Construction Project Status

Construction Project Status

THE STATE EDUCATION DEPARTMENT

FACILITIES PLANNING


UPDATED: 11/22/17 at 08:53:18




CLARKSTOWN CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 50-01-01-06
last updated on 11/22/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Congers Elementary:
14-0120   Reconstruction               0-001-015  09/02/14     DONE    DONE       DONE      08/12/14   08/01/14   10/03/13   02/06/14   2,4,7,8,9              6,500,000             0  JMB             0           0           0 Collins & Scoville Architects           0      10/20/15                       07/14/16           

          Birchwood School:
15-1893   Reconstruction               0-002-011  11/07/16     DONE    DONE       DONE      06/09/16   06/08/16   01/19/16   12/10/15   2,155,16                 657,236             0  JMB             0           0           0 Collins & Scoville Architects           0        /  /                           /  /             
16-1220   Reconstruction               0-002-012  03/21/17     DONE    DONE       DONE      01/20/17   01/20/17   10/14/16   05/17/16   8                         22,971             0  SLC             0           0           0 Collins & Scoville Architects           0        /  /                           /  /             

          New City Elementary:
17-0175   Reconstruction               0-003-014  11/09/17     DONE    DONE       DONE      08/09/17   08/08/17   10/01/16   12/10/15   2,7                    1,711,831             0  SLC             0           0           0 Collins & Scoville Architects           0        /  /                           /  /             

          Little Tor Elementary School:
17-0176   Reconstruction               0-004-015  11/09/17     DONE    DONE       DONE      08/09/17   08/08/17   10/01/16   12/10/15   2,7,16                 2,146,476             0  SLC             0           0           0 Collins & Scoville Architects           0        /  /                           /  /             

          West Nyack Elementary School:
17-0177   Reconstruction               0-006-018  11/09/17     DONE    DONE       DONE      08/09/17   08/08/17   10/01/16   12/10/15   2,7,16                 1,788,882             0  SLC             0           0           0 Collins & Scoville Architects           0        /  /                           /  /             

          Bardonia Elementary School:
15-1894   Reconstruction               0-007-018  11/07/16     DONE    DONE       DONE      06/09/16   06/08/16   01/19/16   12/10/15   2,16                       8,573             0  JMB             0           0           0 Collins & Scoville Architects           0        /  /                           /  /             
16-1221   Reconstruction               0-007-019  03/21/17     DONE    DONE       DONE      01/20/17   01/20/17   10/14/16   05/19/15   16                        56,151             0  SLC             0           0           0 Collins & Scoville Architects           0        /  /                           /  /             

          Senior High School North:
11-1259   Reconstruction               0-010-014  12/11/12     DONE    DONE       DONE      05/03/12   05/03/12   05/24/01   06/09/11   10,16                    417,484       417,484  MGL             0           0           0 Fellenzer Engineering                   0      09/26/13                       10/02/13           
12-0065   Additions and Alterations    0-010-019  03/04/13     DONE    DONE       DONE      07/27/12   07/19/12   04/05/12   05/15/12   02 - 16                  500,000             0  HCM             0           0           0 Fellenzer Engineering                   0      10/23/15                       11/13/15           
15-1895   Reconstruction               0-010-020  11/07/16     DONE    DONE       DONE      06/09/16   06/08/16   01/19/16   12/10/15   2,4,8,9,155,16         1,600,227     1,600,227  JMB             0           0           0 Collins & Scoville Architects           0        /  /                           /  /             
16-0519   Reconstruction               0-010-021  12/08/16     DONE    DONE       DONE      09/29/16   09/28/16   01/19/16   12/10/15   2,7                    4,603,293     4,603,293  JMB             0           0           0 Collins & Scoville Architects           0        /  /                           /  /             
16-0263   Reconstruction               0-010-022  09/20/16     DONE    DONE       DONE      08/16/16   08/15/16   06/16/16   05/17/16   4                         77,770        77,770  AAA             0           0           0 Collins & Scoville Architects           0        /  /                           /  /             
16-1222   Reconstruction               0-010-023  03/21/17     DONE    DONE       DONE      01/20/17   01/20/17   10/14/16   05/17/16   8                         50,249        50,249  SLC             0           0           0 Collins & Scoville Architects           0        /  /                           /  /             

          Laurel Plains Elementary:
15-1896   Reconstruction               0-011-012  11/07/16     DONE    DONE       DONE      06/09/16   06/08/16   01/19/16   12/10/15   2,16                     300,043       300,043  JMB             0           0           0 Collins & Scoville Architects           0        /  /                           /  /             
16-0520   Reconstruction               0-011-013  12/08/16     DONE    DONE       DONE      09/29/16   09/28/16   01/19/16   12/10/15   2,7                    2,105,590     2,105,590  JMB             0           0           0 Collins & Scoville Architects           0        /  /                           /  /             

          Felix Festa Junior High:
14-0579   Reconstruction               0-012-027  02/17/15     DONE    DONE       DONE      11/05/14   11/04/14   01/21/14   05/20/14   2,7                    2,000,000     2,000,000  JMB             0           0           0 Collins & Scoville Architects           0      02/19/16                       03/14/16           
15-1897   Reconstruction               0-012-028  11/07/16     DONE    DONE       DONE      06/09/16   06/08/16   01/19/16   10/12/15   2,155,16               1,300,185     1,300,185  JMB             0           0           0 Collins & Scoville Architects           0        /  /                           /  /             
16-0521   Reconstruction               0-012-029  12/08/16     DONE    DONE       DONE      09/29/16   09/28/16   01/19/16   12/10/15   2,7                    5,547,266     5,547,266  JMB             0           0           0 Collins & Scoville Architects           0        /  /                           /  /             
  -       Reconstruction               0-012-030                                              /  /       /  /     10/07/16     /  /     9,16                           0    53,365,248  SLC             0           0           0                                         0        /  /                           /  /             
16-1223   Reconstruction               0-012-031  03/21/17     DONE    DONE       DONE      01/20/17   01/20/17   10/17/16   05/17/16   2,8,9,10,14,155,16       168,454             0  SLC             0           0           0 Collins & Scoville Architects           0        /  /                           /  /             
16-0928   Reconstruction               0-012-032  01/20/17     DONE    DONE       DONE      12/07/16   12/05/16   12/06/16   05/17/16   2,9,10,14,16             249,453             0  SLC             0           0           0 Collins & Scoville Architects           0        /  /                           /  /             

          Dina Link Elementary:
17-0178   Reconstruction               0-013-014  11/09/17     DONE    DONE       DONE      08/09/17   08/08/17   10/01/16   12/10/15   2,7,16                 1,338,932             0  SLC             0           0           0 Collins & Scoville Architects           0        /  /                           /  /             

          Lakewood Elementary School:
17-0179   Reconstruction               0-017-011  11/09/17     DONE    DONE       DONE      08/09/17   08/08/17   10/01/16   12/10/15   2,7,16                 1,387,826             0  SLC             0           0           0 Collins & Scoville Architects           0        /  /                           /  /             

          Senior High School South:
15-1898   Reconstruction               0-018-020  11/07/16     DONE    DONE       DONE      06/09/16   06/08/16   01/19/16   10/12/15   155,16                 2,328,902     2,328,902  JMB             0           0           0 Collins & Scoville Architects           0        /  /                           /  /             
16-0929   Reconstruction               0-018-021  01/20/17     DONE    DONE       DONE      12/07/16   12/05/16   11/25/16   05/19/15   2,9,10,14,16             380,426       380,426  SLC             0           0           0 Collins & Scoville Architects           0        /  /                           /  /             
  -       Alterations                  0-018-022                                              /  /       /  /       /  /       /  /                                    0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Strawtown Road Elementary:
16-0647   Reconstruction               0-019-013  01/18/17     DONE    DONE       DONE      10/18/16   10/18/16   02/19/15   05/17/16   4                        175,473             0  JMB             0           0           0 Collins & Scoville Architects           0        /  /                           /  /             
17-0180   Reconstruction               0-019-014  11/09/17     DONE    DONE       DONE      08/09/17   08/08/17   10/01/16   12/10/15   2,7                    1,130,375             0  SLC             0           0           0 Collins & Scoville Architects           0        /  /                           /  /             
16-1224   Reconstruction               0-019-015  03/21/17     DONE    DONE       DONE      01/20/17   01/20/17   10/14/16   05/19/15   14                        32,303             0  SLC             0           0           0 Collins & Scoville Architects           0        /  /                           /  /             

          South High School Parking:
11-0017   New Construction             7-033-001  11/20/15     DONE    DONE       DONE      ***FINAL APPLICATION FORM INCOMPLETE/INCORRECT***                                        0  HCM             0           0           0 Fellenzer Engineering                   0      12/17/15                       03/14/16           

          North HS Concession Stand:
12-0456   New Construction             7-035-001  03/26/13     DONE    DONE       DONE      11/19/12   11/16/12   08/09/12   09/27/12   02 - 16                  153,450             0  JMB             0           0           0 Fellenzer Engineering                   0      05/19/14                       06/05/14           

          NHS Guard Booth:
12-0929   New Construction             7-036-001  05/02/13     DONE    DONE       DONE      02/28/13   02/27/13   01/17/13   05/15/12   02 - 16                   40,996             0  JMB             0           0           0 Collins & Scoville Architects           0        /  /                           /  /             

          NHS Guard Booth #2:
15-0582   New Construction             7-038-001  01/04/16     DONE    DONE       DONE      10/15/15   07/28/15   10/15/15   05/20/14   02 - 16                   37,400             0  JMB             0           0           0 H2M Architects + Engineers              0        /  /                           /  /             

          Athletic Stg Container @ South HS:
  -       New Construction             7-039-001                                              /  /       /  /     06/24/16     /  /     02 - 16                        0             0  AAA             0           0           0                                         0        /  /                           /  /             

          District-Wide:
13-1167   Reconstruction               7-999-007  08/12/14     DONE    DONE       DONE      02/03/14   01/31/14   11/12/13   05/21/13   4,8,10,16                599,450       599,450  JMB             0           0           0 H2M Group                               0      12/27/15                       06/21/16           
15-0180   Reconstruction               7-999-008  01/04/16     DONE    DONE       DONE      07/29/15   07/28/15   05/21/15   05/20/14   10,13,16                 524,350       524,350  JMB             0           0           0 H2M Architects + Engineers              0        /  /                           /  /             
15-1313SB Reconstruction               7-999-009                         UNREVIEWED         02/26/16   02/26/16   02/26/16     /  /     10,16                          0             0  JMB             0           0           0                                         0        /  /                           /  /             
16-1499   Reconstruction               7-999-009  06/14/17     DONE    DONE       DONE      03/13/17   03/13/17     /  /     11/04/14   10,16                    250,481       250,481  JMB             0           0           0 Collins & Scoville Architects           0        /  /                           /  /             
15-2004   Reconstruction               7-999-010  08/08/16     DONE    DONE       DONE      06/29/16   06/28/16   06/15/16   05/17/16   2,9                    1,806,749     1,806,749  DDJ             0           0           0 Collins & Scoville Architects           0        /  /                           /  /             

          XXSt. Augustine Schl (2015 no lease):
13-0470   Reconstruction               8-037-L01  10/25/13     DONE    DONE       DONE      10/08/13   10/08/13   10/08/13     /  /                              195,000       195,000  JMB             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




NANUET UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 50-01-08-03
last updated on 11/22/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Miller Elementary:
13-1507   Reconstruction               0-001-018  05/07/15     DONE    DONE       DONE      05/07/14   04/30/14   01/08/14   11/19/13   7,16                           0    13,020,428  JMB             0           0           0                                         0        /  /                           /  /             
14-0831   Reconstruction               0-001-019  11/04/15     DONE    DONE       DONE      12/24/14   12/19/14   10/27/14   05/19/15   2,9,155,15,16             78,000        78,000  JMB             0           0           0 KSQ ARCHITECTS PC                       0        /  /                           /  /             
  -       Reconstruction               0-001-020                                              /  /       /  /     06/14/16     /  /     16                             0     9,469,710  AAA             0           0           0                                         0        /  /                           /  /             

          Highview Elementary:
13-1423   Reconstruction               0-002-016  06/04/14     DONE    DONE       DONE      04/01/14   03/31/14   02/28/14   05/20/14   2,9                      500,000       500,000  JMB             0           0           0 KSQ ARCHITECTS PC                       0      08/28/14                       03/20/15           
14-0832   Reconstruction               0-002-017  11/04/15     DONE    DONE       DONE      12/24/14   12/19/14   10/27/14   05/19/15   2,9,155,15,16             78,000        78,000  JMB             0           0           0 KSQ ARCHITECTS PC                       0        /  /                           /  /             

          Nanuet Senior High:
12-0875   Reconstruction               0-003-023  09/20/13     DONE    DONE       DONE      02/20/13   02/19/13   05/23/12   05/15/12   2,4,16                   500,000       500,000  HCM             0           0           0 KSQ ARCHITECTS PC                       0      11/24/15                       08/04/17           
13-1508   Reconstruction               0-003-024  05/07/15     DONE    DONE       DONE      05/07/14   04/30/14   01/08/14   11/19/13   7,16                           0             0  JMB             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-003-025                                              /  /       /  /     06/14/16     /  /     9,15,16                        0    12,137,008  AAA             0           0           0                                         0        /  /                           /  /             
16-1485   Reconstruction               0-003-026  05/19/17     DONE    DONE       DONE      03/09/17   03/09/17   01/06/17   05/17/16   2,9                      785,000             0  SLC             0           0           0 KSQ ARCHITECTS PC                       0        /  /                           /  /             
  -       Reconstruction               0-003-027                                              /  /       /  /     04/12/17     /  /     4,8,9,10,15,16                 0             0  SLC             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-003-028                                              /  /       /  /     07/13/17     /  /     8,9,10,155,15,16               0             0  SLC             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-003-029                                              /  /       /  /     11/21/17     /  /     2                              0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Barr Middle School:
13-1509   Reconstruction               0-004-015  05/07/15     DONE    DONE       DONE      05/07/14   04/30/14   01/08/14   11/19/13   7,16                           0             0  JMB             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-004-016                                              /  /       /  /     10/27/14     /  /     2,9,155,15,16                  0    16,149,882  JMB             0           0           0                                         0        /  /                           /  /             
14-0833   Reconstruction               0-004-017  11/04/15     DONE    DONE       DONE      12/24/14   12/19/14   10/27/14   05/19/15   2,4,9,155,15,16        1,083,000     1,083,000  JMB             0           0           0 KSQ ARCHITECTS PC                       0      09/29/16                       12/09/16           
15-1915   Reconstruction               0-004-018  07/06/16     DONE    DONE       DONE      06/14/16   06/14/16   03/10/16   05/17/16   2                        120,000       120,000  JMB             0           0           0 KSQ ARCHITECTS PC                       0      08/29/16                       08/04/17           

          Public Library:
12-1007   Reconstruction               6-005-003  06/18/13     DONE    DONE       DONE      03/21/13   03/18/13   01/24/13   03/05/13   155,16                   185,600             0  JMB             0           0           0 Savin Engineers, P.C.                   0        /  /                           /  /             
  -       Reconstruction               6-005-004                                              /  /       /  /     09/11/17     /  /     10,14                          0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Nanuet Outdoor Recreation Center:
10-1319DB Discovered Building          7-012-001  03/19/14     DONE    DONE       DONE      05/19/11   05/19/11   08/24/07     /  /                                    0             0  HCM             0           0           0                                         0      08/21/14                       09/17/14           
14-0834   Reconstruction               7-012-002  11/04/15     DONE    DONE       DONE      12/24/14   12/19/14   09/08/14   09/09/14   8,9,10,155,15,16         100,000             0  JMB             0           0           0 KSQ ARCHITECTS PC                       0        /  /                           /  /             
  -       Reconstruction               7-012-003                                              /  /       /  /     11/21/17     /  /     8,9,10,155,15,16               0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Horse Stables:
10-1320DB Discovered Building          7-013-001  03/17/14     DONE    DONE       DONE      05/19/11   05/19/11   08/24/07     /  /                                    0             0  HCM             0           0           0                                         0      08/21/14                       09/17/14           

          Children of Promise Equestrian Ring:
12-0535   New Construction             7-017-001  05/02/13     DONE    DONE       DONE      12/12/12   11/21/12   04/24/12   06/20/12   02 - 16                  238,418             0  HCM             0           0           0 John E. Collazuol and Associa           0      08/11/15                       08/21/15           

          NOEC Horse Stalls:
13-0025   New Construction             7-018-001  07/12/13     DONE    DONE       DONE      07/10/13   07/03/13   06/14/13   06/18/13   02 - 16                   11,300             0  JMB             0           0           0 NTA INC. ENGINEERS PLANNERS C           0        /  /                           /  /             

          NOEC Greenhouse:
13-1351   New Construction             7-019-001  09/16/14     DONE    DONE       DONE      03/17/14   03/12/14   11/13/13   09/10/13   02 - 16                   70,000             0  JMB             0           0           0 KSQ ARCHITECTS PC                       0      05/27/15                       06/27/16           

          District Wide:
13-0139   Reconstruction               7-999-003  10/10/13     DONE    DONE       DONE      08/06/13   08/06/13   05/15/13   05/21/13   10,16                    500,000       500,000  JMB             0           0           0 KSQ ARCHITECTS PC                       0      09/24/14                       08/04/17           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




NORTH ROCKLAND/HAVERSTRAW-STONY PT STATUS REPORT ON CAPITAL PROJECTS
District No.: 50-02-01-06
last updated on 11/22/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Farley Elementary:
13-1540   Reconstruction               0-003-009  07/22/14     DONE    DONE       DONE      05/19/14   05/12/14   08/26/13   11/19/13   155,16                   764,976       764,976  DDJ             0           0     258,562 Michael Shilale Architects,LL           0        /  /                           /  /             

          North Rockland High School Ext.:
13-1541   Reconstruction               0-007-014  07/22/14     DONE    DONE       DONE      05/19/14   05/12/14   08/26/13   11/19/13   2,4,155,16               136,000       136,000  DDJ             0           0      45,968 Michael Shilale Architects,LL           0        /  /                           /  /             

          Haverstraw Elementary:
13-1542   Reconstruction               0-009-016  07/22/14     DONE    DONE       DONE      05/19/14   05/12/14   08/26/13   11/19/13   2,4,7,9                1,323,165     1,323,165  DDJ             0           0     447,230 Michael Shilale Architects,LL           0        /  /                           /  /             

          Stony Point Elementary:
13-1543   Reconstruction               0-014-008  07/22/14     DONE    DONE       DONE      05/19/14   05/12/14   08/26/13   11/19/13   2,7,16                 1,397,428     1,397,428  DDJ             0           0     472,331 Michael Shilale Architects,LL           0        /  /                           /  /             

          North Rockland High School:
13-1544   Reconstruction               0-016-023  07/22/14     DONE    DONE       DONE      05/19/14   05/12/14   08/26/13   11/19/13   2,4,7,9,155,15,16      2,736,536     2,736,536  DDJ             0           0     926,261 Michael Shilale Architects,LL           0        /  /                           /  /             

          West Haverstraw Elementary:
13-1545   Reconstruction               0-024-011  07/22/14     DONE    DONE       DONE      05/19/14   05/12/14   08/26/13   11/19/13   2,7,15,16                293,366       293,366  DDJ             0           0      99,158 Michael Shilale Architects,LL           0        /  /                           /  /             

          Thiells Elementary School:
13-1546   Reconstruction               0-025-013  07/22/14     DONE    DONE       DONE      05/19/14   05/12/14   08/26/13   11/19/13   2,7,16                   529,142       529,142  DDJ             0           0     178,850 Michael Shilale Architects,LL           0        /  /                           /  /             

          Willow Grove MS (fmly 8-030):
13-1548   Reconstruction               0-030-012  07/22/14     DONE    DONE       DONE      05/19/14   05/12/14   08/26/13   11/19/13   4,9                      158,550       158,550  DDJ             0           0      53,590 Michael Shilale Architects,LL           0      01/08/15                       02/05/15           

          Fieldstone Middle School:
13-1547   Reconstruction               0-031-003  07/22/14     DONE    DONE       DONE      05/19/14   05/12/14   08/26/13   11/19/13   9                        350,837       350,837  DDJ             0           0     118,583 Michael Shilale Architects,LL           0        /  /                           /  /             

          District-Wide:
15-1451SB Reconstruction               7-999-004               DONE                           /  /       /  /     03/18/16     /  /     13,16                          0             0  DDJ             0           0           0                                         0        /  /                           /  /             
15-1933   Reconstruction               7-999-004  10/05/16     DONE    DONE       DONE      06/21/16   06/21/16     /  /     05/17/16   13,16                  5,294,721             0  DDJ             0           0           0 Michael Shilale Architects,LL           0        /  /                           /  /             
  -       Reconstruction               7-999-005                                              /  /       /  /     10/17/17     /  /                                    0             0  MTM             0           0           0                                         0        /  /                           /  /             
17-0587SB Reconstruction               7-999-005               DONE                           /  /       /  /     10/17/17     /  /                                    0             0  MTM             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




SOUTH ORANGETOWN CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 50-03-01-06
last updated on 11/22/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Tappan Zee High School:
12-0820   Reconstruction               0-006-022  10/08/13     DONE    DONE       DONE      02/12/13   02/12/13   07/18/12   05/17/12   14,16                    181,638       181,638  JOD             0           0           0 LAN Associates                          0      09/04/14                       01/20/15           
13-0676   Reconstruction               0-006-023  06/06/14     DONE    DONE       DONE      11/07/13   11/05/13   07/26/13   05/21/13   2,4,8,9,10,155,16        722,765       722,765  MFS             0           0           0 LAN Associates                          0      08/28/15                       12/18/15           
14-0266   Reconstruction               0-006-024  04/23/15     DONE    DONE       DONE      09/09/14   09/08/14   04/23/14   05/21/14   2,9,10,16              1,750,000     1,750,000  MFS             0           0           0 LAN Associates                          0      08/28/15                       12/18/15           
  -       Reconstruction               0-006-025                                              /  /       /  /     06/24/16     /  /     2,13                           0    39,252,464  AAA             0           0           0                                         0        /  /                           /  /             
16-1551   Reconstruction               0-006-026  06/19/17     DONE    DONE       DONE      03/27/17   03/27/17   12/01/16   05/19/15   9,10,155,16              696,391             0  MTM             0           0           0 D&B Engineers & Architects, P           0        /  /                           /  /             

          Tappan Zee Elementary:
13-0677   Reconstruction               0-007-017  06/06/14     DONE    DONE       DONE      11/07/13   11/05/13   10/02/13   05/21/13   16                        68,968        68,968  MFS             0           0           0 LAN Associates                          0      04/06/16                       11/14/17           

          Palisades Elementary:
16-0678   Reconstruction               0-008-011  11/23/16     DONE    DONE       DONE      10/27/16   10/27/16   10/01/16   09/24/16   155                      217,800       217,800  MTM             0           0           0 D&B Engineers & Architects, P           0        /  /                           /  /             

          Cottage Lane Elementary:
13-0678   Additions and Alterations    0-010-017  06/06/14     DONE    DONE       DONE      11/07/13   11/05/13   07/25/13   05/21/13   02 - 16                  800,455       800,455  MFS             0           0           0 LAN Associates                          0      08/28/15                       12/18/15           

          Greenbush Academy:
13-0679   Reconstruction               0-011-009  06/06/14     DONE    DONE       DONE      11/07/13   11/05/13   07/25/13   05/21/13   8,9                      157,275             0  MFS             0           0           0 LAN Associates                          0        /  /                           /  /             

          William Schaefer Elementary:
12-0822   Reconstruction               0-012-013  10/08/13     DONE    DONE       DONE      02/12/13   02/12/13   07/18/12   05/17/12   155,15,16                251,798       251,798  MFS             0           0           0 LAN Associates                          0      09/26/14                       01/20/15           
13-0680   Reconstruction               0-012-014  06/06/14     DONE    DONE       DONE      11/07/13   11/05/13   07/25/13   05/21/13   2,4,8,9,155,16           125,075       125,075  MFS             0           0           0 LAN Associates                          0      08/28/15                       12/18/15           
16-1550   Reconstruction               0-012-015  08/09/17     DONE    DONE       DONE      03/27/17   03/27/17   12/01/16   05/19/15   2,7,9,155,15,16          526,093             0  MTM             0           0           0 D&B Engineers & Architects, P           0        /  /                           /  /             

          Middle School:
12-0821   Reconstruction               0-013-022  10/08/13     DONE    DONE       DONE      02/12/13   02/12/13   07/18/12   05/17/12   8,9,10,14,16           1,092,096     1,092,096  JOD             0           0           0 LAN Associates                          0      09/22/14                       01/20/15           
13-0681   Reconstruction               0-013-023  06/06/14     DONE    DONE       DONE      11/07/13   11/05/13   07/25/13   05/21/13   2,4,8,9,155,15,16        584,121       584,121  MFS             0           0           0 LAN Associates                          0      08/28/15                       12/18/15           
16-1552   Reconstruction               0-013-024  08/10/17     DONE    DONE       DONE      03/27/17   03/27/17   12/01/16   05/19/15   2,4,8,9,10,155,15,16   1,516,477             0  MTM             0           0           0 D&B Engineers & Architects, P           0        /  /                           /  /             

          Guard Booth @ MS:
13-1329   New Construction             7-020-001  06/06/14     DONE    DONE       DONE      03/11/14   03/11/14   03/11/14   05/21/13   02 - 16                   54,400             0  MFS             0           0           0 LAN Associates                          0        /  /                           /  /             

          Guard Booth-North @ Tappan Zee HS:
13-1330   New Construction             7-021-001  06/06/14     DONE    DONE       DONE      03/11/14   03/11/14   03/11/14   05/21/13   02 - 16                   34,400             0  MFS             0           0           0 LAN Associates                          0        /  /                           /  /             

          Guard Booth-South @ Tappan Zee HS:
13-1331   New Construction             7-022-001  06/06/14     DONE    DONE       DONE      03/11/14   03/11/14   03/11/14   05/21/13   02 - 16                   34,400             0  MFS             0           0           0 LAN Associates                          0        /  /                           /  /             

          Districtwide:
12-1235   Reconstruction               7-999-002  06/19/13     DONE    DONE       DONE      05/30/13   05/28/13   05/07/13   05/21/13                            186,716             0  MFS             0           0           0 LAN Associates                          0      03/31/14                       05/11/15           
  -       Reconstruction               7-999-003                                              /  /       /  /     07/25/13     /  /     16                             0             0  MFS             0           0           0                                         0        /  /                           /  /             

          Cottage Lane Library:
  -    PR New Construction             8-023-001                                              /  /       /  /     05/23/17     /  /     02 - 16                        0             0  MTM             0           0           0                                         0        /  /                           /  /             
17-0371   New Construction             8-023-001                         UNREVIEWED         09/11/17   08/31/17   05/23/17   05/16/17   02 - 16                        0             0  MTM             0           0           0 D&B Engineers & Architects, P           0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




NYACK UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 50-03-04-03
last updated on 11/22/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Valley Cottage Elementary:
13-1199   Reconstruction               0-001-010  04/25/14     DONE    DONE       DONE      02/10/14   02/10/14   08/20/13   10/29/13   2,4,7,8,9,10,155,15,     144,619       144,619  DDJ             0           0           0 LAN Associates                          0      08/27/14                       02/09/15           
13-1684   Reconstruction               0-001-011  12/19/14     DONE    DONE       DONE      07/01/14   06/23/14   01/08/14   10/29/13   2,4,7,8,9,10,155,15,   1,472,851     1,472,851  DDJ             0           0           0 LAN Associates                          0      01/29/16                       12/23/16           

          Old Nyack HS Leased to BOCES:
13-1200   Reconstruction               0-003-012  04/28/14     DONE    DONE       DONE      02/10/14   02/10/14   08/20/13   10/29/13   2,4,7,8,9,10,155,15,     362,140       362,140  DDJ             0           0           0 LAN Associates                          0      08/27/14                       02/09/15           
16-0704   Reconstruction               0-003-013  02/18/17     DONE    DONE       DONE      11/02/16   11/02/16   01/08/14   10/29/13   2,4,7,8,10,15,16       4,830,831             0  DDJ             0           0           0 LAN Associates                          0        /  /                           /  /             
14-0358   Reconstruction               0-003-014  06/09/14     DONE    DONE       DONE      09/25/14   09/25/14   07/29/14   08/19/14   2,9,10                   200,000       200,000  DDJ             0           0           0 LAN Associates                          0      10/09/14                       02/17/15           
15-1544   Reconstruction               0-003-015  04/25/16     DONE    DONE       DONE      04/11/16   04/08/16   07/24/15   10/29/13   7                        545,281       545,281  DDJ             0           0           0 LAN Associates                          0        /  /                           /  /             
16-1055   Reconstruction               0-003-016  03/01/17     DONE    DONE       DONE      12/22/16   12/22/16   09/29/16   10/29/13   13,16                    260,787             0  SLC             0           0           0 LAN Associates                          0        /  /                           /  /             

          Nyack Middle School:
13-1685   Reconstruction               0-004-009  12/19/14     DONE    DONE       DONE      07/01/14   06/23/14   09/13/07   10/29/13   2,7,8,155,15,16          571,893       571,893  DDJ             0           0           0 LAN Associates                          0      01/29/16                       12/19/16           
12-1199   Reconstruction               0-004-010  05/23/13     DONE    DONE       DONE      05/16/13   05/14/13   04/22/13   04/23/13   2,9                      357,000       357,000  DDJ             0           0           0 LAN Associates                          0      10/30/13                       03/14/14           
16-0151   Reconstruction               0-004-011  04/25/17     DONE    DONE       DONE      07/25/16   07/25/16   08/21/13   10/29/13   2,4,7,8,9,10,155,15,   2,696,860             0  DDJ             0           0           0 LAN Associates                          0        /  /                           /  /             
15-1545   Reconstruction               0-004-012  04/25/16     DONE    DONE       DONE      03/11/16   03/08/16   07/24/15   10/29/13   7                      1,570,646     1,570,646  DDJ             0           0           0 LAN Associates                          0        /  /                           /  /             
  -       Reconstruction               0-004-013                                              /  /       /  /     01/15/16     /  /     2,8,9                          0    12,616,704  DDJ             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-004-014                                              /  /       /  /     02/02/16     /  /     2,8,9                          0    12,616,704  DDJ             0           0           0                                         0        /  /                           /  /             

          Hilltop Admin (frmly IS)(see 1-005):
12-0512   Reconstruction               0-005-006  12/20/12     DONE    DONE       DONE      12/06/12   12/06/12   09/13/07   06/12/12   7                        780,299             0  DDJ             0           0           0 DCAK-MSA Architecture                   0      07/30/13                       02/10/14           
  -       Reconstruction               0-005-007                                              /  /       /  /     08/20/13     /  /     2,4,7,8,9,10,155,15,           0             0  DDJ             0           0           0                                         0        /  /                           /  /             
14-0926   Reconstruction               0-005-008  02/13/15     DONE    DONE       DONE      01/08/15   01/07/15   06/03/14   05/20/14   2,8,13                   383,054             0  DDJ             0           0           0 LAN Associates                          0      05/30/16                       12/19/16           
14-0927   Reconstruction               0-005-009  02/13/15     DONE    DONE       DONE      01/08/15   01/07/15   10/20/14   10/21/14   2,8,10                   693,379             0  DDJ             0           0           0 LAN Associates                          0      05/30/16                       12/23/16           

          Liberty Elementary School:
17-0439   Reconstruction               0-006-011                         UNREVIEWED         09/22/17   09/22/17   08/20/13   10/29/13   2,4,7,8,9,10,155,15,           0     8,073,258  DDJ             0           0           0 LAN Associates                          0        /  /                           /  /             

          Upper Nyack Elementary School:
13-1201   Reconstruction               0-007-013  04/28/14     DONE    DONE       DONE      02/10/14   02/10/14   09/13/07   10/29/13   2,4,7,8,155,15,16         29,635        29,635  DDJ             0           0           0 LAN Associates                          0      08/27/14                       02/09/15           
13-1686   Reconstruction               0-007-014  12/19/14     DONE    DONE       DONE      07/01/14   06/23/14   08/21/13   10/29/13   2,4,7,8,9,10,155,15,     817,921       817,921  DDJ             0           0           0 LAN Associates                          0      01/18/16                       12/23/16           
16-0152   Reconstruction               0-007-015  04/25/17     DONE    DONE       DONE      07/25/16   07/25/16   01/08/14   10/29/13   2,4,7,8,9,10,155,15,     994,246             0  DDJ             0           0           0 LAN Associates                          0        /  /                           /  /             
15-1546   Reconstruction               0-007-016  04/25/16     DONE    DONE       DONE      04/11/16   04/08/16   07/24/15   10/29/13   7                        681,601       681,601  DDJ             0           0           0 LAN Associates                          0      09/28/16                       06/19/17           
  -       Reconstruction               0-007-017                                              /  /       /  /     01/15/16     /  /     2,4,8,9                        0     7,774,488  DDJ             0           0           0                                         0        /  /                           /  /             

          High School:
13-1687   Reconstruction               0-021-007  12/19/14     DONE    DONE       DONE      07/01/14   06/23/14   08/20/13   10/29/13   2,4,7,8,9,10,155,15,   2,655,726     2,655,726  DDJ             0           0           0 LAN Associates                          0      01/18/16                       12/23/16           
15-0057   Reconstruction               0-021-008  03/22/16     DONE    DONE       DONE      07/13/15   07/13/15   12/05/13   10/29/13   2,4,7,8,9,10,155,15,   8,630,309     8,630,309  DDJ             0           0           0 LAN Associates                          0        /  /                           /  /             
  -       Reconstruction               0-021-009                                              /  /       /  /     12/05/13     /  /     2,4,7,8,9,10,155,15,           0    22,630,088  DDJ             0           0           0                                         0        /  /                           /  /             
16-0116   Reconstruction               0-021-010  04/17/17     DONE    DONE       DONE      07/18/16   07/18/16   02/02/16   05/17/16   9,10,16                  541,000             0  DDJ             0           0           0 LAN Associates                          0        /  /                           /  /             

          Hilltop Administration:
  -       Reconstruction               1-005-001                                              /  /       /  /     07/24/15     /  /     7                              0             0  DDJ             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               1-005-002                                              /  /       /  /     06/22/17     /  /     2,10                           0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Wood Shop Annex-Old Nyack HS:
16-1038   Reconstruction               2-015-001  02/18/17     DONE    DONE       DONE      12/21/16   12/19/16   12/01/16   10/29/13   4,7,8                    264,000             0  SLC             0           0           0 LAN Associates                          0        /  /                           /  /             

          Field House Bus Garage:
15-0058   Reconstruction               5-019-001  03/22/16     DONE    DONE       DONE      07/13/15   07/13/15   01/08/14   10/29/13   155                       47,416        47,416  DDJ             0           0           0 LAN Associates                          0      09/28/16                       06/19/17           

          Exhibitn Field PressBox/Toil/Concess:
15-0059   New Construction             7-031-001  03/22/16     DONE    DONE       DONE      07/13/15   07/13/15   03/04/14   10/29/13   02 - 16                   92,400             0  DDJ             0           0           0 LAN Associates                          0        /  /                           /  /             

          Concession Stand:
15-0060   New Construction             7-032-001  03/22/16     DONE    DONE       DONE      07/13/15   07/13/15   03/04/14   10/29/13   02 - 16                  434,280             0  DDJ             0           0           0 LAN Associates                          0        /  /                           /  /             

          Memorial Press Box/Concession @ HS:
  -       New Construction             7-033-001                                              /  /       /  /     06/30/15     /  /     02 - 16                        0             0  DDJ             0           0           0                                         0        /  /                           /  /             

          District-Wide:
12-1347   Reconstruction               7-999-004  07/18/13     DONE    DONE       DONE      07/01/13   06/28/13   04/22/13   04/23/13   10,16                    139,750       139,750  DDJ             0           0           0 LAN Associates                          0      04/29/14                       05/29/14           
13-1212   Reconstruction               7-999-005  06/18/14     DONE    DONE       DONE      02/12/14   02/11/14   12/05/13   10/29/13   8,16                     643,940       643,940  DDJ             0           0     134,096 LAN Associates                          0      08/27/14                       02/09/15           
15-1970   Reconstruction               7-999-006  07/11/16     DONE    DONE       DONE      06/23/16   06/23/16   12/05/13   05/17/16   8,16                     100,000             0  DDJ             0           0           0 LAN Associates                          0        /  /                           /  /             
  -       Reconstruction               7-999-007                                              /  /       /  /     04/18/16     /  /     16                             0             0  DDJ             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




PEARL RIVER UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 50-03-08-03
last updated on 11/22/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Evans Park School:
  -       Reconstruction               0-002-012                                              /  /       /  /     06/05/17     /  /     8,155,15                       0     7,928,244  BMJ             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-002-013                                              /  /       /  /     06/05/17     /  /     8,9,155,15,16                  0             0  BMJ             0           0           0                                         0        /  /                           /  /             

          Lincoln Ave.Elementary School:
  -       Reconstruction               0-003-012                                              /  /       /  /     06/05/17     /  /     10,155,15                      0             0  BMJ             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-003-013                                              /  /       /  /     06/05/17     /  /     9,155,15,16                    0     5,839,776  BMJ             0           0           0                                         0        /  /                           /  /             

          Senior High School:
14-1711   Reconstruction               0-009-020  09/22/15     DONE    DONE       DONE      06/23/15   06/19/15   11/04/14   05/19/15   4,10,155                 783,000       783,000  JMB             0           0           0 KEEL ARCHITECTURE                       0      09/04/16                       04/12/17           
  -       Reconstruction               0-009-021                                              /  /       /  /     02/25/15     /  /     155                            0    24,456,680  JMB             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-009-022                                              /  /       /  /     06/30/17     /  /     8,9,14,155,15,16               0             0  BMJ             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-009-023                                              /  /       /  /     06/30/17     /  /     9,13                           0             0  BMJ             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-009-024                                              /  /       /  /     07/31/17     /  /     7                              0    25,306,205  BMJ             0           0           0                                         0        /  /                           /  /             

          Franklin Ave. Elementary:
  -       Reconstruction               0-010-011                                              /  /       /  /     06/05/17     /  /     7,8,9,155                      0             0  BMJ             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-010-012                                              /  /       /  /     06/05/17     /  /     9,155,15,16                    0     6,150,662  BMJ             0           0           0                                         0        /  /                           /  /             

          Middle School:
  -       Reconstruction               0-011-016                                              /  /       /  /     06/27/17     /  /     2,7,8,9,155,15,16              0             0  BMJ             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-011-017                                              /  /       /  /     06/27/17     /  /     8,9,155,15                     0             0  BMJ             0           0           0                                         0        /  /                           /  /             

          Storage Building - Field:
  -       New Construction             2-019-001                                              /  /       /  /     06/30/17     /  /     02 - 16                        0             0  BMJ             0           0           0                                         0        /  /                           /  /             

          Pearl River Public Library:
15-0475XX Reconstruction               6-005-002                         CANCELLED          09/18/15   09/14/15   08/11/15     /  /     155,16                         0             0  JMB             0           0           0 KEEL ARCHITECTURE                       0        /  /                           /  /             

          Bathroom Building - Field:
  -       New Construction             7-020-001                                              /  /       /  /     07/13/17     /  /     02 - 16                        0             0  BMJ             0           0           0                                         0        /  /                           /  /             

          District-Wide:
  -    SB Reconstruction               7-999-BA1               DONE                           /  /       /  /       /  /       /  /     13                             0             0  JMB             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




RAMAPO CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 50-04-01-06
last updated on 11/22/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Suffern Middle School:
  -       Reconstruction               0-002-027                                              /  /       /  /     11/15/17     /  /     16                             0             0  BMJ             0           0           0                                         0        /  /                           /  /             

          Suffern High School:
16-0836   Reconstruction               0-020-030  06/08/17     DONE    DONE       DONE      11/23/16   11/22/16   04/05/16   05/17/16   9,10,155,15,16           400,000       400,000  JMB             0           0           0 Clark Patterson Lee                     0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
16-1061   Reconstruction               0-020-031  06/19/17     DONE    DONE       DONE      12/27/16   12/23/16   08/05/16   05/15/07   155,16                 1,073,000             0  BMJ             0           0           0 Clark Patterson Lee                     0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
16-2159   Reconstruction               0-020-032  04/04/17     DONE    DONE       DONE      06/29/17   06/29/17   01/17/17   01/20/17   7                        436,360       436,360  BMJ             0           0           0 Clark Patterson Lee                     0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
16-2071   Reconstruction               0-020-033  08/21/17     DONE    DONE       DONE      06/19/17   06/19/17   03/02/17   05/16/17   7                        563,500             0  BMJ             0           0           0 Clark Patterson Lee                     0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
  -       Reconstruction               0-020-034                                              /  /       /  /     11/15/17     /  /     16                             0             0  BMJ             0           0           0                                         0        /  /                           /  /             

          Viola Elementary:
15-0754   Reconstruction               0-026-016  04/13/16     DONE    DONE       DONE      11/23/15   11/16/15   06/30/11   05/17/11   2,16                     450,000       450,000  HCM             0           0           0 Clark Patterson Lee                     0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
  -       Reconstruction               0-026-017                                              /  /       /  /     10/23/17     /  /     16                             0             0  BMJ             0           0           0                                         0        /  /                           /  /             

          Hillburn Administration Building:
  -       Reconstruction               1-006-010                                              /  /       /  /     11/15/17     /  /     16                             0             0  BMJ             0           0           0                                         0        /  /                           /  /             

          District-Wide:
  -    SB Reconstruction               7-999-BA1               DONE                           /  /       /  /       /  /       /  /     13,16                          0             0  JMB             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




EAST RAMAPO CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 50-04-02-06
last updated on 11/22/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Spring Valley Senior High:
12-0623   Reconstruction               0-003-012  11/28/12     DONE    DONE       DONE      12/27/12   12/27/12   12/04/12   11/27/12   15                        16,000        16,000  JMB             0           0           0 Eisenbach & Ruhnke Engineerin           0      04/19/13                       05/09/13           
12-0434XX Reconstruction               0-003-018  07/03/13               CANCELLED          11/16/12   11/13/12   02/23/09   03/30/11   2,8                      364,298       364,298  HCM             0           0           0 Eisenbach & Ruhnke Engineerin     364,298        /  /                           /  /             
15-1844   Reconstruction               0-003-019  06/22/16     DONE    DONE       DONE      06/01/16   06/01/16   06/21/12   04/19/16   2,9                       90,000        90,000  HCM             0           0           0 Eisenbach & Ruhnke Engineerin           0        /  /                           /  /             
  -       Reconstruction               0-003-020                                              /  /       /  /     10/06/15     /  /     2,8,9,15                       0    39,414,832  JMB             0           0           0                                         0        /  /                           /  /             
16-1339   Reconstruction               0-003-021  03/08/17     DONE    DONE       DONE      02/07/17   02/07/17   01/17/17   12/06/16   2,7,13,155,16          6,388,890             0  SLC             0           0           0 Eisenbach & Ruhnke Engineerin           0        /  /                           /  /             
  -       Reconstruction               0-003-022                                              /  /       /  /     08/02/17     /  /     2,8,155,16                     0             0  SLC             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-003-023                                              /  /       /  /     08/29/17     /  /     4                              0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Hempstead School:
12-0436XX Reconstruction               0-006-013  07/03/13               CANCELLED          11/16/12   11/13/12   05/23/12   03/30/11   10                       109,703       109,703  HCM             0           0           0 Eisenbach & Ruhnke Engineerin     109,703        /  /                           /  /             
  -       Reconstruction               0-006-014                                              /  /       /  /     01/16/15     /  /     2,16                           0     9,820,440  JMB             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-006-015                                              /  /       /  /     10/06/15     /  /     2,8                            0     9,820,440  JMB             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-006-016                                              /  /       /  /     08/02/17     /  /     2,155,15,16                    0             0  SLC             0           0           0                                         0        /  /                           /  /             
17-0782   Reconstruction               0-006-017                         UNREVIEWED         11/16/17   11/15/17   08/02/17   12/20/16   2,7,155,16                     0             0  SLC             0           0           0 Eisenbach and Ruhnke Engineer           0        /  /                           /  /             

          Pomona Middle(fmlyPomonaJR):
12-0437XX Reconstruction               0-008-015  07/03/13               CANCELLED          11/16/12   11/13/12   02/23/09   03/30/11   2,8                      328,583       328,583  HCM             0           0           0 Eisenbach & Ruhnke Engineerin     328,583        /  /                           /  /             
12-1286   Reconstruction               0-008-016  06/17/13     DONE    DONE       DONE      06/13/13   06/13/13   05/17/13   06/04/13   2,9                      135,700       135,700  JMB             0           0     135,700 Eisenbach & Ruhnke Engineerin           0      08/19/13                       02/13/14           
  -       Reconstruction               0-008-017                                              /  /       /  /     08/07/14     /  /     2,9,13,16                      0    31,579,648  JMB             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-008-018                                              /  /       /  /     10/06/15     /  /     2,8                            0    31,579,648  JMB             0           0           0                                         0        /  /                           /  /             
16-1336   Reconstruction               0-008-019  02/24/17     DONE    DONE       DONE      02/07/17   02/07/17   01/17/17   12/06/16   2,4,7                  3,125,000             0  SLC             0           0           0 Eisenbach & Ruhnke Engineerin           0        /  /                           /  /             

          KakiatElemSch(frmrlyRamapoFreshCtr):
12-0624   Reconstruction               0-013-010  10/16/12     DONE    DONE       DONE      12/27/12   12/27/12   12/04/12   11/27/12   13,15                     82,500        82,500  JMB             0           0           0 Eisenbach & Ruhnke Engineerin           0      04/19/13                       05/09/13           
12-0438XX Reconstruction               0-013-015  07/03/13               CANCELLED          11/16/12   11/13/12   10/22/08   03/30/11   4                      1,584,086     1,584,086  HCM             0           0           0 Eisenbach & Ruhnke Engineerin   1,584,086        /  /                           /  /             
  -       Reconstruction               0-013-017                                              /  /       /  /     05/17/13     /  /     2,8                            0    33,246,720  JMB             0           0           0                                         0        /  /                           /  /             
14-0087   Reconstruction               0-013-018  08/01/14     DONE    DONE       DONE      07/31/14   07/30/14   05/23/13   07/24/14   15                       104,500       104,500  JMB             0           0           0 Eisenbach & Ruhnke Engineerin           0      06/04/15                       06/24/15           
  -       Reconstruction               0-013-019                                              /  /       /  /     10/06/15     /  /     2,8                            0    33,246,720  JMB             0           0           0                                         0        /  /                           /  /             
16-1891   Reconstruction               0-013-020  06/29/17     DONE    DONE       DONE      05/24/17   05/24/17   01/17/17   12/06/16   2,8,10,155             1,000,000             0  SLC             0           0   1,000,000 Eisenbach & Ruhnke Engineerin           0        /  /                           /  /             
16-1714   Reconstruction               0-013-021                       ADDENDUM REQ'D       04/20/17   04/20/17   01/31/17   12/06/16   2,155,16                       0    34,010,145  SLC             0           0           0 Eisenbach & Ruhnke Engineerin           0        /  /                           /  /             
17-0120   Reconstruction               0-013-022  08/31/17     DONE    DONE       DONE      07/25/17   07/21/17   07/25/17   12/08/16   2,8,9,155,15,16          700,000             0  SLC             0           0           0 Eisenbach & Ruhnke Engineerin           0        /  /                           /  /             
  -       Reconstruction               0-013-023                                              /  /       /  /     08/02/17     /  /     2,7,8,155,15,16                0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Fleetwood Elementary School:
12-0439XX Reconstruction               0-014-014  07/03/13               CANCELLED          11/16/12   11/13/12   02/23/09   03/30/11   2,8                      157,834       157,834  HCM             0           0           0 Eisenbach & Ruhnke Engineerin     157,834        /  /                           /  /             
  -       Reconstruction               0-014-015                                              /  /       /  /     02/15/13     /  /     2,155                          0     9,820,440  JMB             0           0           0                                         0        /  /                           /  /             
15-1845   Reconstruction               0-014-016  06/22/16     DONE    DONE       DONE      06/01/16   06/01/16   05/23/13   04/19/16   15                       120,000       120,000  JMB             0           0           0 Eisenbach & Ruhnke Engineerin           0        /  /                           /  /             
  -       Reconstruction               0-014-017                                              /  /       /  /     10/06/15     /  /     2,4,8                          0     9,820,440  JMB             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-014-018                                              /  /       /  /     12/21/16     /  /     2,9                            0             0  SLC             0           0           0                                         0        /  /                           /  /             
16-1337   Reconstruction               0-014-019  02/24/17     DONE    DONE       DONE      02/07/17   02/07/17   01/18/17   12/06/16   2,4,7                    125,000             0  SLC             0           0     125,000 Eisenbach & Ruhnke Engineerin           0        /  /                           /  /             
16-1892   Reconstruction               0-014-020  06/29/17     DONE    DONE       DONE      05/24/17   05/24/17   01/18/17   12/06/16   2,4,8                    125,000             0  SLC             0           0     125,000 Eisenbach & Ruhnke Engineerin           0        /  /                           /  /             
  -       Reconstruction               0-014-021                                              /  /       /  /     08/02/17     /  /     2,155,15,16                    0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Summit Park Elementary:
12-0440XX Reconstruction               0-015-014  07/03/13               CANCELLED          11/16/12   11/13/12   07/09/08   03/30/11   15                       146,522       146,522  HCM             0           0           0 Eisenbach & Ruhnke Engineerin     146,522        /  /                           /  /             
  -       Reconstruction               0-015-015                                              /  /       /  /     10/06/15     /  /     2,8                            0     9,820,440  JMB             0           0           0                                         0        /  /                           /  /             
17-0783   Reconstruction               0-015-016                         UNREVIEWED         11/16/17   11/15/17   08/02/17   12/20/16   2,7,155,16                     0             0  SLC             0           0           0 Eisenbach and Ruhnke Engineer           0        /  /                           /  /             

          Grandview Elementary:
12-0441XX Reconstruction               0-016-012  07/03/13               CANCELLED          11/16/12   11/13/12   07/09/08   03/30/11   15                       183,562       183,562  HCM             0           0           0 Eisenbach & Ruhnke Engineerin     183,562        /  /                           /  /             
  -       Reconstruction               0-016-013                                              /  /       /  /     10/06/15     /  /     2,8                            0     9,820,440  JMB             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-016-014                                              /  /       /  /     08/02/17     /  /     2,155,15,16                    0             0  SLC             0           0           0                                         0        /  /                           /  /             
17-0771   Reconstruction               0-016-015                         UNREVIEWED         11/15/17   11/14/17   08/02/17   12/20/16   2,7,155,16                     0             0  SLC             0           0           0 Eisenbach and Ruhnke Engineer           0        /  /                           /  /             

          Margetts Road Elementary:
12-0442XX Reconstruction               0-020-011  07/03/13               CANCELLED          11/16/12   11/13/12   02/23/09   03/30/11   2,8                      116,420       116,420  HCM             0           0           0 Eisenbach & Ruhnke Engineerin     116,420        /  /                           /  /             
15-1846   Reconstruction               0-020-012  06/22/16     DONE    DONE       DONE      06/01/16   06/01/16   10/06/15   04/19/16   2,8                       80,000        80,000  JMB             0           0           0 Eisenbach & Ruhnke Engineerin           0        /  /                           /  /             
17-0772   Reconstruction               0-020-013                         UNREVIEWED         11/15/17   11/14/17   08/02/17   12/20/16   2,7,155,16                     0             0  SLC             0           0           0 Eisenbach and Ruhnke Engineer           0        /  /                           /  /             

          Ramapo Senior High School:
12-0443XX Reconstruction               0-022-016  07/03/13               CANCELLED          11/16/12   11/13/12   02/23/09   03/30/11   2,8                      437,822       437,822  HCM             0           0           0 Eisenbach & Ruhnke Engineerin     437,822        /  /                           /  /             
12-1294   Reconstruction               0-022-018  07/23/13     DONE    DONE       DONE      06/17/13   06/12/13   02/15/13   06/04/13   8                         50,000        50,000  JMB             0           0      50,000 Eisenbach & Ruhnke Engineerin           0      06/03/14                       06/17/14           
15-1490   Reconstruction               0-022-019  04/26/16     DONE    DONE       DONE      03/28/16   03/25/16   10/06/15   04/20/16   2,8,9                  1,130,000     1,130,000  JMB             0           0           0 Eisenbach & Ruhnke Engineerin           0        /  /                           /  /             
16-1340   Reconstruction               0-022-020  03/08/17     DONE    DONE       DONE      02/07/17   02/07/17   01/17/17   12/06/16   2,4,9,13,155,16        3,562,500             0  SLC             0           0           0 Eisenbach & Ruhnke Engineerin           0        /  /                           /  /             

          Lime Kiln School:
12-0444XX Reconstruction               0-027-013  07/03/13               CANCELLED          11/16/12   11/13/12   01/26/12   03/30/11   10                       143,343       143,343  HCM             0           0           0 Eisenbach & Ruhnke Engineerin     143,343        /  /                           /  /             
  -       Reconstruction               0-027-014                                              /  /       /  /     10/06/15     /  /     2,8                            0     9,820,440  JMB             0           0           0                                         0        /  /                           /  /             
16-1517   Reconstruction               0-027-015  05/15/17     DONE    DONE       DONE      03/17/17   03/17/17   01/17/17   12/06/16   2,10,155,16              250,000             0  SLC             0           0           0 Eisenbach & Ruhnke Engineerin           0        /  /                           /  /             
17-0773   Reconstruction               0-027-016                         UNREVIEWED         11/15/17   11/14/17   08/02/17   12/20/16   2,7,155,16                     0             0  SLC             0           0           0 Eisenbach and Ruhnke Engineer           0        /  /                           /  /             

          Elmwood Elementary School:
12-0445XX Reconstruction               0-030-011  07/03/13               CANCELLED          11/16/12   11/13/12   01/26/12   03/30/11   10                       111,498       111,498  HCM             0           0           0 Eisenbach & Ruhnke Engineerin     111,498        /  /                           /  /             
12-0171   Reconstruction               0-030-012  06/18/13     DONE    DONE       DONE      09/13/12   09/13/12   08/17/12   08/21/12   2,155                    285,000       285,000  JMB             0           0           0 Eisenbach & Ruhnke Engineerin           0        /  /                           /  /             
15-0534   Reconstruction               0-030-013  11/18/15     DONE    DONE       DONE      10/06/15   10/06/15   08/28/15   05/19/15   2,8,9,15,16               50,000        50,000  JMB             0           0           0 Eisenbach & Ruhnke Engineerin           0        /  /                           /  /             
15-1847   Reconstruction               0-030-014  06/22/16     DONE    DONE       DONE      06/01/16   06/01/16   10/06/15   04/19/16   2,8                       50,000        50,000  JMB             0           0           0 Eisenbach & Ruhnke Engineerin           0        /  /                           /  /             
16-1523   Reconstruction               0-030-015  04/04/17     DONE    DONE       DONE      03/20/17   03/20/17   01/17/17   12/06/16   2,9,155,16               962,500             0  SLC             0           0           0 Eisenbach & Ruhnke Engineerin           0        /  /                           /  /             

          Chestnut Ridge Middle(frmlySpring Va:
12-0446XX Reconstruction               0-034-017  07/03/13               CANCELLED          11/16/12   11/13/12   01/26/12   03/30/11   10                       451,415       451,415  HCM             0           0           0 Eisenbach & Ruhnke Engineerin     451,415        /  /                           /  /             
15-1848   Reconstruction               0-034-018  06/22/16     DONE    DONE       DONE      06/01/16   06/01/16   10/06/15   04/19/16   2,8,9                     65,000        65,000  JMB             0           0           0 Eisenbach & Ruhnke Engineerin           0        /  /                           /  /             
  -       Reconstruction               0-034-019                                              /  /       /  /     10/25/16     /  /     2,9                            0    16,121,344  SLC             0           0           0                                         0        /  /                           /  /             
16-1893   Reconstruction               0-034-020  09/28/17     DONE    DONE       DONE      05/24/17   05/24/17   01/31/17   12/06/16   2,8                       44,445             0  SLC             0           0           0 Eisenbach & Ruhnke Engineerin           0        /  /                           /  /             
  -       Reconstruction               0-034-021                                              /  /       /  /     08/02/17     /  /     2,7,155,15,16                  0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Eldorado Elementary:
12-0447XX Reconstruction               0-037-014  07/03/13               CANCELLED          11/16/12   11/13/12   01/26/12   03/30/11   10                       143,642       143,642  HCM             0           0           0 Eisenbach & Ruhnke Engineerin     143,642        /  /                           /  /             
15-1849   Reconstruction               0-037-015  06/22/16     DONE    DONE       DONE      06/01/16   06/01/16   10/06/15   04/19/16   2,4,8                     80,000        80,000  JMB             0           0           0 Eisenbach & Ruhnke Engineerin           0        /  /                           /  /             
16-1518   Reconstruction               0-037-016  05/15/17     DONE    DONE       DONE      03/17/17   03/17/17   01/17/17   01/24/17   2,13,155,16              250,000             0  SLC             0           0           0 Eisenbach & Ruhnke Engineerin           0        /  /                           /  /             
17-0774   Reconstruction               0-037-017                         UNREVIEWED         11/15/17   11/14/17   08/02/17   12/20/16   2,7,8,155,16                   0             0  SLC             0           0           0 Eisenbach and Ruhnke Engineer           0        /  /                           /  /             

          Admin Bldg-frmly S.Madison Instr:
12-0435XX Reconstruction               1-005-011  07/03/13               CANCELLED          11/16/12   11/13/12   02/23/09   03/30/11   2,8                      245,382             0  JMB             0           0           0 Eisenbach & Ruhnke Engineerin     245,382        /  /                           /  /             
15-1850   Reconstruction               1-005-012  06/22/16     DONE    DONE       DONE      06/01/16   06/01/16   03/02/16   04/19/16   16                        15,000             0  JMB             0           0           0 Eisenbach & Ruhnke Engineerin           0        /  /                           /  /             
16-1338   Reconstruction               1-005-013  02/24/17     DONE    DONE       DONE      02/07/17   02/07/17   01/17/17   12/06/16   2,4,7                    125,000             0  SLC             0           0           0 Eisenbach & Ruhnke Engineerin           0        /  /                           /  /             

          Transportation Office:
12-0448XX Reconstruction               1-010-004  07/03/13               CANCELLED          11/16/12   11/13/12   01/26/12   03/30/11   10                        46,429             0  HCM             0           0           0 Eisenbach & Ruhnke Engineerin      46,429        /  /                           /  /             

          Central Warehouse Bldg.:
12-0449   Reconstruction               2-009-005  07/03/13     DONE    DONE       DONE      11/16/12   11/13/12   01/26/12   03/30/11   10                       111,953             0  HCM             0           0           0 Eisenbach & Ruhnke Engineerin     111,953        /  /                           /  /             
  -       Reconstruction               2-009-006                                              /  /       /  /     05/05/17     /  /     8,9,155,15,16                  0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Bldgs Grounds Bldg 1:
12-0450   Reconstruction               3-002-008  07/03/13     DONE    DONE       DONE      11/16/12   11/13/12   01/26/12   03/30/11   10                        61,043             0  HCM             0           0           0 Eisenbach & Ruhnke Engineerin      61,043        /  /                           /  /             

          Transportation Garage:
12-0451XX Reconstruction               5-001-009  07/03/13               CANCELLED          11/16/12   11/13/12   01/26/12   03/30/11   10                        41,921        41,921  HCM             0           0           0 Eisenbach & Ruhnke Engineerin      41,921        /  /                           /  /             
13-1164   Reconstruction               5-001-010  02/05/14     DONE    DONE       DONE      01/30/14   01/30/14   07/03/13   07/23/13   10                        65,000        65,000  JMB             0           0           0 Eisenbach & Ruhnke Engineerin           0        /  /                           /  /             

          xxPress Box @ Spr Valley Demolished:
  -       Reconstruction               7-055-002                                              /  /       /  /     01/31/17     /  /                                    0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Press Box @ Spring Valley HS 2:
17-0784   New Construction             7-056-001               UNREVIEWED
                                                                       STARTED    UNREVIEWED11/16/17   06/22/17   01/30/17   12/08/16   02 - 16                        0             0  SLC             0           0           0 Eisenbach and Ruhnke Engineer           0        /  /                           /  /             

          Press Box @ Ramapo High School:
17-0785   New Construction             7-057-001               UNREVIEWED
                                                                       STARTED    UNREVIEWED11/16/17   06/22/17   01/30/17   12/08/16   02 - 16                        0             0  SLC             0           0           0 Eisenbach and Ruhnke Engineer           0        /  /                           /  /             

          Concession Stand @ Spring Valley HS:
17-0786   Alterations                  7-058-001               UNREVIEWED
                                                                       STARTED    UNREVIEWED11/16/17   06/22/17   01/30/17   12/08/16                                  0             0  SLC             0           0           0 Eisenbach and Ruhnke Engineer           0        /  /                           /  /             

          Concession Stand @ Ramapo HS:
17-0787   Alterations                  7-059-001               UNREVIEWED
                                                                       STARTED    UNREVIEWED11/16/17   06/22/17   01/30/17   12/08/16                                  0             0  SLC             0           0           0 Eisenbach and Ruhnke Engineer           0        /  /                           /  /             

          District-Wide:
  -       Reconstruction               7-999-002                                              /  /       /  /       /  /       /  /     13,16                          0             0  JMB             0           0           0                                         0        /  /                           /  /             
15-1634SB Reconstruction               7-999-002               DONE                           /  /       /  /     04/27/16     /  /     13,16                          0             0  JMB             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               7-999-003                                              /  /       /  /     10/01/16     /  /     15                             0             0  SLC             0           0           0                                         0        /  /                           /  /             
  -    SB Reconstruction               7-999-BA1                                              /  /       /  /       /  /       /  /     13,16                          0             0  JMB             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




BOCES ROCKLAND STATUS REPORT ON CAPITAL PROJECTS
District No.: 50-90-00-00
last updated on 11/22/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Jessie J Kaplan #9:
12-0748   Reconstruction               0-010-007  07/26/13     DONE    DONE       DONE      01/31/13   01/22/13   08/14/12   06/12/12   155                       65,000        65,000  JMB             0           0           0                                         0        /  /                           /  /             
14-1213PR Additions and Alterations    0-010-008                         UNREVIEWED         02/27/15   02/26/15   01/06/15     /  /     02 - 16                        0             0  MFS             0           0           0 Michael Shilale Architects,LL           0        /  /                           /  /             
14-1550   Additions and Alterations    0-010-008  04/19/16     DONE    DONE       DONE      05/26/15   05/21/15   01/06/15   11/13/13   02 - 16                8,657,120             0  MFS             0           0           0 Michael Shilale Architects,LL           0        /  /                           /  /             

          Administration Bldg:
14-1214PR Additions and Alterations    1-007-007                         UNREVIEWED         02/27/15   02/26/15   01/06/15     /  /     02 - 16                        0             0  MFS             0           0           0 Michael Shilale Architects,LL           0        /  /                           /  /             
14-1551   Additions and Alterations    1-007-007  04/19/16     DONE    DONE       DONE      05/26/15   05/21/15   01/06/15   11/11/13   02 - 16                  636,600             0  MFS             0           0           0 Michael Shilale Architects,LL           0        /  /                           /  /             

          Bus Garage Bldg #5:
15-1076   Reconstruction               5-009-005  07/28/16     DONE    DONE       DONE      01/20/16   01/19/16   01/07/16   01/13/16   8,15                     254,458       254,458  MFS             0           0           0 Michael Shilale Architects,LL           0      11/15/16                       11/21/16           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED