22-0699   Reconstruction               0-012-034  01/25/23     DONE    DONE       DONE      10/12/22   10/11/22   11/12/21   05/21/19   2,15,16                  708,000             0  SLC             0           0           0 CS Arch                                 0        /  /                         10/11/22           

          Dina Link Elementary:
19-0181   Reconstruction               0-013-015  12/27/19     DONE    DONE       DONE      07/30/19   06/21/19   10/30/18   05/16/17   2,9,155,15,16              9,297             0  JSS             0           0           0 Collins & Scoville Architects           0      08/28/20                       06/21/19           
20-1786   Reconstruction               0-013-016  10/03/21     DONE    DONE       DONE      05/28/21   05/26/21   03/18/21   05/21/19   2,4                      334,112       334,112  SLC             0           0           0 CS Arch                                 0      07/27/23                       05/26/21           

          Woodglen Elementary:
19-0182   Reconstruction               0-016-015  12/27/19     DONE    DONE       DONE      07/30/19   06/21/19   10/30/18   05/16/17   2,9,155,15,16             14,145        14,145  JSS             0           0           0 Collins & Scoville Architects           0      08/28/20                       06/21/19           
20-1787   Reconstruction               0-016-016  10/03/21     DONE    DONE       DONE      05/28/21   05/26/21   03/18/21   05/21/19                            330,124       330,124  SLC             0           0           0 CS Arch                                 0      07/27/23                       05/26/21           

          Lakewood Elementary School:
19-0183   Reconstruction               0-017-012  12/27/19     DONE    DONE       DONE      07/30/19   06/21/19   10/30/18   05/16/17   2,9,155,15,16             14,145        14,145  JSS             0           0           0 Collins & Scoville Architects           0      08/28/20                       06/21/19           
20-1788   Reconstruction               0-017-013  10/03/21     DONE    DONE       DONE      05/28/21   05/26/21   03/18/21   05/21/19   2,4                      371,761       371,761  SLC             0           0           0 CS Arch                                 0      07/27/23                       05/26/21           

          Senior High School South:
19-0184   Reconstruction               0-018-025  12/27/19     DONE    DONE       DONE      07/30/19   06/21/19   10/30/18   05/16/17   2,9,155,15,16          2,321,131     2,321,131  JSS             0           0           0 Collins & Scoville Architects           0      10/30/20                       06/21/19           
  -       Reconstruction               0-018-027                                              /  /       /  /     06/01/21     /  /     4,7                            0             0  SLC             0           0           0                                         0        /  /                           /  /             
22-0700   Reconstruction               0-018-028  01/24/23     DONE    DONE       DONE      10/12/22   10/11/22   11/12/21   05/21/19   7,9,155,16               422,000       422,000  SLC             0           0           0 CS Arch                                 0        /  /                         10/11/22           

          Strawtown Elementary:
19-0185   Reconstruction               0-019-017  12/27/19     DONE    DONE       DONE      07/30/19   06/21/19   10/30/18   05/16/17   2,9,155,15,16              9,836             0  JSS             0           0           0 Collins & Scoville Architects           0      10/16/20                       06/21/19           
20-1789   Reconstruction               0-019-018  10/03/21     DONE    DONE       DONE      05/28/21   05/26/21   03/18/21   05/21/19   2,4                      375,362       375,362  SLC             0           0           0 CS Arch                                 0      07/27/23                       05/26/21           

          XXBus Garage - use 5-022:
19-0186   Reconstruction               5-005-005  12/27/19     DONE    DONE       DONE      07/30/19   06/21/19     /  /     05/16/17   155,16                     2,154             0  JSS             0           0           0 Collins & Scoville Architects           0      01/07/21                       06/21/19           

          Baseball Press Box:
22-2153DB Discovered Building          7-040-001                       ADDENDUM REQ'D       05/05/23   05/05/23     /  /       /  /                                    0             0  MSK             0           0           0                                         0        /  /                         05/05/23           

          District-Wide:
23-0633FA Reconstruction               7-999-011  11/03/23     DONE    DONE       DONE      10/06/23   09/19/23   07/14/23   08/31/23   16                     3,885,016             0  MSK             0           0           0 CS Arch                                 0        /  /                         09/19/23           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




NANUET UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 50-01-08-03
last updated on 03/28/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Miller Elementary:
18-1325   Reconstruction               0-001-021  03/28/19     DONE    DONE       DONE      01/24/19   01/22/19   12/03/18   05/15/18   2,9,155,15,16            175,500       175,500  SLC             0           0           0 KSQ Design                              0      10/21/19                       01/22/19           
19-0862   Reconstruction               0-001-022  01/21/20     DONE    DONE       DONE      11/25/19   11/12/19   08/09/19   05/15/18   9,155,16               2,993,198     2,993,198  SLC             0           0           0 KSQ Design                              0      09/16/21                       11/12/19           
22-0165FC Reconstruction               0-001-023  12/05/22     DONE    DONE       DONE      07/27/22   06/29/22   02/14/22   10/28/21   2,4,8,9,10,155,15,16   2,651,181     2,651,181  WLC             0           0           0 KSQ Design                              0        /  /                         06/29/22           
21-1714   Reconstruction               0-001-024  07/05/22     DONE    DONE       DONE      04/27/22   04/25/22   04/05/22   05/21/19   2,9                      981,750       981,750  FMJ             0           0           0 KSQ Design                              0      09/13/22                       04/25/22           
23-0784   Reconstruction               0-001-025                         UNREVIEWED         10/23/23   10/17/23   05/02/23   10/28/21   2,4,7,8,9,14,155,16            0             0  WLC             0           0           0 KSQ Design                              0        /  /                         10/17/23           

          Highview Elementary:
18-1326   Reconstruction               0-002-018  03/28/19     DONE    DONE       DONE      01/24/19   01/22/19   12/03/18   05/15/18   2,9,155,15,16          1,871,100     1,871,100  SLC             0           0           0 KSQ Design                              0      10/21/19                       01/22/19           
22-0163   Reconstruction               0-002-019  12/05/22     DONE    DONE       DONE      07/27/22   06/29/22   02/22/22   10/28/21   2                         69,881             0  WLC             0           0           0 KSQ Design                              0        /  /                         06/29/22           

          Senior High:
18-1327   Reconstruction               0-003-030  03/28/19     DONE    DONE       DONE      01/24/19   01/22/19   12/03/18   05/16/17   2,4,8,9,155,15,16        854,000       854,000  SLC             0           0           0 KSQ Design                              0      09/26/19                       01/22/19           
21-0703FB Reconstruction               0-003-031  03/25/22     DONE    DONE       DONE      11/15/21   11/12/21   09/21/21   10/28/21   8,9,155,16            11,519,716     6,950,450  SLC             0           0           0 KSQ Design                              0      11/25/22                       11/12/21           
21-1639   Reconstruction               0-003-032  07/26/22     DONE    DONE       DONE      04/08/22   04/06/22   02/14/22   10/28/21   14,16                    818,643       675,536  WLC             0           0           0 KSQ Design                              0      05/02/23                       04/06/22           
22-0166FA Reconstruction               0-003-034  12/05/22     DONE    DONE       DONE      07/27/22   06/29/22   03/07/22   10/28/21   2,4,8,9,10,155,15,16   6,939,420     6,847,820  WLC             0           0           0 KSQ Design                              0        /  /                         06/29/22           
22-1462   Reconstruction               0-003-035  05/18/23     DONE    DONE       DONE      01/11/23   01/10/23   10/19/22   10/28/21   2,4,7,8,9,10,155,15,  11,312,290    11,312,290  WLC             0           0           0 KSQ Design                              0        /  /                         01/10/23           
23-0785   Reconstruction               0-003-036                         UNREVIEWED         10/23/23   10/17/23   05/02/23   11/23/21   2,8,9,155,15,16                0             0  WLC             0           0           0 KSQ Design                              0        /  /                         10/17/23           

          Barr Middle School:
22-0164   Reconstruction               0-004-019  12/05/22     DONE    DONE       DONE      07/27/22   06/29/22   02/14/22   10/28/21   4,8,9,155,15,16        2,765,128     2,765,128  WLC             0           0           0 KSQ Design                              0        /  /                         06/29/22           
22-1463   Reconstruction               0-004-020  05/18/23     DONE    DONE       DONE      01/11/23   01/10/23   10/19/22   10/28/21   2,7,9,14,155,16       10,414,301    10,414,301  WLC             0           0           0 KSQ Design                              0        /  /                         01/10/23           
23-0786   Reconstruction               0-004-021                         UNREVIEWED         10/23/23   10/17/23   05/02/23   10/28/21   2,8,9,10,155,15,16             0             0  WLC             0           0           0 KSQ Design                              0        /  /                         10/17/23           

          Electrical Shed:
  -    PR New Construction             2-020-001                                              /  /       /  /     10/29/21     /  /     02 - 16                        0             0  SLC             0           0           0                                         0        /  /                           /  /             
21-0704   New Construction             2-020-001  03/25/22     DONE    DONE       DONE      11/15/21   11/12/21   10/29/21   10/28/21   02 - 16                   40,000             0  WLC             0           0           0 KSQ Design                              0      09/20/22                       11/12/21           

          Public Library:
19-0198   Reconstruction               6-005-005  10/16/19     DONE    DONE       DONE      07/30/19   07/30/19     /  /     02/04/19   8,9,10,155,15,16         149,747             0  SLC             0           0           0 BUTLER ROWLAND MAYS ARCHITECT           0        /  /                         07/30/19           
23-0059   Reconstruction               6-005-006  08/01/23     DONE    DONE       DONE      07/12/23   07/12/23   05/19/23     /  /     2,16                     438,743             0  WLC             0           0           0 BUTLER ROWLAND MAYS ARCHITECT           0        /  /                         07/12/23           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




NORTH ROCKLAND/HAVERSTRAW-STONY PT STATUS REPORT ON CAPITAL PROJECTS
District No.: 50-02-01-06
last updated on 03/28/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Farley Elementary:
22-1686   Reconstruction               0-003-011  08/03/23     DONE    DONE       DONE      02/15/23   02/15/23   07/14/22   05/17/22   155                    5,865,000     5,865,000  WLC             0           0           0 Michael Shilale Architects,LL           0        /  /                         02/15/23           
  -       Reconstruction               0-003-012                                              /  /       /  /     10/24/23     /  /     4,8                            0             0  WLC             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-003-013                                              /  /       /  /     01/19/24     /  /     2,16                           0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Haverstraw Elementary:
21-0280   Reconstruction               0-009-018  12/15/21     DONE    DONE       DONE      09/03/21   09/03/21   04/28/21   05/18/21   155                    3,800,000     3,800,000  JLB             0           0           0 Michael Shilale Architects,LL           0        /  /                         09/03/21           
22-1687   Reconstruction               0-009-019  08/03/23     DONE    DONE       DONE      02/15/23   02/15/23   07/18/22   05/17/22   8                        720,000       720,000  WLC             0           0           0 Michael Shilale Architects,LL           0        /  /                         02/15/23           
  -       Reconstruction               0-009-020                                              /  /       /  /     01/19/24     /  /     2,16                           0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Gerald F. Neary Elementary:
20-0929   Reconstruction               0-011-008  02/16/21     DONE    DONE       DONE      12/04/20   11/12/20   10/02/20   06/09/20   155                      450,000       450,000  JLB             0           0           0 Michael Shilale Architects,LL           0      12/28/22                       11/12/20           

          Stony Point Elementary:
  -    XX Additions and Alterations    0-014-010                         CANCELLED            /  /       /  /     04/28/21     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-014-011                                              /  /       /  /     11/16/21     /  /     4,8                            0             0  JLB             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-014-012                                              /  /       /  /     10/24/23     /  /     155,16                         0             0  WLC             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-014-013                                              /  /       /  /     01/19/24     /  /     2,16                           0             0  WLC             0           0           0                                         0        /  /                           /  /             

          North Rockland High School:
18-1060   Reconstruction               0-016-027  06/06/19     DONE    DONE       DONE      12/12/18   12/06/18   11/20/18   05/21/19   155                      100,000       100,000  JLB             0           0           0 Michael Shilale Architects,LL           0      01/03/20                       12/06/18           
19-0774   Reconstruction               0-016-028  01/10/20     DONE    DONE       DONE      11/13/19   11/04/19   08/09/19   09/17/19   155                      500,000       500,000  JLB             0           0           0 Michael Shilale Architects,LL           0      09/02/21                       11/04/19           
20-0930FC Reconstruction               0-016-029  02/16/21     DONE    DONE       DONE      12/04/20   11/12/20   08/22/19   06/09/20   155                    2,605,239     2,605,239  JLB             0           0           0 Michael Shilale Architects,LL           0      03/28/23                       11/12/20           
  -    XX Reconstruction               0-016-030                         CANCELLED            /  /       /  /     01/22/20     /  /     155                            0             0  JLB             0           0           0                                         0        /  /                           /  /             
  -    XX Additions and Alterations    0-016-031                         CANCELLED            /  /       /  /     04/28/21     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                           /  /             
21-0441   Reconstruction               0-016-032  11/18/21     DONE    DONE       DONE      09/29/21   09/28/21   06/23/21   05/18/21   7                      1,850,000     1,850,000  JLB             0           0           0 Michael Shilale Architects,LL           0      11/08/22                       09/28/21           
21-0463   Reconstruction               0-016-033  12/07/21     DONE    DONE       DONE      10/04/21   10/01/21   07/23/21   05/18/21   2,4,8,9,155,15,16        300,000       300,000  JLB             0           0           0 Michael Shilale Architects,LL           0        /  /                         10/01/21           
21-1354   Reconstruction               0-016-034  06/01/22     DONE    DONE       DONE      02/23/22   02/18/22   11/16/21   05/18/21   4,8                      100,000       100,000  JLB             0           0           0 Michael Shilale Architects,LL           0      05/15/23                       02/18/22           
22-0909   Reconstruction               0-016-035  02/03/23     DONE    DONE       DONE      11/07/22   11/01/22   07/01/22   05/17/22   2,4,7,8,9,10,155,16    8,835,000     8,835,000  WLC             0           0           0 Michael Shilale Architects,LL           0      09/01/23                       11/01/22           
23-1148   Reconstruction               0-016-036                         UNREVIEWED         12/08/23   12/07/23   11/07/23   12/04/23   2,155                          0             0  WLC             0           0           0 Michael Shilale Architects,LL           0        /  /                         12/07/23           
23-1563   Reconstruction               0-016-037                         UNREVIEWED         03/01/24   02/29/24   12/14/23   12/05/23   4,155,16                       0             0  WLC             0           0           0 Michael Shilale Architects,LL           0        /  /                         02/29/24           
  -       Reconstruction               0-016-038                                              /  /       /  /     01/19/24     /  /     2,16                           0             0  WLC             0           0           0                                         0        /  /                           /  /             

          West Haverstraw Elementary:
  -    XX Additions and Alterations    0-024-013                         CANCELLED            /  /       /  /     04/28/21     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-024-014                                              /  /       /  /     09/29/23     /  /     4,8                            0    18,688,997  WLC             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-024-015                                              /  /       /  /     10/24/23     /  /     155,16                         0             0  WLC             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-024-016                                              /  /       /  /     01/19/24     /  /     2,16                           0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Thiells Elementary School:
  -    XX Additions and Alterations    0-025-015                         CANCELLED            /  /       /  /     04/28/21     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-025-016                                              /  /       /  /     11/16/21     /  /     4,8                            0             0  JLB             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-025-017                                              /  /       /  /     09/29/23     /  /     4,8                            0             0  WLC             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-025-018                                              /  /       /  /     10/24/23     /  /     155,16                         0             0  WLC             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-025-019                                              /  /       /  /     01/19/24     /  /     2,16                           0             0  WLC             0           0           0                                         0        /  /                           /  /             

          XXPress Box Demo:
  -       Reconstruction               0-026-001                                              /  /       /  /     07/01/22     /  /                                    0             0  FMJ             0           0           0                                         0        /  /                           /  /             

          Willow Grove Elemly (8-030):
21-1355   Reconstruction               0-030-014  06/01/22     DONE    DONE       DONE      02/23/22   02/18/22   11/16/21   05/17/22   4,8                      100,000        89,082  JLB             0           0           0 Michael Shilale Architects,LL           0        /  /                         02/18/22           
22-1409   Reconstruction               0-030-015  05/02/23     DONE    DONE       DONE      01/06/23   01/04/23   07/18/22   05/17/22   7                      4,325,000     4,325,000  WLC             0           0           0 Michael Shilale Architects,LL           0      08/29/23                       01/04/23           
22-1688   Reconstruction               0-030-016  08/03/23     DONE    DONE       DONE      02/15/23   02/15/23   07/18/22   05/17/22   155                    3,775,000             0  WLC             0           0           0 Michael Shilale Architects,LL           0        /  /                         02/15/23           
  -       Reconstruction               0-030-017                                              /  /       /  /     01/19/24     /  /     2,16                           0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Fieldstone Middle School:
22-2383   Reconstruction               0-031-005  12/28/23     DONE    DONE       DONE      06/14/23   06/14/23   04/07/23   06/07/22   9,155,16               2,133,275     2,133,275  WLC             0           0     324,288 CLARK PATTERSON LEE                     0        /  /                         06/14/23           

          XXHaverstraw Mid Annex Demo:
22-1936   Reconstruction               1-010-002  07/10/23     DONE    DONE       DONE      03/24/23   03/24/23   01/24/23   05/17/22                            371,900             0  WLC             0           0           0 Michael Shilale Architects,LL           0        /  /                         03/24/23           

          Buckberg Warehouse:
  -       Reconstruction               2-015-003                         UNREVIEWED         07/24/20   07/17/20   05/15/20   02/04/20   2                      3,122,694             0  JLB             0           0           0 Michael Shilale Architects,LL   3,122,694        /  /                         07/17/20           

          Field House:
22-0910   Reconstruction               7-008-001  02/02/23     DONE    DONE       DONE      11/07/22   11/01/22   07/01/22   05/17/22   2,4,7,8,9                280,000             0  WLC             0           0           0 Michael Shilale Architects,LL           0        /  /                         11/01/22           

          XXPress Box Demo:
22-0911   Reconstruction               7-026-001  02/03/23     DONE    DONE       DONE      11/07/22   11/01/22   07/01/22   05/17/22                            202,500             0  JJH             0           0           0 Michael Shilale Architects,LL           0        /  /                         11/01/22           

          xxTent 1 @ James Farley Elem.:
  -    XX New Construction             7-060-001                         CANCELLED            /  /       /  /     03/29/21     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                           /  /             

          xxTent 2 @ James Farley Elem.:
  -    XX New Construction             7-061-001                         CANCELLED            /  /       /  /     03/29/21     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                           /  /             

          xxTent @ Haverstraw Elem. School:
  -    XX New Construction             7-062-001                         CANCELLED            /  /       /  /     03/29/21     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                           /  /             

          xxTent 1 @ Willow Grove Elem.:
  -    XX New Construction             7-063-001                         CANCELLED            /  /       /  /     03/29/21     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                           /  /             

          xxTent 2 @ Willow Grove Elem.:
  -    XX New Construction             7-064-001                         CANCELLED            /  /       /  /     03/29/21     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                           /  /             

          xxTent 1 @ Stony Point Elem.:
  -    XX New Construction             7-065-001                         CANCELLED            /  /       /  /     03/29/21     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                           /  /             

          xxTent 2 @ Stony Point Elem.:
  -    XX New Construction             7-066-001                         CANCELLED            /  /       /  /     03/29/21     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                           /  /             

          xxTent 1 @ Thiells Elem.:
  -    XX New Construction             7-067-001                         CANCELLED            /  /       /  /     03/29/21     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                           /  /             

          xxTent 2 @ Thiells Elem.:
  -    XX New Construction             7-068-001                         CANCELLED            /  /       /  /     03/29/21     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                           /  /             

          xxTent 1 @ West Haverstraw Elem.:
  -    XX New Construction             7-069-001                         CANCELLED            /  /       /  /     03/29/21     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                           /  /             

          xxTent 2 @ West Haverstraw Elem.:
  -    XX New Construction             7-070-001                         CANCELLED            /  /       /  /     03/29/21     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                           /  /             

          xxTent 1 @ Fieldstone MS:
  -    XX New Construction             7-071-001                         CANCELLED            /  /       /  /     03/29/21     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                           /  /             

          xxTent 2 @ Fieldstone MS:
  -    XX New Construction             7-072-001                         CANCELLED            /  /       /  /     03/29/21     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                           /  /             

          Pavilion @ NRHS:
21-0287FA New Construction             7-073-001  11/24/21     DONE    DONE       DONE      09/03/21   09/03/21   07/23/21   05/18/21   02 - 16                  413,160             0  JLB             0           0           0 Michael Shilale Architects,LL           0        /  /                         09/03/21           

          Pavilion @ West Haverstraw Elem.:
21-0288FA New Construction             7-074-001  11/24/21     DONE    DONE       DONE      09/03/21   09/03/21   07/23/21   05/18/21   02 - 16                  304,780             0  JLB             0           0           0 Michael Shilale Architects,LL           0        /  /                         09/03/21           

          Pavilion @ Thiells Elem.:
21-0289FA New Construction             7-075-001  11/24/21     DONE    DONE       DONE      09/03/21   09/03/21   07/23/21   05/18/21   02 - 16                  299,800             0  JLB             0           0           0 Michael Shilale Architects,LL           0        /  /                         09/03/21           

          Pavilion @ Stony Point Elem.:
21-0290FA New Construction             7-076-001  11/24/21     DONE    DONE       DONE      09/03/21   09/03/21   07/23/21   05/18/21   02 - 16                  301,600             0  JLB             0           0           0 Michael Shilale Architects,LL           0        /  /                         09/03/21           

          Caretaker's Garage:
22-0054DB Discovered Building          7-077-001  07/29/22     DONE    DONE       DONE      07/06/22     /  /     05/18/22     /  /                                    0             0  JLB             0           0           0                                         0      03/30/23                         /  /             

          Caretaker's House:
22-0055DB Discovered Building          7-078-001  07/29/22     DONE    DONE       DONE      07/06/22     /  /     05/23/22     /  /                                    0             0  JLB             0           0           0                                         0      03/30/23                         /  /             

          Press Box/Concession Stand (New):
  -    PR New Construction             7-079-001                                              /  /       /  /     07/01/22     /  /     02 - 16                        0             0  WLC             0           0           0                                         0        /  /                           /  /             
22-0912   New Construction             7-079-001  02/02/23     DONE    DONE       DONE      11/07/22   11/01/22   07/01/22   05/17/22   02 - 16                1,220,000             0  WLC             0           0           0 Michael Shilale Architects,LL           0        /  /                         11/01/22           

          Press Box - Softball:
  -       New Construction             7-090-001                                              /  /       /  /     11/07/23     /  /     02 - 16                        0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Press Box - Baseball:
  -       New Construction             7-091-001                                              /  /       /  /     11/07/23     /  /     02 - 16                        0             0  WLC             0           0           0                                         0        /  /                           /  /             

          District-Wide:
18-0069   Reconstruction               7-999-005  04/26/19     DONE    DONE       DONE      07/16/18   06/27/18   10/17/17   11/04/14                          2,012,357             0  MTM             0           0           0 Michael Shilale Architects,LL           0        /  /                         06/27/18           
20-0120   Reconstruction               7-999-006  09/18/20     DONE    DONE       DONE      07/24/20   07/17/20   08/21/20   02/04/20   16                     3,122,694             0  JLB             0           0           0                                 3,122,694        /  /                         07/17/20           

          XXSt.Peters School(no longer leased):
19-0349TQ Temporary Quarters           8-059-001  09/05/19     DONE    DONE       DONE      08/30/19   08/30/19   08/30/19     /  /                                    0             0  JLB             0           0           0                                         0        /  /                         08/30/19           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




SOUTH ORANGETOWN CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 50-03-01-06
last updated on 03/28/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Tappan Zee High School:
18-0940   Reconstruction               0-006-028  05/21/19     DONE    DONE       DONE      11/28/18   11/20/18   10/22/18   05/16/17   2,8,9,155,15,16        1,711,820     1,711,820  MTM             0           0           0 Clark Patterson Lee                     0      09/11/20                       11/20/18           
20-1663   Reconstruction               0-006-029  07/26/21     DONE    DONE       DONE      05/03/21   04/26/21   01/12/21   05/18/21   9,16                     697,442       697,442  JLB             0           0           0 Clark Patterson Lee                     0        /  /                         04/26/21           
21-0006FC Reconstruction               0-006-030  12/17/21     DONE    DONE       DONE      07/06/21   07/02/21   06/23/21   05/18/21   2,4,7,8,9,155,15,16    1,140,046     1,140,046  JLB             0           0           0 Clark Patterson Lee                     0      10/04/22                       07/02/21           
21-1936   Reconstruction               0-006-031  09/09/22     DONE    DONE       DONE      06/06/22   06/06/22   07/23/21   05/17/22   2,8,9,10,155,15,16       879,280       879,280  JLB             0           0           0 Clark Patterson Lee                     0      09/25/23                       06/06/22           
22-1476   Reconstruction               0-006-032  08/10/23     DONE    DONE       DONE      01/13/23   01/12/23   07/06/22   03/08/22   16                       326,608       326,608  JJH             0           0           0 Clark Patterson Lee                     0        /  /                         01/12/23           
23-0643   Reconstruction               0-006-033               UNREVIEWED
                                                                       STARTED    UNREVIEWED10/06/23   10/04/23   03/21/23   03/08/22   2,4,7,8,9,155,15,16            0             0  JJH             0           0           0 Clark Patterson Lee                     0        /  /                         10/04/23           

          Cottage Lane Elementary:
18-0941   Reconstruction               0-010-019  05/21/19     DONE    DONE       DONE      11/28/18   11/20/18   10/22/18   05/16/17   2,7,8,9,155,15,16      1,114,364     1,114,364  MTM             0           0           0 Clark Patterson Lee                     0      09/21/20                       11/20/18           
20-1305   Reconstruction               0-010-020  07/26/21     DONE    DONE       DONE      02/16/21   02/05/21   01/12/21   05/18/21   9,16                     298,904       298,904  JLB             0           0           0 Clark Patterson Lee                     0      09/27/22                       02/05/21           
21-1937   Reconstruction               0-010-021  09/09/22     DONE    DONE       DONE      06/06/22   06/06/22   07/23/21   05/17/22   2,8,9,10,155,15,16       604,366       604,366  JLB             0           0           0 Clark Patterson Lee                     0      09/25/23                       06/06/22           
22-1477   Reconstruction               0-010-022  08/10/23     DONE    DONE       DONE      01/13/23   01/12/23   07/06/22   03/08/22   2,4,7,8,9,155,15,16    6,609,595     6,609,595  JJH             0           0           0 Clark Patterson Lee                     0        /  /                         01/12/23           
22-1478   Reconstruction               0-010-023  08/10/23     DONE    DONE       DONE      01/13/23   01/12/23   07/26/22   05/17/22   16                       327,000       327,000  JJH             0           0           0 Clark Patterson Lee                     0        /  /                         01/12/23           

          William Schaefer Elementary:
20-1306   Reconstruction               0-012-017  07/26/21     DONE    DONE       DONE      02/16/21   02/05/21   01/12/21   05/18/21   2,4,8,9,10,13,15,16      547,989       547,989  JLB             0           0           0 Clark Patterson Lee                     0      09/27/22                       02/05/21           
  -       Reconstruction               0-012-018                                              /  /       /  /     07/23/21     /  /     2,4,7,8,9,155,15,16            0             0  JLB             0           0           0                                         0        /  /                           /  /             
22-1479   Reconstruction               0-012-019  08/10/23     DONE    DONE       DONE      01/13/23   01/12/23   07/06/22   03/08/22   2,4,7,8,9,155,15,16    9,188,219     9,188,219  JJH             0           0           0 Clark Patterson Lee                     0        /  /                         01/12/23           
22-1480   Reconstruction               0-012-020  08/10/23     DONE    DONE       DONE      01/13/23   01/12/23   07/26/22   03/08/22   16                       332,000       332,000  JJH             0           0           0 Clark Patterson Lee                     0        /  /                         01/12/23           

          Middle School:
18-0942   Reconstruction               0-013-026  05/21/19     DONE    DONE       DONE      11/28/18   11/20/18   10/22/18   05/16/17   2,4,8,9,155,15,16      3,325,725     3,325,725  MTM             0           0           0 Clark Patterson Lee                     0      03/05/21                       11/20/18           
20-1664   Reconstruction               0-013-027  07/26/21     DONE    DONE       DONE      05/03/21   04/26/21   01/12/21   05/18/21   9,16                     996,346             0  JLB             0           0           0 Clark Patterson Lee                     0        /  /                         04/26/21           
21-1938   Reconstruction               0-013-028  09/09/22     DONE    DONE       DONE      06/06/22   06/06/22   07/23/21   05/18/22   2,8,9,10,155,15,16       309,429       309,429  JLB             0           0           0 Clark Patterson Lee                     0        /  /                         06/06/22           
22-1554   Reconstruction               0-013-029               STARTED DONE       DONE      01/25/23   01/23/23   11/09/22   12/01/22   9                        408,625       408,625  JJH             0           0           0 Clark Patterson Lee                     0        /  /                         01/23/23           
22-1481XX Reconstruction               0-013-030                         CANCELLED          01/13/23   01/12/23   12/05/22   03/08/22   2,7,9,16                       0    30,868,614  JJH             0           0           0 Clark Patterson Lee                     0        /  /                         01/12/23           
23-0559   Reconstruction               0-013-031               UNREVIEWED
                                                                       DONE       STARTED   09/27/23   09/25/23   07/03/23   05/16/23   2,8,9,155,15,16                0             0  JJH             0           0           0 Clark Patterson Lee                     0        /  /                         09/25/23           
  -       Reconstruction               0-013-032                                              /  /       /  /     01/03/24     /  /     2,7,9,10,155,15,16             0             0  JJH             0           0           0                                         0        /  /                           /  /             

          XXPress Box (demo'd 2018):
18-0943   Reconstruction               7-003-001  05/21/19     DONE    DONE       DONE      11/28/18   11/20/18   10/10/18   05/16/17   2                         63,000             0  MTM             0           0           0 Clark Patterson Lee                     0      09/11/20           YES         11/20/18           

          Press Box:
18-0944   New Construction             7-024-001  05/21/19     DONE    DONE       DONE      11/28/18   11/20/18   10/11/18   05/16/17   02 - 16                  347,092             0  MTM             0           0           0 Clark Patterson Lee                     0      01/30/21                       11/20/18           

          XXWilliam Schaefer Outdoor Classrm:
  -    XX New Construction             7-050-001                         CANCELLED            /  /       /  /     07/06/22     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                           /  /             

          XXTappan Zee H.S. Outdoor Classroom:
  -    XX New Construction             7-051-001                         CANCELLED            /  /       /  /     07/06/22     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                           /  /             

          XXMiddle School Outdoor Classroom:
  -    XX New Construction             7-052-001                         CANCELLED            /  /       /  /     07/06/22     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                           /  /             

          Schaefer Elem Outdoor Classrm:
  -    PR New Construction             7-053-001                                              /  /       /  /     04/17/23     /  /     02 - 16                        0             0  JJH             0           0           0                                         0        /  /                           /  /             
22-2478   New Construction             7-053-001  08/10/23     DONE    DONE       DONE      06/30/23   05/25/23   04/17/23   03/08/22   02 - 16                  246,801             0  JJH             0           0           0 Clark Patterson Lee                     0        /  /                         05/25/23           

          Cottage Lane Elem Outdoor Classrm:
  -    PR New Construction             7-054-001                                              /  /       /  /     04/17/23     /  /     02 - 16                        0             0  JJH             0           0           0                                         0        /  /                           /  /             
22-2479   New Construction             7-054-001  08/10/23     DONE    DONE       DONE      06/30/23   05/25/23   04/17/23   03/08/22   02 - 16                  246,801             0  JJH             0           0           0 Clark Patterson Lee                     0        /  /                         05/25/23           

          Tappan Zee HS Outdoor Classrm:
  -    PR New Construction             7-055-001                                              /  /       /  /     04/17/23     /  /     02 - 16                        0             0  JJH             0           0           0                                         0        /  /                           /  /             
22-2480   New Construction             7-055-001  08/10/23     DONE    DONE       DONE      06/30/23   05/25/23   04/17/23   03/08/22   02 - 16                  224,753             0  JJH             0           0           0 Clark Patterson Lee                     0        /  /                         05/25/23           

          MS Outdoor Classrm:
  -    PR New Construction             7-056-001                                              /  /       /  /     04/17/23     /  /     02 - 16                        0             0  JJH             0           0           0                                         0        /  /                           /  /             
22-2481   New Construction             7-056-001  08/10/23     DONE    DONE       DONE      06/30/23   05/25/23   04/17/23   03/08/22   02 - 16                  224,753             0  JJH             0           0           0 Clark Patterson Lee                     0        /  /                         05/25/23           

          Districtwide:
21-1759SB Reconstruction               7-999-004               DONE                           /  /       /  /     05/04/22     /  /     16                             0             0  JLB             0           0           0                                         0        /  /                           /  /             
22-0872   Reconstruction               7-999-004  02/07/23     DONE    DONE       DONE      10/31/22   10/31/22   05/04/22   11/04/14   16                     1,029,143             0  JJH             0           0           0 Clark Patterson Lee                     0        /  /                         10/31/22           

          Cottage Lane Library:
22-1482   Reconstruction               8-023-002  08/10/23     DONE    DONE       DONE      01/13/23   01/12/23   08/29/22   05/17/22   16                         5,750             0  JJH             0           0           0 Clark Patterson Lee                     0        /  /                         01/12/23           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




NYACK UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 50-03-04-03
last updated on 03/28/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Valley Cottage Elementary:
18-1607   Reconstruction               0-001-012  05/13/19     DONE    DONE       DONE      03/07/19   02/25/19   11/29/18   05/15/18   2,4,8,9,10,16            148,346       148,346  SLC             0           0           0 LAN Associates                          0      11/01/21                       02/25/19           
20-0981   Reconstruction               0-001-013  03/31/21     DONE    DONE       DONE      12/16/20   12/02/20   08/19/19   03/19/19   8,9,10,155,15,16         660,924       660,924  JSS             0           0           0 Kaeyer, Garment & Davidson              0      04/22/22                       12/02/20           
19-1703   Reconstruction               0-001-014  06/16/20     DONE    DONE       DONE      04/24/20   03/18/20   10/28/19   01/14/20   10                        44,000        44,000  JSS             0           0           0 LAN Associates                          0      03/09/21                       03/18/20           
20-0031   Reconstruction               0-001-015  09/01/20     DONE    DONE       DONE      07/08/20   06/25/20   12/17/19   12/10/19   2,10,155,16              560,089       560,089  JSS             0           0           0 ECG Engineering, LLC              443,819      06/30/23                       06/25/20           
22-0182FA Reconstruction               0-001-016  05/08/23     DONE    DONE       DONE      07/27/22   07/26/22   01/25/22   05/17/22   2,8,9,155,16           1,140,000     1,140,000  WLC             0           0           0 Kaeyer, Garment & Davidson              0        /  /                         07/26/22           

          Old Nyack HS Leased to BOCES:
19-1704   Reconstruction               0-003-018  06/16/20     DONE    DONE       DONE      04/24/20   03/18/20   10/28/19   01/14/20   10                        44,000        44,000  JSS             0           0           0 LAN Associates                          0      03/23/21                       03/18/20           

          Nyack Middle School:
18-1608   Reconstruction               0-004-015  05/13/19     DONE    DONE       DONE      03/07/19   02/25/19   11/29/18   05/15/18   2,4,8,9,10,16            176,291       176,291  SLC             0           0           0 LAN Associates                          0      11/01/21                       02/25/19           
19-0985   Reconstruction               0-004-016  02/11/20     DONE    DONE       DONE      12/12/19   11/15/19   06/28/19   03/19/19   8,9,10,155,15,16       1,829,400     1,829,400  JSS             0           0           0 Kaeyer, Garment & Davidson              0      12/28/20                       11/15/19           
19-1705   Reconstruction               0-004-017  03/17/20     DONE    DONE       DONE      04/24/20   03/18/20   10/28/19   01/14/20   10                        56,000        56,000  JSS             0           0           0 LAN Associates                          0      03/09/21                       03/18/20           
20-0032   Reconstruction               0-004-018  09/01/20     DONE    DONE       DONE      07/08/20   06/25/20   12/17/19   12/10/19                            551,160       551,160  JSS             0           0           0 ECG Engineering, LLC              454,253      06/30/23                       06/25/20           
20-1859   Reconstruction               0-004-019  07/30/21     DONE    DONE       DONE      06/11/21   06/07/21   03/23/21   05/18/21   2,8,9,10,155,15,16     1,100,000             0  SLC             0           0           0 Kaeyer, Garment & Davidson              0        /  /                         06/07/21           
22-0183FA Reconstruction               0-004-020  05/08/23     DONE    DONE       DONE      07/27/22   07/26/22   01/25/22   07/06/21   2,8,9,155,16           1,140,000     1,140,000  WLC             0           0           0 Kaeyer, Garment & Davidson              0        /  /                         07/26/22           
  -       Reconstruction               0-004-021                                              /  /       /  /     03/02/22     /  /     2,4,8,9,155,15,16              0             0  SLC             0           0           0                                         0        /  /                           /  /             

          XXXHilltop Admin(see 1-005)FrmrIntSc:
  -       Reconstruction               0-005-007                       ADDENDUM REQ'D       01/07/20   12/11/19   08/20/13   10/29/13   2,4,7,8,9,10,155,15,           0             0  JSS             0           0           0 LAN Associates                          0        /  /                         12/11/19           

          Liberty Elementary School:
18-1609   Reconstruction               0-006-013  05/13/19     DONE    DONE       DONE      03/07/19   02/25/19   11/29/18   05/15/18   2,4,8,9,10,16            168,924       168,924  SLC             0           0           0 LAN Associates                          0      11/01/21                       02/25/19           
20-0982   Reconstruction               0-006-014  03/31/21     DONE    DONE       DONE      12/16/20   12/02/20   08/19/19   03/19/19   8,9,10,155,15,16       1,220,167     1,220,167  JSS             0           0           0 Kaeyer, Garment & Davidson              0      03/01/23                       12/02/20           
20-0033   Reconstruction               0-006-015  09/01/20     DONE    DONE       DONE      07/08/20   06/25/20   12/17/19   12/10/19   2,10,155,16              374,861       374,861  JSS             0           0           0 ECG Engineering, LLC              310,798      06/30/23                       06/25/20           
22-0184FA Reconstruction               0-006-016  05/08/23     DONE    DONE       DONE      07/27/22   07/26/22   01/25/22   07/06/21   2,8,9,155,16           1,140,000     1,140,000  WLC             0           0           0 Kaeyer, Garment & Davidson              0        /  /                         07/26/22           
23-1658   Reconstruction               0-006-017                         UNREVIEWED         03/22/24   03/21/24   10/13/23   05/19/15   2,155,15,16                    0             0  WLC             0           0           0 CS Arch                                 0        /  /                         03/21/24           

          Upper Nyack Elementary School:
18-1610   Reconstruction               0-007-019  05/13/19     DONE    DONE       DONE      03/07/19   02/25/19   11/29/18   05/15/18   2,4,8,9,10,16            424,722       424,722  SLC             0           0           0 LAN Associates                          0      11/01/21                       02/25/19           
19-1389   Reconstruction               0-007-020  05/01/20     DONE    DONE       DONE      02/10/20   02/07/20   07/16/19   01/14/20   13                        22,400             0  JSS             0           0           0 LAN Associates                          0      08/31/20                       02/07/20           
20-0983   Reconstruction               0-007-021  03/31/21     DONE    DONE       DONE      12/16/20   12/02/20   08/19/19   03/19/19   8,9,10,155,15,16         660,924       660,924  JSS             0           0           0 Kaeyer, Garment & Davidson              0      04/22/22                       12/02/20           
20-0034   Reconstruction               0-007-022  09/01/20     DONE    DONE       DONE      07/08/20   06/25/20   12/17/19   12/10/19   2,10,155,16              504,867       504,867  JSS             0           0           0 ECG Engineering, LLC              403,402      06/30/23                       06/25/20           
22-0185FA Reconstruction               0-007-023  05/08/23     DONE    DONE       DONE      07/27/22   07/26/22   01/25/22   07/06/21   2,8,9,155,16           1,140,000     1,140,000  WLC             0           0           0 Kaeyer, Garment & Davidson              0        /  /                         07/26/22           
23-1659   Reconstruction               0-007-024                         UNREVIEWED         03/22/24   03/21/24   10/13/23   05/19/15   2,155,15,16                    0             0  WLC             0           0           0 CS Arch                                 0        /  /                         03/21/24           

          High School:
19-1169   Reconstruction               0-021-009  08/25/20     DONE    DONE       DONE      01/07/20   12/11/19   12/05/13   10/29/13   2,4,7,8,9,10,155,15,   1,849,440     1,849,440  JSS             0           0           0 LAN Associates                          0      11/30/21                       12/11/19           
18-1611   Reconstruction               0-021-012  05/13/19     DONE    DONE       DONE      03/07/19   02/25/19   11/29/18   05/15/18   2,4,8,9,10,16            186,266       186,266  SLC             0           0           0 LAN Associates                          0      11/01/21                       02/25/19           
18-2082   Reconstruction               0-021-013  07/29/19     DONE    DONE       DONE      06/10/19   06/05/19   04/08/19   05/21/19   16                       139,300       139,300  SLC             0           0           0 LAN Associates                          0      08/14/20                       06/05/19           
19-0986   Reconstruction               0-021-014  02/11/20     DONE    DONE       DONE      12/12/19   11/15/19   06/28/19   03/19/19   8,9,10,155,15,16       2,083,700     2,083,700  JSS             0           0           0 Kaeyer, Garment & Davidson              0      12/28/20                       11/15/19           
20-0035   Reconstruction               0-021-015  09/01/20     DONE    DONE       DONE      07/08/20   06/25/20   12/17/19   12/10/19   2,10,155,16              878,433       878,433  JSS             0           0           0 ECG Engineering, LLC              716,660      06/30/23                       06/25/20           
20-1860XX Reconstruction               0-021-016                         CANCELLED          06/11/21   06/07/21   03/23/21   05/18/21   2                              0             0  SLC             0           0           0 Kaeyer, Garment & Davidson              0        /  /                         06/07/21           
21-0540   Reconstruction               0-021-017  04/25/23     DONE    DONE       DONE      10/15/21   10/15/21   09/20/21   05/18/21   2,8                    2,537,500     2,537,500  SLC             0           0           0 Kaeyer, Garment & Davidson              0        /  /                         10/15/21           
23-1144   Reconstruction               0-021-018                         UNREVIEWED         12/07/23   12/01/23   03/22/23   01/10/23   155                       76,005             0  WLC             0           0           0 Kaeyer, Garment & Davidson              0        /  /                         12/01/23           

          Hilltop Admin - Lsd by Nyack College:
19-1168   Reconstruction               1-005-001  08/25/20     DONE    DONE       DONE      01/07/20   12/11/19   07/24/15   10/29/13   2,4,7,8,9,10,155,15,     504,037             0  JSS             0           0           0 LAN Associates                          0      12/06/21                       12/11/19           
18-1612   Reconstruction               1-005-004  05/13/19     DONE    DONE       DONE      03/07/19   02/25/19   12/18/18   05/15/18   2,4,8,9,10,16            399,739             0  SLC             0           0           0 LAN Associates                          0      11/01/21                       02/25/19           
20-0036   Reconstruction               1-005-005  09/01/20     DONE    DONE       DONE      07/08/20   06/25/20   12/17/19   12/10/19   2,16                      54,132             0  JSS             0           0           0 ECG Engineering, LLC               49,647      06/30/23                       06/25/20           
21-1730   Reconstruction               1-005-006  06/14/22     DONE    DONE       DONE      04/29/22   04/26/22   07/21/21   05/18/21   2,8,9,155,15,16          970,000             0  FMJ             0           0           0 Kaeyer, Garment & Davidson              0        /  /                         04/26/22           
  -    XX Reconstruction               1-005-007                         CANCELLED            /  /       /  /     01/25/22     /  /     2,8,9,155,15,16                0             0  SLC             0           0           0                                         0        /  /                           /  /             
  -    PR Additions and Alterations    1-005-008                                              /  /       /  /     10/11/22     /  /     02 - 16                        0             0  WLC             0           0           0                                         0        /  /                           /  /             
23-1145   Reconstruction               1-005-009                         UNREVIEWED         12/07/23   12/01/23   12/12/22   03/21/23   2,7                            0             0  WLC             0           0           0 Kaeyer, Garment & Davidson              0        /  /                         12/01/23           
23-1660   Reconstruction               1-005-010                         UNREVIEWED         03/22/24   03/21/24   10/13/23   05/19/15   2,4,8,9,155,15,16              0             0  WLC             0           0           0 CS Arch                                 0        /  /                         03/21/24           

          Athletic Field Storage Container #1:
18-2137DB Discovered Building          2-034-001  07/09/19     DONE    DONE       DONE      06/17/19   06/17/19   05/14/19     /  /                                    0             0  SLC             0           0           0                                         0        /  /                         06/17/19           
20-0037   Reconstruction               2-034-002  09/01/20     DONE    DONE       DONE      07/08/20   06/25/20   12/17/19   12/10/19   2,16                      23,991             0  JSS             0           0           0 ECG Engineering, LLC               22,440      09/07/23                       06/25/20           

          Athletic Field Storage Container #2:
18-2138DB Discovered Building          2-035-001  07/09/19     DONE    DONE       DONE      06/17/19   06/17/19   05/14/19     /  /                                    0             0  SLC             0           0           0                                         0        /  /                         06/17/19           

          Athletic Field Storage Container #3:
18-2139DB Discovered Building          2-036-001  07/09/19     DONE    DONE       DONE      06/17/19   06/17/19   05/14/19     /  /                                    0             0  SLC             0           0           0                                         0        /  /                         06/17/19           

          Maint. Gar./Field House (fmly 5-019):
18-1337   Reconstruction               3-019-001  05/02/19     DONE    DONE       DONE      01/25/19   01/24/19   12/14/18   12/11/18   10                        10,000             0  SLC             0           0           0 LAN Associates                          0      01/27/21                       01/24/19           
20-0038   Reconstruction               3-019-002  09/01/20     DONE    DONE       DONE      07/08/20   06/25/20   12/17/19   12/10/19   2,16                       7,903             0  JSS             0           0           0 ECG Engineering, LLC                7,446      06/30/23                       06/25/20           

          1 Story Frame Bldg S. (Demolition):
21-1412DB Discovered Building          7-037-001  12/19/22     DONE    DONE       DONE      03/02/22   02/03/22   01/11/22     /  /                                    0             0  FMJ             0           0           0                                         0        /  /                         02/03/22           

          1 Story Frame Bldg.N. (Demolition):
21-1413DB Discovered Building          7-038-001  12/19/22     DONE    DONE       DONE      03/02/22   02/03/22   01/11/22     /  /                                    0             0  FMJ             0           0           0                                         0        /  /                         02/03/22           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




PEARL RIVER UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 50-03-08-03
last updated on 03/28/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Evans Park School:
21-1414   Reconstruction               0-002-014  10/26/22     DONE    DONE       DONE      03/02/22   03/01/22   08/30/21   07/27/21   2,155,16                 161,144       161,144  SLC             0           0           0 ECG Engineering, LLC              153,887        /  /                         03/01/22           

          Lincoln Ave.Elementary School:
21-1415   Reconstruction               0-003-014  10/26/22     DONE    DONE       DONE      03/02/22   03/01/22   08/30/21   07/27/21   2,155,16                 167,843       167,843  SLC             0           0           0 ECG Engineering, LLC              161,466        /  /                         03/01/22           

          Senior High School:
19-0815   Reconstruction               0-009-023  02/14/20     DONE    DONE       DONE      11/18/19   11/18/19   06/30/17   05/16/17   9,13                   8,757,232     5,219,393  JSS             0           0           0 Collins & Scoville Architects           0      02/24/21                       11/18/19           
18-1456   Reconstruction               0-009-025  06/17/19     DONE    DONE       DONE      02/14/19   02/05/19   01/14/19   05/16/17   2,8,9,155,16           3,376,402     3,376,402  BMJ             0           0           0 Collins & Scoville Architects           0      09/03/19                       02/05/19           
21-1416   Reconstruction               0-009-026  10/26/22     DONE    DONE       DONE      03/02/22   03/01/22   08/30/21   07/27/21   2,155,16               1,036,083     1,036,083  SLC             0           0           0 ECG Engineering, LLC            1,003,647        /  /                         03/01/22           

          Franklin Ave. Elementary:
21-1417   Reconstruction               0-010-013  10/26/22     DONE    DONE       DONE      03/02/22   03/01/22   08/30/21   07/27/21   2,155,16                 341,832       341,832  SLC             0           0           0 ECG Engineering, LLC              326,202        /  /                         03/01/22           

          Middle School:
19-0816   Reconstruction               0-011-017  02/14/20     DONE    DONE       DONE      11/18/19   11/18/19   06/27/17   05/16/17   8,9,155,15             8,390,459     6,555,589  BMJ             0           0           0 Collins & Scoville Architects           0      03/25/22                       11/18/19           
21-1418   Reconstruction               0-011-018  10/26/22     DONE    DONE       DONE      03/02/22   03/01/22   08/30/21   07/27/21   2,16                     739,584       739,584  SLC             0           0           0 ECG Engineering, LLC              720,445        /  /                         03/01/22           

          XXFranklin Ave. Outdoor Classroom:
  -    XX New Construction             0-034-001                         CANCELLED            /  /       /  /     01/27/21     /  /     02 - 16                        0             0  JSS             0           0           0                                         0        /  /                           /  /             

          Administration Building:
21-1419   Reconstruction               1-017-002  10/26/22     DONE    DONE       DONE      03/02/22   03/01/22   08/30/21   07/27/21   2,16                      63,055             0  SLC             0           0           0 ECG Engineering, LLC               63,055        /  /                         03/01/22           

          Storage Building - Field:
18-1457   New Construction             2-019-001  06/17/19     DONE    DONE       DONE      02/14/19   02/05/19   06/30/17   05/16/17   02 - 16                  450,300             0  BMJ             0           0           0 Collins & Scoville Architects           0      09/03/19                       02/05/19           

          Pearl River Public Library:
21-1798   Reconstruction               6-005-004  05/19/22     DONE    DONE       DONE      05/09/22   05/09/22   02/14/22   04/25/22   7,9,155,15,16            458,500             0  SLC             0           0           0 Lothrop Associates                      0        /  /                         05/09/22           
22-2200   Reconstruction               6-005-005  06/15/23     DONE    DONE       DONE      05/12/23   05/12/23   03/22/23   04/24/23   8,9,10,155,15,16         746,050             0  MSK             0           0           0 Lothrop Associates                      0        /  /                         05/12/23           
  -       Additions and Alterations    6-005-006                                              /  /       /  /     04/03/23     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               6-005-007                                              /  /       /  /     03/25/24     /  /     2,8                            0             0  MSK             0           0           0                                         0        /  /                           /  /             

          XXHigh School Press Box Demolition:
18-2108   Reconstruction               7-015-003  06/17/19     DONE    DONE       DONE      06/12/19   06/07/19   06/12/19   05/16/17   2                         65,000             0  BMJ             0           0           0 Mark Design Studios                     0        /  /                         06/07/19           

          Bathroom Building - Field:
18-1458   New Construction             7-020-001  06/17/19     DONE    DONE       DONE      02/14/19   02/05/19   07/13/17   05/16/17   02 - 16                  521,250             0  BMJ             0           0           0 Collins & Scoville Architects           0      09/03/19                       02/05/19           

          Pearl River High School Press Box:
18-1459   New Construction             7-022-001  06/17/19     DONE    DONE       DONE      02/14/19   02/05/19   01/14/19   05/16/17   02 - 16                   80,725             0  BMJ             0           0           0 Collins & Scoville Architects           0      09/03/19                       02/05/19           

          The Pines Apartments:
  -    DB Discovered Building          7-047-001                                              /  /       /  /     07/14/22     /  /                                    0             0  SLC             0           0           0                                         0        /  /                           /  /             

          District-Wide:
  -       Reconstruction               7-999-003                                              /  /       /  /     02/07/22     /  /     16                             0             0  SLC             0           0           0                                         0        /  /                           /  /             
21-1236SB Reconstruction               7-999-003               DONE                           /  /       /  /     02/07/22     /  /     16                             0             0  SLC             0           0           0                                         0        /  /                           /  /             
  -    SB Reconstruction               7-999-BA2               DONE                           /  /       /  /       /  /       /  /     16                             0             0  SLC             0           0           0                                         0        /  /                           /  /             

          XX#716016-Cancelled:
20-1362XX Alterations                  8-023-001                         CANCELLED          03/05/21   03/05/21   01/27/21     /  /                                    0             0  JSS             0           0           0                                         0        /  /                         03/05/21           

          XX#616006-Cancelled:
20-1363XX Alterations                  8-024-001                         CANCELLED          03/05/21   03/05/21   01/27/21     /  /                                    0             0  JSS             0           0           0                                         0        /  /                         03/05/21           

          XX#716041-cancelled:
20-1364XX Alterations                  8-025-001                         CANCELLED          03/05/21   03/05/21   01/27/21     /  /                                    0             0  JSS             0           0           0                                         0        /  /                         03/05/21           

          XX#716046-cancelled:
20-1365XX Alterations                  8-026-001                         CANCELLED          03/05/21   03/05/21   01/27/21     /  /                                    0             0  JSS             0           0           0                                         0        /  /                         03/05/21           

          XX#816001-canceled:
20-1366XX Alterations                  8-027-001                         CANCELLED          03/05/21   03/05/21   01/27/21     /  /                                    0             0  JSS             0           0           0                                         0        /  /                         03/05/21           

          XX#816004-cancelled:
20-1367XX Alterations                  8-028-001                         CANCELLED          03/05/21   03/05/21   01/27/21     /  /                                    0             0  JSS             0           0           0                                         0        /  /                         03/05/21           

          XX#516012-cancelled:
20-1368XX Alterations                  8-029-001                         CANCELLED          03/05/21   03/05/21   01/27/21     /  /                                    0             0  JSS             0           0           0                                         0        /  /                         03/05/21           

          XX#516004-cancelled:
20-1369XX Alterations                  8-030-001                         CANCELLED          03/05/21   03/05/21   01/27/21     /  /                                    0             0  JSS             0           0           0                                         0        /  /                         03/05/21           

          XX#849014-cancelled:
20-1370XX Alterations                  8-031-001                         CANCELLED          03/05/21   03/05/21   01/27/21     /  /                                    0             0  JSS             0           0           0                                         0        /  /                         03/05/21           

          xx#516014-cancelled:
20-1371XX Alterations                  8-032-001                         CANCELLED          03/05/21   03/05/21   01/27/21     /  /                                    0             0  JSS             0           0           0                                         0        /  /                         03/05/21           

          XX#816034-cancelled:
20-1372XX Alterations                  8-033-001                         CANCELLED          03/05/21   03/05/21   01/27/21     /  /                                    0             0  JSS             0           0           0                                         0        /  /                         03/05/21           

          XXFA Tent #1 - Cancelled:
21-0430XX Reconstruction               8-035-001                         CANCELLED          09/27/21   09/27/21   08/20/21     /  /                                    0             0  SLC             0           0           0                                         0        /  /                         09/27/21           

          XXFA Tent #2- Cancelled:
21-0431XX Reconstruction               8-036-001                         CANCELLED          09/27/21   09/27/21   08/20/21     /  /                                    0             0  SLC             0           0           0                                         0        /  /                         09/27/21           

          XXLA Tent #1 - Cancelled:
21-0432XX Reconstruction               8-037-001                         CANCELLED          09/27/21   09/27/21   08/20/21     /  /                                    0             0  SLC             0           0           0                                         0        /  /                         09/27/21           

          XXLA Tent #2 - Cancelled:
21-0433XX Reconstruction               8-038-001                         CANCELLED          09/27/21   09/27/21   08/20/21     /  /                                    0             0  SLC             0           0           0                                         0        /  /                         09/27/21           

          XXEP Tent #1 - Cancelled:
21-0434XX Reconstruction               8-039-001                         CANCELLED          09/27/21   09/27/21   08/20/21     /  /                                    0             0  SLC             0           0           0                                         0        /  /                         09/27/21           

          XXEP Tent #2 - Cancelled:
21-0435XX Reconstruction               8-040-001                         CANCELLED          09/27/21   09/27/21   08/20/21     /  /                                    0             0  SLC             0           0           0                                         0        /  /                         09/27/21           

          XXEP Tent #3 - Cancelled:
  -    XX Reconstruction               8-041-001                         CANCELLED            /  /       /  /     08/20/21     /  /                                    0             0  SLC             0           0           0                                         0        /  /                           /  /             

          XXMS Tent #1 - Cancelled:
  -    XX Reconstruction               8-042-001                         CANCELLED            /  /       /  /     08/20/21     /  /                                    0             0  SLC             0           0           0                                         0        /  /                           /  /             

          XXMS Tent #2 - Canceled:
  -    XX Reconstruction               8-043-001                         CANCELLED            /  /       /  /     08/20/21     /  /                                    0             0  SLC             0           0           0                                         0        /  /                           /  /             

          XXHS Tent #1 - Canceled:
21-0436XX Reconstruction               8-044-001                         CANCELLED          09/27/21   09/27/21   08/20/21     /  /                                    0             0  SLC             0           0           0                                         0        /  /                         09/27/21           

          XXHS Tent #2 - Canceled:
21-0437XX Reconstruction               8-045-001                         CANCELLED          09/27/21   09/27/21   08/20/21     /  /                                    0             0  SLC             0           0           0                                         0        /  /                         09/27/21           

          XXHS Tent #3 - Canceled:
21-0438XX Reconstruction               8-046-001                         CANCELLED          09/27/21   09/27/21   08/20/21     /  /                                    0             0  SLC             0           0           0                                         0        /  /                         09/27/21           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




SUFFERN CSD (FMLY RAMAPO CSD) STATUS REPORT ON CAPITAL PROJECTS
District No.: 50-04-01-06
last updated on 03/28/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Suffern Middle School:
19-0264   Reconstruction               0-002-028  11/27/19     DONE    DONE       DONE      08/16/19   08/12/19   04/06/18   05/15/18   2                        906,000       906,000  BMJ             0           0           0 Clark Patterson Lee                     0      11/01/20                       08/12/19           
20-0039   Reconstruction               0-002-030  08/03/20     DONE    DONE       DONE      07/08/20   06/29/20   09/28/18   05/21/19   2,4                    1,271,900     1,271,900  JLB             0           0           0 Clark Patterson Lee                     0      09/10/21                       06/29/20           
20-1541   Reconstruction               0-002-031  10/07/21     DONE    DONE       DONE      04/05/21   03/29/21   06/24/20   06/09/20   16                       382,000       382,000  JLB             0           0           0 Clark Patterson Lee                     0      11/27/23                       03/29/21           
20-1554   Reconstruction               0-002-032  06/24/21     DONE    DONE       DONE      04/05/21   03/29/21   06/24/20   06/09/20   7                        300,000       300,000  JLB             0           0           0 Clark Patterson Lee                     0      12/10/21                       03/29/21           
21-1310   Reconstruction               0-002-033  05/10/22     DONE    DONE       DONE      02/16/22   02/11/22   09/07/21   05/11/21   7                      1,213,986     1,213,986  JLB             0           0           0 Clark Patterson Lee                     0      11/02/22                       02/11/22           
22-1643   Reconstruction               0-002-034  07/11/23     DONE    DONE       DONE      02/08/23   02/08/23   09/21/22   05/17/22   7                        550,400       550,400  JJH             0           0           0 Clark Patterson Lee                     0        /  /                         02/08/23           

          RP Connor Elementary School:
19-0265   Additions and Alterations    0-005-018  11/27/19     DONE    DONE       DONE      08/16/19   08/12/19   04/06/18   05/15/18   02 - 16                  322,900             0  BMJ             0           0           0 Clark Patterson Lee                     0        /  /                         08/12/19           
20-1542   Reconstruction               0-005-019  10/07/21     DONE    DONE       DONE      04/05/21   03/29/21   06/24/20   06/09/20   16                       124,600       124,600  JLB             0           0           0 Clark Patterson Lee                     0      11/27/23                       03/29/21           
20-1548   Reconstruction               0-005-020  08/04/21     DONE    DONE       DONE      04/05/21   03/29/21   06/24/20   06/09/20   16                       107,775             0  JLB             0           0           0 Clark Patterson Lee                     0        /  /                         03/29/21           
22-0074   Reconstruction               0-005-021  10/07/22     DONE    DONE       DONE      07/13/22   07/11/22   09/14/21   05/11/21   4,7,155,15,16          2,912,000     1,334,904  JLB             0           0           0 Clark Patterson Lee                     0        /  /                         07/11/22           

          Sloatsburg Elementary:
19-0573   Reconstruction               0-007-019  06/03/19     DONE    DONE       DONE      10/18/19   10/02/19   10/06/18   03/19/19   16                       412,500       412,500  BMJ             0           0           0 Clark Patterson Lee                     0      09/30/19                       10/02/19           
20-1543   Reconstruction               0-007-020  10/07/21     DONE    DONE       DONE      04/05/21   03/29/21   06/24/20   06/09/20   16                       114,600       114,600  JLB             0           0           0 Clark Patterson Lee                     0      11/27/23                       03/29/21           
20-1549   Reconstruction               0-007-021  08/04/21     DONE    DONE       DONE      04/05/21   03/29/21   06/24/20   06/09/20   7,16                     107,775             0  JLB             0           0           0 Clark Patterson Lee                     0        /  /                         03/29/21           
20-1555   Reconstruction               0-007-022  06/24/21     DONE    DONE       DONE      04/05/21   03/29/21   02/19/21   06/09/20   7                        250,000       250,000  JLB             0           0           0 Clark Patterson Lee                     0      12/10/21                       03/29/21           

          Cherry Lane Elementary:
20-1544   Reconstruction               0-011-019  10/07/21     DONE    DONE       DONE      04/05/21   03/29/21   06/24/20   06/09/20   16                       149,600       149,600  JLB             0           0           0 Clark Patterson Lee                     0      11/27/23                       03/29/21           
20-1550   Reconstruction               0-011-020  08/04/21     DONE    DONE       DONE      04/05/21   03/29/21   06/24/20   06/09/20   16                       107,780             0  JLB             0           0           0 Clark Patterson Lee                     0        /  /                         03/29/21           
21-1311   Reconstruction               0-011-021  05/10/22     DONE    DONE       DONE      02/16/22   02/11/22   09/07/21   05/11/21   7                        646,014       646,014  JLB             0           0           0 Clark Patterson Lee                     0      12/02/22                       02/11/22           

          Montebello Elementary:
20-1545   Reconstruction               0-019-015  10/07/21     DONE    DONE       DONE      04/05/21   03/29/21   06/24/20   06/09/20   16                       129,600       129,600  JLB             0           0           0 Clark Patterson Lee                     0      11/27/23                       03/29/21           
20-1551   Reconstruction               0-019-016  08/04/21     DONE    DONE       DONE      04/05/21   03/29/21   06/24/20   06/09/20   16                       107,780             0  JLB             0           0           0 Clark Patterson Lee                     0        /  /                         03/29/21           

          Suffern High School:
19-0266   Additions and Alterations    0-020-035  11/27/19     DONE    DONE       DONE      08/16/19   08/12/19   04/06/18   05/15/18   02 - 16                  746,450             0  BMJ             0           0           0 Clark Patterson Lee                     0        /  /                         08/12/19           
19-0078   Reconstruction               0-020-037  09/06/19     DONE    DONE       DONE      07/15/19   07/10/19   10/30/18   05/21/19   155,16                   110,000       110,000  BMJ             0           0           0 Clark Patterson Lee                     0      10/30/20                       07/10/19           
19-1456   Reconstruction               0-020-038  05/20/20     DONE    DONE       DONE      02/20/20   02/14/20   03/05/19   05/21/19   7                        270,270       270,270  JLB             0           0           0 Clark Patterson Lee                     0      09/30/20                       02/14/20           
20-1546   Reconstruction               0-020-039  10/07/21     DONE    DONE       DONE      04/05/21   03/29/21   06/24/20   06/09/20   16                       485,000       485,000  JLB             0           0           0 Clark Patterson Lee                     0      11/27/23                       03/29/21           
20-1552   Reconstruction               0-020-040  08/04/21     DONE    DONE       DONE      04/05/21   03/29/21   06/24/20   06/09/20   16                       211,110             0  JLB             0           0           0 Clark Patterson Lee                     0        /  /                         03/29/21           
22-0480FA Reconstruction               0-020-041               STARTED DONE       DONE      09/14/22   07/11/22   09/14/21   05/17/22   4,155,15,16                    0     8,429,460  JJH             0           0           0 Clark Patterson Lee                     0        /  /                         07/11/22           
22-1644   Reconstruction               0-020-042  07/11/23     DONE    DONE       DONE      02/08/23   02/08/23   09/21/22   05/17/22   7                      1,558,800     1,558,800  JJH             0           0           0 Clark Patterson Lee                     0        /  /                         02/08/23           

          Viola Elementary:
19-0267   Additions and Alterations    0-026-018  11/27/19     DONE    DONE       DONE      08/16/19   08/12/19   04/06/18   05/15/18   02 - 16                  391,950       373,700  BMJ             0           0           0 Clark Patterson Lee                     0        /  /                         08/12/19           
20-1547   Reconstruction               0-026-019  10/07/21     DONE    DONE       DONE      04/05/21   03/29/21   06/24/20   06/09/20   16                       114,600       114,600  JLB             0           0           0 Clark Patterson Lee                     0      11/27/23                       03/29/21           
20-1553   Reconstruction               0-026-020  08/04/21     DONE    DONE       DONE      04/05/21   03/29/21   06/24/20   06/09/20   16                       107,780             0  JLB             0           0           0 Clark Patterson Lee                     0        /  /                         03/29/21           

          Hillburn Administration Building:
21-1545FA Reconstruction               1-006-011  05/04/22     DONE    DONE       DONE      03/23/22   03/21/22   11/16/21   05/03/22   7                        461,280             0  JLB             0           0           0 Clark Patterson Lee                     0      11/02/22                       03/21/22           

          Grounds Storage:
22-2129DB Discovered Building          2-037-001  07/20/23     DONE    DONE       DONE      05/03/23   05/01/23   01/31/23     /  /                                    0             0  JJH             0           0           0                                         0        /  /                         05/01/23           

          Athletic Storage:
23-0115DB Discovered Building          2-038-001  07/20/23     DONE    DONE       DONE      07/21/23   07/21/23   01/31/23     /  /                                    0             0  JJH             0           0           0                                         0        /  /                         07/21/23           

          Boat House:
23-0116DB Discovered Building          7-039-001  07/20/23     DONE    DONE       DONE      07/21/23   07/21/23   01/31/23     /  /                                    0             0  JJH             0           0           0                                         0        /  /                         07/21/23           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




EAST RAMAPO CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 50-04-02-06
last updated on 03/28/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Spring Valley Senior High:
18-1815XX Reconstruction               0-003-024                         CANCELLED          04/09/19   04/02/19   10/05/18   12/06/16   2,155                          0             0  SLC             0           0           0 Eisenbach & Ruhnke Engineerin           0        /  /                         04/02/19           
22-2312FA Reconstruction               0-003-025  07/19/23     DONE    DONE       DONE      06/02/23   05/12/23   12/02/21   10/19/21   2,9                    4,574,371     4,574,371  MSK             0           0           0 CS Arch                                 0        /  /                         05/12/23           
22-1862FA Reconstruction               0-003-026  05/02/23     DONE    DONE       DONE      03/17/23   03/07/23   02/24/22   04/26/22   2,8,9,10,14,15,16      3,102,240     3,102,240  JLB             0           0           0 Collins & Scoville Architects           0        /  /                         03/07/23           
22-1030FA Reconstruction               0-003-027  02/07/23     DONE    DONE       DONE      11/18/22   11/07/22   02/24/22   04/26/22   2,7,155,15,16          5,493,746             0  SLC             0           0           0 CS Arch                                 0        /  /                         11/07/22           
22-2058   Reconstruction               0-003-028  08/23/23     DONE    DONE       DONE      04/19/23   04/18/23   03/15/23   02/07/23   16                       797,016       797,016  MSK             0           0           0 Energia Energy                    797,016        /  /                         04/18/23           
23-1677   Reconstruction               0-003-029                         UNREVIEWED         03/26/24   03/25/24   10/23/23   06/20/23   2,9,10,16                      0             0  MSK             0           0           0 CS Arch                                 0        /  /                         03/25/24           

          Hempstead School:
18-1816XX Reconstruction               0-006-018                         CANCELLED          04/09/19   04/02/19   10/06/18   12/06/16   2,4,8,9,155,16                 0             0  SLC             0           0           0 Eisenbach & Ruhnke Engineerin           0        /  /                         04/02/19           
22-2032FA Reconstruction               0-006-019  06/09/23     DONE    DONE       DONE      04/14/23   04/10/23   02/06/23   04/26/22   2,9                    1,329,256     1,329,256  MSK             0           0           0 CS Arch                                 0        /  /                         04/10/23           
22-2059   Reconstruction               0-006-020  08/23/23     DONE    DONE       DONE      04/19/23   04/18/23   03/15/23   02/07/23   16                       588,879       588,879  MSK             0           0           0 Energia Energy                    588,879        /  /                         04/18/23           
22-2229FA Reconstruction               0-006-021  07/17/23     DONE    DONE       DONE      05/19/23   05/15/23   04/04/23   04/26/22   2,8,10                   574,275             0  WLC             0           0           0 CS Arch                                 0        /  /                         05/15/23           
23-0620FA Reconstruction               0-006-022  12/18/23     DONE    DONE       DONE      10/06/23   08/25/23   04/10/23   04/26/22   2,4,7,8,9,10,14,155,     336,839             0  MSK             0           0           0 CS Arch                                 0        /  /                         08/25/23           
23-1004FA Reconstruction               0-006-023  01/10/24     DONE    DONE       DONE      11/15/23   09/28/23   09/08/23   04/26/22   2,4,8,9                2,880,911             0  MSK             0           0           0 CS Arch                                 0        /  /                         09/28/23           

          Pomona Middle(fmlyPomonaJR):
18-1817XX Reconstruction               0-008-021                         CANCELLED          04/09/19   04/02/19   01/22/19   12/06/16   2,10                           0             0  SLC             0           0           0 Eisenbach & Ruhnke Engineerin           0        /  /                         04/02/19           
22-0027FA Reconstruction               0-008-022  07/06/22     DONE    DONE       DONE      07/05/22   06/29/22   02/24/22   04/13/22   2,4,7,8,10,13          3,576,576             0  SLC             0           0           0 CS Arch                                 0        /  /                         06/29/22           
22-2060   Reconstruction               0-008-023  08/23/23     DONE    DONE       DONE      04/19/23   04/18/23   03/15/23   02/07/23   16                        34,744        34,744  MSK             0           0           0 Energia Energy                     34,744        /  /                         04/18/23           
22-2230FA Reconstruction               0-008-024  07/17/23     DONE    DONE       DONE      07/17/23   05/15/23   04/04/23   04/26/22   2,8,10                 1,225,588             0  WLC             0           0           0 CS Arch                                 0        /  /                         05/15/23           
23-0621FA Reconstruction               0-008-025  12/18/23     DONE    DONE       DONE      10/06/23   08/25/23   04/10/23   04/26/22   2,4,7,8,9,10,14,155,     583,614             0  MSK             0           0           0 CS Arch                                 0        /  /                         08/25/23           
  -       Reconstruction               0-008-026                                              /  /       /  /     09/08/23     /  /     2,4,8,9                        0             0  MSK             0           0           0                                         0        /  /                           /  /             
23-1678   Reconstruction               0-008-027                         UNREVIEWED         03/26/24   03/25/24   10/17/23   06/20/23   2,9,10,16                      0             0  MSK             0           0           0 CS Arch                                 0        /  /                         03/25/24           

          Kakiat Elementary:
22-0028FA Reconstruction               0-013-025  07/06/22     DONE    DONE       DONE      07/05/22   06/29/22   02/24/22   04/13/22   7,8,15,16              3,452,306             0  SLC             0           0           0 CS Arch                                 0        /  /                         06/29/22           
22-1863FA Reconstruction               0-013-026  05/02/23     DONE    DONE       DONE      03/17/23   03/07/23   02/28/22   04/26/22   2,8,9,10,14,15,16      2,735,139     2,735,139  JLB             0           0           0 Collins & Scoville Architects           0        /  /                         03/07/23           
22-1031FA Reconstruction               0-013-027  02/07/23     DONE    DONE       DONE      11/18/22   11/07/22   08/09/22   04/26/22   2,4,7,9,155,15,16      6,137,890             0  SLC             0           0           0 CS Arch                                 0        /  /                         11/07/22           
22-2061   Reconstruction               0-013-028  08/23/23     DONE    DONE       DONE      04/19/23   04/18/23   03/15/23   02/07/23   16                       496,172       496,172  MSK             0           0           0 Energia Energy                    496,172        /  /                         04/18/23           
23-1679   Reconstruction               0-013-029                         UNREVIEWED         03/26/24   03/25/24   10/17/23   06/20/23   2,9,10,16                      0             0  MSK             0           0           0 CS Arch                                 0        /  /                         03/25/24           

          Fleetwood Elementary School:
22-2033FA Reconstruction               0-014-023  06/09/23     DONE    DONE       DONE      04/14/23   04/10/23   02/06/23   04/26/22   2,9                    1,554,908     1,554,908  MSK             0           0           0 CS Arch                                 0        /  /                         04/10/23           
22-2062   Reconstruction               0-014-024  08/23/23     DONE    DONE       DONE      04/19/23   04/18/23   03/15/23   02/07/23   16                     1,581,300     1,581,300  MSK             0           0           0 Energia Energy                  1,581,300        /  /                         04/18/23           
22-2231FA Reconstruction               0-014-025  07/17/23     DONE    DONE       DONE      05/19/23   05/15/23   04/04/23   04/26/22   2,8,10                   462,222             0  WLC             0           0           0 CS Arch                                 0        /  /                         05/15/23           
23-0622FA Reconstruction               0-014-026  12/18/23     DONE    DONE       DONE      10/06/23   08/25/23   04/10/23   04/26/22   2,4,7,8,9,10,14,155,     418,645             0  MSK             0           0           0 CS Arch                                 0        /  /                         08/25/23           
23-1005FA Reconstruction               0-014-027  01/10/24     DONE    DONE       DONE      11/15/23   09/28/23   09/08/23   04/26/22   2,4,8,9                1,888,265             0  MSK             0           0           0 CS Arch                                 0        /  /                         09/28/23           
  -       Reconstruction               0-014-028                                              /  /       /  /     12/18/23     /  /     2,9                            0             0  MSK             0           0           0                                         0        /  /                           /  /             

          Summit Park Elementary:
18-1818XX Reconstruction               0-015-019                         CANCELLED          04/09/19   04/02/19     /  /     12/06/16   2,10                           0             0  SLC             0           0           0 Eisenbach & Ruhnke Engineerin           0        /  /                         04/02/19           
22-2034FA Reconstruction               0-015-020  06/09/23     DONE    DONE       DONE      04/14/23   04/10/23   02/06/23   04/26/22   2,9                    1,346,996     1,346,996  MSK             0           0           0 CS Arch                                 0        /  /                         04/10/23           
22-2063   Reconstruction               0-015-021  08/23/23     DONE    DONE       DONE      04/19/23   04/18/23   03/15/23   02/07/23   16                     1,400,553     1,400,553  MSK             0           0           0 Energia Energy                  1,400,553        /  /                         04/18/23           
22-2232FA Reconstruction               0-015-022  07/17/23     DONE    DONE       DONE      05/19/23   05/15/23   04/04/23   04/26/22   2,8,10                   399,191             0  WLC             0           0           0 CS Arch                                 0        /  /                         05/15/23           
23-0623FA Reconstruction               0-015-023  12/18/23     DONE    DONE       DONE      10/06/23   08/25/23   04/10/23   04/26/22   2,4,7,8,9,10,14,155,     365,731             0  MSK             0           0           0 CS Arch                                 0        /  /                         08/25/23           
23-1006FA Reconstruction               0-015-024  01/10/24     DONE    DONE       DONE      11/15/23   09/28/23   09/08/23   04/26/22   2,4,8,9                1,925,583             0  MSK             0           0           0 CS Arch                                 0        /  /                         09/28/23           
  -       Reconstruction               0-015-025                                              /  /       /  /     12/18/23     /  /     2,9                            0             0  MSK             0           0           0                                         0        /  /                           /  /             

          Grandview Elementary:
22-2035FA Reconstruction               0-016-017  06/09/23     DONE    DONE       DONE      04/14/23   04/10/23   02/06/23   04/26/22   2,9                    1,211,505     1,211,505  MSK             0           0           0 CS Arch                                 0        /  /                         04/10/23           
22-2064   Reconstruction               0-016-018  08/23/23     DONE    DONE       DONE      04/19/23   04/18/23   03/15/23   02/07/23   16                     1,280,420     1,280,420  MSK             0           0           0 Energia Energy                  1,280,420        /  /                         04/18/23           
22-2233FA Reconstruction               0-016-019  07/17/23     DONE    DONE       DONE      05/19/23   05/15/23   04/04/23   04/26/22   2,8,10                   455,218             0  WLC             0           0           0 CS Arch                                 0        /  /                         05/15/23           
23-0624FA Reconstruction               0-016-020  12/18/23     DONE    DONE       DONE      10/06/23   08/25/23   04/10/23   04/26/22   2,4,7,8,9,10,14,155,     422,544             0  MSK             0           0           0 CS Arch                                 0        /  /                         08/25/23           
23-1007FA Reconstruction               0-016-021  01/10/24     DONE    DONE       DONE      11/15/23   09/28/23   09/08/23   04/26/22   2,4,8,9                3,097,352             0  MSK             0           0           0 CS Arch                                 0        /  /                         09/28/23           
  -       Reconstruction               0-016-022                                              /  /       /  /     12/18/23     /  /     2,9                            0             0  MSK             0           0           0                                         0        /  /                           /  /             

          Margetts Elem:
22-1864FA Reconstruction               0-020-015  05/02/23     DONE    DONE       DONE      03/17/23   03/07/23   02/24/22   04/26/22   2,8,9,10,14,15,16      3,825,970     3,825,970  JLB             0           0           0 Collins & Scoville Architects           0        /  /                         03/07/23           
22-0029FA Reconstruction               0-020-016  07/06/22     DONE    DONE       DONE      07/05/22   06/29/22   02/24/22   04/13/22   2,7,9,155,15,16        2,213,739             0  SLC             0           0           0 CS Arch                                 0        /  /                         06/29/22           
22-1032FA Reconstruction               0-020-017  02/07/23     DONE    DONE       DONE      11/18/22   11/07/22   08/09/22   04/26/22   2,4,7,9,155,15,16      2,700,184             0  SLC             0           0           0 CS Arch                                 0        /  /                         11/07/22           
22-2065   Reconstruction               0-020-031  08/23/23     DONE    DONE       DONE      04/19/23   04/18/23   03/15/23   02/07/23   16                       152,007       152,007  MSK             0           0           0 Energia Energy                    152,007        /  /                         04/18/23           

          Ramapo Senior High School:
18-1212   Reconstruction               0-022-021  05/06/19     DONE    DONE       DONE      01/10/19   01/02/19   10/06/18   12/06/16   2,8,155,16             3,312,500             0  SLC             0           0           0 Eisenbach and Ruhnke Engineer           0        /  /                         01/02/19           
18-1819XX Reconstruction               0-022-022                         CANCELLED          04/09/19   04/02/19   01/22/19   12/06/16   2,10                           0             0  SLC             0           0           0 Eisenbach & Ruhnke Engineerin           0        /  /                         04/02/19           
  -       Reconstruction               0-022-023                                              /  /       /  /     07/12/21     /  /     4,8                            0             0  SLC             0           0           0                                         0        /  /                           /  /             
22-1865FA Reconstruction               0-022-024  05/02/23     DONE    DONE       DONE      03/17/23   03/07/23   02/24/22   04/26/22   2,8,9,10,14,15,16      3,376,275     3,376,275  JLB             0           0           0 Collins & Scoville Architects           0        /  /                         03/07/23           
22-1033FA Reconstruction               0-022-025  02/07/23     DONE    DONE       DONE      11/18/22   11/07/22   02/24/22   04/26/22   2,7,9,155,15,16        3,174,856             0  SLC             0           0           0 CS Arch                                 0        /  /                         11/07/22           
22-2066   Reconstruction               0-022-026  08/23/23     DONE    DONE       DONE      04/19/23   04/18/23   03/15/23   02/07/23   16                       751,303       751,303  MSK             0           0           0 Energia Energy                    751,303        /  /                         04/18/23           
23-1680   Reconstruction               0-022-027                         UNREVIEWED         03/26/24   03/25/24   10/23/23   06/20/23   2,9,10,14,16                   0             0  MSK             0           0           0 CS Arch                                 0        /  /                         03/25/24           

          Lime Kiln School:
18-1820XX Reconstruction               0-027-017                         CANCELLED          04/09/19   04/02/19   10/06/18   12/06/16   2,8,155,16                     0             0  SLC             0           0           0 Eisenbach & Ruhnke Engineerin           0        /  /                         04/02/19           
22-2036FA Reconstruction               0-027-018  06/09/23     DONE    DONE       DONE      04/14/23   04/10/23   02/06/23   04/26/22   2,9                    1,825,491     1,825,491  MSK             0           0           0 CS Arch                                 0        /  /                         04/10/23           
22-2067   Reconstruction               0-027-019  08/23/23     DONE    DONE       DONE      04/19/23   04/18/23   03/15/23   02/07/23   16                     1,340,710     1,340,710  MSK             0           0           0 Energia Energy                  1,340,710        /  /                         04/18/23           
22-2234FA Reconstruction               0-027-020  07/17/23     DONE    DONE       DONE      05/19/23   05/15/23   04/04/23   04/26/22   2,8,10                   623,299             0  WLC             0           0           0 CS Arch                                 0        /  /                         05/15/23           
23-0625FA Reconstruction               0-027-021  12/18/23     DONE    DONE       DONE      10/06/23   08/25/23   04/10/23   04/26/22   2,4,7,8,9,10,14,155,     461,703             0  MSK             0           0           0 CS Arch                                 0        /  /                         08/25/23           
23-1008FA Reconstruction               0-027-022  01/10/24     DONE    DONE       DONE      11/15/23   09/28/23   09/08/23   04/26/22   2,4,8,9                1,365,820             0  MSK             0           0           0 CS Arch                                 0        /  /                         09/28/23           

          Elmwood Elementary School:
18-1391   Reconstruction               0-030-016  04/05/19     DONE    DONE       DONE      02/05/19   02/01/19   10/06/18   12/06/16   2,7,8,155,16             625,000             0  SLC             0           0           0 Eisenbach & Ruhnke Engineerin           0        /  /                         02/01/19           
22-1866FA Reconstruction               0-030-017  05/02/23     DONE    DONE       DONE      03/17/23   03/07/23   02/24/22   04/26/22   2,8,9,10,14,15,16              0    13,996,584  JLB             0           0           0 Collins & Scoville Architects           0        /  /                         03/07/23           
22-0030FA Reconstruction               0-030-018  07/06/22     DONE    DONE       DONE      07/05/22   06/29/22   02/24/22   04/13/22   2,7,9,155,15,16        2,462,070             0  SLC             0           0           0 CS Arch                                 0        /  /                         06/29/22           
22-1034FA Reconstruction               0-030-019  02/07/23     DONE    DONE       DONE      11/18/22   11/07/22   08/09/22   04/26/22   2,4,7,9,155,15,16      1,585,872             0  SLC             0           0           0 CS Arch                                 0        /  /                         11/07/22           
22-2068   Reconstruction               0-030-020  08/23/23     DONE    DONE       DONE      04/19/23   04/18/23   03/15/23   02/07/23   16                     1,490,884     1,490,884  MSK             0           0           0 Energia Energy                  1,490,884        /  /                         04/18/23           

          Chestnut Ridge Middle(frmlySpring Va:
18-1821XX Reconstruction               0-034-023                         CANCELLED          04/09/19   04/02/19   10/05/18   12/06/16   2,8,155,16                     0             0  SLC             0           0           0 Eisenbach & Ruhnke Engineerin           0        /  /                         04/02/19           
21-1046   Reconstruction               0-034-024  06/30/21     DONE    DONE       DONE      01/05/22   01/05/22   07/12/21   06/29/21   2,9                    2,111,571     2,111,571  SLC             0           0           0 CS Arch                                 0        /  /                         01/05/22           
22-2165FA Reconstruction               0-034-025  05/17/23     DONE    DONE       DONE      05/08/23   05/02/23   02/06/23   04/26/22   2,7,155,15,16            466,891       466,891  MSK             0           0           0 CS Arch                                 0        /  /                         05/02/23           
22-2069   Reconstruction               0-034-026  08/23/23     DONE    DONE       DONE      04/19/23   04/18/23   03/15/23   02/07/23   16                       508,480       508,480  MSK             0           0           0 Energia Energy                    508,480        /  /                         04/18/23           
22-2235FA Reconstruction               0-034-027  07/17/23     DONE    DONE       DONE      05/19/23   05/15/23   04/04/23   04/26/22   2,8,10                 1,120,537             0  WLC             0           0           0 CS Arch                                 0        /  /                         05/15/23           
23-0626FA Reconstruction               0-034-028  12/18/23     DONE    DONE       DONE      10/06/23   08/25/23   04/10/23   04/26/22   2,4,7,8,9,10,155,15,     583,614             0  MSK             0           0           0 CS Arch                                 0        /  /                         08/25/23           
23-1009FA Reconstruction               0-034-029  01/10/24     DONE    DONE       DONE      11/15/23   09/19/23   09/08/23   04/26/22   2,4,8,9                1,241,926             0  MSK             0           0           0 CS Arch                                 0        /  /                         09/19/23           

          Eldorado Elementary:
18-1822XX Reconstruction               0-037-018                         CANCELLED          04/09/19   04/02/19   10/05/18   12/06/16   2,155                          0             0  SLC             0           0           0 Eisenbach & Ruhnke Engineerin           0        /  /                         04/02/19           
22-2037FA Reconstruction               0-037-019  06/09/23     DONE    DONE       DONE      04/14/23   04/10/23   02/06/23   04/26/22   2,9                    2,098,351     2,098,351  MSK             0           0           0 CS Arch                                 0        /  /                         04/10/23           
22-2070   Reconstruction               0-037-020  08/23/23     DONE    DONE       DONE      04/19/23   04/18/23   03/15/23   02/07/23   16                     1,535,697     1,535,697  MSK             0           0           0 Energia Energy                  1,535,697        /  /                         04/18/23           
22-2236FA Reconstruction               0-037-021  07/17/23     DONE    DONE       DONE      05/19/23   05/15/23   04/04/23   04/26/22   2,8,10                   623,299             0  WLC             0           0           0 CS Arch                                 0        /  /                         05/15/23           
23-0627FA Reconstruction               0-037-022  12/18/23     DONE    DONE       DONE      10/06/23   08/25/23   04/10/23   04/26/22   2,4,7,8,9,10,14,155,     499,697             0  MSK             0           0           0 CS Arch                                 0        /  /                         08/25/23           
23-1010FA Reconstruction               0-037-023  01/10/24     DONE    DONE       DONE      11/15/23   09/28/23   09/08/23   04/26/22   2,4,8,9                1,612,116             0  MSK             0           0           0 CS Arch                                 0        /  /                         09/28/23           

          Admin Bldg-frmly S.Madison Instr:
18-1724   Reconstruction               1-005-014  03/16/21     DONE    DONE       DONE      03/27/19   03/13/19   10/05/18   12/06/16   2,8,9,155,15,16        1,440,000             0  SLC             0           0           0 Eisenbach & Ruhnke Engineerin           0        /  /                         03/13/19           
22-2250   Reconstruction               1-005-015  11/08/23     DONE    DONE       DONE      05/19/23   05/18/23   11/22/22   05/02/23   10                        46,608             0  MSK             0           0           0 CS Arch                                 0        /  /                         05/18/23           
22-2071   Reconstruction               1-005-016  08/23/23     DONE    DONE       DONE      04/19/23   04/18/23   03/15/23   02/07/23   16                       327,009             0  MSK             0           0           0 Energia Energy                    327,009        /  /                         04/18/23           

          Admin Bldg.Storage Container:
  -    DB Discovered Building          2-060-001                                              /  /       /  /     03/05/20     /  /                                    0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Bldgs & Grounds Storage Container 1:
  -    DB Discovered Building          2-061-001                                              /  /       /  /     03/05/20     /  /                                    0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Bldgs & Grounds Storage Container 2:
  -    DB Discovered Building          2-062-001                                              /  /       /  /     03/05/20     /  /                                    0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Chestnut Ridge MS Storage Container1:
  -    DB Discovered Building          2-063-001                                              /  /       /  /     03/05/20     /  /                                    0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Chestnut Ridge MS Storage Container2:
  -    DB Discovered Building          2-064-001                                              /  /       /  /     03/05/20     /  /                                    0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Elmwood Elem. Storage Container:
  -    DB Discovered Building          2-065-001                                              /  /       /  /     03/05/20     /  /                                    0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Grandview Elem. Storage Container:
  -    DB Discovered Building          2-066-001                                              /  /       /  /     03/05/20     /  /                                    0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Kakiat Elem. Storage Container 1:
  -    DB Discovered Building          2-067-001                                              /  /       /  /     03/05/20     /  /                                    0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Kakiat Elem. Storage Container 2:
  -    DB Discovered Building          2-068-001                                              /  /       /  /     03/05/20     /  /                                    0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Pomona MS Storage Container:
  -    DB Discovered Building          2-069-001                                              /  /       /  /     03/05/20     /  /                                    0             0  SLC             0           0           0                                         0        /  /                           /  /             

          High School Storage Container 1:
  -    DB Discovered Building          2-070-001                                              /  /       /  /     03/05/20     /  /                                    0             0  SLC             0           0           0                                         0        /  /                           /  /             

          High School Staorage Container 2:
  -    DB Discovered Building          2-071-001                                              /  /       /  /     03/05/20     /  /                                    0             0  SLC             0           0           0                                         0        /  /                           /  /             

          High School Storage Container 3:
  -    DB Discovered Building          2-072-001                                              /  /       /  /     03/05/20     /  /                                    0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Spring valley HS Storage Container1:
  -    DB Discovered Building          2-073-001                                              /  /       /  /     03/05/20     /  /                                    0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Spring Valley HS Storage Container2:
  -    DB Discovered Building          2-074-001                                              /  /       /  /     03/05/20     /  /                                    0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Spring Valley HS Storage Container3:
  -    DB Discovered Building          2-075-001                                              /  /       /  /     03/05/20     /  /                                    0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Spring Valley HS Storage Container4:
  -    DB Discovered Building          2-076-001                                              /  /       /  /     03/05/20     /  /                                    0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Spring valley HS Storage Container5:
  -    DB Discovered Building          2-077-001                                              /  /       /  /     03/05/20     /  /                                    0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Spring Valley HS Storage Container6:
  -    DB Discovered Building          2-078-001                                              /  /       /  /     03/05/20     /  /                                    0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Spring Valley HS Storage Container7:
  -    DB Discovered Building          2-079-001                                              /  /       /  /     03/05/20     /  /                                    0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Summit Park Elem. Storage Container:
  -    DB Discovered Building          2-080-001                                              /  /       /  /     03/05/20     /  /                                    0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Transportation Garage:
21-0169   Reconstruction               5-001-011  04/28/22     DONE    DONE       DONE      08/16/21   08/11/21   07/15/20   06/20/17   10                        34,500        34,500  SLC             0           0           0 CS Arch                                 0        /  /                         08/11/21           

          XXFinkelstein Mem Libr-OwnedByLibrar:
21-1508XX Reconstruction               6-012-005                         CANCELLED          03/14/22   03/14/22   10/08/21   07/28/21   8,9,15                   160,500             0  SLC             0           0           0 Michael Esmay, Architect                0        /  /                         03/14/22           

          District-Wide:
19-1241XX Reconstruction               7-999-004  01/19/21               CANCELLED          01/17/20   01/13/20   08/09/19   01/19/21   16                     1,000,000     1,000,000  SLC             0           0           0 Eisenbach & Ruhnke Engineerin           0        /  /                         01/13/20           
21-1584FA Reconstruction               7-999-005  05/03/22     DONE    DONE       DONE      04/05/22   04/05/22   04/05/22   01/19/21                          3,968,078     3,968,078  SLC             0           0           0 Collins & Scoville Architects           0      08/25/23                       04/05/22           
  -       Reconstruction               7-999-006                                              /  /       /  /     10/17/22     /  /                                    0             0  SLC             0           0           0                                         0        /  /                           /  /             
22-0745SB Reconstruction               7-999-006               DONE                           /  /       /  /     10/17/22     /  /                                    0             0  SLC             0           0           0                                         0        /  /                           /  /             
  -    SB Reconstruction               7-999-BA2               DONE                           /  /       /  /       /  /       /  /     16                             0             0  SLC             0           0           0                                         0        /  /                           /  /             

          XXStorage #2 @ Grandview Ave-Removed:
20-0727TQ Temporary Quarters           8-081-001  02/01/21     DONE    DONE       DONE      10/29/20   10/23/20   08/19/20   09/15/20                              2,000             0  SLC             0           0           0 CS Arch                                 0        /  /                         10/23/20           

          XXStorage #3 @ Grandview Ave-Removed:
20-0728TQ Temporary Quarters           8-082-001  02/01/21     DONE    DONE       DONE      10/29/20   10/23/20   08/19/20   09/15/20                              2,000             0  SLC             0           0           0 CS Arch                                 0        /  /                         10/23/20           

          XXStorage #1 @ Brick Church Rd-Remvd:
20-0729TQ Temporary Quarters           8-083-001  02/01/21     DONE    DONE       DONE      10/29/20   10/23/20   08/19/20   09/15/20                              2,000             0  SLC             0           0           0 CS Arch                                 0        /  /                         10/23/20           

          XXStorage #2 @ Brick Church Rd-Remvd:
20-0730TQ Temporary Quarters           8-084-001  02/01/21     DONE    DONE       DONE      10/29/20   10/23/20   08/19/20   09/15/20                              2,000             0  SLC             0           0           0 CS Arch                                 0        /  /                         10/23/20           

          XXStorage #3 @ Viola Rd-Canceled:
  -    XX Reconstruction               8-085-001                         CANCELLED            /  /       /  /     08/19/20     /  /                                    0             0  SLC             0           0           0                                         0        /  /                           /  /             

          XXStorage #4 @ Viola Rd-Canceled:
  -    XX Reconstruction               8-086-001                         CANCELLED            /  /       /  /     08/19/20     /  /                                    0             0  SLC             0           0           0                                         0        /  /                           /  /             

          XXStorage #5 @ Viola Rd.-Removed:
20-0731TQ Temporary Quarters           8-087-001  02/01/21     DONE    DONE       DONE      10/29/20   10/23/20   08/19/20   09/15/20                              2,000             0  SLC             0           0           0 CS Arch                                 0        /  /                         10/23/20           

          XXStorage #6 @ Viola Rd. - Removed:
20-0732TQ Temporary Quarters           8-088-001  02/01/21     DONE    DONE       DONE      10/29/20   10/23/20   08/19/20   09/15/20                              2,000             0  SLC             0           0           0 CS Arch                                 0        /  /                         10/23/20           

          XXStorage #1 @ Lime Kiln Rd.-Removed:
20-0733TQ Temporary Quarters           8-089-001  02/01/21     DONE    DONE       DONE      10/29/20   10/23/20   08/19/20   09/15/20                              2,000             0  SLC             0           0           0 CS Arch                                 0        /  /                         10/23/20           

          XXStorage #2 @ Lime Kiln Rd.-Removed:
20-0734TQ Temporary Quarters           8-090-001  02/01/21     DONE    DONE       DONE      10/29/20   10/23/20   08/19/20   09/15/20                              2,000             0  SLC             0           0           0 CS Arch                                 0        /  /                         10/23/20           

          XXStorage #1 @ Margetts Rd.-Removed:
20-0735TQ Temporary Quarters           8-091-001  02/01/21     DONE    DONE       DONE      10/29/20   10/23/20   08/19/20   09/15/20                              2,000             0  SLC             0           0           0 CS Arch                                 0        /  /                         10/23/20           

          XXStorage #2 @ Margetts Road-Removed:
20-0736TQ Temporary Quarters           8-092-001  02/01/21     DONE    DONE       DONE      10/29/20   10/23/20   08/19/20   09/15/20                              2,000             0  SLC             0           0           0 CS Arch                                 0        /  /                         10/23/20           

          XXStorage # 2 @ Pomona Rd.-Removed:
20-0737TQ Temporary Quarters           8-093-001  02/01/21     DONE    DONE       DONE      10/29/20   10/23/20   08/19/20   09/15/20                              2,000             0  SLC             0           0           0 CS Arch                                 0        /  /                         10/23/20           

          XXStorage #3 @ Pomona Rd.-Removed:
20-0738TQ Temporary Quarters           8-094-001  02/01/21     DONE    DONE       DONE      10/29/20   10/23/20   08/19/20   09/15/20                              2,000             0  SLC             0           0           0 CS Arch                                 0        /  /                         10/23/20           

          XXStorage #3 @ Viola Rd.-Removed:
20-0739TQ Temporary Quarters           8-095-001  02/01/21     DONE    DONE       DONE      10/29/20   10/23/20   08/19/20   09/15/20                              2,000             0  SLC             0           0           0 CS Arch                                 0        /  /                         10/23/20           

          XXStorage #4 @ Viola Rd.-Removed:
20-0740TQ Temporary Quarters           8-096-001  02/01/21     DONE    DONE       DONE      10/29/20   10/23/20   08/19/20   09/15/20                              2,000             0  SLC             0           0           0 CS Arch                                 0        /  /                         10/23/20           

          XXStorage # 8 @ Route 59-Removed:
20-0741TQ Temporary Quarters           8-097-001  02/01/21     DONE    DONE       DONE      10/29/20   10/23/20   08/19/20   09/15/20                              2,000             0  SLC             0           0           0 CS Arch                                 0        /  /                         10/23/20           

          XXStorage #9 @ Route 59-Removed:
20-0742TQ Temporary Quarters           8-098-001  02/01/21     DONE    DONE       DONE      10/29/20   10/23/20   08/19/20   09/15/20                              2,000             0  SLC             0           0           0 CS Arch                                 0        /  /                         10/23/20           

          XXStorage # 3 @ Route45(ChestnutR MS:
20-0743TQ Temporary Quarters           8-099-001  02/01/21     DONE    DONE       DONE      10/29/20   10/23/20   08/19/20   09/15/20                              2,000             0  SLC             0           0           0 CS Arch                                 0        /  /                         10/23/20           

          XXStorage #4 @ Route 45 - Removed:
20-0744TQ Temporary Quarters           8-100-001  02/01/21     DONE    DONE       DONE      10/29/20   10/23/20   08/19/20   09/15/20                              2,000             0  SLC             0           0           0 CS Arch                                 0        /  /                         10/23/20           

          XXStorage #3 @ New HempsteadRd-Remvd:
20-0745TQ Temporary Quarters           8-101-001  02/01/21     DONE    DONE       DONE      10/29/20   10/23/20   08/19/20   09/15/20                              2,000             0  SLC             0           0           0 CS Arch                                 0        /  /                         10/23/20           

          XXStorage # 1 @ Grandview Ave.-Remvd:
20-0746TQ Temporary Quarters           8-102-001  02/01/21     DONE    DONE       DONE      10/29/20   10/23/20   08/19/20   09/15/20                              2,000             0  SLC             0           0           0 CS Arch                                 0        /  /                         10/23/20           

          XXStorage #3 @ Route 45 (@Summit Pk:
20-0747TQ Temporary Quarters           8-103-001  02/01/21     DONE    DONE       DONE      10/29/20   10/23/20   08/19/20   09/15/20                              2,000             0  SLC             0           0           0 CS Arch                                 0        /  /                         10/23/20           

          XXStorage #4 @ Route 45 (@ Summit Pk:
20-0748TQ Temporary Quarters           8-104-001  02/01/21     DONE    DONE       DONE      10/29/20   10/23/20   08/19/20   09/15/20                              2,000             0  SLC             0           0           0 CS Arch                                 0        /  /                         10/23/20           

          XXStorage #1 @ Eldorado Dr.-Removed:
20-0749TQ Temporary Quarters           8-105-001  02/01/21     DONE    DONE       DONE      10/29/20   10/23/20   08/19/20   09/15/20                              2,000             0  SLC             0           0           0 CS Arch                                 0        /  /                         10/23/20           

          XXStorage #2 @ Eldorado Dr.-Removed:
20-0750TQ Temporary Quarters           8-106-001  02/01/21     DONE    DONE       DONE      10/29/20   10/23/20   08/19/20   09/15/20                              2,000             0  SLC             0           0           0 CS Arch                                 0        /  /                         10/23/20           

          XXStorage #2 @ Robert Pitt Dr.-Remvd:
20-0751TQ Temporary Quarters           8-107-001  02/01/21     DONE    DONE       DONE      10/29/20   10/23/20   08/19/20   09/15/20                              2,000             0  SLC             0           0           0 CS Arch                                 0        /  /                         10/23/20           

          XXStorage #3 @ Robert Pitt Dr.-Remvd:
20-0752TQ Temporary Quarters           8-108-001  02/01/21     DONE    DONE       DONE      10/29/20   10/23/20   08/19/20   09/15/20                              2,000             0  SLC             0           0           0 CS Arch                                 0        /  /                         10/23/20           

          XXStorage #2 @ Fleetwood Ave.-Remvd:
20-0753TQ Temporary Quarters           8-109-001  02/01/21     DONE    DONE       DONE      10/29/20   10/23/20   08/19/20   09/15/20                              2,000             0  SLC             0           0           0 CS Arch                                 0        /  /                         10/23/20           

          XXStorage #3 @ Fleetwood Ave.-Remvd:
20-0754TQ Temporary Quarters           8-110-001  02/01/21     DONE    DONE       DONE      10/29/20   10/23/20   08/19/20   09/15/20                              2,000             0  SLC             0           0           0 CS Arch                                 0        /  /                         10/23/20           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




BOCES ROCKLAND STATUS REPORT ON CAPITAL PROJECTS
District No.: 50-90-00-00
last updated on 03/28/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Bldg #1,Ctr Of Occ:
  -       Reconstruction               0-001-006                                              /  /       /  /     02/21/23     /  /     2                              0             0  WLC             0           0           0                                         0        /  /                           /  /             

          #2 Ctr Of Occ Educ:
23-0149   Reconstruction               0-002-008  12/22/23     DONE    DONE       DONE      07/26/23   07/25/23     /  /     06/21/23   2                        255,792       116,800  WLC             0           0           0 KSQ Design                              0        /  /                         07/25/23           

          #3 Ctr Of Occ Educ:
  -       Reconstruction               0-003-009                                              /  /       /  /     12/15/23     /  /     2                              0             0  WLC             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-003-010                                              /  /       /  /     12/15/23     /  /     2                              0             0  WLC             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-003-011                                              /  /       /  /     12/15/23     /  /     2                              0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Bldg#6 Ctr Of Occ Ed:
22-1812   Reconstruction               0-006-004  07/13/23     DONE    DONE       DONE      03/10/23   03/07/23   11/17/22   11/17/21   7,8,9,155,15,16          255,000       250,460  WLC             0           0           0 KSQ Design                              0        /  /                         03/07/23           
  -       Reconstruction               0-006-005                                              /  /       /  /     02/21/23     /  /     2                              0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Jessie J Kaplan #9:
  -       Reconstruction               0-010-009                                              /  /       /  /     12/15/22     /  /     13                             0             0  JLB             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-010-010                                              /  /       /  /     12/15/23     /  /     10                             0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Student Lifeskills Bldg:
  -    PR New Construction             0-041-001                                              /  /       /  /     01/13/22     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                           /  /             
21-1962   New Construction             0-041-001               STARTED DONE       DONE      06/10/22   06/10/22   01/13/22   05/11/22   02 - 16                        0             0  WLC             0           0           0 LAN Associates                          0        /  /                         06/10/22           

          Next Gen CTEC-PTEC:
  -    PR New Construction             0-044-001                                              /  /       /  /     10/24/23     /  /     02 - 16                        0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Administration Bldg:
  -       Reconstruction               1-007-008                                              /  /       /  /     03/30/23     /  /     2,7,8,9,155,16                 0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Bldg #5 BUS GARAGE/WELDNG&MECH INSTR:
18-1000   Reconstruction               5-009-006  06/26/19     DONE    DONE       DONE      12/04/18   11/29/18   08/30/18   10/17/18   155                       10,000        10,000  MTM             0           0           0 Michael Shilale Architects,LL           0      08/02/19                       11/29/18           
  -       Reconstruction               5-009-007                                              /  /       /  /     12/15/22     /  /     13                             0             0  JLB             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               5-009-008                                              /  /       /  /     03/12/24     /  /     2,13,16                        0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Student Recreation Bldg #13:
  -       New Construction             7-039-001                                              /  /       /  /     01/03/20     /  /     02 - 16                        0             0  JSS             0           0           0                                         0        /  /                           /  /             

          Old Rockland County Day School:
  -    XX Alterations                  8-040-001                         CANCELLED            /  /       /  /     07/28/20     /  /                                    0             0  JSS             0           0           0                                         0        /  /                           /  /             

          Nyack UFSD Admin Bldg-Mtnside:
  -    TQ Temporary Quarters           8-042-001                                              /  /       /  /     01/03/23     /  /                                    0             0  JLB             0           0           0                                         0        /  /                           /  /             

          Nyack UFSD:
  -    TQ Temporary Quarters           8-043-001                                              /  /       /  /     01/03/23     /  /                                    0             0  JLB             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED