SUFFOLK COUNTY

SUFFOLK COUNTY

AMAGANSETT 580303
AMITYVILLE 580106
BABYLON 580101
BAYPORT BLUE P 580505
BAY SHORE 580501
BRENTWOOD 580512
BRIDGEHAMPTON 580909
CENTER MORICHE 580233
CENTRAL ISLIP 580513
COLD SPRING HA 580402
COMMACK 580410
COMSEWOGUE 580203
CONNETQUOT 580507
COPIAGUE 580105
DEER PARK 580107
EAST HAMPTON 580301
EAST ISLIP 580503
EAST MORICHES 580234
EASTPORT-SOUTH MANOR 580251
EASTPORT 580911
EAST QUOGUE 580917
ELWOOD 580401
FIRE ISLAND 580514
FISHERS ISLAND 581004
GREENPORT 581010
HALF HOLLOW HI 580405
HAMPTON BAYS 580905
HARBORFIELDS 580406
HAUPPAUGE 580506
HUNTINGTON 580403
ISLIP 580502
KINGS PARK 580805
LAUREL 581011
LINDENHURST 580104
LITTLE FLOWER 580603
LONGWOOD 580212
MATTITUCK 581009
MIDDLE COUNTRY 580211
MILLER PLACE 580208
MONTAUK 580306
MOUNT SINAI 580207
NEW SUFFOLK 581015
NORTH BABYLON 580103
NORTHPORT 580404
OYSTERPONDS 581002
PATCHOGUE-MEDF 580224
PORT JEFFERSON 580206
QUOGUE 580903
REMSENBURG 580901
RIVERHEAD 580602
ROCKY POINT 580209
SACHEM 580205
SAG HARBOR 580305
SAGAPONACK 580910
SAYVILLE 580504
SHOREHAM-WADIN 580601
SHELTER ISLAND 580701
SMITHTOWN 580801
SOUTH COUNTRY 580235
SOUTHAMPTON 580906
SOUTH HUNTINGTON 580413
SOUTH MANOR 580221
SOUTHOLD 581005
SPRINGS 580304
SUFFOLK 1 BOCE 589100
SUFFOLK 2 BOCE 589200
SUFFOLK 3 BOCE 589300
THREE VILLAGE 580201
TUCKAHOE COMMO 580913
WAINSCOTT 580302
WEST BABYLON 580102
WESTHAMPTON BE 580902
WEST ISLIP 580509
WILLIAM FLOYD 580232
WYANDANCH 580109
















Construction Project Status

Construction Project Status

THE STATE EDUCATION DEPARTMENT

FACILITIES PLANNING


UPDATED: 03/23/17 at 08:13:15




BABYLON UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-01-01-03
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Junior-Senior High School:
12-0078   Reconstruction               0-001-017  08/28/12     DONE    DONE       DONE      08/02/12   07/27/12   05/10/12   06/11/12   9,10,155,15,16           269,014       269,014  HCM             0           0           0 James M. Campbell Architects            0      02/01/13                       02/22/13           
14-0846   Reconstruction               0-001-018  06/01/15     DONE    DONE       DONE      12/29/14   12/19/14   06/11/14   12/10/14   2,4,8,9,155,15,16      3,081,467     3,081,467  DDJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
14-0590   Reconstruction               0-001-019  04/30/15     DONE    DONE       DONE      11/06/14   11/03/14   09/04/14   12/10/13   16                     5,469,990     5,469,990  DDJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
14-1031   Reconstruction               0-001-020  02/22/16     DONE    DONE       DONE      01/27/15   01/26/15   09/04/14   12/10/14   2,4,8,9,10,155,15,16   2,245,498     2,245,498  DDJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
15-0601   Reconstruction               0-001-021  11/08/16     DONE    DONE       DONE      10/16/15   10/15/15   08/20/15   12/10/14   2,4,8,9,10,155,15,16   2,636,500     2,636,500  DDJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
16-0515   Reconstruction               0-001-022                         UNREVIEWED         09/28/16   09/28/16   11/20/15   12/10/14   2,4,8                          0    32,656,264  DDJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
  -       Reconstruction               0-001-023                                              /  /       /  /     11/02/16     /  /     2,4,8,10,155,15,16             0    32,656,264  DDJ             0           0           0                                         0        /  /                           /  /             

          Memorial Grade School:
13-0872   Reconstruction               0-002-010  08/27/13     DONE    DONE       DONE      12/10/13   12/10/13   07/17/06   08/28/13   2,4,9,155,16             131,157       131,157  DDJ             0           0           0 Burton Behrendt Smith                   0      09/04/13                       10/14/14           
14-0605   Reconstruction               0-002-012                       ADDENDUM REQ'D       11/10/14   11/10/14   01/08/14   12/10/13   2                              0    11,924,820  DDJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
  -       Reconstruction               0-002-013                                              /  /       /  /     06/11/14     /  /     2,155,16                       0    11,924,820  DDJ             0           0           0                                         0        /  /                           /  /             
14-0591   Reconstruction               0-002-014  05/15/15     DONE    DONE       DONE      11/06/14   11/03/14   06/11/14   12/10/13   8,16                     733,898       733,898  DDJ             0           0           0 Burton Behrendt Smith                   0      03/09/16           YES           /  /             
15-0602   Reconstruction               0-002-015  08/25/16     DONE    DONE       DONE      10/16/15   10/15/15   08/20/15   12/10/13   2,4,8,9,10,155,15,16     955,230       955,230  DDJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
15-1201   Reconstruction               0-002-016  08/29/16     DONE    DONE       DONE      02/10/16   02/05/16   11/20/15   12/10/13   2,4,8                  3,081,667     3,081,667  DDJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
16-0517   Reconstruction               0-002-017               DONE    UNREVIEWED STARTED   09/28/16   09/28/16   09/02/16   12/10/13   2,4,8,9,10,15                  0    11,924,820  DDJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          Elementary School:
13-0873   Reconstruction               0-003-012  08/27/13     DONE    DONE       DONE      12/12/13   12/10/13   09/10/13   08/28/13   2                         58,429        58,429  DDJ             0           0           0 Burton Behrendt Smith                   0      09/04/13                       10/14/14           
13-1293   Reconstruction               0-003-013  04/30/14     DONE    DONE       DONE      02/26/14   02/25/14   01/08/14   12/10/13   2,7                    1,100,490     1,100,490  DDJ             0           0           0 Burton Behrendt Smith                   0      01/12/16                       02/29/16           
13-1457   Reconstruction               0-003-014  06/02/14     DONE    DONE       DONE      04/16/14   04/07/14   01/08/14   12/10/13   155                       58,798        58,798  DDJ             0           0           0 Burton Behrendt Smith                   0      03/04/16                       04/03/16           
14-0592   Reconstruction               0-003-015  05/15/15     DONE    DONE       DONE      11/06/14   11/03/14   06/11/14   12/10/13   8,16                     749,340       749,340  DDJ             0           0           0 Burton Behrendt Smith                   0      03/09/16           YES           /  /             
15-0603   Reconstruction               0-003-016  09/16/16     DONE    DONE       DONE      10/16/15   10/15/15   08/20/15   12/10/13   2,4,8,9,10,155,15,16     777,910       777,910  DDJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
15-1202   Reconstruction               0-003-017  08/29/16     DONE    DONE       DONE      02/10/16   02/05/16   11/20/15   12/10/13   2,4,8                    635,000       635,000  DDJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
16-0516   Reconstruction               0-003-021               DONE    UNREVIEWED STARTED   09/28/16   09/28/16   09/02/16   12/10/13   2,9,10,15                      0     8,675,685  DDJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          District-Wide:
  -    SB Reconstruction               7-999-BA1               DONE                           /  /       /  /       /  /       /  /     13                             0             0  DDJ             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




WEST BABYLON UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-01-02-03
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Senior High School:
11-1120   Reconstruction               0-001-025  05/08/12     DONE    DONE       DONE      04/12/12   04/11/12   02/02/12   02/15/07   2,4,7,9,155,16           137,853       137,853  JOD             0           0     137,853 Burton Behrendt Smith                   0      06/07/13                       04/03/14           
  -       Reconstruction               0-001-026                                              /  /       /  /     01/22/14     /  /     2,155,15,16                    0    42,154,792  MFS             0           0           0                                         0        /  /                           /  /             
15-0716   Reconstruction               0-001-027  08/10/16     DONE    DONE       DONE      11/12/15   11/04/15   09/24/15   01/13/15   2,4,8,9,10,155,15,16   1,840,000     1,840,000  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
15-0635   Reconstruction               0-001-028  01/14/16     DONE    DONE       DONE      10/28/15   10/27/15   10/28/15   01/13/15   2,9                    2,067,000     2,067,000  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
16-0780   Reconstruction               0-001-029  02/07/17     DONE    DONE       DONE      11/14/16   11/14/16   08/06/16   01/13/15   7,8,10                   358,000             0  BMJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          Junior High School:
14-0018   Reconstruction               0-002-023  08/04/14     DONE    DONE       DONE      07/15/14   07/08/14   06/17/14   05/28/14   2,155,15,16              160,000       160,000  MFS             0           0           0 Burton Behrendt Smith                   0      05/05/15                       06/03/15           
14-1284   Reconstruction               0-002-024  04/30/15     DONE    DONE       DONE      03/18/15   03/12/15   02/10/15   01/13/15   2,155                    400,000       400,000  MFS             0           0           0 Burton Behrendt Smith                   0      02/16/16                       04/08/16           
14-1285   Reconstruction               0-002-025  04/10/15     DONE    DONE       DONE      03/18/15   03/12/15   02/10/15   01/13/15   2,9                    1,879,500     1,879,500  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
15-0340   Reconstruction               0-002-026  06/06/16     DONE    DONE       DONE      08/20/15   08/20/15   08/06/15   01/13/15   2,4,8,9,10,155,15,16   2,882,000     2,882,000  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
15-0496   Reconstruction               0-002-027  03/07/16     DONE    DONE       DONE      09/24/15   09/21/15   09/02/15   01/13/15   2,8                      595,000       595,000  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
16-0125   Reconstruction               0-002-028  12/20/16     DONE    DONE       DONE      07/18/16   07/18/16   09/02/15   01/13/15   2,4,8,9,10,155,15,16   1,578,450             0  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
  -       Reconstruction               0-002-029                                              /  /       /  /     05/24/16     /  /     2,9,13,155,15,16               0    38,866,840  MFS             0           0           0                                         0        /  /                           /  /             
16-0779   Reconstruction               0-002-030  02/07/17     DONE    DONE       DONE      11/14/16   11/14/16   08/06/16   01/13/15   7,8,10                 1,370,000             0  BMJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          Forest Avenue School:
11-1098   Reconstruction               0-003-019  04/12/12     DONE    DONE       DONE      04/10/12   04/10/12   02/02/12   02/15/07   4,9,16                   297,000       297,000  JOD             0           0     297,000 Burton Behrendt Smith                   0      01/31/13                       07/29/13           
  -       Reconstruction               0-003-020                                              /  /       /  /     05/24/16     /  /     2,9,10,15,16                   0     8,417,520  MFS             0           0           0                                         0        /  /                           /  /             
16-0774   Reconstruction               0-003-021  02/07/17     DONE    DONE       DONE      11/14/16   11/14/16   08/06/16   01/13/15   7                        175,000       175,000  BMJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          Santapogue Elementary School:
16-0776   Reconstruction               0-005-020  02/07/17     DONE    DONE       DONE      11/14/16   11/14/16   08/06/16   01/13/15   7,8                      548,000             0  BMJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          Tooker Avenue Elementary:
16-0126   Reconstruction               0-007-018  12/20/16     DONE    DONE       DONE      07/18/16   07/18/16   05/24/16   01/13/15   2,9,10,155,15,16       1,456,775             0  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
16-0777   Reconstruction               0-007-019  02/07/17     DONE    DONE       DONE      11/14/16   11/14/16   08/06/16   01/13/15   2,4,7,8,9,10,155,16      875,000             0  BMJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          John F Kennedy Elementary School:
14-1286   Reconstruction               0-008-022  04/09/15     DONE    DONE       DONE      03/18/15   03/12/15   02/10/15   01/13/15   2,9                      491,000       491,000  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
16-0775   Reconstruction               0-008-023  02/07/17     DONE    DONE       DONE      11/14/16   11/14/16   08/06/16   01/13/15   7,8,10                   415,000             0  BMJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          Bus Garage:
16-0778   Reconstruction               5-004-012  02/07/17     DONE    DONE       DONE      11/14/16   11/14/16   08/22/16   01/13/15   7,16                      46,400             0  BMJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          District-Wide:
  -    SB Reconstruction               7-999-BA1               DONE                           /  /       /  /       /  /       /  /     8,10,13,16                     0             0  MFS             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




NORTH BABYLON UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-01-03-02
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Vacant Residence:
  -    DB Discovered Building          7-013-001                                              /  /       /  /     03/20/17     /  /                                    0             0  MTM             0           0           0                                         0        /  /                           /  /             

          M. G. Vedder Elementary:
16-0918   Reconstruction               0-004-026  01/12/17     DONE    DONE       DONE      12/02/16   12/02/16   10/19/16   11/17/16   155                      128,000             0  MTM             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          North Babylon Public Library:
13-1692   Reconstruction               6-005-018  08/05/14     DONE    DONE       DONE      07/02/14   06/26/14   03/14/14   02/18/14   10,16                     92,833             0  DDJ             0           0           0 Paul Cataldo Architecture & P           0        /  /                           /  /             
15-0846   Reconstruction               6-005-019  03/08/16     DONE    DONE       DONE      12/08/15   11/27/15   12/18/14   02/18/14   155                      834,500             0  DDJ             0           0           0 Paul Cataldo Architecture & P           0        /  /                           /  /             
16-1453   Reconstruction               6-005-020                         UNREVIEWED         03/02/17   03/01/17   11/30/16     /  /     2,10                           0             0  MTM             0           0           0 Paul Cataldo Architecture & P           0        /  /                           /  /             

          District-Wide:
  -       Reconstruction               7-999-004                                              /  /       /  /       /  /       /  /     13,16                          0             0  DDJ             0           0           0                                         0        /  /                           /  /             
15-1565SB Reconstruction               7-999-004               DONE                           /  /       /  /     04/13/16     /  /     13,16                          0             0  DDJ             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




LINDENHURST UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-01-04-03
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Kellum School:
13-0026   Reconstruction               0-001-008  08/22/13     DONE    DONE       DONE      07/16/13   07/10/13   05/24/13   05/21/13   2,15,16                   94,940             0  JOB             0           0           0 John A. Grillo                          0        /  /                           /  /             

          Middle School:
12-1195   Reconstruction               0-002-027  06/11/13     DONE    DONE       DONE      05/15/13   05/15/13   03/29/13   05/17/11   155                       70,000        70,000  JOB             0           0           0 John A. Grillo                          0      01/30/15                       02/12/15           
13-0027   Reconstruction               0-002-028  08/22/13     DONE    DONE       DONE      07/16/13   07/10/13   05/24/13   05/21/13   2,15,16                  158,540             0  JOB             0           0           0 John A. Grillo                          0        /  /                           /  /             
13-0792   Reconstruction               0-002-029  12/16/13     DONE    DONE       DONE      11/29/13   11/29/13   10/21/13   11/06/13   4,7                      181,000       181,000  JMB             0           0           0 John A. Grillo                          0      03/25/15                       04/08/15           
14-1092   Reconstruction               0-002-030  04/22/15     DONE    DONE       DONE      02/06/15   02/05/15   12/03/14   12/02/14   2,4,7,16               1,411,280     1,411,280  JMB             0           0           0 John A. Grillo                          0      02/01/16                       02/19/16           
14-1492   Reconstruction               0-002-031  06/11/15     DONE    DONE       DONE      05/12/15   05/07/15   02/03/15   12/02/14   8                        641,212       641,212  JMB             0           0           0 John A. Grillo                          0        /  /                           /  /             
16-1335   Reconstruction               0-002-032  03/10/17     DONE    DONE       DONE      02/06/17   02/06/17   02/06/17   05/17/16   2,4,8,9,10,155,15,16     350,000             0  SLC             0           0           0 John A. Grillo                          0        /  /                           /  /             

          Alleghany Ave. Elementary:
13-0028   Reconstruction               0-004-018  08/22/13     DONE    DONE       DONE      07/16/13   07/10/13   05/24/13   05/21/13   2,15,16                  222,140             0  JOB             0           0           0 John A. Grillo                          0        /  /                           /  /             

          Daniel Street Elementary:
12-0771   Reconstruction               0-006-021  04/17/13     DONE    DONE       DONE      02/05/13   02/05/13   11/28/12   11/20/12   9                         40,000        40,000  DDJ             0           0           0 John A. Grillo                          0      08/15/13                       08/29/13           
13-0029   Reconstruction               0-006-022  08/22/13     DONE    DONE       DONE      07/16/13   07/10/13   05/24/13   05/21/13   2,15,16                   94,940             0  JOB             0           0           0 John A. Grillo                          0        /  /                           /  /             
13-1326   Reconstruction               0-006-023  08/20/14     DONE    DONE       DONE      03/11/14   03/11/14   01/28/14   05/21/13   155                       40,000        40,000  JMB             0           0           0 John A. Grillo                          0      09/29/15                       10/15/15           

          William Rall Elementary:
13-0030   Reconstruction               0-007-018  08/22/13     DONE    DONE       DONE      07/16/13   07/10/13   05/24/13   05/21/13   2,15,16                  158,540             0  JOB             0           0           0 John A. Grillo                          0        /  /                           /  /             
14-1755   Reconstruction               0-007-019  11/02/15     DONE    DONE       DONE      06/26/15   06/25/15   05/21/15   05/19/15   2,155,15,16              300,000       300,000  JMB             0           0           0 John A. Grillo                          0        /  /                           /  /             

          Senior High School:
12-1083XX Additions and Alterations    0-009-030                         CANCELLED          04/10/13   04/08/13   11/28/12   05/15/12   02 - 16                        0    54,393,280  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             
13-0031   Reconstruction               0-009-031  08/22/13     DONE    DONE       DONE      07/16/13   07/10/13   05/24/13   05/21/13   2,15,16                  282,380             0  JOB             0           0           0 John A. Grillo                          0        /  /                           /  /             
13-1060   Reconstruction               0-009-032  07/11/14     DONE    DONE       DONE      01/21/14   01/17/14   12/12/13   05/17/13   155                       75,000        75,000  JMB             0           0           0 John A. Grillo                          0      09/29/15                       10/15/15           
13-1266   Reconstruction               0-009-033  04/29/14     DONE    DONE       DONE      02/24/14   02/18/14     /  /     02/05/14   13,16                    100,000       100,000  JMB             0           0           0 John A. Grillo                          0      01/30/15                       02/12/15           
14-0050   Reconstruction               0-009-034  02/19/15     DONE    DONE       DONE      07/25/14   07/16/14   01/28/14   05/20/14   16                       325,000       325,000  JMB             0           0           0 John A. Grillo                          0      07/11/16                       08/05/16           
14-1093   Reconstruction               0-009-035  04/22/15     DONE    DONE       DONE      02/06/15   02/05/15   12/03/14   12/02/14   2,4,7                  4,999,460     4,999,460  JMB             0           0           0 John A. Grillo                          0        /  /                           /  /             
14-1672   Reconstruction               0-009-036  02/11/16     DONE    DONE       DONE      06/16/15   06/16/15   02/10/15   05/15/12   155                       82,761        82,761  JMB             0           0           0 John A. Grillo                          0        /  /                           /  /             
15-0678   Reconstruction               0-009-037  04/27/16     DONE    DONE       DONE      11/02/15   10/28/15   09/10/15   05/19/15   2,8,9,10,15,16           207,300       207,300  JMB             0           0           0 John A. Grillo                          0        /  /                           /  /             
15-2029   Reconstruction               0-009-038  12/23/16     DONE    DONE       DONE      10/13/16   06/30/16   05/26/16   05/19/15   2,8,9,10,155,15,16       103,000             0  JMB             0           0           0 John A. Grillo                          0        /  /                           /  /             

          Harding Elementary School:
13-1325   Reconstruction               0-011-017  05/06/14     DONE    DONE       DONE      03/11/14   03/11/14   01/28/14   05/21/13   4,8                      260,000       260,000  JMB             0           0           0 John A. Grillo                          0      09/29/15                       10/13/15           
14-1094   Reconstruction               0-011-018  04/21/15     DONE    DONE       DONE      02/06/15   02/05/15   12/03/14   12/02/14   2,4,7,16               1,172,719     1,172,719  JMB             0           0           0 John A. Grillo                          0      02/01/16                       02/19/16           

          Albany Avenue Elementary School:
13-0032   Reconstruction               0-012-017  08/22/13     DONE    DONE       DONE      07/16/13   07/10/13   05/24/13   05/21/13   2,15,16                   94,940             0  JOB             0           0           0 John A. Grillo                          0        /  /                           /  /             
13-1061   Reconstruction               0-012-018  07/11/14     DONE    DONE       DONE      01/21/14   01/17/14   12/12/13   05/15/12   155                       65,000        65,000  JMB             0           0           0 John A. Grillo                          0      09/29/15                       10/15/15           

          Niagara Ave. School & Admin.:
90-1299   Reconstruction               0-013-003  05/02/91     DONE    DONE       DONE      03/28/91     /  /     10/17/16     /  /     16                       276,957       276,957  SLC             0           0           0                                         0      10/14/92                         /  /             
12-0264   Reconstruction               0-013-009  03/15/13     DONE    DONE       DONE      10/11/12   10/09/12   06/08/12   05/15/12   2,16                     302,080             0  DDJ             0           0           0 John A. Grillo                          0      03/12/14                       05/19/14           

          MA McKenna (formerly Niagara Admin):
13-0033   Reconstruction               1-013-002  08/22/13     DONE    DONE       DONE      07/16/13   07/10/13   07/17/13   05/21/13                             94,940             0  JMB             0           0           0 John A. Grillo                          0        /  /                           /  /             
16-1034   Reconstruction               1-013-003               STARTED DONE       DONE      12/21/16   12/20/16   12/21/16   11/16/16   2,16                           0             0  SLC             0           0           0 John A. Grillo                          0        /  /                           /  /             

          Inter-Modal Shipping Containter #1:
09-0034DB Discovered Building          2-021-001  02/13/13     DONE    DONE       DONE      07/16/09   07/09/09   08/14/08     /  /                                    0             0  JOD             0           0           0 John A. Grillo                          0        /  /                           /  /             

          Masonry Storage Shed (Memorial Shed):
09-0035DB Discovered Building          2-022-001  07/18/13     DONE    DONE       DONE      07/16/09   07/09/09   08/14/08     /  /                                    0             0  JOD             0           0           0 John A. Grillo                          0        /  /                           /  /             

          Inter-Modal Shipping Containter #1:
09-0036DB Discovered Building          2-023-001  02/13/13     DONE    DONE       DONE      07/16/09   07/09/09   08/14/08     /  /                                    0             0  JOD             0           0           0 John A. Grillo                          0        /  /                           /  /             

          Inter-Modal Shipping Container #2:
09-0037DB Discovered Building          2-024-001  02/13/13     DONE    DONE       DONE      07/16/09   07/09/09   08/14/08     /  /                                    0             0  JOD             0           0           0 John A. Grillo                          0        /  /                           /  /             

          Inter-Modal Shipping Container:
09-0038DB Discovered Building          2-025-001  02/13/13     DONE    DONE       DONE      07/16/09   07/09/09   08/14/08     /  /                                    0             0  JOD             0           0           0 John A. Grillo                          0        /  /                           /  /             

          Athletic Field Storage Building:
09-0039DB Discovered Building          2-026-001  07/18/13     DONE    DONE       DONE      07/16/09   07/09/09   08/14/08     /  /                                    0             0  JOD             0           0           0 John A. Grillo                          0        /  /                           /  /             

          Courtyard Storage Shed #1:
09-0040DB Discovered Building          2-027-001  02/13/13     DONE    DONE       DONE      07/16/09   07/09/09   08/14/08     /  /                                    0             0  JOD             0           0           0 John A. Grillo                          0        /  /                           /  /             

          Courtyard Storage Shed #2:
09-0042DB Discovered Building          2-028-001  02/13/13     DONE    DONE       DONE      07/17/09   07/09/09   08/14/08     /  /                                    0             0  JOD             0           0           0 John A. Grillo                          0        /  /                           /  /             

          Grounds Department Shop (Storage Bl):
09-0041DB Discovered Building          2-029-001  07/18/13     DONE    DONE       DONE      07/17/09   07/09/09   08/14/08     /  /                                    0             0  JOD             0           0           0 John A. Grillo                          0        /  /                           /  /             

          Inter-Modal Shipping Container #2:
09-0043DB Discovered Building          2-030-001  02/13/13     DONE    DONE       DONE      07/17/09   07/09/09   08/14/08     /  /                                    0             0  JOD             0           0           0 John A. Grillo                          0        /  /                           /  /             

          Inter-Modal Shipping Container #3:
09-0044DB Discovered Building          2-031-001  02/13/13     DONE    DONE       DONE      07/17/09   07/09/09   08/14/08     /  /                                    0             0  JOD             0           0           0 John A. Grillo                          0        /  /                           /  /             

          Inter-Modal Shipping Container #4:
09-0045DB Discovered Building          2-032-001  02/13/13     DONE    DONE       DONE      07/17/09   07/09/09   08/14/08     /  /                                    0             0  JOD             0           0           0 John A. Grillo                          0        /  /                           /  /             

          Container #1 @ Daniel St Elem Schl:
14-0932DB Discovered Building          2-034-001  03/23/15     DONE    DONE       DONE      01/09/15   01/08/15   12/18/14     /  /                                    0             0  JMB             0           0           0                                         0        /  /                           /  /             

          Container #2 @ Daniel St Elem Schl:
14-0933DB Discovered Building          2-035-001  03/23/15     DONE    DONE       DONE      01/09/15   01/08/15   12/18/14     /  /                                    0             0  JMB             0           0           0                                         0        /  /                           /  /             

          Lindenhurst Memorial Library:
12-0469   Reconstruction               6-003-003  01/10/13     DONE    DONE       DONE      11/20/12   11/20/12   06/29/12   09/22/12   155,16                 1,261,000             0  DDJ             0           0           0 EMTEC Consultants, P.C.                 0        /  /                           /  /             
13-1622   Reconstruction               6-003-004  09/18/14     DONE    DONE       DONE      06/18/14   06/16/14   11/21/13   02/19/14   7,8                      781,179             0  JMB             0           0           0 The Facilities Management Gro           0        /  /                           /  /             
  -       Additions and Alterations    6-003-005                                              /  /       /  /     07/24/14     /  /     02 - 16                        0             0  JMB             0           0           0                                         0        /  /                           /  /             

          High School - Guard Booth #1:
15-1486DB Discovered Building          7-036-001  04/14/16     DONE    DONE       DONE      03/28/16   03/21/16   03/07/16     /  /                                    0             0  JMB             0           0           0                                         0        /  /                           /  /             

          High School - Guard Booth #2:
15-1487DB Discovered Building          7-037-001  04/14/16     DONE    DONE       DONE      03/28/16   03/21/16   03/07/16     /  /                                    0             0  JMB             0           0           0                                         0        /  /                           /  /             

          High School - Guard Booth #3:
15-1488DB Discovered Building          7-038-001  04/14/16     DONE    DONE       DONE      03/28/16   03/21/16   03/07/16     /  /                                    0             0  JMB             0           0           0                                         0        /  /                           /  /             

          District-Wide:
15-0887SB Reconstruction               7-999-002                         UNREVIEWED         12/23/15   12/23/15   12/23/15     /  /     13,16                          0             0  JMB             0           0           0                                         0        /  /                           /  /             
15-1516   Reconstruction               7-999-002  07/25/16     DONE    DONE       DONE      03/31/16   03/31/16     /  /     11/14/14   13,16                    221,000             0  JMB             0           0           0 John A. Grillo                          0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




COPIAGUE UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-01-05-03
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Deauville Gardens Elementary:
14-0398PR Additions and Alterations    0-001-020                         UNREVIEWED         10/03/14   09/24/14   04/04/14     /  /     02 - 16               25,552,715    18,434,779  DDJ             0           0           0                                         0        /  /                           /  /             
16-0135   Additions and Alterations    0-001-020  01/07/17     DONE    DONE       DONE      07/21/16   07/21/16   04/04/14   11/23/15   02 - 16               21,114,824    17,481,581  DDJ             0           0           0 Wendel Duchscherer                      0        /  /                           /  /             

          Great Neck Rd. Elementary:
16-0118   Reconstruction               0-002-019  01/07/17     DONE    DONE       DONE      07/18/16   07/18/16   04/08/14   11/23/15   2,4,8,9,155,15,16      2,347,772             0  DDJ             0           0           0 Wendel Duchscherer                      0        /  /                           /  /             

          Copiague Middle School:
16-0119   Reconstruction               0-004-022  01/07/17     DONE    DONE       DONE      07/18/16   07/18/16   04/04/14   11/23/15   2,4,8,9,155,15,16      5,563,535             0  DDJ             0           0           0 Wendel Duchscherer                      0        /  /                           /  /             
15-1728XX Reconstruction               0-004-023  06/17/16               CANCELLED          05/13/16   05/13/16   04/22/16   11/23/15   2,4,9,155,15,16          325,000       325,000  DDJ             0           0           0 Wendel Duchscherer                      0        /  /                           /  /             
16-0120   Reconstruction               0-004-024  12/27/16     DONE    DONE       DONE      07/18/16   07/18/16   07/14/16   11/23/15   2,9                    1,699,754     1,699,754  DDJ             0           0           0 Wendel Duchscherer                      0        /  /                           /  /             

          Susan E. Wiley Elementary:
16-0121   Reconstruction               0-005-021  01/07/17     DONE    DONE       DONE      07/18/16   07/18/16   04/08/14   11/23/15   2,4,8,9,155,15,16      3,370,400             0  DDJ             0           0           0 Wendel Duchscherer                      0        /  /                           /  /             
15-1858XX Reconstruction               0-005-022  06/17/16               CANCELLED          06/02/16   06/01/16   05/24/16   11/23/15   2,4,9,15                 214,000       214,000  DDJ             0           0           0 Wendel Duchscherer                      0        /  /                           /  /             

          Walter G. O'Connell High School:
16-0122   Reconstruction               0-006-023  01/07/17     DONE    DONE       DONE      07/18/16   07/18/16   04/04/14   11/23/15   2,4,8,9,155,15,16      7,534,920             0  DDJ             0           0           0 Wendel Duchscherer                      0        /  /                           /  /             
15-1729XX Reconstruction               0-006-024                         CANCELLED          05/13/16   05/13/16   04/22/16   11/23/15   2,4,7,8,9,155,15,16            0    33,427,512  DDJ             0           0           0 Wendel Duchscherer                      0        /  /                           /  /             
15-1859XX Reconstruction               0-006-025  06/17/16               CANCELLED          06/02/16   06/01/16   05/24/16   11/23/15   2,4,9,15                 466,500       466,500  DDJ             0           0           0 Wendel Duchscherer                      0        /  /                           /  /             
15-1931XX Reconstruction               0-006-026                         CANCELLED          06/20/16   06/17/16   06/10/16   11/23/15   2,4,9,16                       0    33,427,512  DDJ             0           0           0 Wendel Duchscherer                      0        /  /                           /  /             
16-0123   Reconstruction               0-006-027  12/27/16     DONE    DONE       DONE      07/18/16   07/18/16   07/14/16   11/23/15   2,9                    1,847,108             0  DDJ             0           0           0 Wendel Duchscherer                      0        /  /                           /  /             

          Copiague Public Library:
12-0005   Reconstruction               6-007-007  08/29/12     DONE    DONE       DONE      07/09/12   07/05/12   05/29/12   04/25/12   9,10,16                  150,000             0  DDJ             0           0           0 John A. Grillo                          0      01/03/13                       01/18/13           
13-1183   Reconstruction               6-007-008  05/13/14     DONE    DONE       DONE      02/06/14   02/03/14   02/06/14   11/20/13   155                      325,000             0  DDJ             0           0           0 John A. Grillo                          0      07/16/15                       08/12/15           
15-1193   Reconstruction               6-007-009  07/06/16     DONE    DONE       DONE      02/04/16   02/04/16   08/27/15   08/26/15   9,10,155,15,16           140,000             0  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             

          District-Wide:
  -       Reconstruction               7-999-003                                              /  /       /  /     08/26/16     /  /     8,9,13,16                      0             0  DDJ             0           0           0                                         0        /  /                           /  /             
16-0318SB Reconstruction               7-999-003               DONE                           /  /       /  /     08/26/16     /  /     8,9,13,16                      0             0  DDJ             0           0           0                                         0        /  /                           /  /             
  -    SB Reconstruction               7-999-BA1                                              /  /       /  /       /  /       /  /     13                             0             0  DDJ             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




AMITYVILLE UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-01-06-03
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Amityville Memorial High School:
13-1177   Reconstruction               0-001-011  10/01/14     DONE    DONE       DONE      02/06/14   02/03/14   11/27/13   09/04/13   155,15,16              1,793,249     1,793,249  MFS             0           0           0 ECG Engineering, LLC            1,793,249      03/04/16                       07/18/16           
16-0568   Reconstruction               0-001-012               DONE    ADD. REQ'D DONE      10/06/16   10/06/16   07/25/16   03/08/16   4,8,9,155,16                   0    13,253,288  BMJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
  -    PR Additions and Alterations    0-001-013                                              /  /       /  /     09/14/16     /  /     02 - 16                        0    13,253,288  BMJ             0           0           0                                         0        /  /                           /  /             

          Northeast Elementary School:
13-1178   Reconstruction               0-003-013  10/01/14     DONE    DONE       DONE      02/06/14   02/03/14   11/27/13   09/04/13   2,155,15,16            1,402,387     1,402,387  MFS             0           0           0 ECG Engineering, LLC            1,402,387      03/04/16                       07/18/16           
16-0567   Reconstruction               0-003-014               DONE    ADD. REQ'D DONE      10/06/16   10/06/16   07/25/16   03/08/16   4,8,9,155,16                   0     4,910,220  AAA             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
16-0528   Reconstruction               0-003-015  11/18/16     DONE    DONE       DONE      09/30/16   09/30/16   07/25/16   03/08/16   8                        255,000       255,000  AAA             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
  -       Reconstruction               0-003-016                                              /  /       /  /     09/14/16     /  /     2,4,7,8,9,155,15,16            0     4,910,220  BMJ             0           0           0                                         0        /  /                           /  /             

          Northwest Elementary School:
13-1179   Reconstruction               0-004-012  10/01/14     DONE    DONE       DONE      02/06/14   02/03/14   11/27/13   09/04/13   2,155,15,16            1,821,926     1,821,926  MFS             0           0           0 ECG Engineering, LLC            1,821,926      03/04/16                       07/18/16           
16-0569   Reconstruction               0-004-013               DONE    ADD. REQ'D DONE      10/06/16   10/06/16   07/25/16   03/08/16   4,8,9,155,16                   0     7,712,790  BMJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
16-0527   Reconstruction               0-004-014  11/18/16     DONE    DONE       DONE      09/30/16   09/30/16   07/25/16   03/08/16   8                        470,000       470,000  BMJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
  -    PR Additions and Alterations    0-004-015                                              /  /       /  /     09/14/16     /  /     02 - 16                        0             0  BMJ             0           0           0                                         0        /  /                           /  /             

          Park Avenue Elementary:
  -       Reconstruction               0-005-011                                              /  /       /  /     10/22/13     /  /     2                              0    10,171,170  MFS             0           0           0                                         0        /  /                           /  /             
13-1180   Reconstruction               0-005-012  10/01/14     DONE    DONE       DONE      02/06/14   02/03/14   11/27/13   09/04/13   155,15,16                986,343       986,343  MFS             0           0           0 ECG Engineering, LLC              986,343      03/04/16                       07/18/16           
16-0570   Reconstruction               0-005-013               DONE    ADD. REQ'D DONE      10/06/16   10/06/16   07/25/16   03/08/16   4,8,9,155,16                   0    10,171,170  BMJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
  -       Reconstruction               0-005-014                                              /  /       /  /     09/14/16     /  /     2,4,7,8,9,155,15,16            0    10,171,170  BMJ             0           0           0                                         0        /  /                           /  /             
16-0913   Reconstruction               0-005-015               DONE    STARTED    STARTED   12/01/16   12/01/16   09/14/16   03/08/16   4                              0    10,171,170  BMJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          Edmund Miles Middle School:
13-1181   Reconstruction               0-008-014  10/01/14     DONE    DONE       DONE      02/06/14   02/03/14   11/27/13   09/04/13   155,16                 1,180,095     1,180,095  MFS             0           0           0 ECG Engineering, LLC            1,180,095      03/04/16                       07/18/16           
16-0571   Reconstruction               0-008-015               DONE    ADD. REQ'D DONE      10/06/16   10/06/16   07/25/16   03/08/16   4,8,9,155,16                   0    27,317,248  BMJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
  -       Reconstruction               0-008-016                                              /  /       /  /     09/14/16     /  /     2,4,7,8,9,14,155,15,           0    27,317,248  BMJ             0           0           0                                         0        /  /                           /  /             

          Admin Bldg Parknorth:
  -       Reconstruction               1-002-002                                              /  /       /  /     01/18/17     /  /     4,7                            0             0  BMJ             0           0           0                                         0        /  /                           /  /             

          Amityville Public Library:
  -       Reconstruction               6-015-006                                              /  /       /  /     10/28/16     /  /     16                             0             0  BMJ             0           0           0                                         0        /  /                           /  /             

          District-Wide:
16-0547   Reconstruction               7-999-003  03/17/17     DONE    DONE       DONE      10/03/16   10/03/16   07/25/16   03/08/16   8                        872,400             0  BMJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




DEER PARK UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-01-07-03
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Abraham Lincoln Elementary:
13-0260   Reconstruction               0-001-009  12/02/13     DONE    DONE       DONE      08/23/13   08/22/13   06/28/13   05/21/13   2,16                      19,167        19,167  MFS             0           0           0 John A. Grillo                          0        /  /                           /  /             

          JF Kennedy Junior High:
13-0261   Reconstruction               0-002-032  12/02/13     DONE    DONE       DONE      08/23/13   08/22/13   06/28/13   05/21/13   2,16                      19,167        19,167  MFS             0           0           0 John A. Grillo                          0        /  /                           /  /             
14-0302   Reconstruction               0-002-033  06/01/15     DONE    DONE       DONE      09/15/14   09/15/14   06/06/14   05/20/14   2,9                       90,000        90,000  MFS             0           0           0 John A. Grillo                          0      12/07/15                       01/07/16           
14-1351   Reconstruction               0-002-034  05/21/15     DONE    DONE       DONE      04/07/15   04/07/15   03/05/15   05/19/15   2,9                      300,000       300,000  MFS             0           0           0 John A. Grillo                          0      12/07/15                       01/06/16           
15-1044   Reconstruction               0-002-035  06/24/16     DONE    DONE       DONE      01/13/16   01/13/16   11/02/15   10/20/15   9,10                      87,640        87,640  MFS             0           0           0 John A. Grillo                          0      11/04/16                       02/02/17           
16-0142   Reconstruction               0-002-036  12/22/16     DONE    DONE       DONE      07/25/16   07/20/16   01/25/16   10/20/15   2,4,7,8,9,10,155,15,   3,939,020             0  MFS             0           0           0 John A. Grillo                          0        /  /                           /  /             

          Memorial Elementary:
16-0143   Reconstruction               0-003-008  12/22/16     DONE    DONE       DONE      07/25/16   07/20/16   01/25/16   10/20/15   2,7                    1,165,817             0  MFS             0           0           0 John A. Grillo                          0        /  /                           /  /             

          May Moore Elementary School:
13-0262   Reconstruction               0-004-032  12/02/13     DONE    DONE       DONE      08/23/13   08/22/13   06/28/13   05/21/13   2,16                      88,167        88,167  MFS             0           0           0 John A. Grillo                          0        /  /                           /  /             
15-1045   Reconstruction               0-004-033  06/24/16     DONE    DONE       DONE      01/13/16   01/13/16   11/02/15   10/20/15   2,7                    1,505,658     1,505,658  MFS             0           0           0 John A. Grillo                          0      11/04/16                       02/02/17           
16-0458   Reconstruction               0-004-034               DONE    UNREVIEWED STARTED   09/19/16   09/19/16   01/25/16   10/20/15   2,4,7,8,9,10,155,15,           0     5,923,440  MFS             0           0           0 John A. Grillo                          0        /  /                           /  /             
  -       Additions and Alterations    0-004-035                                              /  /       /  /     09/13/16     /  /     02 - 16                        0             0  MTM             0           0           0                                         0        /  /                           /  /             

          Senior High School:
11-1446   Reconstruction               0-006-049  07/12/12     DONE    DONE       DONE      06/29/12   06/21/12   05/29/12   05/12/12   7                        279,400       279,400  JOD             0           0           0 John A. Grillo                          0      08/27/13                       09/19/13           
12-1230   Reconstruction               0-006-050  07/25/13     DONE    DONE       DONE      05/23/13   05/23/13   03/08/13   05/21/13   2,4                      200,000       200,000  MFS             0           0           0 John A. Grillo                          0      08/27/13                       11/14/13           
13-0263   Reconstruction               0-006-051  12/02/13     DONE    DONE       DONE      08/23/13   08/22/13   06/28/13   05/21/13   2,16                     242,686       242,686  MFS             0           0           0 John A. Grillo                          0        /  /                           /  /             
14-0303   Reconstruction               0-006-052  06/01/15     DONE    DONE       DONE      09/15/14   09/15/14   06/06/14   05/20/14   15                        60,000        60,000  MFS             0           0           0 John A. Grillo                          0      09/01/15                       12/04/15           
15-1046   Reconstruction               0-006-053  06/24/16     DONE    DONE       DONE      01/13/16   01/13/16   11/02/15   10/20/15   2,8,9,10               1,552,500     1,552,500  MFS             0           0           0 John A. Grillo                          0      11/04/16                       02/02/17           
16-0144   Reconstruction               0-006-054  12/22/16     DONE    DONE       DONE      07/25/16   07/20/16   01/25/16   10/20/15   2,4,8,9,10,155,15,16     933,850             0  MFS             0           0           0 John A. Grillo                          0        /  /                           /  /             
  -       Reconstruction               0-006-055                                              /  /       /  /     09/13/16     /  /     155,16                         0    38,217,368  MTM             0           0           0                                         0        /  /                           /  /             

          John Q. Adams Elementary:
13-0264   Reconstruction               0-007-024  12/02/13     DONE    DONE       DONE      08/23/13   08/22/13   06/28/13   05/21/13   2,16                      88,167        88,167  MFS             0           0           0 John A. Grillo                          0      08/04/14                       08/28/14           
14-0304   Reconstruction               0-007-025  06/01/15     DONE    DONE       DONE      09/15/14   09/15/14   06/06/14   05/20/14   16                        25,000        25,000  MFS             0           0           0 John A. Grillo                          0        /  /                           /  /             
15-1047   Reconstruction               0-007-026  06/24/16     DONE    DONE       DONE      01/13/16   01/13/16   11/02/15   10/20/15   7                      1,215,872     1,215,872  MFS             0           0           0 John A. Grillo                          0      11/04/16           YES         02/02/17           
16-0459   Reconstruction               0-007-027                         UNREVIEWED         09/19/16   09/19/16   01/25/16   10/20/15   2,4,7,8,9,10,155,15,           0    10,171,170  MFS             0           0           0 John A. Grillo                          0        /  /                           /  /             
  -       Reconstruction               0-007-028                                              /  /       /  /     09/13/16     /  /     2,4                            0    10,171,170  MTM             0           0           0                                         0        /  /                           /  /             

          Robert Frost Junior High:
13-0265   Reconstruction               0-008-030  12/02/13     DONE    DONE       DONE      08/23/13   08/22/13   06/28/13   05/21/13   2,16                      19,167        19,167  MFS             0           0           0 John A. Grillo                          0        /  /                           /  /             
14-0305   Reconstruction               0-008-031  06/01/15     DONE    DONE       DONE      09/15/14   09/15/14   06/06/14   05/20/14   2,4,7,8,9,10,155,15,     200,000       200,000  MFS             0           0           0 John A. Grillo                          0      09/01/15                       12/04/15           
15-1048   Reconstruction               0-008-032  06/24/16     DONE    DONE       DONE      01/13/16   01/13/16   11/02/15   10/20/15   2,10                     308,390       308,390  MFS             0           0           0 John A. Grillo                          0      11/04/16                       02/02/17           
16-0460   Reconstruction               0-008-033                         UNREVIEWED         09/19/16   09/19/16   01/25/16   10/20/15   2,4,7,8,9,10,155,15,           0    26,843,648  MFS             0           0           0 John A. Grillo                          0        /  /                           /  /             
  -       Reconstruction               0-008-034                                              /  /       /  /     09/13/16     /  /     155,16                         0    26,843,648  MTM             0           0           0                                         0        /  /                           /  /             

          Annex Office Buildin:
12-0093   Reconstruction               1-009-003  10/31/12     DONE    DONE       DONE      08/09/12   07/26/12   10/05/12   05/15/12                             53,100             0  JMB             0           0           0 John A. Grillo                          0        /  /                           /  /             

          Trans Annex(Fuel-Buses only):
  -    XX Reconstruction               5-017-003                         CANCELLED          08/09/12   07/26/12   08/07/12     /  /     7                              0             0  JMB             0           0           0 John A. Grillo                          0        /  /                           /  /             

          District-Wide:
  -    SB Reconstruction               7-999-BA1               DONE                           /  /       /  /       /  /       /  /     9,13,16                        0             0  MFS             0           0           0                                         0        /  /                           /  /             
  -    SB Reconstruction               7-999-BA2               DONE                           /  /       /  /       /  /       /  /     13                             0             0  MFS             0           0           0                                         0        /  /                           /  /             
  -    SB Reconstruction               7-999-BA3                                              /  /       /  /       /  /       /  /     13,16                          0             0  MTM             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




WYANDANCH UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-01-09-02
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          ML King ES/LaFrancis Hardiman/Admin.:
11-0827   Reconstruction               0-002-026  05/11/12     DONE    DONE       DONE      02/22/12   02/21/12   01/25/12   01/12/12   7                      1,061,572     1,061,572  DDJ             0           0           0 Tetra Tech Architects & Engin           0      12/21/12                       01/17/13           
12-0070   Reconstruction               0-002-027  10/19/12     DONE    DONE       DONE      08/01/12   07/26/12   03/15/12   01/10/12   2,4,155,15,16          1,187,880     1,187,880  DDJ             0           0           0 Tetra Tech Architects and Eng           0      11/10/14                       12/15/14           
12-0164   Reconstruction               0-002-028  10/11/12     DONE    DONE       DONE      09/13/12   09/04/12   06/29/12   01/10/12   8                      3,145,000     3,145,000  DDJ             0           0           0 Tetra Tech Architects & Engin           0      11/10/14                       12/15/14           
13-0833   Reconstruction               0-002-029  06/12/14     DONE    DONE       DONE      12/04/13   12/04/13   11/21/13   01/10/12   8,9                       45,210        45,210  MFS             0           0           0 Tetra Tech Architects & Engin           0        /  /                           /  /             

          Wyandanch Memorial High School:
11-0829   Reconstruction               0-004-020  05/11/12     DONE    DONE       DONE      02/22/12   02/21/12   01/25/12   01/10/12   7,9,10                   645,895       645,895  DDJ             0           0           0 Tetra Tech Architects & Engin           0      12/21/12                       01/17/13           
12-0071   Reconstruction               0-004-021  10/19/12     DONE    DONE       DONE      08/01/12   07/26/12   06/29/12   01/10/12   8,10                   4,812,626     4,812,626  DDJ             0           0           0 Tetra Tech Architects and Eng           0      11/10/14                       12/15/14           
12-0165   Reconstruction               0-004-022  10/11/12     DONE    DONE       DONE      09/14/12   09/14/12     /  /     01/10/12   8                      2,096,150     2,096,150  DDJ             0           0           0 Tetra Tech Architects & Engin           0      11/10/14                       12/15/14           
13-0834   Reconstruction               0-004-023  06/12/14     DONE    DONE       DONE      12/04/13   12/04/13   09/04/13   01/10/12   2,4,7,8,9,155,15,16    1,637,440     1,637,440  MFS             0           0           0 Tetra Tech Architects & Engin           0        /  /                           /  /             

          Olive Middle School:
11-0828   Reconstruction               0-005-019  05/11/12     DONE    DONE       DONE      02/22/12   02/21/12   01/25/12   01/10/12   7,9                      398,938       398,938  DDJ             0           0           0 Tetra Tech Architects & Engin           0      12/21/12                       01/17/13           
12-0072   Reconstruction               0-005-020  10/19/12     DONE    DONE       DONE      08/01/12   07/26/12   03/15/12   01/10/12   2,4,9,155,15,16        2,567,169     2,567,169  DDJ             0           0           0 Tetra Tech Architects and Eng           0      11/10/14                       12/15/14           
12-0166   Reconstruction               0-005-021  10/11/12     DONE    DONE       DONE      09/13/12   09/04/12   06/29/12   01/10/12   8                      2,068,000     2,068,000  DDJ             0           0           0 Tetra Tech Architects & Engin           0      11/10/14                       12/15/14           
13-0835   Reconstruction               0-005-022  06/12/14     DONE    DONE       DONE      12/04/13   12/04/13   09/04/13   01/10/12   2,4,7,8,9,155,15,16      307,350       307,350  MFS             0           0           0 Tetra Tech Architects & Engin           0        /  /                           /  /             
14-1354   Reconstruction               0-005-023  04/24/15     DONE    DONE       DONE      04/08/15   04/02/15   01/16/15   01/12/10   7,10                     145,000       145,000  MFS             0           0           0 Tetra Tech Architects & Engin           0        /  /                           /  /             

          6 Clrm Modular @ Olive MS:
  -    PR New Construction             0-011-001                                              /  /       /  /     06/02/16     /  /     02 - 16                        0             0  MFS             0           0           0                                         0        /  /                           /  /             
15-1966   New Construction             0-011-001  07/28/16     DONE    DONE       DONE      06/23/16   06/20/16   06/02/16   05/17/16   02 - 16                  205,000             0  MFS             0           0           0 Tetra Tech Architects & Engin           0      12/29/16                       01/18/17           

          Bus Garage:
11-0830   Reconstruction               5-007-007  05/11/12     DONE    DONE       DONE      02/22/12   02/21/12   01/25/12   01/10/12   7                        161,520       161,520  DDJ             0           0           0 Tetra Tech Architects & Engin           0      12/21/12                       01/17/13           
12-0073   Reconstruction               5-007-008  10/19/12     DONE    DONE       DONE      08/01/12   07/26/12   06/06/12   01/10/12   2,9,155,15,16            221,000       221,000  DDJ             0           0           0 Tetra Tech Architects and Eng           0      11/10/14                       12/15/14           
12-0167   Reconstruction               5-007-009  10/11/12     DONE    DONE       DONE      09/13/12   09/04/12   06/29/12   01/10/12   8                         90,850        90,850  DDJ             0           0           0 Tetra Tech Architects & Engin           0      11/10/14                       12/15/14           

          Wyandanch Public Library:
12-0163   Additions and Alterations    6-008-004  08/09/13     DONE    DONE       DONE      09/10/12   09/04/12   12/08/11   07/15/09   02 - 16                  965,000             0  DDJ             0           0           0 ACGA ARCHITECTS                         0      03/12/15                       06/24/15           

          District Wide:
13-0877   Reconstruction               7-999-003  04/09/14     DONE    DONE       DONE      12/12/13   12/09/13   09/04/13   01/10/12   13,16                  1,390,000             0  MFS             0           0           0 Tetra Tech Architects & Engin           0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




THREE VILLAGE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-02-01-06
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Setauket Elementary School:
11-1418   Reconstruction               0-001-032  08/03/12     DONE    DONE       DONE      06/21/12   06/18/12   03/20/12   05/15/12   155                       90,000        90,000  DDJ             0           0           0 John A. Grillo                          0      05/12/14                       05/30/14           
12-1024   Reconstruction               0-001-033  07/01/13     DONE    DONE       DONE      03/27/13   03/27/13   03/23/12   11/10/09   16                       185,450       185,450  DDJ             0           0      32,453 John A. Grillo                          0      08/04/14                       08/28/14           
13-0739   Reconstruction               0-001-034  10/17/14     DONE    DONE       DONE      11/22/13   11/20/13   04/16/13   06/25/13   155,15,16                238,242       238,242  DDJ             0           0           0 John A. Grillo                    238,242      08/06/16                       09/02/16           
15-0469   Reconstruction               0-001-035  06/13/16     DONE    DONE       DONE      09/17/15   09/14/15   06/18/14   02/04/14   2,4,7,8,9,10,155,15,   3,688,832     3,688,832  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             
  -       Reconstruction               0-001-036                                              /  /       /  /     03/24/15     /  /     7,16                           0    15,438,606  DDJ             0           0           0                                         0        /  /                           /  /             
16-0388   Reconstruction               0-001-037               DONE    UNREVIEWED DONE      09/08/16   09/08/16   06/08/16   05/17/16   2,15,16                        0    15,438,606  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             

          Nassakeag Elementary School:
11-1419   Reconstruction               0-002-025  08/03/12     DONE    DONE       DONE      06/21/12   06/18/12   03/20/12   05/15/12   155                       70,000        70,000  DDJ             0           0           0 John A. Grillo                          0      05/12/14                       05/30/14           
12-1025   Reconstruction               0-002-026  07/01/13     DONE    DONE       DONE      03/27/13   03/27/13   03/23/12   11/10/09   16                       185,850       185,850  DDJ             0           0      32,524 John A. Grillo                          0      08/04/14                       08/28/14           
13-0740   Reconstruction               0-002-027  10/17/14     DONE    DONE       DONE      11/22/13   11/20/13   04/16/13   06/25/13   155,15,16                314,919       314,919  DDJ             0           0           0 John A. Grillo                    314,919      08/16/16                       09/02/16           
13-1379   Reconstruction               0-002-028  05/06/14     DONE    DONE       DONE      03/19/14   03/18/14   02/07/14   02/04/14   2,4,8,9,10               324,900       324,900  DDJ             0           0           0 John A. Grillo                          0      08/29/14                       09/15/14           
15-0470   Reconstruction               0-002-029  06/13/16     DONE    DONE       DONE      09/17/15   09/14/15   06/18/14   02/04/14   2,4,7,8,9,10,155,15,   4,572,035     4,572,035  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             
  -       Reconstruction               0-002-030                                              /  /       /  /     03/24/15     /  /     7,16                           0    15,948,450  DDJ             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-002-031                                              /  /       /  /     06/08/16     /  /     2,7,9,155,16                   0    15,948,450  DDJ             0           0           0                                         0        /  /                           /  /             

          Mount Elementary School:
11-1420   Reconstruction               0-006-025  08/03/12     DONE    DONE       DONE      06/21/12   06/18/12   03/20/12   05/15/12   155                       70,000        70,000  DDJ             0           0           0 John A. Grillo                          0      05/12/14                       05/30/14           
12-1026   Reconstruction               0-006-026  07/01/13     DONE    DONE       DONE      03/27/13   03/27/13   03/23/12   11/10/09   16                       154,250       154,250  DDJ             0           0      26,993 John A. Grillo                          0      08/04/14                       08/28/14           
13-0741   Reconstruction               0-006-027  10/17/14     DONE    DONE       DONE      11/22/13   11/20/13   04/16/13   06/25/13   155,15,16                380,330       380,330  DDJ             0           0           0 John A. Grillo                    380,330      08/16/16                       09/02/16           
15-0471   Reconstruction               0-006-028  06/13/16     DONE    DONE       DONE      09/17/15   09/14/15   06/18/14   02/04/14   2,4,7,8,9,10,155,15,   4,506,527     4,506,527  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             
  -       Reconstruction               0-006-029                                              /  /       /  /     03/24/15     /  /     7,16                           0    15,568,506  DDJ             0           0           0                                         0        /  /                           /  /             
15-0711   Reconstruction               0-006-030  05/09/16     DONE    DONE       DONE      11/10/15   11/10/15   05/01/15   05/19/15   2,4,16                   300,000       300,000  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             
  -       Reconstruction               0-006-031                                              /  /       /  /     06/08/16     /  /     2,7,9,155,16                   0    15,568,506  DDJ             0           0           0                                         0        /  /                           /  /             

          Arrowhead Lane Elementary:
11-1421   Reconstruction               0-007-024  08/03/12     DONE    DONE       DONE      06/21/12   06/18/12   03/20/12   05/15/12   155                      140,000       140,000  DDJ             0           0           0 John A. Grillo                          0      05/12/14                       05/30/14           
12-1027   Reconstruction               0-007-025  07/01/13     DONE    DONE       DONE      03/27/13   03/27/13   03/23/12   11/10/09   16                       202,550       202,550  DDJ             0           0      35,446 John A. Grillo                          0      08/04/14                       08/28/14           
13-0742   Reconstruction               0-007-026  10/17/14     DONE    DONE       DONE      11/22/13   11/20/13   04/16/13   06/25/13   155,15,16                452,305       452,305  DDJ             0           0           0 John A. Grillo                    452,305      08/16/16                       09/02/16           
13-1013   Reconstruction               0-007-027  04/04/14     DONE    DONE       DONE      01/13/14   01/13/14   12/12/13   05/17/05   4                         21,128        21,128  DDJ             0           0           0 John A. Grillo                          0      08/29/14                       09/15/14           
14-0051   Reconstruction               0-007-028  12/30/14     DONE    DONE       DONE      07/25/14   07/16/14   04/18/14   02/04/14   2,4,8,9,10,155,15,16   4,234,711     4,234,711  DDJ             0           0           0 John A. Grillo                          0      09/01/15                       10/19/15           
  -       Reconstruction               0-007-029                                              /  /       /  /     03/24/15     /  /     7,16                           0    18,059,286  DDJ             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-007-030                                              /  /       /  /     06/08/16     /  /     7,9,155,16                     0    18,059,286  DDJ             0           0           0                                         0        /  /                           /  /             

          Paul J Gelinas Junior High:
12-1028   Reconstruction               0-008-030  07/01/13     DONE    DONE       DONE      03/27/13   03/27/13   01/12/12   11/10/09   16                       190,850       190,850  DDJ             0           0      33,397 John A. Grillo                          0      08/04/14                       08/28/14           
11-1422   Reconstruction               0-008-031  08/03/12     DONE    DONE       DONE      06/21/12   06/18/12   03/20/12   05/15/12   155                       85,000        85,000  DDJ             0           0           0 John A. Grillo                          0      05/12/14                       05/30/14           
13-0743   Reconstruction               0-008-032  10/17/14     DONE    DONE       DONE      11/22/13   11/20/13   04/16/13   06/25/13   155,15,16                989,408       989,408  DDJ             0           0           0 John A. Grillo                    989,408      08/16/16                       09/02/16           
13-1009   Reconstruction               0-008-033  06/04/14     DONE    DONE       DONE      01/13/14   01/13/14   12/12/13   10/18/94   9,15                      47,027        47,027  DDJ             0           0           0 John A. Grillo                          0      10/27/14                       11/07/14           
13-1008   Reconstruction               0-008-034  04/29/14     DONE    DONE       DONE      01/13/14   01/13/14   12/12/13   02/03/99   16                        61,278        61,278  DDJ             0           0           0 John A. Grillo                          0      08/29/14                       09/15/14           
13-1301   Reconstruction               0-008-035  04/22/14     DONE    DONE       DONE      03/05/14   03/03/14   02/07/14   02/04/14   2,4,9,10               1,201,348     1,201,348  DDJ             0           0           0 John A. Grillo                          0      08/29/14                       09/15/14           
14-0052   Reconstruction               0-008-036  12/30/14     DONE    DONE       DONE      07/25/14   07/16/14   05/02/14   02/04/14   2,4,8,9,10,155,15,16   6,906,284     6,906,284  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             
14-0265   Reconstruction               0-008-037  05/05/15     DONE    DONE       DONE      09/09/14   09/08/14   07/31/14   05/20/14   14                        70,000        70,000  DDJ             0           0           0 John A. Grillo - Architect PC           0      01/04/16                       01/14/16           
  -       Reconstruction               0-008-038                                              /  /       /  /     03/24/15     /  /     7,16                           0    28,908,544  DDJ             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-008-039                                              /  /       /  /     06/08/16     /  /     7,9,155,16                     0    28,908,544  DDJ             0           0           0                                         0        /  /                           /  /             

          Ward Melville Senior High:
12-1029   Reconstruction               0-009-035  07/01/13     DONE    DONE       DONE      03/27/13   03/27/13   01/11/12   11/10/09   16                       295,050       295,050  DDJ             0           0      36,384 John A. Grillo                          0      08/04/14                       08/28/14           
13-0744   Reconstruction               0-009-036  10/17/14     DONE    DONE       DONE      11/22/13   11/20/13   04/16/13   06/25/13   155,15,16              2,754,245     2,754,245  DDJ             0           0           0 John A. Grillo                  2,754,245      08/16/16                       09/02/16           
13-1010   Reconstruction               0-009-037  06/04/14     DONE    DONE       DONE      01/13/14   01/13/14   12/12/13   02/03/99   16                        47,027        47,027  DDJ             0           0           0 John A. Grillo                          0      10/27/14                       11/07/14           
13-1302   Reconstruction               0-009-038  04/22/14     DONE    DONE       DONE      03/05/14   03/03/14   02/07/14   02/04/14   2,4,10                 1,031,220     1,031,220  DDJ             0           0           0 John A. Grillo                          0      04/20/15                       05/05/15           
14-0053   Reconstruction               0-009-039  12/30/14     DONE    DONE       DONE      07/25/14   07/16/14   02/25/14   02/04/14   2,4,7,8,9,10,155,15,  11,261,087    11,261,087  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             
14-1726   Reconstruction               0-009-040  07/24/15     DONE    DONE       DONE      06/23/15   06/22/15   03/24/15   02/04/14   8                        188,800       188,800  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             
  -       Reconstruction               0-009-041                                              /  /       /  /     03/24/15     /  /     7,16                           0    39,719,380  DDJ             0           0           0                                         0        /  /                           /  /             
15-1326   Reconstruction               0-009-042  09/06/16     DONE    DONE       DONE      02/29/16   02/17/16   02/26/16   05/19/15   7,8,9,155,15,16        1,480,000     1,480,000  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             
16-0384   Reconstruction               0-009-043  01/23/17     DONE    DONE       DONE      09/07/16   09/07/16   08/15/16   02/04/14   15                       118,000             0  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             

          Minnesauke Elementary:
11-1423   Reconstruction               0-014-023  08/03/12     DONE    DONE       DONE      06/21/12   06/18/12   03/20/12   05/15/12   155                      100,000       100,000  DDJ             0           0           0 John A. Grillo                          0      05/12/14                       05/30/14           
12-1030   Reconstruction               0-014-024  07/01/13     DONE    DONE       DONE      03/27/13   03/27/13   03/23/12   11/10/09   16                       133,050       133,050  DDJ             0           0      23,283 John A. Grillo                          0      08/04/14                       08/28/14           
13-0745   Reconstruction               0-014-025  10/17/14     DONE    DONE       DONE      11/22/13   11/20/13   04/16/13   06/25/13   155,15,16                566,635       566,635  DDJ             0           0           0 John A. Grillo                    566,635      08/16/16                       09/02/16           
13-1014   Reconstruction               0-014-026  04/04/14     DONE    DONE       DONE      01/13/14   01/13/14   12/12/13   05/18/99   2,4,7                    149,854       149,854  DDJ             0           0           0 John A. Grillo                          0      08/29/14                       09/15/14           
13-1380   Reconstruction               0-014-027  05/06/14     DONE    DONE       DONE      03/19/14   03/18/14   02/07/14   02/04/14   2,8,9,10                 255,100       255,100  DDJ             0           0           0 John A. Grillo                          0      08/29/14                       09/15/14           
15-0472   Reconstruction               0-014-028  06/13/16     DONE    DONE       DONE      09/17/15   09/14/15   06/18/14   02/04/14   2,4,7,8,9,10,155,15,   4,296,492     4,296,492  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             
  -       Reconstruction               0-014-029                                              /  /       /  /     03/24/15     /  /     7,16                           0    14,652,702  DDJ             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-014-030                                              /  /       /  /     06/08/16     /  /     7,9,155,16                     0    14,652,702  DDJ             0           0           0                                         0        /  /                           /  /             

          Murphy Jr. High School:
12-1031   Reconstruction               0-015-028  07/01/13     DONE    DONE       DONE      03/27/13   03/27/13   01/12/12   11/10/09   16                       204,650       204,650  DDJ             0           0      35,813 John A. Grillo                          0      08/04/14                       08/28/14           
11-1424   Reconstruction               0-015-029  08/03/12     DONE    DONE       DONE      06/21/12   06/18/12   03/20/12   05/15/12   155                       85,000        85,000  DDJ             0           0           0 John A. Grillo                          0      05/12/14                       05/30/14           
13-0746   Reconstruction               0-015-030  10/17/14     DONE    DONE       DONE      11/22/13   11/20/13   04/16/13   06/25/13   155,15,16              1,019,328     1,019,328  DDJ             0           0           0 John A. Grillo                  1,019,328      06/16/16                       09/02/16           
13-1011   Reconstruction               0-015-031  06/04/14     DONE    DONE       DONE      01/13/14   01/13/14   12/12/13   02/03/99   16                        47,027        47,027  DDJ             0           0           0 John A. Grillo                          0      10/27/14                       11/07/14           
13-1303   Reconstruction               0-015-032  04/22/14     DONE    DONE       DONE      03/05/14   03/03/14   02/07/14   02/04/14   2,4,9,10                 867,620       867,620  DDJ             0           0           0 John A. Grillo                          0      08/29/14                       09/15/14           
13-1522   Reconstruction               0-015-033  06/11/14     DONE    DONE       DONE      05/14/14   05/06/14   04/02/14   04/09/14   14                        55,750        55,750  DDJ             0           0           0 John A. Grillo                          0      04/20/15                       05/05/15           
14-0054   Reconstruction               0-015-034  12/30/14     DONE    DONE       DONE      07/25/14   07/16/14   05/02/14   02/04/14   2,4,7,8,9,10,155,15,   6,903,700     6,903,700  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             
  -       Reconstruction               0-015-035                                              /  /       /  /     03/24/15     /  /     7,16                           0    28,870,656  DDJ             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-015-036                                              /  /       /  /     06/08/16     /  /     7,9,155,16                     0    28,870,656  DDJ             0           0           0                                         0        /  /                           /  /             

          North Country Learning Ctr.:
12-1032   Reconstruction               0-018-016  07/01/13     DONE    DONE       DONE      03/27/13   03/27/13   12/05/11   11/10/09   2,16                     111,250       111,250  DDJ             0           0           0 John A. Grillo                          0      08/04/14                       08/28/14           
11-1425   Reconstruction               0-018-017  08/03/12     DONE    DONE       DONE      07/05/12   06/18/12   03/20/12   05/15/12   155                      140,000       140,000  DDJ             0           0           0 John A. Grillo                          0      05/12/14                       05/30/14           
12-1130   Reconstruction               0-018-018  05/22/13     DONE    DONE       DONE      04/25/13   04/19/13   02/26/13   02/28/13   7                        283,376       283,376  DDJ             0           0           0 John A. Grillo                          0      08/30/13                       09/13/13           
13-0747   Reconstruction               0-018-019  10/17/14     DONE    DONE       DONE      11/22/13   11/20/13   04/16/13   06/25/13   155,15,16                493,593       493,593  DDJ             0           0           0 John A. Grillo                    493,593      08/16/16                       09/02/16           
15-0391   Reconstruction               0-018-020  02/02/16     DONE    DONE       DONE      09/01/15   08/31/15   03/24/15   02/04/14   7,16                     295,600       295,600  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             
15-0519   Reconstruction               0-018-021  03/18/16     DONE    DONE       DONE      10/01/15   10/01/15   05/01/15   05/20/15   2,4                      600,000             0  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             
  -       Reconstruction               0-018-022                                              /  /       /  /     06/10/16     /  /     7,16                           0     1,217,760  DDJ             0           0           0                                         0        /  /                           /  /             

          20' Container #11 @ Ward Melville HS:
13-1318DB Discovered Building          2-069-001  01/15/15     DONE    DONE       DONE      03/10/14   03/07/14   01/23/14     /  /                                    0             0  DDJ             0           0           0                                         0        /  /                           /  /             

          20' Container #12 @ Ward Melville HS:
13-1319DB Discovered Building          2-070-001  01/15/15     DONE    DONE       DONE      03/10/14   03/07/14   01/23/14     /  /                                    0             0  DDJ             0           0           0                                         0        /  /                           /  /             

          Container #5 @ NC Admin Cntr:
14-0267DB Discovered Building          2-072-001  01/21/15     DONE    DONE       DONE      09/09/14   09/08/14   08/07/14     /  /                                    0             0  DDJ             0           0           0 John A. Grillo - Architect PC           0        /  /                           /  /             

          Container #6 @ NC Admin Bldg:
14-0268DB Discovered Building          2-073-001  01/21/15     DONE    DONE       DONE      09/09/14   09/08/14   08/07/14     /  /                                    0             0  DDJ             0           0           0 John A. Grillo - Architect PC           0        /  /                           /  /             

          Container #7 @ NC Admin Cntr:
14-0269DB Discovered Building          2-074-001  01/21/15     DONE    DONE       DONE      09/09/14   09/08/14   08/07/14     /  /                                    0             0  DDJ             0           0           0 John A. Grillo - Architect PC           0        /  /                           /  /             

          Maintenance Building:
14-0025   New Construction             3-071-001  11/20/14     DONE    DONE       DONE      07/16/14   07/10/14   03/12/14   02/04/14   02 - 16                1,901,800             0  DDJ             0           0           0 John A. Grillo                          0      12/16/15                       01/04/15           

          District-Wide:
  -    SB Reconstruction               7-999-BA1               DONE                           /  /       /  /       /  /       /  /     13                             0             0  DDJ             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




BROOKHAVEN-COMSEWOGUE UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-02-03-02
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Terryville Elementary:
11-0902   Reconstruction               0-002-016  03/01/13     DONE    DONE       DONE      03/06/12   03/06/12   03/25/11   02/07/11   2,4,8,155,15,16          441,814       441,814  JOD             0           0           0 Burton Behrendt Smith             441,814      09/05/14                       10/14/14         YES
                                                                                                                                                                                                                                                                                                                                   
  -    PR Additions and Alterations    0-002-017                                              /  /       /  /     03/21/14     /  /     02 - 16                        0             0  MFS             0           0           0                                         0        /  /                           /  /             
14-0306   Alterations                  0-002-017  06/01/15     DONE    DONE       DONE      09/15/14   09/15/14   03/21/14   05/20/14   02 - 16                  230,000       230,000  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   

          John F Kennedy Jr. Middle:
12-1194   Reconstruction               0-003-007  07/16/13     DONE    DONE       DONE      05/15/13   05/15/13   12/11/12   06/19/12   2,9,16                   275,000       275,000  DDJ             0           0           0 Burton Behrendt Smith                   0      03/27/14                       04/18/14         YES
                                                                                                                                                                                                                                                                                                                                   
11-0903   Reconstruction               0-003-013  03/01/13     DONE    DONE       DONE      03/06/12   03/06/12   03/25/11   02/07/11   2,4,8,15,16              599,505       599,505  JOD             0           0           0 Burton Behrendt Smith             599,505      09/05/14                       10/14/14         YES
                                                                                                                                                                                                                                                                                                                                   
16-1409   Reconstruction               0-003-014                         UNREVIEWED         02/21/17   02/21/17   09/14/16   05/17/16   2,8,16                         0    24,229,376  BMJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
16-1410   Reconstruction               0-003-015                         UNREVIEWED         02/22/17   02/21/17   09/14/16   05/17/16   2,4,155,16                     0    24,229,376  BMJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   

          Norwood Avenue Elem. School:
11-0904   Reconstruction               0-004-010  03/01/13     DONE    DONE       DONE      03/06/12   03/06/12   03/25/11   02/07/11   2,4,8,155,15,16          529,530       529,530  JOD             0           0           0 Burton Behrendt Smith             529,530      09/05/14                       10/14/14         YES
                                                                                                                                                                                                                                                                                                                                   
11-1208   Reconstruction               0-004-011  05/17/12     DONE    DONE       DONE      04/25/12   04/20/12   03/01/12   05/17/11   155,16                   100,000       100,000  JOD             0           0           0 Burton Behrendt Smith                   0      07/22/13                       04/24/14         YES
                                                                                                                                                                                                                                                                                                                                   
13-1182   Reconstruction               0-004-012  04/14/14     DONE    DONE       DONE      02/06/14   02/03/14   08/27/13   05/21/13   2,4,8,9,15               365,000       365,000  MFS             0           0           0 Burton Behrendt Smith                   0      01/15/16                       09/22/16         YES
                                                                                                                                                                                                                                                                                                                                   

          Boyle Road Elementary:
11-0905   Reconstruction               0-005-011  03/01/13     DONE    DONE       DONE      03/06/12   03/06/12   03/25/11   02/07/11   2,4,7,8,155,15,16        334,796       334,796  JOD             0           0           0 Burton Behrendt Smith             334,796      09/05/14                       10/14/14         YES
                                                                                                                                                                                                                                                                                                                                   
12-1143   Reconstruction               0-005-012  07/10/13     DONE    DONE       DONE      05/01/13   04/29/13   02/01/13   05/17/11   2,4,8,155,15,16           81,500        81,500  MFS             0           0           0 Burton Behrendt Smith                   0      06/25/14                       07/03/14         YES
                                                                                                                                                                                                                                                                                                                                   

          Comsewogue Senior High School:
11-0906   Reconstruction               0-010-017  03/01/13     DONE    DONE       DONE      03/06/12   03/06/12   03/25/11   02/07/11   2,4,8,155,15,16        1,163,179     1,163,179  JOD             0           0           0 Burton Behrendt Smith           1,163,179      09/05/14                       10/14/14         YES
                                                                                                                                                                                                                                                                                                                                   
14-0910   Reconstruction               0-010-018  03/18/16     DONE    DONE       DONE      12/31/14   12/26/14   08/27/13   05/20/14   2,4,155,15,16            367,796       367,796  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
14-0307   Reconstruction               0-010-019  06/01/15     DONE    DONE       DONE      09/15/14   09/15/14   07/22/14   05/20/14   2,8,9,155,15,16          540,000       540,000  MFS             0           0           0 Burton Behrendt Smith                   0      12/18/15                       02/29/16         YES
                                                                                                                                                                                                                                                                                                                                   
  -       Reconstruction               0-010-020                                              /  /       /  /     06/20/16     /  /     2,4,9,13,155,15,16             0    29,733,640  AAA             0           0           0                                         0        /  /                           /  /             
16-1456   Reconstruction               0-010-021                         UNREVIEWED         03/02/17   03/02/17   11/08/16   05/17/16   2,10,16                        0    29,733,640  BMJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          Clinton Avenue ES:
11-0907   Reconstruction               0-011-009  03/01/13     DONE    DONE       DONE      03/06/12   03/06/12   03/25/11   02/07/11   2,4,8,155,15,16          274,580       274,580  JOD             0           0           0 Burton Behrendt Smith             274,580      09/05/14                       10/14/14         YES
                                                                                                                                                                                                                                                                                                                                   
15-1233   Reconstruction               0-011-010  04/07/16     DONE    DONE       DONE      02/12/16   02/10/16   05/01/15   05/20/15   2,4,7,15                 925,000       925,000  MFS             0           0           0 Burton Behrendt Smith                   0      09/16/16                       10/21/16         YES
                                                                                                                                                                                                                                                                                                                                   
  -       Reconstruction               0-011-011                                              /  /       /  /     11/12/15     /  /     155,15,16                      0     7,716,060  MFS             0           0           0                                         0        /  /                           /  /             

          Administration Bldg.:
11-0908   Reconstruction               1-001-001  03/01/13     DONE    DONE       DONE      03/06/12   03/06/12   03/25/11   02/07/11   2,4,7,8,155,15,16        241,523             0  JOD             0           0           0 Burton Behrendt Smith             241,523      09/05/14                       10/14/14         YES
                                                                                                                                                                                                                                                                                                                                   

          Comsewogue Public Library:
  -       Reconstruction               6-009-002                                              /  /       /  /     04/10/12     /  /     4                              0             0  JOD             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




SACHEM CENTRAL SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-02-05-06
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Lynwood Avenue School:
11-0681XX Reconstruction               0-002-017  05/16/12               CANCELLED          01/18/12   01/18/12   06/28/11   05/17/11   155,16                    42,857        42,857  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             
15-0221   Reconstruction               0-002-018  03/01/16     DONE    DONE       DONE      08/05/15   08/04/15   03/19/15   03/04/15   16                       954,147       954,147  MFS             0           0           0 ECG Engineering, LLC              954,147        /  /                           /  /             
  -       Reconstruction               0-002-019                                              /  /       /  /       /  /       /  /     8,9,16                         0             0  BMJ             0           0           0                                         0        /  /                           /  /             
16-1114SB Reconstruction               0-002-019               DONE                           /  /       /  /     01/04/17     /  /     8,9,16                         0             0  BMJ             0           0           0                                         0        /  /                           /  /             

          Waverly Ave. Elementary:
15-0222   Reconstruction               0-003-019  03/01/16     DONE    DONE       DONE      08/05/15   08/04/15   03/19/15   03/04/15   16                       150,010       150,010  MFS             0           0           0 ECG Engineering, LLC              150,010        /  /                           /  /             
  -       Reconstruction               0-003-020                                              /  /       /  /     03/27/15     /  /     2,4,7,9,155,15,16              0    10,495,920  MFS             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-003-021                                              /  /       /  /       /  /       /  /     8,9,16                         0             0  BMJ             0           0           0                                         0        /  /                           /  /             
16-1115SB Reconstruction               0-003-021               DONE                           /  /       /  /     01/04/17     /  /     8,9,16                         0             0  BMJ             0           0           0                                         0        /  /                           /  /             

          Nokomis School:
11-0682   Reconstruction               0-004-015  05/16/12     DONE    DONE       DONE      01/18/12   01/18/12   06/28/11   05/17/11   2,9,155,16               155,607       155,607  DDJ             0           0           0 John A. Grillo                          0      01/07/13                       10/04/13           
15-0223   Reconstruction               0-004-016  03/01/16     DONE    DONE       DONE      08/05/15   08/04/15   03/19/15   03/04/15   16                       991,346       991,346  MFS             0           0           0 ECG Engineering, LLC              991,346        /  /                           /  /             
  -       Reconstruction               0-004-017                                              /  /       /  /       /  /       /  /     8,9,16                         0             0  BMJ             0           0           0                                         0        /  /                           /  /             
16-1116SB Reconstruction               0-004-017               DONE                           /  /       /  /     01/04/17     /  /     8,9,16                         0             0  BMJ             0           0           0                                         0        /  /                           /  /             

          Grundy Avenue Elementary:
15-0224   Reconstruction               0-006-015  03/01/16     DONE    DONE       DONE      08/05/15   08/04/15   03/19/15   03/04/15   16                     1,317,484     1,317,484  MFS             0           0           0 ECG Engineering, LLC            1,317,484        /  /                           /  /             
  -       Reconstruction               0-006-016                                              /  /       /  /       /  /       /  /     8,9,16                         0             0  BMJ             0           0           0                                         0        /  /                           /  /             
16-1117SB Reconstruction               0-006-016               DONE                           /  /       /  /     01/04/17     /  /     8,9,16                         0             0  BMJ             0           0           0                                         0        /  /                           /  /             

          Gatelot Ave. School:
11-0683   Reconstruction               0-007-016  05/16/12     DONE    DONE       DONE      01/18/12   01/18/12   06/28/11   05/17/11   2,9,155,16               127,249       127,249  DDJ             0           0           0 John A. Grillo                          0      05/13/13                       10/28/13           
15-0225   Reconstruction               0-007-017  03/01/16     DONE    DONE       DONE      08/05/15   08/04/15   03/19/15   03/04/15   16                       143,796       143,796  MFS             0           0           0 ECG Engineering, LLC              143,796        /  /                           /  /             

          Samoset M.S.(fmly  HS South):
11-0684   Reconstruction               0-008-026  05/16/12     DONE    DONE       DONE      01/18/12   01/18/12   06/28/11   05/17/11   2,9,155,16               354,333       354,333  DDJ             0           0           0 John A. Grillo                          0      05/13/13                       10/28/13           
  -       Reconstruction               0-008-027                                              /  /       /  /     09/30/14     /  /     16                             0    15,414,402  MFS             0           0           0                                         0        /  /                           /  /             
15-0226   Reconstruction               0-008-028  03/01/16     DONE    DONE       DONE      08/05/15   08/04/15   03/20/15   03/04/15   155,15,16              1,476,299     1,476,299  MFS             0           0           0 ECG Engineering, LLC            1,476,299        /  /                           /  /             
  -       Reconstruction               0-008-029                                              /  /       /  /       /  /       /  /     8,9,16                         0             0  BMJ             0           0           0                                         0        /  /                           /  /             
16-1118SB Reconstruction               0-008-029               DONE                           /  /       /  /     01/04/17     /  /     8,9,16                         0             0  BMJ             0           0           0                                         0        /  /                           /  /             

          Sagamore Jr. High:
11-0685   Reconstruction               0-010-020  05/16/12     DONE    DONE       DONE      01/18/12   01/18/12   06/28/11   05/17/11   155,16                    75,857        75,857  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             
15-0227   Reconstruction               0-010-021  03/01/16     DONE    DONE       DONE      08/05/15   08/04/15   03/20/15   03/04/15   155,15,16                819,375       819,375  MFS             0           0           0 ECG Engineering, LLC              819,375        /  /                           /  /             
  -       Reconstruction               0-010-022                                              /  /       /  /       /  /       /  /     8,9,16                         0             0  BMJ             0           0           0                                         0        /  /                           /  /             
16-1119SB Reconstruction               0-010-022               DONE                           /  /       /  /     01/04/17     /  /     8,9,16                         0             0  BMJ             0           0           0                                         0        /  /                           /  /             

          Hiawatha Elementary:
15-0228   Reconstruction               0-011-017  03/01/16     DONE    DONE       DONE      08/05/15   08/04/15   03/19/15   03/04/15   16                       959,256       959,256  MFS             0           0           0 ECG Engineering, LLC              959,256        /  /                           /  /             
  -       Reconstruction               0-011-018                                              /  /       /  /       /  /       /  /     8,9,16                         0             0  BMJ             0           0           0                                         0        /  /                           /  /             
16-1120SB Reconstruction               0-011-018               DONE                           /  /       /  /     01/04/17     /  /     8,9,16                         0             0  BMJ             0           0           0                                         0        /  /                           /  /             

          Chippewa School:
15-0229   Reconstruction               0-012-014  03/01/16     DONE    DONE       DONE      08/05/15   08/04/15   03/19/15   03/04/15   16                       881,382       881,382  MFS             0           0           0 ECG Engineering, LLC              881,382        /  /                           /  /             
  -       Reconstruction               0-012-015                                              /  /       /  /       /  /       /  /     8,9,16                         0             0  BMJ             0           0           0                                         0        /  /                           /  /             
16-1121SB Reconstruction               0-012-015               DONE                           /  /       /  /     01/04/17     /  /     8,9,16                         0             0  BMJ             0           0           0                                         0        /  /                           /  /             

          Wenonah Elementary:
15-0230   Reconstruction               0-013-019  03/01/16     DONE    DONE       DONE      08/05/15   08/04/15   03/19/15   03/04/15   16                     1,338,882     1,338,882  MFS             0           0           0 ECG Engineering, LLC            1,338,882        /  /                           /  /             
  -       Reconstruction               0-013-020                                              /  /       /  /       /  /       /  /     8,9,16                         0             0  BMJ             0           0           0                                         0        /  /                           /  /             
16-1122SB Reconstruction               0-013-020               DONE                           /  /       /  /     01/04/17     /  /     8,9,16                         0             0  BMJ             0           0           0                                         0        /  /                           /  /             

          Merrimac School:
15-0231   Reconstruction               0-014-017  03/01/16     DONE    DONE       DONE      08/05/15   08/04/15   03/19/15   04/03/15   16                       964,605       964,605  MFS             0           0           0 ECG Engineering, LLC              964,605        /  /                           /  /             
  -       Reconstruction               0-014-018                                              /  /       /  /       /  /       /  /     8,9,16                         0             0  BMJ             0           0           0                                         0        /  /                           /  /             
16-1123SB Reconstruction               0-014-018               DONE                           /  /       /  /     01/04/17     /  /     8,9,16                         0             0  BMJ             0           0           0                                         0        /  /                           /  /             

          Cayuga School:
15-0232   Reconstruction               0-015-016  03/01/16     DONE    DONE       DONE      08/05/15   08/04/15   03/20/15   03/04/15   16                       629,067       629,067  MFS             0           0           0 ECG Engineering, LLC              629,067        /  /                           /  /             
  -       Reconstruction               0-015-017                                              /  /       /  /       /  /       /  /     8,9,16                         0             0  BMJ             0           0           0                                         0        /  /                           /  /             
16-1124SB Reconstruction               0-015-017               DONE                           /  /       /  /     01/04/17     /  /     8,9,16                         0             0  BMJ             0           0           0                                         0        /  /                           /  /             

          North High School:
11-0686   Reconstruction               0-016-025  05/16/12     DONE    DONE       DONE      01/18/12   01/18/12   06/28/11   05/17/11   15                        22,000        22,000  DDJ             0           0           0 John A. Grillo                          0      07/09/13                       10/04/13           
13-1310   Reconstruction               0-016-026  06/02/14     DONE    DONE       DONE      03/07/14   03/06/14   02/04/14   05/20/14   4,7,9,15,16              750,000       750,000  MFS             0           0           0 John A. Grillo                          0      10/23/14                       11/12/14           
15-0233   Reconstruction               0-016-027  03/01/16     DONE    DONE       DONE      08/05/15   08/04/15   03/20/15   03/04/15   155,15,16              2,192,492     2,192,492  MFS             0           0           0 ECG Engineering, LLC            2,192,492        /  /                           /  /             
  -       Reconstruction               0-016-028                                              /  /       /  /       /  /       /  /     8,9,16                         0             0  BMJ             0           0           0                                         0        /  /                           /  /             
16-1125SB Reconstruction               0-016-028               DONE                           /  /       /  /     01/04/17     /  /     8,9,16                         0             0  BMJ             0           0           0                                         0        /  /                           /  /             

          Seneca Jr. High:
11-0687   Reconstruction               0-017-015  05/16/12     DONE    DONE       DONE      01/18/12   01/18/12   06/28/11   05/17/11   155,16                   119,858       119,858  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             
15-0234   Reconstruction               0-017-016  03/01/16     DONE    DONE       DONE      08/05/15   08/04/15   03/20/15   04/03/15   155,15,16                920,242       920,242  MFS             0           0           0 ECG Engineering, LLC              920,242        /  /                           /  /             
  -       Reconstruction               0-017-017                                              /  /       /  /       /  /       /  /     8,9,16                         0             0  BMJ             0           0           0                                         0        /  /                           /  /             
16-1126SB Reconstruction               0-017-017               DONE                           /  /       /  /     01/04/17     /  /     8,9,16                         0             0  BMJ             0           0           0                                         0        /  /                           /  /             

          Tecumseh Elementary:
11-0688XX Reconstruction               0-018-013  05/16/12               CANCELLED          01/18/12   01/18/12   06/28/11   05/17/11   155,16                    42,857        42,857  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             
15-0235   Reconstruction               0-018-014  03/01/16     DONE    DONE       DONE      08/05/15   08/04/15   03/19/15   03/04/15   16                       961,762       961,762  MFS             0           0           0 ECG Engineering, LLC              961,762        /  /                           /  /             

          Tamarac Elementary:
15-0236   Reconstruction               0-019-017  03/01/16     DONE    DONE       DONE      08/05/15   08/04/15   03/19/15   03/04/15   16                     1,344,264     1,344,264  MFS             0           0           0 ECG Engineering, LLC            1,344,264        /  /                           /  /             
  -       Reconstruction               0-019-018                                              /  /       /  /       /  /       /  /     8,9,16                         0             0  BMJ             0           0           0                                         0        /  /                           /  /             
16-1127SB Reconstruction               0-019-018               DONE                           /  /       /  /     01/04/17     /  /     8,9,16                         0             0  BMJ             0           0           0                                         0        /  /                           /  /             

          Sachem East High School:
11-0689   Reconstruction               0-050-006  05/16/12     DONE    DONE       DONE      01/18/12   01/18/12   06/28/11   05/17/11   15                        60,500        60,500  DDJ             0           0           0 John A. Grillo                          0      07/09/13                       10/04/13           
  -       Reconstruction               0-050-007                                              /  /       /  /     09/30/14     /  /     16                             0    68,742,747  MFS             0           0           0                                         0        /  /                           /  /             
15-0237   Reconstruction               0-050-008  03/01/16     DONE    DONE       DONE      08/05/15   08/04/15   03/20/15   03/04/15   155,15,16              4,608,506     4,608,506  MFS             0           0           0 ECG Engineering, LLC            4,608,506        /  /                           /  /             
  -       Reconstruction               0-050-009                                              /  /       /  /       /  /       /  /     8,9,16                         0             0  BMJ             0           0           0                                         0        /  /                           /  /             
16-1128SB Reconstruction               0-050-009               DONE                           /  /       /  /     01/04/17     /  /     8,9,16                         0             0  BMJ             0           0           0                                         0        /  /                           /  /             

          Sequoya Middle School:
15-0238   Reconstruction               0-051-005  03/01/16     DONE    DONE       DONE      08/05/15   08/04/15   03/20/15   03/04/15   155,15,16                970,955       970,955  MFS             0           0           0 ECG Engineering, LLC              970,955        /  /                           /  /             

          Administrative Annex:
  -       Reconstruction               1-005-005                                              /  /       /  /     09/30/14     /  /     16                             0             0  MFS             0           0           0                                         0        /  /                           /  /             
15-0239   Reconstruction               1-005-006  03/01/16     DONE    DONE       DONE      08/05/15   08/04/15   03/19/15   03/04/15   16                        28,447             0  MFS             0           0           0 ECG Engineering, LLC               28,447        /  /                           /  /             

          Transportation Office Bus Garage:
  -       Reconstruction               5-021-009                                              /  /       /  /     09/30/14     /  /     16                             0             0  MFS             0           0           0                                         0        /  /                           /  /             
15-0240   Reconstruction               5-021-010  03/01/16     DONE    DONE       DONE      08/05/15   08/04/15   03/19/15   03/15/15   16                        19,525        19,525  MFS             0           0           0 ECG Engineering, LLC               19,525        /  /                           /  /             

          Public Library:
13-0143   Reconstruction               6-022-009  08/28/13     DONE    DONE       DONE      08/06/13   08/06/13   07/29/13   04/15/13   16                        86,000             0  MFS             0           0           0 John Tanzi Architects                   0        /  /                           /  /             
  -       Reconstruction               6-022-010                                              /  /       /  /     04/29/14     /  /     2                              0             0  MFS             0           0           0                                         0        /  /                           /  /             
14-0233   Reconstruction               6-022-011  09/30/14     DONE    DONE       DONE      08/29/14   08/29/14   07/16/14   08/18/14   7,16                     155,800             0  MFS             0           0           0 John Tanzi Architects                   0        /  /                           /  /             
  -       Reconstruction               6-022-012                                              /  /       /  /     10/15/14     /  /     2                              0             0  MFS             0           0           0                                         0        /  /                           /  /             
16-0217   Reconstruction               6-022-013  08/26/16     DONE    DONE       DONE      08/05/16   08/05/16   04/29/16   05/16/16   155,16                   148,500             0  MFS             0           0           0 John Tanzi Architects                   0        /  /                           /  /             
16-0218   Reconstruction               6-022-014                       ADDENDUM REQ'D       08/05/16   08/05/16   04/29/16   05/16/16   16                             0             0  MFS             0           0           0 John Tanzi Architects                   0        /  /                           /  /             

          Food Service Office:
  -       Reconstruction               7-020-002                                              /  /       /  /     09/30/14     /  /     16                             0             0  MFS             0           0           0                                         0        /  /                           /  /             

          Concession:
15-1376DB Discovered Building          7-078-001                       ADDENDUM REQ'D       03/07/16   03/03/16   09/14/15     /  /                                    0             0  MFS             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




PORT JEFFERSON UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-02-06-02
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Earl Vandermeulen High School:
14-1424   Reconstruction               0-001-015  05/26/15     DONE    DONE       DONE      04/23/15   04/23/15   07/16/14   04/14/15   2,4,7,8,9,10,155,15,     250,000       250,000  JMB             0           0           0 John A. Grillo                          0        /  /                           /  /             
14-1142   Reconstruction               0-001-016  05/19/15     DONE    DONE       DONE      02/13/15   02/12/15   02/13/15   05/19/15   2,4,7,15                 275,000       275,000  JMB             0           0           0 John A. Grillo                          0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
15-1269   Reconstruction               0-001-017  05/26/16     DONE    DONE       DONE      02/23/16   02/23/16   05/22/15   05/12/15   10,155,15,16           1,141,966     1,141,966  JMB             0           0           0 John A. Grillo                  1,141,966        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
15-1183   Reconstruction               0-001-018  03/11/16     DONE    DONE       DONE      02/04/16   02/04/16   07/06/15   05/20/08   2,4,7,8,9,14,155,15,   1,250,000     1,250,000  JMB             0           0           0 John A. Grillo                          0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
15-1616   Reconstruction               0-001-019  07/07/16     DONE    DONE       DONE      04/21/16   04/20/16   02/10/16   04/12/16   2                        100,000       100,000  JMB             0           0           0 John A. Grillo                          0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
15-1841   Reconstruction               0-001-020  06/09/16     DONE    DONE       DONE      06/01/16   05/24/16   03/14/16   03/08/16   16                        65,000        65,000  JMB             0           0           0 John A. Grillo                          0      08/30/16                       10/21/16         YES
                                                                                                                                                                                                                                                                                                                                   
  -       Reconstruction               0-001-021                                              /  /       /  /     01/18/17     /  /     7,8,9,16                       0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Edna Louise Spear ES (Pt.Jeff ES):
15-1270   Reconstruction               0-002-016  05/26/16     DONE    DONE       DONE      02/23/16   02/23/16   05/22/15   05/12/15   10,155,15,16           1,351,153     1,351,153  JMB             0           0           0 John A. Grillo                  1,351,153        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
15-1617   Reconstruction               0-002-017  07/07/16     DONE    DONE       DONE      04/21/16   04/20/16   02/10/16   04/12/16   2                        150,000             0  JMB             0           0           0 John A. Grillo                          0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
15-1842   Reconstruction               0-002-018  06/09/16     DONE    DONE       DONE      06/01/16   05/24/16   03/14/16   03/08/16   16                        30,000        30,000  JMB             0           0           0 John A. Grillo                          0      08/30/16                       10/21/16         YES
                                                                                                                                                                                                                                                                                                                                   

          Industrial Arts:
12-0609   Reconstruction               0-004-002  03/07/13     DONE    DONE       DONE      12/26/12   12/20/12   03/08/12   05/15/12   2,7,155,16               640,000       640,000  HCM             0           0           0 John A. Grillo                          0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
15-1271   Reconstruction               0-004-003  05/26/16     DONE    DONE       DONE      02/23/16   02/23/16   05/22/15   05/12/15   10,16                     37,274        37,274  JMB             0           0           0 John A. Grillo                     37,274        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   

          Admin Bldg (was Pupil Personal Srv):
15-1272   Reconstruction               1-009-003  05/26/16     DONE    DONE       DONE      02/23/16   02/23/16   05/22/15   05/12/15   16                         5,393             0  JMB             0           0           0 John A. Grillo                      5,393        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   

          Baseball 1 - 20' Container:
15-0920DB Discovered Building          2-018-001  12/22/15     DONE    DONE       DONE      12/22/15   12/22/15   11/18/15     /  /                                    0             0  JMB             0           0           0                                         0        /  /                           /  /             

          Baseball 2 - 20' Container:
15-0921DB Discovered Building          2-019-001  12/22/15     DONE    DONE       DONE      12/22/15   12/22/15   11/18/15     /  /                                    0             0  JMB             0           0           0                                         0        /  /                           /  /             

          Football 1 - 20' Container:
15-0922DB Discovered Building          2-020-001  12/22/15     DONE    DONE       DONE      12/22/15   12/22/15   11/18/15     /  /                                    0             0  JMB             0           0           0                                         0        /  /                           /  /             

          Football 2 - 40' Container:
15-0923DB Discovered Building          2-021-001  12/22/15     DONE    DONE       DONE      12/22/15   12/22/15   11/18/15     /  /                                    0             0  JMB             0           0           0                                         0        /  /                           /  /             

          Tech Ed 1 - 20' Container:
15-0974DB Discovered Building          2-022-001  12/30/15     DONE    DONE       DONE      12/28/15   12/28/15   11/18/15     /  /                                    0             0  JMB             0           0           0                                         0        /  /                           /  /             

          Tech Ed 2 - 20' Container:
15-0975DB Discovered Building          2-023-001  12/30/15     DONE    DONE       DONE      12/28/15   12/28/15   11/18/15     /  /                                    0             0  JMB             0           0           0                                         0        /  /                           /  /             

          Elementary 1 - 20' Container:
15-0924DB Discovered Building          2-024-001  12/22/15     DONE    DONE       DONE      12/22/15   12/22/15   11/18/15     /  /                                    0             0  JMB             0           0           0                                         0        /  /                           /  /             

          Elementary 2 - 20' Container:
15-0925DB Discovered Building          2-025-001  12/22/15     DONE    DONE       DONE      12/22/15   12/22/15   11/18/15     /  /                                    0             0  JMB             0           0           0                                         0        /  /                           /  /             

          Elementary 3 - 20' Container:
15-0926DB Discovered Building          2-026-001  12/22/15     DONE    DONE       DONE      12/22/15   12/22/15   11/18/15     /  /                                    0             0  JMB             0           0           0                                         0        /  /                           /  /             

          Elem Field House 1 - 20' Container:
15-0927DB Discovered Building          2-027-001  12/22/15     DONE    DONE       DONE      12/22/15   12/22/15   11/18/15     /  /                                    0             0  JMB             0           0           0                                         0        /  /                           /  /             

          Elem Field House 2 - 20' Container:
15-0928DB Discovered Building          2-028-001  12/22/15     DONE    DONE       DONE      12/22/15   12/22/15   11/18/15     /  /                                    0             0  JMB             0           0           0                                         0        /  /                           /  /             

          Elem Field House 3 - 20' Container:
15-0929DB Discovered Building          2-029-001  12/22/15     DONE    DONE       DONE      12/22/15   12/22/15   11/18/15     /  /                                    0             0  JMB             0           0           0                                         0        /  /                           /  /             

          Elementary 4 - 20' Container:
15-0930DB Discovered Building          2-030-001  12/22/15     DONE    DONE       DONE      12/22/15   12/22/15   12/11/15     /  /                                    0             0  JMB             0           0           0                                         0        /  /                           /  /             

          Elementary 5 - 20' Container:
15-0931DB Discovered Building          2-031-001  12/22/15     DONE    DONE       DONE      12/22/15   12/22/15   12/11/15     /  /                                    0             0  JMB             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




MOUNT SINAI UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-02-07-02
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Mt. Sinai Middle School:
13-0280   Reconstruction               0-002-011  11/14/13     DONE    DONE       DONE      08/26/13   08/23/13   04/24/13   05/21/13   7                        327,099       327,099  DDJ             0           0           0 H2M Group                               0      11/12/14                       11/24/14         YES
                                                                                                                                                                                                                                                                                                                                   
14-0314   Reconstruction               0-002-012  11/17/14     DONE    DONE       DONE      09/18/14   09/18/14   03/25/14   05/20/14   2,4,7,9                1,561,413     2,000,000  DDJ             0           0           0 H2M Group                               0      12/11/15                       03/14/16         YES
                                                                                                                                                                                                                                                                                                                                   

          HS Storage Shed:
13-0839DB Discovered Building          2-007-001  04/17/14     DONE    DONE       DONE      12/09/13   12/05/13   10/22/13     /  /                                    0             0  DDJ             0           0           0 H2M Group                               0        /  /                           /  /             

          HS Concession Stand:
13-0840DB Discovered Building          7-008-001  04/09/14     DONE    DONE       DONE      12/09/13   12/05/13   10/22/13     /  /                                    0             0  DDJ             0           0           0 H2M Group                               0        /  /                           /  /             

          HS Press Box:
13-0841DB Discovered Building          7-009-001  04/17/14     DONE    DONE       DONE      12/09/13   12/05/13   10/22/13     /  /                                    0             0  DDJ             0           0           0 H2M Group                               0        /  /                           /  /             

          District-Wide:
  -       Reconstruction               7-999-005                                              /  /       /  /       /  /       /  /     13,16                          0             0  DDJ             0           0           0                                         0        /  /                           /  /             
15-1883SB Reconstruction               7-999-005               DONE                           /  /       /  /     06/08/16     /  /     13,16                          0             0  DDJ             0           0           0                                         0        /  /                           /  /             
  -    SB Reconstruction               7-999-BA1                                              /  /       /  /       /  /       /  /     13                             0             0  DDJ             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




MILLER PLACE UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-02-08-02
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          No. Country Road MS (fmly ES):
11-0743   Reconstruction               0-001-014  06/12/12     DONE    DONE       DONE      02/01/12   01/30/12   03/18/09   05/20/08   2,4,8,9,16               687,500       687,500  DDJ             0           0     189,750 Michael J. Guido Jr.                    0      07/30/14                       10/23/15         YES
                                                                                                                                                                                                                                                                                                                                   
11-0172   Reconstruction               0-001-017  04/19/12     DONE    DONE       DONE      09/13/11   09/09/11   05/19/11   11/17/10   8,155,15,16              733,890       733,890  DDJ             0           0           0 Michael J. Guido Jr.              733,890      05/29/13                       11/08/13         YES
                                                                                                                                                                                                                                                                                                                                   
14-0361   Reconstruction               0-001-018  04/15/15     DONE    DONE       DONE      09/30/14   09/26/14   05/06/14   03/24/14   2,7,8,16               1,723,980     1,723,980  DDJ             0           0           0 Michael J. Guido Jr.                    0      09/01/16                       12/12/16         YES
                                                                                                                                                                                                                                                                                                                                   
14-1515   Reconstruction               0-001-019               DONE    DONE       ADD. REQ'D05/14/15   05/08/15   03/24/15   11/20/14   16                             0    14,306,985  DDJ             0           0           0 Michael J. Guido Jr.                    0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   

          Andrew Muller Primary School:
11-0744   Reconstruction               0-002-013  06/12/12     DONE    DONE       DONE      02/02/12   01/30/12   03/18/09   06/12/12   2,4,9,16                  62,500        62,500  DDJ             0           0      17,250                                         0      07/30/14                       10/23/15         YES
                                                                                                                                                                                                                                                                                                                                   
11-0173   Reconstruction               0-002-015  04/19/12     DONE    DONE       DONE      09/13/11   09/09/11   05/19/11   11/17/10   8,155,15,16              387,347       387,347  DDJ             0           0           0 Michael J. Guido Jr.              387,347      05/29/13                       11/08/13         YES
                                                                                                                                                                                                                                                                                                                                   
14-0362   Reconstruction               0-002-016  04/15/15     DONE    DONE       DONE      09/26/14   09/26/14   05/06/14   03/24/14   2,4,7,8,9,155,16       1,697,490     1,697,490  DDJ             0           0           0 Michael J. Guido Jr.                    0      09/01/16                       12/12/16         YES
                                                                                                                                                                                                                                                                                                                                   
14-1516   Reconstruction               0-002-017               DONE    DONE       ADD. REQ'D05/14/15   05/08/15   03/24/15   11/20/14   16                             0     9,513,531  DDJ             0           0           0 Michael J. Guido Jr.                    0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
  -       Additions and Alterations    0-002-018                                              /  /       /  /       /  /       /  /     02 - 16                        0             0  DDJ             0           0           0                                         0        /  /                           /  /             
  -    PR Additions and Alterations    0-002-018                                              /  /       /  /       /  /       /  /     02 - 16                        0             0  DDJ             0           0           0                                         0        /  /                           /  /             
15-1292SB Additions and Alterations    0-002-018                         UNREVIEWED         02/25/16   02/25/16   02/25/16     /  /     02 - 16                        0             0  DDJ             0           0           0                                         0        /  /                           /  /             

          Sound Beach School:
11-0745   Reconstruction               0-003-012  06/12/12     DONE    DONE       DONE      02/01/12   01/30/12   03/18/09   05/20/08   16                        12,500        12,500  DDJ             0           0       3,450 Michael J. Guido Jr.                    0      07/30/14                       10/23/15         YES
                                                                                                                                                                                                                                                                                                                                   
11-0174   Reconstruction               0-003-014  04/19/12     DONE    DONE       DONE      09/13/11   09/09/11   05/19/11   11/17/10   8,155,15,16              532,401       532,401  DDJ             0           0           0 Michael J. Guido Jr.              532,401      05/29/13                       11/08/13         YES
                                                                                                                                                                                                                                                                                                                                   
14-0363   Reconstruction               0-003-015  04/15/15     DONE    DONE       DONE      09/30/14   09/26/14   05/06/14   03/24/14   2,4,7,8,9,155,15,16      601,500       601,500  DDJ             0           0           0 Michael J. Guido Jr.                    0      09/01/16                       12/12/16         YES
                                                                                                                                                                                                                                                                                                                                   
16-0162   Reconstruction               0-003-016  08/10/14     DONE    DONE       DONE      07/27/16   07/27/16   06/03/14   03/24/14   2,4,9,14,16              141,800       141,800  DDJ             0           0           0 Michael J. Guido Jr.                    0      10/03/16                       01/31/17         YES
                                                                                                                                                                                                                                                                                                                                   
14-1517   Reconstruction               0-003-017               DONE    DONE       ADD. REQ'D05/14/15   05/08/15   03/24/15   11/20/14   16                             0    11,038,230  DDJ             0           0           0 Michael J. Guido Jr.                    0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   

          Miller Place High School:
11-0746   Reconstruction               0-006-024  06/12/12     DONE    DONE       DONE      02/01/12   01/30/12   03/18/09   05/20/08   2,4,9,16                 187,500       187,500  DDJ             0           0      51,750 Michael J. Guido Jr.                    0      07/30/14                       10/23/15         YES
                                                                                                                                                                                                                                                                                                                                   
11-0175   Reconstruction               0-006-026  04/19/12     DONE    DONE       DONE      09/13/11   09/09/11   05/19/11   11/17/10   8,155,15,16            1,321,618     1,321,618  DDJ             0           0           0 Michael J. Guido Jr.            1,321,618      05/29/13                       11/08/13         YES
                                                                                                                                                                                                                                                                                                                                   
14-0364   Reconstruction               0-006-027  04/15/15     DONE    DONE       DONE      09/30/14   09/26/14   05/06/14   03/24/14   2,7,8,9,16             3,405,030     3,405,030  DDJ             0           0           0 Michael J. Guido Jr.                    0      09/01/16                       12/12/16         YES
                                                                                                                                                                                                                                                                                                                                   
16-0163   Reconstruction               0-006-028  08/10/14     DONE    DONE       DONE      07/27/16   07/27/16   06/03/14   03/24/14   2,4,9,14,16              100,000       100,000  DDJ             0           0           0 Michael J. Guido Jr.                    0      10/03/16                       01/31/17         YES
                                                                                                                                                                                                                                                                                                                                   
14-1518   Reconstruction               0-006-029               DONE    DONE       ADD. REQ'D05/14/15   05/08/15   03/24/15   11/20/14   16                             0    20,945,484  DDJ             0           0           0 Michael J. Guido Jr.                    0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
  -       Reconstruction               0-006-030                                              /  /       /  /       /  /       /  /     2,4,8,9,155,15,16              0    20,945,484  DDJ             0           0           0                                         0        /  /                           /  /             
15-1468SB Reconstruction               0-006-030               DONE                           /  /       /  /     03/24/16     /  /     2,4,8,9,155,15,16              0    20,945,484  DDJ             0           0           0                                         0        /  /                           /  /             

          Administration Building:
14-0365   Reconstruction               1-028-002  04/15/15     DONE    DONE       DONE      09/30/14   09/26/14   05/06/14   03/24/14   16                        20,000             0  DDJ             0           0           0 Michael J. Guido Jr.                    0      09/01/16                       12/12/16         YES
                                                                                                                                                                                                                                                                                                                                   

          District-Wide:
  -    SB Reconstruction               7-999-BA1                         UNREVIEWED         03/25/16   03/25/16     /  /       /  /     13                             0             0  DDJ             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




ROCKY POINT UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-02-09-02
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Joseph A Edgar School:
11-1024   Reconstruction               0-001-012  04/03/12     DONE    DONE       DONE      03/27/12   03/27/12   03/13/12   05/17/11   2,9                       94,400        94,400  DDJ             0           0           0 John A. Grillo                          0      08/15/12                       03/22/13         YES
                                                                                                                                                                                                                                                                                                                                   
16-0565   Reconstruction               0-001-013  02/13/17     DONE    DONE       DONE      10/06/16   10/06/16   06/02/16   05/17/16   2,4,7,8,9,14,16          817,401             0  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
16-0815   Reconstruction               0-001-014               DONE    STARTED    STARTED   11/21/16   11/18/16   06/15/16   05/17/16   2,4,7,8,9,10,155,15,           0    17,661,489  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
  -       Reconstruction               0-001-015                                              /  /       /  /     03/10/17     /  /     2,8,9,10,14,16                 0             0  DDJ             0           0           0                                         0        /  /                           /  /             

          Rocky Point High:
12-0492   Reconstruction               0-005-028  01/23/13     DONE    DONE       DONE      11/28/12   11/28/12   11/27/12   05/17/11   2,7,8,9,10,155,15,16      64,900        64,900  DDJ             0           0           0 John A. Grillo                          0      09/16/13                       06/23/14         YES
                                                                                                                                                                                                                                                                                                                                   
12-0673   Reconstruction               0-005-029  03/15/13     DONE    DONE       DONE      01/16/13   12/18/12   01/16/13   11/19/12   2,7,8,9,10,155,15,16   1,990,000     1,990,000  DDJ             0           0           0 John A. Grillo                          0      09/16/13                       06/23/14         YES
                                                                                                                                                                                                                                                                                                                                   
12-0862   Reconstruction               0-005-030  05/15/13     DONE    DONE       DONE      02/15/13   02/12/13   02/14/13   05/17/11   2,4,9,10,155,15,16       136,500       136,500  DDJ             0           0           0 John A. Grillo                          0      09/16/13                       06/23/14         YES
                                                                                                                                                                                                                                                                                                                                   
16-0482   Reconstruction               0-005-031  02/01/17     DONE    DONE       DONE      09/21/16   09/21/16   06/02/16   05/17/16   2,4,7,8,9                729,800             0  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
16-0816   Reconstruction               0-005-032               DONE    STARTED    UNREVIEWED11/21/16   11/18/16   06/15/16   05/17/16   2,4,7,8,9,10,155,15,           0    28,631,327  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
16-0708   Reconstruction               0-005-033               DONE    UNREVIEWED STARTED   11/02/16   11/02/16   10/01/16   05/17/16   2,16                           0    28,631,327  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
  -       Reconstruction               0-005-034                                              /  /       /  /     03/10/17     /  /     2,4,7,8,9,10,155,15,           0             0  DDJ             0           0           0                                         0        /  /                           /  /             

          Frank J. Carasiti Elementary School:
12-0281   Reconstruction               0-006-015  05/25/16     DONE    DONE       DONE      10/16/12   10/15/12     /  /     05/15/07   2,10                      58,800        58,800  DDJ             0           0      42,000 John A. Grillo                          0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
12-1231   Reconstruction               0-006-016  05/25/16     DONE    DONE       DONE      05/28/13   05/28/13   04/12/13   05/15/07   7                        100,000       100,000  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
16-0483   Reconstruction               0-006-017  02/01/17     DONE    DONE       DONE      09/21/16   09/21/16   06/02/16   05/17/16   10,15                    133,000             0  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
16-0933   Reconstruction               0-006-018                         UNREVIEWED         12/08/16   12/08/16   06/15/16   05/17/16   7,9,155,15,16                  0    15,600,948  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
  -       Reconstruction               0-006-019                                              /  /       /  /     03/10/17     /  /     2,7,8,9,10,155,15,16           0             0  DDJ             0           0           0                                         0        /  /                           /  /             

          District-Wide:
16-0246   Reconstruction               7-999-004  12/13/16     DONE    DONE       DONE      08/12/16   08/11/16   06/02/16   05/17/16   16                       530,750             0  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




MIDDLE COUNTRY CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-02-11-06
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Oxhead Road Elementary School:
14-1274   Reconstruction               0-001-018  10/22/15     DONE    DONE       DONE      03/16/15   03/13/15   01/29/15   11/18/14   8,9,10,16                 25,497        25,497  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
14-1355   Reconstruction               0-001-019  03/11/16     DONE    DONE       DONE      04/08/15   04/03/15   01/29/15   11/18/14   8,9                    1,081,569     1,081,569  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
15-1300   Reconstruction               0-001-020  09/14/16     DONE    DONE       DONE      02/25/16   02/19/16   01/29/16   11/18/14   155,15,16                509,950       509,950  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
15-1734   Reconstruction               0-001-021  03/21/17     DONE    DONE       DONE      05/17/16   05/16/16   02/16/16   11/18/14   4,8,9,15,16            1,530,028             0  MFS             0           0           0 H2M Group                               0        /  /                           /  /             

          Holbrook Road Elementary:
15-1735   Reconstruction               0-002-015               DONE    DONE       ADD. REQ'D05/17/16   05/16/16   01/29/15   11/18/14   8,9,10,16                      0     9,469,710  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
14-1356   Reconstruction               0-002-016  03/11/16     DONE    DONE       DONE      04/08/15   04/03/15   01/29/15   11/18/14   8,9                    1,081,569     1,081,569  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
15-0937   Reconstruction               0-002-017  09/13/16     DONE    DONE       DONE      12/22/15   12/22/15   10/14/15   11/18/14   16                        64,500        64,500  MFS             0           0           0 H2M Group                               0        /  /                           /  /             

          Unity Dr. Pre-K Kdgtn. Ctr.:
14-1275   Reconstruction               0-003-013  10/14/15     DONE    DONE       DONE      03/16/15   03/13/15   01/29/15   11/18/14   8,9,10,16                 25,497        25,497  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
14-1357   Reconstruction               0-003-014  03/11/16     DONE    DONE       DONE      04/08/15   04/03/15   01/29/15   11/18/14   8,9                      839,843       839,843  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
15-1736   Reconstruction               0-003-015  03/17/17     DONE    DONE       DONE      05/17/16   05/16/16   02/16/16   11/18/14   2,4,8,9,15                     0     9,118,980  MFS             0           0           0 H2M Group                               0        /  /                           /  /             

          Bicycle Path Pre-K Kdgtn. Ctr.:
14-1276   Reconstruction               0-005-012  10/22/15     DONE    DONE       DONE      03/16/15   03/13/15   01/29/15   11/18/14   8,9,10,16                 25,497        25,497  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
14-1358   Reconstruction               0-005-013  03/11/16     DONE    DONE       DONE      04/08/15   04/03/15   01/29/15   11/18/14   8,9                      839,843       839,843  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
15-1737   Reconstruction               0-005-014                       ADDENDUM REQ'D       05/17/16   05/16/16   02/16/16   11/18/14   2,9,15                         0    12,834,120  MFS             0           0           0 H2M Group                               0        /  /                           /  /             

          Newfield High School:
13-0437   Reconstruction               0-006-020                       ADDENDUM REQ'D       09/26/13   09/26/13   02/14/13     /  /     155,15,16                      0    36,431,320  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
14-1261   Reconstruction               0-006-021  05/29/15     DONE    DONE       DONE      03/12/15   03/09/15   01/08/15   11/18/14   2,7                    4,667,318     4,667,318  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
15-0968   Reconstruction               0-006-022  09/13/16     DONE    DONE       DONE      12/28/15   12/28/15   01/29/15   11/18/14   8,9,10,16                 64,500        64,500  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
14-1359XX Reconstruction               0-006-023                         CANCELLED          04/08/15   04/03/15   01/29/15   11/18/14   8,9                            0    36,431,320  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
15-0481   Additions and Alterations    0-006-024  09/16/16     DONE    DONE       DONE      09/21/15   09/15/15   08/19/15   11/18/14   02 - 16                6,384,466     2,797,449  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
  -       Reconstruction               0-006-025                                              /  /       /  /     10/14/15     /  /     16                             0    30,951,400  MFS             0           0           0                                         0        /  /                           /  /             
16-0539   Reconstruction               0-006-026                         UNREVIEWED         10/03/16   10/03/16   08/19/16   11/18/14   8                              0    30,951,400  AAA             0           0           0 H2M Group                               0        /  /                           /  /             

          Dawnwood Middle School:
15-0969   Reconstruction               0-008-018  09/13/16     DONE    DONE       DONE      12/28/15   12/28/15   01/29/15   11/18/14   8,9,10,16                 64,500        64,500  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
14-1360XX Reconstruction               0-008-019                         CANCELLED          04/08/15   04/03/15   01/29/15   11/18/14   8,9                            0    23,752,410  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
15-1738   Reconstruction               0-008-020                       ADDENDUM REQ'D       05/17/16   05/16/16   10/14/15   11/18/14   16                             0    23,752,410  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
15-0917   Reconstruction               0-008-021  04/26/16     DONE    DONE       DONE      12/22/15   12/18/15   11/18/15   11/18/14   7                      3,012,678     3,012,678  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
16-0542   Reconstruction               0-008-022                         UNREVIEWED         10/03/16   10/03/16   08/19/16   11/18/14   8                              0    23,752,410  AAA             0           0           0 H2M Group                               0        /  /                           /  /             

          Hawkins Path Elementary:
14-1277   Reconstruction               0-009-010  10/22/15     DONE    DONE       DONE      03/16/15   03/13/15   01/29/15   11/18/14   8,9,10,16                 25,497        25,497  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
14-1361   Reconstruction               0-009-011  03/11/16     DONE    DONE       DONE      04/08/15   04/03/15   01/29/15   11/18/14   8,9                    1,081,569     1,081,569  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
15-1739   Reconstruction               0-009-012  03/22/17     DONE    DONE       DONE      05/17/16   05/16/16   02/16/16   11/18/14   2,4,9,155,15,16                0     9,469,710  MFS             0           0           0 H2M Group                               0        /  /                           /  /             

          Selden Middle School:
14-1262   Reconstruction               0-010-017  05/29/15     DONE    DONE       DONE      03/12/15   03/09/15   01/08/15   11/18/14   7                      1,534,733     1,534,733  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
15-0970   Reconstruction               0-010-018  09/13/16     DONE    DONE       DONE      12/28/15   12/28/15   01/29/15   11/18/14   8,9,10,16                 64,500        64,500  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
14-1362XX Reconstruction               0-010-019                         CANCELLED          04/08/15   04/03/15   01/29/15   11/18/14   8,9                            0    28,997,701  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
15-1301   Reconstruction               0-010-020  09/14/16     DONE    DONE       DONE      02/25/16   02/19/16   10/14/15   11/18/14   16                       637,437       637,437  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
15-1740   Reconstruction               0-010-021                       ADDENDUM REQ'D       05/17/16   05/16/16   02/16/16   11/18/14   8,9,155,15,16                  0    28,997,701  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
16-0541   Reconstruction               0-010-022                         UNREVIEWED         10/03/16   10/03/16   08/19/16   11/18/14   8                              0    28,997,701  AAA             0           0           0 H2M Group                               0        /  /                           /  /             

          North Coleman Elementary:
14-1278   Reconstruction               0-011-014  10/14/15     DONE    DONE       DONE      03/16/15   03/13/15   01/29/15   11/18/14   8,9,10,16                 25,497        25,497  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
14-1363   Reconstruction               0-011-015  03/11/16     DONE    DONE       DONE      04/08/15   04/03/15   01/29/15   11/18/14   8,9                    1,081,569     1,081,569  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
15-1741   Reconstruction               0-011-016  03/21/17     DONE    DONE       DONE      05/17/16   05/16/16   02/16/16   11/18/14   2,4,9,15,16            1,415,318             0  MFS             0           0           0 H2M Group                               0        /  /                           /  /             

          Stagecoach Rd. Elementary:
15-1742   Reconstruction               0-012-011  09/23/16     DONE    DONE       DONE      05/17/16   05/16/16   01/29/15   11/18/14   8,9,10,16              1,229,148             0  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
14-1364   Reconstruction               0-012-012  03/11/16     DONE    DONE       DONE      04/08/15   04/03/15   01/29/15   11/18/14   8,9                    1,081,569     1,081,569  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
15-0940   Reconstruction               0-012-013  09/13/16     DONE    DONE       DONE      12/22/15   12/22/15   10/14/15   11/18/14   16                        64,500        64,500  MFS             0           0           0 H2M Group                               0        /  /                           /  /             

          Eugene Auer Elementary School:
14-1279   Reconstruction               0-013-013  10/14/15     DONE    DONE       DONE      03/16/15   03/13/15   01/29/15   11/18/14   8,9,10,16                 25,497             0  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
14-1365   Reconstruction               0-013-014  03/11/16     DONE    DONE       DONE      04/08/15   04/03/15   01/29/15   11/18/14   8,9                    1,081,569     1,081,569  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
15-1743   Reconstruction               0-013-015               DONE    ADD. REQ'D DONE      05/17/16   05/16/16   02/16/16   11/18/14   2,4,8,9,155                    0     9,820,440  MFS             0           0           0 H2M Group                               0        /  /                           /  /             

          Jericho Elementary:
15-1744   Reconstruction               0-014-011  03/21/17     DONE    DONE       DONE      05/17/16   05/16/16   01/29/15   11/18/14   8,9,10,16              1,493,676             0  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
14-1366   Reconstruction               0-014-012  03/11/16     DONE    DONE       DONE      04/08/15   04/03/15   01/29/15   11/18/14   8,9                    1,081,569     1,081,569  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
15-0938   Reconstruction               0-014-013  09/13/16     DONE    DONE       DONE      12/22/15   12/22/15   10/14/15   11/18/14   16                        64,500        64,500  MFS             0           0           0 H2M Group                               0        /  /                           /  /             

          Centereach High School:
13-0438XX Reconstruction               0-015-018                         CANCELLED          09/26/13   09/26/13   10/16/12     /  /     13,155,15,16                   0    36,532,800  JMB             0           0           0 H2M Group                               0        /  /                           /  /             
14-1263   Reconstruction               0-015-019  05/29/15     DONE    DONE       DONE      03/12/15   03/09/15   01/08/15   11/18/14   2,7                    4,359,581     4,359,581  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
15-0971   Reconstruction               0-015-020  09/13/16     DONE    DONE       DONE      12/28/15   12/28/15   01/29/15   11/18/14   8,9,10,16                 64,500        64,500  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
14-1367XX Reconstruction               0-015-021                         CANCELLED          04/08/15   04/03/15   01/29/15   11/18/14   8,9                            0    36,532,800  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
15-0563   Reconstruction               0-015-022  04/04/16     DONE    DONE       DONE      10/09/15   10/09/15   08/19/15   11/18/14   2,7                      413,273       413,273  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
15-0482   Additions and Alterations    0-015-023  09/22/16     DONE    DONE       DONE      09/21/15   09/15/15   08/19/15   11/18/14   02 - 16                7,768,166     3,342,353  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
  -       Reconstruction               0-015-024                                              /  /       /  /     10/14/15     /  /     16                             0    37,141,680  MFS             0           0           0                                         0        /  /                           /  /             
16-0540   Reconstruction               0-015-025                         UNREVIEWED         10/03/16   10/03/16   08/19/16   11/18/14   8                              0    37,141,680  AAA             0           0           0 H2M Group                               0        /  /                           /  /             

          New Lane Memorial Elementary:
15-0540   Reconstruction               0-016-014  09/12/16     DONE    DONE       DONE      10/02/15   10/02/15   01/08/15   11/18/14   8,9,10,155,15,16         455,767       455,767  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
15-1302   Reconstruction               0-016-015  10/27/16     DONE    DONE       DONE      02/25/16   02/19/16   01/29/15   11/18/14   8,9,10,16                382,462       382,462  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
14-1368   Reconstruction               0-016-016  03/11/16     DONE    DONE       DONE      04/08/15   04/03/15   01/29/15   11/18/14   8,9                    1,577,656     1,577,656  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
15-0939   Reconstruction               0-016-017  09/13/16     DONE    DONE       DONE      12/22/15   12/22/15   10/14/15   11/18/14   16                        64,500        64,500  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
  -       Reconstruction               0-016-018                                              /  /       /  /     09/30/16     /  /     13,155,15,16                   0    21,745,260  BMJ             0           0           0                                         0        /  /                           /  /             

          Mid Country Cultural Center:
15-1108   Additions and Alterations    6-021-002  11/21/16     DONE    DONE       DONE      01/25/16   01/22/16   03/25/11   06/17/15   02 - 16                2,241,628             0  JOD             0           0           0 BERMELLO AJAMIL & PARTNERS AR           0        /  /                           /  /             

          District-Wide:
16-1065   Reconstruction               7-999-007                         UNREVIEWED         12/27/16   12/23/16   01/29/15   11/18/14   10,16                          0             0  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
14-1460   Reconstruction               7-999-008  05/11/16     DONE    DONE       DONE      04/30/15   04/29/15   03/04/15   11/18/14   8                      5,750,186     5,750,186  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
  -    SB Reconstruction               7-999-BA1               DONE                           /  /       /  /       /  /       /  /     13                             0             0  AAA             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




LONGWOOD CENTRAL SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-02-12-06
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Chas. E. Walters Elementary:
12-0776   Reconstruction               0-002-012  04/16/14     DONE    DONE       DONE      02/07/13   02/06/13   07/14/09   03/06/12   155,16                   262,600       262,600  MFS             0           0           0 Wiedersum Associates Architec           0        /  /                           /  /             
12-0790   Reconstruction               0-002-013  04/23/13     DONE    DONE       DONE      02/07/13   02/07/13   11/20/12   03/06/12   2,9,16                    80,000        80,000  MFS             0           0           0 Wiedersum Associates Architec           0      06/20/15                       02/13/15           
  -       Reconstruction               0-002-014                                              /  /       /  /     11/23/16     /  /     16                             0    11,971,875  BMJ             0           0           0                                         0        /  /                           /  /             

          West Middle Island Primary School:
12-0777   Reconstruction               0-004-015  04/16/14     DONE    DONE       DONE      02/07/13   02/06/13   07/14/09   03/06/12   155,16                   358,050       358,050  MFS             0           0           0 Wiedersum Associates Architec           0        /  /                           /  /             
13-0758   Reconstruction               0-004-016  05/13/15     DONE    DONE       DONE      11/25/13   11/21/13   10/23/13   05/21/13   155                       93,750        93,750  MFS             0           0           0 Wiedersum Associates Architec           0      08/17/16                       12/02/16           

          Coram Elementary:
12-0778   Reconstruction               0-007-013  04/16/14     DONE    DONE       DONE      02/07/13   02/06/13   07/14/09   03/06/12   155,16                   262,600       262,600  MFS             0           0           0 Wiedersum Associates Architec           0        /  /                           /  /             
  -       Reconstruction               0-007-014                                              /  /       /  /     11/19/13     /  /     155                            0    12,577,536  MFS             0           0           0                                         0        /  /                           /  /             

          Ridge Elementary:
12-0779   Reconstruction               0-008-013  04/16/14     DONE    DONE       DONE      02/07/13   02/06/13   07/14/09   03/06/12   155,16                   298,600       298,600  MFS             0           0           0 Wiedersum Associates Architec           0        /  /                           /  /             

          Longwood Junior High School:
12-0780   Reconstruction               0-009-012  04/16/14     DONE    DONE       DONE      02/07/13   02/06/13   07/14/09   03/06/12   2,4,8,16                 871,720       871,720  MFS             0           0           0 Wiedersum Associates Architec           0        /  /                           /  /             
12-0791   Reconstruction               0-009-014  04/23/13     DONE    DONE       DONE      02/07/13   02/07/13   11/20/12   03/06/12   2,4,8,16                 657,700       657,700  MFS             0           0           0 Wiedersum Associates Architec           0      06/20/14                       02/13/15           
13-0759   Reconstruction               0-009-015  05/13/15     DONE    DONE       DONE      11/25/13   11/21/13   10/23/13   05/21/13   155                      178,125       178,125  MFS             0           0           0 Wiedersum Associates Architec           0        /  /                           /  /             

          Longwood Middle School:
12-0781   Reconstruction               0-010-011  04/16/14     DONE    DONE       DONE      02/07/13   02/06/13   07/14/09   03/06/12   155,16                 2,800,100     2,800,100  MFS             0           0           0 Wiedersum Associates Architec           0        /  /                           /  /             
11-0879   Reconstruction               0-010-012  05/18/12     DONE    DONE       DONE      03/06/12   02/24/12   11/17/11   05/18/10   155,16                   450,000       450,000  DDJ             0           0           0 Wiedersum Associates Architec           0      11/19/13                       03/03/14           
11-1076   Reconstruction               0-010-014  04/10/12     DONE    DONE       DONE      04/05/12   04/02/12   03/20/12   03/06/12   2,4,7                  3,415,000     3,415,000  DDJ             0           0           0 Wiedersum Associates Architec           0      06/28/13                       09/13/13           
12-0792   Reconstruction               0-010-015  04/23/13     DONE    DONE       DONE      02/07/13   02/07/13   11/20/12   03/06/12   2,8,9                  1,740,000     1,740,000  MFS             0           0           0 Wiedersum Associates Architec           0      06/20/15                       02/13/15           
15-0566   Reconstruction               0-010-016  03/30/16     DONE    DONE       DONE      10/14/15   10/07/15   09/03/15   05/19/15   2,4                      450,000       450,000  MFS             0           0           0 Wiedersum Associates Architec           0        /  /                           /  /             

          Ridge Elem.Annex 1:
12-0782   Reconstruction               0-011-009  04/16/14     DONE    DONE       DONE      02/07/13   02/06/13   07/14/09   02/06/12   155,16                   265,600       265,600  MFS             0           0           0 Wiedersum Associates Architec           0        /  /                           /  /             
11-1077   Reconstruction               0-011-010  04/10/12     DONE    DONE       DONE      04/05/12   04/02/12   03/20/12   03/06/12   2,7                      766,500       766,500  DDJ             0           0           0 Wiedersum Associates Architec           0      06/28/13                       09/13/13           
  -       Reconstruction               0-011-011                                              /  /       /  /     11/23/16     /  /     16                             0    10,609,560  BMJ             0           0           0                                         0        /  /                           /  /             

          Coram Primary School:
12-0783   Reconstruction               0-012-006  04/16/14     DONE    DONE       DONE      02/07/13   02/06/13   07/14/09   03/06/12   155,16                   249,600       249,600  MFS             0           0           0 Wiedersum Associates Architec           0        /  /                           /  /             
11-1078   Reconstruction               0-012-007  04/10/12     DONE    DONE       DONE      04/05/12   04/02/12   03/20/12   03/06/12   2,7                      816,500       816,500  DDJ             0           0           0 Wiedersum Associates Architec           0      06/28/13                       09/13/13           
14-1350   Reconstruction               0-012-008  05/13/15     DONE    DONE       DONE      04/02/15   03/26/15   10/23/13   05/21/13   155                       56,250        56,250  MFS             0           0           0 Wiedersum Associates Architec           0      08/17/16                       12/02/16           

          Charles E. Walters Annex 1:
12-0784   Reconstruction               0-014-008  04/16/14     DONE    DONE       DONE      02/07/13   02/06/13   07/14/09   03/06/12   155,16                   620,600       620,600  MFS             0           0           0 Wiedersum Associates Architec           0        /  /                           /  /             
11-1079   Reconstruction               0-014-009  04/10/12     DONE    DONE       DONE      04/05/12   04/02/12   03/20/12   03/06/12   2,7                      797,500       797,500  DDJ             0           0           0 Wiedersum Associates Architec           0      06/28/13                       09/13/13           

          Longwood Sr High School:
11-1443   Reconstruction               0-015-013  10/25/12     DONE    DONE       DONE      06/29/12   06/20/12   05/07/12   03/06/12   2,14,16                2,796,303     2,796,303  DDJ             0           0           0 Wiedersum Associates Architec           0      08/05/14                       03/02/15           
12-0785   Reconstruction               0-015-014  04/16/14     DONE    DONE       DONE      02/07/13   02/06/13   06/20/12   03/06/12   155,16                 1,906,430     1,906,430  MFS             0           0           0 Wiedersum Associates Architec           0        /  /                           /  /             
13-0760   Reconstruction               0-015-015  05/13/15     DONE    DONE       DONE      11/25/13   11/21/13   08/27/13   05/21/13   155                      121,875       121,875  MFS             0           0           0 Wiedersum Associates Architec           0      08/17/16                       12/02/16           

          W. Middle Island Annex:
12-0786   Reconstruction               0-018-005  04/16/14     DONE    DONE       DONE      02/07/13   02/06/13   07/14/09   03/06/12   155,16                   258,100       258,100  MFS             0           0           0 Wiedersum Associates Architec           0        /  /                           /  /             
11-1080   Reconstruction               0-018-006  04/10/12     DONE    DONE       DONE      04/05/12   04/02/12   03/20/12   03/06/12   2,7                      865,800       865,800  DDJ             0           0           0 Wiedersum Associates Architec           0      06/28/13                       09/13/13           

          XXBldgs & Grounds Office (now 0-005):
16-1376   Reconstruction               1-005-004                         UNREVIEWED         02/14/17   02/14/17   06/24/16   05/17/16   7,9                            0             0  AAA             0           0           0 Wiedersum Associates Architec           0        /  /                           /  /             

          Public Library:
12-1229   Additions and Alterations    6-016-005  11/26/13     DONE    DONE       DONE      05/28/13   05/28/13   11/02/12   10/09/12   02 - 16               17,896,347             0  DDJ             0           0           0 Peter Gisolfi Associates                0      10/02/15                       10/07/15           
13-0116   Reconstruction               6-016-007  08/16/13     DONE    DONE       DONE      08/01/13   07/26/13   05/31/13   10/09/12   2                        319,859             0  MFS             0           0           0 Peter Gisolfi Associates                0        /  /                           /  /             

          New Co-Gen Building:
12-0787   New Construction             7-020-001  04/16/14     DONE    DONE       DONE      02/07/13   02/06/13   06/21/12   03/06/12   02 - 16                4,600,000             0  MFS             0           0           0 Wiedersum Associates Architec           0        /  /                           /  /             

          District-Wide:
14-1288   Reconstruction               7-999-003  05/27/15     DONE    DONE       DONE      03/18/15   03/17/15   11/05/14   05/20/14   8,16                     450,000       450,000  MFS             0           0           0 Wiedersum Associates Architec           0        /  /                           /  /             
  -       Reconstruction               7-999-004                                              /  /       /  /       /  /       /  /     13,16                          0             0  MFS             0           0           0                                         0        /  /                           /  /             
15-0891SB Reconstruction               7-999-004                         UNREVIEWED         12/17/15   12/17/15   12/17/15     /  /     13,16                          0             0  MFS             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




PATCHOGUE-MEDFORD UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-02-24-03
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Bay Avenue School:
13-0195   Reconstruction               0-001-011  10/21/14     DONE    DONE       DONE      08/14/13   08/12/13   12/18/12   12/11/07   4,8,155,16               112,000       112,000  DDJ             0           0      29,904 Burton Behrendt Smith                   0        /  /                           /  /             
12-0372   Reconstruction               0-001-017  12/30/13     DONE    DONE       DONE      11/02/12   10/30/12   06/21/12   05/03/12   8,155,15,16              324,610       324,610  DDJ             0           0           0 Burton Behrendt Smith             305,640      08/09/16                       09/22/16           
16-0859   Reconstruction               0-001-018  12/27/16     DONE    DONE       DONE      11/28/16   11/23/16   10/07/16   05/17/16   7                        360,000             0  BMJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          Medford Avenue School:
13-0196   Reconstruction               0-002-008  10/21/14     DONE    DONE       DONE      08/14/13   08/12/13   12/18/12   12/11/07   8,155,16                  89,300        89,300  DDJ             0           0      23,843 Burton Behrendt Smith                   0        /  /                           /  /             
12-0373   Reconstruction               0-002-011  12/30/13     DONE    DONE       DONE      11/02/12   10/30/12   06/21/12   05/03/12   8,155,15,16              346,628       346,628  DDJ             0           0           0 Burton Behrendt Smith             318,113      08/09/16                       09/22/16           
16-0860   Reconstruction               0-002-012  12/27/16     DONE    DONE       DONE      11/28/16   11/23/16   10/07/16   05/17/16   2,8                      510,000             0  BMJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
16-0861   Reconstruction               0-002-013  12/27/16     DONE    DONE       DONE      11/28/16   11/23/16   10/07/16   05/17/16   7                        500,000             0  BMJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          River Avenue Elem. School:
13-0197   Reconstruction               0-003-004  10/21/14     DONE    DONE       DONE      08/14/13   08/12/13   12/18/12   12/11/07   4,8                       94,519        70,000  DDJ             0           0      25,237 Burton Behrendt Smith                   0        /  /                           /  /             
12-0374   Reconstruction               0-003-009  12/30/13     DONE    DONE       DONE      11/02/12   10/30/12   06/21/12   05/03/12   8,155,15,16              286,291       286,291  DDJ             0           0           0 Burton Behrendt Smith             265,926      08/09/16                       09/22/16           

          South Ocean Middle School:
13-0198   Reconstruction               0-004-011  10/21/14     DONE    DONE       DONE      08/14/13   08/12/13   12/18/12   12/11/07   4,8,9,155                437,000       437,000  DDJ             0           0     116,679 Burton Behrendt Smith                   0        /  /                           /  /             
12-0375   Reconstruction               0-004-017  12/30/13     DONE    DONE       DONE      11/02/12   10/30/12   06/21/12   05/03/12   8,155,15,16              454,706       454,706  DDJ             0           0           0 Burton Behrendt Smith             399,416      08/09/16                       09/22/16           

          Saxton Middle School:
12-0376   Reconstruction               0-005-019  12/30/13     DONE    DONE       DONE      11/02/12   10/30/12   06/21/12   05/03/12   8,155,15,16            1,688,939     1,688,939  DDJ             0           0           0 Burton Behrendt Smith           1,621,529      08/09/16                       09/22/16           
13-0199   Reconstruction               0-005-020  10/21/14     DONE    DONE       DONE      08/14/13   08/12/13   12/18/12   12/11/07   4,155                    134,000       134,000  DDJ             0           0      35,778 Burton Behrendt Smith                   0        /  /                           /  /             
16-0862   Reconstruction               0-005-021  12/27/16     DONE    DONE       DONE      11/28/16   11/23/16   10/07/16   05/17/16   7                      1,067,000             0  BMJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          Barton Ave. Elementary:
13-0200   Reconstruction               0-008-008  10/21/14     DONE    DONE       DONE      08/14/13   08/12/13   12/18/12   12/11/07   4,8,9,15                  86,012        86,012  DDJ             0           0      22,965 Burton Behrendt Smith                   0        /  /                           /  /             
12-0377   Reconstruction               0-008-010  12/30/13     DONE    DONE       DONE      11/02/12   10/30/12   06/21/12   05/03/12   8,155,15,16              520,751       520,751  DDJ             0           0           0 Burton Behrendt Smith             478,706      08/09/16                       09/22/16           
16-0863   Reconstruction               0-008-011  12/27/16     DONE    DONE       DONE      11/28/16   11/23/16   10/07/16   05/17/16   7                        630,000             0  BMJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          Oregon Avenue Junior High:
13-0201   Reconstruction               0-009-009  10/21/14     DONE    DONE       DONE      08/14/13   08/12/13   12/18/12   12/11/07   8                        430,684       416,795  DDJ             0           0     114,993 Burton Behrendt Smith                   0        /  /                           /  /             
12-0378   Reconstruction               0-009-011  12/30/13     DONE    DONE       DONE      11/02/12   10/30/12   06/21/12   05/03/12   8,155,15,16            1,141,382     1,141,382  DDJ             0           0           0 Burton Behrendt Smith           1,102,777      08/09/16                       08/09/16           
15-1899   Reconstruction               0-009-012  06/23/16     DONE    DONE       DONE      06/09/16   06/09/16   05/06/16   12/11/07   7                        100,165       100,165  MFS             0           0      26,744 Burton Behrendt Smith                   0        /  /                           /  /             

          Tremont Ave School:
13-0202   Reconstruction               0-010-005  10/21/14     DONE    DONE       DONE      08/14/13   08/12/13   12/18/12   12/11/07   4                          4,500             0  DDJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
12-0379   Reconstruction               0-010-011  12/30/13     DONE    DONE       DONE      11/02/12   10/30/12   06/21/12   05/03/12   8,155,15,16              400,718       400,718  JOD             0           0           0 Burton Behrendt Smith             360,848      08/09/16                       09/22/16           
16-0864   Reconstruction               0-010-012  12/27/16     DONE    DONE       DONE      11/28/16   11/23/16   10/07/16   05/17/16   7                        725,000             0  BMJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          Eagle Drive Elementary:
13-0204   Reconstruction               0-011-005  10/21/14     DONE    DONE       DONE      08/14/13   08/12/13   12/18/12   12/11/07   4                          2,500             0  DDJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
12-0380   Reconstruction               0-011-012  12/30/13     DONE    DONE       DONE      11/02/12   10/30/12   06/21/12   05/03/12   8,155,15,16              478,884       478,884  DDJ             0           0           0 Burton Behrendt Smith             441,109      08/09/16                       09/22/16           
16-0865   Reconstruction               0-011-013  12/27/16     DONE    DONE       DONE      11/28/16   11/23/16   10/07/16   05/17/16   7                        586,000             0  BMJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          Canaan Elementary School:
13-0205   Reconstruction               0-013-007  10/21/14     DONE    DONE       DONE      08/14/13   08/12/13   12/18/12   12/11/07   4,155                     85,000        85,000  DDJ             0           0      22,695 Burton Behrendt Smith                   0        /  /                           /  /             
12-0381   Reconstruction               0-013-011  12/30/13     DONE    DONE       DONE      11/02/12   10/30/12   06/21/12   05/03/12   8,155,15,16              401,384       401,384  DDJ             0           0           0 Burton Behrendt Smith             374,529      08/09/16                       09/22/16           
16-0866   Reconstruction               0-013-012  12/27/16     DONE    DONE       DONE      11/28/16   11/23/16   10/07/16   05/17/16   7                        533,000             0  BMJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          Patchogue-Medford High School:
12-0382   Reconstruction               0-015-018  12/30/13     DONE    DONE       DONE      11/02/12   10/30/12   06/21/12   05/03/12   8,155,15,16            4,466,193     4,466,193  DDJ             0           0           0 Burton Behrendt Smith           4,348,013      08/09/16                       09/22/16           
13-0203   Reconstruction               0-015-019  10/21/14     DONE    DONE       DONE      08/14/13   08/12/13   12/18/12   12/11/07   4,7,8,155,16             293,000       293,000  DDJ             0           0      78,231 Burton Behrendt Smith                   0        /  /                           /  /             
  -    SB Visual Structural Inspection 0-015-SB1               DONE                           /  /       /  /       /  /       /  /                                    0             0  MFS             0           0           0                                         0        /  /                           /  /             

          Administration Bldg.:
12-0383   Reconstruction               1-006-002  12/30/13     DONE    DONE       DONE      11/02/12   10/30/12   06/21/12   05/03/12   8,155,15,16               92,045             0  DDJ             0           0           0 Burton Behrendt Smith              86,615      08/09/16                       09/22/16           

          Storage Container/Baseball @ HS:
  -    DB Discovered Building          2-036-001                                              /  /       /  /     01/30/15     /  /                                    0             0  MFS             0           0           0                                         0        /  /                           /  /             

          Storage Container @ Saxton MS:
  -    DB Discovered Building          2-037-001                                              /  /       /  /     01/30/15     /  /                                    0             0  MFS             0           0           0                                         0        /  /                           /  /             

          Storage Container @ Bay Avenue Schl:
  -    DB Discovered Building          2-038-001                                              /  /       /  /     01/30/15     /  /                                    0             0  MFS             0           0           0                                         0        /  /                           /  /             

          Carnegie Library:
13-1305   Reconstruction               6-033-001  08/04/14     DONE    DONE       DONE      03/05/14   03/03/14   11/22/13   01/15/14   2,4,7,8,9,10,13,14,1   1,500,000             0  MFS             0           0           0 RICHARD SEARLES ARCHITECTS              0      09/26/16                       09/27/16           

          Press Box @ High School:
12-0939DB Discovered Building          7-026-001  03/06/13     DONE    DONE       DONE      03/01/13   03/01/13   04/10/07     /  /                                    0             0  JOD             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          Dugout #1 @ Oregon MS:
  -    DB Discovered Building          7-034-001                                              /  /       /  /     01/27/15     /  /                                    0             0  MFS             0           0           0                                         0        /  /                           /  /             

          Dugout #2 @ Oregon MS:
  -    DB Discovered Building          7-035-001                                              /  /       /  /     01/27/15     /  /                                    0             0  MFS             0           0           0                                         0        /  /                           /  /             

          :
  -    DB Discovered Building          7-036-001                                              /  /       /  /     01/30/15     /  /                                    0             0  MFS             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




WILLIAM FLOYD UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-02-32-03
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Nathaniel Woodhull Elementary:
12-1287   Reconstruction               0-003-011  09/24/13     DONE    DONE       DONE      06/14/13   06/12/13   05/08/13   12/12/07   2,8                       27,450        27,450  JOB             0           0       5,764 Tetra Tech Architects & Engin           0        /  /                           /  /             

          William Floyd Elementary:
12-1288   Reconstruction               0-004-015  09/24/13     DONE    DONE       DONE      06/14/13   06/12/13   05/14/13   12/12/07   2,8                       27,450        27,450  JOB             0           0       5,764 Tetra Tech Architects & Engin           0        /  /                           /  /             

          William Floyd Jr/Sr High:
11-0826   Additions and Alterations    0-005-021  06/12/12     DONE    DONE       DONE      02/22/12   02/21/12   10/05/11   12/12/07   02 - 16                  211,000       211,000  HCM             0           0     211,000 Tetra Tech Architects & Engin           0      07/20/15                       01/07/16           
11-0914   Reconstruction               0-005-022  06/26/12     DONE    DONE       DONE      03/08/12   02/23/12   02/17/12   12/12/07   4,8,9,155,15,16        1,120,000     1,120,000  HCM             0           0     235,200 Tetra Tech Architects & Engin           0      07/20/15                       01/07/16           
  -    PR Additions and Alterations    0-005-023                                              /  /       /  /     09/19/12     /  /     02 - 16                        0             0  JMB             0           0           0                                         0        /  /                           /  /             
12-0390   Additions and Alterations    0-005-023  03/19/13     DONE    DONE       DONE      11/06/12   11/05/12   09/19/12   12/12/07   02 - 16                2,440,000     1,218,491  JMB             0           0   1,722,200 Tetra Tech Architects & Engin           0      11/04/13                       10/20/14           
  -       Reconstruction               0-005-024                                              /  /       /  /     05/08/13     /  /     2,8                            0    73,776,256  JOB             0           0           0                                         0        /  /                           /  /             
16-0389   Reconstruction               0-005-025               DONE    UNREVIEWED STARTED   09/09/16   09/09/16   05/11/16   12/12/07   4,9                            0    73,776,256  MFS             0           0           0 Tetra Tech Architects & Engin           0        /  /                           /  /             

          Moriches Elementary School:
12-1289   Reconstruction               0-009-011  09/24/13     DONE    DONE       DONE      06/14/13   06/12/13   05/08/13   12/12/07   2,8                       27,450        27,450  JOB             0           0       5,764 Tetra Tech Architects & Engin           0        /  /                           /  /             

          Tangier Smith Elementary:
12-1290   Reconstruction               0-010-013  09/24/13     DONE    DONE       DONE      06/14/13   06/12/13   05/08/13   12/12/07   2,8                       27,450        27,450  JOB             0           0       5,764 Tetra Tech Architects & Engin           0        /  /                           /  /             

          Jr. HS/7-9:
12-1291   Reconstruction               0-011-014  09/24/13     DONE    DONE       DONE      06/14/13   06/12/13   05/08/13   12/12/07   2,4,8                    103,000       103,000  JOB             0           0      21,630 Tetra Tech Architects & Engin           0        /  /                           /  /             

          Hobart Elementary School:
12-1292   Reconstruction               0-012-011  09/24/13     DONE    DONE       DONE      06/14/13   06/12/13   05/08/13   12/12/07   2,8                       27,450        27,450  JOB             0           0       5,764 Tetra Tech Architects & Engin           0        /  /                           /  /             

          New Middle School:
12-1293   Reconstruction               0-053-003  09/24/13     DONE    DONE       DONE      06/14/13   06/12/13   05/14/13   12/12/07   2,8                       42,250        42,250  JOB             0           0       8,872 Tetra Tech Architects & Engin           0        /  /                           /  /             

          Mastics Moriches Shirley Comu. Libr.:
12-0170   Reconstruction               6-007-006  09/17/12     DONE    DONE       DONE      09/13/12   09/12/12   03/24/11   08/27/12   7,9,10,155,15,16         223,000             0  HCM             0           0           0                                         0        /  /                           /  /             
13-1442   Reconstruction               6-007-008  06/02/14     DONE    DONE       DONE      04/10/14   04/08/14   10/03/13   10/28/13   4,10                     362,000             0  MFS             0           0           0 Wiedersum Associates Architec           0        /  /                           /  /             
13-1441   Reconstruction               6-007-009  09/16/14     DONE    DONE       DONE      04/10/14   04/08/14   01/17/14     /  /     7,9,16                 4,000,000             0  MFS             0           0           0 Wiedersum Associates Architec           0        /  /                           /  /             

          District-Wide:
  -       Reconstruction               7-999-008                                              /  /       /  /       /  /       /  /     13,16                          0             0  MFS             0           0           0                                         0        /  /                           /  /             
15-1923SB Reconstruction               7-999-008               DONE                           /  /       /  /     06/17/16     /  /     13,16                          0             0  MFS             0           0           0                                         0        /  /                           /  /             
  -    SB Reconstruction               7-999-BA1               DONE                           /  /       /  /       /  /       /  /     13                             0             0  MFS             0           0           0                                         0        /  /                           /  /             
  -    SB Reconstruction               7-999-BA2               DONE                           /  /       /  /       /  /       /  /     10                             0             0  SLC             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




CENTER MORICHES UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-02-33-02
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Main Street School:
15-0632   Reconstruction               0-001-015  04/15/16     DONE    DONE       DONE      10/28/15   10/27/15   06/18/15   05/19/15   2,7,8,9                3,358,404     3,358,404  MFS             0           0           0 John A. Grillo                          0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
16-0040   Reconstruction               0-001-016  12/05/16     DONE    DONE       DONE      07/11/16   07/08/16   01/29/16   05/19/15   2,4,7,8,9,10,155,15,   1,426,320     1,426,320  MFS             0           0           0 John A. Grillo                          0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   

          High School:
11-1246   Reconstruction               0-006-010  07/13/12     DONE    DONE       DONE      05/01/12   04/26/12   03/23/12   06/19/12   4,7,8,9,10,155,16        100,000       100,000  JOD             0           0           0 John A. Grillo                          0      12/05/12                       12/19/12         YES
                                                                                                                                                                                                                                                                                                                                   
14-1564   Reconstruction               0-006-011  06/15/15     DONE    DONE       DONE      05/27/15   05/26/15   04/15/15   05/19/15   4                        150,000       150,000  MFS             0           0           0 John A. Grillo                          0      08/20/15                       10/19/15         YES
                                                                                                                                                                                                                                                                                                                                   
15-0633   Reconstruction               0-006-012  04/15/16     DONE    DONE       DONE      10/28/15   10/27/15   06/18/15   05/19/15   2,7,8                    793,160       793,160  MFS             0           0           0 John A. Grillo                          0      11/14/16                       01/12/17         YES
                                                                                                                                                                                                                                                                                                                                   
16-0041   Reconstruction               0-006-013  12/05/16     DONE    DONE       DONE      07/11/16   07/08/16   01/29/16   05/19/15   2,7,8,9,10,155,15,16   2,495,000     2,495,000  MFS             0           0           0 John A. Grillo                          0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   

          High School Field Press Box:
09-1089DB Discovered Building          7-022-001  06/09/16     DONE    DONE       DONE      03/17/10   03/04/10   10/26/09     /  /                                    0             0  JOD             0           0           0 James M. Campbell Architects            0        /  /                           /  /             

          District-Wide:
  -       Reconstruction               7-999-001                                              /  /       /  /       /  /       /  /     13,16                          0             0  MFS             0           0           0                                         0        /  /                           /  /             
15-1514SB Reconstruction               7-999-001                         UNREVIEWED         03/31/16   03/31/16   03/31/16     /  /     13,16                          0             0  MFS             0           0           0                                         0        /  /                           /  /             
  -    SB Reconstruction               7-999-BA1                         UNREVIEWED         03/31/16   03/31/16     /  /       /  /     13                             0             0  MFS             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




EAST MORICHES UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-02-34-02
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          East Moriches School:
11-1258   Reconstruction               0-001-017  07/02/12     DONE    DONE       DONE      05/03/12   05/01/12   01/10/12   05/15/12   7,9                      450,000       450,000  JOD             0           0           0 John A. Grillo                          0      01/12/15                       02/03/15         YES
                                                                                                                                                                                                                                                                                                                                   
13-0430   Reconstruction               0-001-018  04/04/14     DONE    DONE       DONE      09/25/13   09/24/13   05/23/13   05/21/13   2,4,7,8,9,15,16          977,040       977,040  DDJ             0           0           0 John A. Grillo                          0      08/29/14                       02/03/15         YES
                                                                                                                                                                                                                                                                                                                                   
  -    XX Reconstruction               0-001-019                         CANCELLED            /  /       /  /     06/26/13     /  /     2                              0    10,242,690  DDJ             0           0           0                                         0        /  /                           /  /             

          District-Wide:
  -    SB Reconstruction               7-999-BA1               DONE                           /  /       /  /       /  /       /  /     13                             0             0  DDJ             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




SOUTH COUNTRY CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-02-35-06
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Bellport Middle School:
16-0985   Reconstruction               0-004-013                         UNREVIEWED         12/15/16   12/15/16   08/06/16   09/14/16   8,9,16                         0    26,510,092  DDJ             0           0           0 Wiedersum Associates Architec           0        /  /                           /  /             

          Frank P Long Inter.(frmr Hampton):
14-1731   Reconstruction               0-005-011  07/09/15     DONE    DONE       DONE      06/25/15   06/23/15   05/29/15   05/19/14   2,155                    100,000       100,000  DDJ             0           0           0 Wiedersum Associates Architec           0      09/02/15                       02/29/16           
16-0986   Reconstruction               0-005-012                         UNREVIEWED         12/15/16   12/15/16   08/06/16   09/14/16   8,9,16                         0    11,145,402  DDJ             0           0           0 Wiedersum Associates Architec           0        /  /                           /  /             

          Senior High School:
16-0620   Reconstruction               0-006-011               STARTED UNREVIEWED STARTED   10/14/16   10/14/16   04/26/16   05/19/15   8,9,16                         0    43,210,184  DDJ             0           0           0 Wiedersum Associates Architec           0        /  /                           /  /             

          District-Wide:
  -       Reconstruction               7-999-004                         UNREVIEWED         04/19/16   04/19/16     /  /       /  /     13,16                          0             0  DDJ             0           0           0                                         0        /  /                           /  /             
15-1582SB Reconstruction               7-999-004               DONE                           /  /       /  /     04/19/16     /  /     13,16                          0             0  DDJ             0           0           0                                         0        /  /                           /  /             
  -    SB Reconstruction               7-999-BA1               DONE                           /  /       /  /       /  /       /  /     13,16                          0             0  DDJ             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




EAST HAMPTON UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-03-01-02
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Middle School:
11-0979   Reconstruction               0-003-019  06/15/12     DONE    DONE       DONE      03/16/12   03/15/12   05/19/11   05/18/10   4                        734,870       734,870  HCM             0           0           0 Michael J. Guido Jr.                    0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
12-1047   Reconstruction               0-003-020  05/06/13     DONE    DONE       DONE      03/29/13   03/29/13   02/01/13   03/05/13   16                       133,000       133,000  MFS             0           0           0 MICHAEL J. GUIDO JR. ARCHITEC           0        /  /                           /  /             
  -    PR Additions and Alterations    0-003-021                                              /  /       /  /     04/01/14     /  /     02 - 16                        0             0  MFS             0           0           0                                         0        /  /                           /  /             
14-0627   Additions and Alterations    0-003-021  09/22/15     DONE    DONE       DONE      11/13/14   11/13/14   04/01/14   05/20/14   02 - 16                  345,000       345,000  MFS             0           0           0 Michael J. Guido Jr.                    0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
  -       Reconstruction               0-003-022                                              /  /       /  /     02/07/17     /  /     155,16                         0             0  MTM             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-003-023                                              /  /       /  /     02/07/17     /  /     4                              0             0  MTM             0           0           0                                         0        /  /                           /  /             

          John Marshall Elementary:
11-0980   Reconstruction               0-004-016  06/15/12     DONE    DONE       DONE      03/16/12   03/15/12   01/25/12   05/18/10   2                        114,000       114,000  HCM             0           0           0 Michael J. Guido Jr.                    0      03/25/13                       04/29/13         YES
                                                                                                                                                                                                                                                                                                                                   
12-1057   Reconstruction               0-004-017  05/14/13     DONE    DONE       DONE      04/02/13   03/29/13   02/01/13   05/15/12   7                        650,000       650,000  MFS             0           0           0 Michael J. Guido Jr.                    0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
14-0628   Additions and Alterations    0-004-018  11/04/15     DONE    DONE       DONE      11/18/14   11/13/14   04/01/14   05/20/14   02 - 16                  375,000       375,000  MFS             0           0           0 Michael J. Guido Jr.                    0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
  -       Reconstruction               0-004-019                                              /  /       /  /     02/07/17     /  /     155,16                         0             0  MTM             0           0           0                                         0        /  /                           /  /             

          High School/Modular @ HS:
14-0629   Reconstruction               0-006-027  09/22/15     DONE    DONE       DONE      11/18/14   11/13/14   04/01/14   05/20/14   8,9,16                   180,000       180,000  MFS             0           0           0 Michael J. Guido Jr.                    0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
  -       Reconstruction               0-006-028                                              /  /       /  /     02/07/17     /  /     155,16                         0             0  MTM             0           0           0                                         0        /  /                           /  /             

          District-Wide:
  -    SB Reconstruction               7-999-BA1               DONE                           /  /       /  /       /  /       /  /     10                             0             0  MTM             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




AMAGANSETT UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-03-03-02
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Elementary School:
11-1288   Reconstruction               0-001-016  05/17/12     DONE    DONE       DONE      05/10/12   05/07/12   03/29/12   05/17/11   2,9                       40,000        40,000  DDJ             0           0           0 Burton Behrendt Smith                   0      08/31/12                       08/25/12         YES
                                                                                                                                                                                                                                                                                                                                   
  -    SB Reconstruction               0-001-BA1                                              /  /       /  /       /  /       /  /     13                             0     4,260,720  JMB             0           0           0                                         0        /  /                           /  /             

          Historic School House:
14-0904   New Construction             7-009-001  03/10/15     DONE    DONE       DONE      12/31/14   12/26/14   12/10/14   11/18/14   02 - 16                        0             0  JMB             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




SPRINGS UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-03-04-02
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Springs School:
13-0441   Reconstruction               0-001-014  05/01/14     DONE    DONE       DONE      10/03/13   10/01/13   03/22/13   05/08/13   2,4,7,8,9,10,155,16      168,000       168,000  MFS             0           0           0 Chaleff & Rogers Architects             0      12/07/14                       05/31/16         YES
                                                                                                                                                                                                                                                                                                                                   
  -       Reconstruction               0-001-015                                              /  /       /  /     04/04/13     /  /     8,9,10,155,16                  0    11,291,580  MFS             0           0           0                                         0        /  /                           /  /             

          Greenhouse:
08-1530TQ Temporary Quarters           0-011-001  07/03/14     DONE    DONE       DONE      04/22/09   03/17/09   12/04/08     /  /     02 - 16                        0             0  JOD             0           0           0 D.B. Bennett Consulting engin           0        /  /                           /  /             

          Springs Youth Center:
13-1465TQ Temporary Quarters           8-013-001  07/03/14     DONE    DONE       DONE      04/17/14   04/16/14   03/20/14     /  /                                    0             0  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




SAG HARBOR UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-03-05-02
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Pierson High School:
11-0915   Reconstruction               0-001-024  07/27/12     DONE    DONE       DONE      03/08/12   02/23/12   06/29/11   05/18/10   16                       274,320       274,320  DDJ             0           0           0 Burton Behrendt Smith                   0      12/16/14                       12/16/14         YES
                                                                                                                                                                                                                                                                                                                                   
11-1369   Reconstruction               0-001-025  10/22/12     DONE    DONE       DONE      05/31/12   05/25/12   12/06/11   05/15/10   10,155,16                 77,682        77,682  DDJ             0           0           0 Burton Behrendt Smith                   0      08/02/16                       09/22/16         YES
                                                                                                                                                                                                                                                                                                                                   
13-0034   Reconstruction               0-001-026  09/17/13     DONE    DONE       DONE      07/11/13   07/11/13   08/09/12   05/22/12   155,16                   315,476       315,476  DDJ             0           0           0 Burton Behrendt Smith                   0      06/17/15                       08/19/15         YES
                                                                                                                                                                                                                                                                                                                                   
13-0709   Reconstruction               0-001-027  05/01/14     DONE    DONE       DONE      11/14/13   11/12/13   05/31/13   05/21/13   10                       703,600       703,600  DDJ             0           0           0 Burton Behrendt Smith                   0      01/21/15                       03/26/15         YES
                                                                                                                                                                                                                                                                                                                                   
  -       Reconstruction               0-001-028                                              /  /       /  /     05/31/13     /  /     7                              0    22,044,012  DDJ             0           0           0                                         0        /  /                           /  /             
  -    PR Additions and Alterations    0-001-029                                              /  /       /  /     11/26/13     /  /     02 - 16                        0             0  DDJ             0           0           0                                         0      10/11/16                         /  /             
14-0718   Additions and Alterations    0-001-029  01/15/16     DONE    DONE       DONE      12/05/14   12/04/14   11/26/13   11/26/13   02 - 16                7,617,922     6,647,922  DDJ             0           0           0 Burton Behrendt Smith                   0      11/10/16           YES         12/23/16         YES
                                                                                                                                                                                                                                                                                                                                   

          Sag Harbor Elementary:
11-0916   Reconstruction               0-003-018  07/27/12     DONE    DONE       DONE      03/08/12   02/23/12   06/29/11   05/18/10   16                       106,680       106,680  DDJ             0           0           0 Burton Behrendt Smith                   0      12/16/14                       02/13/15         YES
                                                                                                                                                                                                                                                                                                                                   
11-1370   Reconstruction               0-003-019  10/22/12     DONE    DONE       DONE      05/31/12   05/25/12   12/06/11   05/18/10   8,10,155,16               40,446        40,446  MTM             0           0           0 Burton Behrendt Smith                   0      08/02/16                       09/22/16         YES
                                                                                                                                                                                                                                                                                                                                   
13-0035   Reconstruction               0-003-020  09/17/13     DONE    DONE       DONE      07/11/13   07/11/13   08/09/12   05/22/12   155,16                   166,000       166,000  DDJ             0           0           0 Burton Behrendt Smith                   0      06/17/15                       08/19/15         YES
                                                                                                                                                                                                                                                                                                                                   
13-0710   Reconstruction               0-003-021  05/01/14     DONE    DONE       DONE      11/14/13   11/12/13   05/31/13   05/21/13   7                        410,000       410,000  DDJ             0           0           0 Burton Behrendt Smith                   0      01/21/15                       03/26/15         YES
                                                                                                                                                                                                                                                                                                                                   
  -    PR Additions and Alterations    0-003-022                                              /  /       /  /     11/26/13     /  /     02 - 16                        0             0  DDJ             0           0           0                                         0      10/11/16                         /  /           YES
                                                                                                                                                                                                                                                                                                                                   
14-0719   Additions and Alterations    0-003-022  01/05/16     DONE    DONE       DONE      12/05/14   12/04/14   11/26/13   11/26/13   02 - 16                1,672,710     1,545,210  DDJ             0           0           0 Burton Behrendt Smith                   0      08/31/16           YES           /  /           YES
                                                                                                                                                                                                                                                                                                                                   

          Sag Harbor Pre-K (fmr Catholic Schl):
  -       Reconstruction               0-014-001                                              /  /       /  /     04/14/16     /  /     2,4,7,8,9,14,155,15,           0             0  DDJ             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




MONTAUK UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-03-06-02
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Montauk School K-8:
  -       Reconstruction               0-001-009                                              /  /       /  /     04/29/14     /  /     13,16                          0     7,862,238  MFS             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-001-010                                              /  /       /  /     09/23/14     /  /     4,8,9,155,16                   0     7,862,238  MFS             0           0           0                                         0        /  /                           /  /             

          Storage Shed 3:
13-0471DB Discovered Building          2-011-001                       ADDENDUM REQ'D       10/08/13   10/08/13   10/08/13     /  /                                    0             0  MFS             0           0           0                                         0        /  /                           /  /             

          Public Library:
13-0341   Reconstruction               6-002-008  09/26/13     DONE    DONE       DONE      09/09/13   09/09/13   08/21/13   08/27/13   15,16                    119,280             0  MFS             0           0           0 John Tanzi Architects                   0      03/04/15                       04/22/15           
15-1483   Reconstruction               6-002-009  05/19/16     DONE    DONE       DONE      03/25/16   03/22/16   10/27/15   02/19/16   155                       44,300             0  MFS             0           0           0 FPM Engineering Group, P.C.             0      11/01/16                       11/16/16           
16-0342   Reconstruction               6-002-010  09/13/16     DONE    DONE       DONE      08/31/16   08/31/16   08/31/16   07/18/16   7,8                      155,000             0  DDJ             0           0           0 John Tanzi Architects                   0        /  /                           /  /             

          Modular Classroom Bldg (Leased):
  -    TQ Temporary Quarters           8-012-001                                              /  /       /  /     04/03/14     /  /                                    0             0  MFS             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




ELWOOD UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-04-01-02
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          District-Wide:
15-2005SB Alterations                  7-999-003  10/14/16     DONE    DONE       DONE      06/29/16   06/28/16   09/03/15   10/22/15   02 - 16                  545,581       545,581  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




COLD SPRING HARBOR CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-04-02-06
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Lloyd Harbor Elementary School:
11-1395   Reconstruction               0-002-026  01/30/13     DONE    DONE       DONE      06/12/12   06/06/12   12/21/11   12/13/11   155,15,16                730,692       730,692  DDJ             0           0           0 John A. Grillo                    730,692      09/19/14                       10/08/14           
12-0898   Reconstruction               0-002-027  09/12/13     DONE    DONE       DONE      02/21/13   02/21/13   05/17/12   05/15/12   2,4,7,9,10,155,16        577,110       577,110  DDJ             0           0           0 John A. Grillo                          0      02/03/16                       03/02/16           
13-0549   Reconstruction               0-002-028  06/04/14     DONE    DONE       DONE      10/16/13   10/10/13   05/23/13   05/21/13   2,4,7,8,9,10,155,15,     670,133       670,133  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             
14-0724   Reconstruction               0-002-029  10/07/15     DONE    DONE       DONE      12/08/14   12/03/14   06/17/14   05/20/14   2,155,16                 142,340       142,340  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             
15-1184   Reconstruction               0-002-030  07/06/16     DONE    DONE       DONE      02/04/16   02/04/16   05/27/15   05/19/15   2,8,9,10,15,16           314,000       314,000  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             
16-0809   Reconstruction               0-002-031  02/14/17     DONE    DONE       DONE      11/17/16   11/17/16   05/25/16   05/17/16   2                        105,130             0  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             

          Goosehill Primary School:
11-1394   Reconstruction               0-003-028  01/30/13     DONE    DONE       DONE      06/12/12   06/06/12   12/21/11   12/13/11   155,15,16                359,375       359,375  DDJ             0           0           0 John A. Grillo                    359,375      09/19/14                       10/08/14           
12-0899   Reconstruction               0-003-029  09/12/13     DONE    DONE       DONE      02/21/13   02/21/13   05/17/12   05/15/12   2,4,7,155                291,640       291,640  DDJ             0           0           0 John A. Grillo                          0      02/03/16                       03/02/16           
13-0550   Reconstruction               0-003-030  06/04/14     DONE    DONE       DONE      10/16/13   10/10/13   05/23/13   05/21/13   10,155,15,16             187,450       187,450  DDJ             0           0           0 John A. Grillo                          0      02/03/16                       03/02/16           
13-1403   Reconstruction               0-003-031  05/30/14     DONE    DONE       DONE      03/25/14   03/21/14   12/17/13   05/20/13   2,9                      223,206       223,206  DDJ             0           0           0 John A. Grillo                          0      02/03/16                       03/02/16           
15-1001   Reconstruction               0-003-032  06/08/16     DONE    DONE       DONE      01/04/16   12/30/15   05/27/15   05/19/15   4,8                       16,500        16,500  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             
16-0810   Reconstruction               0-003-033  02/14/17     DONE    DONE       DONE      11/17/16   11/17/16   05/25/16   05/17/16   2                        170,736             0  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             

          Westside Elementary School:
11-1393   Reconstruction               0-006-024  01/30/13     DONE    DONE       DONE      06/12/12   06/06/12   12/21/11   12/13/11   155,15,16                503,652       503,652  DDJ             0           0           0 John A. Grillo                    503,652      09/19/14                       10/08/14           
12-0900   Reconstruction               0-006-025  09/12/13     DONE    DONE       DONE      02/21/13   02/21/13   05/17/12   05/15/12   2,4,7,9,10,155,16        286,237       286,237  DDJ             0           0           0 John A. Grillo                          0      02/03/16                       03/02/16           
13-0551   Reconstruction               0-006-026  06/04/14     DONE    DONE       DONE      10/16/13   10/10/13   05/23/13   05/21/13   10,155,15,16             263,965       263,965  DDJ             0           0           0 John A. Grillo                          0      02/03/16                       03/02/16           
14-0725   Reconstruction               0-006-027  10/07/15     DONE    DONE       DONE      12/08/14   12/03/14   06/17/14   05/20/14   9,155,15,16              155,366       155,366  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             
15-1002   Reconstruction               0-006-028  06/08/16     DONE    DONE       DONE      01/04/16   12/30/15   05/27/15   05/19/15   2,8,10                   289,870       289,870  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             
16-0811   Reconstruction               0-006-029  02/14/17     DONE    DONE       DONE      11/17/16   11/17/16   05/25/16   05/17/16   2                        375,000             0  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             

          High School:
11-0818   Reconstruction               0-007-041  04/30/12     DONE    DONE       DONE      02/15/12   02/14/12   12/01/11   09/25/07   2,7                      270,000       270,000  DDJ             0           0           0 John A. Grillo                          0      02/01/13                       04/11/13           
11-1392   Reconstruction               0-007-042  01/30/13     DONE    DONE       DONE      06/12/12   06/06/12   12/21/11   12/13/11   9,155,15,16            2,345,681     2,345,681  DDJ             0           0           0 John A. Grillo                  2,345,681      09/19/14                       10/08/14           
12-0901   Reconstruction               0-007-043  09/12/13     DONE    DONE       DONE      02/21/13   02/21/13   05/17/12   05/15/12   2,4,7,9,155,15,16        636,250       636,250  DDJ             0           0           0 John A. Grillo                          0      02/03/16                       03/02/16           
13-0552   Reconstruction               0-007-044  06/04/14     DONE    DONE       DONE      10/16/13   10/10/13   05/23/13   05/21/13   2,155,15,16              428,452       428,452  DDJ             0           0           0 John A. Grillo                          0      02/03/16                       03/02/16           
14-0726   Reconstruction               0-007-045  10/07/15     DONE    DONE       DONE      12/08/14   12/03/14   06/17/14   05/20/14   2,4,7,8,9,10,14,155,     966,500       966,500  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             
15-1185   Reconstruction               0-007-046  07/06/16     DONE    DONE       DONE      02/04/16   02/04/16   05/27/15   05/19/15   2,8,9,10,155,15,16     1,066,540     1,066,540  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             
16-0812   Reconstruction               0-007-047  02/14/17     DONE    DONE       DONE      11/17/16   11/17/16   05/25/16   05/17/16   2,8,10                 1,239,134             0  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             

          Storage Building:
13-0553   New Construction             2-016-001  06/04/14     DONE    DONE       DONE      10/16/13   10/10/13   05/23/13   05/21/13   02 - 16                   50,000             0  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             

          District-Wide:
11-1065   Reconstruction               7-999-006  04/23/12     DONE    DONE       DONE      04/04/12   03/28/12   12/01/11   05/17/11   16                       148,900       148,900  DDJ             0           0           0 John A. Grillo                          0      10/01/12                       02/04/13           
  -    SB Visual Structural Inspection 7-999-SB1               DONE                           /  /       /  /       /  /       /  /                                    0             0  DDJ             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




HUNTINGTON UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-04-03-03
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Huntington High School:
12-0923   Reconstruction               0-001-027  12/13/13     DONE    DONE       DONE      02/28/13   02/22/13   11/21/12   05/15/12   2,8,9,155,15,16          480,000       480,000  JMB             0           0           0 Burton Behrendt Smith                   0      05/13/15                       06/05/15           
12-0844   Reconstruction               0-001-041  09/24/13     DONE    DONE       DONE      02/15/13   02/14/13   05/21/12   05/15/12   4,8,9,155,15,16          335,000       335,000  JOD             0           0           0 Burton Behrendt Smith                   0      07/17/14                       09/26/14           
13-1232   Reconstruction               0-001-042  03/06/15     DONE    DONE       DONE      02/14/14   02/13/14   07/29/13   05/20/13   2,4,7,9,10,15,16       1,745,000     1,745,000  DDJ             0           0           0 Burton Behrendt Smith                   0      06/17/16                       08/12/16           
14-0928XX Reconstruction               0-001-043                         CANCELLED          01/08/15   01/06/15   05/22/14   05/21/13   2                              0    34,442,312  DDJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
15-1649   Reconstruction               0-001-044  01/31/17     DONE    DONE       DONE      04/29/16   04/25/16   06/02/15   05/19/13   2,8,155,16               525,000             0  DDJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
16-1147   Reconstruction               0-001-045                         UNREVIEWED         01/09/17   01/09/17   08/06/16   05/17/16   2,4,9,14,16                    0    34,442,312  DDJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          Flower Hill Elementary:
12-0845   Reconstruction               0-002-019  09/24/13     DONE    DONE       DONE      02/15/13   02/14/13   05/21/12   05/15/12   9,16                      25,000        25,000  JOD             0           0           0 Burton Behrendt Smith                   0      07/17/14                       09/26/14           
16-1148   Reconstruction               0-002-020                         UNREVIEWED         01/09/17   01/09/17   08/06/16   05/17/16   4,8,9,10,155,15,16             0     7,365,330  DDJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          Southdown Primary School:
12-0846   Reconstruction               0-003-018  09/24/13     DONE    DONE       DONE      02/15/13   02/14/13   05/21/12   05/15/12   2,9,16                   630,000       630,000  JOD             0           0           0 Burton Behrendt Smith                   0      01/07/15                       05/19/15           
16-1149   Reconstruction               0-003-019                         UNREVIEWED         01/09/17   01/09/17   08/06/16   05/17/16   4,8,9,10,155,15,16             0     7,365,330  DDJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          Woodhull Intermediate:
12-0847   Reconstruction               0-004-016  09/24/13     DONE    DONE       DONE      02/15/13   02/14/13   05/21/12   05/15/12   2,9,16                   185,000       185,000  JOD             0           0           0 Burton Behrendt Smith                   0      07/17/14                       10/14/14           
13-1233   Reconstruction               0-004-017  03/06/15     DONE    DONE       DONE      02/14/14   02/13/14   08/05/13   05/21/13   16                       120,000       120,000  DDJ             0           0           0 Burton Behrendt Smith                   0      06/17/16                       08/12/16           
  -       Reconstruction               0-004-018                                              /  /       /  /     10/21/13     /  /     16                             0     3,130,590  DDJ             0           0           0                                         0        /  /                           /  /             
14-0925   Reconstruction               0-004-019  03/04/15     DONE    DONE       DONE      01/08/15   01/06/14   05/22/14   05/20/14   8                        100,000       100,000  DDJ             0           0      33,870 Burton Behrendt Smith                   0      11/13/15                       04/08/16           
16-1150   Reconstruction               0-004-020                         UNREVIEWED         01/09/17   01/09/17   08/06/16   05/17/16   2,4,9,10,155,15,16             0     3,130,590  DDJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          Washington Elementary:
12-0848   Reconstruction               0-009-018  09/24/13     DONE    DONE       DONE      02/15/13   02/14/13   05/21/12   05/15/12   2,9,16                   350,000       350,000  JOD             0           0           0 Burton Behrendt Smith                   0      01/07/15                       05/19/15           
16-1151   Reconstruction               0-009-019                         UNREVIEWED         01/09/17   01/09/17   08/06/16   05/17/16   4,8,9,10,155,15,16             0     7,365,330  DDJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          Jefferson Elementary:
12-0849   Reconstruction               0-013-014  09/24/13     DONE    DONE       DONE      02/15/13   02/14/13   05/21/12   05/15/12   9,16                      25,000        25,000  JOD             0           0           0 Burton Behrendt Smith                   0      07/17/14                       09/26/14           
13-1234   Reconstruction               0-013-015  03/06/15     DONE    DONE       DONE      02/14/14   02/13/14   07/29/13   05/21/13   2,16                      66,000        66,000  DDJ             0           0           0 Burton Behrendt Smith                   0      06/17/16                       08/12/16           
16-1152   Reconstruction               0-013-016                         UNREVIEWED         01/09/17   01/09/17   08/06/16   05/17/16   4,8,9,10,155,15,16             0     7,365,330  DDJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          J. Taylor Finley:
12-0850   Reconstruction               0-014-022  09/24/13     DONE    DONE       DONE      02/15/13   02/14/13   05/21/12   05/15/12   9,16                     242,000       242,000  JOD             0           0           0 Burton Behrendt Smith                   0      07/17/14                       09/26/14           
13-1235   Reconstruction               0-014-023  03/06/15     DONE    DONE       DONE      02/14/14   02/13/14   07/29/13   05/21/13   2,4,8,9,10,15,16         560,000       560,000  DDJ             0           0           0 Burton Behrendt Smith                   0      06/17/16                       08/12/16           
16-1153   Reconstruction               0-014-024                         UNREVIEWED         01/09/17   01/09/17   08/06/16   05/17/16   4,8,9,10,155,15,16             0    19,360,768  DDJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          Jack Abrams STEM Magnet School:
12-0851   Reconstruction               0-017-015  09/24/13     DONE    DONE       DONE      02/15/13   02/14/13   05/21/12   05/15/12   16                        27,000        27,000  JOD             0           0           0 Burton Behrendt Smith                   0      07/17/14                       09/26/14           
13-1236   Reconstruction               0-017-016  03/06/15     DONE    DONE       DONE      02/14/14   02/13/14   07/29/13   05/21/13   15,16                    192,500       192,500  DDJ             0           0           0 Burton Behrendt Smith                   0      06/17/16                       08/12/16           
15-1647   Reconstruction               0-017-017  07/07/16     DONE    DONE       DONE      04/29/16   04/25/16   06/02/15   05/19/13   2,16                     506,000       506,000  DDJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
16-1154   Reconstruction               0-017-018                         UNREVIEWED         01/09/17   01/09/17   08/06/16   05/17/16   4,8,9,10,155,15,16             0    13,327,740  DDJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          Container #1 @ Woodhull:
12-1011DB Discovered Building          2-022-001  04/10/13     DONE    DONE       DONE      03/25/13   03/25/13   03/16/12     /  /                                    0             0  JOD             0           0           0                                         0        /  /                           /  /             

          Container #2 @ Woodhull:
12-1012DB Discovered Building          2-023-001  04/10/13     DONE    DONE       DONE      03/25/13   03/25/13   03/16/12     /  /                                    0             0  JOD             0           0           0                                         0        /  /                           /  /             

          Container #3 @ Woodhull:
12-1013DB Discovered Building          2-024-001  04/10/13     DONE    DONE       DONE      03/25/13   03/25/13   03/16/12     /  /                                    0             0  JOD             0           0           0                                         0        /  /                           /  /             

          Public Library:
16-1446   Reconstruction               6-015-004                         UNREVIEWED         02/27/17   02/27/17   01/25/17   01/17/17   9,155,16                       0             0  MTM             0           0           0 H2M Group                               0        /  /                           /  /             

          District-Wide:
14-0080   Reconstruction               7-999-001  08/28/14     DONE    DONE       DONE      07/29/14   07/29/14   05/22/14   05/20/14   16                     1,250,000     1,250,000  DDJ             0           0           0 Burton Behrendt Smith                   0      06/17/15                       12/03/15           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




NORTHPORT-EAST NORTHPORT UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-04-04-03
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Dickenson Ave. Elementary:
12-0837   Reconstruction               0-002-014  12/12/13     DONE    DONE       DONE      02/14/13   02/14/13   09/25/12   09/19/12   2,10,155,15,16           750,000       750,000  JMB             0           0           0 Burton Behrendt Smith                   0      04/29/15                       06/03/15           
13-1202   Reconstruction               0-002-016  10/03/14     DONE    DONE       DONE      02/11/14   02/10/14   11/08/13   12/09/13   155,15,16                995,550       995,550  JMB             0           0           0 ECG Engineering, LLC              995,550        /  /                           /  /             

          East Northport Middle School:
  -       Reconstruction               0-003-018                                              /  /       /  /     09/25/12     /  /     2,9,10                         0    13,115,698  JMB             0           0           0                                         0        /  /                           /  /             
11-1111   Reconstruction               0-003-020  05/16/12     DONE    DONE       DONE      04/11/12   04/06/12   07/05/11   05/17/11   2,16                     987,500       987,500  HCM             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
12-0838   Reconstruction               0-003-021  12/12/13     DONE    DONE       DONE      02/14/13   02/14/13   05/18/12   05/15/12   155                      342,500       342,500  HCM             0           0           0 Burton Behrendt Smith                   0      06/15/16                       08/12/16           
14-1110   Reconstruction               0-003-022  04/21/15     DONE    DONE       DONE      02/11/15   02/10/15   07/30/13   05/21/13   2,9,10,16                357,903       357,903  JMB             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
13-1203   Reconstruction               0-003-023  10/03/14     DONE    DONE       DONE      02/11/14   02/10/14   11/08/13   12/09/13   155,15,16                919,970       919,970  JMB             0           0           0 ECG Engineering, LLC              919,970        /  /                           /  /             
16-0385   Reconstruction               0-003-024  01/23/17     DONE    DONE       DONE      09/07/16   09/07/16   05/22/15   05/19/15   16                       100,000             0  JMB             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          Fifth Ave. Elementary:
13-1204   Reconstruction               0-004-020  10/03/14     DONE    DONE       DONE      02/11/14   02/10/14     /  /     12/09/13   155,15,16                721,670       721,670  JMB             0           0           0 ECG Engineering, LLC              721,670        /  /                           /  /             
16-1198   Reconstruction               0-004-021                         UNREVIEWED         01/17/17   01/17/17   07/08/16   05/17/16   155,16                         0     9,820,440  AAA             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          Norwood Ave. Elementary:
13-1205   Reconstruction               0-005-018  10/03/14     DONE    DONE       DONE      02/11/14   02/10/14   11/08/13   12/09/13   155,15,16                618,330       618,330  JMB             0           0           0 ECG Engineering, LLC              618,330        /  /                           /  /             
15-1474   Reconstruction               0-005-019  05/25/16     DONE    DONE       DONE      03/24/16   03/23/16   05/26/15   05/19/15   2,155,15,16              750,000       750,000  JMB             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          Laurel Ave-Admin office:
12-0661   Reconstruction               0-006-021  03/01/13     DONE    DONE       DONE      01/10/13   01/10/13   02/24/12   05/18/10   16                       162,000       162,000  HCM             0           0     117,125 Burton Behrendt Smith                   0        /  /                           /  /             
12-0839   Reconstruction               0-006-022  12/12/13     DONE    DONE       DONE      02/14/13   02/14/13   05/18/12   05/15/12   15,16                    125,000             0  HCM             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
13-1206   Reconstruction               0-006-023  10/03/14     DONE    DONE       DONE      02/11/14   02/10/14   11/08/13   12/09/13   155,15,16              1,017,165             0  JMB             0           0           0 ECG Engineering, LLC            1,017,165        /  /                           /  /             

          Ocean Avenue Elementary:
12-0840   Reconstruction               0-007-016  12/12/13     DONE    DONE       DONE      02/14/13   02/14/13   05/18/12   05/15/12   9,13,15                  200,000       200,000  HCM             0           0           0 Burton Behrendt Smith                   0      06/15/16                       08/12/16           
14-1111   Reconstruction               0-007-017  04/21/15     DONE    DONE       DONE      02/11/15   02/10/15   07/30/13   05/21/13   2,4,16                   392,416       392,416  JMB             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
13-1207   Reconstruction               0-007-018  10/03/14     DONE    DONE       DONE      02/11/14   02/10/14   11/08/13   12/09/13   155,15,16                759,751       759,751  JMB             0           0           0 ECG Engineering, LLC              759,751        /  /                           /  /             
16-1199   Reconstruction               0-007-019                         UNREVIEWED         01/17/17   01/17/17   07/08/16   05/17/16   2,155,15,16                    0    10,859,640  AAA             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          Northport Middle School:
  -       Reconstruction               0-008-016                                              /  /       /  /     09/25/12     /  /     9,155,15,16                    0    10,286,592  JMB             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-008-017                                              /  /       /  /     09/25/12     /  /     2,9,10,16                      0    10,286,592  JMB             0           0           0                                         0        /  /                           /  /             
12-0042   Reconstruction               0-008-019  12/06/12     DONE    DONE       DONE      07/19/12   07/11/12   07/05/11   05/17/11   2,16                     362,500       362,500  HCM             0           0           0 Burton Behrendt Smith                   0      01/05/15                       06/03/15           
12-0841   Reconstruction               0-008-020  12/12/13     DONE    DONE       DONE      02/14/13   02/14/13   05/18/12   05/15/12   155                      747,500       747,500  HCM             0           0           0 Burton Behrendt Smith                   0      10/24/16                       01/30/17           
14-1112   Reconstruction               0-008-021  04/21/15     DONE    DONE       DONE      02/11/15   02/10/15   07/30/13   05/21/13   2,9,16                   137,800       137,800  JMB             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
13-1208   Reconstruction               0-008-022  10/03/14     DONE    DONE       DONE      02/11/14   02/10/14   11/08/13   12/09/13   155,15,16              1,732,765     1,732,765  JMB             0           0           0 ECG Engineering, LLC            1,732,765        /  /                           /  /             
  -       Reconstruction               0-008-023                                              /  /       /  /     09/04/14     /  /     9,155,15,16                    0    10,286,592  JMB             0           0           0                                         0        /  /                           /  /             
16-1200   Reconstruction               0-008-024                         UNREVIEWED         01/17/17   01/17/17   07/08/16   05/17/16   2,10,155,15,16                 0    10,286,592  AAA             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
  -       Reconstruction               0-008-025                                              /  /       /  /     03/13/17     /  /     2,8,9,155                      0             0  BMJ             0           0           0                                         0        /  /                           /  /             

          Pulaski Rd. Elementary:
13-1209   Reconstruction               0-009-016  10/03/14     DONE    DONE       DONE      02/11/14   02/10/14   11/08/13   12/09/13   155,15,16                597,139       597,139  JMB             0           0           0 ECG Engineering, LLC              597,139        /  /                           /  /             
16-1201   Reconstruction               0-009-017                         UNREVIEWED         01/17/17   01/17/17   07/08/16   05/17/16   2,155,15,16                    0     9,820,440  AAA             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          Northport High School:
12-0842   Reconstruction               0-010-027  12/12/13     DONE    DONE       DONE      02/14/13   02/14/13   05/18/12   05/15/12   2,9,10,155             1,334,791     1,334,791  HCM             0           0           0 Burton Behrendt Smith                   0      06/15/16                       08/12/16           
14-1113   Reconstruction               0-010-028  04/21/15     DONE    DONE       DONE      02/11/15   02/10/15   07/30/13   05/21/13   2,8,16                   796,807       796,807  JMB             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
13-1210   Reconstruction               0-010-029  10/03/14     DONE    DONE       DONE      02/11/14   02/10/14   11/08/13   12/09/13   155,15,16              4,980,831     4,980,831  JMB             0           0           0 ECG Engineering, LLC            4,980,831        /  /                           /  /             
15-1472   Reconstruction               0-010-030  06/09/16     DONE    DONE       DONE      03/24/16   03/23/16   05/26/15   05/19/15   2,155,15,16            2,137,400     1,079,900  JMB             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
16-1202   Reconstruction               0-010-031                         UNREVIEWED         01/17/17   01/17/17   07/08/16   05/17/16   9,15,16                        0    61,212,736  AAA             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          Bellerose Elementary:
12-0843   Reconstruction               0-019-014  12/12/13     DONE    DONE       DONE      02/14/13   02/14/13   05/18/12   05/15/12   2,155                    600,000       600,000  HCM             0           0           0 Burton Behrendt Smith                   0      01/25/16                       02/16/16           
13-1211   Reconstruction               0-019-015  10/03/14     DONE    DONE       DONE      02/11/14   02/10/14   11/08/13   12/09/13   155,15,16                622,488       622,488  JMB             0           0           0 ECG Engineering, LLC              622,488        /  /                           /  /             

          Storage Container:
12-0788   New Construction             2-050-001  01/13/13     DONE    DONE       DONE      02/07/13   02/04/13     /  /       /  /     02 - 16                        0             0  JMB             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          Container @ Pulaksi Road ES:
14-1315DB Discovered Building          2-051-001  03/20/15     DONE    DONE       DONE      03/20/15   03/19/15   01/13/15     /  /                                    0             0  JMB             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          Northport Public Library:
11-0976   Reconstruction               6-001-005  06/15/12     DONE    DONE       DONE      03/16/12   03/15/12   10/05/11   06/15/11   8,9,155,15,16             34,000             0  HCM             0           0           0 BEATTY HARVEY COCO                      0        /  /                           /  /             

          Press Box @ Northport HS:
15-1473   New Construction             7-052-001  06/09/16     DONE    DONE       DONE      03/24/16   03/23/16   10/02/15   05/19/15   02 - 16                        0             0  JMB             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          District-Wide:
14-1553   Reconstruction               7-999-004  09/03/15     DONE    DONE       DONE      05/26/15   05/21/15   10/07/14   05/20/14   16                       650,000       650,000  JMB             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
  -    SB Reconstruction               7-999-BA1               DONE                           /  /       /  /       /  /       /  /     13,16                          0             0  AAA             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




HALF HOLLOW HILLS CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-04-05-06
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Sunquam Elementary School:
  -       Reconstruction               0-001-016                                              /  /       /  /     07/07/16     /  /     2,9                            0     8,633,445  DDJ             0           0           0                                         0        /  /                           /  /             

          Forest Park ES(closed 6/2014):
12-1089   Reconstruction               0-002-014  07/25/13     DONE    DONE       DONE      04/11/13   04/08/13   12/04/12   05/15/12   2,7,155                  400,000       400,000  DDJ             0           0           0 James M. Campbell Architects            0      10/23/14                       06/10/15           

          High School East:
12-1091   Reconstruction               0-006-018  07/25/13     DONE    DONE       DONE      04/11/13   04/08/13   12/04/12   05/15/12   2,4,8,9,15               109,000       109,000  DDJ             0           0           0 James M. Campbell Architects            0      01/28/15                       06/10/15           
14-1320   Reconstruction               0-006-033  11/03/15     DONE    DONE       DONE      03/25/15   03/24/15   06/19/14   05/24/14   2,16                     800,000       800,000  DDJ             0           0           0 James M. Campbell Architects            0        /  /                           /  /             
15-1552   Reconstruction               0-006-034  05/13/16     DONE    DONE       DONE      04/11/16   04/11/16   10/22/15   05/19/15   155,16                   490,000       490,000  DDJ             0           0           0 James M. Campbell Architects            0        /  /                           /  /             
15-1551   Reconstruction               0-006-035  04/25/16     DONE    DONE       DONE      04/11/16   04/11/16   03/22/16   05/19/15   2,155,16               1,000,000     1,000,000  DDJ             0           0           0 James M. Campbell Architects            0        /  /                           /  /             
  -       Reconstruction               0-006-036                                              /  /       /  /     07/06/16     /  /     10                             0    43,331,960  DDJ             0           0           0                                         0        /  /                           /  /             

          Candlewood Middle School:
  -       Reconstruction               0-008-021                                              /  /       /  /     07/07/16     /  /     8                              0    18,546,176  DDJ             0           0           0                                         0        /  /                           /  /             

          Otsego Avenue Elementary:
  -       Reconstruction               0-011-017                                              /  /       /  /     02/27/17     /  /     2,155                          0             0  MTM             0           0           0                                         0        /  /                           /  /             

          Paumanok School:
  -       Reconstruction               0-014-019                                              /  /       /  /     02/27/17     /  /     7                              0             0  MTM             0           0           0                                         0        /  /                           /  /             

          Signal Hill School:
  -       Reconstruction               0-015-020                                              /  /       /  /     07/07/16     /  /     2,9,155,16                     0    10,521,900  DDJ             0           0           0                                         0        /  /                           /  /             

          West Hollow Middle School:
13-0644   Reconstruction               0-017-017  02/10/14     DONE    DONE       DONE      10/28/13   10/28/13   06/13/13   05/21/13   2,9,16                 1,000,000     1,000,000  DDJ             0           0           0 James M. Campbell Architects            0      08/20/14                       03/25/15           
14-1321   Reconstruction               0-017-018  11/03/15     DONE    DONE       DONE      03/24/15   03/24/15   06/19/14   05/24/14   7,8,9,16                 750,000       750,000  DDJ             0           0           0 James M. Campbell Architects            0        /  /                           /  /             

          Natatorium:
12-1090   Reconstruction               0-020-009  07/25/13     DONE    DONE       DONE      04/11/13   04/08/13   12/04/12   05/15/12   7,9                      175,000       175,000  DDJ             0           0           0 James M. Campbell Architects            0      06/13/14                       03/25/15           
  -       Reconstruction               0-020-010                                              /  /       /  /     07/06/16     /  /     4,9,155,15,16                  0       608,880  DDJ             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-020-011                                              /  /       /  /     02/27/17     /  /     2,9,155,16                     0             0  MTM             0           0           0                                         0        /  /                           /  /             

          High School West:
14-1254   Reconstruction               0-021-016  05/21/15     DONE    DONE       DONE      03/10/15   03/06/15   10/27/14   05/19/15   2,9,10,16                910,000       910,000  DDJ             0           0           0 James M. Campbell Architects            0      12/08/15                       05/04/16           
  -       Reconstruction               0-021-017                                              /  /       /  /     07/06/16     /  /     10                             0    27,590,075  DDJ             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-021-018                                              /  /       /  /     07/07/16     /  /     8                              0    27,590,075  DDJ             0           0           0                                         0        /  /                           /  /             

          Administration Bldg (fmly 0-007):
14-1322   Reconstruction               1-007-001  11/03/15     DONE    DONE       DONE      03/25/15   03/24/15   06/19/14   05/24/14   2,16                     280,000             0  DDJ             0           0           0 James M. Campbell Architects            0        /  /                           /  /             

          Half Hollow Hills Community Library:
12-0181   Reconstruction               6-009-008  01/30/13     DONE    DONE       DONE      09/18/12   09/14/12   07/17/12   09/24/12   155,16                   195,000             0  DDJ             0           0           0 DESIGN & CONSTRUCTION SERVICE           0        /  /                           /  /             

          District-Wide:
15-1878   Reconstruction               7-999-004  06/10/16     DONE    DONE       DONE      06/07/16   06/07/16   03/21/16   04/18/16   13,16                    330,000       330,000  DDJ             0           0           0 James M. Campbell Architects            0        /  /                           /  /             
  -       Reconstruction               7-999-005                                              /  /       /  /     02/09/17     /  /     7,8,9,10,16                    0             0  MTM             0           0           0                                         0        /  /                           /  /             
16-1353SB Reconstruction               7-999-005               DONE                           /  /       /  /     02/09/17     /  /     7,8,9,10,16                    0             0  MTM             0           0           0                                         0        /  /                           /  /             
  -    SB Reconstruction               7-999-BA1               DONE                           /  /       /  /       /  /       /  /     8,9,10,16                      0             0  MTM             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




HARBORFIELDS CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-04-06-06
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Senior High School:
  -       Reconstruction               0-001-024                                              /  /       /  /     09/23/13     /  /     2,9                            0    32,676,560  MFS             0           0           0                                         0        /  /                           /  /             
15-1261   Reconstruction               0-001-025  04/29/16     DONE    DONE       DONE      02/18/16   02/18/16   01/19/16   10/27/15   2,8,9                    955,000       955,000  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
16-0153   Reconstruction               0-001-026  01/17/17     DONE    DONE       DONE      07/25/16   07/25/16   05/06/16   10/27/15   2,4,8,9,10,13,155,15   1,675,000             0  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
16-0023   Reconstruction               0-001-027  01/13/17     DONE    DONE       DONE      07/05/16   07/05/16   05/06/16   10/27/15   2,8,9,10,155,15,16       690,000             0  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
16-0523   Reconstruction               0-001-028                         UNREVIEWED         09/30/16   09/30/16   08/06/16   10/27/15   2,4,7,8,9,10,155,15,           0    32,676,560  AAA             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          Washington Drive Primary School:
15-1262   Reconstruction               0-005-004  04/29/16     DONE    DONE       DONE      02/18/16   02/18/16   01/19/16   10/27/15   2                         91,000        91,000  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          Oldfield Middle School:
15-1263   Reconstruction               0-007-021  04/29/16     DONE    DONE       DONE      02/18/16   02/18/16   01/19/16   10/27/15   2,4                    1,525,000     1,525,000  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
16-0154   Reconstruction               0-007-022  01/17/17     DONE    DONE       DONE      07/25/16   07/25/16   05/06/16   10/27/15   2,4,8,9,13,155,15,16     390,000             0  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
16-0024   Reconstruction               0-007-023  01/13/17     DONE    DONE       DONE      07/05/16   07/05/16   05/06/16   10/27/15   2,8,9,10,155,15,16     1,150,000             0  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
16-0524   Reconstruction               0-007-024                         UNREVIEWED         09/30/16   09/30/16   08/06/16   10/27/15   2,4,8,9,10,155,15,16           0    29,154,816  AAA             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          T. J. Lahey Elementary:
15-1264   Reconstruction               0-011-013  04/29/16     DONE    DONE       DONE      02/18/16   02/18/16   01/19/16   10/27/15   2,9,10                   650,000       650,000  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
16-0155   Reconstruction               0-011-014  01/17/17     DONE    DONE       DONE      07/25/16   07/25/16   05/06/16   10/27/15   2,8,9,16                 150,000             0  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
16-0525   Reconstruction               0-011-015                         UNREVIEWED         09/30/16   09/30/16   08/06/16   10/27/15   2,4,7,8,9,10,155,15,           0    15,432,120  AAA             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          Athl Stg Bldg #1 @ HS:
16-0335   New Construction             2-026-001               DONE    STARTED    DONE      08/30/16   08/29/16   04/01/16   10/27/15   02 - 16                        0             0  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          District-wide:
  -    SB Reconstruction               7-999-BA1               DONE                           /  /       /  /       /  /       /  /     13                             0             0  MFS             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




COMMACK UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-04-10-03
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Cedar Rd School:
11-0625   Reconstruction               0-004-008  06/21/12     DONE    DONE       DONE      01/10/12   01/06/12   09/28/11   09/01/11   2,155,15,16              855,912       855,912  JOD             0           0           0 ECG Engineering, LLC              855,912      09/02/15                       10/23/15           
  -       Reconstruction               0-004-009                                              /  /       /  /     02/23/17     /  /     16                             0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Old Farms School:
11-0626   Reconstruction               0-006-009  06/21/12     DONE    DONE       DONE      01/10/12   01/06/12   09/28/11   09/01/11   2,155,15,16              251,508       251,508  JOD             0           0           0 ECG Engineering, LLC              251,508      03/27/15                       05/01/15           
  -       Reconstruction               0-006-010                                              /  /       /  /     02/23/17     /  /     16                             0             0  SLC             0           0           0                                         0        /  /                           /  /             

          North Ridge School:
11-0627   Reconstruction               0-007-011  06/21/12     DONE    DONE       DONE      01/09/12   01/06/12   09/28/11   09/01/11   2,7,155,15,16          1,951,047     1,951,047  JOD             0           0           0 ECG Engineering, LLC            1,951,047      09/02/15                       10/23/15           
13-1414   Reconstruction               0-007-012  05/29/14     DONE    DONE       DONE      04/01/14   03/27/14   07/18/13   10/16/08   16                        39,000        39,000  DDJ             0           0      14,160 Burton Behrendt Smith                   0        /  /                           /  /             
  -       Reconstruction               0-007-013                                              /  /       /  /     02/22/17     /  /     15,16                          0             0  SLC             0           0           0                                         0        /  /                           /  /             

          North Senior High School:
11-0628   Reconstruction               0-008-020  06/21/12     DONE    DONE       DONE      01/09/12   01/06/12   09/28/11   09/01/11   2,8,155,15,16          3,218,357     3,218,357  JOD             0           0           0 ECG Engineering, LLC            3,218,357      09/02/15                       10/23/15           
12-0969   Reconstruction               0-008-021  07/11/13     DONE    DONE       DONE      03/14/13   03/14/13   01/15/13   06/19/01   2,4,9                    436,400       436,400  DDJ             0           0           0 Burton Behrendt Smith                   0      04/04/16                       09/22/16           
13-1415   Reconstruction               0-008-022  05/29/14     DONE    DONE       DONE      04/01/14   03/27/14   07/18/13   10/16/08   16                       226,000       226,000  DDJ             0           0      82,052 Burton Behrendt Smith                   0        /  /                           /  /             
  -       Reconstruction               0-008-023                                              /  /       /  /     10/01/16     /  /     2,10,13                        0    52,830,488  SLC             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-008-024                                              /  /       /  /     02/22/17     /  /     7,9,155,16                     0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Wood Park School:
11-0629   Reconstruction               0-009-011  06/21/12     DONE    DONE       DONE      01/11/12   01/06/12   09/28/11   09/01/11   2,155,15,16            1,141,455     1,141,455  JOD             0           0           0 ECG Engineering, LLC            1,141,455      09/02/15                       10/23/15           
13-1416   Reconstruction               0-009-012  05/29/14     DONE    DONE       DONE      04/01/14   03/27/14   07/18/13   10/16/08   16                        30,000        30,000  DDJ             0           0      10,900 Burton Behrendt Smith                   0        /  /                           /  /             
13-0869   Reconstruction               0-009-013  06/05/14     DONE    DONE       DONE      12/09/13   12/06/13   08/20/13   06/19/01   2,15,16                  175,000       175,000  DDJ             0           0           0 Burton Behrendt Smith                   0      02/26/16                       05/23/16           
  -       Reconstruction               0-009-014                                              /  /       /  /     02/23/17     /  /     16                             0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Smith's Lane ES (bldg leased to UCP):
11-0630   Reconstruction               0-011-006  06/21/12     DONE    DONE       DONE      01/11/12   01/06/12   09/28/11   09/01/11   2,155,15,16              247,964       247,964  JOD             0           0           0 ECG Engineering, LLC              247,964      09/02/15                       10/23/15           
14-0681   Reconstruction               0-011-007  01/29/15     DONE    DONE       DONE      12/01/14   11/26/14   09/09/14   05/20/14   2                         85,000             0  DDJ             0           0           0 John A. Grillo                          0      02/02/16                       04/25/16           

          Long Acres School:
11-0631   Reconstruction               0-012-009  06/21/12     DONE    DONE       DONE      01/11/12   01/06/12   09/28/11   09/11/11   2,155,15,16              413,479       413,479  JOD             0           0           0 ECG Engineering, LLC              413,479      09/02/15                       10/23/15           
  -       Reconstruction               0-012-010                                              /  /       /  /     02/22/17     /  /     16                             0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Indian Hollow School:
11-0632   Reconstruction               0-014-010  06/21/12     DONE    DONE       DONE      01/11/12   01/06/12   09/28/11   09/01/11   2,155,15,16            1,228,730     1,228,730  JOD             0           0           0 ECG Engineering, LLC            1,228,730      09/02/15                       10/23/15           
13-1417   Reconstruction               0-014-011  05/29/14     DONE    DONE       DONE      04/01/14   03/27/14   07/18/13   10/16/08   16                        18,000        18,000  DDJ             0           0       6,530 Burton Behrendt Smith                   0        /  /                           /  /             
14-0682   Reconstruction               0-014-012  01/29/15     DONE    DONE       DONE      12/01/14   11/26/14   09/09/14   05/20/14   2                         57,500        57,500  DDJ             0           0           0 John A. Grillo                          0      02/02/16                       04/25/16           
15-0571   Reconstruction               0-014-013  04/05/16     DONE    DONE       DONE      10/15/15   10/05/15   06/08/15   05/19/15   2,4,7,8,9,10,155,15,     504,000       504,000  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             
  -       Reconstruction               0-014-014                                              /  /       /  /     02/23/17     /  /     16                             0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Sagtikos School:
11-0633   Reconstruction               0-017-006  06/21/12     DONE    DONE       DONE      01/06/12   01/06/12   09/28/11   09/01/11   2,8,155,15,16          1,998,047     1,998,047  JOD             0           0           0 ECG Engineering, LLC            1,998,047      03/27/15                       05/01/15           
  -       Reconstruction               0-017-007                                              /  /       /  /     02/23/17     /  /     16                             0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Rolling Hills School:
11-0634   Reconstruction               0-023-012  06/21/12     DONE    DONE       DONE      01/11/12   01/06/12   09/28/11   09/01/11   2,155,15,16              474,300       474,300  JOD             0           0           0 ECG Engineering, LLC              474,300      09/02/15                       10/23/15           
13-1418   Reconstruction               0-023-013  05/29/14     DONE    DONE       DONE      04/01/14   03/27/14   07/18/13   10/16/08   16                        23,780        23,780  DDJ             0           0       8,630 Burton Behrendt Smith                   0        /  /                           /  /             
14-0683   Reconstruction               0-023-014  01/29/15     DONE    DONE       DONE      12/01/14   11/26/14   09/09/14   05/20/14   9                         35,000        35,000  DDJ             0           0           0 John A. Grillo                          0      02/02/16                       04/25/16           
  -       Reconstruction               0-023-015                                              /  /       /  /     02/23/17     /  /     7,15,16                        0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Commack M.S. ( fmly HS South):
11-0635   Reconstruction               0-027-015  06/21/12     DONE    DONE       DONE      01/11/12   01/06/12   09/28/11   09/01/11   2,155,15,16            2,404,238     2,404,238  JOD             0           0           0 ECG Engineering, LLC            2,404,238      09/02/15                       10/23/15           
12-0127   Reconstruction               0-027-016  02/13/13     DONE    DONE       DONE      08/28/12   08/21/12   10/14/11   06/19/01   4,9,10                   358,335       358,335  JOD             0           0           0 Burton Behrendt Smith                   0      06/26/13                       08/27/13           
12-0970   Reconstruction               0-027-017  07/11/13     DONE    DONE       DONE      03/14/13   03/14/13   01/15/13   06/19/01   2,4,9                    258,685       258,685  DDJ             0           0           0 Burton Behrendt Smith                   0      06/08/16                       07/14/16           
13-1419   Reconstruction               0-027-018  05/29/14     DONE    DONE       DONE      04/01/14   03/27/14   07/18/13   10/16/08   16                       139,000       139,000  DDJ             0           0      50,470 Burton Behrendt Smith                   0        /  /                           /  /             
  -       Reconstruction               0-027-019                                              /  /       /  /     02/10/15     /  /     155,16                         0    43,397,666  DDJ             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-027-020                                              /  /       /  /     02/22/17     /  /     155,16                         0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Burr Rd. Intermediate (fmly JH):
11-0636   Reconstruction               0-035-015  06/21/12     DONE    DONE       DONE      01/11/12   01/06/12   09/28/11   09/01/11   2,155,15,16            1,411,448     1,411,448  JOD             0           0           0 ECG Engineering, LLC            1,411,448      09/02/15                       10/23/15           
12-0971   Reconstruction               0-035-016  07/11/13     DONE    DONE       DONE      03/14/13   03/14/13   01/15/13   06/19/01   4,9                      118,100       118,100  DDJ             0           0           0 Burton Behrendt Smith                   0      10/14/15                       02/29/16           
13-1420   Reconstruction               0-035-017  05/29/14     DONE    DONE       DONE      04/01/14   03/27/14   07/18/13   10/16/08   16                        45,000        45,000  DDJ             0           0      16,340 Burton Behrendt Smith                   0        /  /                           /  /             
  -       Reconstruction               0-035-018                                              /  /       /  /     12/11/15     /  /     2                              0    18,705,600  DDJ             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-035-019                                              /  /       /  /     02/22/17     /  /     155,16                         0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Sawmill Int.(fmly Jr.HS):
11-0637   Reconstruction               0-036-014  06/21/12     DONE    DONE       DONE      01/11/12   01/06/11   09/28/11   09/01/11   2,155,15,16            1,168,330     1,168,330  JOD             0           0           0 ECG Engineering, LLC            1,168,330      09/02/15                       10/23/15           
12-0972   Reconstruction               0-036-015  07/11/13     DONE    DONE       DONE      03/14/13   03/14/13   01/15/13   06/19/01   4,9                      119,100       119,100  DDJ             0           0           0 Burton Behrendt Smith                   0      10/14/15                       02/29/16           
13-1421   Reconstruction               0-036-016  05/29/14     DONE    DONE       DONE      04/01/14   03/27/14   07/18/13   10/16/08   16                        45,000        45,000  DDJ             0           0      16,340 Burton Behrendt Smith                   0        /  /                           /  /             
14-0684   Reconstruction               0-036-017  01/29/15     DONE    DONE       DONE      12/01/14   11/26/14   09/09/14   05/20/14   10                        35,000        35,000  DDJ             0           0           0 John A. Grillo                          0      02/02/16                       04/25/16           
  -       Reconstruction               0-036-018                                              /  /       /  /     02/23/17     /  /     16                             0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Maintenance Office:
11-0638   Reconstruction               1-002-003  06/21/12     DONE    DONE       DONE      01/11/12   01/06/12   09/28/11   09/01/11   2,155,15,16               61,458             0  JOD             0           0           0 ECG Engineering, LLC               61,458      03/27/15                       05/01/15           
  -       Reconstruction               1-002-004                                              /  /       /  /     02/23/17     /  /     16                             0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Hubbs Administration:
11-0639   Reconstruction               1-015-008  06/21/12     DONE    DONE       DONE      01/11/12   01/06/12   09/28/11   09/01/11   2,155,15,16              341,880             0  JOD             0           0           0 ECG Engineering, LLC              341,880      03/27/15                       05/01/15           
  -       Reconstruction               1-015-009                                              /  /       /  /     02/23/17     /  /     16                             0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Container #1 @ Sawmill Intermediate:
15-1346DB Discovered Building          2-047-001  07/19/16     DONE    DONE       DONE      03/04/16   03/04/16     /  /       /  /                                    0             0  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             

          Container #2 @ Sawmill Intermediate:
15-1347DB Discovered Building          2-048-001  07/19/16     DONE    DONE       DONE      03/04/16   03/04/16     /  /       /  /                                    0             0  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             

          Container #3 @ Sawmill Intermediate:
15-1348DB Discovered Building          2-049-001  07/19/16     DONE    DONE       DONE      03/04/16   03/04/16     /  /       /  /                                    0             0  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             

          Container #1 @ Burr Intermediate:
15-1349DB Discovered Building          2-050-001  07/19/16     DONE    DONE       DONE      03/04/16   03/04/16     /  /       /  /                                    0             0  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             

          Container #2 @ Burr Intermediate:
15-1350DB Discovered Building          2-051-001  07/19/16     DONE    DONE       DONE      03/04/16   03/04/16     /  /       /  /                                    0             0  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             

          Container #1 @ Smiths Lane School:
15-1351DB Discovered Building          2-052-001  07/19/16     DONE    DONE       DONE      03/04/16   03/04/16     /  /       /  /                                    0             0  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             

          Container #2 @ Smiths Lane School:
15-1352DB Discovered Building          2-053-001  07/19/16     DONE    DONE       DONE      03/04/16   03/04/16     /  /       /  /                                    0             0  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             

          Container #1 @ Long Acres School:
15-1353DB Discovered Building          2-054-001  07/19/16     DONE    DONE       DONE      03/04/16   03/04/16     /  /       /  /                                    0             0  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             

          Container #1 @ Sagtikos Elem Schl:
15-1354DB Discovered Building          2-055-001  07/19/16     DONE    DONE       DONE      03/04/16   03/04/16     /  /       /  /                                    0             0  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             

          Container #1 @ Commack Middle School:
15-1355DB Discovered Building          2-056-001  07/19/16     DONE    DONE       DONE      03/04/16   03/04/16     /  /       /  /                                    0             0  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             

          Container #1 @ Commack High School:
15-1356DB Discovered Building          2-057-001  07/19/16     DONE    DONE       DONE      03/04/16   03/04/16     /  /       /  /                                    0             0  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             

          Container #2 @ Commack High School:
15-1357DB Discovered Building          2-058-001  07/19/16     DONE    DONE       DONE      03/04/16   03/04/16     /  /       /  /                                    0             0  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             

          Container #3 @ Commack High School:
15-1358DB Discovered Building          2-059-001  07/19/16     DONE    DONE       DONE      03/04/16   03/04/16     /  /       /  /                                    0             0  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             

          Container #4 @ Commack High School:
15-1359DB Discovered Building          2-060-001  07/19/16     DONE    DONE       DONE      03/04/16   03/04/16     /  /       /  /                                    0             0  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             

          Container #5 @ Commack High School:
15-1360DB Discovered Building          2-062-001  07/19/16     DONE    DONE       DONE      03/04/16   03/04/16     /  /       /  /                                    0             0  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             

          District-Wide:
15-1365SB Reconstruction               7-999-001               STARTED                        /  /       /  /     03/04/16     /  /     13,16                          0             0  DDJ             0           0           0                                         0        /  /                           /  /             
15-2003   Reconstruction               7-999-001  12/21/16     DONE    DONE       DONE      06/28/16   06/27/16     /  /     11/04/14   13,16                    333,000             0  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             
  -    SB Reconstruction               7-999-BA1                                              /  /       /  /       /  /       /  /     13                             0             0  DDJ             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




SOUTH HUNTINGTON UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-04-13-03
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Birchwood Intermediate:
12-0815   Reconstruction               0-001-024  08/16/13     DONE    DONE       DONE      02/12/13   02/08/13     /  /     03/03/07   16                       107,000       107,000  DDJ             0           0           0 H2M Group                               0      09/15/14                       10/23/14           
12-1058XX Reconstruction               0-001-025                         CANCELLED          04/02/13   04/01/13   01/09/13   03/03/07   16                             0    10,872,630  DDJ             0           0           0 H2M Group                               0        /  /                           /  /             
15-1005   Reconstruction               0-001-026                         UNREVIEWED         01/05/16   01/04/15   11/20/15     /  /     4                              0    10,872,630  DDJ             0           0           0 H2M Group                               0        /  /                           /  /             

          Maplewood Intermediate School:
11-0493   Reconstruction               0-005-020  04/27/12     DONE    DONE       DONE      12/13/11   12/08/11   03/24/09   03/03/07   2,8,9,15,16            1,710,685     1,710,685  DDJ             0           0           0 H2M Group                               0      11/14/13                       12/05/13           
11-0525   Additions and Alterations    0-005-023  04/06/12     DONE    DONE       DONE      12/22/11   12/16/11   10/19/11   02/28/03   02 - 16                  461,794       316,836  DDJ             0           0           0 H2M Group                               0      04/12/13                       09/27/13           
12-1059XX Reconstruction               0-005-024                         CANCELLED          04/02/13   04/01/13   01/09/13   03/03/07   16                             0    10,872,630  DDJ             0           0           0 H2M Group                               0        /  /                           /  /             

          Oakwood Elementary:
11-0524   Reconstruction               0-006-020  07/03/12     DONE    DONE       DONE      12/22/11   12/19/11   03/30/09   02/28/03   2,8,9,15,16            2,019,626     2,019,626  DDJ             0           0           0 H2M Group                               0      08/31/12                       10/09/12           
11-0526   Additions and Alterations    0-006-023  04/06/12     DONE    DONE       DONE      12/22/11   12/16/11   10/19/11   02/28/03   02 - 16                  556,000       316,836  DDJ             0           0           0 H2M Group                               0      07/19/13                       08/08/13           
12-1060XX Reconstruction               0-006-024                         CANCELLED          04/02/13   04/01/13   01/09/13   03/03/07   16                             0    12,626,280  DDJ             0           0           0 H2M Group                               0        /  /                           /  /             

          SILAS WOOD 6TH GRADE CENTER:
07-1903   Reconstruction               0-008-027  03/28/13     DONE    DONE       DONE      04/01/08   03/25/08   10/29/07   03/03/07   2,8,9                  1,025,157     1,025,157  DDJ             0           0           0 H2M Group                               0      09/03/13                       09/27/13           

          Walt Whitman Senior High:
12-1061   Reconstruction               0-010-050                       ADDENDUM REQ'D       04/02/13   04/01/13   01/09/13   03/03/07                                  0    59,122,248  DDJ             0           0           0 H2M Group                               0        /  /                           /  /             
16-0124   Reconstruction               0-010-051  01/30/17     DONE    DONE       DONE      07/18/16   07/18/16   04/20/15   05/17/16   2,8,9,10,155,16          214,000             0  DDJ             0           0           0 H2M Group                               0        /  /                           /  /             
15-1006   Reconstruction               0-010-052                         UNREVIEWED         01/05/16   01/04/16   11/20/15     /  /     4                              0    59,122,248  DDJ             0           0           0 H2M Group                               0        /  /                           /  /             
16-1026   Reconstruction               0-010-053                         UNREVIEWED         12/20/16   12/19/16   12/18/15   05/17/16   2,8,9,16                       0    59,122,248  DDJ             0           0           0 H2M Group                               0        /  /                           /  /             

          Countrywood Elementary:
12-1062XX Reconstruction               0-011-026                         CANCELLED          04/02/13   04/01/13   01/09/13   03/03/07   16                             0    12,275,550  DDJ             0           0           0 H2M Group                               0        /  /                           /  /             
13-0754   Reconstruction               0-011-027  08/26/13     DONE    DONE       DONE      11/22/13   11/18/13   09/13/13   08/14/13   2,9                       62,740        62,740  DDJ             0           0           0 H2M Group                               0      08/27/13                       06/24/14           

          Stimson Middle School:
12-1063XX Reconstruction               0-012-029                         CANCELLED          04/02/13   04/01/13   01/09/13   03/03/07   16                             0    22,922,240  DDJ             0           0           0 H2M Group                               0        /  /                           /  /             
13-1591   Reconstruction               0-012-030  09/30/14     DONE    DONE       DONE      05/30/14   05/29/14   04/23/14   02/28/03   2,8,9,10,15              721,715       721,715  DDJ             0           0           0 H2M Group                               0        /  /                           /  /             
14-0733   Reconstruction               0-012-031  02/25/15     DONE    DONE       DONE      12/10/14   11/17/14   11/24/14   09/17/14   155,16                   267,280       267,280  DDJ             0           0     163,814 H2M Group                               0        /  /                           /  /             

          Teen Center Garage:
  -       New Construction             2-026-001                                              /  /       /  /     06/08/15     /  /     02 - 16                        0             0  DDJ             0           0           0                                         0        /  /                           /  /             

          Public Library:
13-0112   Reconstruction               6-024-005  09/06/13     DONE    DONE       DONE      07/31/13   07/30/13   06/05/13   05/17/13   2,15,16                  450,000             0  DDJ             0           0           0 BEATTY HARVEY COCO                      0        /  /                           /  /             
16-0240   Reconstruction               6-024-006  09/16/16     DONE    DONE       DONE      08/12/16   08/11/16   07/15/16   07/18/16   8,9,155,15,16            300,000             0  DDJ             0           0           0 BEATTY HARVEY COCO                      0        /  /                           /  /             

          Memorial Junior High School:
11-0666   Reconstruction               7-009-017  04/27/12     DONE    DONE       DONE      01/17/12   01/12/12   10/19/11   03/03/07   2,16                     267,500             0  DDJ             0           0           0 H2M Group                               0      08/07/13                       09/27/13           
12-1064XX Reconstruction               7-009-018                         CANCELLED          04/02/13   04/01/13   11/16/12   03/03/07   16                             0             0  DDJ             0           0           0 H2M Group                               0        /  /                           /  /             
12-0816   Reconstruction               7-009-019  08/16/13     DONE    DONE       DONE      02/12/13   02/08/13   01/09/13   03/03/07   16                       133,750             0  DDJ             0           0           0 H2M Group                               0      08/26/14           YES           /  /             

          District-Wide:
  -       Reconstruction               7-999-008                                              /  /       /  /     03/15/17     /  /     16                             0             0  DDJ             0           0           0                                         0        /  /                           /  /             
16-1511SB Reconstruction               7-999-008               DONE                           /  /       /  /     03/15/17     /  /     16                             0             0  DDJ             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




BAY SHORE UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-05-01-03
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Bay Shore High School:
15-0745   Reconstruction               0-006-028  04/01/16     DONE    DONE       DONE      11/19/15   11/12/15   04/13/15   05/19/15   2,4,13                   398,438       398,438  DDJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          Armory Pre-K Center:
12-0501   Reconstruction               0-019-001  12/13/12     DONE    DONE       DONE      11/30/12   11/30/12   11/13/12   11/20/12   2,4,7,8,9,155,15,16    1,350,000     1,350,000  DDJ             0           0           0 Burton Behrendt Smith                   0      07/14/14                       11/29/16           
  -       Additions and Alterations    0-019-002                                              /  /       /  /       /  /       /  /     02 - 16                        0             0  DDJ             0           0           0                                         0        /  /                           /  /             
15-1363SB Additions and Alterations    0-019-002                                              /  /       /  /     03/04/16     /  /     02 - 16                        0             0  DDJ             0           0           0                                         0        /  /                           /  /             
16-0205PR Additions and Alterations    0-019-002               DONE                         08/03/16     /  /       /  /       /  /     02 - 16                        0     7,001,592  DDJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
16-0206   Reconstruction               0-019-003  02/06/17     DONE    DONE       DONE      08/03/16   08/03/16   04/04/16   05/17/16   2,7                    1,285,670             0  DDJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          Bay Shore-Brightwaters Publ. Library:
13-1664   Reconstruction               6-010-005  07/22/14     DONE    DONE       DONE      06/25/14   06/24/14   05/28/14   05/27/14   8,9                       50,000             0  DDJ             0           0           0 BEATTY HARVEY COCO                      0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




ISLIP UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-05-02-02
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Sherwood Elementary:
13-0091   Reconstruction               0-002-013  11/13/13     DONE    DONE       DONE      07/24/13   07/23/13   02/05/13   12/13/12   2,4,8,9                  566,073       566,073  MFS             0           0           0 Burton Behrendt Smith                   0      10/15/15                       06/15/16           
  -       Reconstruction               0-002-014                                              /  /       /  /     02/05/13     /  /     2                              0     8,716,290  MFS             0           0           0                                         0        /  /                           /  /             
13-0584   Reconstruction               0-002-015  09/10/14     DONE    DONE       DONE      10/18/13   10/16/13   08/13/13   12/13/12   16                        65,200        65,200  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
13-1699   Reconstruction               0-002-016  12/04/14     DONE    DONE       DONE      07/03/14   06/27/14   11/19/13   12/13/12   2,4,8,9                  143,500       143,500  MFS             0           0           0 Burton Behrendt Smith                   0      12/15/16                       01/30/17           
13-1700   Reconstruction               0-002-017  12/04/14     DONE    DONE       DONE      07/03/14   06/27/14   11/19/13   12/13/12   2,7,9                  1,008,300     1,008,300  MFS             0           0           0 Burton Behrendt Smith                   0      05/11/16                       06/20/16           
14-0962   Reconstruction               0-002-018  06/28/16     DONE    DONE       DONE      01/16/15   01/14/15   03/13/14   12/13/12   2,4,7,8,9,10,155,15,     482,446       482,446  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
14-1242   Reconstruction               0-002-019  05/02/16     DONE    DONE       DONE      03/06/15   03/05/15   04/18/14   12/13/12   2,155,16               1,088,544     1,088,544  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
14-1611   Reconstruction               0-002-020  08/03/15     DONE    DONE       DONE      06/10/15   06/01/15   01/06/15   12/13/12   2,9,155,16               486,776       486,776  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
14-1712   Reconstruction               0-002-021  08/06/15     DONE    DONE       DONE      06/23/15   06/19/15   01/20/15   12/13/12   9,10                      26,646        26,646  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
16-0675   Reconstruction               0-002-022                         UNREVIEWED         10/27/16   10/25/16   04/23/15   12/13/12   2,4,7,8,9,10,155,15,           0     8,716,290  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
15-1335   Reconstruction               0-002-023  05/16/16     DONE    DONE       DONE      03/01/16   02/29/16   01/21/16   12/13/12   155,16                   288,675       288,675  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
16-0687   Reconstruction               0-002-024               DONE    STARTED    STARTED   10/31/16   10/31/16   03/15/16   12/13/12   155,16                         0     8,716,290  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          Winganhauppauge Elementary:
13-0092   Reconstruction               0-003-019  11/13/13     DONE    DONE       DONE      07/24/13   07/23/13   02/05/13   12/13/12   2,4,8,9                  530,140       530,140  MFS             0           0           0 Burton Behrendt Smith                   0      10/15/15                       06/15/16           
  -       Reconstruction               0-003-020                                              /  /       /  /     02/05/13     /  /     2                              0    10,729,740  MFS             0           0           0                                         0        /  /                           /  /             
13-0585   Reconstruction               0-003-021  09/10/14     DONE    DONE       DONE      10/18/13   10/16/13   08/09/13   12/13/12   16                       223,000       223,000  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
14-1115   Reconstruction               0-003-022  04/30/15     DONE    DONE       DONE      02/11/15   02/10/15   01/22/14   12/13/12   2,4,7,8,9                187,450       187,450  MFS             0           0           0 Burton Behrendt Smith                   0      12/15/16                       01/30/17           
14-0963   Reconstruction               0-003-023  06/28/16     DONE    DONE       DONE      01/16/15   01/14/15   03/13/14   12/13/12   2,4,7,8,9,10,155,15,     613,823       613,823  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
14-1612   Reconstruction               0-003-024  08/03/15     DONE    DONE       DONE      06/10/15   06/01/15   01/06/15   12/13/12   2,9,155,16               696,724       696,724  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
14-1713   Reconstruction               0-003-025  08/06/15     DONE    DONE       DONE      06/23/15   06/19/15   01/20/15   12/13/12   9,10                     341,077       341,077  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
15-1243   Reconstruction               0-003-026  04/21/16     DONE    DONE       DONE      02/12/16   02/12/16   06/15/15   12/13/12   2,9,16                    99,927        99,927  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
15-1336   Reconstruction               0-003-027  05/16/16     DONE    DONE       DONE      03/01/16   02/29/16   01/21/16   12/13/12   155,16                   328,643       328,643  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
16-0688   Reconstruction               0-003-028               DONE    STARTED    STARTED   10/31/16   10/31/16   03/15/16   12/13/12   155,16                         0    10,729,740  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
  -       Reconstruction               0-003-029                                              /  /       /  /     12/02/16     /  /     155,16                         0    10,729,740  MTM             0           0           0                                         0        /  /                           /  /             

          Senior High School:
13-0093   Reconstruction               0-007-016  11/13/13     DONE    DONE       DONE      07/24/13   07/23/13   02/05/13   12/13/12   2,4,8,9                  419,500       419,500  MFS             0           0           0 Burton Behrendt Smith                   0      06/09/16                       06/20/16           
  -       Reconstruction               0-007-017                                              /  /       /  /     02/05/13     /  /     16                             0    38,623,333  MFS             0           0           0                                         0        /  /                           /  /             
13-0126   Reconstruction               0-007-018  10/08/13     DONE    DONE       DONE      08/05/13   08/02/13   03/08/13   12/13/12   10                       172,000       172,000  MFS             0           0           0 Burton Behrendt Smith                   0      05/01/15                       10/15/15           
13-0586   Reconstruction               0-007-019  09/10/14     DONE    DONE       DONE      10/18/13   10/16/13   08/13/13   12/13/12   16                       145,500       145,500  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
13-0686   Reconstruction               0-007-020  04/29/14     DONE    DONE       DONE      11/07/13   11/07/13   09/18/13   12/13/12   2,4,7,8,13,155,15,16   9,226,482     9,226,482  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
  -       Reconstruction               0-007-021                                              /  /       /  /     09/23/13     /  /     2,4,7,8,13,155,15,16           0    38,623,333  MFS             0           0           0                                         0        /  /                           /  /             
13-1191   Reconstruction               0-007-022  01/20/15     DONE    DONE       DONE      02/06/14   02/06/14   11/26/13   12/13/12   155,16                 1,575,545     1,575,545  MFS             0           0           0 Burton Behrendt Smith                   0      10/31/16                       01/30/17           
14-0964   Reconstruction               0-007-023  06/28/16     DONE    DONE       DONE      01/16/15   01/14/15   03/13/14   12/13/12   2,4,7,8,9,10,155,15,     480,000       480,000  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
14-1613   Reconstruction               0-007-024  08/03/15     DONE    DONE       DONE      06/10/15   06/01/15   01/06/15   12/13/12   2,9,155,16             1,245,639     1,245,639  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
14-1714   Reconstruction               0-007-025  08/06/15     DONE    DONE       DONE      06/23/15   06/19/15   01/20/15   12/13/12   9,10                     129,544       129,544  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
14-1470   Reconstruction               0-007-026  05/16/16     DONE    DONE       DONE      05/01/15   04/30/15   01/27/15   12/13/12   155,15,16                657,289       657,289  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
15-0564   Reconstruction               0-007-027  06/27/16     DONE    DONE       DONE      10/09/15   10/09/15   04/20/15   12/13/12   8,9,10,155,15,16         526,620       526,620  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
15-1244   Reconstruction               0-007-028  04/21/16     DONE    DONE       DONE      02/12/16   02/12/16   06/15/15   12/13/12   2,9,16                   279,880       279,880  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
15-1337   Reconstruction               0-007-029  05/16/16     DONE    DONE       DONE      02/29/16   02/29/16   03/14/16   12/13/12   16                       463,875       463,875  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          Commack Road Elementary:
13-0094   Reconstruction               0-008-014  11/13/13     DONE    DONE       DONE      07/24/13   07/23/13   02/05/13   12/13/12   2,4,8,9                  687,503       687,503  MFS             0           0           0 Burton Behrendt Smith                   0      01/20/15                       06/15/16           
  -       Reconstruction               0-008-015                                              /  /       /  /     02/05/13     /  /     2                              0    10,482,930  MFS             0           0           0                                         0        /  /                           /  /             
13-0587   Reconstruction               0-008-016  09/10/14     DONE    DONE       DONE      10/18/13   10/16/13   08/13/13   12/13/12   16                        62,065        62,065  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
13-1620   Reconstruction               0-008-017  11/20/14     DONE    DONE       DONE      06/18/14   06/17/14   11/04/13   12/13/12   2,4,8,9,10,155,15,16     225,525       225,525  MFS             0           0           0 Burton Behrendt Smith                   0      03/04/16                       04/08/16           
13-1674   Reconstruction               0-008-018  12/23/14     DONE    DONE       DONE      06/27/14   06/19/14   11/04/13   12/13/12   2,4,8,9                2,145,000     2,145,000  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
13-1675   Reconstruction               0-008-019  12/23/14     DONE    DONE       DONE      06/27/14   06/19/14   01/22/14   12/13/12   2,4,7,8,9              1,201,950     1,201,950  MFS             0           0           0 Burton Behrendt Smith                   0      05/11/16                       05/23/16           
14-0965   Reconstruction               0-008-020  06/28/16     DONE    DONE       DONE      01/16/15   01/14/15   03/13/14   12/13/12   2,4,7,8,9,10,155,15,     211,500       211,500  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
14-1243   Reconstruction               0-008-021  05/02/16     DONE    DONE       DONE      03/06/15   03/05/15   04/18/14   12/13/12   2,155,16               1,569,124     1,569,124  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
14-1614   Reconstruction               0-008-022  08/03/15     DONE    DONE       DONE      06/10/15   06/01/15   01/06/15   12/13/12   2,9,155,16               435,531       435,531  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
14-1217   Reconstruction               0-008-023  05/08/15     DONE    DONE       DONE      03/02/15   02/27/15   01/08/15   12/13/12   2,15,16                  155,938       155,938  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
14-1715   Reconstruction               0-008-024  08/06/15     DONE    DONE       DONE      06/23/15   06/19/15   01/20/15   12/13/12   9,10                      55,069        55,069  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
15-1659   Reconstruction               0-008-025  10/12/16     DONE    DONE       DONE      05/03/16   05/02/16   04/23/15   12/13/12   10,155,15,16             252,350       252,350  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
15-1245   Reconstruction               0-008-026  04/21/16     DONE    DONE       DONE      02/12/16   02/12/16   06/15/15   12/13/12   2,9,16                    17,393        17,393  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
15-1338   Reconstruction               0-008-027  05/16/16     DONE    DONE       DONE      03/01/16   02/29/16   01/21/16   12/13/12   155,16                   266,469       266,469  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
  -       Reconstruction               0-008-028                                              /  /       /  /     03/15/16     /  /     155,16                         0    10,482,930  MFS             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-008-029                                              /  /       /  /     12/02/16     /  /     155,15,16                      0    10,482,930  MTM             0           0           0                                         0        /  /                           /  /             

          Junior High School:
12-1163   Reconstruction               0-011-014  06/28/13     DONE    DONE       DONE      05/07/13   05/06/13   02/05/13   12/13/12   2,4,7                    673,300       673,300  MFS             0           0           0 Burton Behrendt Smith                   0      01/22/15                       10/15/15           
13-0095   Reconstruction               0-011-015  11/13/13     DONE    DONE       DONE      07/24/13   07/23/13   02/05/13   12/13/12   2,4,8,9                  356,000       356,000  MFS             0           0           0 Burton Behrendt Smith                   0      06/09/16                       06/20/16           
13-0127   Reconstruction               0-011-016  10/08/13     DONE    DONE       DONE      08/05/13   08/02/13   03/08/13   12/13/12   10                       247,500       247,500  MFS             0           0           0 Burton Behrendt Smith                   0      05/01/15                       10/15/15           
13-0588   Reconstruction               0-011-017  09/10/14     DONE    DONE       DONE      10/18/13   10/16/13   08/09/13   12/13/12   9,16                     375,000       375,000  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
13-0687   Reconstruction               0-011-018  04/29/14     DONE    DONE       DONE      11/07/13   11/07/13   09/18/13   12/13/12   2,4,8,13,155,15,16     2,915,808     2,915,808  MFS             0           0           0 Burton Behrendt Smith                   0      12/12/16                       01/30/17           
  -       Reconstruction               0-011-019                                              /  /       /  /     09/23/13     /  /     2,4,8,13,155,15,16             0    29,514,752  MFS             0           0           0                                         0        /  /                           /  /             
13-1192   Reconstruction               0-011-020  01/20/15     DONE    DONE       DONE      02/06/14   02/06/14   11/26/13   12/13/12   155,16                 1,915,970     1,915,970  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
14-0966   Reconstruction               0-011-021  06/28/16     DONE    DONE       DONE      01/16/15   01/14/15   03/13/14   12/13/12   2,4,7,8,9,10,155,15,     570,000       570,000  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
14-1615   Reconstruction               0-011-022  08/03/15     DONE    DONE       DONE      06/10/15   06/01/15   01/06/15   12/13/12   2,9,155,16             1,074,400     1,074,400  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
14-1716   Reconstruction               0-011-023  08/06/15     DONE    DONE       DONE      06/23/15   06/19/15   01/20/15   12/13/12   9,10                     123,148       123,148  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
15-1660   Reconstruction               0-011-024  10/12/16     DONE    DONE       DONE      05/03/16   05/02/16   04/23/15   12/13/12   2,4,8,9,10,155,15,16     598,000       598,000  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
15-1246   Reconstruction               0-011-025  04/21/16     DONE    DONE       DONE      02/12/16   02/12/16   06/15/15   12/13/12   2,9,16                   412,926       412,926  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
15-1339   Reconstruction               0-011-026  05/16/16     DONE    DONE       DONE      03/01/16   02/29/16   01/21/16   12/13/12   155                      443,485       443,485  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
15-1367   Reconstruction               0-011-027  04/14/16     DONE    DONE       DONE      03/14/16   03/02/16   02/11/16   12/13/12   7                        225,000       225,000  MFS             0           0           0 Burton Behrendt Smith                   0      12/15/16                       01/30/17           
16-0689   Reconstruction               0-011-028               DONE    STARTED    STARTED   10/31/16   10/31/16   03/15/16   12/13/12   155,16                         0    29,514,752  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
  -       Reconstruction               0-011-029                                              /  /       /  /     12/02/16     /  /     15,16                          0    29,514,752  MTM             0           0           0                                         0        /  /                           /  /             

          Islip HS Comfort & Concession Bldg:
13-0688   New Construction             7-022-001  04/29/14     DONE    DONE       DONE      11/07/13   11/07/13   10/22/13   12/13/12   02 - 16                  777,278             0  MFS             0           0           0 Burton Behrendt Smith                   0      03/29/16                       05/23/16           

          Press Box @ HS:
13-1340   New Construction             7-023-001  04/29/14     DONE    DONE       DONE      03/14/14   03/14/14   03/13/14   12/13/12   02 - 16                  269,475             0  MFS             0           0           0 Burton Behrendt Smith                   0      03/29/16                       05/23/16           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




EAST ISLIP UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-05-03-03
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Terrace Junior High:
11-0711   Reconstruction               0-002-017  07/05/12     DONE    DONE       DONE      01/25/12   01/19/12   09/28/11   06/20/00   8,9,155,15,16            722,120       722,120  JOD             0           0           0 Tetra Tech Architects & Engin           0      09/11/14                       09/22/14           
16-0766   Reconstruction               0-002-018                         UNREVIEWED         11/14/16   11/14/16   10/26/16   10/13/16   155,16                         0    11,061,320  BMJ             0           0           0 ECG Engineering, LLC            2,142,919        /  /                           /  /             

          Timber Point Elementary:
11-0712   Reconstruction               0-003-009  07/05/12     DONE    DONE       DONE      01/25/12   01/19/12   09/28/11   06/20/00   4,8,9,155,15,16          457,262       457,262  JOD             0           0           0 Tetra Tech Architects & Engin           0      09/11/14                       09/22/14           
16-0767   Reconstruction               0-003-010                         UNREVIEWED         11/14/16   11/14/16   10/26/16   10/13/16   155,16                         0    11,574,090  BMJ             0           0           0 ECG Engineering, LLC                    0        /  /                           /  /             

          Connetquot Elementary:
11-0713   Reconstruction               0-005-009  07/05/12     DONE    DONE       DONE      01/25/12   01/19/12   09/28/11   06/20/00   4,8,9,155,15,16          286,333       286,333  JOD             0           0           0 Tetra Tech Architects & Engin           0      09/11/14                       10/14/14           
16-0768   Reconstruction               0-005-010                         UNREVIEWED         11/14/16   11/14/16   10/26/16   10/13/16   7,155,16                       0     7,365,330  BMJ             0           0           0 ECG Engineering, LLC                    0        /  /                           /  /             

          JF Kennedy Elementary:
11-0714   Reconstruction               0-007-011  07/05/12     DONE    DONE       DONE      01/25/12   01/19/12   09/28/11   06/20/00   2,4,8,9,155,15,16        340,239       340,239  JOD             0           0           0 Tetra Tech Architects & Engin           0      09/11/14                       10/14/14           
16-0769   Reconstruction               0-007-012                         UNREVIEWED         11/14/16   11/14/16   10/26/16   10/13/16   155,16                         0    10,476,390  BMJ             0           0           0 ECG Engineering, LLC                    0        /  /                           /  /             

          Ruth Kinney Elementary:
11-0715   Reconstruction               0-008-011  07/05/12     DONE    DONE       DONE      01/25/12   01/19/12   09/28/11   06/20/00   4,8,9,155,15,16          516,794       516,794  JOD             0           0           0 Tetra Tech Architects & Engin           0      09/11/14                       10/14/14           
16-0770   Reconstruction               0-008-012                         UNREVIEWED         11/14/16   11/14/16   10/26/16   10/13/16   155,16                         0     9,781,470  BMJ             0           0           0 ECG Engineering, LLC                    0        /  /                           /  /             

          Early Childhood Center:
11-0716   Reconstruction               0-009-010  07/05/12     DONE    DONE       DONE      01/25/12   01/19/12   09/28/11   06/20/00   4,8,155,15,16            567,069       567,069  JOD             0           0           0 Tetra Tech Architects & Engin           0      09/11/14                       09/22/14           
16-0771   Reconstruction               0-009-011                         UNREVIEWED         11/14/16   11/14/16   10/27/16   10/13/16   155,16                         0     9,893,475  BMJ             0           0           0 ECG Engineering, LLC                    0        /  /                           /  /             

          East Islip Senior High:
11-0656   Reconstruction               0-010-019  04/06/12     DONE    DONE       DONE      01/12/12   01/10/12   06/30/11   11/17/11   10,16                          0             0  JOD             0           0           0 Tetra Tech Architects & Engin           0      09/11/14                       09/18/14           
11-0717   Reconstruction               0-010-020  07/05/12     DONE    DONE       DONE      01/25/12   01/19/12   09/28/11   06/20/00   2,9,155,15,16          1,312,427     1,312,427  JOD             0           0           0 Tetra Tech Architects & Engin           0      09/11/14                       09/22/14           
16-0772   Reconstruction               0-010-021                         UNREVIEWED         11/14/16   11/14/16   10/26/16   10/13/16   155,15,16                      0    41,160,288  BMJ             0           0           0 ECG Engineering, LLC                    0        /  /                           /  /             

          District-Wide:
  -    SB Alterations                  7-999-BA1               DONE                           /  /       /  /       /  /       /  /                                    0             0  BMJ             0           0           0                                         0        /  /                           /  /             
  -    SB Reconstruction               7-999-BA2                                              /  /       /  /       /  /       /  /     16                             0             0  BMJ             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




SAYVILLE UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-05-04-03
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Old Sayville Jr. High School:
15-1948   Reconstruction               0-001-008                       ADDENDUM REQ'D       06/22/16   06/20/16   10/06/15   05/19/16   2,4,8,9,155,16                 0             0  MFS             0           0           0 James M. Campbell Architects            0        /  /                           /  /             

          Greene Elementary School:
12-0943   Reconstruction               0-002-009  10/22/13     DONE    DONE       DONE      03/06/13   03/04/13   12/17/12   11/29/07   4,7,8,9,155,15,16        877,221             0  MFS             0           0           0 James M. Campbell Architects            0      04/14/15                       04/27/15           
  -       Reconstruction               0-002-011                                              /  /       /  /     12/02/16     /  /     10                             0     6,157,260  SLC             0           0           0                                         0        /  /                           /  /             

          Sunrise Drive Elementary:
  -       Reconstruction               0-003-016                                              /  /       /  /     07/24/15     /  /     2,9,155,15,16                  0    11,223,360  MFS             0           0           0                                         0        /  /                           /  /             
15-1400   Reconstruction               0-003-017  09/06/16     DONE    DONE       DONE      03/07/16   03/07/16   07/24/15   05/19/15   2,10,155                 375,000       375,000  MFS             0           0           0 James M. Campbell Architects            0        /  /                           /  /             

          Sayville High School:
14-0823   Reconstruction               0-004-024  03/06/15     DONE    DONE       DONE      12/23/14   12/22/14   08/28/14   05/20/14   2,4,16                   162,000       162,000  MFS             0           0           0 James M. Campbell Architects            0      05/21/15                       08/04/15           
14-1595   Reconstruction               0-004-025  10/01/15     DONE    DONE       DONE      06/09/15   06/05/15   03/10/15   05/19/15   155                      800,000       800,000  MFS             0           0           0 James M. Campbell Architects            0      05/09/16                       05/31/16           
15-1161   Reconstruction               0-004-026  08/12/16     DONE    DONE       DONE      02/01/16   01/28/16   07/24/15   05/19/15   2,4,8,10,13,15,16      2,433,000     2,433,000  MFS             0           0           0 James M. Campbell Architects            0        /  /                           /  /             
  -       Reconstruction               0-004-027                                              /  /       /  /     07/24/15     /  /     2,8,155,15,16                  0    27,034,272  MFS             0           0           0                                         0        /  /                           /  /             
15-1401   Reconstruction               0-004-028  09/06/16     DONE    DONE       DONE      03/07/16   03/07/16   07/24/15   05/19/15   2,10,155               1,362,000     1,362,000  MFS             0           0           0 James M. Campbell Architects            0        /  /                           /  /             

          Cherry Ave. Elementary:
14-1469   Reconstruction               0-005-012  11/13/14     DONE    DONE       DONE      05/01/15   04/30/15   12/02/14   11/24/14   10,15                    200,000       200,000  MFS             0           0           0 James M. Campbell Architects            0      06/19/15                       08/04/15           
  -       Reconstruction               0-005-013                                              /  /       /  /     07/24/15     /  /     2,9,155,15,16                  0     8,417,520  MFS             0           0           0                                         0        /  /                           /  /             
15-1402   Reconstruction               0-005-014  09/06/16     DONE    DONE       DONE      03/07/16   03/07/16   07/24/15   05/19/15   2,10,155                 845,000       845,000  MFS             0           0           0 James M. Campbell Architects            0        /  /                           /  /             
16-0669   Reconstruction               0-005-015  03/02/17     DONE    DONE       DONE      10/26/16   10/26/16   03/10/16   05/17/16   155                      650,000             0  MFS             0           0           0 James M. Campbell Architects            0        /  /                           /  /             

          Lincoln Ave. Elementary:
  -       Reconstruction               0-006-012                                              /  /       /  /     07/24/15     /  /     2,8,155,15,16                  0     9,469,710  MFS             0           0           0                                         0        /  /                           /  /             
15-1403   Reconstruction               0-006-013  09/06/16     DONE    DONE       DONE      03/07/16   03/07/16   07/24/15   05/19/15   2,10,155               1,347,000     1,347,000  MFS             0           0           0 James M. Campbell Architects            0        /  /                           /  /             
16-0670   Reconstruction               0-006-014  03/02/17     DONE    DONE       DONE      10/26/16   10/26/16   03/10/16   05/17/16   155                      150,000             0  MFS             0           0           0 James M. Campbell Architects            0        /  /                           /  /             

          Sayville Middle School:
14-1382   Reconstruction               0-008-018  05/21/15     DONE    DONE       DONE      04/08/15   04/03/15   03/10/15   05/19/15   7                      3,800,000     3,800,000  MFS             0           0           0 James M. Campbell Architects            0        /  /                           /  /             
15-0499   Reconstruction               0-008-019  10/09/15     DONE    DONE       DONE      09/25/15   09/24/15   07/24/15   05/19/15   155                      650,000       650,000  MFS             0           0           0 James M. Campbell Architects            0        /  /                           /  /             
  -       Reconstruction               0-008-020                                              /  /       /  /     07/24/15     /  /     2,8,9,155,15,16                0    32,034,304  MFS             0           0           0                                         0        /  /                           /  /             
15-1404   Reconstruction               0-008-021  09/06/16     DONE    DONE       DONE      03/07/16   03/07/16   07/24/15   05/19/15   2,10,155                 416,000       416,000  MFS             0           0           0 James M. Campbell Architects            0        /  /                           /  /             

          Administration Bldg:
15-1405   Reconstruction               1-011-006  09/06/16     DONE    DONE       DONE      03/08/16   03/08/16   07/24/15   05/19/15   2,10,155                 785,000             0  MFS             0           0           0 James M. Campbell Architects            0        /  /                           /  /             

          HS Sports Stor #1:
12-0948DB Discovered Building          2-019-001  03/08/13     DONE    DONE       DONE      03/08/13   02/27/13   10/07/11     /  /                                    0             0  JOD             0           0           0                                         0        /  /                           /  /             

          HS Sports Stor #2:
12-0949DB Discovered Building          2-020-001  03/08/13     DONE    DONE       DONE      03/08/13   02/27/13   10/07/11     /  /                                    0             0  JOD             0           0           0                                         0        /  /                           /  /             

          MS Drama Stor:
11-1309DB Discovered Building          2-021-001  05/22/12     DONE    DONE       DONE      05/22/12   05/04/12   10/07/11     /  /                                    0             0  JOD             0           0           0                                         0        /  /                           /  /             

          Cherry Avenue Storage Shed:
12-0947DB Discovered Building          2-022-001  03/08/13     DONE    DONE       DONE      03/08/13   02/27/13   10/14/11     /  /     02 - 16                        0             0  JOD             0           0           0                                         0        /  /                           /  /             

          District-Wide:
13-0167   Reconstruction               7-999-005  12/24/13     DONE    DONE       DONE      08/07/13   08/05/13   07/29/13   05/21/13   16                       500,000       500,000  MFS             0           0           0 James M. Campbell Architects            0      08/22/14                       09/03/14           
  -       Reconstruction               7-999-006                                              /  /       /  /     03/21/16     /  /     13,16                          0             0  MFS             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               7-999-007                                              /  /       /  /     08/03/16     /  /     13,16                          0             0  AAA             0           0           0                                         0        /  /                           /  /             
16-0194SB Reconstruction               7-999-007               DONE                           /  /       /  /     08/03/16     /  /     13,16                          0             0  AAA             0           0           0                                         0        /  /                           /  /             
  -    SB Reconstruction               7-999-BA1               DONE                           /  /       /  /       /  /       /  /     13                             0             0  AAA             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




BAYPORT BLUE POINT UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-05-05-02
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Bayport Blue Point Elementary:
11-1268   Reconstruction               0-001-016  11/21/12     DONE    DONE       DONE      05/07/12   05/04/12   03/08/12   02/07/12   2,155,15,16              778,743       778,743  DDJ             0           0           0 ECG Engineering, LLC              778,743      06/15/15                       07/06/15           
15-1290   Reconstruction               0-001-017  03/31/16     DONE    DONE       DONE      02/25/16   02/17/16   01/19/16   11/17/15   4,7                      507,000       507,000  DDJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
16-0416   Reconstruction               0-001-018               DONE    UNREVIEWED DONE      09/13/16   09/13/16   03/09/16   11/17/15   2,8,9,16                       0     6,358,578  DDJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          Academy Street Elementary:
11-1269   Reconstruction               0-002-015  11/21/12     DONE    DONE       DONE      05/07/12   05/04/12   03/08/12   02/07/12   2,155,15,16              367,367       367,367  DDJ             0           0           0 ECG Engineering, LLC              367,367      06/15/15                       07/06/15           
16-0417   Reconstruction               0-002-016               DONE    UNREVIEWED DONE      09/13/16   09/13/16   03/09/16   11/17/15   2,8,9,16                       0     9,255,366  DDJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          Bayport High School:
11-1270   Reconstruction               0-004-020  11/21/12     DONE    DONE       DONE      05/07/12   05/04/12   03/08/12   02/07/12   2,8,155,15,16          1,298,166     1,298,166  DDJ             0           0           0 ECG Engineering, LLC            1,298,166      06/15/15                       07/06/15           
15-1291   Reconstruction               0-004-021  03/31/16     DONE    DONE       DONE      02/25/16   02/17/16   01/19/16   11/17/15   2,4,7,8,9,10           4,369,513     4,369,513  DDJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
16-0418   Reconstruction               0-004-022               DONE    UNREVIEWED DONE      09/13/16   09/13/16   03/09/16   11/17/15   2,8,9,16                       0    21,310,858  DDJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          Sylvan Avenue Elementary:
11-1271   Reconstruction               0-006-011  11/21/12     DONE    DONE       DONE      05/07/12   05/04/12   03/08/12   02/07/12   2,8,155,15,16            983,113       983,113  DDJ             0           0           0 ECG Engineering, LLC              983,113      06/15/15                       07/06/15           
16-0419   Reconstruction               0-006-012               DONE    UNREVIEWED DONE      09/13/16   09/13/16   03/09/16   11/17/15   2,8,9,16                       0    11,184,390  DDJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
16-0314   Reconstruction               0-006-013                         UNREVIEWED         08/24/16   08/24/16   03/09/16   11/17/15   2,7,16                         0    11,184,390  DDJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          J. W. Young Jr. High School:
11-1272   Reconstruction               0-011-012  11/21/12     DONE    DONE       DONE      05/07/12   05/04/12   03/08/12   02/07/12   2,4,8,155,15             889,412       889,412  DDJ             0           0           0 ECG Engineering, LLC              889,412      06/15/15                       07/06/15           
16-0420   Reconstruction               0-011-013               DONE    UNREVIEWED DONE      09/13/16   09/13/16   03/09/16   11/17/15   2,8,9,16                       0    17,650,900  DDJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
16-0367   Reconstruction               0-011-014               STARTED UNREVIEWED STARTED   09/02/16   09/02/16   03/09/16   11/17/15   2,4,8,9,10,155,15,16           0    17,650,900  DDJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          Barn:
11-1273   Reconstruction               2-012-003  11/21/12     DONE    DONE       DONE      05/07/12   05/04/12   03/08/12   02/07/12   8,15,16                   86,459             0  DDJ             0           0           0 ECG Engineering, LLC               86,459      06/15/15                       07/08/15           

          Container @ HS:
13-1588DB Discovered Building          2-017-001  07/03/14     DONE    DONE       DONE      05/29/14   05/29/14   05/29/14     /  /                                    0             0  DDJ             0           0           0                                         0        /  /                           /  /             

          Container @ Academy St Elem School:
13-1589DB Discovered Building          2-018-001  07/03/14     DONE    DONE       DONE      05/29/14   05/29/14   05/29/14     /  /                                    0             0  DDJ             0           0           0                                         0        /  /                           /  /             

          Container @ JW Young Jr HS:
13-1590DB Discovered Building          2-019-001  07/03/14     DONE    DONE       DONE      05/29/14   05/29/14   05/29/14     /  /                                    0             0  DDJ             0           0           0                                         0        /  /                           /  /             

          District-Wide:
16-1477   Reconstruction               7-999-002                         UNREVIEWED         03/07/17   03/07/17   01/17/17   11/04/14   16                             0             0  DDJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
  -    XX Reconstruction               7-999-BA1                         CANCELLED            /  /       /  /       /  /       /  /     13                             0             0  DDJ             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




HAUPPAUGE UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-05-06-03
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Middle School:
11-0751   Reconstruction               0-002-027  06/25/12     DONE    DONE       DONE      02/02/12   02/01/12   01/19/11   10/15/08   2,9,155,16               647,460       647,460  JOD             0           0           0 John A. Grillo                          0      03/01/13                       03/05/14           
14-0288   Reconstruction               0-002-028  03/31/15     DONE    DONE       DONE      09/12/14   09/12/14   07/01/14   05/20/14   16                       200,000       200,000  MFS             0           0           0 John A. Grillo                          0      05/24/16                       06/30/16           
16-0513   Reconstruction               0-002-029               DONE    UNREVIEWED STARTED   09/28/16   09/28/16   05/20/16   05/17/16   2,7,8,9,10,155,15,16           0    10,093,792  MFS             0           0           0 John A. Grillo                          0        /  /                           /  /             

          Pines Elementary School:
12-0739   Reconstruction               0-006-021  08/09/13     DONE    DONE       DONE      01/31/13   01/30/13   10/18/12   05/15/12   2,4,9,155,15,16          971,765       971,765  JMB             0           0           0 John A. Grillo                          0      08/29/14                       10/01/14           
13-0813   Reconstruction               0-006-022  04/01/14     DONE    DONE       DONE      12/03/13   11/25/13   06/13/13   05/21/13   8,9,16                    21,000        21,000  MFS             0           0           0 John A. Grillo                          0      03/06/15                       03/31/15           

          Bretton Woods Elementary:
13-0814   Reconstruction               0-007-021  04/01/14     DONE    DONE       DONE      12/03/13   11/25/13   06/13/13   05/21/13   2,8,9,16                 271,000       271,000  MFS             0           0           0 John A. Grillo                          0      03/06/15                       03/31/15           
13-0649   Reconstruction               0-007-022  04/21/14     DONE    DONE       DONE      10/30/13   10/28/13   10/30/13   05/17/11   9,155,16                 204,110       204,110  MFS             0           0           0 John A. Grillo                          0      03/06/15                       03/31/15           

          Hauppauge High School:
11-0752   Reconstruction               0-008-041  06/25/12     DONE    DONE       DONE      02/02/12   02/01/12   12/01/11   10/15/08   7,9,155,16               468,460       468,460  JOD             0           0           0 John A. Grillo                          0      03/01/13                       03/05/14           
12-0740   Reconstruction               0-008-042  08/09/13     DONE    DONE       DONE      01/31/13   01/30/13   10/18/12   05/15/12   2                        250,000       250,000  JMB             0           0           0 John A. Grillo                          0      08/29/14                       10/01/14           
13-0815   Reconstruction               0-008-043  04/01/14     DONE    DONE       DONE      12/03/13   11/25/13   06/13/13   05/21/13   2,8,9,10,155,15,16       607,494       607,494  MFS             0           0           0 John A. Grillo                          0      03/06/15                       03/31/15           
14-0289   Reconstruction               0-008-044  03/31/15     DONE    DONE       DONE      09/12/14   09/12/14   05/28/14   05/20/14   2,4,7,8,9,10,155,15,     186,166       186,166  MFS             0           0           0 John A. Grillo                          0      09/15/15                       10/19/15           
14-0412   Reconstruction               0-008-045  08/16/14     DONE    DONE       DONE      10/06/14   10/06/14   08/14/14   08/18/14   7                        902,335       902,335  MFS             0           0           0 John A. Grillo - Architect PC           0      02/27/15                       03/23/15           
15-0266   Reconstruction               0-008-046  11/02/15     DONE    DONE       DONE      08/06/15   07/31/15   04/23/15   05/19/15   2,9                    1,700,000     1,700,000  MFS             0           0           0 John A. Grillo                          0      08/19/16                       09/09/16           

          Forest Brook Elementary:
12-0741   Reconstruction               0-010-017  08/09/13     DONE    DONE       DONE      01/31/13   01/30/13   10/18/12   05/15/12   2,4,9,155,15,16        1,042,720     1,042,720  JMB             0           0           0 John A. Grillo                          0      08/29/14                       10/01/14           
13-0816   Reconstruction               0-010-018  04/01/14     DONE    DONE       DONE      12/03/13   11/25/13   06/13/13   05/21/13   8,9,16                    21,000        21,000  MFS             0           0           0 John A. Grillo                          0      03/06/15                       03/31/15           

          Whiporwil Dist.Office/Storage:
13-0357   Reconstruction               2-004-016  12/13/13     DONE    DONE       DONE      09/11/13   09/11/13   06/13/13   05/21/13   2,8                      665,000             0  MFS             0           0           0 John A. Grillo                          0      10/05/15                       10/26/15           
13-0817   Reconstruction               2-004-017  04/01/14     DONE    DONE       DONE      12/03/13   11/25/13   12/02/13   05/21/13   8,9,16                    21,000             0  MFS             0           0           0 John A. Grillo                          0      03/06/15                       03/31/15           
14-0290   Reconstruction               2-004-018  03/24/15     DONE    DONE       DONE      09/12/14   09/12/14   05/28/14   05/20/14   2,8                      665,000             0  MFS             0           0           0 John A. Grillo                          0        /  /                           /  /             
14-1717   Reconstruction               2-004-019  09/03/15     DONE    DONE       DONE      06/23/15   06/19/15   04/23/15   05/19/15   2,155,15,16              450,000             0  MFS             0           0           0 John A. Grillo                          0        /  /                           /  /             

          District-Wide:
13-1230   Reconstruction               7-999-005  08/12/14     DONE    DONE       DONE      02/13/14   02/13/14   02/13/14   10/15/08   16                       444,619       444,619  MFS             0           0           0 John A. Grillo                          0      05/24/16                       06/30/16           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




CONNETQUOT CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-05-07-06
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Sycamore Avenue Elementary:
12-0793   Reconstruction               0-001-015  06/26/13     DONE    DONE       DONE      02/08/13   01/29/13   11/24/10   02/01/11   2,4,8,9,14,155,15,16     900,151       900,151  DDJ             0           0           0 Wiedersum Associates Architec           0      09/01/15                       11/09/15           
14-0891   Reconstruction               0-001-016  01/28/16     DONE    DONE       DONE      12/30/14   12/26/14   05/08/14   03/25/14   2,4,155,16               859,876       859,876  MFS             0           0           0 Wiedersum Associates Architec           0        /  /                           /  /             

          John Pearl Elementary School:
12-0794   Reconstruction               0-002-018  03/04/14     DONE    DONE       DONE      02/08/13   01/29/13   11/24/10   02/01/11   2,4,8,9,14,155,15,16      41,246        41,246  MFS             0           0           0 Wiedersum Associates Architec           0      09/01/15                       09/06/16           
14-0892   Reconstruction               0-002-019  01/28/16     DONE    DONE       DONE      12/30/14   12/26/14   05/08/14   03/25/14   2,8,9,155,16             721,000       721,000  MFS             0           0           0 Wiedersum Associates Architec           0        /  /                           /  /             

          Edith L Slocum Elementary:
12-0852   Reconstruction               0-004-021  10/11/13     DONE    DONE       DONE      02/15/13   02/14/13   11/24/10   02/01/11   2,4,8,9,14,155,15,16     447,768       447,768  MFS             0           0           0 Wiedersum Associates Architec           0      09/01/15                       11/09/15           
13-0252   Reconstruction               0-004-022  11/29/13     DONE    DONE       DONE      08/20/13   08/13/13   05/09/13   05/20/08                            355,000       355,000  MFS             0           0           0 Wiedersum Associates Architec           0      06/23/14                       10/27/14           
  -       Reconstruction               0-004-023                                              /  /       /  /     05/29/13     /  /     155                            0     8,232,390  MFS             0           0           0                                         0        /  /                           /  /             
14-0893   Reconstruction               0-004-024  01/28/16     DONE    DONE       DONE      12/30/14   12/26/14   05/08/14   03/25/14   2,4,8,9,155,16         1,197,617     1,197,617  MFS             0           0           0 Wiedersum Associates Architec           0        /  /                           /  /             

          Helen B Duffield Elementary:
12-0853   Reconstruction               0-005-019  10/11/13     DONE    DONE       DONE      02/15/13   02/14/13   11/24/10   02/01/11   2,4,8,9,14,155,15,16     745,150       745,150  DDJ             0           0           0 Wiedersum Associates Architec           0      09/01/15                       11/09/15           
14-0894   Reconstruction               0-005-020  01/28/16     DONE    DONE       DONE      12/30/14   12/26/14   05/08/14   03/25/14   2,4,9,155,16             780,501       780,501  MFS             0           0           0 Wiedersum Associates Architec           0        /  /                           /  /             

          Arthur Premm Learning Center:
12-0854   Reconstruction               0-006-009  10/11/13     DONE    DONE       DONE      02/15/13   02/14/13   11/22/10   02/01/11   2,4,8,9,14,155,15,16     173,950       173,950  MFS             0           0           0 Wiedersum Associates Architec           0        /  /                           /  /             
13-0994   Reconstruction               0-006-010  04/23/14     DONE    DONE       DONE      01/13/14   01/09/14   10/21/13   05/15/09   15                       250,000       250,000  MFS             0           0           0 Wiedersum Associates Architec           0      05/22/15                       07/06/15           
14-0895   Reconstruction               0-006-011  01/28/16     DONE    DONE       DONE      12/30/14   12/26/14   05/08/14   03/25/14   4,9,16                   438,091       438,091  MFS             0           0           0 Wiedersum Associates Architec           0        /  /                           /  /             

          Connetquot High School:
14-0896   Reconstruction               0-007-036  01/28/16     DONE    DONE       DONE      12/30/14   12/26/14   05/08/14   03/25/14   2,4,8,9,155,15,16      3,669,376     3,669,376  MFS             0           0           0 Wiedersum Associates Architec           0        /  /                           /  /             

          Idle Hour Elementary:
12-0855   Reconstruction               0-009-014  10/11/13     DONE    DONE       DONE      02/15/13   02/14/13   11/24/10   02/01/11   2,4,8,9,14,155,15,16     436,750       436,750  MFS             0           0           0 Wiedersum Associates Architec           0      09/01/15                       11/09/15           
14-0897   Reconstruction               0-009-015  01/28/16     DONE    DONE       DONE      12/30/14   12/26/14   05/08/14   03/25/14   2,4,9,155,16           1,480,584     1,480,584  MFS             0           0           0 Wiedersum Associates Architec           0        /  /                           /  /             

          Oakdale-Bohemia Jr. High:
12-0795   Reconstruction               0-010-021  03/04/14     DONE    DONE       DONE      02/08/13   01/29/13   11/22/10   02/01/11   2,4,7,8,9,14,155,15,   1,237,160     1,237,160  MFS             0           0           0 Wiedersum Associates Architec           0      09/01/15                       11/09/15           
12-0953   Reconstruction               0-010-022  06/17/13     DONE    DONE       DONE      03/11/13   03/08/13   01/31/13   05/15/12   8,16                      40,000        40,000  MFS             0           0           0 Wiedersum Associates Architec           0      09/03/13                       09/26/13           
  -       Reconstruction               0-010-023                                              /  /       /  /     08/09/13     /  /     155,15                         0    23,528,448  MFS             0           0           0                                         0        /  /                           /  /             
14-0898   Reconstruction               0-010-024  01/28/16     DONE    DONE       DONE      12/30/14   12/26/14   05/08/14   03/25/14   2,4,8,9,155,16         1,310,170     1,310,170  MFS             0           0           0 Wiedersum Associates Architec           0        /  /                           /  /             

          Ronkonkoma Junior High:
12-0796   Reconstruction               0-011-023  03/04/14     DONE    DONE       DONE      02/08/13   01/29/13   11/22/10   02/01/11   2,4,7,8,9,14,155,15,   1,418,477     1,418,477  DDJ             0           0           0 Wiedersum Associates Architec           0      09/01/15                       11/09/15           
12-0954   Reconstruction               0-011-025  06/17/13     DONE    DONE       DONE      03/11/13   03/08/13   01/30/13   05/15/12   8,16                      40,000        40,000  MFS             0           0           0 Wiedersum Associates Architec           0      09/03/13                       09/26/13           
14-0899   Reconstruction               0-011-026  01/28/16     DONE    DONE       DONE      12/30/14   12/26/14   05/08/14   03/25/14   2,4,8,9,155,16         1,301,931     1,301,931  MFS             0           0           0 Wiedersum Associates Architec           0        /  /                           /  /             

          Cherokee St Elementary:
12-0797   Reconstruction               0-012-017  03/04/14     DONE    DONE       DONE      02/08/13   01/29/13   11/24/10   02/01/11   2,4,8,9,14,155,15,16     652,750       652,750  MFS             0           0           0 Wiedersum Associates Architec           0      09/01/15                       11/09/15           
12-0955   Reconstruction               0-012-018  06/17/13     DONE    DONE       DONE      03/11/13   03/08/13   01/31/13   05/15/12   8,16                      30,000        30,000  MFS             0           0           0 Wiedersum Associates Architec           0      09/03/13                       09/26/13           
  -       Reconstruction               0-012-019                                              /  /       /  /     05/29/13     /  /     155                            0    12,182,985  MFS             0           0           0                                         0        /  /                           /  /             
14-0900   Reconstruction               0-012-020  01/28/16     DONE    DONE       DONE      12/30/14   12/26/14   05/08/14   03/25/14   2,4,9,155,16           1,288,007     1,288,007  MFS             0           0           0 Wiedersum Associates Architec           0        /  /                           /  /             

          Edward J Bosti School:
12-0798   Reconstruction               0-013-014  03/04/14     DONE    DONE       DONE      02/08/13   01/29/13   11/23/10   02/01/11   2,4,8,9,14,155,15,16     136,750       136,750  MFS             0           0           0 Wiedersum Associates Architec           0        /  /                           /  /             
12-0956   Reconstruction               0-013-016  06/17/13     DONE    DONE       DONE      03/11/13   03/08/13   01/31/13   05/15/12   8,16                      30,000        30,000  MFS             0           0           0 Wiedersum Associates Architec           0      09/03/13                       09/26/13           
14-0901   Reconstruction               0-013-017  01/28/16     DONE    DONE       DONE      12/30/14   12/26/14   05/08/14   03/25/14   2,4,9,155,16           1,852,847     1,852,847  MFS             0           0           0 Wiedersum Associates Architec           0        /  /                           /  /             

          Field Storage Container:
12-0116DB Discovered Building          2-022-001  08/24/12     DONE    DONE       DONE      08/24/12   08/24/12   11/16/11     /  /                                    0             0  DDJ             0           0           0 Wiedersum Associates Architec           0        /  /                           /  /             

          Bus Garage/Adm(frmrly Admin_):
12-0856   Additions and Alterations    5-015-013  10/11/13     DONE    DONE       DONE      02/15/13   02/14/13   03/25/11   02/01/11   02 - 16                1,276,800     1,276,800  MFS             0           0           0 Wiedersum Associates Architec           0      04/08/15                       07/06/15           

          Connetquot Public Library:
13-0141   Reconstruction               6-016-004  08/29/13     DONE    DONE       DONE      08/06/13   08/06/13   04/12/13   07/18/13   4,7,8,9,14,15,16         165,500             0  MFS             0           0           0 Burton Behrendt Smith                   0      01/31/14                       04/03/14           
14-0689   Reconstruction               6-016-005  10/07/15     DONE    DONE       DONE      12/01/14   11/26/14   10/20/14     /  /     4,8,9,155,16             213,324             0  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
15-0863   Reconstruction               6-016-006  12/16/15     DONE    DONE       DONE      12/11/15   12/11/15   11/24/15     /  /     8,9,10                    72,925             0  MFS             0           0           0                                         0        /  /                           /  /             

          District-Wide:
  -    SB Reconstruction               7-999-BA1               DONE                           /  /       /  /       /  /       /  /     13                             0             0  MFS             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




WEST ISLIP UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-05-09-03
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Manetuck Elementary:
15-1265   Reconstruction               0-003-016  04/15/16     DONE    DONE       DONE      02/18/16   02/18/16   01/27/16   11/17/15   2,7                    2,156,000     2,156,000  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
16-0100   Reconstruction               0-003-017  11/15/16     DONE    DONE       DONE      07/14/16   07/14/16   03/25/16   11/17/15   9                         37,000        37,000  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
16-0690   Reconstruction               0-003-018               DONE    DONE       ADD. REQ'D11/01/16   10/17/16   10/26/16   11/17/15   8                              0     7,365,330  BMJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
  -       Reconstruction               0-003-019                                              /  /       /  /     12/20/16     /  /     2,4,8,15,16                    0     7,365,330  BMJ             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-003-020                                              /  /       /  /     01/18/17     /  /     2,4,8,9,155,16                 0             0  BMJ             0           0           0                                         0        /  /                           /  /             

          Masera Elementary School:
12-1008   Reconstruction               0-004-010  04/09/13     DONE    DONE       DONE      03/21/13   03/18/13   02/15/13   12/13/12   2,16                     800,000             0  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          Paul J. Bellew Elementary:
15-1266   Reconstruction               0-005-019  04/11/16     DONE    DONE       DONE      02/18/16   02/18/16   01/27/16   11/17/15   2,7                    2,355,000     2,355,000  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
16-0101   Reconstruction               0-005-020  11/15/16     DONE    DONE       DONE      07/14/16   07/14/16   03/25/16   11/17/15   9                        162,000       162,000  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
16-0691   Reconstruction               0-005-021               DONE    DONE       ADD. REQ'D11/01/16   10/17/16   10/26/16   11/17/15   8,9,10                         0     7,365,330  BMJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
  -       Reconstruction               0-005-022                                              /  /       /  /     12/20/16     /  /     2,4,8,15,16                    0     7,365,330  BMJ             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-005-023                                              /  /       /  /     01/18/17     /  /     2,4,8,9,155,16                 0             0  BMJ             0           0           0                                         0        /  /                           /  /             

          Udall Road Jr. High School:
16-0692   Reconstruction               0-007-015               DONE    DONE       ADD. REQ'D11/01/16   10/17/16   10/26/16   11/17/15   8,10                           0    17,320,190  BMJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
  -       Reconstruction               0-007-016                                              /  /       /  /     12/14/16     /  /     2,4,8,10,15,16                 0    17,320,190  BMJ             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-007-017                                              /  /       /  /     01/18/17     /  /     2,4,8,9,155,16                 0             0  BMJ             0           0           0                                         0        /  /                           /  /             

          West Islip Senior High School:
12-0999   Reconstruction               0-008-029  06/12/13     DONE    DONE       DONE      03/20/13   03/20/13   02/15/13   12/13/12   2                      1,220,000     1,220,000  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
16-0693   Reconstruction               0-008-030               DONE    DONE       ADD. REQ'D11/01/16   10/17/16   10/26/16   11/17/15   7,155                          0    36,512,504  BMJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
  -       Reconstruction               0-008-031                                              /  /       /  /     12/14/16     /  /     2,4,8,10,15,16                 0    36,512,504  BMJ             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-008-032                                              /  /       /  /     01/18/17     /  /     2,4,8,9,155,16                 0             0  BMJ             0           0           0                                         0        /  /                           /  /             

          Westbrook ES (leased to others 2013):
15-1721   Reconstruction               0-009-016  06/07/16     DONE    DONE       DONE      05/13/16   05/10/16   03/25/16   04/19/16   15                     1,200,000             0  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          Beach Street Middle School:
16-0694   Reconstruction               0-010-021               DONE    DONE       ADD. REQ'D11/01/16   10/17/16   10/26/16   11/17/15   8,10                           0    18,432,512  BMJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
  -       Reconstruction               0-010-022                                              /  /       /  /     12/14/16     /  /     2,4,8,10,15,16                 0    18,432,512  BMJ             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-010-023                                              /  /       /  /     01/18/17     /  /     2,4,8,9,155,16                 0             0  BMJ             0           0           0                                         0        /  /                           /  /             

          Bayview School:
12-1000   Reconstruction               0-011-014  06/12/13     DONE    DONE       DONE      03/20/13   03/20/13   02/15/13   12/13/12   2                        500,000       500,000  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
16-0102   Reconstruction               0-011-015  11/15/16     DONE    DONE       DONE      07/14/16   07/14/16   03/25/16   11/17/15   9                        162,000       162,000  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
16-0696   Reconstruction               0-011-016               DONE    DONE       ADD. REQ'D11/01/16   10/17/16   11/01/16   11/17/15   8                              0    11,678,010  BMJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
  -       Reconstruction               0-011-017                                              /  /       /  /     12/20/16     /  /     2,4,8,15,16                    0    11,678,010  BMJ             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-011-018                                              /  /       /  /     01/18/17     /  /     2,4,8,9,155,16                 0             0  BMJ             0           0           0                                         0        /  /                           /  /             

          Oquenock School:
16-0103   Reconstruction               0-012-017  11/15/16     DONE    DONE       DONE      07/14/16   07/14/16   03/25/16   11/17/15   9                         37,000        37,000  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
16-0695   Reconstruction               0-012-018               DONE    DONE       ADD. REQ'D11/01/16   10/17/16   10/26/16   11/17/15   8                              0    11,678,010  BMJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
  -       Reconstruction               0-012-019                                              /  /       /  /     12/20/16     /  /     2,4,8,15,16                    0    11,678,010  BMJ             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-012-020                                              /  /       /  /     01/18/17     /  /     2,4,8,9,155,16                 0             0  BMJ             0           0           0                                         0        /  /                           /  /             

          West Islip Public Library:
15-2010   Reconstruction               6-013-005  12/06/16     DONE    DONE       DONE      06/29/16   06/29/16   05/25/16     /  /     9,10,155,16              150,000             0  MFS             0           0           0 Paul Cataldo Architecture & P           0        /  /                           /  /             

          District-Wide:
15-1732SB Reconstruction               7-999-007                         UNREVIEWED         05/16/16   05/16/16   05/16/16     /  /     13,16                          0             0  MFS             0           0           0                                         0        /  /                           /  /             
16-0648   Reconstruction               7-999-007                       ADDENDUM REQ'D       10/18/16   10/14/16   05/16/16   08/30/16   13,16                          0             0  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
  -    SB Reconstruction               7-999-BA1               DONE                           /  /       /  /       /  /       /  /     13                             0             0  MFS             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




BRENTWOOD UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-05-12-03
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Ross/Sonderling High School:
11-0321   Reconstruction               0-002-012  05/29/12     DONE    DONE       DONE      11/02/11   10/26/11   03/25/10   02/17/11   2,155,15,16            1,383,837     1,383,837  HCM             0           0           0 Tetra Tech Architects & Engin   1,383,837      04/11/16                       05/31/16           
11-1213   Reconstruction               0-002-013  05/11/12     DONE    DONE       DONE      04/26/12   04/25/12   04/14/11   12/12/06   155,16                   672,979       672,979  HCM             0           0           0 Tetra Tech Architects & Engin           0      01/07/14                       10/27/14           
15-0172   Reconstruction               0-002-015  07/28/15     DONE    DONE       DONE      07/27/15   07/24/15   05/21/15   07/01/15   15                       100,000       100,000  JMB             0           0           0 Tetra Tech Architects & Engin           0      01/30/17                       03/20/17           

          Southeast Elementary:
11-0322   Reconstruction               0-003-010  05/29/12     DONE    DONE       DONE      11/02/11   10/26/11   04/14/11   02/17/11   2,9,155,16               661,318       661,318  HCM             0           0           0 Tetra Tech Architects & Engin     661,318      04/11/16                       05/31/16           
11-1217   Reconstruction               0-003-011  12/10/12     DONE    DONE       DONE      04/26/12   04/25/12   03/20/12   12/12/06   2,9,155,16               135,000       135,000  HCM             0           0      20,250 Tetra Tech Architects & Engin           0        /  /                           /  /             

          Southwest Elementary:
11-0323   Reconstruction               0-004-010  05/29/12     DONE    DONE       DONE      11/02/11   10/26/11   04/14/11   02/17/11   2,9,155,16             1,374,290     1,374,290  HCM             0           0           0 Tetra Tech Architects & Engin   1,374,290      04/11/16                       05/31/16           
11-1218   Reconstruction               0-004-011  12/10/12     DONE    DONE       DONE      04/26/12   04/25/12   03/20/12   12/12/06   2,9,155,16               320,000       320,000  HCM             0           0      48,000 Tetra Tech Architects & Engin           0      08/12/14                       10/27/14           

          South Middle School:
11-0324   Reconstruction               0-005-013  05/29/12     DONE    DONE       DONE      11/02/11   10/26/11   04/14/11   02/17/11   2,9,155,16             1,493,831     1,493,831  HCM             0           0           0 Tetra Tech Architects & Engin   1,493,831      04/11/16                       05/31/16           
11-1219   Reconstruction               0-005-014  12/10/12     DONE    DONE       DONE      04/26/12   04/25/12   03/20/12   12/12/06   155,16                    55,000        55,000  HCM             0           0       8,250 Tetra Tech Architects & Engin           0        /  /                           /  /             

          Northeast Elementary:
11-0325   Reconstruction               0-007-009  05/29/12     DONE    DONE       DONE      11/02/11   10/26/11   04/14/11   02/17/11   2,9,155,16             1,168,892     1,168,892  JMB             0           0           0 Tetra Tech Architects & Engin   1,168,892      04/11/16                       05/31/16           
11-1220   Reconstruction               0-007-010  12/10/12     DONE    DONE       DONE      04/26/12   04/25/12   03/20/12   12/12/06   155,16                   260,000       260,000  HCM             0           0      39,000 Tetra Tech Architects & Engin           0      08/12/14                       10/27/14           

          North Elementary:
11-0326   Reconstruction               0-008-008  05/29/12     DONE    DONE       DONE      11/02/11   10/26/11   04/14/11   02/17/11   2,9,155,16             1,226,520     1,226,520  HCM             0           0           0 Tetra Tech Architects & Engin   1,226,520      04/11/16                       05/31/16           
11-1221   Reconstruction               0-008-009  12/10/12     DONE    DONE       DONE      04/26/12   04/25/12   03/20/12   12/12/06   155,16                   790,000       790,000  HCM             0           0     118,500 Tetra Tech Architects & Engin           0      08/12/14                       10/27/14           

          East ES (K):
11-0327   Reconstruction               0-009-009  05/29/12     DONE    DONE       DONE      11/02/11   10/26/11   04/14/11   02/17/11   2,9,155,16               726,828       726,828  HCM             0           0           0 Tetra Tech Architects & Engin     726,828      04/11/16                       05/31/16           
11-1222   Reconstruction               0-009-010  12/10/12     DONE    DONE       DONE      04/26/12   04/25/12   03/20/12   12/12/06   7,155,16                 502,000       502,000  HCM             0           0      75,300 Tetra Tech Architects & Engin           0      08/12/14                       10/27/14           

          Freshman Center:
11-0328   Reconstruction               0-010-010  05/29/12     DONE    DONE       DONE      11/02/11   10/26/11   04/14/11   02/17/11   2,9,155,16               635,537       635,537  HCM             0           0           0 Tetra Tech Architects & Engin     635,537      04/11/16                       05/31/16           
11-1214   Reconstruction               0-010-011  05/11/12     DONE    DONE       DONE      04/26/12   04/25/12   03/13/12   12/12/06   7                      1,943,565     1,943,565  HCM             0           0     291,535 Tetra Tech Architects & Engin           0      09/22/15                       11/27/15           
11-1223   Reconstruction               0-010-012  12/10/12     DONE    DONE       DONE      04/26/12   04/25/12   03/20/12   12/12/06   2,155,15,16              500,000       500,000  HCM             0           0      75,000 Tetra Tech Architects & Engin           0      08/12/14                       10/27/14           

          North Middle School:
11-0329   Reconstruction               0-011-011  05/29/12     DONE    DONE       DONE      11/02/11   10/26/11   04/15/11   02/17/11   2,9,155,16               966,917       966,917  HCM             0           0           0 Tetra Tech Architects & Engin     966,917      04/12/16                       04/12/16           

          Loretta Park Elementary:
11-0330   Reconstruction               0-012-007  05/31/12     DONE    DONE       DONE      11/02/11   10/26/11   04/15/11   02/17/11   2,9,155,16               876,702       876,702  HCM             0           0           0 Tetra Tech Architects & Engin     876,702      04/12/16                       05/31/16           
11-1224   Reconstruction               0-012-008  12/10/12     DONE    DONE       DONE      04/26/12   04/25/12     /  /     12/12/06   7,155,16                 505,000       505,000  HCM             0           0      75,750 Tetra Tech Architects & Engin           0      08/12/14                       10/27/14           

          Pine Park Elementary:
11-0331   Reconstruction               0-013-008  05/29/12     DONE    DONE       DONE      11/02/11   10/26/11   04/15/11   02/17/11   2,9,155,16               721,144       721,144  HCM             0           0           0 Tetra Tech Architects & Engin     721,144      04/12/16                       05/31/16           
11-1225   Reconstruction               0-013-009  12/10/12     DONE    DONE       DONE      04/26/12   04/25/12   03/20/12   12/12/06   7,155,16                 520,000       520,000  HCM             0           0      78,000 Tetra Tech Architects & Engin           0      08/12/14                       10/27/14           

          Oak Park Elementary:
11-0332   Reconstruction               0-014-009  05/29/12     DONE    DONE       DONE      11/02/11   10/26/11   04/15/11   02/17/11   2,9,155,16               914,430       914,430  HCM             0           0           0 Tetra Tech Architects & Engin     914,430      04/12/16                       05/31/16           
11-1226   Reconstruction               0-014-010  12/10/12     DONE    DONE       DONE      04/26/12   04/25/12   03/20/12   12/12/06   7,155,16                 500,000       500,000  HCM             0           0      75,000 Tetra Tech Architects & Engin           0      08/12/14                       10/27/14           

          West Middle School:
11-0333   Reconstruction               0-015-010  05/29/12     DONE    DONE       DONE      11/02/11   10/26/11   04/15/11   02/17/11   2,9,155,16             1,181,455     1,181,455  HCM             0           0           0 Tetra Tech Architects & Engin   1,181,455      04/12/16                       05/31/16           
11-1227   Reconstruction               0-015-011  12/10/12     DONE    DONE       DONE      04/26/12   04/25/12   03/20/12   12/12/06   16                       383,768       383,768  HCM             0           0           0 Tetra Tech Architects & Engin           0      08/12/14                       10/27/14           

          Sounderling Sr High:
11-0334   Reconstruction               0-016-008  05/29/12     DONE    DONE       DONE      11/02/11   10/26/11   04/15/11   02/17/11   155,16                   998,850       998,850  HCM             0           0           0 Tetra Tech Architects & Engin     998,850      04/12/16                       05/31/16           

          Hemlock Elem:
11-0338   Reconstruction               0-017-007  05/29/12     DONE    DONE       DONE      11/02/11   10/26/11   04/15/11   02/17/11   2,9,155,16               996,488       996,488  HCM             0           0           0 Tetra Tech Architects & Engin     996,488      04/12/16                       05/31/16           
11-1228   Reconstruction               0-017-008  12/10/12     DONE    DONE       DONE      04/26/12   04/25/12   03/20/12   12/12/06   7,155,16                 500,000       500,000  HCM             0           0      75,000 Tetra Tech Architects & Engin           0      08/12/14                       10/27/14           

          Laurel Park Elementary:
11-0335   Reconstruction               0-018-007  05/31/12     DONE    DONE       DONE      11/02/11   10/26/11   04/15/11   02/17/11   2,9,155,16               868,362       868,362  HCM             0           0           0 Tetra Tech Architects & Engin     868,362      04/12/16                       05/31/16           
11-1229   Reconstruction               0-018-008  12/10/12     DONE    DONE       DONE      04/26/12   04/25/12   03/20/12   12/12/06   7,155,16                 500,000       500,000  HCM             0           0      75,000 Tetra Tech Architects & Engin           0      08/12/14                       10/27/14           

          Twin Pines Elementary:
11-0336   Reconstruction               0-019-008  05/29/12     DONE    DONE       DONE      11/02/11   10/26/11   04/15/11   02/17/11   2,9,155,16               912,019       912,019  HCM             0           0           0 Tetra Tech Architects & Engin     912,019      04/12/16                       05/31/16           
11-1230   Reconstruction               0-019-009  12/10/12     DONE    DONE       DONE      04/26/12   04/25/12   03/20/12   12/12/06   7,155,16                 550,000       550,000  HCM             0           0      82,500 Tetra Tech Architects & Engin           0      08/12/14                       10/27/14           

          East Middle School:
11-0337   Reconstruction               0-020-012  05/29/12     DONE    DONE       DONE      11/02/11   10/26/11   04/15/11   02/17/11   2,9,155,16             1,789,974     1,789,974  HCM             0           0           0 Tetra Tech Architects & Engin   1,789,974      04/12/16                       05/31/16           
11-1231   Reconstruction               0-020-013  12/10/12     DONE    DONE       DONE      04/26/12   04/25/12   03/20/12   12/12/06   155,16                   135,000       135,000  HCM             0           0      20,250 Tetra Tech Architects & Engin           0        /  /                           /  /             

          Headstart Center:
  -       Reconstruction               0-031-003                                              /  /       /  /     04/08/14     /  /     7                              0             0  JMB             0           0           0                                         0        /  /                           /  /             

          Felicio Administration Bldg:
11-0339   Reconstruction               1-023-003  05/29/12     DONE    DONE       DONE      11/02/11   10/26/11   09/25/06   02/17/11   2,4,10,155,16             89,613             0  HCM             0           0           0 Tetra Tech Architects & Engin      89,613      04/12/16                       05/31/16           

          Brentwood Public Library:
12-1120   Reconstruction               6-021-009  07/11/13     DONE    DONE       DONE      04/22/13   04/22/13   02/15/13   03/21/13   7,16                     385,000             0  JMB             0           0           0 Beatty, Harvey & Associates             0        /  /                           /  /             
13-1623   Reconstruction               6-021-010  07/17/14     DONE    DONE       DONE      06/18/14   06/16/14   03/04/14   05/29/14   8,9,155,15,16            525,000             0  JMB             0           0           0 BEATTY HARVEY COCO                      0        /  /                           /  /             

          Brentwood/Modern Times Schoolhouse:
  -       Reconstruction               7-043-002                                              /  /       /  /     12/14/16     /  /     4,7,8,9,155,16                 0             0  MTM             0           0           0                                         0        /  /                           /  /             

          District-Wide:
  -    SB Reconstruction               7-999-BA1               DONE                           /  /       /  /       /  /       /  /     10                             0             0  MTM             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




CENTRAL ISLIP UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-05-13-03
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Ralph G. Reed Middle School:
  -       Reconstruction               0-001-012                                              /  /       /  /     04/05/12     /  /     2,9,10                         0    18,678,784  JOD             0           0           0                                         0        /  /                           /  /             
12-0726   Reconstruction               0-001-013  05/15/13     DONE    DONE       DONE      01/28/13   01/16/13   11/15/12   04/02/08   2,4,7,8,9,155,15,16      205,374       205,374  JMB             0           0      34,112 Tetra Tech Architects and Eng           0      04/20/15                       07/08/15           
13-1356   Reconstruction               0-001-014  04/18/14     DONE    DONE       DONE      03/17/14   03/14/14   02/05/14   01/28/14   2,9                      135,000       135,000  DDJ             0           0           0 Tetra Tech Architects & Engin           0      02/04/16                       02/16/16           
14-0270   Reconstruction               0-001-015  07/28/15     DONE    DONE       DONE      09/09/14   09/08/14   04/08/14   01/28/14   2,9,155,16             1,203,230     1,203,230  DDJ             0           0           0 Tetra Tech Architects & Engin           0        /  /                           /  /             
14-0062   Reconstruction               0-001-016  03/06/15     DONE    DONE       DONE      07/25/14   07/21/14   07/10/14   01/28/14   2,9,155,15,16          1,480,000     1,480,000  DDJ             0           0           0 Tetra Tech Architects & Engin           0        /  /                           /  /             

          Alfano Elementary:
13-1357   Reconstruction               0-002-010  04/18/14     DONE    DONE       DONE      03/17/14   03/14/14   02/05/14   01/28/14   2,4,9                    610,000       610,000  DDJ             0           0           0 Tetra Tech Architects & Engin           0      02/04/16                       02/16/16           
14-0063   Reconstruction               0-002-011  03/06/15     DONE    DONE       DONE      07/25/14   07/21/14   04/08/14   01/28/14   155,16                   880,000       880,000  DDJ             0           0           0 Tetra Tech Architects & Engin           0        /  /                           /  /             

          Marguerite L Mulvey Elem.:
13-1358   Reconstruction               0-003-013  04/18/14     DONE    DONE       DONE      03/17/14   03/14/14   02/05/14   01/28/14   2,9                      415,000       415,000  DDJ             0           0           0 Tetra Tech Architects & Engin           0      01/13/16                       02/16/16           
14-0064   Reconstruction               0-003-014  03/06/15     DONE    DONE       DONE      07/25/14   07/21/14   04/08/14   01/28/14   155,16                   722,000       722,000  DDJ             0           0           0 Tetra Tech Architects & Engin           0        /  /                           /  /             

          Cordello Ave. School:
14-0065   Reconstruction               0-004-010  03/06/15     DONE    DONE       DONE      07/25/14   07/21/14   02/05/14   01/28/14   2,155,16               1,210,000     1,210,000  DDJ             0           0           0 Tetra Tech Architects & Engin           0        /  /                           /  /             
  -    PR Additions and Alterations    0-004-011                                              /  /       /  /     05/21/15     /  /     02 - 16                        0             0  DDJ             0           0           0                                         0        /  /                           /  /             

          Mulligan Middle School:
12-0727   Reconstruction               0-005-011  05/15/13     DONE    DONE       DONE      01/28/13   01/16/13   11/15/12   04/02/08   2,4,8,9,10,155,15,16   1,844,795     1,844,795  JMB             0           0     312,813 Tetra Tech Architects and Eng           0      04/20/15                       07/08/15           
13-1359XX Reconstruction               0-005-012                         CANCELLED          03/17/14   03/14/14   02/05/14   01/28/14   10                             0    13,275,780  DDJ             0           0           0 Tetra Tech Architects & Engin           0        /  /                           /  /             
14-0066   Reconstruction               0-005-013  03/06/15     DONE    DONE       DONE      07/25/14   07/21/14   04/08/14   01/28/14   2,4,8,9,155,15,16      1,699,000     1,699,000  DDJ             0           0           0 Tetra Tech Architects & Engin           0        /  /                           /  /             

          Francis O'Neil Elementary:
13-1360   Reconstruction               0-006-010  04/18/14     DONE    DONE       DONE      03/17/14   03/14/14   02/05/14   01/28/14   2,9                    1,113,000     1,113,000  DDJ             0           0           0 Tetra Tech Architects & Engin           0      01/28/16                       02/16/16           
14-0067   Reconstruction               0-006-011  03/06/15     DONE    DONE       DONE      07/25/14   07/21/14   04/08/14   01/28/14   2,155,16                 755,000       755,000  DDJ             0           0           0 Tetra Tech Architects & Engin           0        /  /                           /  /             
  -    PR Additions and Alterations    0-006-012                                              /  /       /  /     05/21/15     /  /     02 - 16                        0             0  DDJ             0           0           0                                         0        /  /                           /  /             

          A.T. Morrow Elementary:
14-0068   Reconstruction               0-007-010  03/06/15     DONE    DONE       DONE      07/25/14   07/21/14   02/05/14   01/28/14   2,155,16               1,335,000     1,335,000  DDJ             0           0           0 Tetra Tech Architects & Engin           0        /  /                           /  /             

          Senior High:
14-0069   Reconstruction               0-008-014  03/06/15     DONE    DONE       DONE      07/25/14   07/21/14   02/05/14   01/28/14   155,16                   644,605       644,605  DDJ             0           0           0 Tetra Tech Architects & Engin           0        /  /                           /  /             
14-0271   Reconstruction               0-008-015  07/28/15     DONE    DONE       DONE      09/09/14   09/08/14   04/08/14   01/28/14   2,4,7,8,9,155,15,16    7,590,305     7,590,305  DDJ             0           0           0 Tetra Tech Architects & Engin           0        /  /                           /  /             
14-0079   Reconstruction               0-008-016  08/27/14     DONE    DONE       DONE      07/29/14   07/25/14   07/16/14   01/28/14   2,9                    5,060,000     5,060,000  DDJ             0           0           0 Tetra Tech Architects & Engin           0        /  /                           /  /             

          Districtwide:
  -       Reconstruction               7-999-002                                              /  /       /  /     05/01/12     /  /     155                            0             0  JOD             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




FIRE ISLAND UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-05-14-02
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Woodhull School:
14-0286   Reconstruction               0-001-011  11/10/15     DONE    DONE       DONE      09/12/14   09/12/14   08/12/14   05/20/14   4,8,9,155,15,16          445,929       445,929  JMB             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
14-0676   Reconstruction               0-001-012  12/01/15     DONE    DONE       DONE      11/26/14   11/24/14   08/12/14   05/20/14   4,8,155,16               193,265       193,265  JMB             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          Bus Maintenance:
14-0287   Reconstruction               5-002-004  11/06/15     DONE    DONE       DONE      09/12/14   09/12/14   08/12/14   05/20/14   10,16                    103,505       103,505  JMB             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




SHOREHAM-WADING RIVER CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-06-01-04
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Wading River Elementary School:
12-0857   Reconstruction               0-003-013  05/09/13     DONE    DONE       DONE      02/15/13   02/14/13     /  /     10/02/12   16                        95,996        95,996  JMB             0           0           0 Burton Behrendt Smith                   0      01/23/14                       04/28/14           
13-1017   Reconstruction               0-003-014  05/15/14     DONE    DONE       DONE      01/14/14   01/13/14   09/23/13   05/21/13   8,9,16                    16,050        16,050  JMB             0           0           0 Burton Behrendt Smith                   0      09/22/15                       10/15/15           
14-0498   Reconstruction               0-003-015  01/29/15     DONE    DONE       DONE      10/21/14   10/17/14   06/26/14   05/20/14   16                       164,388       164,388  JMB             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
14-0735   Reconstruction               0-003-016  05/12/16     DONE    DONE       DONE      12/12/14   12/08/14   11/06/14   11/04/14   15,16                    765,189       765,189  JMB             0           0           0 ECG Engineering, LLC              765,189        /  /                           /  /             
15-0377PR Reconstruction               0-003-017                         UNREVIEWED         09/01/15   08/31/15   06/05/15   01/13/14   2,4,7,8,9,10,155,15,           0     9,115,704  JMB             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
15-0833   Reconstruction               0-003-017  09/12/16     DONE    DONE       DONE      12/04/15   12/04/15   06/05/15   01/13/15   2,4,7,8,9,10,155,15,  11,710,414     5,590,761  JMB             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          Briarcliff ES (Closed 14/15 SY):
12-0858   Reconstruction               0-004-016  05/09/13     DONE    DONE       DONE      02/15/13   02/14/13   11/13/12   10/02/12   16                        97,921        97,921  JMB             0           0           0 Burton Behrendt Smith                   0      01/23/14                       04/28/14           
12-1097   Reconstruction               0-004-017  04/26/13     DONE    DONE       DONE      04/12/13   04/12/13   03/08/13   05/15/12   7                        228,487       228,487  JMB             0           0           0 Burton Behrendt Smith                   0      12/18/13                       02/25/14           
13-1018   Reconstruction               0-004-018  05/15/14     DONE    DONE       DONE      01/14/14   01/13/14   09/23/13   05/21/13   8,9,16                    20,425             0  JMB             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
14-0736   Reconstruction               0-004-019  05/12/16     DONE    DONE       DONE      12/12/14   12/08/14   11/06/14   11/04/14   155,16                   414,350             0  JMB             0           0           0 ECG Engineering, LLC              414,350        /  /                           /  /             
16-1197   Reconstruction               0-004-020  02/17/17     DONE    DONE       DONE      01/17/17   01/17/17   10/14/16   05/19/15   2,7                      521,235             0  MTM             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          Albert Prodell Middle School:
12-0859   Reconstruction               0-005-012  05/09/13     DONE    DONE       DONE      02/15/13   02/14/13   11/13/12   10/02/12   16                       145,958       145,958  JMB             0           0           0 Burton Behrendt Smith                   0      05/23/16                       06/27/16           
13-1019   Reconstruction               0-005-013  05/15/14     DONE    DONE       DONE      01/14/14   01/13/14   09/23/13   05/21/13   8,9,16                    31,642        31,642  JMB             0           0           0 Burton Behrendt Smith                   0      09/22/15                       10/15/15           
14-0610   Reconstruction               0-005-014  12/02/14     DONE    DONE       DONE      11/13/14   11/12/14   06/26/14   05/20/14   2,7                      420,463       420,463  JMB             0           0           0 Burton Behrendt Smith                   0      05/27/16                       08/07/16           
14-0737   Reconstruction               0-005-015  05/12/16     DONE    DONE       DONE      12/12/14   12/08/14   11/06/14   11/04/14   155,16                   824,606       824,606  JMB             0           0           0 ECG Engineering, LLC              824,606        /  /                           /  /             
15-1038   Reconstruction               0-005-016  07/26/16     DONE    DONE       DONE      01/11/16   01/06/16   12/11/15   01/13/15   2,7,8                  2,428,537     2,428,537  JMB             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
  -    PR Additions and Alterations    0-005-017                                              /  /       /  /     01/20/16     /  /     02 - 16                        0             0  JMB             0           0           0                                         0        /  /                           /  /             
16-1414   Additions and Alterations    0-005-017                         UNREVIEWED         02/22/17   02/21/17   01/20/16   01/13/15   02 - 16                        0             0  JMB             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          Miller Avenue School:
12-0860   Reconstruction               0-006-012  05/09/13     DONE    DONE       DONE      02/15/13   02/14/13   11/13/12   10/02/12   16                        93,946        93,946  JMB             0           0           0 Burton Behrendt Smith                   0      01/23/14                       04/28/14           
13-1020   Reconstruction               0-006-013  05/15/14     DONE    DONE       DONE      01/14/14   01/13/14   09/23/13   05/21/13   8,9,16                    58,255        58,255  JMB             0           0           0 Burton Behrendt Smith                   0      09/22/15                       10/15/15           
14-0284   Reconstruction               0-006-014  01/29/15     DONE    DONE       DONE      09/12/14   09/12/14   06/26/14   05/20/14   16                       154,344       154,344  JMB             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
14-0738   Reconstruction               0-006-015  05/12/16     DONE    DONE       DONE      12/12/14   12/08/14   11/06/14   11/04/14   155,15,16              1,003,202     1,003,202  JMB             0           0           0 ECG Engineering, LLC            1,003,202        /  /                           /  /             
15-0832   Reconstruction               0-006-016  09/12/16     DONE    DONE       DONE      12/04/15   12/04/15   06/05/15   01/13/15   2,4,7,8,9,10,155,15,  12,159,173     6,608,440  JMB             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          High School/Public Library:
12-1098   Reconstruction               0-007-019  04/26/13     DONE    DONE       DONE      04/12/13   04/12/13   03/08/13   05/15/12   7                        451,502       451,502  JMB             0           0           0 Burton Behrendt Smith                   0      12/18/13                       02/25/14           
12-0861   Reconstruction               0-007-021  05/09/13     DONE    DONE       DONE      02/15/13   02/14/13   11/13/12   10/02/12   2,10,16                  734,150       734,150  JMB             0           0      24,797 Burton Behrendt Smith                   0      05/23/16                       06/27/16           
13-1016   Reconstruction               0-007-022  10/07/14     DONE    DONE       DONE      01/14/14   01/13/14   09/23/13   05/21/13   2,4,8,9,14,155,15,16   4,739,700     4,739,700  JMB             0           0           0 Burton Behrendt Smith                   0      08/28/15                       10/15/15           
13-1021   Reconstruction               0-007-023  05/15/14     DONE    DONE       DONE      01/14/14   01/13/14   09/23/13   05/21/13   8,9,16                    35,875        35,875  JMB             0           0           0 Burton Behrendt Smith                   0      09/22/15                       10/15/15           
13-1338   Reconstruction               0-007-024  03/13/14     DONE    DONE       DONE      03/12/14   03/10/14   02/25/14   02/25/14   7,9                      401,923       401,923  JMB             0           0           0 Burton Behrendt Smith                   0      09/15/14                       10/14/14           
14-0285   Reconstruction               0-007-025  10/21/14     DONE    DONE       DONE      09/12/14   09/12/14   06/26/14   05/20/14   2,7                      401,923       401,923  JMB             0           0           0 Burton Behrendt Smith                   0      04/23/15                       07/14/15           
14-0668   Reconstruction               0-007-026  02/09/15     DONE    DONE       DONE      11/24/14   11/21/14   06/26/14   05/20/14   16                       196,200       196,200  JMB             0           0           0 Burton Behrendt Smith                   0      12/19/16                       01/30/17           
14-0739   Reconstruction               0-007-027  05/12/16     DONE    DONE       DONE      12/12/14   12/08/14   11/06/14   11/04/14   155,15,16              5,174,451     5,174,451  JMB             0           0           0 ECG Engineering, LLC            5,174,451        /  /                           /  /             
14-1244   Reconstruction               0-007-028  04/10/15     DONE    DONE       DONE      03/06/15   03/05/15   02/09/15   01/13/15   2,7                    3,816,771     3,816,771  JMB             0           0           0 Burton Behrendt Smith                   0      12/06/16                       01/30/17           
15-0278   Reconstruction               0-007-029  12/22/15     DONE    DONE       DONE      08/11/15   08/10/15   06/05/15   01/13/15   10,16                  1,100,000     1,100,000  JMB             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
15-0870   Reconstruction               0-007-030  07/12/16     DONE    DONE       DONE      12/11/15   12/11/15   06/05/15   01/13/15   8                      1,627,000     1,627,000  JMB             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
16-0773   Reconstruction               0-007-031                         UNREVIEWED         11/14/16   11/14/16   09/02/16   05/19/16   2,10                           0    21,249,912  AAA             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          Warehouse/Fitness Cntr (fmly 0-020):
15-1792   Reconstruction               2-020-001  08/24/16     DONE    DONE       DONE      05/23/16   05/19/16   02/25/16   05/19/15   2                        264,013             0  JMB             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          Container 1 @ Wading River ES:
12-0265DB Discovered Building          2-047-001  02/06/13     DONE    DONE       DONE        /  /       /  /     10/11/12     /  /                                    0             0  JMB             0           0           0                                         0        /  /                           /  /             

          Container 2 @ Wading River ES:
12-0266DB Discovered Building          2-048-001  02/05/13     DONE    DONE       DONE        /  /       /  /     10/11/12     /  /                                    0             0  JMB             0           0           0                                         0        /  /                           /  /             

          Press Box:
12-0075   New Construction             7-046-001  10/03/12     DONE    DONE       DONE      08/02/12   07/23/12   02/15/12   02/14/12   02 - 16                   60,000             0  HCM             0           0           0 Burton Behrendt Smith                   0      07/30/13                       08/01/13           

          Concession Stand:
12-0981   New Construction             7-049-001  05/19/16     DONE    DONE       DONE      03/18/13   03/15/13   11/16/12   06/19/12   02 - 16                  450,000             0  JMB             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          District-Wide:
15-1025   Reconstruction               7-999-004                       ADDENDUM REQ'D       01/05/16   12/23/15   12/01/15   01/13/15   16                             0             0  JMB             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




RIVERHEAD CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-06-02-04
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Phillips Avenue School:
09-1593   Reconstruction               0-001-013  07/02/12     DONE    DONE       DONE      07/06/10   06/23/10   11/20/09   07/08/09   10,155,15,16           1,555,576     1,555,576  HCM             0           0           0 Burton Behrendt Smith           1,555,576      03/04/14                       05/23/14           
11-0889   Additions and Alterations    0-001-015  07/03/12     DONE    DONE       DONE      03/06/12   03/05/12   10/26/11   10/11/11   02 - 16                4,025,891     4,025,891  HCM             0           0           0 Burton Behrendt Smith                   0      04/23/14                       05/23/14           

          Roanoke Avenue Elementary:
09-1594   Reconstruction               0-003-012  07/02/12     DONE    DONE       DONE      07/06/10   06/23/10   04/05/07   07/08/09   10,15,16                 271,437       271,437  HCM             0           0           0 Burton Behrendt Smith             271,437      03/04/14                       05/23/14           
13-0187PR Additions and Alterations    0-003-014                         UNREVIEWED         08/12/13   08/12/13   10/26/11     /  /     02 - 16                        0             0  HCM             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
13-0826   Additions and Alterations    0-003-014  09/30/14     DONE    DONE       DONE      12/04/13   11/27/13   10/26/11   10/11/11   02 - 16                8,551,777     5,768,964  HCM             0           0           0 Burton Behrendt Smith                   0      07/22/16           YES         08/12/16           

          Pulaski Street Elementary:
09-1595   Reconstruction               0-004-015  07/02/12     DONE    DONE       DONE      07/06/10   06/23/10   03/17/08   07/08/09   7                        521,376       521,376  HCM             0           0           0 Burton Behrendt Smith             521,376      03/04/14                       05/23/14           
13-0188PR Additions and Alterations    0-004-017                         UNREVIEWED         08/12/13   08/12/13   10/26/11     /  /     02 - 16                        0             0  HCM             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
13-0825   Additions and Alterations    0-004-017  09/04/14     DONE    DONE       DONE      12/04/13   11/27/13   10/26/11   10/11/11   02 - 16                7,880,675     3,808,213  HCM             0           0           0 Burton Behrendt Smith                   0      04/29/16           YES         05/09/16           
  -       Reconstruction               0-004-018                                              /  /       /  /     08/20/15     /  /     2                              0     6,881,430  JMB             0           0           0                                         0        /  /                           /  /             

          Aquebogue Elementary:
09-1596   Reconstruction               0-005-014  07/02/12     DONE    DONE       DONE      07/06/10   06/23/10   11/25/09   07/08/09   2,7,8,10,155,15,16       429,340       429,340  HCM             0           0           0 Burton Behrendt Smith             429,340      03/04/14                       06/09/14           
11-1067   Additions and Alterations    0-005-015  08/17/12     DONE    DONE       DONE      04/05/12   04/03/12   10/26/11   10/11/11   02 - 16                3,807,996     3,243,036  HCM             0           0           0 Burton Behrendt Smith                   0      03/04/14                       06/23/14           

          Pulaski St. Music Annex:
09-1597   Reconstruction               0-008-002  07/02/12     DONE    DONE       DONE      07/06/10   06/23/10   03/31/10   07/08/09   2,7,8,10,155,15,16         4,001             0  HCM             0           0           0 Burton Behrendt Smith               4,001        /  /                           /  /             

          Riley Ave. Elementary:
09-1598   Reconstruction               0-009-011  07/02/12     DONE    DONE       DONE      07/06/10   06/23/10   06/08/05   07/08/09   8,9,16                 1,612,799     1,612,799  HCM             0           0           0 Burton Behrendt Smith           1,612,799      03/04/14                       05/23/14           
11-1252   Additions and Alterations    0-009-015  10/09/12     DONE    DONE       DONE      05/01/12   04/30/12   10/26/11   10/11/11   02 - 16                5,667,830     4,668,223  HCM             0           0           0 Burton Behrendt Smith                   0      05/27/14                       06/24/14           

          Middle School:
09-1599   Reconstruction               0-010-011  07/02/12     DONE    DONE       DONE      07/06/10   06/23/10   06/08/05   07/08/09   155                      887,583       887,583  HCM             0           0           0 Burton Behrendt Smith             887,583      03/04/14                       05/23/14           
13-0220   Additions and Alterations    0-010-018  04/16/14     DONE    DONE       DONE      08/15/13   08/08/13   10/26/11   10/11/11   02 - 16               15,965,944    12,173,250  HCM             0           0           0 Burton Behrendt Smith                   0      06/29/16                       08/12/16           
15-0679   Reconstruction               0-010-019  03/28/16     DONE    DONE       DONE      11/02/15   10/28/15   10/15/15   05/19/15   2                      1,200,000     1,200,000  JMB             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          Riverhead Senior High:
09-1600   Reconstruction               0-012-016  07/02/12     DONE    DONE       DONE      07/06/10   06/23/10   06/08/05   07/08/09   10                     1,730,587     1,730,587  HCM             0           0           0 Burton Behrendt Smith           1,730,587      03/04/14                       05/23/14           
12-0111   Additions and Alterations    0-012-021  06/05/13     DONE    DONE       DONE      08/15/12   08/03/12   10/26/11   10/11/11   02 - 16               32,572,521    23,333,754  HCM             0           0           0 Burton Behrendt Smith                   0      01/11/17                       02/27/17           

          Phillips Ave Portables (2):
09-1601   Reconstruction               0-035-003  07/02/12     DONE    DONE       DONE      07/06/10   06/23/10   03/31/10   07/08/09   2,7,8,10,155,15,16         7,575             0  HCM             0           0           0 Burton Behrendt Smith               7,575        /  /                           /  /             

          Roanoke School Portable:
09-1602   Reconstruction               0-038-002  07/02/12     DONE    DONE       DONE      07/06/10   06/23/10   04/01/10   07/08/09   2,8,10,155,15,16           5,170             0  HCM             0           0           0 Burton Behrendt Smith               5,170        /  /                           /  /             

          MS Portable:
09-1603   Reconstruction               0-039-002  07/02/12     DONE    DONE       DONE      07/06/10   07/08/09   04/01/10   07/08/09   2,7,8,10,155,15,16        16,385             0  HCM             0           0           0 Burton Behrendt Smith              16,385        /  /                           /  /             

          Portable A @ Riverhead High:
09-1604   Reconstruction               0-043-002  07/02/12     DONE    DONE       DONE      07/06/10   06/23/10   04/01/10   07/08/09   2,7,8,10,155,15,16        12,397             0  HCM             0           0           0 Burton Behrendt Smith              12,397        /  /                           /  /             

          Portable B @ Riverhead High:
09-1605   Reconstruction               0-044-002  07/02/12     DONE    DONE       DONE      07/06/10   06/23/10   04/01/10   07/08/09   2,7,8,10,155,15,16         6,485             0  HCM             0           0           0 Burton Behrendt Smith               6,485        /  /                           /  /             

          Administration Bldg:
09-1606   Additions and Alterations    1-002-002  07/02/12     DONE    DONE       DONE      07/06/10   06/23/10   05/03/07   07/08/09   02 - 16                   24,368             0  HCM             0           0           0 Burton Behrendt Smith              24,368      03/04/14                       05/23/14           

          Storage Bldg. @ High School:
15-1927DB Discovered Building          2-049-001                       ADDENDUM REQ'D       06/20/16   06/17/16   06/09/16     /  /     02 - 16                        0             0  JMB             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          Bldgs & Grounds Maintenance Bldg:
15-1534   New Construction             3-051-001               DONE    STARTED    UNREVIEWED04/08/16   04/07/16   08/20/15   05/19/15   02 - 16                        0             0  JMB             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          XXMaint. Shop/Bus Garage (demo 2015):
09-1607   Reconstruction               5-011-003  07/02/12     DONE    DONE       DONE      07/06/10   06/23/10   11/25/09   07/08/09   2,7,8,10,155,15,16        43,057        43,057  HCM             0           0           0 Burton Behrendt Smith              43,057      03/04/14                       05/23/14           
15-1550   Reconstruction               5-011-004  09/01/16     DONE    DONE       DONE      04/11/16   04/11/16   08/19/15   05/19/15   2                              0             0  JMB             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          Transportation Center:
15-1077   New Construction             5-052-001  12/02/16     DONE    DONE       DONE      01/20/16   01/19/16   09/24/15   05/19/15   02 - 16                7,491,057     7,491,057  JMB             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          XXRadio BoothXX (demo 2014):
  -    XX Additions and Alterations    7-022-001                         CANCELLED          08/15/13   08/08/13   10/26/11   10/11/11   02 - 16                        0             0  HCM             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          qless Box @ MS:
13-0221   New Construction             7-050-001  04/16/14     DONE    DONE       DONE      03/07/14   03/07/14   03/07/14   10/11/11   02 - 16                  622,612             0  JMB             0           0           0 Burton Behrendt Smith                   0      06/27/16           YES         06/27/16           

          District-Wide:
  -    SB Reconstruction               7-999-BA1               DONE                           /  /       /  /       /  /       /  /     13,16                          0             0  MTM             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




LITTLE FLOWER UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-06-03-02
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Little Flower School:
15-1456PR Additions and Alterations    0-001-010                         UNREVIEWED         03/23/16   03/17/16   08/03/07     /  /     02 - 16                4,109,773     3,247,440  DDJ             0           0           0 BARTLETT,AMORUSO,&RECCE-ARCHI           0        /  /                           /  /             
15-1626   Additions and Alterations    0-001-010  07/15/16     DONE    DONE       DONE      04/22/16   04/22/16   08/03/07   11/24/14   02 - 16                4,104,823     3,341,160  DDJ             0           0           0 BARTLETT,AMORUSO,&RECCE-ARCHI           0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




SHELTER ISLAND UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-07-01-02
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Shelter Island School:
11-0671   Reconstruction               0-001-023  05/09/12     DONE    DONE       DONE      01/17/12   01/13/12   06/14/11   05/17/11   2,4,8,9,10,155,15,16   2,679,767     2,679,767  DDJ             0           0           0 Mosaic Associates                       0      03/27/14                       06/20/16           
  -       Reconstruction               0-001-024                                              /  /       /  /     05/30/14     /  /     4,10,16                        0     5,833,978  DDJ             0           0           0                                         0        /  /                           /  /             
14-0297   Reconstruction               0-001-025  06/09/15     DONE    DONE       DONE      09/15/14   09/10/14   05/30/14   03/17/14   2,9,13                   380,692       380,692  DDJ             0           0           0 McClave Engineering,P.C.                0        /  /                           /  /             
14-0607   Reconstruction               0-001-026  08/25/15     DONE    DONE       DONE      11/12/14   11/07/14   09/29/14   09/23/14   4,155,15,16            1,629,500     1,629,500  DDJ             0           0           0 McClave Engineering,P.C.                0        /  /                           /  /             
14-0744   Reconstruction               0-001-027  11/06/15     DONE    DONE       DONE      12/15/14   12/10/14   09/29/14   09/23/14   8,10,155,16            1,007,359     1,007,359  DDJ             0           0           0 McClave Engineering,P.C.        1,007,359        /  /                           /  /             

          Grounds Equipment Storage Shed:
15-0504DB Discovered Building          2-003-001                       ADDENDUM REQ'D       09/29/15   09/23/15   03/25/15     /  /                                    0             0  DDJ             0           0           0                                         0        /  /                           /  /             

          Athl. Equip. Storage Shed #1:
15-0505DB Discovered Building          2-004-001                       ADDENDUM REQ'D       09/29/15   09/23/15   03/25/15     /  /                                    0             0  DDJ             0           0           0                                         0        /  /                           /  /             

          Athl. Equip. Storage Shed #2:
15-0506DB Discovered Building          2-005-001                       ADDENDUM REQ'D       09/29/15   09/23/15   03/25/15     /  /                                    0             0  DDJ             0           0           0                                         0        /  /                           /  /             

          Maintenance Storage Shed:
15-0507DB Discovered Building          2-006-001                       ADDENDUM REQ'D       09/29/15   09/23/15   03/25/15     /  /                                    0             0  DDJ             0           0           0                                         0        /  /                           /  /             

          Baseball Storage Shed:
15-0508DB Discovered Building          2-007-001                       ADDENDUM REQ'D       09/29/15   09/23/15   03/25/15     /  /                                    0             0  DDJ             0           0           0                                         0        /  /                           /  /             

          Grounds Equipment Red Storage Shed:
15-0509DB Discovered Building          2-008-001                       ADDENDUM REQ'D       09/29/15   09/23/15   09/01/15     /  /                                    0             0  DDJ             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




SMITHTOWN CENTRAL SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-08-01-06
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Nesconset Elementary School:
12-0420   Reconstruction               0-001-021  06/27/13     DONE    DONE       DONE      11/14/12   11/08/12   05/31/12   09/28/12   7,8,9,155,15,16          104,500       104,500  DDJ             0           0           0 H2M Group                               0      01/30/15                       02/17/15           

          Smithtown Elementary:
14-0509   Reconstruction               0-006-023  07/02/15     DONE    DONE       DONE      10/22/14   10/22/14   06/18/14   05/20/14   2,155                    316,003       316,003  DDJ             0           0           0 John A. Grillo                          0      01/31/17                       02/24/17           

          St. James Elementary:
14-0510   Reconstruction               0-016-022  07/02/15     DONE    DONE       DONE      10/22/14   10/22/14   06/18/14   05/20/14   155                       79,604        79,604  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             

          Smithtown Middle School (H.S. East):
12-0823   Reconstruction               0-023-027  02/22/13     DONE    DONE       DONE      02/12/13   02/12/13   12/19/12   04/17/08   2,7                    1,172,920     1,172,920  DDJ             0           0     444,071 John A. Grillo                          0      09/06/13                       09/24/13           
10-1399XX Reconstruction               0-023-029  03/11/13               CANCELLED          06/17/11   06/13/11   05/19/11   03/03/07   2,4,7,8,9,10,13,155,   1,503,375     1,503,375  DDJ             0           0     626,907 H2M Group                               0        /  /                           /  /             
12-1096   Reconstruction               0-023-030  04/22/13     DONE    DONE       DONE      04/12/13   04/12/13   03/13/13   05/15/07   2                        580,525       580,525  DDJ             0           0           0 John A. Grillo                          0      09/06/13                       09/24/13           
13-0672   Reconstruction               0-023-031  12/16/13     DONE    DONE       DONE      11/04/13   11/04/13   11/04/13   05/20/08   2,4,7,8,9,10,155,15,   2,200,000     2,200,000  DDJ             0           0     848,401 John A. Grillo                          0      08/29/14                       09/12/14           
14-0511   Reconstruction               0-023-032  07/02/15     DONE    DONE       DONE      10/22/14   10/22/14   06/19/14   05/20/14   2,155,15,16              601,898       601,898  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             

          Dogwood Elementary School:
14-0512   Reconstruction               0-024-017  07/02/15     DONE    DONE       DONE      10/22/14   10/22/14   06/18/14   05/20/14   2,155,15,16              312,754       312,754  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             

          Mt. Pleasant Elementary:
14-0513   Reconstruction               0-025-019  07/02/15     DONE    DONE       DONE      10/22/14   10/22/14   06/18/14   05/20/14   2,155,15,16              312,754       312,754  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             

          Great Hollow Jr. High:
03-0391   Reconstruction               0-027-006  09/10/03     DONE    DONE       DONE      09/06/03   08/01/03   06/10/96   06/15/02   7                        260,030       260,030  MAC             0           0           0 Burton Behrendt Smith                   0      04/25/05                         /  /             
12-0824   Reconstruction               0-027-018  02/22/13     DONE    DONE       DONE      02/12/13   02/12/13   12/19/12   05/15/00   7                      1,684,450     1,684,450  DDJ             0           0           0 John A. Grillo                          0      09/06/13                       09/24/13           
14-0514   Reconstruction               0-027-019  07/02/15     DONE    DONE       DONE      10/22/14   10/22/14   06/18/14   05/20/14   155                       90,804        90,804  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             

          Mills Pond Elementary:
14-0515   Reconstruction               0-028-009  07/02/15     DONE    DONE       DONE      10/22/14   10/22/14   06/18/14   05/20/14   155                       90,804        90,804  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             

          Accompsett Elementary:
14-0516   Reconstruction               0-029-022  07/02/15     DONE    DONE       DONE      10/22/14   10/22/14   06/18/14   05/20/14   2,155,15,16              323,953       323,953  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             

          Branch Brook Elementary:
14-0517   Reconstruction               0-030-020  07/02/15     DONE    DONE       DONE      10/22/14   10/22/14   06/18/14   05/20/14   2,155,15,16              301,555       301,555  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             

          Tackan Elementary School:
14-0518   Reconstruction               0-031-018  07/02/15     DONE    DONE       DONE      10/22/14   10/22/14   06/18/14   05/20/14   2,155,15,16              301,555       301,555  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             

          Nesaquake Intermediate:
14-0519   Reconstruction               0-033-015  07/02/15     DONE    DONE       DONE      10/22/14   10/22/14   06/18/14   05/20/14   155                      247,591       247,591  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             

          Accompsett Middle School:
14-0520   Reconstruction               0-034-027  07/02/15     DONE    DONE       DONE      10/22/14   10/22/14   06/18/14   05/20/14   155                       85,804        85,804  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             

          Smithtown H.S. West:
14-0521   Reconstruction               0-038-025  07/02/15     DONE    DONE       DONE      10/22/14   10/22/14   06/19/14   05/20/14   2,155,15,16              629,922       629,922  DDJ             0           0           0 John A. Grillo                          0        /  /                           /  /             

          New Maintenance Building:
12-0280   New Construction             3-082-001  09/03/13     DONE    DONE       DONE      10/15/12   10/15/12   12/13/11   09/28/12   02 - 16                  108,000             0  DDJ             0           0           0 H2M Group                               0      12/15/15                       01/06/16           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




KINGS PARK CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-08-05-06
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          RJO Intermediate:
12-0239   Reconstruction               0-002-018  05/05/16     DONE    DONE       DONE      10/03/12   09/24/12   06/29/12   05/08/12   155,15,16              1,605,783     1,605,783  HCM             0           0           0 H2M Group                       1,605,783        /  /                           /  /             
16-1020   Reconstruction               0-002-019                         UNREVIEWED         12/20/16   12/19/16   05/20/16   12/08/15   2,9,10,155,16                  0    20,175,360  JMB             0           0           0 H2M Group                               0        /  /                           /  /             
  -       Reconstruction               0-002-020                                              /  /       /  /     03/10/17     /  /     4,7,8,9,10,155,15,16           0             0  MTM             0           0           0                                         0        /  /                           /  /             

          Kings Park High School:
12-0240   Reconstruction               0-004-026  05/05/16     DONE    DONE       DONE      10/03/12   09/24/12   06/29/12   05/08/12   155,15,16              2,549,674     2,549,674  HCM             0           0           0 H2M Group                       2,549,674        /  /                           /  /             
14-1579   Reconstruction               0-004-027  06/25/15     DONE    DONE       DONE      06/04/15   06/04/15   03/31/15   05/19/15   2,7                      866,840       866,840  JMB             0           0           0 H2M Group                               0      11/23/15                       02/01/16           
15-1303   Reconstruction               0-004-028  05/04/16     DONE    DONE       DONE      02/26/16   02/24/16   01/05/16   12/08/15   2,7,9,10               6,184,188     6,184,188  JMB             0           0           0 H2M Group                               0      08/31/16           YES           /  /             
16-1023   Reconstruction               0-004-029                         UNREVIEWED         12/20/16   12/19/16   05/20/16   12/08/15   2,9,10,155,16                  0    38,684,260  JMB             0           0           0 H2M Group                               0        /  /                           /  /             
  -       Reconstruction               0-004-030                                              /  /       /  /     03/10/17     /  /     8,9,10,155,15,16               0             0  MTM             0           0           0                                         0        /  /                           /  /             

          Parkview Elementary:
12-0241   Reconstruction               0-005-019  05/05/16     DONE    DONE       DONE      10/03/12   09/24/12   06/29/12   05/08/12   155,15,16              1,103,749     1,103,749  HCM             0           0           0 H2M Group                       1,103,749        /  /                           /  /             
13-1090   Reconstruction               0-005-020  07/22/14     DONE    DONE       DONE      01/24/14   01/24/14   02/21/13   11/13/12   4,7                       97,042        97,042  JMB             0           0           0 H2M Group                               0      08/22/14                       02/01/16           
16-1021   Reconstruction               0-005-021                         UNREVIEWED         12/20/16   12/19/16   05/20/16   12/08/15   2,4,8,9,10,155,15,16           0    12,301,530  JMB             0           0           0 John A. Grillo                          0        /  /                           /  /             

          Fort Salonga Elementary:
12-0242   Reconstruction               0-006-021  05/05/16     DONE    DONE       DONE      10/03/12   09/24/12   06/29/12   05/08/12   155,15,16                416,791       416,791  HCM             0           0           0 H2M Group                         416,791        /  /                           /  /             
15-1320   Reconstruction               0-006-022  04/21/16     DONE    DONE       DONE      02/26/16   02/19/16   01/05/16   12/08/15   2,9                      999,000       999,000  JMB             0           0           0 H2M Group                               0      08/31/16                       10/06/16           
  -       Reconstruction               0-006-023                                              /  /       /  /     05/20/16     /  /     4,7,8,9,155,15,16              0    11,937,810  JMB             0           0           0                                         0        /  /                           /  /             

          W.T.Rogers Middle School:
12-0243   Reconstruction               0-008-021  05/05/16     DONE    DONE       DONE      10/03/12   09/24/12   06/29/12   05/08/12   155,15,16              1,366,232     1,366,232  HCM             0           0           0 H2M Group                       1,366,232        /  /                           /  /             
15-1305   Reconstruction               0-008-022  05/12/16     DONE    DONE       DONE      02/26/16   02/24/16   01/05/16   12/08/15   2,9                      723,600       723,600  JMB             0           0           0 H2M Group                               0      08/31/16                       10/06/16           
16-1022   Reconstruction               0-008-023                         UNREVIEWED         12/20/16   12/19/16   10/17/16   12/08/15   2,9,10,15                      0    33,796,096  MTM             0           0           0 H2M Group                               0        /  /                           /  /             
  -       Reconstruction               0-008-024                                              /  /       /  /     03/10/17     /  /     4,7,8,9,10,155,15,16           0             0  MTM             0           0           0                                         0        /  /                           /  /             

          San Remo Elementary School:
12-0244   Reconstruction               0-009-008  05/05/16     DONE    DONE       DONE      10/03/12   09/24/12   06/29/12   05/08/12   155,15,16                166,324             0  HCM             0           0           0 H2M Group                         166,324        /  /                           /  /             
15-1304   Reconstruction               0-009-009  05/11/16     DONE    DONE       DONE      02/25/16   02/24/16   01/05/16   12/08/15   2,9                      760,320             0  JMB             0           0           0 H2M Group                               0      08/31/16                       10/06/16           
  -       Reconstruction               0-009-010                                              /  /       /  /     03/10/17     /  /     4,8,9,10,15,16                 0             0  MTM             0           0           0                                         0        /  /                           /  /             

          Office Trailer @ Trans Facility:
15-1884   Reconstruction               1-010-003               UNREVIEWED
                                                                       DONE       DONE      06/09/16   05/16/16   02/03/16   05/08/12   155,15,16                      0             0  JMB             0           0           0 H2M Group                               0        /  /                           /  /             

          Press Box:
12-0060   New Construction             2-013-001  04/09/13     DONE    DONE       DONE      07/26/12   07/18/12   06/08/12   06/12/12   02 - 16                   75,000             0  HCM             0           0           0 H2M Group                               0      09/03/13                       09/10/13           

          Bus/Maintenance Garage:
12-0245   Reconstruction               5-003-010  05/05/16     DONE    DONE       DONE      10/03/12   09/24/12   06/29/12   05/08/12   155,15,16                 12,887        12,887  HCM             0           0           0 H2M Group                          12,887        /  /                           /  /             

          Comfort Station:
16-1205   New Construction             7-014-001                         UNREVIEWED         01/18/17   01/17/17   05/20/16   12/08/15   02 - 16                        0             0  JMB             0           0           0 H2M Group                               0        /  /                           /  /             

          District-Wide:
  -       Reconstruction               7-999-003               DONE                           /  /       /  /     01/14/16     /  /     13,16                          0             0  JMB             0           0           0                                         0        /  /                           /  /             
15-1055SB Reconstruction               7-999-003               DONE                           /  /       /  /     01/14/16     /  /     13,16                          0             0  JMB             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




REMSENBURG-SPEONK UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-09-01-02
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Remsenburg Elementary:
16-1365   Reconstruction               0-002-012                         UNREVIEWED         02/10/17   02/09/17   12/08/16   05/11/04   7                              0     4,507,530  DDJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




WESTHAMPTON BEACH UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-09-02-02
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Senior High School:
  -       Reconstruction               0-004-020                                              /  /       /  /     03/16/17     /  /     7                              0             0  BMJ             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-004-021                                              /  /       /  /     03/16/17     /  /     7                              0             0  BMJ             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




QUOGUE UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-09-03-02
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Quogue Elementary School:
14-1700   Reconstruction               0-001-012  02/29/16     DONE    DONE       DONE      06/19/15   06/13/15   06/17/15   05/19/15   155,16                   902,750       902,750  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




HAMPTON BAYS UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-09-05-02
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Hampton Bays Elementary:
12-0742   Reconstruction               0-003-010  04/25/13     DONE    DONE       DONE      01/31/13   01/30/13   12/07/12   11/27/12   2,4                    1,053,850     1,053,850  JMB             0           0           0 Burton Behrendt Smith                   0      09/07/13                       12/04/13         YES
                                                                                                                                                                                                                                                                                                                                   
12-0977   Reconstruction               0-003-011  02/28/14     DONE    DONE       DONE      03/14/13   03/14/13   01/24/13   11/13/12   8,155,15,16              898,063       898,063  JMB             0           0           0 Burton Behrendt Smith             898,063      11/03/15                       12/16/15         YES
                                                                                                                                                                                                                                                                                                                                   
13-0615   Reconstruction               0-003-012  01/23/15     DONE    DONE       DONE      10/24/13   10/22/13   09/19/13   11/27/12   2,4,7,8,9,155,15,16      763,453       763,453  JMB             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
13-1000   Reconstruction               0-003-013  05/30/14     DONE    DONE       DONE      01/13/14   01/07/14   11/19/13   11/27/12   4,8,9,155,15,16        3,004,486     3,004,486  JMB             0           0           0 Burton Behrendt Smith                   0      01/19/16           YES         02/29/16         YES
                                                                                                                                                                                                                                                                                                                                   
  -       Reconstruction               0-003-014                                              /  /       /  /     03/09/17     /  /     2,8,9,155,15,16                0             0  MTM             0           0           0                                         0        /  /                           /  /             

          High School:
12-0743   Reconstruction               0-010-005  04/25/13     DONE    DONE       DONE      01/31/13   01/30/13   12/07/12   11/27/12   2,8,9,16               2,901,219     2,901,219  JMB             0           0           0 Burton Behrendt Smith                   0      09/07/13                       12/04/13         YES
                                                                                                                                                                                                                                                                                                                                   
11-1081   Reconstruction               0-010-009  09/07/12     DONE    DONE       DONE      04/05/12   04/02/12   01/05/12   05/22/12   2,4,8,9,155,15,16        548,282       548,282  HCM             0           0           0 Burton Behrendt Smith                   0      11/07/12                       01/24/13         YES
                                                                                                                                                                                                                                                                                                                                   
12-0978   Reconstruction               0-010-010  02/28/14     DONE    DONE       DONE      03/14/13   03/14/13   01/09/13   11/13/12   8,155,15,16            1,460,502     1,460,502  JMB             0           0           0 Burton Behrendt Smith           1,460,502      11/03/15                       12/16/15         YES
                                                                                                                                                                                                                                                                                                                                   
12-1250   Reconstruction               0-010-011  06/18/13     DONE    DONE       DONE      06/05/13   05/31/13   02/05/13   11/27/12   155,16                   700,000       700,000  JMB             0           0           0 Burton Behrendt Smith                   0      07/18/16                       08/12/16         YES
                                                                                                                                                                                                                                                                                                                                   
13-0616   Reconstruction               0-010-012  01/23/15     DONE    DONE       DONE      10/24/13   10/22/13   09/19/13   11/27/12   2,4,7,8,9,155,15,16      609,727       609,727  JMB             0           0           0 Burton Behrendt Smith                   0      10/19/15                       12/16/15         YES
                                                                                                                                                                                                                                                                                                                                   
13-1001   Reconstruction               0-010-013  05/30/14     DONE    DONE       DONE      01/13/14   01/07/14   11/19/13   11/27/12   2,4,7,8,9,155,15,16    3,448,102     3,448,102  JMB             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
15-1415   Reconstruction               0-010-014  07/18/16     DONE    DONE       DONE      03/10/16   03/10/16   11/13/15   11/27/12   2,4,7,9,13,16            969,027       969,027  JMB             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   

          New Middle School:
12-0979   Reconstruction               0-016-002  02/28/14     DONE    DONE       DONE      03/14/13   03/14/13   01/24/13   11/13/12   8,155,15,16              674,662       674,662  JMB             0           0           0 Burton Behrendt Smith             674,662      11/03/15                       12/16/15         YES
                                                                                                                                                                                                                                                                                                                                   
13-0617   Reconstruction               0-016-003  01/23/15     DONE    DONE       DONE      10/24/13   10/22/13   10/24/13   11/27/12   8,155,15,16              189,500       189,500  JMB             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
13-1002   Reconstruction               0-016-004  05/30/14     DONE    DONE       DONE      01/13/14   01/07/14   11/19/13   11/27/12   8,155,15,16              415,000       415,000  JMB             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   

          District Office:
12-0980   Reconstruction               1-001-001  02/28/14     DONE    DONE       DONE      03/14/13   03/14/13   01/09/13   11/13/12   8,155,15,16               37,382             0  JMB             0           0           0 Burton Behrendt Smith              37,382      11/03/15                       12/16/15           
13-1003   Reconstruction               1-001-003  06/24/14     DONE    DONE       DONE      01/13/14   01/07/14   11/19/13   11/27/12   8,9,155,15,16             41,450             0  JMB             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   

          High School Press Box:
13-0185   New Construction             2-018-001  04/03/14     DONE    DONE       DONE      08/12/13   08/12/13   06/05/13   11/27/12   02 - 16                  698,095             0  JMB             0           0           0 Burton Behrendt Smith                   0      07/21/15                       09/04/15         YES
                                                                                                                                                                                                                                                                                                                                   

          Storage Building:
13-0386   New Construction             2-020-001  03/21/14     DONE    DONE       DONE      09/19/13   09/18/13   08/02/13   11/27/12   02 - 16                  221,480             0  JMB             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   

          High School Concession Stand:
13-0186   New Construction             7-017-001  04/03/14     DONE    DONE       DONE      08/12/13   08/12/13   06/05/13   11/17/12   02 - 16                1,300,435             0  JMB             0           0           0 Burton Behrendt Smith                   0      09/01/15                       09/04/15         YES
                                                                                                                                                                                                                                                                                                                                   

          Elem School Comfort Station:
13-0387   New Construction             7-019-001  03/21/14     DONE    DONE       DONE      09/19/13   09/18/13   06/05/13   11/27/12   02 - 16                  221,480             0  JMB             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   

          District-Wide:
13-0189   Reconstruction               7-999-002  08/29/13     DONE    DONE       DONE      08/13/13   08/13/13   03/26/13   11/27/12   16                        76,000        76,000  JMB             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
  -    SB Reconstruction               7-999-BA1               DONE                           /  /       /  /       /  /       /  /     13                             0             0  JMB             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




SOUTHAMPTON UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-09-06-03
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Southampton Elementary School:
11-0452   Reconstruction               0-001-025  03/23/12     DONE    DONE       DONE      12/02/11   12/01/11   02/15/11   05/17/11   2,4,8,9,155,16         1,030,571     1,030,571  JOD             0           0           0 Burton Behrendt Smith                   0      02/28/14                       04/03/14         YES
                                                                                                                                                                                                                                                                                                                                   
10-1119   Reconstruction               0-001-026  03/19/13     DONE    DONE       DONE      03/30/11   03/28/11   02/15/11   09/07/10   155,15,16                430,031       430,031  JOD             0           0           0 Burton Behrendt Smith             430,031      11/03/16                       12/23/16         YES
                                                                                                                                                                                                                                                                                                                                   
13-1223   Reconstruction               0-001-027  04/25/14     DONE    DONE       DONE      02/12/14   02/07/14   11/12/13   05/21/13   2,4,16                   110,572       110,572  MFS             0           0           0 Burton Behrendt Smith                   0      12/09/15                       02/29/16         YES
                                                                                                                                                                                                                                                                                                                                   
  -       Reconstruction               0-001-028                                              /  /       /  /     12/03/13     /  /     2,16                           0    14,379,930  MFS             0           0           0                                         0        /  /                           /  /             
14-0909   Reconstruction               0-001-029  03/18/15     DONE    DONE       DONE      12/31/14   12/26/14   06/10/14   05/20/14   7,9                      370,000       370,000  MFS             0           0           0 Burton Behrendt Smith                   0      11/03/16                       01/30/17         YES
                                                                                                                                                                                                                                                                                                                                   
15-1464   Reconstruction               0-001-030  09/28/16     DONE    DONE       DONE      03/23/16   03/14/16   10/14/15   05/19/15   2,4,8,9,155,15,16         75,000        75,000  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
15-1937   Reconstruction               0-001-031  03/10/17     DONE    DONE       DONE      06/22/16   06/13/16   02/05/16   05/19/15   2,9                      125,000       125,000  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   

          Intermediate School:
11-0453   Reconstruction               0-003-019  03/23/12     DONE    DONE       DONE      12/02/11   12/01/11   02/15/11   05/17/11   2,9,10,155,15,16       1,194,298     1,194,298  JOD             0           0           0 Burton Behrendt Smith                   0      11/22/13                       02/07/14         YES
                                                                                                                                                                                                                                                                                                                                   
10-1120   Reconstruction               0-003-020  03/19/13     DONE    DONE       DONE      03/30/11   03/28/11   02/15/11   09/07/10   155,15,16                207,654       207,654  JOD             0           0           0 Burton Behrendt Smith             207,654      11/03/16                       12/23/16         YES
                                                                                                                                                                                                                                                                                                                                   
13-0132   Reconstruction               0-003-021  10/08/13     DONE    DONE       DONE      08/05/13   08/02/13   05/24/13   05/21/13   4                         69,254        69,254  JOB             0           0           0 Burton Behrendt Smith                   0      09/14/15                       10/07/15         YES
                                                                                                                                                                                                                                                                                                                                   
14-0959   Reconstruction               0-003-022  04/22/15     DONE    DONE       DONE      01/14/15   01/08/15   06/10/14   05/20/14   2,7,10,155               750,000       750,000  MFS             0           0           0 Burton Behrendt Smith                   0      11/03/16                       12/23/16         YES
                                                                                                                                                                                                                                                                                                                                   
15-0346   Reconstruction               0-003-023  03/21/16     DONE    DONE       DONE      08/24/15   08/24/15   12/05/14   05/20/14   7,155                     78,000        78,000  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
15-1465   Reconstruction               0-003-024  09/28/16     DONE    DONE       DONE      03/23/16   03/14/16   10/14/15   05/19/15   2,4,8,9,10,155,15,16     990,000       990,000  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   

          High School:
11-0836   Reconstruction               0-007-015  01/28/13     DONE    DONE       DONE      02/23/12   02/21/12   03/02/10   02/06/07   4,8,9,10,13,155,15,1   1,382,062     1,382,062  JOD             0           0           0 Burton Behrendt Smith                   0      08/11/15                       09/09/15         YES
                                                                                                                                                                                                                                                                                                                                   
10-1121   Reconstruction               0-007-017  03/19/13     DONE    DONE       DONE      03/30/11   03/28/11   02/15/11   09/07/10   10,155,15,16           2,116,415     2,116,415  JOD             0           0           0 Burton Behrendt Smith           2,116,415      11/03/16                       12/23/16         YES
                                                                                                                                                                                                                                                                                                                                   
11-0454   Reconstruction               0-007-018  03/23/12     DONE    DONE       DONE      12/02/11   12/01/11   06/30/11   05/17/11   2,4,8,9,155,15,16        858,285       858,285  JOD             0           0           0 Burton Behrendt Smith                   0      05/01/14                       06/05/14         YES
                                                                                                                                                                                                                                                                                                                                   
13-0133   Reconstruction               0-007-019  10/08/13     DONE    DONE       DONE      08/05/13   08/02/13   05/24/13   05/21/13   4                         57,872        57,872  JOB             0           0           0 Burton Behrendt Smith                   0      09/14/15                       10/07/15         YES
                                                                                                                                                                                                                                                                                                                                   

          Bus Garage:
11-0855   Reconstruction               5-005-007  06/11/12     DONE    DONE       DONE      02/28/12   02/27/12   01/04/11   05/17/11   2,7,8,9,155,15,16      1,100,000     1,100,000  JOD             0           0           0 Burton Behrendt Smith                   0      01/15/16                       01/20/15         YES
                                                                                                                                                                                                                                                                                                                                   

          District Wide:
  -    SB Reconstruction               7-999-BA1               DONE                           /  /       /  /       /  /       /  /     13                             0             0  AAA             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




BRIDGEHAMPTON UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-09-09-02
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Bridgehampton High:
11-0482   Reconstruction               0-001-014  06/04/12     DONE    DONE       DONE      12/12/11   12/12/11   04/12/05   11/30/11   10                       136,000       136,000  HCM             0           0           0 Chaleff & Rogers Architects,P           0      09/25/12                       01/14/14         YES
                                                                                                                                                                                                                                                                                                                                   
  -    PR Additions and Alterations    0-001-016                                              /  /       /  /     12/23/16     /  /     02 - 16                        0             0  MTM             0           0           0                                         0        /  /                           /  /             

          Storage Building:
14-0631   New Construction             2-009-001  01/20/16     DONE    DONE       DONE      11/14/14   11/13/14   04/30/14   03/12/14   02 - 16                   35,000             0  JMB             0           0           0 Chaleff & Rogers Architects,P           0      03/08/16                       03/15/16         YES
                                                                                                                                                                                                                                                                                                                                   


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




EASTPORT - SOUTH MANOR CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-09-12-06
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Eastport Elementary:
09-0368   Reconstruction               0-001-005  08/26/13     DONE    DONE       DONE      10/29/09   10/26/09   05/14/09   10/21/09   10,155,16              3,880,150     3,880,150  DDJ             0           0           0 Wiedersum Associates Architec   3,880,150      08/15/16                       10/19/16           
13-1314   Reconstruction               0-001-006  08/06/14     DONE    DONE       DONE      03/07/14   03/07/14   12/06/12   12/08/09   2,4,7,8,9,10,155,15,   7,799,013     7,799,013  DDJ             0           0           0 Wiedersum Associates Architec           0        /  /                           /  /             
12-0987   Reconstruction               0-001-007  05/21/13     DONE    DONE       DONE      03/19/13   03/19/13   02/14/13   12/08/09   2,4,7,8,9                543,000       543,000  DDJ             0           0           0 Wiedersum Associates Architec           0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   

          Eastport-South Manor Jr/Sr HS:
09-0369   Reconstruction               0-011-002  08/26/13     DONE    DONE       DONE      10/29/09   10/26/09   05/14/09   10/21/09   10,155,16              5,592,074     5,592,074  DDJ             0           0           0 Wiedersum Associates Architec   5,592,074      08/15/16                       10/19/16           
  -       Reconstruction               0-011-003                                              /  /       /  /     12/06/12     /  /     2,4,8,9,10,155,15,16           0    66,307,242  DDJ             0           0           0                                         0        /  /                           /  /             
12-1102PR Reconstruction               0-011-004                         UNREVIEWED         04/12/13   04/12/13   04/09/13     /  /     2,4,7,8,9,155,15,16            0    68,823,946  DDJ             0           0           0 Wiedersum Associates Architec           0        /  /                           /  /             

          South Street ES (frmrly South Manor):
13-1315   Reconstruction               0-012-003  06/30/14     DONE    DONE       DONE      03/07/14   03/07/14   12/06/12   12/08/09   4,9,10,155,15,16          96,014        96,014  DDJ             0           0           0 Wiedersum Associates Architec           0        /  /                           /  /             
09-0370   Reconstruction               0-012-005  08/26/13     DONE    DONE       DONE      10/29/09   10/26/09   05/14/09   10/21/09   8,10,155,16            3,442,467     3,442,467  DDJ             0           0           0 Wiedersum Associates Architec   3,442,467      08/15/16                       10/19/16           

          Dayton Ave. School:
13-1316   Reconstruction               0-014-004  06/30/14     DONE    DONE       DONE      03/07/14   03/07/14   12/06/12   12/08/09   2,7,8,9,10,155,15,16     887,029       887,029  DDJ             0           0           0 Wiedersum Associates Architec           0        /  /                           /  /             
09-0601   Reconstruction               0-014-006  08/26/13     DONE    DONE       DONE      12/23/09   12/21/09   05/14/09   10/21/09   16                       283,394       283,394  DDJ             0           0           0 Wiedersum Associates Architec     283,394      08/15/16                       10/19/16           

          Maintenance Garage:
  -       Reconstruction               3-004-001                                              /  /       /  /     12/07/12     /  /     2,7,8,9,155,15,16              0             0  DDJ             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




TUCKAHOE COMMON SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-09-13-08
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Tuckahoe Common School:
11-1025   Reconstruction               0-001-011  03/21/12     DONE    DONE       DONE      03/28/12   03/22/12   03/07/12   02/27/12   2                        180,392       180,392  JOD             0           0           0 Chaleff & Rogers Architects,P           0      07/26/12                       09/20/12         YES
                                                                                                                                                                                                                                                                                                                                   
11-1249   Reconstruction               0-001-012  12/12/12     DONE    DONE       DONE      05/01/12   04/30/12   03/21/12   01/23/12   8,10,15,16               583,217       583,217  JOD             0           0           0 Savin Engineers, P.C.             583,217        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
  -       Reconstruction               0-001-014                                              /  /       /  /     11/09/12     /  /     7                              0     7,311,735  JMB             0           0           0                                         0        /  /                           /  /             
13-0409   Reconstruction               0-001-015  11/22/13     DONE    DONE       DONE      09/24/13   09/23/13   05/03/13   06/19/12   15                       398,195       398,195  JMB             0           0           0 Chaleff & Rogers Architects,P           0      12/01/15                       06/02/16         YES
                                                                                                                                                                                                                                                                                                                                   
  -       Reconstruction               0-001-016               DONE                           /  /       /  /       /  /       /  /     13,16                          0     7,311,735  JMB             0           0           0                                         0        /  /                           /  /             
15-1212SB Reconstruction               0-001-016               DONE                           /  /       /  /     02/10/16     /  /     13,16                          0     7,311,735  JMB             0           0           0                                         0        /  /                           /  /             
  -    SB Reconstruction               0-001-BA1               DONE                           /  /       /  /       /  /       /  /     13                             0     7,311,735  JMB             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




EAST QUOGUE UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-09-17-02
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          House (demo):
12-0430   Reconstruction               7-005-001  01/25/13     DONE    DONE       DONE      11/16/12   11/02/12   09/20/12   02/28/12   2                         77,100             0  JMB             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




OYSTERPONDS UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-10-02-02
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Oysterponds Elementary:
09-0511   Reconstruction               0-001-006  01/29/14     DONE    DONE       DONE      11/27/09   11/24/09   06/29/06   05/15/08   8                        150,000       150,000  JOD             0           0           0 Beatty Harvey & Associates              0      10/23/15                       02/16/17         YES
                                                                                                                                                                                                                                                                                                                                   
15-1480   Reconstruction               0-001-010  04/08/16     DONE    DONE       DONE      03/24/16   03/22/16   01/29/16   03/01/16   8                        600,000       600,000  MFS             0           0           0 Beatty, Harvey & Associates             0      09/12/16                       02/15/17         YES
                                                                                                                                                                                                                                                                                                                                   


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




FISHERS ISLAND UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-10-04-02
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Main Building:
14-0699   Reconstruction               0-001-004  12/23/15     DONE    DONE       DONE      12/02/14   12/01/14   09/24/14   05/20/14   2,8,9,14,155,15,16       500,000       500,000  DDJ             0           0           0 Point One Architects                    0        /  /                           /  /             
  -       Reconstruction               0-001-005                                              /  /       /  /     09/29/14     /  /     2,8,9,14,155,15,16             0     2,802,526  DDJ             0           0           0                                         0        /  /                           /  /             
  -    PR Additions and Alterations    0-001-006                                              /  /       /  /     04/05/16     /  /     02 - 16                        0             0  DDJ             0           0           0                                         0        /  /                           /  /             
  -    SB Reconstruction               0-001-BA1               DONE                           /  /       /  /       /  /       /  /     13                             0     2,802,526  BMJ             0           0           0                                         0        /  /                           /  /             

          Bowling Alley:
  -       Reconstruction               7-007-001                                              /  /       /  /       /  /       /  /     8,9,155,15,16                  0             0  DDJ             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




SOUTHOLD UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-10-05-02
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Southold Jr-Sr High School:
12-0760   Reconstruction               0-001-013  02/14/13     DONE    DONE       DONE      02/01/13   01/22/13   12/07/12   10/16/12   2,4,7                  1,999,219     1,999,219  DDJ             0           0           0 Burton Behrendt Smith                   0      01/28/14                       02/25/14         YES
                                                                                                                                                                                                                                                                                                                                   
13-1213   Reconstruction               0-001-014  07/18/14     DONE    DONE       DONE      02/12/14   02/11/14   10/03/13   10/16/12   2,4,8,9,155,15,16        632,926       632,926  DDJ             0           0           0 Burton Behrendt Smith                   0      09/04/15                       09/09/15         YES
                                                                                                                                                                                                                                                                                                                                   
13-1214   Reconstruction               0-001-015  07/18/14     DONE    DONE       DONE      02/12/14   02/11/14   10/03/13   10/15/12   2,4,8,9,155,15,16        379,717       379,717  DDJ             0           0           0 Burton Behrendt Smith                   0      08/31/15                       09/09/15         YES
                                                                                                                                                                                                                                                                                                                                   
16-0446   Reconstruction               0-001-016               STARTED UNREVIEWED STARTED   09/16/16   09/15/16   07/15/16   12/08/15   2,4,8,9,10,155,15,16           0    13,293,880  DDJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
16-0800   Reconstruction               0-001-017                         UNREVIEWED         11/16/16   11/16/16   07/15/16   12/08/15   2,4,8,9,10,155,15,16           0    13,293,880  DDJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   
  -       Reconstruction               0-001-018                                              /  /       /  /     07/15/16     /  /     2,4,8,9,10,155,15,16           0    13,293,880  DDJ             0           0           0                                         0        /  /                           /  /             

          Elementary School:
16-0912   Reconstruction               0-014-005                         UNREVIEWED         12/01/16   12/01/16   07/15/16   12/08/15   2,4,8,9,10,155,15,16           0    12,920,145  DDJ             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
  -       Reconstruction               0-014-006                                              /  /       /  /     07/15/16     /  /     2,4,8,9,10,155,15,16           0    12,920,145  DDJ             0           0           0                                         0        /  /                           /  /             

          Greenhouse @ Jr/Sr High School:
15-1030DB Discovered Building          7-018-001  06/14/16     DONE    DONE       DONE      01/08/16   01/08/16   09/24/15     /  /     02 - 16                        0             0  DDJ             0           0           0                                         0        /  /                           /  /             

          District-Wide:
  -       Reconstruction               7-999-001                                              /  /       /  /       /  /       /  /     13,16                          0             0  DDJ             0           0           0                                         0        /  /                           /  /             
16-0014SB Reconstruction               7-999-001               DONE                           /  /       /  /     07/06/16     /  /     13,16                          0             0  DDJ             0           0           0                                         0        /  /                           /  /             
  -    SB Reconstruction               7-999-BA1               STARTED                        /  /       /  /       /  /       /  /     13                             0             0  DDJ             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




GREENPORT UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-10-10-02
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Main Building:
11-0657   Reconstruction               0-001-013  10/15/12     DONE    DONE       DONE      01/12/12   01/10/12   12/20/11   12/07/10   2,16                   1,496,640             0  JOD             0           0           0 Tetra Tech Architects & Engin           0        /  /                           /  /             
12-1036   Reconstruction               0-001-014  06/03/13     DONE    DONE       DONE      03/27/13   03/27/13   01/30/13   12/07/10   2,4                      470,000       470,000  MFS             0           0           0 Tetra Tech Architects & Engin           0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




MATTITUCK-CUTCHOGUE UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-10-12-02
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Mattituck-Cutchogue Jr./Sr. HS:
13-0795   Reconstruction               0-001-005  03/26/14     DONE    DONE       DONE      11/29/13   11/29/13   07/19/13   10/29/13   2,9,13                   925,000       925,000  JMB             0           0           0 John A. Grillo                          0      04/10/15                       04/30/15           
15-1287SB Reconstruction               0-001-006                         UNREVIEWED         02/24/16   02/24/16   02/24/16     /  /     8,9,13,16                      0    16,481,280  JMB             0           0           0                                         0        /  /                           /  /             
15-1469   Reconstruction               0-001-006  07/19/16     DONE    DONE       DONE      03/24/16   03/23/16   02/24/16   11/04/14   8,9,13,16                 31,886        31,886  JMB             0           0           0 John A. Grillo                          0        /  /                           /  /             
  -       Reconstruction               0-001-007                                              /  /       /  /     03/17/17     /  /     8,155,15,16                    0             0  BMJ             0           0           0                                         0        /  /                           /  /             
  -    SB Reconstruction               0-001-BA1                         UNREVIEWED         02/24/16   02/24/16     /  /       /  /     13,16                          0    16,481,280  JMB             0           0           0                                         0        /  /                           /  /             

          Cutchogue East Elementary School:
15-1288SB Reconstruction               0-007-006                         UNREVIEWED         02/24/16   02/24/16   02/24/16     /  /     8,9,13,16                      0    10,479,660  JMB             0           0           0                                         0        /  /                           /  /             
15-1470   Reconstruction               0-007-006  07/21/16     DONE    DONE       DONE      03/24/16   03/23/16     /  /     11/04/14   8,9,13,16                227,939       227,939  JMB             0           0           0 John A. Grillo                          0        /  /                           /  /             
  -       Reconstruction               0-007-007                                              /  /       /  /     03/17/17     /  /     8,155,15,16                    0             0  BMJ             0           0           0                                         0        /  /                           /  /             
  -    SB Reconstruction               0-007-BA1                         UNREVIEWED         02/24/16   02/24/16     /  /       /  /     13,16                          0    10,479,660  JMB             0           0           0                                         0        /  /                           /  /             

          Cutchogue West Admin (fmly 0-009):
15-1289SB Reconstruction               1-009-001                         UNREVIEWED         02/24/16   02/24/16   02/24/16     /  /     13,16                          0             0  JMB             0           0           0                                         0        /  /                           /  /             
15-1471   Reconstruction               1-009-001  07/21/16     DONE    DONE       DONE      03/24/16   03/23/16     /  /     11/04/14   13,16                     13,686             0  JMB             0           0           0 John A. Grillo                          0        /  /                           /  /             
  -       Reconstruction               1-009-002                                              /  /       /  /     03/17/17     /  /     8                              0             0  BMJ             0           0           0                                         0        /  /                           /  /             

          Pole Barn @ Mattituck Jr/Sr HS:
16-1296   New Construction             2-021-001                         UNREVIEWED         02/01/17   02/01/17   12/20/16   05/17/16   02 - 16                        0             0  BMJ             0           0           0 John A. Grillo                          0        /  /                           /  /             

          Greenhouse @ Mattituck HS:
15-1195DB Discovered Building          7-020-001  09/13/16     DONE    DONE       DONE      02/05/16   02/05/16   01/04/16     /  /                                    0             0  JMB             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




BOCES EASTERN SUFFOLK STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-91-00-00
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Jefferson Academic Center:
11-1070   Reconstruction               0-003-009  10/12/12     DONE    DONE       DONE      04/04/12   03/29/12   03/31/11   12/12/11   8,9                      175,000       175,000  JOD             0           0           0 Burton Behrendt Smith                   0      02/12/13                       04/08/13           

          Special Education Center:
  -       Reconstruction               0-013-011                                              /  /       /  /     01/25/17     /  /     16                             0             0  MTM             0           0           0                                         0        /  /                           /  /             

          BOCES I Learning Center:
16-0937   Reconstruction               0-022-010  02/13/17     DONE    DONE       DONE      12/08/16   12/08/16   11/24/15   11/16/16   8                        182,000             0  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          Gary D. Bixtorn Tech Ct(Brookheaven):
  -       Reconstruction               0-048-017                                              /  /       /  /     11/24/15     /  /     7                              0    24,355,600  MFS             0           0           0                                         0        /  /                           /  /             

          Edward J. Milliken Technical Center:
14-1122   Reconstruction               0-049-018  03/31/15     DONE    DONE       DONE      02/11/15   02/11/15   07/22/14   12/17/14   2,7                    4,447,964     2,744,442  MFS             0           0           0 Burton Behrendt Smith                   0      09/25/16                       04/03/16           

          Brookhaven Learning Center West:
16-0938   Reconstruction               0-058-009  02/27/17     DONE    DONE       DONE      12/08/16   12/08/16   11/24/15   11/16/16   8                        123,500             0  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          Brookhaven Career Center:
  -       Reconstruction               0-059-009                                              /  /       /  /     01/25/17     /  /     16                             0             0  MTM             0           0           0                                         0        /  /                           /  /             

          Modular #1 @ Islip Career Cntr:
  -    PR New Construction             0-101-001                                              /  /       /  /     05/24/16     /  /     02 - 16                        0             0  MFS             0           0           0                                         0        /  /                           /  /             
16-0939   New Construction             0-101-001                         UNREVIEWED         12/08/16   12/08/16   05/24/16   11/16/16   02 - 16                        0             0  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          Modular #2 @ Islip Career Cntr:
  -    PR New Construction             0-102-001                                              /  /       /  /     05/24/16     /  /     02 - 16                        0             0  MFS             0           0           0                                         0        /  /                           /  /             

          Dr. R. DeFeo Admin. Bldg.:
  -       Reconstruction               1-005-010                                              /  /       /  /     01/25/17     /  /     16                             0             0  MTM             0           0           0                                         0        /  /                           /  /             

          Grounds Building:
15-1343   New Construction             3-100-001  02/23/17     DONE    DONE       DONE      03/01/16   03/01/16   07/22/14   12/16/15   02 - 16                  700,000             0  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             

          St Joseph's Academy:
12-1180TQ Temporary Quarters           8-099-001                       ADDENDUM REQ'D       05/10/13   05/08/13   04/08/13     /  /                                    0             0  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




BOCES WESTERN SUFFOLK STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-93-00-00
last updated on 03/23/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          McGuire Hall #1:
11-0206XX Reconstruction               0-001-018  04/17/12               CANCELLED          09/29/11   09/28/11   06/01/11   05/10/11   155                        7,000             0  JOD             0           0           0 Bladykas Engineering,P.C.               0        /  /                           /  /             
11-1047   Reconstruction               0-001-019  04/27/12     DONE    DONE       DONE      03/28/12   03/23/12   01/31/12   05/11/11   8                        250,000       250,000  JOD             0           0           0 Burton Behrendt Smith                   0      07/15/13                       10/14/14           
12-0807XX Reconstruction               0-001-020  04/29/13               CANCELLED          02/12/13   02/01/13   10/04/12   05/11/12   8,9,155,15,16             58,000        58,000  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
12-0880   Reconstruction               0-001-021  11/18/13     DONE    DONE       DONE      02/20/13   02/11/13   11/02/12   05/08/12   2,16                     100,000       100,000  MFS             0           0           0 H2M Group                               0      07/15/15                       12/21/15           
12-0881   Reconstruction               0-001-022  05/22/13     DONE    DONE       DONE      02/20/13   02/11/13   02/20/13   05/08/12   2,10,16                   21,000        21,000  MFS             0           0           0 H2M Group                               0      12/03/13                       12/13/13           
13-0932XX Reconstruction               0-001-023  04/16/14               CANCELLED          12/24/13   12/20/13   11/29/13   05/07/13   8,9,10,155,15,16          75,000        75,000  MFS             0           0           0 Burton Behrendt Smith                   0        /  /                           /  /             
13-1328   Reconstruction               0-001-024  02/24/15     DONE    DONE       DONE      03/11/14   03/11/14   12/10/13   06/11/13   155                      596,457       596,457  MFS             0           0           0 H2M Group                               0      09/23/16                       11/21/16           
13-1269   Reconstruction               0-001-025  08/15/14     DONE    DONE       DONE      02/24/14   02/18/14   12/10/13   06/11/13   16                        60,000        60,000  MFS             0           0           0 H2M Group                               0      11/02/15                       02/11/16           
15-0717   Reconstruction               0-001-026                       ADDENDUM REQ'D       11/12/15   11/04/15   05/14/15   05/12/15   8                              0    12,583,520  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
15-0753   Reconstruction               0-001-027  05/26/16     DONE    DONE       DONE      11/23/15   11/16/15   05/14/15   05/12/15   9,10,155,15,16            75,000        75,000  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
15-0070   Reconstruction               0-001-028  06/07/16     DONE    DONE       DONE      07/16/15   07/15/15   05/19/15   05/12/15   16                       390,182       390,182  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
16-0405   Reconstruction               0-001-029  03/13/17     DONE    DONE       DONE      09/13/16   09/12/16   05/24/16   05/10/16   155,15,16                263,850             0  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
16-0145   Reconstruction               0-001-030  12/16/16     DONE    DONE       DONE      07/25/16   07/20/16   05/24/16   05/10/16   9,15,16                   75,000             0  MFS             0           0           0 H2M Group                               0        /  /                           /  /             

          Wilson Tech Career Center:
11-0720   Reconstruction               0-015-008  04/17/12     DONE    DONE       DONE      01/25/12   01/24/12   06/01/11   05/10/11   2,15                     129,000             0  JOD             0           0           0 Bladykas Engineering,P.C.               0      10/16/12                       01/29/13           
12-0882   Reconstruction               0-015-009  11/18/13     DONE    DONE       DONE      02/20/13   02/11/13   11/02/12   05/08/12   2,16                     100,000        93,500  MFS             0           0           0 H2M Group                               0      07/15/15                       12/21/15           
  -    XX Reconstruction               0-015-010                         CANCELLED            /  /       /  /     11/02/12     /  /     2,10,16                        0     2,638,480  JMB             0           0           0                                         0        /  /                           /  /             
13-1270   Reconstruction               0-015-011  08/15/14     DONE    DONE       DONE      02/24/14   02/18/14   12/10/13   06/11/13   16                        60,000        60,000  MFS             0           0           0 H2M Group                               0      11/02/15                       02/11/16           
  -       Reconstruction               0-015-012                                              /  /       /  /     02/11/14     /  /     16                             0     2,638,480  MFS             0           0           0                                         0        /  /                           /  /             
14-1499   Reconstruction               0-015-013  10/27/15     DONE    DONE       DONE      05/12/15   05/11/15   10/06/14   05/13/14   2                         48,200        48,200  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
14-1228XX Reconstruction               0-015-014                         CANCELLED          03/03/15   03/02/15   01/08/15   05/13/14   16                             0     2,638,480  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
15-0718   Reconstruction               0-015-015                       ADDENDUM REQ'D       11/12/15   11/04/15   05/14/15   05/12/15   2                              0     2,638,480  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
15-0071   Reconstruction               0-015-016  06/07/16     DONE    DONE       DONE      07/16/15   07/15/15   05/18/15   05/13/14   16                        50,000        50,000  MFS             0           0           0 H2M Group                               0        /  /                           /  /             

          JE Allen Jr/Sr High School Mellville:
11-0207   Reconstruction               0-016-026  04/17/12     DONE    DONE       DONE      09/29/11   09/28/11   06/01/11   05/10/11   16                        20,000        20,000  JOD             0           0           0 Bladykas Engineering,P.C.               0        /  /                           /  /             
11-0853   Reconstruction               0-016-028  06/26/12     DONE    DONE       DONE      02/28/12   02/27/12   07/21/11   04/07/11   16                       200,000       200,000  JOD             0           0           0 Bladykas Engineering,P.C.               0      10/04/13                       11/29/13           
12-0806   Reconstruction               0-016-029  05/15/13     DONE    DONE       DONE      02/11/13   01/08/13   09/26/12   05/10/11   155,16                   700,000       700,000  MFS             0           0           0 Bladykas Engineering,P.C.               0      04/20/15                       07/30/15           
12-0808   Reconstruction               0-016-030  04/29/13     DONE    DONE       DONE      02/12/13   02/01/13   10/04/12   05/10/12   8,16                      85,200        85,200  JMB             0           0           0 Burton Behrendt Smith                   0      05/09/14                       06/05/14           
12-0883   Reconstruction               0-016-031  06/25/13     DONE    DONE       DONE      02/20/13   02/11/13   11/02/12   05/08/12   155,15,16                 16,000        16,000  MFS             0           0           0 H2M Group                               0      12/03/13                       12/13/13           
14-0206   Reconstruction               0-016-032  04/27/15     DONE    DONE       DONE      08/21/14   08/18/14   12/10/13   06/11/14   16                        90,000        90,000  MFS             0           0           0 H2M Group                               0      09/18/15                       11/19/15           
14-1484   Reconstruction               0-016-033  11/03/15     DONE    DONE       DONE      05/04/15   05/04/15   10/06/14   05/13/14   9,15,16                  151,520       151,520  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
15-0752   Reconstruction               0-016-034  05/26/16     DONE    DONE       DONE      11/23/15   11/16/15   05/14/15   05/12/15   9,10                     134,000       134,000  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
  -       Reconstruction               0-016-035                                              /  /       /  /     05/14/15     /  /     2                              0    16,277,793  MFS             0           0           0                                         0        /  /                           /  /             
15-0072   Reconstruction               0-016-036  06/07/16     DONE    DONE       DONE      07/16/15   07/15/15   05/19/15   05/13/14   16                        50,000        50,000  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
16-0146   Reconstruction               0-016-037  12/16/16     DONE    DONE       DONE      07/25/16   07/20/16   05/24/16   05/10/16   9                         47,800             0  MFS             0           0           0 H2M Group                               0        /  /                           /  /             

          JE Allen Elementary-Dix Hills:
11-0208   Reconstruction               0-017-026  04/17/12     DONE    DONE       DONE      09/29/11   09/28/11   06/01/11   05/10/11   155,16                    40,000        40,000  JOD             0           0           0 Bladykas Engineering,P.C.               0      01/06/14                       10/28/14           
11-0854   Reconstruction               0-017-028  06/26/12     DONE    DONE       DONE      02/28/11   02/27/11   07/21/11   04/07/11   16                       200,000       200,000  JOD             0           0           0 Bladykas Engineering,P.C.               0      10/04/13                       11/29/13           
12-0884   Reconstruction               0-017-029  10/02/13     DONE    DONE       DONE      02/20/13   02/11/13   11/02/12   05/08/12   2,8,16                   148,000       148,000  MFS             0           0           0 H2M Group                               0      05/30/14                       06/30/14           
13-0667   Reconstruction               0-017-030  02/19/14     DONE    DONE       DONE      11/04/13   10/31/13   08/30/13     /  /     9,13,15,16                80,000        80,000  MFS             0           0           0 Burton Behrendt Smith                   0      09/22/14                       06/01/15           
  -       Reconstruction               0-017-031                                              /  /       /  /     12/10/13     /  /     10,16                          0    11,568,720  MFS             0           0           0                                         0        /  /                           /  /             
14-0760   Reconstruction               0-017-032  10/29/15     DONE    DONE       DONE      12/17/14   12/12/14   07/28/14   05/13/14   16                       216,698       216,698  MFS             0           0           0 H2M Group                               0      08/11/16                       10/05/16           
14-1108   Reconstruction               0-017-033  07/17/15     DONE    DONE       DONE      02/10/15   02/09/15   10/06/14   05/13/14   8,9,16                   174,310       174,310  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
15-0700   Reconstruction               0-017-034  04/28/16     DONE    DONE       DONE      11/06/15   11/05/15   05/14/15   05/12/15   9,10                     147,250       147,250  MFS             0           0           0 H2M Group                               0      12/29/16                       03/01/17           
  -       Reconstruction               0-017-035                                              /  /       /  /     05/14/15     /  /     16                             0    11,568,720  MFS             0           0           0                                         0        /  /                           /  /             
15-0073   Reconstruction               0-017-036  06/07/16     DONE    DONE       DONE      07/16/15   07/15/15   05/19/15   05/13/14   16                        50,000        50,000  MFS             0           0           0 H2M Group                               0        /  /                           /  /             

          Wilson Tech Northport:
12-0885   Reconstruction               0-018-017  08/22/13     DONE    DONE       DONE      02/20/13   02/11/13   11/02/12   05/08/12   16                       117,000       117,000  MFS             0           0           0 H2M Group                               0      02/28/14                       04/30/14           
11-0209   Reconstruction               0-018-026  04/17/12     DONE    DONE       DONE      09/29/11   09/28/11   06/01/11   05/10/11   15                        11,000        11,000  JOD             0           0           0 Bladykas Engineering,P.C.               0      01/06/14                       10/28/14           
12-0886   Reconstruction               0-018-027  03/31/14     DONE    DONE       DONE      02/20/13   02/11/13   11/02/12   05/08/12   16                       180,000       180,000  MFS             0           0           0 H2M Group                               0      05/08/15                       06/29/15           
14-1485   Reconstruction               0-018-028  02/26/16     DONE    DONE       DONE      05/04/15   05/04/15   10/06/14   05/13/14   16                        85,785        85,785  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
14-1229XX Reconstruction               0-018-029                         CANCELLED          03/03/15   03/02/15   01/08/15   05/13/14   16                             0     8,930,240  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
15-0701   Reconstruction               0-018-030  04/28/16     DONE    DONE       DONE      11/06/15   11/05/15   05/14/15   05/12/15   8,9                       68,700        68,700  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
15-0074   Reconstruction               0-018-031  09/23/16     DONE    DONE       DONE      07/16/15   07/15/15   05/14/15   05/12/15   155,16                   166,250       166,250  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
  -       Reconstruction               0-018-032                                              /  /       /  /     05/14/15     /  /     16                             0     8,930,240  MFS             0           0           0                                         0        /  /                           /  /             
15-0075   Reconstruction               0-018-033  06/07/16     DONE    DONE       DONE      07/16/15   07/15/15   05/19/15   05/13/14   16                        50,000        50,000  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
16-0303   Reconstruction               0-018-034                       ADDENDUM REQ'D       08/23/16   07/25/16   05/24/16   05/10/16   16                             0     8,930,240  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
  -       Reconstruction               0-018-035                                              /  /       /  /     02/07/17     /  /     16                             0             0  MTM             0           0           0                                         0        /  /                           /  /             

          Jones Hall #2:
12-0887   Reconstruction               0-019-007  11/18/13     DONE    DONE       DONE      02/20/13   02/11/13   11/02/12   05/08/12   2,16                     100,000       100,000  MFS             0           0           0 H2M Group                               0      07/15/15                       12/21/15           
13-1271   Reconstruction               0-019-008  08/15/14     DONE    DONE       DONE      02/24/14   02/18/14   12/10/13   06/11/13   16                        60,000        60,000  MFS             0           0           0 H2M Group                               0      11/02/15                       02/11/16           
14-1230XX Reconstruction               0-019-009                         CANCELLED          03/03/15   03/02/15   01/08/15   05/13/14   16                             0    11,974,640  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
15-0076   Reconstruction               0-019-010  06/07/16     DONE    DONE       DONE      07/16/15   07/15/15   05/19/15   05/12/15   16                        76,669        76,669  MFS             0           0           0 H2M Group                               0        /  /                           /  /             

          McGuire Hall #2:
  -    XX Reconstruction               0-021-007                         CANCELLED            /  /       /  /     11/02/12     /  /     2,16                           0     1,217,760  JMB             0           0           0                                         0        /  /                           /  /             
12-0888   Reconstruction               0-021-009  05/22/13     DONE    DONE       DONE      02/20/13   02/11/13   11/28/12   05/08/12   2,16                      21,000        18,350  MFS             0           0           0 H2M Group                               0      07/02/13                       07/24/13           
12-0889   Reconstruction               0-021-013  11/18/13     DONE    DONE       DONE      02/20/13   02/11/13   02/20/13   05/08/12   2,16                     100,000       100,000  MFS             0           0           0 H2M Group                               0      07/15/15                       12/21/15           
13-1272   Reconstruction               0-021-014  08/15/14     DONE    DONE       DONE      02/24/14   02/18/14   12/10/13   06/11/13   16                        60,000        60,000  MFS             0           0           0 H2M Group                               0      11/02/15                       02/11/16           
14-1500   Reconstruction               0-021-015  10/27/15     DONE    DONE       DONE      05/12/15   05/11/15   10/06/14   05/13/14   4                         80,000        80,000  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
14-1231XX Reconstruction               0-021-016                         CANCELLED          03/03/15   03/02/15   01/08/15   05/13/14   16                             0     1,217,760  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
15-0719   Reconstruction               0-021-017                       ADDENDUM REQ'D       11/12/15   11/04/15   05/14/15   05/12/15   2                              0     1,217,760  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
15-0077   Reconstruction               0-021-018  06/07/16     DONE    DONE       DONE      07/16/15   07/15/15   05/18/15   05/13/14   16                        50,000        50,000  MFS             0           0           0 H2M Group                               0        /  /                           /  /             

          Jones Hall #1:
11-0210   Reconstruction               0-022-011  04/17/12     DONE    DONE       DONE      09/29/11   09/28/11   06/01/11   05/10/11   155,16                   190,000       190,000  JOD             0           0           0 Bladykas Engineering,P.C.               0      01/06/14                       10/28/14           
12-0809   Reconstruction               0-022-012  04/29/13     DONE    DONE       DONE      02/12/13   02/01/13   10/04/12   05/10/12   8                         56,000        56,000  MFS             0           0           0 Burton Behrendt Smith                   0      05/09/14                       06/05/14           
12-0890   Reconstruction               0-022-013  11/18/13     DONE    DONE       DONE      02/20/13   02/11/13   11/02/12   05/08/12   2,16                     100,000       100,000  MFS             0           0           0 H2M Group                               0      07/15/15                       12/21/15           
13-1273   Reconstruction               0-022-014  08/15/14     DONE    DONE       DONE      02/24/14   02/18/14   12/10/13   06/11/13   16                        60,000        60,000  MFS             0           0           0 H2M Group                               0      11/02/15                       02/11/16           
14-0853   Reconstruction               0-022-015  10/26/15     DONE    DONE       DONE      12/29/14   12/24/14   09/10/14   05/13/14   155,16                   200,000       200,000  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
15-0720   Reconstruction               0-022-016                       ADDENDUM REQ'D       11/12/15   11/04/15   05/14/15   05/12/15   8                              0       405,920  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
15-0078   Reconstruction               0-022-017  06/07/16     DONE    DONE       DONE      07/16/15   07/15/15   05/19/15   05/12/15   16                        70,514        70,514  MFS             0           0           0 H2M Group                               0        /  /                           /  /             

          Taukomas School(Brennen Sch.):
12-0891   Reconstruction               0-025-015  06/05/13     DONE    DONE       DONE      02/20/13   02/11/13   11/02/12   05/08/12   16                       150,000       150,000  JMB             0           0           0 H2M Group                               0      01/08/14                       03/17/14           
11-0721   Reconstruction               0-025-019  04/17/12     DONE    DONE       DONE      01/25/12   01/24/12   06/01/11   05/10/11   2,15                     350,000             0  JOD             0           0           0 Bladykas Engineering,P.C.               0      10/16/12                       01/29/13           
13-0931   Reconstruction               0-025-021  04/08/14     DONE    DONE       DONE      12/24/13   12/20/13   08/30/13   05/07/13   2,8                    1,300,000     1,300,000  MFS             0           0           0 Burton Behrendt Smith                   0      06/01/15                       07/14/15           
13-1409   Reconstruction               0-025-022  04/28/14     DONE    DONE       DONE      04/01/14   03/27/14   12/10/13   06/11/13   16                        50,000        50,000  MFS             0           0           0 H2M Group                               0      01/15/15                       05/21/15           
14-0721   Reconstruction               0-025-023  12/23/15     DONE    DONE       DONE      12/05/14   12/03/14   09/08/14   05/13/14   16                       201,400       201,400  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
  -       Reconstruction               0-025-024                                              /  /       /  /     05/14/15     /  /     2                              0     8,280,972  MFS             0           0           0                                         0        /  /                           /  /             
15-0079   Reconstruction               0-025-025  06/07/16     DONE    DONE       DONE      07/16/15   07/15/15   05/19/15   05/13/14   16                        50,000        50,000  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
16-0406   Reconstruction               0-025-026  03/13/17     DONE    DONE       DONE      09/13/16   09/12/16   05/24/16   05/10/16   155,15,16                 20,350             0  MFS             0           0           0 H2M Group                               0        /  /                           /  /             

          Manor Plains School:
11-0211   Reconstruction               0-029-020  04/17/12     DONE    DONE       DONE      09/29/11   09/28/11   06/01/11   05/10/11   15                        80,000        80,000  JOD             0           0           0 Bladykas Engineering,P.C.               0      01/06/14                       10/28/14           
11-1048   Reconstruction               0-029-021  04/27/12     DONE    DONE       DONE      03/28/12   03/23/12   01/31/12   05/11/11   8                        500,000       500,000  JOD             0           0           0 Burton Behrendt Smith                   0      05/09/14                       06/05/14           
12-0810   Reconstruction               0-029-022  04/29/13     DONE    DONE       DONE      02/12/13   02/01/13   10/04/12   05/10/12   8                        520,000       520,000  MFS             0           0           0 Burton Behrendt Smith                   0      05/09/14                       06/05/14           
12-0892   Reconstruction               0-029-023  07/23/13     DONE    DONE       DONE      02/20/13   02/11/13   11/02/12   05/08/12   155,15,16                500,000       500,000  MFS             0           0           0 H2M Group                               0      09/16/14                       01/02/15           
13-0666   Reconstruction               0-029-024  02/19/14     DONE    DONE       DONE      11/04/13   10/31/13   08/30/13   05/11/11   4,8,9,15,16               89,300        89,300  MFS             0           0           0 Burton Behrendt Smith                   0      09/22/14                       12/04/14           
13-0930   Reconstruction               0-029-025  04/08/14     DONE    DONE       DONE      12/24/13   12/20/13   11/29/13   05/07/13   2,9                       85,000        85,000  MFS             0           0           0 Burton Behrendt Smith                   0      09/22/14                       12/04/14           
13-1517   Reconstruction               0-029-026  12/04/14     DONE    DONE       DONE      05/14/14   04/30/14   02/11/14   06/11/13   16                       150,000       150,000  MFS             0           0           0 H2M Group                               0      11/05/15                       01/30/17           
14-0791   Reconstruction               0-029-027  12/14/15     DONE    DONE       DONE      12/18/14   12/18/14   10/06/14   05/13/14   155,16                    30,470        30,470  MFS             0           0           0 H2M Group                               0      09/02/16                       11/03/16           
15-0702   Reconstruction               0-029-028  04/28/16     DONE    DONE       DONE      11/06/15   11/05/15   05/14/15   05/12/15   8,9                       68,200        68,200  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
15-0751   Reconstruction               0-029-029  05/26/16     DONE    DONE       DONE      11/23/15   11/16/15   05/14/15   05/12/15   7                        783,165       783,165  MFS             0           0           0 H2M Group                               0      11/11/16                       12/05/16           
15-0080   Reconstruction               0-029-030  06/07/16     DONE    DONE       DONE      07/16/15   07/15/15   05/19/15   05/12/15   16                       284,069       284,069  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
16-0147   Reconstruction               0-029-031                       ADDENDUM REQ'D       07/25/16   07/20/16   05/24/16   05/10/16   16                             0    16,237,160  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
16-0148   Reconstruction               0-029-032  12/16/16     DONE    DONE       DONE      07/25/16   07/20/16   05/24/16   05/10/16   8,9                      135,707             0  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
16-0407   Reconstruction               0-029-033  03/13/17     DONE    DONE       DONE      09/13/16   09/12/16   05/24/16   05/10/16   155,15                    36,850             0  MFS             0           0           0 H2M Group                               0        /  /                           /  /             

          Aviation Center:
  -       Reconstruction               0-052-003                                              /  /       /  /     10/06/14     /  /     9                              0     5,845,248  MFS             0           0           0                                         0        /  /                           /  /             
14-1765   Reconstruction               0-052-004  01/12/16     DONE    DONE       DONE      06/30/15   06/29/15   05/14/15   05/12/15   16                       145,330             0  MFS             0           0           0 H2M Group                               0      12/21/16                       01/17/17           
14-1745   Reconstruction               0-052-005  02/02/16     DONE    DONE       DONE      06/25/15   06/24/15   05/14/15   05/12/15   16                        19,750        19,750  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
  -       Reconstruction               0-052-006                                              /  /       /  /     05/14/15     /  /     16                             0     5,845,248  MFS             0           0           0                                         0        /  /                           /  /             
15-0081   Reconstruction               0-052-007  06/07/16     DONE    DONE       DONE      07/16/15   07/15/15   05/19/15   05/13/14   16                        50,000        50,000  MFS             0           0           0 H2M Group                               0        /  /                           /  /             

          Central Office:
11-0212   Reconstruction               1-035-011  04/17/12     DONE    DONE       DONE      09/29/11   09/28/11   06/01/11   05/10/11   155                       15,000             0  JOD             0           0           0 Bladykas Engineering,P.C.               0      01/06/14                       10/28/14           
11-0675   Reconstruction               1-035-013  05/01/12     DONE    DONE       DONE      01/18/12   01/17/12   10/05/11   04/07/10   2,8,9,10,155,15,16       543,000             0  JOD             0           0           0 Burton Behrendt Smith                   0      06/24/13                       12/04/14           

          Storage-Wilson Tech:
  -       Reconstruction               2-049-002                                              /  /       /  /     03/20/17     /  /     16                             0             0  MTM             0           0           0                                         0        /  /                           /  /             

          Container @ J.E. Allen Elem:
14-1670DB Discovered Building          2-061-001  07/16/15     DONE    DONE       DONE      06/16/15   06/11/15   04/28/15     /  /                                    0             0  MFS             0           0           0                                         0        /  /                           /  /             

          P.J. Brennan - North Babylon:
11-0213   Reconstruction               8-048-009  04/17/12     DONE    DONE       DONE      09/29/11   09/28/11   06/07/11   05/10/11   155,16                    75,000             0  JOD             0           0           0 Bladykas Engineering,P.C.               0      01/06/14                       10/28/14           
14-0283   Reconstruction               8-048-011  07/13/15     DONE    DONE       DONE      09/12/14   09/11/14   12/10/13     /  /     155,16                   105,000             0  MFS             0           0           0 H2M Group                               0      06/02/16                       07/25/16           
14-0575   Reconstruction               8-048-012  08/03/15     DONE    DONE       DONE      11/03/14   10/31/14   09/11/14   05/13/14   16                       198,104             0  MFS             0           0           0 H2M Group                               0      01/05/17                       02/02/17           
14-0825   Reconstruction               8-048-013  09/30/15     DONE    DONE       DONE      12/23/14   12/22/14   10/06/14   05/13/14   155,16                    67,985             0  MFS             0           0           0 H2M Group                               0      09/13/16                       11/21/16           
15-0082   Reconstruction               8-048-014  11/25/16     DONE    DONE       DONE      07/16/15   07/15/15   05/14/15   05/12/15   155,16                   157,250             0  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
14-1764   Reconstruction               8-048-015  09/14/15     DONE    DONE       DONE      06/30/15   06/29/15   05/14/15   05/12/15   16                       190,551             0  MFS             0           0           0 H2M Group                               0      08/12/16                       10/05/16           
  -       Reconstruction               8-048-016                                              /  /       /  /     05/14/15     /  /     16                             0             0  MFS             0           0           0                                         0        /  /                           /  /             
15-0083   Reconstruction               8-048-017  06/07/16     DONE    DONE       DONE      07/16/15   07/15/15   05/19/15   05/13/14   16                        50,000             0  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
16-0158   Reconstruction               8-048-018                       ADDENDUM REQ'D       07/25/16   07/25/16   05/24/16   05/10/16   9                              0             0  MFS             0           0           0 H2M Group                               0        /  /                           /  /             
16-0408   Reconstruction               8-048-019                       ADDENDUM REQ'D       09/13/16   09/12/16   05/24/16   05/10/16   155,15,16                      0             0  MFS             0           0           0 H2M Group                               0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED