Construction Project Status

Construction Project Status

THE STATE EDUCATION DEPARTMENT

FACILITIES PLANNING


UPDATED: 06/19/13 at 10:06:32




ODESSA MONTOUR CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 55-01-01-04
last updated on 06/19/13
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Odessa Elem.& High School:
09-0297   Reconstruction               0-001-014  01/13/10     DONE    DONE       DONE      10/09/09   10/08/09   03/07/08   11/24/08   2,4,7,8,9,155,15,16    6,274,200     6,214,200  DDJ             0           0     269,680 Hunt Engineers,                         0        /  /             /  /        
10-0792   Reconstruction               0-001-015  01/25/12     DONE    DONE       DONE      02/04/11   02/01/11   11/24/10   11/24/08   2,4,7,8,9,10,14,155,   1,736,595     1,736,595  DDJ             0           0     130,200 Hunt Engineers,                         0        /  /           10/01/12      

          H A Hanlon Elementary School:
09-0298   Reconstruction               0-002-009  01/13/10     DONE    DONE       DONE      10/09/09   10/08/09   03/07/08   11/24/08   2,4,7,8,9,155,15,16      920,020       920,020  DDJ             0           0      39,560 Hunt Engineers,                         0        /  /             /  /        
10-0793   Reconstruction               0-002-010  01/25/12     DONE    DONE       DONE      02/04/11   02/01/11   11/24/10   11/24/08   2,4,9,155,15,16           96,521        96,521  DDJ             0           0       7,200 Hunt Engineers,                         0        /  /           08/30/12      

          B.C. Cate Elementary:
09-0299   Reconstruction               0-004-009  01/13/10     DONE    DONE       DONE      10/09/09   10/08/09   03/07/08   11/24/08   2,4,7,8,9,155,15,16    2,049,350     2,035,452  DDJ             0           0      88,122 Hunt Engineers,                         0        /  /             /  /        
10-0794   Reconstruction               0-004-010  01/25/12     DONE    DONE       DONE      02/04/11   02/01/11   11/24/10   11/24/08   2,9,10,15,16             412,500       412,500  DDJ             0           0      18,975 Hunt Engineers,                         0        /  /           10/01/12      

          Athletic Storage Shed:
06-1153DB Discovered Building          2-015-001  06/30/08     DONE    DONE       DONE      03/21/07   03/09/07   12/13/06     /  /                                    0             0  MGL             0           0           0                                         0        /  /             /  /        
10-0795XX Reconstruction               2-015-002  11/24/10               CANCELLED          02/04/11   02/01/11   11/24/10   11/24/08   7,8,16                         0             0  DDJ             0           0           0                                         0        /  /             /  /        

          Bus Garage:
10-0796   Reconstruction               5-003-010  01/25/12     DONE    DONE       DONE      02/04/11   02/01/11   11/24/10   11/24/08   2,7,8,13,15,16           312,500       312,500  DDJ             0           0           0 Hunt Engineers,                         0        /  /           08/30/12      

          :
09-0300   Additions and Alterations    7-008-001  01/13/10     DONE    DONE       DONE      10/09/09   10/08/09   02/02/09   11/24/08   02 - 16                  162,500             0  DDJ             0           0           0 Hunt Engineers,                         0        /  /             /  /        

          Districtwide:
09-0301   Reconstruction               7-999-002  01/13/10     DONE    DONE       DONE      10/09/09   10/08/09   09/05/08   11/24/08   10,13,16                 971,510       971,510  DDJ             0           0      41,775 Hunt Engineers,                         0        /  /             /  /        


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




WATKINS GLEN CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 55-03-01-06
last updated on 06/19/13
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Elementary School:
11-0176PR Reconstruction               0-002-010               DONE                         09/13/11     /  /     07/22/11     /  /     2,4,8,9,10,155,15,16   4,186,203     4,186,203  DDJ             0           0           0 Hunt Engineers,                         0        /  /             /  /        
12-0273   Reconstruction               0-002-010  04/30/13     DONE    DONE       DONE      10/12/12   10/11/12   07/22/11   12/13/11   2,4,8,9,10,155,15,16   5,143,538     5,143,538  DDJ             0           0           0 Hunt Engineers,                         0        /  /             /  /        

          High School:
11-0177PR Additions and Alterations    0-004-014               STARTED                      09/13/11     /  /     07/22/11     /  /     02 - 16               18,832,649    17,600,710  DDJ             0           0           0 Hunt Engineers,                         0        /  /             /  /        
12-0274   Additions and Alterations    0-004-014  04/30/13     DONE    DONE       DONE      10/12/12   10/11/12   07/22/11   12/13/11   02 - 16               19,518,652    19,425,650  DDJ             0           0           0 Hunt Engineers,                         0        /  /             /  /        

          DISTRICTWIDE PROJECTS:
08-1337   Reconstruction               7-999-001  05/22/09     DONE    DONE       DONE      03/12/09   03/04/09   09/13/06   12/19/06   16                       150,000       150,000  DDJ             0           0           0 Hunt Engineers,                         0        /  /             /  /        


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




BOCES GREATER SOUTHERN TIER STATUS REPORT ON CAPITAL PROJECTS
District No.: 55-90-00-00
last updated on 06/19/13
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          P.C. Bush Center--Bldg. 1:
11-1164   Reconstruction               0-001-020               DONE    DONE       ADD. REQ'D04/26/12   04/23/12   02/23/12   08/30/11   7,8,155,16                     0    19,421,820  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        

          Building 2 - Bush Campus:
08-0684   Reconstruction               0-002-008  04/08/09     DONE    DONE       DONE      11/05/08   11/04/08   04/03/08   04/01/08   9,15                       4,159        51,000  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        
09-0205   Reconstruction               0-002-009  11/17/09     DONE    DONE       DONE      09/14/09   09/11/09   08/07/09   08/25/09   9,15                      80,000        80,000  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        
11-1165   Reconstruction               0-002-010               DONE    DONE       ADD. REQ'D04/26/12   04/23/12   02/23/12   08/30/11   7,8,155,16                     0     2,284,920  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        

          Building #3 - Bush Campus:
08-0685   Reconstruction               0-003-006  04/08/09     DONE    DONE       DONE      11/05/08   11/04/08   04/03/08   04/01/08   9,155,15                  76,780        76,780  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        
09-0206   Reconstruction               0-003-007  11/17/09     DONE    DONE       DONE      09/14/09   09/11/09   08/07/09   08/25/09   155                      100,000       100,000  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        
11-1166   Reconstruction               0-003-008               DONE    DONE       ADD. REQ'D04/26/12   04/23/12   02/23/12   08/30/11   7,8,155,16                     0     1,523,280  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        

          Bldg 4  (was 1-004) Bush Campus:
07-1137   Reconstruction               0-004-010  07/08/08     DONE    DONE       DONE      12/14/07   12/14/07   11/20/07   11/02/07   155,16                   201,900       201,900  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        
08-0686   Reconstruction               0-004-011  04/08/09     DONE    DONE       DONE      11/05/08   11/04/08   04/03/08   04/01/08   16                       170,887       170,887  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        
11-1167   Reconstruction               0-004-012               DONE    DONE       ADD. REQ'D04/26/12   04/23/12   02/23/12   08/30/11   7,8,155,16                     0     1,523,280  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        
12-0233   Reconstruction               0-004-013  04/09/13     DONE    DONE       DONE      10/01/12   09/21/12   07/05/12   07/10/12   2,4,9,10,155,15,16       335,000             0  JOD             0           0           0 Hunt Engineers,                         0        /  /             /  /        

          Bldg 5:
11-0270   Additions and Alterations    0-005-013  12/19/11     DONE    DONE       DONE      10/21/11   10/20/11   09/01/11   07/05/11   02 - 16                  223,000       223,000  JOD             0           0           0 Beardsley Design Associates A           0        /  /           12/10/12      
11-1168   Reconstruction               0-005-014               DONE    DONE       ADD. REQ'D04/26/12   04/23/12   02/23/12   08/30/11   7,8,155,16                     0    18,660,180  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        

          Bldg 6:
11-0271   Additions and Alterations    0-006-013  12/19/11     DONE    DONE       DONE      10/21/11   10/20/11   09/01/11   07/05/11   02 - 16                  611,270       611,270  JOD             0           0           0 Beardsley Design Associates A           0        /  /           12/10/12      
11-1169   Reconstruction               0-006-014               DONE    DONE       ADD. REQ'D04/26/12   04/23/12   02/23/12   08/30/11   7,8,155,16                     0    20,373,870  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        

          Bldg 7:
07-1138   Reconstruction               0-007-009  07/08/08     DONE    DONE       DONE      12/14/07   12/14/07   11/20/07   11/02/07   8,16                     159,000       159,000  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        
11-1170   Reconstruction               0-007-010               DONE    DONE       ADD. REQ'D04/26/12   04/23/12   02/23/12   08/30/11   7,8,155,16                     0    17,739,900  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        

          Bldg 8:
11-1171   Reconstruction               0-008-006               DONE    DONE       ADD. REQ'D04/26/12   04/23/12   02/23/12   08/30/11   7,8,155,16                     0             0  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        

          Instructional Support Bldg.11:
07-1139   Reconstruction               0-020-003  07/08/08     DONE    DONE       DONE      12/14/07   12/14/07   11/20/07   11/02/07   7,155,16                 442,150       329,210  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        
11-1174   Reconstruction               0-020-004               DONE    DONE       ADD. REQ'D04/26/12   04/23/12   02/23/12   08/30/11   7,8,155,16                     0             0  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        

          Wildwood bldg#7 culinary arts:
09-0207   Reconstruction               0-030-002  11/17/09     DONE    DONE       DONE      09/14/09   09/11/09   08/07/09   08/25/09   7                        250,000       250,000  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        
11-1183   Reconstruction               0-030-003               DONE    DONE       ADD. REQ'D04/26/12   04/23/12   02/24/12   08/30/11   7,8,155,16                     0             0  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        

          Coopers bldg#1 Automotive:
09-0208   Reconstruction               0-037-002  11/17/09     DONE    DONE       DONE      09/14/09   09/11/09   04/03/08   08/25/09   155                      200,000       200,000  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        
  -       Reconstruction               0-037-003                                              /  /       /  /     08/17/09     /  /     10,155,16                      0             0  JOD             0           0           0                                         0        /  /             /  /        
11-1188   Reconstruction               0-037-004               DONE    DONE       ADD. REQ'D04/26/12   04/23/12   02/23/12   08/30/11   7,8,155,16                     0             0  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        

          Wildwood bldg#1 admin/dist lrng:
08-0687   Reconstruction               0-038-002  04/08/09     DONE    DONE       DONE      11/05/08   11/04/08   04/03/08   04/01/08   2,9                       13,285        13,285  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        
10-0471   Reconstruction               0-038-003  03/15/11     DONE    DONE       DONE      11/15/10   11/12/10   08/18/10   08/04/10   2,7,155,16               423,148       423,148  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        
11-1177   Reconstruction               0-038-004               DONE    DONE       ADD. REQ'D04/26/12   04/23/12   02/24/12   08/30/11   7,8,155,16                     0             0  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        

          Autobody and tech:
11-1178   Reconstruction               0-039-003               DONE    DONE       ADD. REQ'D04/26/12   04/23/12   02/24/12   08/30/11                                  0       378,200  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        
12-0234   Reconstruction               0-039-004  04/09/13     DONE    DONE       DONE      10/01/12   09/21/12   07/05/12   07/10/12   2,7,155,15,16            400,000             0  JOD             0           0           0 Hunt Engineers,                         0        /  /             /  /        

          Wildwood bldg#3 Cosmotol/nursing:
08-0688   Reconstruction               0-041-002  04/08/09     DONE    DONE       DONE      11/05/08   11/04/08   04/03/08   04/01/08   2,9,10,15,16             116,775       116,775  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        
11-1179   Reconstruction               0-041-003               DONE    DONE       ADD. REQ'D04/26/12   04/23/12   02/24/12   08/30/11   7,8,155,16                     0             0  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        

          Wildwood bldg#4 Career Majors:
11-1180   Reconstruction               0-042-002               DONE    DONE       ADD. REQ'D04/26/12   04/23/12   02/24/12   08/30/11   7,8,155,16                     0     1,134,600  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        

          Wildwood bldg#5 Trades/Welding:
08-0689   Reconstruction               0-043-002  04/08/09     DONE    DONE       DONE      11/05/08   11/04/08   04/03/08   04/01/08   7                         13,826        13,826  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        
09-0209   Reconstruction               0-043-003  11/17/09     DONE    DONE       DONE      09/14/09   09/11/09   08/07/09   08/25/09   7,16                     362,200       293,060  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        
11-1181   Reconstruction               0-043-004               DONE    DONE       ADD. REQ'D04/26/12   04/23/12   02/24/12   08/30/11   7,8,155,16                     0             0  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        

          Coopers bldg#2 Heavy Equipment:
11-1189   Reconstruction               0-044-002               DONE    DONE       ADD. REQ'D04/26/12   04/23/12   02/23/12   08/30/11   7,8,155,16                     0       567,300  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        

          Coopers bldg#3 Intro Career Majors:
11-1190   Reconstruction               0-045-002               DONE    DONE       ADD. REQ'D04/26/12   04/23/12   02/23/12   08/30/11   7,8,155,16                     0     2,647,400  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        
  -       Reconstruction               0-045-003                                              /  /       /  /     07/05/12     /  /     2,4,8,9,10,155,15,16           0             0  JOD             0           0           0                                         0        /  /             /  /        

          Coopers bldg#4 Machine Shop:
10-0472   Reconstruction               0-046-002  03/15/11     DONE    DONE       DONE      11/15/10   11/12/10   08/18/10   08/04/10   7                        135,000       135,000  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        
11-1191   Reconstruction               0-046-003               DONE    DONE       ADD. REQ'D04/26/12   04/23/12   02/23/12   08/30/11   7,8,155,16                     0             0  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        

          Coopers Bldg#5 Computer Graphics:
10-0473   Reconstruction               0-047-002  03/15/11     DONE    DONE       DONE      11/15/10   11/12/10   08/18/10   08/04/10   2,4,8,9,155,15,16        220,000       220,000  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        
11-0272   Reconstruction               0-047-003  12/19/11     DONE    DONE       DONE      10/21/11   10/20/11   09/01/11   07/05/11   2,7,9,15,16              347,900       347,900  JOD             0           0           0 Beardsley Design Associates A           0        /  /           12/10/12      
11-1192   Reconstruction               0-047-004               DONE    DONE       ADD. REQ'D04/26/12   04/23/12   02/23/12   08/30/11   7,8,155,16                     0             0  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        

          Coopers bldg#6 Cosmotology:
10-0474   Reconstruction               0-048-002  03/15/11     DONE    DONE       DONE      11/15/10   11/12/10   08/18/10   08/04/10   2,4,8,9,155,15,16        200,000       200,000  JOD             0           0           0 Beardsley Design Associates A           0        /  /           12/18/12      
11-0273   Reconstruction               0-048-003  12/19/11     DONE    DONE       DONE      10/21/11   10/20/11   09/01/11   07/25/11   2,7,9,15,16              362,430       362,430  JOD             0           0           0 Beardsley Design Associates A           0        /  /           12/10/12      
11-1193   Reconstruction               0-048-004               DONE    DONE       ADD. REQ'D04/26/12   04/23/12   02/23/12   08/30/11   7,8,155,16                     0             0  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        

          Coopers bldg#7 Culinary/Nursing:
11-1194   Reconstruction               0-049-002               DONE    DONE       ADD. REQ'D04/26/12   04/23/12   02/23/12   08/30/11   7,8,155,16                     0     1,437,160  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        
12-0235   Reconstruction               0-049-003  05/08/13     DONE    DONE       DONE      10/01/12   09/21/12   09/12/12   07/10/12   2,4,8,9,10,155,15,16     665,000             0  JMB             0           0           0 Hunt Engineers,                         0        /  /             /  /        
12-0922   Reconstruction               0-049-004  06/17/13     DONE    DONE       DONE      02/27/13   02/25/13   02/13/13   01/08/13   2,15                           0     1,498,036  MFS             0           0           0 Hunt Engineers,                         0        /  /             /  /        

          Coopers Campus bldg#8:
07-1140   Reconstruction               0-050-002  07/08/08     DONE    DONE       DONE      12/14/07   12/14/07   11/20/07   11/02/07   7                         75,000        75,000  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        
11-1195   Reconstruction               0-050-003               DONE    DONE       ADD. REQ'D04/26/12   04/23/12   02/24/12   08/30/11   7,8,155,16                     0             0  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        

          Wildwood bldg#6 Heavy Equipment:
11-1182   Reconstruction               0-051-002               DONE    DONE       ADD. REQ'D04/26/12   04/23/12   02/24/12   08/30/11   155,16                         0       756,400  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        

          Modular Classroom@Coopers:
11-1200   Reconstruction               0-052-002               DONE    DONE       ADD. REQ'D04/26/12   04/23/12   02/24/12   08/30/11   7,8,155,16                     0             0  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        

          Wildwood bldg#12 Trades:
11-1185   Reconstruction               0-055-002               DONE    DONE       ADD. REQ'D04/26/12   04/23/12   02/24/12   08/30/11   7,8,155,16                     0       378,200  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        

          Wildwood bldg#13 Heavy Equipment:
11-1186   Reconstruction               0-056-002               DONE    DONE       ADD. REQ'D04/26/12   04/23/12   02/24/12   08/30/11   155,16                         0       378,200  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        

          Criminal Justice bldg#18:
11-1187   Reconstruction               0-059-002               DONE    DONE       ADD. REQ'D04/26/12   04/23/12   02/24/12   08/30/11   7,8,155,16                     0       378,200  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        

          Bldg#12 Greenhouse:
11-1198   Reconstruction               0-060-002               DONE    DONE       ADD. REQ'D04/26/12   04/23/12   02/24/12   08/30/11   155,16                         0             0  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        

          Modular Clsrm #16:
10-0475   Reconstruction               0-061-002  03/15/11     DONE    DONE       DONE      11/15/10   11/12/10   08/18/10   08/04/10   7                         30,000        30,000  JOD             0           0           0 Beardsley Design Associates A           0        /  /           12/18/12      

          New Coopers Bldg. #9 - Paint Shop:
08-0690   New Construction             0-062-001  04/08/09     DONE    DONE       DONE      11/05/08   11/04/08   10/22/08   04/01/08   02 - 16                  967,589       404,784  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        
09-0210   Reconstruction               0-062-002  11/17/09     DONE    DONE       DONE      09/14/09   09/11/09   08/07/09   08/25/09   155,16                   420,000       393,825  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        
11-1196   Reconstruction               0-062-003               DONE    DONE       ADD. REQ'D04/26/12   04/23/12   02/24/12   08/30/11   155,16                         0             0  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        

          Building #9:
08-0691   Reconstruction               1-017-003  04/08/09     DONE    DONE       DONE      11/05/08   11/04/08   04/03/08   04/01/08   7,15                       3,402             0  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        
11-1172   Reconstruction               1-017-004               DONE    DONE       ADD. REQ'D04/26/12   04/23/12   02/23/12   08/30/11   7,8,155,16                     0             0  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        

          Administration Bldg #10:
08-0692   Reconstruction               1-019-003  04/08/09     DONE    DONE       DONE      11/05/08   11/04/08   04/03/08   04/01/08   7                          3,370             0  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        
11-1173   Reconstruction               1-019-004               DONE    DONE       ADD. REQ'D04/26/12   04/23/12   02/23/12   08/30/11   7,8,155,16                     0             0  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        

          B & G Storage:
11-1176   Reconstruction               2-009-001               DONE    DONE       ADD. REQ'D04/26/12   04/23/12   03/08/12   08/30/11   155,16                         0             0  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        

          File Room #10:
11-1197   Reconstruction               2-054-002               DONE    DONE       ADD. REQ'D04/26/12   04/23/12   02/24/12   08/30/11   7,8,155,16                     0             0  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        

          Storage Building #19:
  -    DB Discovered Building          2-063-001                                              /  /       /  /     06/23/11     /  /                                    0             0  JOD             0           0           0                                         0        /  /             /  /        

          Wildwood bldg#11 maintenance:
11-1184   Reconstruction               3-036-002               DONE    DONE       ADD. REQ'D04/26/12   04/23/12   02/24/12   08/30/11   155,16                         0             0  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        

          Coopers WB19 Maintenance:
11-1199   Reconstruction               3-057-002               DONE    DONE       ADD. REQ'D04/26/12   04/23/12   02/24/12   08/30/11   7,8,155,16                     0             0  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        

          Gas House:
10-0476   Reconstruction               7-034-002  03/15/11     DONE    DONE       DONE      11/15/10   11/12/10   08/18/10   08/04/10   7                         15,000             0  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        

          District Wide:
07-1141   Reconstruction               7-999-008  07/24/08     DONE    DONE       DONE      12/14/07   12/14/07   11/20/07   11/02/07   8,16                     361,300       361,300  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        
07-1142   Reconstruction               7-999-009  07/08/08     DONE    DONE       DONE      12/14/07   12/14/07   11/20/07   11/02/07   16                       165,000       165,000  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        
09-0211   Reconstruction               7-999-010  11/17/09     DONE    DONE       DONE      09/14/09   09/11/09   08/07/09   08/25/09   2                              0             0  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        

          Building # 12:
08-0693   Reconstruction               8-022-002  04/08/09     DONE    DONE       DONE      11/05/08   11/04/08   04/03/08   04/01/08   7,15                      29,917        29,917  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        
10-0477   Reconstruction               8-022-003  03/15/11     DONE    DONE       DONE      11/15/10   11/12/10   08/18/10   08/04/10   7                        369,352       369,352  JOD             0           0           0 Beardsley Design Associates A           0        /  /           12/18/12      
11-1175   Reconstruction               8-022-004               DONE    DONE       ADD. REQ'D04/26/12   04/23/12   02/23/12   08/30/11   7,8,155,16                     0    10,211,400  JOD             0           0           0 Beardsley Design Associates A           0        /  /             /  /        

          Science Center / Print Shop:
11-0139TQ Temporary Quarters           8-063-001  09/15/11     DONE    DONE       DONE      08/24/11   08/24/11   08/24/11     /  /                                    0             0  JOD             0           0           0                                         0        /  /             /  /        


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED