REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
eunior-Senior High School:
07-2342 Reconstruction 0-001-013 07/16/08 DONE DONE DONE 07/08/08 06/30/08 04/09/08 05/20/08 2,16 90,000 90,000 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
08-0607 Reconstruction 0-001-014 07/14/09 DONE DONE DONE 10/29/08 10/28/08 08/01/08 05/20/08 8,9,155,16 2,087,820 2,087,820 HCM 0 0 0 John A Grillo-ARCHITECTS PC 2,087,820 / / / /
08-0760 Reconstruction 0-001-015 09/15/08 DONE DONE DONE 11/14/08 11/13/08 09/16/08 09/08/08 9,16 200,000 200,000 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
08-1588 Reconstruction 0-001-016 04/17/09 DONE DONE DONE 05/05/09 04/30/09 03/24/09 03/09/09 2 40,000 40,000 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
12-0078 Reconstruction 0-001-017 08/28/12 DONE DONE DONE 08/02/12 07/27/12 05/10/12 06/11/12 9,10,155,15,16 200,000 200,000 HCM 0 0 0 James M. Campbell Architects 0 / / 02/22/13
Memorial Grade School:
08-0608 Reconstruction 0-002-011 07/14/09 DONE DONE DONE 10/29/08 10/28/08 08/01/08 05/20/08 8,9,155,16 602,471 602,471 HCM 0 0 0 John A Grillo-ARCHITECTS PC 602,471 / / / /
Elementary School:
08-0609 Reconstruction 0-003-011 07/14/09 DONE DONE DONE 10/29/08 10/28/08 08/01/08 05/20/08 8,9,155,16 815,210 815,210 HCM 0 0 0 John A Grillo-ARCHITECTS PC 815,210 / / / /
Storage Container @ Babylon Library:
08-1663DB Discovered Building 2-015-001 07/30/09 DONE DONE DONE 06/08/09 05/27/09 05/10/07 / / 0 0 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Press Box @ Babylon HS Football Stad:
09-0270DB Discovered Building 7-010-001 10/09/09 DONE DONE DONE 09/28/09 09/28/09 03/18/04 / / 0 0 MAC 0 0 0 James M. Campbell Architects 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Senior High School:
- Reconstruction 0-001-023 / / / / 08/12/08 / / 2,9,10,16 0 0 JOD 0 0 0 0 / / / /
10-0304 Reconstruction 0-001-024 03/28/11 DONE DONE DONE 10/04/10 09/24/10 07/23/10 04/27/10 2,155,15,16 1,774,024 1,774,024 JOD 0 0 0 ECG Eninering, LLC 1,774,024 / / / /
11-1120 Reconstruction 0-001-025 05/08/12 DONE DONE DONE 04/12/12 04/11/12 02/02/12 02/15/07 2,4,7,9,155,16 137,853 137,853 JOD 0 0 137,853 Burton Behrendt Smith 0 / / / /
Junior High School:
07-2037 Reconstruction 0-002-019 11/14/08 DONE DONE DONE 04/30/08 04/21/08 10/27/04 04/12/99 2,4,8,9,155,15,16 741,097 741,097 MGL 0 0 0 Burton Behrendt Smith 0 / / / /
09-1162XX Reconstruction 0-002-021 09/17/10 CANCELLED 03/26/10 03/23/10 03/07/08 04/12/99 2,9,10,16 119,462 119,462 MGL 0 0 119,462 Burton Behrendt Smith 0 / / / /
10-0305 Reconstruction 0-002-022 03/28/11 DONE DONE DONE 10/04/10 09/24/10 07/23/10 04/27/10 2,155,15,16 1,089,620 1,089,620 JOD 0 0 0 ECG Eninering, LLC 1,089,620 / / / /
Forest Avenue School:
10-0306 Reconstruction 0-003-018 03/28/11 DONE DONE DONE 10/04/10 09/24/10 07/23/10 04/27/10 2,155,16 303,308 303,308 JOD 0 0 0 ECG Eninering, LLC 303,308 / / / /
11-1098 Reconstruction 0-003-019 04/12/12 DONE DONE DONE 04/10/12 04/10/12 02/02/12 02/15/07 4,9,16 297,000 297,000 JOD 0 0 297,000 Burton Behrendt Smith 0 / / 04/08/13
Santapogue Elementary School:
07-2304 Reconstruction 0-005-016 01/29/09 DONE DONE DONE 07/03/08 06/18/08 10/27/04 04/12/99 2,4,8,9,155,15,16 452,420 452,420 MGL 0 0 114,915 Burton Behrendt Smith 0 / / / /
09-1163XX Reconstruction 0-005-018 09/17/10 CANCELLED 03/26/10 03/23/10 03/07/08 04/12/99 2,9,15,16 345,465 0 MGL 0 0 345,465 Burton Behrendt Smith 0 / / / /
10-0307 Reconstruction 0-005-019 03/28/11 DONE DONE DONE 10/04/10 09/24/10 07/22/10 04/27/10 2,155,16 456,712 456,712 JOD 0 0 0 ECG Eninering, LLC 456,712 / / / /
South Bay School:
07-2305 Reconstruction 0-006-020 01/29/09 DONE DONE DONE 07/03/08 06/18/08 10/27/04 04/12/99 2,4,8,9,155,15,16 443,228 443,228 MGL 0 0 112,580 Burton Behrendt Smith 0 / / / /
10-0160 Reconstruction 0-006-023 09/08/10 DONE DONE DONE 08/26/10 08/23/10 07/22/10 03/02/10 2,4,7,8,9,10,155,15, 16,772,027 13,028,856 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
Tooker Avenue Elementary:
10-0308 Reconstruction 0-007-017 03/28/11 DONE DONE DONE 10/04/10 09/24/10 07/22/10 04/27/10 2,155,16 200,659 200,659 JOD 0 0 0 ECG Eninering, LLC 200,659 / / / /
John F Kennedy Elementary School:
07-2038 Reconstruction 0-008-019 11/14/08 DONE DONE DONE 04/30/08 04/21/08 10/27/04 04/12/99 2,4,8,9,155,15,16 502,088 502,088 MGL 0 0 275,000 Burton Behrendt Smith 0 / / / /
10-0309 Reconstruction 0-008-021 03/28/11 DONE DONE DONE 10/04/10 09/24/10 07/22/10 04/27/10 2,155,16 362,353 362,353 JOD 0 0 0 ECG Eninering, LLC 362,353 / / / /
Bus Garage:
- Reconstruction 5-004-011 / / / / 07/22/10 / / 2,155,16 0 0 JOD 0 0 0 0 / / / /
10-0310 Reconstruction 5-004-011 03/28/11 DONE DONE DONE 10/04/10 09/24/10 / / 04/27/10 177,034 177,034 0 0 0 ECG Eninering, LLC 177,034 / / / /
Drivers Building:
10-0311 Reconstruction 7-009-002 03/28/11 DONE DONE DONE 10/04/10 09/24/10 07/22/10 / / 2,155,16 41,095 0 JOD 0 0 0 ECG Eninering, LLC 41,095 / / / /
Our Lady of Grace School:
09-0971TQ Temporary Quarters 8-013-001 08/26/10 DONE DONE DONE 02/26/10 02/25/10 02/22/10 / / 0 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Senior High School:
08-0332 Reconstruction 0-002-035 03/05/09 DONE DONE DONE 09/16/08 09/12/08 01/30/08 11/20/07 2,4,9,155,16 1,275,000 0 DDJ 0 0 578,916 Wiedersum Associates Architec 0 / / / /
Belmont Elementary:
08-0333 Reconstruction 0-003-019 03/05/09 DONE DONE DONE 09/16/08 09/12/08 01/30/08 11/20/07 2,16 191,000 0 DDJ 0 0 86,724 Wiedersum Associates Architec 0 / / / /
M. G. Vedder Elementary:
08-0334 Reconstruction 0-004-025 03/05/09 DONE DONE DONE 09/16/08 09/12/08 01/30/08 11/20/07 7,9,13,155,16 195,000 0 DDJ 0 0 88,540 Wiedersum Associates Architec 0 / / / /
Woods Road Elementary School:
08-0335 Reconstruction 0-007-019 03/05/09 DONE DONE DONE 09/16/08 09/12/08 01/30/08 11/20/07 2,16 200,000 0 DDJ 0 0 90,810 Wiedersum Associates Architec 0 / / / /
Parliament Place Elementary:
08-0336 Reconstruction 0-008-019 03/05/09 DONE DONE DONE 09/16/08 09/12/08 01/30/08 11/20/07 2,9,16 50,000 0 DDJ 0 0 22,702 Wiedersum Associates Architec 0 / / / /
William DeLuca Elementary:
08-0337 Reconstruction 0-010-022 03/05/09 DONE DONE DONE 09/16/08 09/12/08 01/30/08 11/20/07 9,16 65,000 0 DDJ 0 0 29,513 Wiedersum Associates Architec 0 / / / /
Robert Moses Jr. High:
08-0338 Reconstruction 0-011-024 03/05/09 DONE DONE DONE 09/16/08 09/12/08 01/30/08 11/20/07 9,155,16 260,000 0 DDJ 0 0 118,054 Wiedersum Associates Architec 0 / / / /
Transportation Trailer - Bus Lot:
- DB Discovered Building 1-028-001 / / / / 02/07/12 / / 0 0 DDJ 0 0 0 0 / / / /
Container - Robert Moses MS:
- DB Discovered Building 2-024-001 / / / / 02/07/12 / / 0 0 DDJ 0 0 0 0 / / / /
Container - Marion G. Vedder Elem:
- DB Discovered Building 2-025-001 / / / / 02/07/12 / / 0 0 DDJ 0 0 0 0 / / / /
Storage Shed 1 - High School:
- DB Discovered Building 2-026-001 / / / / 02/07/12 / / 0 0 DDJ 0 0 0 0 / / / /
Storage Shed 2 - High School:
- DB Discovered Building 2-027-001 / / / / 02/07/12 / / 0 0 DDJ 0 0 0 0 / / / /
Bus Garage:
08-0339 Additions and Alterations 5-012-006 03/05/09 DONE DONE DONE 09/16/08 09/12/08 08/13/08 11/20/07 02 - 16 1,343,000 0 DDJ 0 0 0 Wiedersum Associates Architec 0 / / / /
North Babylon Public Library:
07-1699 Additions and Alterations 6-005-015 09/02/08 DONE DONE DONE 02/25/08 02/15/08 10/17/07 / / 02 - 16 160,000 0 DDJ 0 0 0 VNA Architects,PC 0 / / / /
07-2160 Reconstruction 6-005-016 06/18/08 DONE DONE DONE 05/27/08 05/19/08 02/21/08 / / 8,10,13 300,000 0 DDJ 0 0 0 VNA Architects,PC 0 / / / /
09-1518 Reconstruction 6-005-017 06/29/10 DONE DONE DONE 06/14/10 06/11/10 11/06/09 04/17/09 8 500,000 0 DDJ 0 0 0 William F. Collins 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Kellum School:
10-1021 Reconstruction 0-001-007 09/13/11 DONE DONE DONE 03/10/11 03/09/11 10/15/10 10/20/10 2,155,15,16 235,576 235,576 JOD 0 0 0 ECG Eninering, LLC 235,576 / / 02/13/13
- Reconstruction 0-001-008 / / / / 05/24/13 / / 2,15,16 0 0 JOB 0 0 0 0 / / / /
Junior High School:
10-1022 Reconstruction 0-002-024 09/12/11 DONE DONE DONE 03/10/11 03/09/11 10/15/10 10/20/10 2,155,15,16 645,270 645,270 JOD 0 0 0 ECG Eninering, LLC 645,270 / / 02/13/13
11-0156 Reconstruction 0-002-025 09/21/11 DONE DONE DONE 09/02/11 09/02/11 06/29/11 05/17/11 4,7,9 214,710 214,710 JOD 0 0 56,035 John A Grillo-ARCHITECTS PC 0 / / 08/30/12
- Reconstruction 0-002-026 / / / / 03/07/12 / / 4,7 0 0 JOD 0 0 0 0 / / / /
12-1195 Reconstruction 0-002-027 06/11/13 DONE DONE DONE 05/15/13 05/15/13 03/29/13 05/17/11 155 0 0 JOB 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
- Reconstruction 0-002-028 / / / / 05/24/13 / / 2,15,16 0 0 JOB 0 0 0 0 / / / /
Alleghany Ave. Elementary:
10-1023 Reconstruction 0-004-017 09/13/11 DONE DONE DONE 03/10/11 03/09/11 10/15/10 10/20/10 2,155,15,16 222,931 222,931 JOD 0 0 0 ECG Eninering, LLC 222,931 / / 02/13/13
- Reconstruction 0-004-018 / / / / 05/24/13 / / 2,15,16 0 0 JOB 0 0 0 0 / / / /
08-1689SC Visual Structural Inspection 0-004-SC1 06/18/09 DONE DONE DONE 03/16/09 03/16/09 / / / / 16 19,494 0 JOD 0 0 0 0 / / / /
Edward Bower Elementary:
10-1024 Reconstruction 0-005-018 09/13/11 DONE DONE DONE 03/10/11 03/09/11 10/15/10 10/20/10 2,155,15,16 287,589 0 JOD 0 0 0 ECG Eninering, LLC 287,589 / / 02/13/13
Daniel Street Elementary:
10-1025 Reconstruction 0-006-020 09/13/11 DONE DONE DONE 03/10/11 03/09/11 10/14/10 10/20/10 2,155,15,16 374,535 374,535 JOD 0 0 0 ECG Eninering, LLC 374,535 / / 02/13/13
12-0771 Reconstruction 0-006-021 04/17/13 DONE DONE DONE 02/05/13 02/05/13 11/28/12 11/20/12 9 40,000 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
- Reconstruction 0-006-022 / / / / 05/24/13 / / 2,15,16 0 0 JOB 0 0 0 0 / / / /
08-1687SC Visual Structural Inspection 0-006-SC1 06/18/09 DONE DONE DONE 03/16/09 03/16/09 / / / / 16 19,654 0 JOD 0 0 0 0 / / / /
William Rall Elementary:
10-1026 Reconstruction 0-007-017 09/13/11 DONE DONE DONE 03/11/11 03/09/11 10/15/10 10/20/10 2,155,15,16 231,942 231,942 JOD 0 0 0 ECG Eninering, LLC 231,942 / / 02/13/13
- Reconstruction 0-007-018 / / / / 05/24/13 / / 2,15,16 0 0 JOB 0 0 0 0 / / / /
Senior High School:
07-2218 Reconstruction 0-009-025 08/21/08 DONE DONE DONE 06/05/08 05/28/08 04/23/08 05/15/07 9 58,752 58,752 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
09-0266 Reconstruction 0-009-026 10/07/09 DONE DONE DONE 09/28/09 09/25/09 05/20/09 05/19/09 2,15 100,000 100,000 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
10-1027 Reconstruction 0-009-027 09/13/11 DONE DONE DONE 03/11/11 03/09/11 10/15/10 10/20/10 2,155,15,16 959,595 959,595 JOD 0 0 0 ECG Eninering, LLC 959,595 / / 02/13/13
10-0601 Reconstruction 0-009-028 04/12/11 DONE DONE DONE 12/22/10 12/13/10 10/15/10 11/15/06 4,13,15 64,900 64,900 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 08/30/12
10-1052 Reconstruction 0-009-029 06/04/11 DONE DONE DONE 03/15/11 03/10/11 02/10/11 01/15/11 2,4,8,9,155,15,16 485,000 485,000 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 08/30/12
12-1083 Additions and Alterations 0-009-030 UNREVIEWED 04/10/13 04/08/13 11/28/12 05/15/12 02 - 16 0 52,825,480 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
- Reconstruction 0-009-031 / / / / 05/24/13 / / 2,15,16 0 0 JOB 0 0 0 0 / / / /
West Gates Elementary:
09-1428 Reconstruction 0-010-012 06/16/10 DONE DONE DONE 05/11/10 05/07/10 05/20/09 11/15/06 2,4,15 49,560 49,560 JOD 0 0 49,560 John A Grillo-ARCHITECTS PC 0 / / / /
10-1028 Reconstruction 0-010-013 09/13/11 DONE DONE DONE 03/11/11 03/09/11 10/15/10 10/20/10 2,155,15,16 263,544 263,544 JOD 0 0 0 ECG Eninering, LLC 263,544 / / 02/13/13
Earding Elementary School:
10-1029 Reconstruction 0-011-016 09/13/11 DONE DONE DONE 03/11/11 03/09/11 10/15/10 10/20/10 2,155,15,16 283,081 283,081 JOD 0 0 0 ECG Eninering, LLC 283,081 / / 02/13/13
Albany Avenue Elementary School:
10-1030 Reconstruction 0-012-016 09/13/11 DONE DONE DONE 03/11/11 03/09/11 10/15/10 10/20/10 2,155,15,16 985,427 985,427 JOD 0 0 0 ECG Eninering, LLC 985,427 / / 02/13/13
- Reconstruction 0-012-017 / / / / 05/24/13 / / 2,15,16 0 0 JOB 0 0 0 0 / / / /
Niagara Ave. School & Admin.:
10-1031 Reconstruction 0-013-008 09/13/11 DONE DONE DONE 03/11/11 03/09/11 10/15/10 10/20/10 2,14,155,15,16 961,736 961,736 JOD 0 0 0 ECG Eninering, LLC 961,736 / / 02/13/13
12-0264 Reconstruction 0-013-009 03/15/13 DONE DONE DONE 10/11/12 10/09/12 06/08/12 05/15/12 2,16 302,080 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
- Reconstruction 0-013-010 / / / / 05/24/13 / / 2,15,16 0 0 JOB 0 0 0 0 / / / /
McKenna former Niagara Administratio:
08-1688SC Visual Structural Inspection 1-013-SC1 06/18/09 DONE DONE DONE 03/16/09 03/16/09 / / / / 16 16,833 0 JOD 0 0 0 0 / / / /
Inter-Modal Shipping Containter #1:
09-0034DB Discovered Building 2-021-001 02/13/13 DONE DONE DONE 07/16/09 07/09/09 08/14/08 / / 0 0 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Masonry Storage Shed (Memorial Shed):
09-0035DB Discovered Building 2-022-001 ADDENDUM REQ'D 07/16/09 07/09/09 08/14/08 / / 0 0 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Inter-Modal Shipping Containter #1:
09-0036DB Discovered Building 2-023-001 02/13/13 DONE DONE DONE 07/16/09 07/09/09 08/14/08 / / 0 0 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Inter-Modal Shipping Container #2:
09-0037DB Discovered Building 2-024-001 02/13/13 DONE DONE DONE 07/16/09 07/09/09 08/14/08 / / 0 0 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Inter-Modal Shipping Container:
09-0038DB Discovered Building 2-025-001 02/13/13 DONE DONE DONE 07/16/09 07/09/09 08/14/08 / / 0 0 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Athletic Field Storage Building:
09-0039DB Discovered Building 2-026-001 UNREVIEWED
DONE DONE 07/16/09 07/09/09 08/14/08 / / 0 0 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Courtyard Storage Shed #1:
09-0040DB Discovered Building 2-027-001 02/13/13 DONE DONE DONE 07/16/09 07/09/09 08/14/08 / / 0 0 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Courtyard Storage Shed #2:
09-0042DB Discovered Building 2-028-001 02/13/13 DONE DONE DONE 07/17/09 07/09/09 08/14/08 / / 0 0 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Grounds Department Shop (Storage Bl):
09-0041DB Discovered Building 2-029-001 UNREVIEWED 07/17/09 07/09/09 08/14/08 / / 0 0 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Inter-Modal Shipping Container #2:
09-0043DB Discovered Building 2-030-001 02/13/13 DONE DONE DONE 07/17/09 07/09/09 08/14/08 / / 0 0 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Inter-Modal Shipping Container #3:
09-0044DB Discovered Building 2-031-001 02/13/13 DONE DONE DONE 07/17/09 07/09/09 08/14/08 / / 0 0 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Inter-Modal Shipping Container #4:
09-0045DB Discovered Building 2-032-001 02/13/13 DONE DONE DONE 07/17/09 07/09/09 08/14/08 / / 0 0 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Grounds Shed (see#2029):
- XX New Construction 2-033-001 CANCELLED / / / / 11/14/08 / / 02 - 16 0 0 JOD 0 0 0 0 / / / /
Lindenhurst Memorial Library:
12-0469 Reconstruction 6-003-003 01/10/13 DONE DONE DONE 11/20/12 11/20/12 06/29/12 09/22/12 155,16 1,261,000 0 DDJ 0 0 0 EMTEC Consultants, P.C. 0 / / / /
District Wide:
08-1640 Reconstruction 7-999-001 05/19/09 DONE DONE DONE 05/19/09 05/15/09 04/23/09 11/15/06 10,13,16 450,000 450,000 JOD 0 0 138,150 John A Grillo-ARCHITECTS PC 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Great Neck Rd. Elementary:
09-1366 Reconstruction 0-002-018 05/26/10 DONE DONE DONE 05/03/10 04/26/10 04/08/10 01/25/07 8 648,174 648,174 DDJ 0 0 210,657 John A Grillo-ARCHITECTS PC 0 / / / /
Copiague Jr High School:
07-2000 Reconstruction 0-004-019 07/13/11 DONE DONE DONE 04/21/08 04/11/08 / / 01/25/07 10,13 162,875 162,875 DDJ 0 0 52,934 John A Grillo-ARCHITECTS PC 0 / / / /
- Reconstruction 0-004-021 / / / / 04/08/10 / / 9,16 0 0 DDJ 0 0 0 0 / / / /
Susan E. Wiley Elementary:
09-1367 Reconstruction 0-005-020 05/26/10 DONE DONE DONE 05/03/10 04/26/10 04/08/10 01/25/10 7,8,9,16 209,981 209,981 DDJ 0 0 68,244 John A Grillo-ARCHITECTS PC 0 / / / /
Senior High School:
08-0068 Reconstruction 0-006-020 09/11/08 DONE DONE DONE 07/21/08 07/11/08 04/22/08 01/25/07 15 163,059 163,059 DDJ 0 0 52,994 John A Grillo-ARCHITECTS PC 0 / / / /
09-1368 Reconstruction 0-006-022 05/26/10 DONE DONE DONE 05/03/10 04/26/10 04/08/10 01/25/10 4,8,9,16 21,240 21,240 DDJ 0 0 6,903 John A Grillo-ARCHITECTS PC 0 / / / /
Public Library:
09-0857 Additions and Alterations 6-007-005 07/16/10 DONE DONE DONE 02/04/10 02/01/10 04/23/09 10/27/09 02 - 16 1,865,000 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
11-0069 Reconstruction 6-007-006 08/05/11 DONE DONE DONE 07/26/11 07/26/11 05/19/11 04/26/11 155,15 100,000 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 08/29/12
12-0005 Reconstruction 6-007-007 08/29/12 DONE DONE DONE 07/09/12 07/05/12 05/29/12 04/25/12 9,10,16 150,000 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 01/18/13
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Northeast Elementary School:
09-1200 Reconstruction 0-003-011 05/11/10 DONE DONE DONE 04/01/10 03/29/10 05/03/07 03/16/10 2,4,7,15 988,000 988,000 MGL 0 0 0 Thornton-Tomasetti,Inc 0 / / / /
- PR Additions and Alterations 0-003-012 / / / / 03/24/10 / / 02 - 16 0 0 JOD 0 0 0 0 / / / /
Northwest Elementary School:
09-1201 Reconstruction 0-004-010 04/27/10 DONE DONE DONE 04/01/10 03/29/10 05/03/07 03/16/10 2,4,7,15 1,202,000 1,202,000 MGL 0 0 0 Thornton-Tomasetti,Inc 0 / / / /
- PR Additions and Alterations 0-004-011 / / / / 03/25/10 / / 02 - 16 0 0 JOD 0 0 0 0 / / / /
Amityville Public Library:
10-1332 Reconstruction 6-015-005 08/12/11 DONE DONE DONE 05/24/11 05/23/11 04/15/11 04/05/11 7,155,15,16 700,000 0 JOD 0 0 0 EMTEC Consultants, P.C. 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Abraham Lincoln Elementary:
09-1189 Reconstruction 0-001-008 12/22/10 DONE DONE DONE 04/01/10 03/25/10 11/20/06 11/25/09 8,9 2,069,195 2,069,195 JOD 0 0 0 John A Grillo-ARCHITECTS PC 2,069,195 / / / /
08-1353SC Visual Structural Inspection 0-001-SC2 03/16/09 DONE DONE DONE 03/09/09 03/09/09 / / / / 16 7,647 0 JOD 0 0 0 0 / / / /
JF Kennedy Junior High:
09-1190 Reconstruction 0-002-031 12/22/10 DONE DONE DONE 04/01/10 03/25/10 12/17/09 11/25/09 2,4,7,9,10,155,15,16 3,298,698 3,298,698 JOD 0 0 0 John A Grillo-ARCHITECTS PC 3,298,698 / / / /
08-1354SC Visual Structural Inspection 0-002-SC2 03/16/09 DONE DONE DONE 03/09/09 03/09/09 / / / / 16 25,227 0 JOD 0 0 0 0 / / / /
Memorial Elementary:
09-1191 Reconstruction 0-003-007 12/22/10 DONE DONE DONE 04/01/10 03/25/10 12/17/09 11/25/09 15,16 113,443 113,443 JOD 0 0 0 John A Grillo-ARCHITECTS PC 113,443 / / / /
08-1352SC Visual Structural Inspection 0-003-SC1 03/16/09 DONE DONE DONE 03/09/09 03/09/09 / / / / 16 4,019 0 JOD 0 0 0 0 / / / /
May Moore Elementary School:
09-1192 Reconstruction 0-004-031 12/22/10 DONE DONE DONE 04/01/10 03/25/10 12/17/09 11/25/09 2,8,155,15,16 1,681,055 1,681,055 JOD 0 0 0 John A Grillo-ARCHITECTS PC 1,681,055 / / / /
08-1351SC Visual Structural Inspection 0-004-SC1 03/16/09 DONE DONE DONE 03/09/09 03/09/09 / / / / 16 9,460 0 JOD 0 0 0 0 / / / /
G. Washington School:
09-1193 Reconstruction 0-005-009 12/22/10 DONE DONE DONE 04/01/10 03/25/10 12/17/09 11/25/09 2,155,15,16 404,273 404,273 JOD 0 0 0 John A Grillo-ARCHITECTS PC 404,273 / / / /
08-1355SC Visual Structural Inspection 0-005-SC1 03/16/09 DONE DONE DONE 03/09/09 03/09/09 / / / / 16 5,833 0 JOD 0 0 0 0 / / / /
Senior High School:
07-1096 Reconstruction 0-006-045 11/26/08 DONE DONE DONE 12/12/07 12/11/07 09/11/07 03/20/07 9,155,15,16 589,326 589,326 JOD 0 0 400,012 Bartlett,Amoruso, & Recce-Arc 0 / / / /
09-1194 Reconstruction 0-006-046 12/22/10 DONE DONE DONE 04/01/10 03/25/10 / / 11/25/09 1,412,009 1,412,009 JOD 0 0 0 John A Grillo-ARCHITECTS PC 1,412,009 / / / /
10-0589 Reconstruction 0-006-047 06/16/11 DONE DONE DONE 12/21/10 12/10/10 11/22/10 05/17/11 2,15 118,000 118,000 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
10-1396 Reconstruction 0-006-048 07/28/11 DONE DONE DONE 06/15/11 06/10/11 05/26/11 05/11/11 2,4,13 500,000 500,000 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
11-1446 Reconstruction 0-006-049 07/12/12 DONE DONE DONE 06/29/12 06/21/12 05/29/12 05/12/12 7 279,400 0 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
12-1230 Reconstruction 0-006-050 UNREVIEWED 05/23/13 05/23/13 03/08/13 05/21/13 2,4 0 0 MFS 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
08-1357SC Visual Structural Inspection 0-006-SC3 03/16/09 DONE DONE DONE 03/09/09 03/09/09 / / / / 16 89,656 0 JOD 0 0 0 0 / / / /
John Q. Adams Elementary:
09-1195 Reconstruction 0-007-023 12/22/10 DONE DONE DONE 04/01/10 03/25/10 12/17/09 11/25/09 2,8,14,155,15 521,244 521,244 JOD 0 0 0 John A Grillo-ARCHITECTS PC 521,244 / / / /
08-1356SC Visual Structural Inspection 0-007-SC2 03/16/09 DONE DONE DONE 03/09/09 03/09/09 / / / / 16 13,790 0 JOD 0 0 0 0 / / / /
Robert Frost Junior High:
09-1196 Reconstruction 0-008-029 12/22/10 DONE DONE DONE 04/01/10 03/25/10 12/17/09 11/25/09 2,155,15,16 802,629 802,629 JOD 0 0 0 John A Grillo-ARCHITECTS PC 802,629 / / / /
08-1350SC Visual Structural Inspection 0-008-SC2 03/16/09 DONE DONE DONE 03/09/09 03/09/09 / / / / 16 69,356 64,000 JOD 0 0 0 0 / / / /
Annex Office Buildin:
12-0093 Reconstruction 1-009-003 10/31/12 DONE DONE DONE 08/09/12 07/26/12 10/05/12 05/15/12 53,100 0 JMB 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Trans Annex(Fuel-Buses only):
09-1228 Reconstruction 5-017-002 05/28/10 DONE DONE DONE 04/05/10 03/31/10 03/26/10 05/20/08 2,13,15 135,000 135,000 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
- XX Reconstruction 5-017-003 CANCELLED 08/09/12 07/26/12 08/07/12 / / 7 0 0 JMB 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Deer Park Public Library:
10-0088 Reconstruction 6-010-004 08/24/10 DONE DONE DONE 08/05/10 07/30/10 03/25/10 / / 2,8 500,000 0 JOD 0 0 0 William F. Collins 0 / / / /
Press Box:
10-1397 New Construction 7-014-001 07/28/11 DONE DONE DONE 06/15/11 06/10/11 05/30/96 05/11/11 02 - 16 137,349 0 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Districtwide:
07-1095 Reconstruction 7-999-002 11/18/08 DONE DONE DONE 12/12/07 12/11/07 09/11/07 03/20/07 8,10,13,16 706,719 706,719 JOD 0 0 706,719 Bartlett,Amoruso, & Recce-Arc 0 / / / /
07-1154 Reconstruction 7-999-003 11/05/08 DONE DONE DONE 12/18/07 12/18/07 09/11/07 03/20/07 10,16 358,874 358,874 JOD 0 0 275,269 Bartlett,Amoruso, & Recce-Arc 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
ML King ES/LaFrancis Hardiman/Admin.:
- Reconstruction 0-002-022 / / / / 03/30/09 / / 2,9 0 9,555,699 DDJ 0 0 0 0 / / / /
08-1547 Reconstruction 0-002-023 05/13/09 DONE DONE DONE 04/27/09 04/22/09 04/06/09 04/15/09 2,9 100,000 100,000 DDJ 0 0 0 ECG Eninering, LLC 0 / / 01/17/13
10-1182 Reconstruction 0-002-024 04/13/11 DONE DONE DONE 04/12/11 04/08/11 11/18/10 08/25/10 7 225,000 225,000 DDJ 0 0 0 Tetra Tech Architects & Engi 0 / / 01/17/13
- PR Additions and Alterations 0-002-025 / / / / 02/08/11 / / 02 - 16 0 0 DDJ 0 0 0 0 / / / /
11-0827 Reconstruction 0-002-026 05/11/12 DONE DONE DONE 02/22/12 02/21/12 01/25/12 01/12/12 7 1,789,165 1,789,165 DDJ 0 0 0 Tetra Tech Architects & Engi 0 / / 01/17/13
12-0070 Reconstruction 0-002-027 10/19/12 DONE DONE DONE 08/01/12 07/26/12 03/15/12 01/10/12 2,4,155,15,16 1,516,330 0 DDJ 0 0 0 Tetra Tech Architects And Eni 0 / / / /
12-0164 Reconstruction 0-002-028 10/11/12 DONE DONE DONE 09/13/12 09/04/12 06/29/12 01/10/12 8 3,145,000 0 DDJ 0 0 0 Tetra Tech Architects & Engi 0 / / / /
Wyandanch Memorial High School:
09-0582 Reconstruction 0-004-018 12/23/09 DONE DONE DONE 12/17/09 12/14/09 11/09/09 12/17/09 7 725,000 725,000 DDJ 0 0 9,555 Tetra Tech Architects & Engi 0 / / 01/17/12
- Additions and Alterations 0-004-019 / / / / 11/18/10 / / 02 - 16 0 16,451,700 DDJ 0 0 0 0 / / / /
11-0829 Reconstruction 0-004-020 05/11/12 DONE DONE DONE 02/22/12 02/21/12 01/25/12 01/10/12 7,9,10 1,127,925 1,127,925 DDJ 0 0 0 Tetra Tech Architects & Engi 0 / / 01/17/13
12-0071 Reconstruction 0-004-021 10/19/12 DONE DONE DONE 08/01/12 07/26/12 06/29/12 01/10/12 8,10 4,812,626 0 DDJ 0 0 0 Tetra Tech Architects And Eni 0 / / / /
12-0165 Reconstruction 0-004-022 10/11/12 DONE DONE DONE 09/14/12 09/14/12 / / 01/10/12 8 2,096,150 0 DDJ 0 0 0 Tetra Tech Architects & Engi 0 / / / /
Olive Middle School:
11-0828 Reconstruction 0-005-019 05/11/12 DONE DONE DONE 02/22/12 02/21/12 01/25/12 01/10/12 7,9 799,475 799,475 DDJ 0 0 0 Tetra Tech Architects & Engi 0 / / 01/17/13
12-0072 Reconstruction 0-005-020 10/19/12 DONE DONE DONE 08/01/12 07/26/12 03/15/12 01/10/12 2,4,9,155,15,16 2,567,169 0 DDJ 0 0 0 Tetra Tech Architects And Eni 0 / / / /
12-0166 Reconstruction 0-005-021 10/11/12 DONE DONE DONE 09/13/12 09/04/12 06/29/12 01/10/12 8 2,068,000 0 DDJ 0 0 0 Tetra Tech Architects & Engi 0 / / / /
Wyandanch Hoigh School:
- PR New Construction 0-010-001 / / / / 11/16/10 / / 02 - 16 0 0 DDJ 0 0 0 0 / / / /
Bus Garage:
11-0830 Reconstruction 5-007-007 05/11/12 DONE DONE DONE 02/22/12 02/21/12 01/25/12 01/10/12 7 133,435 133,435 DDJ 0 0 0 Tetra Tech Architects & Engi 0 / / 01/17/13
12-0073 Reconstruction 5-007-008 10/19/12 DONE DONE DONE 08/01/12 07/26/12 06/06/12 01/10/12 2,9,155,15,16 221,000 0 DDJ 0 0 0 Tetra Tech Architects And Eni 0 / / / /
12-0167 Reconstruction 5-007-009 10/11/12 DONE DONE DONE 09/13/12 09/04/12 06/29/12 01/10/12 8 90,850 0 DDJ 0 0 0 Tetra Tech Architects & Engi 0 / / / /
Wyandanch Public Library:
08-0412 Reconstruction 6-008-003 09/30/08 DONE DONE DONE 09/26/08 09/26/08 09/26/08 09/24/08 10,15 81,389 0 DDJ 0 0 0 Robert St. C Gaskin, Architec 0 / / / /
12-0163 Additions and Alterations 6-008-004 ADDENDUM REQ'D 09/10/12 09/04/12 12/08/11 07/15/09 02 - 16 0 0 DDJ 0 0 0 ACGA ARCHITECTS 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Setauket Elementary School:
08-0464 Reconstruction 0-001-028 03/18/09 DONE DONE DONE 10/06/08 10/03/08 10/06/06 10/10/06 8,155,15,16 626,618 626,618 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 626,618 / / / /
08-0032 Reconstruction 0-001-029 12/17/08 DONE DONE DONE 07/21/08 07/02/08 10/06/06 10/16/07 2 5,822,957 5,822,957 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
08-1238 Reconstruction 0-001-030 06/30/09 DONE DONE DONE 02/19/09 02/13/09 12/05/07 10/16/07 2,4,7,8,9,155,15,16 1,258,234 1,258,234 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
10-0757 Reconstruction 0-001-031 05/19/11 DONE DONE DONE 01/28/11 01/14/11 05/19/10 11/10/09 8,16 160,000 160,000 DDJ 0 0 28,800 John A Grillo-ARCHITECTS PC 0 / / / /
11-1418 Reconstruction 0-001-032 08/03/12 DONE DONE DONE 06/21/12 06/18/12 03/20/12 05/15/12 155 90,000 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
12-1024 Reconstruction 0-001-033 UNREVIEWED 03/27/13 03/27/13 03/23/12 11/10/09 16 0 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
- Reconstruction 0-001-034 / / / / 04/16/13 / / 155,15,16 0 0 DDJ 0 0 0 0 / / / /
Nassakeag Elementary School:
08-0465 Reconstruction 0-002-021 03/18/09 DONE DONE DONE 10/06/08 10/03/08 10/06/06 10/10/06 8,155,15,16 889,939 889,939 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 889,939 / / / /
08-0033 Reconstruction 0-002-022 12/17/08 DONE DONE DONE 07/21/08 07/02/08 02/25/08 10/16/07 2,4,7,8,9,155,15,16 1,574,205 1,574,205 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
08-1239 Reconstruction 0-002-023 06/30/09 DONE DONE DONE 02/19/09 02/13/09 08/11/08 10/16/07 2,4,7 894,685 894,685 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
10-0758 Reconstruction 0-002-024 05/19/11 DONE DONE DONE 01/28/11 01/14/11 05/19/10 11/10/09 8,16 160,000 160,000 DDJ 0 0 28,800 John A Grillo-ARCHITECTS PC 0 / / / /
11-1419 Reconstruction 0-002-025 08/03/12 DONE DONE DONE 06/21/12 06/18/12 03/20/12 05/15/12 155 70,000 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
12-1025 Reconstruction 0-002-026 UNREVIEWED 03/27/13 03/27/13 03/23/12 11/10/09 16 0 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
- Reconstruction 0-002-027 / / / / 04/16/13 / / 155,15,16 0 0 DDJ 0 0 0 0 / / / /
Mount Elementary School:
08-0466 Reconstruction 0-006-021 03/18/09 DONE DONE DONE 10/06/08 10/03/08 10/06/06 10/10/06 2,8,155,15,16 1,295,340 1,295,340 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 1,295,340 / / / /
08-1240 Reconstruction 0-006-022 06/30/09 DONE DONE DONE 02/19/09 02/13/09 03/11/08 10/16/07 2,4,9,155,15,16 1,641,866 1,641,866 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
10-0759 Reconstruction 0-006-023 05/19/11 DONE DONE DONE 01/28/11 01/14/11 05/19/10 11/10/09 8,16 160,000 160,000 DDJ 0 0 28,800 John A Grillo-ARCHITECTS PC 0 / / / /
- Reconstruction 0-006-024 / / / / 03/08/12 / / 16 0 0 DDJ 0 0 0 0 / / / /
11-1420 Reconstruction 0-006-025 08/03/12 DONE DONE DONE 06/21/12 06/18/12 03/20/12 05/15/12 155 70,000 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
12-1026 Reconstruction 0-006-026 UNREVIEWED 03/27/13 03/27/13 03/23/12 11/10/09 16 0 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
- Reconstruction 0-006-027 / / / / 04/16/13 / / 155,15,16 0 0 DDJ 0 0 0 0 / / / /
Arrowhead Lane Elementary:
08-0467 Reconstruction 0-007-020 03/18/09 DONE DONE DONE 10/06/08 10/03/08 10/06/06 10/10/06 8,9,155,15,16 634,650 634,650 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 634,650 / / / /
08-0034 Reconstruction 0-007-021 12/17/08 DONE DONE DONE 07/21/08 07/02/08 03/11/08 10/16/07 2,4,9,155,15,16 1,668,575 1,668,575 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
08-1241 Reconstruction 0-007-022 06/30/09 DONE DONE DONE 02/19/09 02/13/09 08/11/08 10/16/07 2,4,7 244,732 244,732 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
10-0760 Reconstruction 0-007-023 05/19/11 DONE DONE DONE 01/28/11 01/14/11 05/19/10 11/10/09 8,16 160,000 160,000 DDJ 0 0 28,800 John A Grillo-ARCHITECTS PC 0 / / / /
11-1421 Reconstruction 0-007-024 08/03/12 DONE DONE DONE 06/21/12 06/18/12 03/20/12 05/15/12 155 140,000 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
12-1027 Reconstruction 0-007-025 UNREVIEWED 03/27/13 03/27/13 03/23/12 11/10/09 16 0 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
- Reconstruction 0-007-026 / / / / 04/16/13 / / 155,15,16 0 0 DDJ 0 0 0 0 / / / /
Paul J Gelinas Junior High:
08-0468 Additions and Alterations 0-008-023 03/18/09 DONE DONE DONE 10/06/08 10/03/08 09/29/06 10/10/06 02 - 16 1,545,175 1,545,175 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 1,545,175 / / / /
08-0035 Additions and Alterations 0-008-026 12/17/08 DONE DONE DONE 07/21/08 07/02/08 03/11/08 10/16/07 02 - 16 395,122 395,122 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
08-1242 Additions and Alterations 0-008-027 06/30/09 DONE DONE DONE 02/19/09 02/13/09 05/27/08 10/16/07 02 - 16 6,004,468 5,922,673 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
09-0653 Reconstruction 0-008-028 01/15/10 DONE DONE DONE 12/30/09 12/23/09 07/22/09 11/10/09 7 2,265,120 2,265,120 DDJ 0 0 407,722 John A Grillo-ARCHITECTS PC 0 / / / /
10-0761 Reconstruction 0-008-029 05/19/11 DONE DONE DONE 01/28/11 01/14/11 05/19/10 11/10/09 8,16 350,000 350,000 DDJ 0 0 63,000 John A Grillo-ARCHITECTS PC 0 / / / /
12-1028 Reconstruction 0-008-030 UNREVIEWED 03/27/13 03/27/13 01/12/12 11/10/09 16 0 28,072,296 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
11-1422 Reconstruction 0-008-031 08/03/12 DONE DONE DONE 06/21/12 06/18/12 03/20/12 05/15/12 155 85,000 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
- Reconstruction 0-008-032 / / / / 04/16/13 / / 155,15,16 0 0 DDJ 0 0 0 0 / / / /
Ward Melville Senior High:
08-0469 Reconstruction 0-009-030 03/18/09 DONE DONE DONE 10/06/08 10/03/08 10/06/06 10/10/06 2,8,155,15,16 3,354,585 3,354,585 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 3,354,585 / / / /
08-1243 Reconstruction 0-009-031 06/30/09 DONE DONE DONE 02/19/09 02/13/09 12/29/06 10/16/07 155 4,028,460 4,028,460 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
08-0036 Additions and Alterations 0-009-032 12/17/08 DONE DONE DONE 07/21/08 07/02/08 12/05/07 10/16/07 02 - 16 25,761,745 23,325,991 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
09-0654 Reconstruction 0-009-033 01/15/10 DONE DONE DONE 12/30/09 12/23/09 07/28/09 11/10/09 7 3,346,200 3,346,200 DDJ 0 0 602,316 John A Grillo-ARCHITECTS PC 0 / / / /
10-0762 Reconstruction 0-009-034 05/19/11 DONE DONE DONE 01/28/11 01/14/11 05/19/10 11/10/09 8,16 700,000 700,000 DDJ 0 0 126,000 John A Grillo-ARCHITECTS PC 0 / / / /
12-1029 Reconstruction 0-009-035 UNREVIEWED 03/27/13 03/27/13 01/11/12 11/10/09 16 0 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
- Reconstruction 0-009-036 / / / / 04/16/13 / / 155,15,16 0 0 DDJ 0 0 0 0 / / / /
Minnesauke Elementary:
08-0470 Reconstruction 0-014-020 03/18/09 DONE DONE DONE 10/06/08 10/03/08 10/06/06 10/10/06 155,15,16 498,397 498,397 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 498,397 / / / /
08-1244 Reconstruction 0-014-021 06/30/09 DONE DONE DONE 02/19/09 02/13/09 03/11/08 10/16/07 2,4,9,155,15,16 2,548,852 2,548,852 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
10-0763 Reconstruction 0-014-022 05/19/11 DONE DONE DONE 01/28/11 01/14/11 05/19/10 11/10/09 8,16 160,000 160,000 DDJ 0 0 28,800 John A Grillo-ARCHITECTS PC 0 / / / /
11-1423 Reconstruction 0-014-023 08/03/12 DONE DONE DONE 06/21/12 06/18/12 03/20/12 05/15/12 155 100,000 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
12-1030 Reconstruction 0-014-024 UNREVIEWED 03/27/13 03/27/13 03/23/12 11/10/09 16 0 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
- Reconstruction 0-014-025 / / / / 04/16/13 / / 155,15,16 0 0 DDJ 0 0 0 0 / / / /
Murphy Jr. High School:
08-0471 Reconstruction 0-015-023 03/18/09 DONE DONE DONE 10/06/08 10/03/08 10/06/06 10/10/06 2,155,15,16 1,523,641 1,523,641 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 1,523,641 / / / /
08-0037 Additions and Alterations 0-015-024 12/17/08 DONE DONE DONE 07/21/08 07/02/08 03/11/08 10/16/07 02 - 16 375,720 375,720 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
08-1245 Additions and Alterations 0-015-025 06/30/09 DONE DONE DONE 02/19/09 02/13/09 05/27/08 10/16/07 02 - 16 5,976,619 5,928,012 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
09-0655 Reconstruction 0-015-026 01/15/10 DONE DONE DONE 12/30/09 12/23/09 07/22/09 11/10/09 7 2,265,120 2,265,120 DDJ 0 0 407,722 John A Grillo-ARCHITECTS PC 0 / / / /
10-0764 Reconstruction 0-015-027 05/19/11 DONE DONE DONE 01/28/11 01/14/11 05/19/10 11/10/09 8,16 350,000 350,000 DDJ 0 0 63,000 John A Grillo-ARCHITECTS PC 0 / / / /
12-1031 Reconstruction 0-015-028 UNREVIEWED 03/27/13 03/27/13 01/12/12 11/10/09 16 0 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
11-1424 Reconstruction 0-015-029 08/03/12 DONE DONE DONE 06/21/12 06/18/12 03/20/12 05/15/12 155 85,000 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
- Reconstruction 0-015-030 / / / / 04/16/13 / / 155,15,16 0 0 DDJ 0 0 0 0 / / / /
North Country Learning Ctr.:
08-0472 Reconstruction 0-018-013 03/18/09 DONE DONE DONE 10/06/08 10/03/08 10/06/06 10/10/06 2,155,15,16 708,648 708,648 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 708,648 / / / /
07-1824 Reconstruction 0-018-014 09/11/08 DONE DONE DONE 03/17/08 03/11/08 12/26/07 10/16/05 2,4,7,8,9,155,15,16 2,966,048 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
10-0765 Reconstruction 0-018-015 05/19/11 DONE DONE DONE 01/28/11 01/14/11 05/19/10 11/10/09 8,16 159,685 159,685 DDJ 0 0 28,743 John A Grillo-ARCHITECTS PC 0 / / / /
12-1032 Reconstruction 0-018-016 UNREVIEWED 03/27/13 03/27/13 12/05/11 11/10/09 2,16 0 1,182,660 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
11-1425 Reconstruction 0-018-017 08/03/12 DONE DONE DONE 07/05/12 06/18/12 03/20/12 05/15/12 155 140,000 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
12-1130 Reconstruction 0-018-018 05/22/13 DONE DONE DONE 04/25/13 04/19/13 02/26/13 02/28/13 7 283,376 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
- Reconstruction 0-018-019 / / / / 04/16/13 / / 155,15,16 0 0 DDJ 0 0 0 0 / / / /
District's Container:
09-1049DB Discovered Building 2-033-001 05/11/10 DONE DONE DONE 03/10/10 03/09/10 02/22/10 / / 0 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
District's 40' Container:
09-1050DB Discovered Building 2-034-001 05/11/10 DONE DONE DONE 03/10/10 03/09/10 02/22/10 / / 0 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
District's 20 Container #2680498:
09-1051DB Discovered Building 2-035-001 05/11/10 DONE DONE DONE 03/10/10 03/09/10 02/23/10 / / 0 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
District's 40' Container #PJG1 #1:
09-1052DB Discovered Building 2-036-001 05/11/10 DONE DONE DONE 03/10/10 03/09/10 02/23/10 / / 0 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
District's 40' Container #PJG2 #2:
09-1053DB Discovered Building 2-037-001 05/11/10 DONE DONE DONE 03/10/10 03/09/10 02/23/10 / / 0 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
District's 40' Container #4188255:
09-1054DB Discovered Building 2-038-001 05/11/10 DONE DONE DONE 03/10/10 03/09/10 02/23/10 / / 0 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
District's 40' Container #PJG3 #4:
09-1055DB Discovered Building 2-039-001 05/11/10 DONE DONE DONE 03/10/10 03/09/10 02/23/10 / / 0 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
District's 40' Container #1:
09-1056DB Discovered Building 2-040-001 05/11/10 DONE DONE DONE 03/10/10 03/09/10 02/23/10 / / 0 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
District's 40' Container #RCM1 #2:
09-1057DB Discovered Building 2-041-001 05/11/10 DONE DONE DONE 03/10/10 03/09/10 02/23/10 / / 0 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
District's 20' Container #2061493 #1:
09-1058DB Discovered Building 2-042-001 05/11/10 DONE DONE DONE 03/10/10 03/09/10 02/23/10 / / 0 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
District's 20' Container #2753717:
09-1059DB Discovered Building 2-043-001 05/11/10 DONE DONE DONE 03/10/10 03/09/10 02/23/10 / / 0 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
District's 40' Container #WM1 #1:
09-1060DB Discovered Building 2-044-001 05/11/10 DONE DONE DONE 03/10/10 03/09/10 02/23/10 / / 0 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
District's 40' Container #WM2 #2:
09-1061DB Discovered Building 2-045-001 05/11/10 DONE DONE DONE 03/10/10 03/09/10 02/23/10 / / 0 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
District's 20' Container #WM3 #1:
09-1062DB Discovered Building 2-046-001 05/11/10 DONE DONE DONE 03/10/10 03/09/10 02/23/10 / / 0 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
District's 20' Container #WM4 #2:
09-1063DB Discovered Building 2-047-001 05/11/10 DONE DONE DONE 03/10/10 03/09/10 02/23/10 / / 0 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
District's 20' Container #WM6:
09-1064DB Discovered Building 2-048-001 05/11/10 DONE DONE DONE 03/10/10 03/09/10 02/23/10 / / 0 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
District's 40' Containter #WM7 #3:
09-1065DB Discovered Building 2-049-001 05/11/10 DONE DONE DONE 03/10/10 03/09/10 02/23/10 / / 0 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
District's 40' Container #WM8 #4:
09-1066DB Discovered Building 2-050-001 05/11/10 DONE DONE DONE 03/10/10 03/09/10 02/23/10 / / 0 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
District's 40' Container #WM9:
09-1067DB Discovered Building 2-051-001 05/11/10 DONE DONE DONE 03/10/10 03/09/10 02/23/10 / / 0 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
District's 40' Container #WM10#6:
09-1068DB Discovered Building 2-052-001 05/11/10 DONE DONE DONE 03/10/10 03/09/10 02/23/10 / / 0 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
District's 20' Container #WM11 #4:
09-1069DB Discovered Building 2-053-001 05/11/10 DONE DONE DONE 03/10/10 03/09/10 02/23/10 / / 0 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
District's 20' Container #1711233 #5:
09-1070DB Discovered Building 2-054-001 05/11/10 DONE DONE DONE 03/10/10 03/09/10 02/23/10 / / 0 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
District's 20' Container #1937180 #6:
09-1071DB Discovered Building 2-055-001 05/11/10 DONE DONE DONE 03/10/10 03/09/10 02/23/10 / / 0 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
District's 20' Container #2885857 #7:
09-1072DB Discovered Building 2-056-001 05/11/10 DONE DONE DONE 03/10/10 03/09/10 02/24/10 / / 0 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
District's20' Container #2360078 #8:
09-1073DB Discovered Building 2-057-001 05/11/10 DONE DONE DONE 03/10/10 03/09/10 02/24/10 / / 0 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
District's 20 Container #WM5 #9:
09-1074DB Discovered Building 2-058-001 05/11/10 DONE DONE DONE 03/10/10 03/09/10 02/24/10 / / 0 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
District's 20' Container #CC338 #10:
09-1075DB Discovered Building 2-059-001 05/11/10 DONE DONE DONE 03/10/10 03/09/10 02/24/10 / / 0 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Shipping Container #1 @ NC Admin Ctr:
09-1520DB Discovered Building 2-060-001 06/20/11 DONE DONE DONE 06/14/10 06/01/10 04/30/10 / / 0 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Shipping Container #2 NC Admin Ctr:
09-1521DB Discovered Building 2-061-001 06/20/11 DONE DONE DONE 06/14/10 06/01/10 04/30/10 / / 0 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Shipping Container #3 @ NC Admin Ctr:
09-1522DB Discovered Building 2-062-001 UNREVIEWED
DONE DONE 06/14/10 06/01/10 04/30/10 / / 0 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Shipping Container #4 @ NC Admin Ctr:
09-1523DB Discovered Building 2-063-001 UNREVIEWED
DONE DONE 06/14/10 06/01/10 05/26/10 / / 0 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Baseball Concession Stand (Storage):
09-1563DB Discovered Building 2-064-001 ADDENDUM REQ'D 06/21/10 06/14/10 05/18/10 / / 0 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Storage Container #1 @ North Century:
- DB Discovered Building 2-065-001 / / / / 06/23/11 / / 0 0 DDJ 0 0 0 0 / / / /
Maintenance Bldg-new Auto Shop Bldg:
07-1859 New Construction 3-032-001 09/22/08 DONE DONE DONE 03/24/08 03/20/08 10/02/06 10/16/07 02 - 16 1,937,230 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Districtwide:
08-0456 Reconstruction 7-999-004 12/11/08 DONE DONE DONE 10/06/08 10/01/08 09/29/06 01/30/07 13,16 1,156,400 1,156,400 DDJ 0 0 393,176 John A Grillo-ARCHITECTS PC 0 / / 12/26/12
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Terryville Elementary:
09-0614 Reconstruction 0-002-015 01/06/10 DONE DONE DONE 12/23/09 12/18/09 10/08/09 05/19/09 7 117,405 117,405 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
11-0902 Reconstruction 0-002-016 03/01/13 DONE DONE DONE 03/06/12 03/06/12 03/25/11 02/07/11 2,4,8,155,15,16 441,814 0 JOD 0 0 0 Burton Behrendt Smith 441,814 / / / /
John F Kennedy Jr. Middle:
12-1194 Reconstruction 0-003-007 UNREVIEWED 05/15/13 05/15/13 12/11/12 06/19/12 2,9,16 0 23,528,484 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
11-0903 Reconstruction 0-003-013 03/01/13 DONE DONE DONE 03/06/12 03/06/12 03/25/11 02/07/11 2,4,8,15,16 599,505 0 JOD 0 0 0 Burton Behrendt Smith 599,505 / / / /
Norwood Avenue Elem. School:
11-0904 Reconstruction 0-004-010 03/01/13 DONE DONE DONE 03/06/12 03/06/12 03/25/11 02/07/11 2,4,8,155,15,16 529,530 0 JOD 0 0 0 Burton Behrendt Smith 529,530 / / / /
11-1208 Reconstruction 0-004-011 05/17/12 DONE DONE DONE 04/25/12 04/20/12 03/01/12 05/17/11 155,16 100,000 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
Boyle Road Elementary:
11-0905 Reconstruction 0-005-011 03/01/13 DONE DONE DONE 03/06/12 03/06/12 03/25/11 02/07/11 2,4,7,8,155,15,16 334,796 0 JOD 0 0 0 Burton Behrendt Smith 334,796 / / / /
12-1143 Reconstruction 0-005-012 UNREVIEWED 05/01/13 04/29/13 02/01/13 05/17/11 2,4,8,155,15,16 0 11,579,652 MFS 0 0 0 Burton Behrendt Smith 0 / / / /
Comsewogue Senior High School:
10-1011 Reconstruction 0-010-016 05/31/11 DONE DONE DONE 03/09/11 03/07/11 12/28/10 05/18/10 2,10,16 125,000 125,000 JOD 0 0 0 Burton Behrendt Smith 0 / / 01/04/13
11-0906 Reconstruction 0-010-017 03/01/13 DONE DONE DONE 03/06/12 03/06/12 03/25/11 02/07/11 2,4,8,155,15,16 1,163,179 0 JOD 0 0 0 Burton Behrendt Smith 1,163,179 / / / /
Clinton Avenue ES:
11-0907 Reconstruction 0-011-009 03/01/13 DONE DONE DONE 03/06/12 03/06/12 03/25/11 02/07/11 2,4,8,155,15,16 274,580 0 JOD 0 0 0 Burton Behrendt Smith 274,580 / / / /
Administration Bldg.:
11-0908 Reconstruction 1-001-001 03/01/13 DONE DONE DONE 03/06/12 03/06/12 03/25/11 02/07/11 2,4,7,8,155,15,16 241,523 0 JOD 0 0 0 Burton Behrendt Smith 241,523 / / / /
Comsewogue Public Library:
11-0072 Reconstruction 6-009-001 08/08/11 DONE DONE DONE 07/28/11 07/28/11 04/13/11 06/21/11 4 68,000 0 JOD 0 0 0 BEATTY HARVEY COCO 0 / / / /
- Reconstruction 6-009-002 / / / / 04/10/12 / / 4 0 0 JOD 0 0 0 0 / / / /
District Wide:
08-1258 Reconstruction 7-999-002 06/03/09 DONE DONE DONE 02/23/09 02/13/09 10/20/08 05/15/07 10,16 350,000 350,000 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Sachem HS Union Campus(frmnly admin:
08-1552 Reconstruction 0-001-005 03/18/10 DONE DONE DONE 04/29/09 04/24/09 02/11/09 12/03/08 2,155,15,16 97,527 0 DDJ 0 0 0 ECG Eninering, LLC 97,527 / / / /
Lynwood Avenue School:
08-0705 Reconstruction 0-002-014 04/28/09 DONE DONE DONE 11/07/08 11/05/08 10/26/07 03/18/08 2,4,7,9,155,15,16 1,314,520 1,314,520 DDJ 0 0 307,598 John A Grillo-ARCHITECTS PC 0 / / / /
09-0773 Reconstruction 0-002-015 05/25/10 DONE DONE DONE 01/25/10 01/21/10 09/24/08 03/18/08 2,8,155,15,16 1,123,660 1,123,660 DDJ 0 0 258,724 John A Grillo-ARCHITECTS PC 0 / / 05/04/12
08-1553 Reconstruction 0-002-016 03/18/10 DONE DONE DONE 04/29/09 04/24/09 02/11/09 12/03/08 2,155,15,16 499,691 0 DDJ 0 0 0 ECG Eninering, LLC 499,691 / / / /
11-0681XX Reconstruction 0-002-017 05/16/12 CANCELLED 01/18/12 01/18/12 06/28/11 05/17/11 155,16 42,857 42,857 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Waverly Ave. Elementary:
08-0706 Reconstruction 0-003-015 04/28/09 DONE DONE DONE 11/07/08 11/05/08 10/26/07 03/18/08 2,9,155,15,16 393,519 393,519 DDJ 0 0 92,083 John A Grillo-ARCHITECTS PC 0 / / / /
09-0774 Reconstruction 0-003-016 05/25/10 DONE DONE DONE 01/25/10 01/21/10 09/24/08 03/18/08 2,155,16 178,480 178,480 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 11/14/11
08-1554 Reconstruction 0-003-017 03/18/10 DONE DONE DONE 04/29/09 04/24/09 02/13/09 12/03/08 2,155,15,16 515,408 0 DDJ 0 0 0 ECG Eninering, LLC 515,408 / / / /
- Reconstruction 0-003-018 / / / / 06/28/11 / / 155,16 0 0 DDJ 0 0 0 0 / / / /
Nokomis School:
08-0398 Reconstruction 0-004-012 02/05/09 DONE DONE DONE 09/26/08 09/24/08 10/26/07 03/18/08 2,155,15,16 169,920 169,920 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 12/12/11
09-0775 Reconstruction 0-004-013 05/25/10 DONE DONE DONE 01/25/10 01/21/10 09/24/08 03/18/08 2,155,16 99,732 99,732 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 12/12/11
08-1555 Reconstruction 0-004-014 03/18/10 DONE DONE DONE 04/29/09 04/24/09 02/11/09 12/03/08 2,155,15,16 393,731 393,731 DDJ 0 0 0 ECG Eninering, LLC 393,731 / / / /
11-0682 Reconstruction 0-004-015 05/16/12 DONE DONE DONE 01/18/12 01/18/12 06/28/11 05/17/11 2,9,155,16 155,607 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Grundy Avenue Elementary:
08-0707 Reconstruction 0-006-011 04/28/09 DONE DONE DONE 11/07/08 11/05/08 10/26/07 03/18/08 2,9,155,15,16 295,000 295,000 DDJ 0 0 69,030 John A Grillo-ARCHITECTS PC 0 / / / /
09-0776 Reconstruction 0-006-012 05/25/10 DONE DONE DONE 01/25/10 01/21/10 / / 03/18/08 2,9,155,16 341,760 341,760 DDJ 0 0 77,866 John A Grillo-ARCHITECTS PC 0 / / 01/30/12
08-1556 Reconstruction 0-006-013 03/18/10 DONE DONE DONE 04/29/09 04/24/09 02/11/09 12/03/08 2,155,15,16 954,816 0 DDJ 0 0 0 ECG Eninering, LLC 954,816 / / / /
- Reconstruction 0-006-014 / / / / 06/28/11 / / 155,16 0 0 DDJ 0 0 0 0 / / / /
Gatelot Ave. School:
08-0708 Reconstruction 0-007-013 04/28/09 DONE DONE DONE 11/07/08 11/05/08 10/26/07 03/18/08 2,8,9,155,15,16 621,860 621,860 DDJ 0 0 145,515 John A Grillo-ARCHITECTS PC 0 / / 01/30/12
09-0777 Reconstruction 0-007-014 05/25/10 DONE DONE DONE 01/25/10 01/21/10 09/24/08 03/18/08 2,8,9,155,16 1,367,004 1,367,004 DDJ 0 0 317,136 John A Grillo-ARCHITECTS PC 0 / / 05/04/12
08-1557 Reconstruction 0-007-015 03/18/10 DONE DONE DONE 04/29/09 04/24/09 02/11/09 12/03/08 2,155,15,16 1,654,535 0 DDJ 0 0 0 ECG Eninering, LLC 1,654,535 / / / /
11-0683 Reconstruction 0-007-016 05/16/12 DONE DONE DONE 01/18/12 01/18/12 06/28/11 05/17/11 2,9,155,16 127,249 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Samoset M.S.(fmly HS South):
08-0709 Reconstruction 0-008-022 04/28/09 DONE DONE DONE 11/07/08 11/05/08 10/26/07 03/18/08 2,4,7,8,9,10,155,15, 2,866,856 2,866,856 DDJ 0 0 670,844 John A Grillo-ARCHITECTS PC 0 / / 05/04/12
09-0778 Reconstruction 0-008-023 05/25/10 DONE DONE DONE 01/25/10 01/21/10 09/24/08 03/18/08 2,8,9,155,15,16 3,625,947 3,625,947 DDJ 0 0 726,640 John A Grillo-ARCHITECTS PC 0 / / 10/17/12
08-1558 Reconstruction 0-008-024 03/18/10 DONE DONE DONE 04/29/09 04/24/09 02/11/09 12/03/08 2,155,16 1,305,742 0 DDJ 0 0 0 ECG Eninering, LLC 1,305,742 / / / /
10-0470 Reconstruction 0-008-025 01/06/11 DONE DONE DONE 11/15/10 11/12/10 07/07/10 05/18/10 13,16 877,000 877,000 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 05/04/12
11-0684 Reconstruction 0-008-026 05/16/12 DONE DONE DONE 01/18/12 01/18/12 06/28/11 05/17/11 2,9,155,16 354,333 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Sagamore Jr. High:
08-0710 Reconstruction 0-010-017 04/28/09 DONE DONE DONE 11/07/08 11/05/08 10/26/07 03/18/08 2,9,10,155,15,16 548,700 548,700 DDJ 0 0 128,396 John A Grillo-ARCHITECTS PC 0 / / / /
09-0779 Reconstruction 0-010-018 05/25/10 DONE DONE DONE 01/25/10 01/21/10 09/24/08 03/18/08 2,155,16 119,950 119,950 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 10/17/12
08-1559 Reconstruction 0-010-019 03/18/10 DONE DONE DONE 04/29/09 04/24/09 02/11/09 12/03/08 2,155,15,16 868,426 0 DDJ 0 0 0 ECG Eninering, LLC 868,426 / / / /
11-0685 Reconstruction 0-010-020 05/16/12 DONE DONE DONE 01/18/12 01/18/12 06/28/11 05/17/11 155,16 75,857 75,857 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Hiawatha Elementary:
08-0399 Reconstruction 0-011-013 02/05/09 DONE DONE DONE 09/26/08 09/24/08 10/26/07 03/18/08 2,155,15,16 138,060 138,060 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 12/12/11
09-0780 Reconstruction 0-011-014 05/25/10 DONE DONE DONE 01/25/10 01/21/10 09/24/08 03/18/08 2,155,16 111,026 111,026 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 12/12/11
08-1560 Reconstruction 0-011-015 03/18/10 DONE DONE DONE 04/29/09 04/24/09 02/11/09 12/03/08 2,155,15,16 444,358 0 DDJ 0 0 0 ECG Eninering, LLC 444,358 / / / /
- Reconstruction 0-011-016 / / / / 06/28/11 / / 155,16 0 0 DDJ 0 0 0 0 / / / /
Chippewa School:
08-0400 Reconstruction 0-012-010 02/05/09 DONE DONE DONE 09/26/08 09/24/08 10/26/07 03/18/08 2,155,15,16 174,640 174,640 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 12/12/11
09-0781 Reconstruction 0-012-011 05/25/10 DONE DONE DONE 01/25/10 01/21/10 09/24/08 03/18/08 2,155,16 77,246 77,246 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 11/14/11
08-1561 Reconstruction 0-012-012 03/18/10 DONE DONE DONE 04/29/09 04/24/09 02/11/09 12/03/08 2,155,15,16 421,815 0 DDJ 0 0 0 ECG Eninering, LLC 421,815 / / / /
- Reconstruction 0-012-013 / / / / 06/28/11 / / 155,16 0 0 DDJ 0 0 0 0 / / / /
eenonah Elementary:
08-0401 Reconstruction 0-013-015 02/05/09 DONE DONE DONE 09/26/08 09/24/08 10/26/07 03/18/08 2,155,15,16 152,221 152,221 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 12/12/11
09-0782 Reconstruction 0-013-016 05/25/10 DONE DONE DONE 01/25/10 01/21/10 09/24/08 03/18/08 2,155,16 109,267 109,267 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 11/14/11
08-1562 Reconstruction 0-013-017 03/18/10 DONE DONE DONE 04/29/09 04/24/09 02/13/09 12/03/08 2,155,15,16 457,539 0 DDJ 0 0 0 ECG Eninering, LLC 457,539 / / / /
- Reconstruction 0-013-018 / / / / 06/28/11 / / 155,16 0 0 DDJ 0 0 0 0 / / / /
Merrimac School:
08-0711 Reconstruction 0-014-013 04/28/09 DONE DONE DONE 11/07/08 11/05/08 10/26/07 03/18/08 2,155,15,16 158,120 158,120 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
09-0783 Reconstruction 0-014-014 05/25/10 DONE DONE DONE 01/25/10 01/21/10 09/24/08 03/18/08 2,155,16 127,121 127,121 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 11/14/11
08-1563 Reconstruction 0-014-015 03/18/10 DONE DONE DONE 04/29/09 04/24/09 02/11/09 12/03/08 2,155,15,16 397,406 0 HCM 0 0 0 ECG Eninering, LLC 397,406 / / / /
- Reconstruction 0-014-016 / / / / 06/28/11 / / 155,16 0 0 DDJ 0 0 0 0 / / / /
Cayuga School:
08-0402 Reconstruction 0-015-012 02/05/09 DONE DONE DONE 09/26/08 09/24/08 10/26/07 03/18/08 2,155,15,16 152,220 152,220 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 12/12/11
09-0784 Reconstruction 0-015-013 05/25/10 DONE DONE DONE 01/25/10 01/21/10 09/24/08 03/18/08 2,155,16 74,640 74,640 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
08-1564 Reconstruction 0-015-014 03/18/10 DONE DONE DONE 04/29/09 04/24/09 02/11/09 12/03/08 2,155,15,16 396,630 0 DDJ 0 0 0 ECG Eninering, LLC 396,630 / / / /
- Reconstruction 0-015-015 / / / / 06/28/11 / / 155,16 0 0 DDJ 0 0 0 0 / / / /
North High School:
08-0712 Reconstruction 0-016-022 04/28/09 DONE DONE DONE 11/07/08 11/05/08 10/26/07 03/18/08 2,4,7,8,9,10,155,15, 10,525,600 10,525,600 DDJ 0 0 2,462,990 John A Grillo-ARCHITECTS PC 0 / / 05/04/12
09-0785 Reconstruction 0-016-023 05/25/10 DONE DONE DONE 01/25/10 01/21/10 09/24/08 03/18/08 2,155,16 644,260 644,260 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 05/04/12
08-1565 Reconstruction 0-016-024 03/18/10 DONE DONE DONE 04/29/09 04/24/09 02/11/09 12/03/08 2,155,15,16 2,040,975 2,040,975 DDJ 0 0 0 ECG Eninering, LLC 2,040,975 / / / /
11-0686 Reconstruction 0-016-025 05/16/12 DONE DONE DONE 01/18/12 01/18/12 06/28/11 05/17/11 15 22,000 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Seneca Jr. High:
08-0713 Reconstruction 0-017-012 04/28/09 DONE DONE DONE 11/07/08 11/05/08 10/26/07 03/18/08 2,9,10,155,15,16 905,060 905,060 DDJ 0 0 211,784 John A Grillo-ARCHITECTS PC 0 / / 12/12/11
09-0786 Reconstruction 0-017-013 05/25/10 DONE DONE DONE 01/25/10 01/21/10 09/24/08 03/18/08 2,9,155,15,16 1,009,200 1,009,200 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 11/14/11
08-1566 Reconstruction 0-017-014 03/18/10 DONE DONE DONE 04/29/09 04/24/09 02/11/09 12/03/08 2,155,15,16 1,126,655 0 DDJ 0 0 0 ECG Eninering, LLC 1,126,655 / / / /
11-0687 Reconstruction 0-017-015 05/16/12 DONE DONE DONE 01/18/12 01/18/12 06/28/11 05/17/11 155,16 119,858 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Tecumseh Elementary:
08-0403 Reconstruction 0-018-010 02/05/09 DONE DONE DONE 09/26/08 09/24/08 10/26/07 03/18/08 2,155,15,16 136,880 136,880 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 12/12/11
09-0787 Reconstruction 0-018-011 05/25/10 DONE DONE DONE 01/25/10 01/21/10 09/24/08 03/18/08 2,155,16 176,975 176,975 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 11/14/11
08-1567 Reconstruction 0-018-012 03/18/10 DONE DONE DONE 04/29/09 04/24/09 02/11/09 12/03/08 2,155,15,16 424,316 0 DDJ 0 0 0 ECG Eninering, LLC 424,316 / / / /
11-0688XX Reconstruction 0-018-013 05/16/12 CANCELLED 01/18/12 01/18/12 06/28/11 05/17/11 155,16 42,857 42,857 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Tamarac Elementary:
08-0404 Reconstruction 0-019-013 02/05/09 DONE DONE DONE 09/26/08 09/24/08 10/26/07 03/18/08 2,155,15,16 126,260 126,260 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 12/12/11
09-0788 Reconstruction 0-019-014 05/25/10 DONE DONE DONE 01/25/10 01/21/10 09/24/08 03/18/08 2,155,16 88,935 88,935 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 11/14/11
08-1568 Reconstruction 0-019-015 03/18/10 DONE DONE DONE 04/29/09 04/24/09 02/11/09 12/03/08 2,155,15,16 928,489 0 DDJ 0 0 0 ECG Eninering, LLC 928,489 / / / /
- Reconstruction 0-019-016 / / / / 06/28/11 / / 155,16 0 0 DDJ 0 0 0 0 / / / /
Sachem East High School:
08-0714 Reconstruction 0-050-002 04/28/09 DONE DONE DONE 11/07/08 11/05/08 10/26/07 03/18/08 2,8,155,16 4,006,100 4,006,100 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
08-1569 Reconstruction 0-050-003 03/18/10 DONE DONE DONE 04/29/09 04/24/09 02/11/09 12/03/08 2,155,15,16 1,724,587 0 DDJ 0 0 0 ECG Eninering, LLC 1,724,587 / / / /
09-1082 Reconstruction 0-050-004 03/15/10 DONE DONE DONE 03/16/10 03/15/10 03/11/10 09/16/09 7 2,530,000 2,530,000 DDJ 0 0 0 McClave Engineering,P.C 0 / / / /
10-1108 Reconstruction 0-050-005 04/07/11 DONE DONE DONE 03/24/11 03/24/11 10/15/10 10/06/10 4,7,10,16 3,200,000 3,200,000 DDJ 0 0 0 McClave Engineering,P.C 0 / / / /
11-0689 Reconstruction 0-050-006 05/16/12 DONE DONE DONE 01/18/12 01/18/12 06/28/11 05/17/11 15 60,500 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Sequoya Middle School:
08-0715 Reconstruction 0-051-003 04/28/09 DONE DONE DONE 11/07/08 11/05/08 10/26/07 03/18/08 2 133,000 133,000 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
08-1570 Reconstruction 0-051-004 03/18/10 DONE DONE DONE 04/29/09 04/24/09 02/11/09 12/03/08 2,155,15,16 949,212 949,212 DDJ 0 0 0 ECG Eninering, LLC 949,212 / / / /
Walter C. Dunham Admin Bldg:
09-0789 Reconstruction 1-001-007 05/25/10 DONE DONE DONE 01/25/10 01/21/10 01/22/10 03/18/08 2,16 759,400 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 10/17/12
- Reconstruction 1-001-008 / / / / / / / / 2,9,155,16 0 0 DDJ 0 0 0 0 / / / /
Administrative Annex:
08-0716 Reconstruction 1-005-003 04/28/09 DONE DONE DONE 11/07/08 11/05/08 10/26/07 03/18/08 2,7 422,162 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 10/17/12
08-1571 Reconstruction 1-005-004 03/18/10 DONE DONE DONE 04/29/09 04/24/09 02/11/09 12/03/08 2,8,155,15,16 256,183 0 DDJ 0 0 0 ECG Eninering, LLC 256,183 / / / /
Transportation Office Bus Garage:
08-1572 Reconstruction 5-021-007 03/18/10 DONE DONE DONE 04/29/09 04/24/09 02/11/09 12/03/08 2,155,16 168,479 0 DDJ 0 0 0 ECG Eninering, LLC 168,479 / / / /
11-0416 Reconstruction 5-021-008 12/15/11 DONE DONE DONE 11/18/11 11/18/11 09/09/11 03/11/08 7,155,16 190,000 190,000 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 02/04/13
Public Library:
09-0180 Reconstruction 6-022-007 09/02/09 DONE DONE DONE 08/31/09 08/27/09 08/31/09 08/06/09 16 60,000 0 DDJ 0 0 0 McClave Engineering,P.C 0 / / 12/13/12
11-0055 Reconstruction 6-022-008 08/03/11 DONE DONE DONE 07/21/11 07/15/11 06/29/11 06/20/11 4,8,9,16 199,500 0 DDJ 0 0 0 BEATTY HARVEY COCO 0 / / / /
Soccer Bldg./Concession @ Waverly:
07-1970XX New Construction 7-070-001 09/24/08 CANCELLED 04/15/08 04/07/08 06/25/02 06/19/07 02 - 16 40,000 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Press Box @ East High School:
08-0717 New Construction 7-074-001 04/28/09 DONE DONE DONE 11/07/08 11/05/08 04/01/04 03/18/08 02 - 16 236,000 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Pressbox @ North High School:
08-0718 New Construction 7-075-001 04/28/09 DONE DONE DONE 11/07/08 11/05/08 04/01/04 03/18/08 02 - 16 153,688 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Accessory Bldg @ Library site:
- DB Discovered Building 7-077-001 / / / / 01/16/08 / / 02 - 16 0 0 DDJ 0 0 0 0 / / / /
District Wide:
08-0719 Reconstruction 7-999-005 04/28/09 DONE DONE DONE 11/07/08 11/05/08 10/26/07 03/18/08 10,13,16 1,000,000 1,000,000 DDJ 0 0 234,000 John A Grillo-ARCHITECTS PC 0 / / 06/18/11
08-1746 Reconstruction 7-999-007 12/22/09 DONE DONE DONE 06/26/09 06/18/09 04/23/09 03/18/08 10,13,16 1,200,111 1,200,111 DDJ 0 0 515,070 John A Grillo-ARCHITECTS PC 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Earl Vandermeulen High School:
09-1578 Reconstruction 0-001-013 08/12/10 DONE DONE DONE 07/06/10 06/30/10 04/21/10 04/28/10 16 211,213 0 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
- Reconstruction 0-001-014 / / / / 07/09/10 / / 2,8,9,155,16 0 0 HCM 0 0 0 0 / / / /
Edna Louise Spear ES (Pt.Jeff ES):
09-1579 Reconstruction 0-002-014 08/12/10 DONE DONE DONE 07/06/10 06/30/10 04/21/10 04/28/10 16 64,582 0 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
10-0402 Additions and Alterations 0-002-015 12/10/10 DONE DONE DONE 11/01/10 10/19/10 07/09/10 08/30/10 02 - 16 402,930 0 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Industrial Arts:
09-1580 Reconstruction 0-004-001 08/12/10 DONE DONE DONE 07/06/10 06/30/10 04/21/10 04/28/10 16 20,827 0 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
12-0609 Reconstruction 0-004-002 03/07/13 DONE DONE DONE 12/26/12 12/20/12 03/08/12 05/15/12 2,7,155,16 640,000 0 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Relocatable:
09-1581 Reconstruction 0-005-001 08/12/10 DONE DONE DONE 07/06/10 06/30/10 04/21/10 04/28/10 16 10,000 0 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Elem S Field House:
- Reconstruction 0-015-002 / / / / 04/21/10 / / 16 0 0 HCM 0 0 0 0 / / / /
- PR Additions and Alterations 0-015-003 / / / / 05/02/11 / / 02 - 16 0 0 HCM 0 0 0 0 / / / /
Admin Bldg (was Pupil Personal Srv):
- Reconstruction 1-009-002 / / / / 04/08/10 / / 16 0 0 HCM 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Elementary School:
11-0285 Reconstruction 0-001-013 12/27/11 DONE DONE DONE 10/25/11 10/24/11 11/30/10 11/17/10 16 321,127 0 DDJ 0 0 0 H2M Group 321,127 / / / /
Mt. Sinai Jr. High School:
08-1302 Additions and Alterations 0-002-008 07/06/09 DONE DONE DONE 02/27/09 02/24/09 02/02/09 02/11/09 02 - 16 3,108,311 1,744,367 DDJ 0 0 151,253 H2M Group 0 / / 02/23/11
10-0956 Reconstruction 0-002-009 06/01/11 DONE DONE DONE 03/08/11 03/03/11 07/07/10 02/11/09 2,7 491,655 491,655 DDJ 0 0 0 H2M Group 0 / / 09/13/12
11-0286 Reconstruction 0-002-010 12/27/11 DONE DONE DONE 10/25/11 10/24/11 11/30/10 11/17/10 16 464,784 0 DDJ 0 0 0 H2M Group 464,784 / / / /
- Reconstruction 0-002-011 / / / / 04/24/13 / / 7 0 0 DDJ 0 0 0 0 / / / /
Senior High School:
11-0287 Reconstruction 0-006-011 12/27/11 DONE DONE DONE 10/25/11 10/24/11 11/30/10 11/17/10 16 2,884,089 0 DDJ 0 0 0 H2M Group 2,884,089 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
No.Country Road MS(former ES):
08-0825 Reconstruction 0-001-012 04/29/09 DONE DONE DONE 12/01/08 11/26/08 04/23/04 05/20/08 8,9,155,15,16 486,979 486,979 DDJ 0 0 134,447 John A Grillo-ARCHITECTS PC 0 / / 12/13/12
09-0303PR Reconstruction 0-001-013 UNREVIEWED 10/14/09 10/09/09 01/28/05 / / 8,9,155,15,16 2,421,900 1,786,410 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
09-0525 Reconstruction 0-001-013 05/14/10 DONE DONE DONE 11/30/09 11/18/09 01/28/05 11/12/08 8,9,155,15,16 2,424,900 2,424,900 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
11-0743 Reconstruction 0-001-014 06/12/12 DONE DONE DONE 02/01/12 01/30/12 03/18/09 05/20/08 2,4,8,9,16 687,500 0 DDJ 0 0 189,750 Michael J. Guido Jr. 0 / / / /
- PR Additions and Alterations 0-001-015 / / / / 03/18/09 / / 02 - 16 0 0 DDJ 0 0 0 0 / / / /
- PR Additions and Alterations 0-001-016 / / / / 03/18/09 / / 02 - 16 0 0 DDJ 0 0 0 0 / / / /
11-0172 Reconstruction 0-001-017 04/19/12 DONE DONE DONE 09/13/11 09/09/11 05/19/11 11/17/10 8,155,15,16 733,890 0 DDJ 0 0 0 Michael J. Guido Jr. 733,890 / / / /
A. Muller Primary School:
08-0826 Reconstruction 0-002-011 04/29/09 DONE DONE DONE 12/01/08 11/26/08 04/23/04 05/20/08 8,9,155,15,16 868,750 868,750 DDJ 0 0 237,746 John A Grillo-ARCHITECTS PC 0 / / 12/13/12
09-0304PR Additions and Alterations 0-002-012 UNREVIEWED 10/14/09 10/09/09 11/21/07 / / 02 - 16 2,829,904 1,548,212 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
09-0526 Additions and Alterations 0-002-012 05/14/10 DONE DONE DONE 11/30/09 11/18/09 11/21/07 11/12/08 02 - 16 2,829,904 2,309,318 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
11-0744 Reconstruction 0-002-013 06/12/12 DONE DONE DONE 02/02/12 01/30/12 03/18/09 06/12/12 2,4,9,16 62,500 62,500 DDJ 0 0 17,250 0 / / / /
- PR Additions and Alterations 0-002-014 / / / / 03/18/09 / / 02 - 16 0 0 DDJ 0 0 0 0 / / / /
11-0173 Reconstruction 0-002-015 04/19/12 DONE DONE DONE 09/13/11 09/09/11 05/19/11 11/17/10 8,155,15,16 387,347 0 DDJ 0 0 0 Michael J. Guido Jr. 387,347 / / / /
Sound Beach School:
08-0827 Reconstruction 0-003-010 04/29/09 DONE DONE DONE 12/01/08 11/26/08 04/23/04 05/20/08 8,9,155,15,16 664,500 664,500 DDJ 0 0 175,867 John A Grillo-ARCHITECTS PC 0 / / 12/13/12
09-0305PR Reconstruction 0-003-011 UNREVIEWED 10/14/09 10/09/09 02/25/05 / / 8,9,155,15,16 4,702,300 3,050,722 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
09-0527 Reconstruction 0-003-011 05/14/10 DONE DONE DONE 11/30/09 11/18/09 02/25/05 11/12/08 16 4,702,300 4,572,935 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
11-0745 Reconstruction 0-003-012 06/12/12 DONE DONE DONE 02/01/12 01/30/12 03/18/09 05/20/08 16 12,500 0 DDJ 0 0 3,450 Michael J. Guido Jr. 0 / / / /
- Additions and Alterations 0-003-013 / / / / 03/18/09 / / 02 - 16 0 0 DDJ 0 0 0 Michael J. Guido Jr. 0 / / / /
11-0174 Reconstruction 0-003-014 04/19/12 DONE DONE DONE 09/13/11 09/09/11 05/19/11 11/17/10 8,155,15,16 532,401 532,401 DDJ 0 0 0 Michael J. Guido Jr. 532,401 / / / /
Miller Place High School:
08-0828 Reconstruction 0-006-021 04/29/09 DONE DONE DONE 12/01/08 11/26/08 01/28/05 05/20/08 8,9,155,15,16 1,755,771 1,755,771 DDJ 0 0 452,416 John A Grillo-ARCHITECTS PC 0 / / 12/13/12
09-0306PR Additions and Alterations 0-006-022 UNREVIEWED 10/14/09 10/09/09 11/21/07 / / 02 - 16 15,442,896 9,727,084 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
09-0528 Additions and Alterations 0-006-022 05/14/10 DONE DONE DONE 11/30/09 11/18/09 11/21/07 11/12/08 02 - 16 15,442,896 13,876,160 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
10-0590 Additions and Alterations 0-006-023 06/13/11 DONE DONE DONE 12/21/10 12/10/10 03/18/09 03/02/10 02 - 16 100,000 100,000 DDJ 0 0 0 Michael J Guido Jr 0 / / 06/13/13
11-0746 Reconstruction 0-006-024 06/12/12 DONE DONE DONE 02/01/12 01/30/12 03/18/09 05/20/08 2,4,9,16 187,500 0 DDJ 0 0 51,750 Michael J. Guido Jr. 0 / / / /
- Reconstruction 0-006-025 / / / / 09/20/10 / / 2,4,7,8,9,155,15,16 0 0 DDJ 0 0 0 0 / / / /
11-0175 Reconstruction 0-006-026 04/19/12 DONE DONE DONE 09/13/11 09/09/11 05/19/11 11/17/10 8,155,15,16 1,321,618 0 DDJ 0 0 0 Michael J. Guido Jr. 1,321,618 / / / /
Administration Building:
10-0591 New Construction 1-028-001 06/13/11 DONE DONE DONE 12/21/10 12/10/10 10/06/10 03/02/10 02 - 16 3,300,000 0 DDJ 0 0 0 Michael J Guido Jr 0 / / 06/13/13
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Joseph A Edgar School:
08-1290 Reconstruction 0-001-011 04/23/09 DONE DONE DONE 02/25/09 02/19/09 10/07/08 05/15/07 8,155,16 306,325 306,325 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
11-1024 Reconstruction 0-001-012 04/03/12 DONE DONE DONE 03/27/12 03/27/12 03/13/12 05/17/11 2,9 94,400 94,400 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 03/22/13
Rocky Point High:
07-1387 Reconstruction 0-005-021 06/25/08 DONE DONE DONE 01/16/08 01/16/08 11/09/07 06/05/00 2,9,10,155,15,16 472,000 472,000 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
08-1291 Reconstruction 0-005-022 04/23/09 DONE DONE DONE 02/25/09 02/19/09 10/07/08 05/15/07 2,9,15,16 408,350 408,350 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
08-0963 Reconstruction 0-005-023 04/20/09 DONE DONE DONE 12/24/08 12/17/08 10/07/08 06/05/00 2,9,155,15,16 472,000 472,000 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
09-1016 Reconstruction 0-005-024 03/04/10 DONE DONE DONE 03/04/10 03/03/10 05/20/09 05/15/07 4,7 766,809 766,809 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
10-1225 Reconstruction 0-005-025 05/26/11 DONE DONE DONE 04/26/11 04/22/11 11/24/10 05/17/10 2,7,9,16 2,757,660 2,757,660 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 03/22/13
- Reconstruction 0-005-026 / / / / 05/10/11 / / 16 0 0 DDJ 0 0 0 0 / / / /
- Reconstruction 0-005-027 / / / / 05/10/11 / / 2,7,9 0 0 DDJ 0 0 0 0 / / / /
12-0492 Reconstruction 0-005-028 01/23/13 DONE DONE DONE 11/28/12 11/28/12 11/27/12 05/17/11 2,7,8,9,10,155,15,16 64,900 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
12-0673 Reconstruction 0-005-029 03/15/13 DONE DONE DONE 01/16/13 12/18/12 01/16/13 11/19/12 2,7,8,9,10,155,15,16 1,990,000 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
12-0862 Reconstruction 0-005-030 05/15/13 DONE DONE DONE 02/15/13 02/12/13 02/14/13 05/17/11 2,4,9,10,155,15,16 136,500 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Frank J. Carasiti Elementary School:
08-1292 Reconstruction 0-006-013 04/23/09 DONE DONE DONE 02/25/09 02/19/09 10/07/08 05/15/07 2,8,155,16 271,824 271,824 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
08-1489 Reconstruction 0-006-014 07/16/09 DONE DONE DONE 04/13/09 04/08/09 02/02/09 05/15/07 2,8,9,155,15,16 505,158 505,158 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
12-0281 Reconstruction 0-006-015 10/30/12 DONE DONE DONE 10/16/12 10/15/12 / / 05/15/07 2,10 58,800 0 DDJ 0 0 42,000 John A Grillo-ARCHITECTS PC 0 / / / /
12-1231 Reconstruction 0-006-016 06/17/13 DONE DONE DONE 05/28/13 05/28/13 04/12/13 05/15/07 7 100,000 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Storage Container #1:
- DB Discovered Building 2-012-001 / / / / 10/07/08 / / 0 0 DDJ 0 0 0 0 / / / /
Storage Container #2:
- DB Discovered Building 2-013-001 / / / / 10/07/08 / / 0 0 DDJ 0 0 0 0 / / / /
Storage Container # 3:
- DB Discovered Building 2-014-001 / / / / 10/07/08 / / 0 0 DDJ 0 0 0 0 / / / /
Maintenance Bldg.:
07-1914 New Construction 3-011-001 09/19/08 DONE DONE DONE 04/03/08 03/25/08 01/04/07 05/15/07 02 - 16 565,220 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Oxhead Road Elementary:
09-1257 Reconstruction 0-001-017 04/15/11 DONE DONE DONE 04/09/10 04/02/10 10/09/09 09/23/09 2,155,15,16 326,731 0 JOD 0 0 0 ECG Eninering, LLC 323,171 / / / /
Holbrook Road Elementary:
- Reconstruction 0-002-013 / / / / 10/08/09 / / 2,155,15,16 0 0 JOD 0 0 0 0 / / / /
09-1258 Reconstruction 0-002-014 04/15/11 DONE DONE DONE 04/09/10 04/02/10 10/08/09 09/23/09 2,8,155,15,16 262,412 0 JOD 0 0 0 ECG Eninering, LLC 259,842 / / / /
Unity Dr. Pre-K Kdgtn. Ctr.:
09-1259 Reconstruction 0-003-012 04/15/11 DONE DONE DONE 04/09/10 04/02/10 10/09/09 09/23/09 2,155,15,16 371,314 0 JOD 0 0 0 ECG Eninering, LLC 365,304 / / / /
Bicycle Path Pre-K Kdgtn. Ctr.:
08-0824 Additions and Alterations 0-005-010 02/27/09 DONE DONE DONE 11/26/08 11/26/08 10/23/07 05/20/08 02 - 16 1,755,717 1,755,717 JOD 0 0 1,755,717 Wiedersum Associates Architec 0 / / / /
09-1260 Reconstruction 0-005-011 04/15/11 DONE DONE DONE 04/09/10 04/02/10 10/08/09 09/23/09 2,155,15,16 323,793 0 JOD 0 0 0 ECG Eninering, LLC 321,293 / / / /
Newfield High School:
09-1261 Reconstruction 0-006-019 04/15/11 DONE DONE DONE 04/09/10 04/02/10 10/09/09 09/23/09 2,8,155,15,16 2,699,296 2,699,296 JOD 0 0 450,000 ECG Eninering, LLC 2,245,051 / / / /
- Reconstruction 0-006-020 / / / / 02/14/13 / / 155,15,16 0 0 MFS 0 0 0 0 / / / /
Dawnwood Middle School:
- Reconstruction 0-008-007 UNREVIEWED 04/09/10 04/02/10 04/20/92 09/23/09 155,15,16 0 23,606,010 MGL 0 0 0 ECG Eninering, LLC 0 / / / /
09-1262 Reconstruction 0-008-017 04/15/11 DONE DONE DONE 04/09/10 04/02/10 10/08/09 09/23/09 2,8,155,15,16 1,478,580 1,478,580 JOD 0 0 230,000 ECG Eninering, LLC 1,241,730 / / / /
Hawkins Path Elementary:
09-1263 Reconstruction 0-009-009 04/15/11 DONE DONE DONE 04/09/10 04/02/10 10/08/09 09/23/09 2,155,15,16 340,946 0 JOD 0 0 0 ECG Eninering, LLC 336,846 / / / /
Selden Middle School:
09-1264 Reconstruction 0-010-016 04/15/11 DONE DONE DONE 04/09/10 04/02/10 10/09/09 09/23/09 2,8,155,15,16 1,504,250 1,504,250 JOD 0 0 236,731 ECG Eninering, LLC 1,260,619 / / / /
North Coleman Elementary:
09-1265 Reconstruction 0-011-013 04/15/11 DONE DONE DONE 04/09/10 04/02/10 10/08/09 09/23/09 2,155,15,16 387,884 387,884 JOD 0 0 38,708 ECG Eninering, LLC 341,458 / / / /
Stagecoach Rd. Elementary:
09-1266 Reconstruction 0-012-010 04/15/11 DONE DONE DONE 04/09/10 04/02/10 10/08/09 09/23/09 2,155,15,16 317,484 0 JOD 0 0 0 ECG Eninering, LLC 312,444 / / / /
Auer Elementary:
09-1267 Reconstruction 0-013-012 04/15/11 DONE DONE DONE 04/09/10 04/02/10 10/08/09 09/23/09 2,155,15,16 301,678 0 JOD 0 0 0 ECG Eninering, LLC 299,748 / / / /
Jericho Elementary:
09-1268 Reconstruction 0-014-010 04/15/11 DONE DONE DONE 04/09/10 04/02/10 10/08/09 09/23/09 2,155,15,16 484,077 484,077 JOD 0 0 50,000 ECG Eninering, LLC 429,552 / / / /
Centereach High School:
09-1269 Reconstruction 0-015-017 04/15/11 DONE DONE DONE 04/09/10 04/02/10 10/08/09 09/23/09 2,8,155,15,16 3,793,407 3,793,407 JOD 0 0 600,000 ECG Eninering, LLC 3,185,207 / / / /
- Reconstruction 0-015-018 / / / / 10/16/12 / / 13,155,15,16 0 0 JMB 0 0 0 0 / / / /
New Lane Memorial Elementary:
09-1270 Reconstruction 0-016-013 04/15/11 DONE DONE DONE 04/09/10 04/02/10 10/08/09 09/23/09 2,155,15,16 806,922 806,922 JOD 0 0 120,000 ECG Eninering, LLC 679,532 / / / /
Trans Admin Bldg:
09-1271 Reconstruction 1-004-005 04/15/11 DONE DONE DONE 04/09/10 04/02/10 10/09/09 09/23/09 2,155,15,16 17,193 0 JOD 0 0 0 ECG Eninering, LLC 16,733 / / / /
Administration Building:
09-1272 Reconstruction 1-022-004 04/15/11 DONE DONE DONE 04/09/10 04/02/10 10/08/09 09/23/09 2,155,15,16 44,026 0 JOD 0 0 0 ECG Eninering, LLC 43,906 / / / /
Double Modular #1 @ Transp. Bldg.:
09-1273 Reconstruction 1-024-002 04/15/11 DONE DONE DONE 04/09/10 04/02/10 10/09/09 09/23/09 2,155,16 7,950 0 JOD 0 0 0 ECG Eninering, LLC 7,950 / / / /
Double Modular #2 @ Transp. Bldg.:
09-1274 Reconstruction 1-025-002 04/15/11 DONE DONE DONE 04/09/10 04/02/10 10/09/09 09/23/09 2,155,16 12,255 0 JOD 0 0 0 ECG Eninering, LLC 12,255 / / / /
Trans./Student Services:
09-1275 Reconstruction 1-028-002 04/15/11 DONE DONE DONE 04/09/10 04/02/10 10/09/09 09/23/09 2,155,16 10,440 0 JOD 0 0 0 ECG Eninering, LLC 10,440 / / / /
Transportation Garage:
09-1276 Reconstruction 3-007-004 04/15/11 DONE DONE DONE 04/09/10 04/02/10 10/09/09 09/23/09 2,155,15,16 59,362 0 JOD 0 0 0 ECG Eninering, LLC 56,332 / / / /
Transporation Garage(was 3-007):
- PR Additions and Alterations 5-007-002 / / / / 10/06/08 / / 02 - 16 0 0 JOD 0 0 0 0 / / / /
09-0617 Reconstruction 5-007-003 02/12/10 DONE DONE DONE 12/23/09 12/18/09 10/09/09 05/20/08 15 44,000 0 JOD 0 0 0 Wiedersum Associates Architec 0 / / / /
Bus Garage / Transportation Garage:
10-0404 New Construction 5-032-001 04/11/11 DONE DONE DONE 11/01/10 10/20/10 05/19/10 05/18/10 02 - 16 1,185,000 0 JOD 0 0 0 McClave Engineering,P.C 0 / / / /
Middle Country Public Library:
08-1503 Reconstruction 6-020-004 07/17/09 DONE DONE DONE 04/14/09 04/10/09 12/09/08 04/08/08 8,9,16 362,000 0 JOD 0 0 0 Beatty, Harvey & Associates 0 / / / /
10-1346 Additions and Alterations 6-020-005 08/16/11 DONE DONE DONE 06/02/11 05/27/11 03/25/11 05/18/11 02 - 16 1,958,555 0 JOD 0 0 0 BERMELLO AJAMIL & PARTNERS AR 0 / / 01/24/13
Mid Country Cultural Center:
- PR Additions and Alterations 6-021-002 / / / / 03/25/11 / / 02 - 16 0 0 JOD 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Chas. E. Walters Elementary:
08-0164 Reconstruction 0-002-011 01/05/09 DONE DONE DONE 08/14/08 08/07/08 / / 09/27/07 7 674,095 674,095 DDJ 0 0 182,870 Wiedersum Associates Architec 0 / / / /
12-0776 Reconstruction 0-002-012 DONE STARTED UNREVIEWED02/07/13 02/06/13 07/14/09 03/06/12 155,16 0 0 MFS 0 0 0 Wiedersum Associates Architec 0 / / / /
12-0790 Reconstruction 0-002-013 04/23/13 DONE DONE DONE 02/07/13 02/07/13 11/20/12 03/06/12 2,9,16 80,000 0 MFS 0 0 0 Wiedersum Associates Architec 0 / / / /
West Middle Island Elem.:
08-0172 Reconstruction 0-004-014 01/05/09 DONE DONE DONE 08/14/08 08/07/08 01/30/08 09/27/07 4,7 436,324 436,324 DDJ 0 0 113,385 Wiedersum Associates Architec 0 / / / /
12-0777 Reconstruction 0-004-015 DONE STARTED UNREVIEWED02/07/13 02/06/13 07/14/09 03/06/12 155,16 0 0 MFS 0 0 0 Wiedersum Associates Architec 0 / / / /
Coram Elementary:
08-0165 Reconstruction 0-007-012 01/05/09 DONE DONE DONE 08/14/08 08/07/08 / / 09/27/07 7 418,631 418,631 DDJ 0 0 124,254 Wiedersum Associates Architec 0 / / / /
12-0778 Reconstruction 0-007-013 DONE STARTED UNREVIEWED02/07/13 02/06/13 07/14/09 03/06/12 155,16 0 0 MFS 0 0 0 Wiedersum Associates Architec 0 / / / /
Ridge Elementary:
08-0163 Reconstruction 0-008-012 01/05/09 DONE DONE DONE 08/14/08 08/07/08 / / 09/27/07 10,16 491,927 491,927 DDJ 0 0 131,724 Wiedersum Associates Architec 0 / / / /
12-0779 Reconstruction 0-008-013 DONE STARTED UNREVIEWED02/07/13 02/06/13 07/14/09 03/06/12 155,16 0 0 MFS 0 0 0 Wiedersum Associates Architec 0 / / / /
Longwood Junior High School:
08-0170 Reconstruction 0-009-010 01/05/09 DONE DONE DONE 08/14/08 08/07/08 11/05/07 09/27/07 16 1,882,570 1,882,570 DDJ 0 0 267,351 Wiedersum Associates Architec 0 / / / /
- XX Reconstruction 0-009-011 CANCELLED / / / / 12/02/08 / / 8,9,15 0 37,527,919 DDJ 0 0 0 0 / / / /
12-0780 Reconstruction 0-009-012 DONE STARTED UNREVIEWED02/07/13 02/06/13 07/14/09 03/06/12 2,4,8,16 0 0 MFS 0 0 0 Wiedersum Associates Architec 0 / / / /
11-0157XX Reconstruction 0-009-013 CANCELLED 09/02/11 09/01/11 08/16/11 05/10/10 2,4 0 0 DDJ 0 0 0 Wiedersum Associates Architec 0 / / / /
12-0791 Reconstruction 0-009-014 04/23/13 DONE DONE DONE 02/07/13 02/07/13 11/20/12 03/06/12 2,4,8,16 657,700 657,700 MFS 0 0 0 Wiedersum Associates Architec 0 / / / /
Longwood Middle School:
08-0169 Reconstruction 0-010-010 01/05/09 DONE DONE DONE 08/14/08 08/07/08 11/05/07 09/27/07 155 1,114,503 1,114,503 DDJ 0 0 246,225 Wiedersum Associates Architec 0 / / / /
12-0781 Reconstruction 0-010-011 DONE STARTED UNREVIEWED02/07/13 02/06/13 07/14/09 03/06/12 155,16 0 0 MFS 0 0 0 Wiedersum Associates Architec 0 / / / /
11-0879 Reconstruction 0-010-012 05/18/12 DONE DONE DONE 03/06/12 02/24/12 11/17/11 05/18/10 155,16 450,000 0 DDJ 0 0 0 Wiedersum Associates Architec 0 / / / /
- Reconstruction 0-010-013 / / / / 03/15/12 / / 2,4,7 0 0 DDJ 0 0 0 0 / / / /
11-1076 Reconstruction 0-010-014 04/10/12 DONE DONE DONE 04/05/12 04/02/12 03/20/12 03/06/12 2,4,7 3,415,000 0 DDJ 0 0 0 Wiedersum Associates Architec 0 / / / /
12-0792 Reconstruction 0-010-015 04/23/13 DONE DONE DONE 02/07/13 02/07/13 11/20/12 03/06/12 2,8,9 1,740,000 0 MFS 0 0 0 Wiedersum Associates Architec 0 / / / /
Ridge Elem.Annex 1:
08-0167 Reconstruction 0-011-008 01/05/09 DONE DONE DONE 08/14/08 08/07/08 11/05/07 09/27/07 16 253,286 253,286 DDJ 0 0 0 Wiedersum Associates Architec 0 / / / /
12-0782 Reconstruction 0-011-009 DONE STARTED UNREVIEWED02/07/13 02/06/13 07/14/09 02/06/12 155,16 0 0 MFS 0 0 0 Wiedersum Associates Architec 0 / / / /
11-1077 Reconstruction 0-011-010 04/10/12 DONE DONE DONE 04/05/12 04/02/12 03/20/12 03/06/12 2,7 766,500 0 DDJ 0 0 0 Wiedersum Associates Architec 0 / / / /
Coram Elem Annex:
08-0166 Reconstruction 0-012-005 01/05/09 DONE DONE DONE 08/14/08 08/07/08 11/05/07 09/27/07 16 176,250 176,250 DDJ 0 0 0 Wiedersum Associates Architec 0 / / / /
12-0783 Reconstruction 0-012-006 DONE STARTED UNREVIEWED02/07/13 02/06/13 07/14/09 03/06/12 155,16 0 0 MFS 0 0 0 Wiedersum Associates Architec 0 / / / /
11-1078 Reconstruction 0-012-007 04/10/12 DONE DONE DONE 04/05/12 04/02/12 03/20/12 03/06/12 2,7 816,500 0 DDJ 0 0 0 Wiedersum Associates Architec 0 / / / /
Charles E. Walters Annex 1:
08-0168 Reconstruction 0-014-006 01/05/09 DONE DONE DONE 08/14/08 08/07/08 11/05/07 09/27/07 7 228,424 228,424 DDJ 0 0 0 Wiedersum Associates Architec 0 / / / /
12-0784 Reconstruction 0-014-008 UNREVIEWED
STARTED UNREVIEWED02/07/13 02/06/13 07/14/09 03/06/12 155,16 0 10,406,658 MFS 0 0 0 Wiedersum Associates Architec 0 / / / /
11-1079 Reconstruction 0-014-009 04/10/12 DONE DONE DONE 04/05/12 04/02/12 03/20/12 03/06/12 2,7 797,500 0 DDJ 0 0 0 Wiedersum Associates Architec 0 / / / /
Longwood Sr High School:
07-2128 Reconstruction 0-015-009 07/16/08 DONE DONE DONE 05/19/08 05/15/08 11/05/07 05/15/07 155 350,000 350,000 DDJ 0 0 0 Wiedersum Associates Architec 0 / / / /
08-0173 Reconstruction 0-015-010 01/05/09 DONE DONE DONE 08/14/08 08/07/08 05/29/08 09/27/07 16 1,765,815 1,765,815 DDJ 0 0 0 Wiedersum Associates Architec 0 / / / /
- Reconstruction 0-015-011 / / / / 12/02/08 / / 2 0 0 DDJ 0 0 0 0 / / / /
09-0296 Reconstruction 0-015-012 11/23/09 DONE DONE DONE 10/09/09 10/09/09 07/14/09 05/19/09 155,16 450,000 450,000 DDJ 0 0 0 Wiedersum Associates Architec 0 / / / /
11-1443 Reconstruction 0-015-013 10/25/12 DONE DONE DONE 06/29/12 06/20/12 05/07/12 03/06/12 2,14,16 2,796,303 2,207,000 DDJ 0 0 0 Wiedersum Associates Architec 0 / / / /
12-0785 Reconstruction 0-015-014 DONE STARTED UNREVIEWED02/07/13 02/06/13 06/20/12 03/06/12 155,16 0 0 MFS 0 0 0 Wiedersum Associates Architec 0 / / / /
W. Middle Island Annex:
08-0171 Reconstruction 0-018-004 01/05/09 DONE DONE DONE 08/14/08 08/07/08 11/05/07 09/27/07 16 238,868 238,868 DDJ 0 0 0 Wiedersum Associates Architec 0 / / / /
12-0786 Reconstruction 0-018-005 DONE STARTED UNREVIEWED02/07/13 02/06/13 07/14/09 03/06/12 155,16 0 0 MFS 0 0 0 Wiedersum Associates Architec 0 / / / /
11-1080 Reconstruction 0-018-006 04/10/12 DONE DONE DONE 04/05/12 04/02/12 03/20/12 03/06/12 2,7 865,800 0 DDJ 0 0 0 Wiedersum Associates Architec 0 / / / /
Central Office Annex East:
- Reconstruction 1-019-002 / / / / 07/14/09 / / 155,16 0 0 DDJ 0 0 0 0 / / / /
Public Library:
12-1229 Additions and Alterations 6-016-005 UNREVIEWED 05/28/13 05/28/13 11/02/12 / / 02 - 16 0 0 DDJ 0 0 0 Peter Gisolfi Associates 0 / / / /
09-0072 Reconstruction 6-016-006 08/11/09 DONE DONE DONE 07/22/09 07/20/09 06/19/09 06/17/09 7,16 180,000 0 DDJ 0 0 0 Beatty, Harvey & Associates 0 / / / /
- Reconstruction 6-016-007 / / / / 05/31/13 / / 2 0 0 MFS 0 0 0 0 / / / /
New Co-Gen Building:
12-0787 New Construction 7-020-001 DONE STARTED UNREVIEWED02/07/13 02/06/13 06/21/12 03/06/12 02 - 16 0 0 MFS 0 0 0 Wiedersum Associates Architec 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Bay Avenue School:
- Reconstruction 0-001-011 / / / / 12/18/12 / / 4,8,155,16 0 6,090,147 DDJ 0 0 0 0 / / / /
08-0056 Additions and Alterations 0-001-016 12/08/08 DONE DONE DONE 07/21/08 07/08/08 07/15/08 12/11/07 02 - 16 723,223 723,223 JOD 0 0 178,201 Burton Behrendt Smith 0 / / 01/04/13
12-0372 Reconstruction 0-001-017 DONE DONE ADD. REQ'D11/02/12 10/30/12 06/21/12 05/03/12 8,155,15,16 0 7,945,272 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
Medford Avenue School:
- Reconstruction 0-002-008 / / / / 12/18/12 / / 8,155,16 0 7,669,074 DDJ 0 0 0 0 / / / /
12-0373 Reconstruction 0-002-011 DONE DONE ADD. REQ'D11/02/12 10/30/12 06/21/12 05/03/12 8,155,15,16 0 8,700,804 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
River Avenue Elem. School:
- Reconstruction 0-003-004 / / / / 12/18/12 / / 4,8 0 5,338,277 DDJ 0 0 0 0 / / / /
12-0374 Reconstruction 0-003-009 DONE DONE ADD. REQ'D11/02/12 10/30/12 06/21/12 05/03/12 8,155,15,16 0 6,135,714 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
South Ocean Middle School:
- Reconstruction 0-004-011 / / / / 12/18/12 / / 4,8,9,155 0 16,284,290 DDJ 0 0 0 0 / / / /
08-0492 Reconstruction 0-004-015 03/04/09 DONE DONE DONE 10/09/08 10/06/08 02/27/08 12/11/07 8 578,911 0 JOD 0 0 154,569 Burton Behrendt Smith 0 / / / /
08-0086 Reconstruction 0-004-016 08/28/08 DONE DONE DONE 07/22/08 07/18/08 02/27/08 12/11/07 16 269,262 269,262 JOD 0 0 71,893 Burton Behrendt Smith 0 / / / /
12-0375 Reconstruction 0-004-017 DONE DONE ADD. REQ'D11/02/12 10/30/12 06/21/12 05/03/12 8,155,15,16 0 19,097,712 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
Saxton Middle School:
10-1250 Reconstruction 0-005-016 08/03/11 DONE DONE DONE 05/02/11 05/02/11 02/27/08 12/11/10 10 161,045 161,045 JOD 0 0 42,999 Burton Behrendt Smith 0 / / 01/04/13
08-0493 Reconstruction 0-005-017 03/04/09 DONE DONE DONE 10/09/08 10/06/08 02/27/08 12/11/07 8 1,682,879 1,682,879 JOD 0 0 449,328 Burton Behrendt Smith 0 / / / /
09-0313 Reconstruction 0-005-018 11/24/09 DONE DONE DONE 10/19/09 10/14/09 02/27/08 12/11/07 4,155,16 572,180 572,180 JOD 0 0 154,488 Burton Behrendt Smith 0 / / / /
12-0376 Reconstruction 0-005-019 DONE DONE ADD. REQ'D11/02/12 10/30/12 06/21/12 05/03/12 8,155,15,16 0 26,594,544 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
- Reconstruction 0-005-020 / / / / 12/18/12 / / 4,155 0 0 DDJ 0 0 0 0 / / / /
Barton Ave. Elementary:
- Reconstruction 0-008-008 / / / / 12/18/12 / / 4,8,9,15 0 10,150,245 DDJ 0 0 0 0 / / / /
12-0377 Reconstruction 0-008-010 DONE DONE ADD. REQ'D11/02/12 10/30/12 06/21/12 05/03/12 8,155,15,16 0 12,082,626 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
Oregon Avenue Junior High:
- Reconstruction 0-009-009 / / / / 12/18/12 / / 8 0 16,565,424 DDJ 0 0 0 0 / / / /
12-0378 Reconstruction 0-009-011 DONE DONE ADD. REQ'D11/02/12 10/30/12 06/21/12 05/03/12 8,155,15,16 0 16,565,424 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
Tremont Ave School:
- Reconstruction 0-010-005 / / / / 12/18/12 / / 4 0 8,990,217 DDJ 0 0 0 0 / / / /
12-0379 Reconstruction 0-010-011 DONE DONE ADD. REQ'D11/02/12 10/30/12 06/21/12 05/03/12 8,155,15,16 0 12,134,304 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
Eagle Drive Elementary:
- Reconstruction 0-011-005 / / / / 12/18/12 / / 4 0 13,050,315 DDJ 0 0 0 0 / / / /
08-0606 Reconstruction 0-011-011 03/18/10 DONE DONE DONE 10/29/08 10/28/08 02/27/08 12/11/07 16 28,625 67,315 JOD 0 0 7,706 Burton Behrendt Smith 0 / / / /
12-0380 Reconstruction 0-011-012 DONE DONE ADD. REQ'D11/02/12 10/30/12 06/21/12 05/03/12 8,155,15,16 0 14,805,990 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
Canaan Elementary School:
- Reconstruction 0-013-007 / / / / 12/18/12 / / 4,155 0 8,700,210 DDJ 0 0 0 0 / / / /
12-0381 Reconstruction 0-013-011 DONE DONE ADD. REQ'D11/02/12 10/30/12 06/21/12 05/03/12 8,155,15,16 0 11,369,622 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
Patchogue-Medford High School:
- Reconstruction 0-015-017 / / / / 03/22/10 / / 2,4,7,9,15 0 75,384,578 JOD 0 0 0 0 / / / /
12-0382 Reconstruction 0-015-018 DONE DONE ADD. REQ'D11/02/12 10/30/12 06/21/12 05/03/12 8,155,15,16 0 80,486,567 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
- Reconstruction 0-015-019 / / / / 12/18/12 / / 4,7,8,155,16 0 0 DDJ 0 0 0 0 / / / /
Administration Bldg.:
12-0383 Reconstruction 1-006-002 DONE DONE ADD. REQ'D11/02/12 10/30/12 06/21/12 05/03/12 8,155,15,16 0 0 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
Public Library:
08-1463 Reconstruction 6-021-009 04/13/09 DONE DONE DONE 04/07/09 03/06/09 01/08/09 12/16/08 155,15,16 340,000 0 JOD 0 0 0 EMTEC Consultants, P.C. 0 / / / /
09-1207 Reconstruction 6-021-010 08/19/10 DONE DONE DONE 04/02/10 03/29/10 01/06/10 02/16/10 2,9,10,155,15,16 1,064,238 0 JOD 0 0 0 H2M Group 0 / / / /
11-0012 Reconstruction 6-021-011 07/11/11 DONE DONE DONE 07/11/11 07/07/11 04/14/11 02/15/11 14 250,000 0 JOD 0 0 0 RICHARD SEARLES ARCHITECTS 0 / / / /
St. Paul Episcopal Church:
10-0179TQ Temporary Quarters 6-032-001 08/30/10 DONE DONE DONE 08/30/10 08/30/10 08/10/10 / / 0 0 JOD 0 0 0 0 / / / /
Press Box @ High School:
12-0939DB Discovered Building 7-026-001 03/06/13 DONE DONE DONE 03/01/13 03/01/13 04/10/07 / / 0 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
District Wide:
07-2127 Reconstruction 7-999-007 07/14/08 DONE DONE DONE 05/19/08 05/15/08 11/21/06 12/11/07 10,16 4,376,496 4,376,496 JOD 0 0 1,168,524 Burton Behrendt Smith 0 / / / /
10-0916 Reconstruction 7-999-008 05/24/11 DONE DONE DONE 02/28/11 02/22/11 02/27/08 12/11/07 10,13,16 1,723,136 1,723,136 JOD 0 0 460,077 Burton Behrendt Smith 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Nathaniel Woodhull Elementary:
08-0584 Reconstruction 0-003-010 04/08/09 DONE DONE DONE 10/23/08 10/22/08 12/05/05 12/12/07 2,8,155,16 1,603,500 1,603,500 HCM 0 0 186,006 ThomasAssociates, PC 0 / / 10/17/12
12-1287 Reconstruction 0-003-011 UNREVIEWED 06/14/13 06/12/13 05/08/13 12/12/07 2,8 27,450 0 JOB 0 0 5,764 Tetra Tech Architects & Engi 0 / / / /
William Floyd Elementary:
08-0585 Reconstruction 0-004-014 04/08/09 DONE DONE DONE 10/23/08 10/22/08 12/05/05 12/12/07 2,4,16 260,500 260,500 HCM 0 0 30,218 ThomasAssociates, PC 0 / / 10/17/12
12-1288 Reconstruction 0-004-015 UNREVIEWED 06/14/13 06/12/13 05/14/13 12/12/07 2,8 27,450 0 JOB 0 0 5,764 Tetra Tech Architects & Engi 0 / / / /
William Floyd Jr/Sr High:
08-1622 Additions and Alterations 0-005-020 11/05/09 DONE DONE DONE 05/12/09 05/11/09 07/05/05 12/12/07 02 - 16 48,735,000 48,735,000 HCM 0 0 5,653,260 Tetra Tech Architects & Engi 0 / / 09/06/12
11-0826 Additions and Alterations 0-005-021 06/12/12 DONE DONE DONE 02/22/12 02/21/12 10/05/11 12/12/07 02 - 16 211,000 211,000 HCM 0 0 211,000 Tetra Tech Architects & Engi 0 / / / /
11-0914 Reconstruction 0-005-022 06/26/12 DONE DONE DONE 03/08/12 02/23/12 02/17/12 12/12/07 4,8,9,155,15,16 1,120,000 0 HCM 0 0 235,200 Tetra Tech Architects & Engi 0 / / / /
- PR Additions and Alterations 0-005-023 / / / / 09/19/12 / / 02 - 16 0 0 JMB 0 0 0 0 / / / /
12-0390 Additions and Alterations 0-005-023 03/19/13 DONE DONE DONE 11/06/12 11/05/12 09/19/12 12/12/07 02 - 16 2,440,000 0 JMB 0 0 1,722,200 Tetra Tech Architects & Engi 0 / / / /
- Reconstruction 0-005-024 / / / / 05/08/13 / / 2,8 0 0 JOB 0 0 0 0 / / / /
Moriches Elementary School:
08-0586 Reconstruction 0-009-009 04/08/09 DONE DONE DONE 10/23/08 10/22/08 02/17/05 12/12/07 9 135,500 135,500 HCM 0 0 15,718 ThomasAssociates, PC 0 / / 10/17/12
12-1289 Reconstruction 0-009-011 UNREVIEWED 06/14/13 06/12/13 05/08/13 12/12/07 2,8 27,450 0 JOB 0 0 5,764 Tetra Tech Architects & Engi 0 / / / /
Tangier Smith Elementary:
12-1290 Reconstruction 0-010-013 UNREVIEWED 06/14/13 06/12/13 05/08/13 12/12/07 2,8 27,450 0 JOB 0 0 5,764 Tetra Tech Architects & Engi 0 / / / /
Wm. Paca Jr. HS/7-9:
08-0587 Reconstruction 0-011-012 04/08/09 DONE DONE DONE 10/23/08 10/22/08 12/05/05 12/12/07 2,8 486,175 486,175 HCM 0 0 58,827 ThomasAssociates, PC 0 / / 10/17/12
12-1291 Reconstruction 0-011-014 UNREVIEWED 06/14/13 06/12/13 05/08/13 12/12/07 2,4,8 0 0 JOB 0 0 0 Tetra Tech Architects & Engi 0 / / / /
Hobart Elementary School:
08-0588 Reconstruction 0-012-010 04/08/09 DONE DONE DONE 10/23/08 10/22/08 / / 12/12/07 2,16 135,500 135,500 HCM 0 0 15,718 ThomasAssociates, PC 0 / / 10/17/12
12-1292 Reconstruction 0-012-011 UNREVIEWED 06/14/13 06/12/13 05/08/13 12/12/07 2,8 0 0 JOB 0 0 0 Tetra Tech Architects & Engi 0 / / / /
New Middle School:
08-0589 Reconstruction 0-053-002 04/08/09 DONE DONE DONE 10/23/08 10/22/08 12/05/05 12/12/07 2,16 301,724 301,724 HCM 0 0 36,509 ThomasAssociates, PC 0 / / 10/17/12
12-1293 Reconstruction 0-053-003 UNREVIEWED 06/14/13 06/12/13 05/14/13 12/12/07 2,8 0 0 JOB 0 0 0 Tetra Tech Architects & Engi 0 / / / /
Mastics Moriches Shirley Comu. Libr.:
09-0026 Reconstruction 6-007-005 07/07/09 DONE DONE DONE 07/03/09 07/03/09 01/08/09 08/25/08 9,16 143,500 0 HCM 0 0 0 Wiedersum Associates Architec 0 / / / /
12-0170 Reconstruction 6-007-006 09/17/12 DONE DONE DONE 09/13/12 09/12/12 03/24/11 08/27/12 7,9,10,155,15,16 223,000 0 HCM 0 0 0 0 / / / /
- Reconstruction 6-007-007 / / / / 03/25/11 / / 7,9,10,155,15,16 0 0 HCM 0 0 0 0 / / / /
District Wide:
08-0100 Reconstruction 7-999-007 12/08/08 DONE DONE DONE 07/25/08 07/24/08 05/14/08 12/12/07 10,13,16 5,400,000 5,400,000 HCM 0 0 626,400 ThomasAssociates, PC 0 / / 10/17/12
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Main Street School:
08-1496 Reconstruction 0-001-013 08/28/09 DONE DONE DONE 04/14/09 04/09/09 01/15/09 05/20/08 2,4,7,8,9,155,15,16 1,197,980 1,197,980 JOD 0 0 352,980 James M. Campbell Architects 0 / / / /
09-0751 Reconstruction 0-001-014 10/15/10 DONE DONE DONE 01/22/10 01/21/10 09/09/09 09/02/09 2,8,155,15,16 973,904 973,904 JOD 0 0 0 ECG Eninering, LLC 973,904 / / 09/24/12
High School:
- Reconstruction 0-006-008 / / / / 01/09/09 / / 2,4,8,9,155,15,16 0 0 JOD 0 0 0 0 / / / /
09-0752 Reconstruction 0-006-009 10/15/10 DONE DONE DONE 01/22/10 01/21/10 09/09/09 09/02/09 2,8,155,15,16 1,815,335 1,815,335 JOD 0 0 0 ECG Eninering, LLC 1,815,335 / / 09/24/12
11-1246 Reconstruction 0-006-010 07/13/12 DONE DONE DONE 05/01/12 04/26/12 03/23/12 06/19/12 4,7,8,9,10,155,16 100,000 100,000 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 12/19/12
Administration Building:
09-0753 Reconstruction 1-003-002 10/15/10 DONE DONE DONE 01/22/10 01/21/10 09/09/09 09/02/09 2,155,16 70,051 0 JOD 0 0 0 ECG Eninering, LLC 70,051 / / 09/24/12
Shed #11 Maintenance Storage:
08-0750DB Discovered Building 2-021-001 11/25/08 DONE DONE DONE 11/12/08 10/20/08 09/23/08 / / 0 0 JOD 0 0 0 Enviroscience Consultants, In 0 / / / /
High School Field storage:
09-1091XX Reconstruction 2-024-001 CANCELLED 03/17/10 03/04/10 10/26/09 / / 0 0 JOD 0 0 0 James M. Campbell Architects 0 / / / /
Maintenance Building:
09-0754 Reconstruction 3-016-002 10/15/10 DONE DONE DONE 01/22/10 01/21/10 09/09/09 09/02/09 2,155,16 24,503 0 JOD 0 0 0 ECG Eninering, LLC 24,503 / / 09/24/12
Public Library:
08-0061 Reconstruction 6-003-005 07/25/08 DONE DONE DONE 07/21/08 07/10/08 08/10/07 11/26/07 4,9,16 66,000 0 MGL 0 0 0 Wiedersum Associates Architec 0 / / / /
- XX Reconstruction 6-003-006 CANCELLED / / / / 08/10/09 / / 2,4,8,10,155,15,16 0 0 JOD 0 0 0 0 / / / /
11-0045 Additions and Alterations 6-003-007 08/17/11 DONE DONE DONE 07/20/11 07/20/11 01/04/11 02/28/11 02 - 16 2,750,000 0 JOD 0 0 0 Wiedersum Associates Architec 0 / / 02/20/13
CONCESSION TRAILER:
09-1091DB Discovered Building 7-019-001 ADDENDUM REQ'D 03/04/10 03/04/10 10/26/09 / / 0 0 JOD 0 0 0 0 / / / /
Community Center:
07-2088 New Construction 7-020-001 05/13/09 DONE DONE DONE 05/05/08 05/05/08 03/26/08 / / 02 - 16 287,125 0 JOD 0 0 0 Lemmen Paul Architects 0 / / / /
High School Field Press Box:
09-1089DB Discovered Building 7-022-001 ADDENDUM REQ'D 03/17/10 03/04/10 10/26/09 / / 0 0 JOD 0 0 0 James M. Campbell Architects 0 / / / /
High School Small Concession Stand:
09-1090DB Discovered Building 7-023-001 ADDENDUM REQ'D 03/17/10 03/04/10 10/26/09 / / 0 0 JOD 0 0 0 James M. Campbell Architects 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
East Moriches School:
08-1075 Reconstruction 0-001-014 02/27/09 DONE DONE DONE 01/09/09 01/09/09 07/09/08 05/20/08 2,7,155 569,083 569,083 JOD 0 0 188,366 John A Grillo-ARCHITECTS PC 0 / / / /
08-1652 Reconstruction 0-001-015 06/25/09 DONE DONE DONE 06/01/09 05/18/09 02/10/09 05/20/08 2,155 200,600 200,600 JOD 0 0 66,397 John A Grillo-ARCHITECTS PC 0 / / / /
11-0704 Reconstruction 0-001-016 03/19/12 DONE DONE DONE 01/24/12 01/19/12 01/10/12 05/17/11 4,7,9 28,320 0 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
11-1258 Reconstruction 0-001-017 07/02/12 DONE DONE DONE 05/03/12 05/01/12 01/10/12 05/15/12 7,9 450,000 450,000 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
- Reconstruction 0-001-018 / / / / 05/23/13 / / 2,4,7,8,9,15,16 0 0 JOB 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
South Haven Primary School:
- Reconstruction 0-001-005 / / / / 08/05/09 / / 9,155,16 0 0 DDJ 0 0 0 0 / / / /
- Reconstruction 0-001-006 / / / / 02/05/10 / / 2,9,155,16 0 0 DDJ 0 0 0 0 / / / /
- Reconstruction 0-001-007 / / / / 03/12/10 / / 2,9,155,16 0 0 DDJ 0 0 0 0 / / / /
Kreamer Street Elementary:
07-1775 Reconstruction 0-002-008 01/09/09 DONE DONE DONE 03/09/08 03/05/08 08/14/07 05/15/07 2,8,155,16 1,462,000 1,462,000 DDJ 0 0 73,100 Wiedersum Associates Architec 0 / / 12/23/12
09-0638 Reconstruction 0-002-009 05/06/10 DONE DONE DONE 12/29/09 12/18/09 08/05/09 06/19/06 9,155,16 968,480 968,480 DDJ 0 0 0 Wiedersum Associates Architec 0 / / 12/23/12
09-1143 Reconstruction 0-002-010 05/27/10 DONE DONE DONE 03/25/10 03/18/10 02/05/10 06/16/09 2,9,155,16 1,280,410 1,280,410 DDJ 0 0 0 Wiedersum Associates Architec 0 / / 12/23/12
Brookhaven Elementary:
07-1776 Reconstruction 0-003-008 01/09/09 DONE DONE DONE 03/09/08 03/05/08 08/14/07 05/15/07 8,9,155,16 2,830,000 2,830,000 DDJ 0 0 141,500 Wiedersum Associates Architec 0 / / 12/23/12
09-0639 Reconstruction 0-003-009 05/06/10 DONE DONE DONE 12/29/09 12/18/09 08/05/09 06/19/06 9,155,16 851,500 851,500 DDJ 0 0 0 Wiedersum Associates Architec 0 / / 12/23/12
09-1144 Reconstruction 0-003-010 05/27/10 DONE DONE DONE 03/25/10 03/18/10 02/05/10 06/16/09 2,155,16 630,000 630,000 DDJ 0 0 0 Wiedersum Associates Architec 0 / / 12/23/12
Bellport Middle School:
07-1777 Reconstruction 0-004-010 01/09/09 DONE DONE DONE 03/09/08 03/05/08 08/14/07 05/15/07 2,4,8,10,155,16 3,130,800 3,130,800 DDJ 0 0 156,540 Wiedersum Associates Architec 0 / / 12/23/12
09-0640 Reconstruction 0-004-011 05/06/10 DONE DONE DONE 12/29/09 12/18/09 08/05/09 06/19/06 2,9,155,16 1,574,470 1,574,470 DDJ 0 0 0 Wiedersum Associates Architec 0 / / 12/23/12
09-1145 Reconstruction 0-004-012 05/27/10 DONE DONE DONE 03/25/10 03/18/10 02/05/10 06/16/09 2,8,9,155,15,16 1,006,066 1,006,066 DDJ 0 0 0 Wiedersum Associates Architec 0 / / 12/23/12
Frank P Long Inter.(frmr Hampton):
07-1778 Reconstruction 0-005-008 01/09/09 DONE DONE DONE 03/09/08 03/05/08 08/14/07 05/15/07 8,9,155,16 4,375,000 4,375,000 DDJ 0 0 218,950 Wiedersum Associates Architec 0 / / 12/23/12
09-0641 Reconstruction 0-005-009 05/06/10 DONE DONE DONE 12/29/09 12/18/09 12/29/09 06/19/06 7,16 993,950 993,950 DDJ 0 0 0 Wiedersum Associates Architec 0 / / 12/23/12
09-1146 Reconstruction 0-005-010 05/27/10 DONE DONE DONE 03/25/10 03/18/10 / / 06/16/09 1,807,800 1,807,800 JOD 0 0 0 Wiedersum Associates Architec 0 / / 12/23/12
Senior High School:
07-1779 Reconstruction 0-006-008 01/09/09 DONE DONE DONE 03/09/08 03/05/08 08/14/07 02/12/08 2,4,8,10,155,16 11,720,450 11,720,450 DDJ 0 0 586,022 Wiedersum Associates Architec 0 / / 12/23/12
09-0642 Reconstruction 0-006-009 05/06/10 DONE DONE DONE 12/29/09 12/18/09 08/05/09 06/19/06 4,9,155,15,16 1,712,020 1,712,020 DDJ 0 0 0 Wiedersum Associates Architec 0 / / 12/23/12
09-1147 Reconstruction 0-006-010 05/27/10 DONE DONE DONE 03/25/10 03/18/10 02/05/10 06/16/09 2,4,8,9,155,15,16 2,835,454 2,835,454 DDJ 0 0 0 Wiedersum Associates Architec 0 / / 12/23/12
Verne W. Critz Elementary:
07-1780 Reconstruction 0-007-008 01/09/09 DONE DONE DONE 03/09/08 03/05/08 08/14/07 05/15/07 2,4,8,9,155,15,16 2,925,000 2,925,000 DDJ 0 0 146,250 Wiedersum Associates Architec 0 / / 12/23/12
09-0643 Reconstruction 0-007-009 05/06/10 DONE DONE DONE 12/29/09 12/18/09 08/05/09 06/19/06 9,155,16 1,024,850 1,024,850 DDJ 0 0 0 Wiedersum Associates Architec 0 / / 12/23/12
09-1148 Reconstruction 0-007-010 05/27/10 DONE DONE DONE 03/25/10 03/18/10 02/05/10 06/16/09 2,9,155,16 315,000 315,000 DDJ 0 0 0 Wiedersum Associates Architec 0 / / 12/23/12
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Middle School:
09-1576 Reconstruction 0-003-017 07/19/10 DONE DONE DONE 07/02/10 06/23/10 07/15/08 05/18/10 4 650,000 650,000 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
11-0693 Reconstruction 0-003-018 08/18/11 DONE DONE DONE 01/19/12 01/18/12 03/23/10 07/26/11 2,15,16 150,000 150,000 HCM 0 0 0 Michael J. Guido Jr. 0 / / 09/27/12
11-0979 Reconstruction 0-003-019 06/15/12 DONE DONE DONE 03/16/12 03/15/12 05/19/11 05/18/10 4 734,870 0 HCM 0 0 0 Michael J. Guido Jr. 0 / / / /
12-1047 Reconstruction 0-003-020 05/06/13 DONE DONE DONE 03/29/13 03/29/13 02/01/13 03/05/13 16 133,000 0 MFS 0 0 0 MICHAEL J. GUIDO JR. ARCHITEC 0 / / / /
John Marshall Elementary:
11-0980 Reconstruction 0-004-016 06/15/12 DONE DONE DONE 03/16/12 03/15/12 01/25/12 05/18/10 2 114,000 114,000 HCM 0 0 0 Michael J. Guido Jr. 0 / / 04/29/13
12-1057 Reconstruction 0-004-017 05/14/13 DONE DONE DONE 04/02/13 03/29/13 02/01/13 05/15/12 7 650,000 0 MFS 0 0 0 Michael J. Guido Jr. 0 / / / /
High School/Modular @ HS:
08-1476 Reconstruction 0-006-026 04/29/09 DONE DONE DONE 04/09/09 04/07/09 06/20/08 03/21/06 15 73,561 0 HCM 0 0 0 Beatty, Harvey & Associates 0 / / / /
Football Storage Shed @ High School:
09-1030DB Discovered Building 2-021-001 06/22/10 DONE DONE DONE 03/09/10 03/08/10 03/11/08 / / 0 0 HCM 0 0 0 BEATTY HARVEY COCO 0 / / / /
Soccer Shed @ High School:
09-1031DB Discovered Building 2-022-001 06/22/10 DONE DONE DONE 03/09/10 03/08/10 03/11/08 / / 0 0 HCM 0 0 0 BEATTY HARVEY COCO 0 / / / /
Softball Storage @ High School:
09-1033DB Discovered Building 2-024-001 UNREVIEWED
DONE DONE 03/09/10 03/08/10 03/11/08 / / 0 0 HCM 0 0 0 BEATTY HARVEY COCO 0 / / / /
Technology Shop Storage Shed:
09-1024DB Discovered Building 2-025-001 06/22/10 DONE DONE DONE 03/09/10 03/08/10 03/12/08 / / 0 0 HCM 0 0 0 BEATTY HARVEY COCO 0 / / / /
Large Pole Barn - High School:
09-1026DB Discovered Building 2-027-001 06/22/10 DONE DONE DONE 03/09/10 03/08/10 03/11/08 / / 0 0 HCM 0 0 0 BEATTY HARVEY COCO 0 / / / /
Softball Dugout / Storage (3rd Base):
09-1027DB Discovered Building 2-028-001 06/22/10 DONE DONE DONE 03/09/10 03/08/10 03/11/08 / / 0 0 HCM 0 0 0 BEATTY HARVEY COCO 0 / / / /
Baseball Dugout / Storage (3rd Base):
09-1029DB Discovered Building 2-030-001 06/22/10 DONE DONE DONE 03/09/10 03/08/10 03/11/08 / / 0 0 HCM 0 0 0 BEATTY HARVEY COCO 0 / / / /
Press Box @ High School:
09-1032DB Discovered Building 7-023-001 08/09/10 DONE DONE DONE 03/09/10 03/08/10 03/12/08 / / 0 0 HCM 0 0 0 BEATTY HARVEY COCO 0 / / / /
Softball Dugout (1st base) @ High:
09-1025DB Discovered Building 7-026-001 06/22/10 DONE DONE DONE 03/09/10 03/08/10 03/11/08 / / 0 0 HCM 0 0 0 BEATTY HARVEY COCO 0 / / / /
Baseball Dugout (1st Base):
09-1028DB Discovered Building 7-029-001 06/22/10 DONE DONE DONE 03/09/10 03/08/10 03/11/08 / / 0 0 HCM 0 0 0 BEATTY HARVEY COCO 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Elementary School:
08-1130 Reconstruction 0-001-012 01/27/09 DONE DONE DONE 01/27/09 01/23/09 08/01/08 01/21/09 155 297,016 297,016 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
08-1665 Reconstruction 0-001-013 06/26/09 DONE DONE DONE 06/09/09 06/01/09 03/24/09 05/19/09 7,10 78,102 78,102 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
10-0825 Reconstruction 0-001-014 05/17/11 DONE DONE DONE 02/08/11 02/04/11 08/19/10 05/18/10 4 135,000 0 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
10-0790 Reconstruction 0-001-015 05/23/11 DONE DONE DONE 02/03/11 02/03/11 09/08/10 05/18/10 155 45,000 45,000 DDJ 0 0 0 Burton Behrendt Smith 0 / / 01/24/13
11-1288 Reconstruction 0-001-016 05/17/12 DONE DONE DONE 05/10/12 05/07/12 03/29/12 05/17/11 2,9 40,000 40,000 DDJ 0 0 0 Burton Behrendt Smith 0 / / 08/25/12
Superintendent's Residence:
09-0257 Reconstruction 7-005-003 01/11/10 DONE DONE DONE 09/22/09 09/22/09 08/28/09 05/19/09 2,155 25,000 0 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Springs School:
09-0171 Reconstruction 0-001-011 10/22/09 DONE DONE DONE 08/27/09 08/25/09 03/26/09 02/13/07 2,16 159,427 159,427 JOD 0 0 80,462 ECG Eninering, LLC 0 / / 12/26/12
- Reconstruction 0-001-012 / / / / 10/06/10 / / 7 0 0 JOD 0 0 0 0 / / / /
11-0081 Reconstruction 0-001-013 08/16/11 DONE DONE DONE 08/04/11 08/04/11 06/29/11 07/05/11 7 211,000 0 JOD 0 0 98,675 Chaleff & Rogers Architects,P 0 / / / /
- Reconstruction 0-001-014 / / / / 03/22/13 / / 2,4,7,8,9,10,155,16 0 0 MFS 0 0 0 0 / / / /
- Reconstruction 0-001-015 / / / / 04/04/13 / / 8,9,10,155,16 0 0 MFS 0 0 0 0 / / / /
07-2206SC Visual Structural Inspection 0-001-SC1 10/01/08 DONE DONE DONE 05/27/08 05/27/08 / / / / 16 6,000 0 JOD 0 0 0 0 / / / /
Greenhouse:
08-1530 New Construction 0-011-001 UNREVIEWED 04/22/09 03/17/09 12/04/08 / / 02 - 16 0 0 JOD 0 0 0 D.B. Bennett Consulting engin 0 / / / /
Storage Shed:
10-0514DB Discovered Building 2-012-001 UNREVIEWED 12/02/10 12/02/10 11/05/10 / / 02 - 16 0 0 JOD 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Pierson High School:
08-1446 Reconstruction 0-001-020 05/19/09 DONE DONE DONE 03/31/09 03/30/09 03/12/08 05/20/08 155 101,155 101,155 DDJ 0 0 101,155 Burton Behrendt Smith 0 / / / /
07-2161 Reconstruction 0-001-021 09/18/08 DONE DONE DONE 05/27/08 05/19/08 03/12/08 05/15/07 16 50,000 50,000 DDJ 0 0 0 Burton Behrendt Smith 0 / / 10/23/12
08-1384 Reconstruction 0-001-022 05/29/09 DONE DONE DONE 03/16/09 03/10/09 01/26/09 05/20/08 10 55,854 55,854 DDJ 0 0 55,854 Burton Behrendt Smith 0 / / 01/18/13
09-0242 Reconstruction 0-001-023 03/03/10 DONE DONE DONE 09/17/09 09/16/09 / / 05/19/09 10 150,000 150,000 DDJ 0 0 0 Burton Behrendt Smith 0 / / 07/15/12
11-0915 Reconstruction 0-001-024 07/27/12 DONE DONE DONE 03/08/12 02/23/12 06/29/11 05/18/10 16 274,320 0 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
11-1369 Reconstruction 0-001-025 10/22/12 DONE DONE DONE 05/31/12 05/25/12 12/06/11 05/15/10 10,155,16 77,682 0 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
- Reconstruction 0-001-026 / / / / 08/09/12 / / 155,16 0 0 DDJ 0 0 0 0 / / / /
- Reconstruction 0-001-027 / / / / 05/31/13 / / 10 0 0 DDJ 0 0 0 0 / / / /
- Reconstruction 0-001-028 / / / / 05/31/13 / / 7 0 0 DDJ 0 0 0 0 / / / /
Sag Harbor Elementary:
08-1447 Reconstruction 0-003-015 05/19/09 DONE DONE DONE 03/31/09 03/30/09 03/12/08 05/20/08 155 195,810 195,810 DDJ 0 0 195,810 Burton Behrendt Smith 0 / / / /
08-1385 Reconstruction 0-003-017 05/29/09 DONE DONE DONE 03/16/09 03/10/09 02/12/09 05/20/08 10 6,569 32,100 DDJ 0 0 0 Burton Behrendt Smith 0 / / 01/14/13
11-0916 Reconstruction 0-003-018 07/27/12 DONE DONE DONE 03/08/12 02/23/12 06/29/11 05/18/10 16 106,680 106,680 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
11-1370 Reconstruction 0-003-019 10/22/12 DONE DONE DONE 05/31/12 05/25/12 12/06/11 05/18/10 8,10,155,16 40,446 0 0 0 0 Burton Behrendt Smith 0 / / / /
- Reconstruction 0-003-020 / / / / 08/09/12 / / 155,16 0 0 DDJ 0 0 0 0 / / / /
- Reconstruction 0-003-021 / / / / 05/31/13 / / 7 0 0 DDJ 0 0 0 0 / / / /
Storage Container - Elem School:
- DB Discovered Building 2-013-001 / / / / 06/23/11 / / 0 0 DDJ 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Montauk School K-8:
08-1653 Reconstruction 0-001-008 DONE DONE ADD. REQ'D06/01/09 05/19/09 10/26/04 12/09/08 2 0 6,500,994 JOD 0 0 0 Island Structures Engineering 0 / / / /
- Reconstruction 0-001-009 / / / / 12/08/09 / / 4,7 0 0 JOD 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
John H. Glen High School:
08-1510 Reconstruction 0-004-020 04/07/10 DONE DONE DONE 04/16/09 04/15/09 10/06/08 05/20/08 8,9,155,16 40,322 40,322 JOD 0 0 14,717 Burton Behrendt Smith 0 / / / /
11-0318 Reconstruction 0-004-021 02/02/12 DONE DONE DONE 11/01/11 11/01/11 01/19/11 12/09/10 2,4,8,9,10,155,16 737,700 737,700 JOD 0 0 292,609 Burton Behrendt Smith 0 / / 10/23/12
Harley Avenue Elementary:
10-1391 Reconstruction 0-005-013 07/08/11 DONE DONE DONE 06/09/11 06/08/11 01/19/11 12/10/10 2,4,8,9,155,15,16 211,860 211,860 JOD 0 0 67,801 Burton Behrendt Smith 0 / / 10/23/12
Elwood Middle School:
11-0319 Reconstruction 0-006-015 02/02/12 DONE DONE DONE 11/01/11 11/01/11 01/19/11 12/09/10 2,10,16 96,300 96,300 JOD 0 0 30,819 Burton Behrendt Smith 0 / / 10/23/12
James Boyd Intermediate:
11-0320 Reconstruction 0-007-007 02/02/12 DONE DONE DONE 11/01/11 11/01/11 01/19/11 12/09/10 2,155,16 353,742 0 JOD 0 0 113,207 Burton Behrendt Smith 0 / / / /
Districtwide:
11-0274 Reconstruction 7-999-002 12/06/11 DONE DONE DONE 10/25/11 10/21/11 08/19/11 12/09/10 16 50,000 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Lloyd Harbor School:
08-0518 Reconstruction 0-002-020 02/17/09 DONE DONE DONE 10/14/08 10/09/08 06/22/07 09/25/07 2,4,16 329,277 329,277 DDJ 0 0 172,870 John A Grillo-ARCHITECTS PC 0 / / / /
09-1106 Reconstruction 0-002-022 04/29/10 DONE DONE DONE 03/18/10 03/12/10 11/19/09 12/08/09 2,8,9,155,15,16 479,243 479,243 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
- Reconstruction 0-002-023 / / / / 03/15/10 / / 2,15,16 0 8,202,765 DDJ 0 0 0 0 / / / /
10-0826 Reconstruction 0-002-024 06/07/11 DONE DONE DONE 02/08/11 02/04/11 11/02/10 12/08/09 2,4,7,8,9,10,155,15, 613,458 613,458 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 10/05/11
11-0466 Reconstruction 0-002-025 03/19/12 DONE DONE DONE 12/08/11 12/05/11 12/01/11 05/17/11 2,155 370,000 370,000 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 09/04/12
11-1395 Reconstruction 0-002-026 01/30/13 DONE DONE DONE 06/12/12 06/06/12 12/21/11 12/13/11 155,15,16 730,692 730,692 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 730,692 / / / /
12-0898 Reconstruction 0-002-027 DONE DONE UNREVIEWED02/21/13 02/21/13 05/17/12 05/15/12 2,4,7,9,10,155,16 0 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
- Reconstruction 0-002-028 / / / / 05/23/13 / / 2,4,7,8,9,10,155,15, 0 0 DDJ 0 0 0 0 / / / /
Goosehill Primary School:
- XX Reconstruction 0-003-026 CANCELLED / / / / 11/18/09 / / 7,9,155,16 0 3,746,358 DDJ 0 0 0 0 / / / /
10-0827 Reconstruction 0-003-027 06/07/11 DONE DONE DONE 02/08/11 02/04/11 11/02/10 12/08/09 4,7,155,16 188,800 188,800 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
11-1394 Reconstruction 0-003-028 01/30/13 DONE DONE DONE 06/12/12 06/06/12 12/21/11 12/13/11 155,15,16 359,375 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 359,375 / / / /
12-0899 Reconstruction 0-003-029 DONE DONE UNREVIEWED02/21/13 02/21/13 05/17/12 05/15/12 2,4,7,155 0 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
- Reconstruction 0-003-030 / / / / 05/23/13 / / 10,155,15,16 0 0 DDJ 0 0 0 0 / / / /
Westside Elementary:
- XX Reconstruction 0-006-022 CANCELLED / / / / 11/18/09 / / 2,4,15,16 0 5,058,214 DDJ 0 0 0 0 / / / /
11-0467 Reconstruction 0-006-023 03/19/12 DONE DONE DONE 12/08/11 12/05/11 12/01/11 05/17/11 2,4,7,9,155,16 980,000 980,000 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 09/17/12
11-1393 Reconstruction 0-006-024 01/30/13 DONE DONE DONE 06/12/12 06/06/12 12/21/11 12/13/11 155,15,16 503,652 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 503,652 / / / /
12-0900 Reconstruction 0-006-025 DONE DONE UNREVIEWED02/21/13 02/21/13 05/17/12 05/15/12 2,4,7,9,10,155,16 0 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
- Reconstruction 0-006-026 / / / / 05/23/13 / / 10,155,15,16 0 0 DDJ 0 0 0 0 / / / /
Junior/Senior High:
08-0519 Reconstruction 0-007-032 02/17/09 DONE DONE DONE 10/14/08 10/09/08 06/22/07 09/25/07 2,4,8,10,155,15,16 1,170,412 1,170,412 DDJ 0 0 311,520 John A Grillo-ARCHITECTS PC 0 / / / /
- XX Additions and Alterations 0-007-035 CANCELLED / / / / 07/14/09 / / 02 - 16 0 0 DDJ 0 0 0 0 / / / /
09-0199 Reconstruction 0-007-036 10/26/09 DONE DONE DONE 09/14/09 09/08/09 07/30/09 09/25/07 16 130,000 130,000 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
09-1107 Reconstruction 0-007-037 04/29/10 DONE DONE DONE 03/18/10 03/12/10 11/18/09 12/08/09 2,8,9,13,155,15,16 814,952 814,952 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
- Reconstruction 0-007-038 / / / / 03/15/10 / / 2,7 0 0 DDJ 0 0 0 0 / / / /
10-0828 Reconstruction 0-007-039 06/07/11 DONE DONE DONE 02/08/11 02/04/11 11/02/10 12/08/09 8,16 265,500 265,500 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 10/05/11
11-0468 Reconstruction 0-007-040 03/19/12 DONE DONE DONE 12/08/11 12/05/11 12/01/11 05/17/11 2,4,7,8,9,10,155,15, 450,000 450,000 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 09/17/12
11-0818 Reconstruction 0-007-041 04/30/12 DONE DONE DONE 02/15/12 02/14/12 12/01/11 09/25/07 2,7 270,000 270,000 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 04/11/13
11-1392 Reconstruction 0-007-042 01/30/13 DONE DONE DONE 06/12/12 06/06/12 12/21/11 12/13/11 9,155,15,16 2,345,681 2,345,681 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 2,345,681 / / / /
12-0901 Reconstruction 0-007-043 DONE DONE UNREVIEWED02/21/13 02/21/13 05/17/12 05/15/12 2,4,7,9,155,15,16 0 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
- Reconstruction 0-007-044 / / / / 05/23/13 / / 2,155,15,16 0 0 DDJ 0 0 0 0 / / / /
Storage Building:
- New Construction 2-016-001 / / / / 05/23/13 / / 02 - 16 0 0 DDJ 0 0 0 0 / / / /
Districtwide:
11-1065 Reconstruction 7-999-006 04/23/12 DONE DONE DONE 04/04/12 03/28/12 12/01/11 05/17/11 16 148,900 148,900 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 02/04/13
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Huntington High School:
12-0923 Reconstruction 0-001-027 DONE STARTED UNREVIEWED02/28/13 02/22/13 11/21/12 05/15/12 2,8,9,155,15,16 0 28,479,054 JMB 0 0 0 Burton Behrendt Smith 0 / / / /
07-1482 Reconstruction 0-001-036 10/30/08 DONE DONE DONE 01/30/08 01/28/08 05/24/07 05/15/07 2 620,000 620,000 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
07-1483 Reconstruction 0-001-037 10/30/08 DONE DONE DONE 01/30/08 01/28/08 05/24/07 05/15/07 2,4,7,8,9,10,15,16 340,624 340,624 JOD 0 0 340,624 Burton Behrendt Smith 0 / / / /
09-0633 Reconstruction 0-001-039 04/23/10 DONE DONE DONE 12/29/09 12/21/09 08/14/08 05/19/09 8,9 46,810 46,810 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
10-0534 Reconstruction 0-001-040 01/13/11 DONE DONE DONE 12/06/10 11/22/10 04/30/10 05/15/07 8,16 25,900 25,900 JOD 0 0 25,900 Burton Behrendt Smith 0 / / / /
12-0844 Reconstruction 0-001-041 DONE STARTED UNREVIEWED02/15/13 02/14/13 05/21/12 05/15/12 4,8,9,155,15,16 0 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
Flower Hill Elementary:
07-1488 Reconstruction 0-002-015 10/30/08 DONE DONE DONE 01/30/08 01/28/08 05/24/07 05/15/07 2,16 157,000 157,000 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
07-1489 Reconstruction 0-002-016 10/30/08 DONE DONE DONE 01/30/08 01/28/08 05/24/07 05/15/07 16 73,388 73,388 JOD 0 0 73,388 Burton Behrendt Smith 0 / / / /
09-0634 Reconstruction 0-002-017 04/23/10 DONE DONE DONE 12/29/09 12/21/09 08/12/08 05/19/09 8,9 29,000 29,000 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
11-0520 Reconstruction 0-002-018 02/22/12 DONE DONE DONE 12/22/11 12/19/11 06/08/11 06/06/11 15 215,000 215,000 JOD 0 0 0 Burton Behrendt Smith 0 / / 01/04/13
12-0845 Reconstruction 0-002-019 DONE STARTED UNREVIEWED02/15/13 02/14/13 05/21/12 05/15/12 9,16 0 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
Southdown Primary School:
07-1491 Reconstruction 0-003-015 10/30/08 DONE DONE DONE 01/30/08 01/28/08 05/24/07 05/15/07 16 83,944 83,944 JOD 0 0 83,944 Burton Behrendt Smith 0 / / / /
08-1473 Reconstruction 0-003-016 05/20/09 DONE DONE DONE 04/09/09 04/07/09 05/29/08 05/20/08 16 112,000 112,000 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
09-0635 Reconstruction 0-003-017 04/23/10 DONE DONE DONE 12/29/09 12/21/09 08/12/08 05/19/09 8,9 29,000 29,000 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
12-0846 Reconstruction 0-003-018 DONE STARTED UNREVIEWED02/15/13 02/14/13 05/21/12 05/15/12 2,9,16 0 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
Woodhull K / Admin Building:
07-1487 Reconstruction 0-004-011 10/30/08 DONE DONE DONE 01/30/08 01/28/08 05/24/07 05/15/07 9,16 506,435 506,435 JOD 0 0 180,435 Burton Behrendt Smith 0 / / / /
07-1944 Reconstruction 0-004-013 09/26/08 DONE DONE DONE 04/14/08 04/03/08 01/31/08 05/20/07 2,4,7,8,9,155,16 483,190 489,545 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
10-0535 Reconstruction 0-004-014 01/13/11 DONE DONE DONE 12/06/10 11/22/10 04/30/10 05/15/07 8,16 17,934 17,934 JOD 0 0 17,934 Burton Behrendt Smith 0 / / / /
11-0521 Reconstruction 0-004-015 02/22/12 DONE DONE DONE 12/22/11 12/19/11 06/07/11 06/06/11 15 215,000 215,000 JOD 0 0 0 Burton Behrendt Smith 0 / / 01/24/13
12-0847 Reconstruction 0-004-016 DONE STARTED UNREVIEWED02/15/13 02/14/13 05/21/12 05/15/12 2,9,16 0 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
Washington Elementary:
- Reconstruction 0-009-004 10/30/08 DONE DONE DONE 01/30/08 01/28/08 11/20/90 05/15/07 7 21,304 21,304 MGL 0 0 6,900 Burton Behrendt Smith 0 / / / /
07-1492 Reconstruction 0-009-014 10/30/08 DONE DONE DONE 01/28/08 01/28/08 05/24/07 05/15/07 2,15,16 21,304 0 JOD 0 0 6,900 Burton Behrendt Smith 0 / / / /
08-1405 Reconstruction 0-009-016 05/12/09 DONE DONE DONE 03/20/09 03/17/09 05/29/08 05/20/08 2 64,000 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
09-0636 Reconstruction 0-009-017 04/23/10 DONE DONE DONE 12/29/09 12/21/09 08/12/08 05/19/09 8,9 29,000 29,000 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
12-0848 Reconstruction 0-009-018 DONE STARTED UNREVIEWED02/15/13 02/14/13 05/21/12 05/15/12 2,9,16 0 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
Jefferson Elementary:
07-1490 Reconstruction 0-013-011 10/30/08 DONE DONE DONE 01/30/08 01/28/08 05/24/07 05/15/07 15,16 208,316 208,316 JOD 0 0 208,316 Burton Behrendt Smith 0 / / / /
09-0637 Reconstruction 0-013-012 04/23/10 DONE DONE DONE 12/29/09 12/21/09 08/12/08 05/19/09 8,9,10,14,15,16 235,000 235,000 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
11-0522 Reconstruction 0-013-013 02/22/12 DONE DONE DONE 12/22/11 12/19/11 06/08/11 06/06/11 15 215,000 215,000 JOD 0 0 0 Burton Behrendt Smith 0 / / 01/04/13
12-0849 Reconstruction 0-013-014 DONE STARTED UNREVIEWED02/15/13 02/14/13 05/21/12 05/15/12 9,16 0 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
J. Taylor Finley:
07-1485 Reconstruction 0-014-020 10/30/08 DONE DONE DONE 01/30/08 01/28/08 05/24/07 05/15/07 2,15,16 260,960 260,960 JOD 0 0 260,960 Burton Behrendt Smith 0 / / / /
10-0536 Reconstruction 0-014-021 01/13/11 DONE DONE DONE 12/06/10 11/22/10 04/30/10 05/15/10 8,16 17,934 17,934 JOD 0 0 17,934 Burton Behrendt Smith 0 / / / /
12-0850 Reconstruction 0-014-022 DONE STARTED UNREVIEWED02/15/13 02/14/13 05/21/12 05/15/12 9,16 0 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
Jack Abrams Interm.(fka Huntington I:
07-1486 Reconstruction 0-017-012 10/30/08 DONE DONE DONE 01/30/08 01/28/08 05/24/07 05/15/07 16 133,331 133,331 JOD 0 0 133,331 Burton Behrendt Smith 0 / / / /
08-1477 Reconstruction 0-017-013 05/08/09 DONE DONE DONE 04/09/09 04/07/08 05/29/08 05/20/08 2 72,000 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
10-0537 Reconstruction 0-017-014 01/13/11 DONE DONE DONE 12/06/10 11/22/10 04/30/10 05/15/07 8,16 17,934 17,934 JOD 0 0 17,934 Burton Behrendt Smith 0 / / / /
12-0851 Reconstruction 0-017-015 DONE STARTED UNREVIEWED02/15/13 02/14/13 05/21/12 05/15/12 16 0 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
Woodhull Intermediate:
10-0042 Reconstruction 0-021-001 07/28/10 DONE DONE DONE 07/26/10 07/15/10 04/30/10 05/18/10 255,000 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
Container #1 @ Woodhull:
12-1011DB Discovered Building 2-022-001 04/10/13 DONE DONE DONE 03/25/13 03/25/13 03/16/12 / / 0 0 JOD 0 0 0 0 / / / /
Container #2 @ Woodhull:
12-1012DB Discovered Building 2-023-001 04/10/13 DONE DONE DONE 03/25/13 03/25/13 03/16/12 / / 0 0 JOD 0 0 0 0 / / / /
Container #3 @ Woodhull:
12-1013DB Discovered Building 2-024-001 04/10/13 DONE DONE DONE 03/25/13 03/25/13 03/16/12 / / 0 0 JOD 0 0 0 0 / / / /
Security Booth at High School:
07-1484 New Construction 7-020-001 10/30/08 DONE DONE DONE 01/30/08 01/28/08 11/16/07 05/15/07 02 - 16 25,000 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Dickenson Ave. Elementary:
12-0837 Reconstruction 0-002-014 DONE DONE UNREVIEWED02/14/13 02/14/13 09/25/12 09/19/12 2,10,155,15,16 0 10,204,726 JMB 0 0 0 Burton Behrendt Smith 0 / / / /
East Northport Middle School:
10-0158 Reconstruction 0-003-017 11/04/10 DONE DONE DONE 08/26/10 08/12/10 07/10/08 05/18/10 8 838,000 838,000 HCM 0 0 0 Burton Behrendt Smith 0 / / 12/31/12
- Reconstruction 0-003-018 / / / / 09/25/12 / / 2,9,10 0 12,736,234 JMB 0 0 0 0 / / / /
- Reconstruction 0-003-019 / / / / 06/22/11 / / 155,16 0 12,736,234 HCM 0 0 0 0 / / / /
11-1111 Reconstruction 0-003-020 05/16/12 DONE DONE DONE 04/11/12 04/06/12 07/05/11 05/17/11 2,16 987,500 987,500 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
12-0838 Reconstruction 0-003-021 DONE DONE UNREVIEWED02/14/13 02/14/13 05/18/12 05/15/12 155 0 0 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
Fifth Ave. Elementary:
10-1066 Reconstruction 0-004-019 03/29/11 DONE DONE DONE 03/18/11 03/16/11 05/21/10 05/18/10 155 500,000 500,000 HCM 0 0 0 Burton Behrendt Smith 0 / / 06/13/13
Laurel Ave School:
- Reconstruction 0-006-020 / / / / 06/22/11 / / 4 0 0 HCM 0 0 0 0 / / / /
12-0661 Reconstruction 0-006-021 03/01/13 DONE DONE DONE 01/10/13 01/10/13 02/24/12 05/18/10 16 162,000 0 HCM 0 0 117,125 Burton Behrendt Smith 0 / / / /
12-0839 Reconstruction 0-006-022 DONE DONE UNREVIEWED02/14/13 02/14/13 05/18/12 05/15/12 15,16 0 0 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
Ocean Avenue Elementary:
10-0159 Reconstruction 0-007-015 11/04/10 DONE DONE DONE 08/26/10 08/12/10 07/10/08 05/18/10 8 189,191 189,191 HCM 0 0 0 Burton Behrendt Smith 0 / / 12/31/12
12-0840 Reconstruction 0-007-016 DONE DONE UNREVIEWED02/14/13 02/14/13 05/18/12 05/15/12 9,13,15 0 0 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
Northport Middle School:
- Reconstruction 0-008-016 / / / / 09/25/12 / / 9,155,15,16 0 0 JMB 0 0 0 0 / / / /
- Reconstruction 0-008-017 / / / / 09/25/12 / / 2,9,10,16 0 0 JMB 0 0 0 0 / / / /
12-0042 Reconstruction 0-008-019 12/06/12 DONE DONE DONE 07/19/12 07/11/12 07/05/11 05/17/11 2,16 362,500 0 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
12-0841 Reconstruction 0-008-020 DONE DONE UNREVIEWED02/14/13 02/14/13 05/18/12 05/15/12 155 0 0 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
Northport High School:
09-0604 Alterations 0-010-024 04/07/10 DONE DONE DONE 12/23/09 12/17/09 03/04/09 06/16/08 02 - 16 40,000 40,000 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
10-0662 Reconstruction 0-010-025 01/25/11 DONE DONE DONE 12/30/10 12/23/10 05/21/10 05/18/10 4 100,000 100,000 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
- Reconstruction 0-010-026 / / / / 12/16/11 / / 16 0 59,448,376 HCM 0 0 0 0 / / / /
12-0842 Reconstruction 0-010-027 DONE DONE UNREVIEWED02/14/13 02/14/13 05/18/12 05/15/12 2,9,10,155 0 59,448,376 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
Bellerose Elementary:
12-0843 Reconstruction 0-019-014 DONE DONE UNREVIEWED02/14/13 02/14/13 05/18/12 05/15/12 2,155 0 0 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
Container @ Ocean Ave Elem:
11-0214DB Discovered Building 2-049-001 10/05/11 DONE DONE DONE 10/05/11 09/28/11 06/10/11 / / 0 0 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
Storage Container:
12-0788 New Construction 2-050-001 01/13/13 DONE DONE DONE 02/07/13 02/04/13 / / / / 02 - 16 0 0 JMB 0 0 0 Burton Behrendt Smith 0 / / / /
Northport Public Library:
08-0160 Reconstruction 6-001-003 09/19/08 DONE DONE DONE 08/13/08 08/07/08 07/05/95 07/17/08 4 100,000 0 HCM 0 0 0 Beatty, Harvey & Associates 0 / / / /
10-1453 Reconstruction 6-001-004 08/17/11 DONE DONE DONE 07/01/11 06/28/11 06/28/11 06/15/11 2,4 45,000 0 HCM 0 0 0 BEATTY HARVEY COCO 0 / / / /
11-0976 Reconstruction 6-001-005 06/15/12 DONE DONE DONE 03/16/12 03/15/12 10/05/11 06/15/11 8,9,155,15,16 34,000 0 HCM 0 0 0 BEATTY HARVEY COCO 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Sunquam School:
09-0434 Reconstruction 0-001-013 10/01/10 DONE DONE DONE 11/18/09 11/16/09 07/20/09 07/01/09 2,155,15,16 465,529 465,529 HCM 0 0 0 ECG Eninering, LLC 465,529 / / 04/10/13
10-0350 Reconstruction 0-001-014 02/14/11 DONE DONE DONE 10/12/10 10/04/10 05/12/10 05/18/10 4,7,155,15,16 782,000 782,000 HCM 0 0 0 Wiedersum Associates Architec 0 / / 06/04/12
10-1253 Reconstruction 0-001-015 06/27/11 DONE DONE DONE 05/10/11 05/03/11 04/13/11 05/17/11 4,7,155,15,16 782,000 782,000 HCM 0 0 0 James M. Campbell Architects 0 / / / /
Forest Park Elementary:
12-1089 Reconstruction 0-002-014 DONE STARTED UNREVIEWED04/11/13 04/08/13 12/04/12 05/15/12 2,7,155 0 11,264,356 DDJ 0 0 0 James M. Campbell Architects 0 / / / /
09-0435 Reconstruction 0-002-019 10/01/10 DONE DONE DONE 11/18/09 11/16/09 07/20/09 07/01/09 2,155,15,16 493,651 493,651 HCM 0 0 0 ECG Eninering, LLC 493,651 / / 04/10/13
High School East:
12-1091 Reconstruction 0-006-018 DONE STARTED UNREVIEWED04/11/13 04/08/13 12/04/12 05/15/12 2,4,8,9,15 0 35,829,570 DDJ 0 0 0 James M. Campbell Architects 0 / / / /
07-2166 Reconstruction 0-006-031 12/24/08 DONE DONE DONE 05/27/08 05/22/08 02/21/08 03/29/00 2,8,9,10,13,155,15,1 1,012,827 1,012,827 HCM 0 0 0 Wiedersum Associates Architec 0 / / / /
09-0436 Reconstruction 0-006-032 10/01/10 DONE DONE DONE 11/18/09 11/16/09 07/20/09 07/01/09 2,8,155,15,16 2,164,575 2,164,575 HCM 0 0 0 ECG Eninering, LLC 2,164,575 / / 04/10/13
Manasquan School:
09-0437 Reconstruction 0-007-012 10/01/10 DONE DONE DONE 11/18/09 11/16/09 07/20/09 07/01/09 2,155,15,16 559,110 559,110 HCM 0 0 0 ECG Eninering, LLC 559,110 / / 04/10/13
09-1323 Reconstruction 0-007-013 09/03/10 DONE DONE DONE 04/16/10 04/13/10 08/19/09 05/19/09 2,8,9,155,15,16 212,000 212,000 HCM 0 0 0 Wiedersum Associates Architec 0 / / 05/25/12
Candlewood Junior High:
07-1424 Reconstruction 0-008-018 07/07/08 DONE DONE DONE 01/22/08 01/18/08 09/13/07 05/15/07 16 193,611 193,611 HCM 0 0 5,444 Wiedersum Associates Architec 0 / / / /
09-0438 Reconstruction 0-008-019 10/01/10 DONE DONE DONE 11/18/09 11/16/09 07/20/09 07/01/09 2,155,15,16 786,972 786,972 HCM 0 0 0 ECG Eninering, LLC 786,972 / / 04/10/13
09-1324 Reconstruction 0-008-020 09/03/10 DONE DONE DONE 04/16/10 04/13/10 08/18/09 05/19/09 2,8,9,10,155,15,16 300,000 300,000 HCM 0 0 0 Wiedersum Associates Architec 0 / / 05/25/12
Otsego Avenue Elementary:
09-0439 Reconstruction 0-011-016 10/01/10 DONE DONE DONE 11/18/09 11/16/09 07/20/09 07/01/09 2,155,15,16 1,167,814 1,167,814 HCM 0 0 0 ECG Eninering, LLC 1,167,814 / / 04/10/13
Paumanok School:
08-0561 Reconstruction 0-014-017 02/12/09 DONE DONE DONE 10/20/08 10/16/08 09/13/07 05/15/07 2,4,7,8,9,10,155,15, 316,500 316,500 HCM 0 0 0 Wiedersum Associates Architec 0 / / / /
09-0440 Reconstruction 0-014-018 10/01/10 DONE DONE DONE 11/18/09 11/16/09 07/20/09 07/01/09 2,155,15,16 1,163,886 1,163,886 HCM 0 0 0 ECG Eninering, LLC 1,163,886 / / 04/10/13
Signal Hill School:
09-0441 Reconstruction 0-015-018 10/01/10 DONE DONE DONE 11/18/09 11/16/09 07/20/09 07/01/09 2,155,15,16 545,269 545,269 HCM 0 0 0 ECG Eninering, LLC 545,269 / / 04/10/13
09-1325 Reconstruction 0-015-019 09/03/10 DONE DONE DONE 04/16/10 04/13/10 08/19/09 05/19/09 2,8,9,13,155,15,16 450,500 450,500 HCM 0 0 0 Wiedersum Associates Architec 0 / / 05/25/12
Vanderbilt Elementary School:
09-0442 Reconstruction 0-016-017 10/01/10 DONE DONE DONE 11/18/09 11/16/09 07/20/09 07/01/09 2,155,15,16 1,225,302 1,225,302 HCM 0 0 0 ECG Eninering, LLC 1,225,302 / / 04/10/13
West Hollow Jr. High:
07-1425 Reconstruction 0-017-014 07/07/08 DONE DONE DONE 01/22/08 01/18/08 09/13/07 05/15/07 16 173,875 173,875 HCM 0 0 0 Wiedersum Associates Architec 0 / / / /
08-0559 Reconstruction 0-017-015 01/21/09 DONE DONE DONE 10/20/08 10/16/08 08/11/08 05/20/08 8,9,155 389,400 389,400 HCM 0 0 0 Wiedersum Associates Architec 0 / / / /
09-0443 Reconstruction 0-017-016 10/01/10 DONE DONE DONE 11/19/09 11/16/09 07/20/09 07/01/09 2,155,15,16 3,178,349 3,178,349 HCM 0 0 0 ECG Eninering, LLC 3,178,349 / / 04/10/13
- Reconstruction 0-017-017 / / / / 06/13/13 / / 2,9,16 0 0 JOB 0 0 0 0 / / / /
Chestnut Hill:
09-0444 Reconstruction 0-018-016 10/01/10 DONE DONE DONE 11/19/09 11/16/09 07/20/09 07/01/09 2,155,15,16 1,243,171 1,243,171 HCM 0 0 0 ECG Eninering, LLC 1,243,171 / / 04/10/13
- Reconstruction 0-018-017 / / / / 02/03/10 / / 2 0 0 HCM 0 0 0 0 / / / /
Natatorium:
- XX Reconstruction 0-020-007 CANCELLED / / / / 08/13/08 / / 7,16 0 0 HCM 0 0 0 0 / / / /
09-0445 Reconstruction 0-020-008 10/01/10 DONE DONE DONE 11/19/09 11/16/09 07/20/09 07/01/09 2,155,15,16 639,968 639,968 HCM 0 0 0 ECG Eninering, LLC 639,968 / / 04/10/13
12-1090 Reconstruction 0-020-009 DONE STARTED UNREVIEWED04/11/13 04/08/13 12/04/12 05/15/12 7,9 0 591,330 DDJ 0 0 0 James M. Campbell Architects 0 / / / /
High School West:
09-0446 Reconstruction 0-021-015 10/01/10 DONE DONE DONE 11/19/09 11/16/09 07/20/09 07/01/09 2,155,15,16 2,406,820 2,406,820 HCM 0 0 0 ECG Eninering, LLC 2,406,820 / / 04/10/13
Maintenance Building:
- Reconstruction 3-045-002 / / / / 02/12/09 / / 15 0 0 HCM 0 0 0 0 / / / /
Transportation Building:
09-0447 Reconstruction 5-003-004 10/01/10 DONE DONE DONE 11/19/09 11/16/09 07/20/09 07/01/09 2,155,15,16 359,584 0 HCM 0 0 0 ECG Eninering, LLC 359,584 / / / /
09-0177 Reconstruction 5-003-005 09/17/09 DONE DONE DONE 08/31/09 08/28/09 07/31/09 05/18/04 15 250,000 250,000 HCM 0 0 0 Wiedersum Associates Architec 0 / / / /
- Reconstruction 5-003-006 / / / / 07/31/09 / / 15 0 0 HCM 0 0 0 0 / / / /
Half Hollow Hills Community Library:
09-1250 Reconstruction 6-009-007 08/18/10 DONE DONE DONE 04/06/10 04/02/10 12/21/09 / / 7,16 600,000 0 HCM 0 0 0 BEATTY HARVEY COCO 0 / / / /
12-0181 Reconstruction 6-009-008 01/30/13 DONE DONE DONE 09/18/12 09/14/12 07/17/12 09/24/12 155,16 195,000 0 DDJ 0 0 0 DESIGN & CONSTRUCTION SERVICE 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Senior High School:
- Reconstruction 0-001-022 / / / / 08/05/09 / / 2 0 0 HCM 0 0 0 0 / / / /
10-0539 Reconstruction 0-001-023 07/13/11 DONE DONE DONE 12/06/10 11/22/10 06/01/10 06/04/09 8,155,15,16 1,296,859 1,296,859 HCM 0 0 0 Burton Behrendt Smith 1,296,859 / / 10/23/12
Washington Drive School:
10-0540 Reconstruction 0-005-003 07/13/11 DONE DONE DONE 12/06/10 11/22/10 06/01/10 06/04/09 8,155,15,16 532,438 532,438 HCM 0 0 0 Burton Behrendt Smith 532,438 / / 10/12/12
Oldfield Middle School:
10-0541 Reconstruction 0-007-020 07/13/11 DONE DONE DONE 12/06/10 11/22/10 06/01/10 06/04/09 8,155,15,16 892,980 892,980 HCM 0 0 0 Burton Behrendt Smith 892,980 / / 10/23/12
T. J. Lahey Elementary:
08-1620 Reconstruction 0-011-011 06/09/09 DONE DONE DONE 05/11/09 05/07/09 12/05/06 05/19/09 2,4,7 2,341,677 2,341,677 HCM 0 0 757,084 Burton Behrendt Smith 0 / / / /
10-0542 Reconstruction 0-011-012 07/13/11 DONE DONE DONE 12/06/10 11/22/10 06/01/10 06/04/09 8,155,15,16 1,680,373 1,680,373 HCM 0 0 0 Burton Behrendt Smith 1,680,373 / / 10/23/12
District-wide:
09-1156 Reconstruction 7-999-002 10/15/10 DONE DONE DONE 03/26/10 03/22/10 09/28/09 10/27/09 10 479,850 479,850 HCM 0 0 216,150 Burton Behrendt Smith 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Cedar Rd School:
08-0425 Reconstruction 0-004-006 02/04/09 DONE DONE DONE 09/29/08 09/29/08 05/31/07 06/19/01 155 56,645 56,645 MGL 0 0 0 Burton Behrendt Smith 0 / / / /
07-2255 Reconstruction 0-004-007 09/04/08 DONE DONE DONE 06/16/08 06/06/08 10/15/07 06/19/01 2,155,15,16 169,350 169,350 MGL 0 0 0 Burton Behrendt Smith 0 / / / /
11-0625 Reconstruction 0-004-008 06/21/12 DONE DONE DONE 01/10/12 01/06/12 09/28/11 09/01/11 2,155,15,16 855,912 0 JOD 0 0 0 ECG Eninering, LLC 855,912 / / / /
Old Farms School:
08-0426 Reconstruction 0-006-006 02/04/09 DONE DONE DONE 09/29/08 09/29/08 05/31/07 06/19/01 155 56,645 56,645 MGL 0 0 0 Burton Behrendt Smith 0 / / / /
07-2256 Reconstruction 0-006-007 09/04/08 DONE DONE DONE 06/16/08 06/06/08 10/11/07 06/16/01 2,4,7,8,9,13,155,15, 169,350 169,350 MGL 0 0 0 Burton Behrendt Smith 0 / / / /
11-0074 Reconstruction 0-006-008 08/12/11 DONE DONE DONE 07/28/11 07/28/11 05/19/11 06/19/01 2,10 97,125 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
11-0626 Reconstruction 0-006-009 06/21/12 DONE DONE DONE 01/10/12 01/06/12 09/28/11 09/01/11 2,155,15,16 251,508 0 JOD 0 0 0 ECG Eninering, LLC 251,508 / / / /
North Ridge School:
07-2257 Reconstruction 0-007-008 09/04/08 DONE DONE DONE 06/16/08 06/06/08 10/15/07 06/19/01 2,4,7,8,9,13,155,15, 169,350 169,350 MGL 0 0 0 Burton Behrendt Smith 0 / / / /
09-0147 Reconstruction 0-007-009 03/10/10 DONE DONE DONE 08/25/09 08/20/09 01/26/09 10/16/08 8,16 45,052 13,143 JOD 0 0 16,354 Burton Behrendt Smith 0 / / / /
09-0148 Reconstruction 0-007-010 03/10/10 DONE DONE DONE 08/25/09 08/20/09 01/26/09 10/16/08 10,16 113,589 113,589 JOD 0 0 41,233 Burton Behrendt Smith 0 / / / /
11-0627 Reconstruction 0-007-011 06/21/12 DONE DONE DONE 01/09/12 01/06/12 09/28/11 09/01/11 2,7,155,15,16 1,951,047 0 JOD 0 0 0 ECG Eninering, LLC 1,951,047 / / / /
North Senior High School:
08-0137 Reconstruction 0-008-016 06/04/09 DONE DONE DONE 08/08/08 08/04/08 10/11/07 06/19/01 2,10,155,15,16 1,315,940 1,315,940 MGL 0 0 0 Burton Behrendt Smith 0 / / / /
09-0116 Reconstruction 0-008-017 03/31/10 DONE DONE DONE 08/12/09 08/11/09 01/26/09 10/16/08 16 722,283 0 JOD 0 0 262,189 Burton Behrendt Smith 0 / / / /
09-0149 Reconstruction 0-008-018 03/10/10 DONE DONE DONE 08/25/09 08/20/09 01/26/09 10/16/08 8,16 206,610 206,610 JOD 0 0 75,000 Burton Behrendt Smith 0 / / / /
09-0150 Reconstruction 0-008-019 03/10/10 DONE DONE DONE 08/25/09 08/20/09 01/26/09 10/16/08 10,16 574,662 530,423 JOD 0 0 208,602 Burton Behrendt Smith 0 / / / /
11-0628 Reconstruction 0-008-020 06/21/12 DONE DONE DONE 01/09/12 01/06/12 09/28/11 09/01/11 2,8,155,15,16 3,218,357 0 JOD 0 0 0 ECG Eninering, LLC 3,218,357 / / / /
12-0969 Reconstruction 0-008-021 ADDENDUM REQ'D 03/14/13 03/14/13 01/15/13 06/19/01 2,4,9 0 0 JMB 0 0 0 Burton Behrendt Smith 0 / / / /
Wood Park School:
09-0151 Reconstruction 0-009-009 03/10/10 DONE DONE DONE 08/25/09 08/20/09 01/26/09 10/16/08 8,16 50,707 13,143 JOD 0 0 18,407 Burton Behrendt Smith 0 / / / /
09-0152 Reconstruction 0-009-010 03/10/10 DONE DONE DONE 08/25/09 08/20/09 01/26/09 10/16/08 10,16 120,402 120,402 JOD 0 0 43,706 Burton Behrendt Smith 0 / / / /
11-0629 Reconstruction 0-009-011 06/21/12 DONE DONE DONE 01/11/12 01/06/12 09/28/11 09/01/11 2,155,15,16 1,141,455 0 JOD 0 0 0 ECG Eninering, LLC 1,141,455 / / / /
SMITH'S Lane Elementary:
08-0427 Reconstruction 0-011-004 02/04/09 DONE DONE DONE 09/29/08 09/29/08 05/31/07 06/19/01 155 56,645 56,645 MGL 0 0 0 Burton Behrendt Smith 0 / / / /
07-2258 Reconstruction 0-011-005 06/04/08 DONE DONE DONE 06/16/08 06/06/08 10/15/07 06/19/01 155,15,16 169,350 169,350 MGL 0 0 0 Burton Behrendt Smith 0 / / / /
11-0630 Reconstruction 0-011-006 06/21/12 DONE DONE DONE 01/11/12 01/06/12 09/28/11 09/01/11 2,155,15,16 247,964 0 JOD 0 0 0 ECG Eninering, LLC 247,964 / / / /
Long Acres School:
07-2259 Reconstruction 0-012-008 09/04/08 DONE DONE DONE 06/16/08 06/06/08 10/15/07 06/19/01 155,15,16 169,350 169,350 MGL 0 0 0 Burton Behrendt Smith 0 / / / /
11-0631 Reconstruction 0-012-009 06/21/12 DONE DONE DONE 01/11/12 01/06/12 09/28/11 09/11/11 2,155,15,16 413,479 0 JOD 0 0 0 ECG Eninering, LLC 413,479 / / / /
Indian Hollow School:
09-0153 Reconstruction 0-014-008 03/10/10 DONE DONE DONE 08/25/09 08/20/09 01/26/09 10/16/08 8,16 39,160 39,160 JOD 0 0 14,216 Burton Behrendt Smith 0 / / / /
09-0154 Reconstruction 0-014-009 03/10/10 DONE DONE DONE 08/25/09 08/20/09 01/26/09 10/16/08 10,16 167,291 167,291 JOD 0 0 60,726 Burton Behrendt Smith 0 / / / /
11-0632 Reconstruction 0-014-010 06/21/12 DONE DONE DONE 01/11/12 01/06/12 09/28/11 09/01/11 2,155,15,16 1,228,730 0 JOD 0 0 0 ECG Eninering, LLC 1,228,730 / / / /
Sagtikos School:
08-0428 Reconstruction 0-017-004 02/04/09 DONE DONE DONE 09/29/08 09/29/08 05/31/07 06/19/01 155 56,645 56,645 MGL 0 0 0 Burton Behrendt Smith 0 / / / /
07-2260 Reconstruction 0-017-005 09/04/08 DONE DONE DONE 06/16/08 06/06/08 10/15/07 06/19/01 155,15,16 169,350 169,350 MGL 0 0 0 Burton Behrendt Smith 0 / / / /
11-0633 Reconstruction 0-017-006 06/21/12 DONE DONE DONE 01/06/12 01/06/12 09/28/11 09/01/11 2,8,155,15,16 1,998,047 0 JOD 0 0 0 ECG Eninering, LLC 1,998,047 / / / /
Rolling Hills School:
07-2261 Reconstruction 0-023-009 09/04/08 DONE DONE DONE 06/16/08 06/06/08 / / 06/19/01 155,15,16 169,350 169,350 MGL 0 0 0 Burton Behrendt Smith 0 / / / /
09-0155 Reconstruction 0-023-010 03/10/10 DONE DONE DONE 08/25/09 08/20/09 01/26/09 10/16/08 8,16 41,711 41,711 JOD 0 0 15,142 Burton Behrendt Smith 0 / / / /
09-0156 Reconstruction 0-023-011 03/10/10 DONE DONE DONE 08/25/09 08/20/09 01/26/09 10/16/08 10,16 100,207 100,207 JOD 0 0 36,375 Burton Behrendt Smith 0 / / / /
11-0634 Reconstruction 0-023-012 06/21/12 DONE DONE DONE 01/11/12 01/06/12 09/28/11 09/01/11 2,155,15,16 474,300 0 JOD 0 0 0 ECG Eninering, LLC 474,300 / / / /
Commack M.S. ( fmly HS South):
07-2277 Reconstruction 0-027-010 11/07/08 DONE DONE DONE 06/27/08 06/11/08 10/11/07 06/19/01 2,10,155,15,16 1,640,705 1,640,705 MGL 0 0 0 Burton Behrendt Smith 0 / / / /
07-2262 Additions and Alterations 0-027-011 09/04/08 DONE DONE DONE 06/16/08 06/06/08 04/22/08 06/19/00 02 - 16 169,350 169,350 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
09-0117 Reconstruction 0-027-012 03/31/10 DONE DONE DONE 08/12/09 08/11/09 01/26/09 10/16/08 16 722,283 722,283 JOD 0 0 262,189 Burton Behrendt Smith 0 / / / /
09-0157 Reconstruction 0-027-013 03/10/10 DONE DONE DONE 08/25/09 08/20/09 01/26/09 10/16/08 8,16 218,871 218,871 JOD 0 0 79,451 Burton Behrendt Smith 0 / / / /
09-0158 Reconstruction 0-027-014 03/10/10 DONE DONE DONE 08/25/09 08/20/09 01/26/09 10/16/08 10,16 502,551 502,551 JOD 0 0 182,427 Burton Behrendt Smith 0 / / / /
11-0635 Reconstruction 0-027-015 06/21/12 DONE DONE DONE 01/11/12 01/06/12 09/28/11 09/01/11 2,155,15,16 2,404,238 2,404,238 JOD 0 0 0 ECG Eninering, LLC 2,404,238 / / / /
12-0127 Reconstruction 0-027-016 02/13/13 DONE DONE DONE 08/28/12 08/21/12 10/14/11 06/19/01 4,9,10 358,335 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
- Reconstruction 0-027-017 / / / / 10/21/11 / / 4,9,10 0 39,230,980 JOD 0 0 0 0 / / / /
12-0970 Reconstruction 0-027-017 ADDENDUM REQ'D 03/14/13 03/14/13 01/15/13 06/19/01 2,4,9 0 0 JMB 0 0 0 Burton Behrendt Smith 0 / / / /
Burr Rd. Intermediate (fmly JH):
09-0292 Reconstruction 0-035-010 11/23/09 DONE DONE DONE 10/06/09 10/05/09 09/27/07 06/19/01 9,10 663,079 663,079 MGL 0 0 0 Burton Behrendt Smith 0 / / / /
07-2248 Reconstruction 0-035-011 09/10/08 DONE DONE DONE 06/11/08 05/28/08 10/11/07 06/19/01 4,7,155,15,16 1,246,620 1,136,311 MGL 0 0 0 Burton Behrendt Smith 0 / / / /
09-0159 Reconstruction 0-035-012 03/10/10 DONE DONE DONE 08/25/09 08/20/09 01/26/09 10/16/08 8,16 26,283 0 JOD 0 0 9,541 Burton Behrendt Smith 0 / / / /
09-0118 Reconstruction 0-035-013 03/31/10 DONE DONE DONE 08/12/09 08/11/09 01/26/09 10/16/08 16 722,283 0 JOD 0 0 262,189 Burton Behrendt Smith 0 / / / /
09-0160 Reconstruction 0-035-014 03/10/10 DONE DONE DONE 08/25/09 08/20/09 01/26/09 10/16/08 10,16 253,242 240,243 JOD 0 0 91,927 Burton Behrendt Smith 0 / / / /
11-0636 Reconstruction 0-035-015 06/21/12 DONE DONE DONE 01/11/12 01/06/12 09/28/11 09/01/11 2,155,15,16 1,411,448 0 JOD 0 0 0 ECG Eninering, LLC 1,411,448 / / / /
12-0971 Reconstruction 0-035-016 ADDENDUM REQ'D 03/14/13 03/14/13 01/15/13 06/19/01 4,9 0 0 JMB 0 0 0 Burton Behrendt Smith 0 / / / /
Sawmill Int.(fmly Jr.HS):
09-0293 Reconstruction 0-036-009 11/23/09 DONE DONE DONE 10/06/09 10/05/09 10/11/07 06/19/01 155,15,16 688,200 688,200 MGL 0 0 0 Burton Behrendt Smith 0 / / / /
09-0070 Reconstruction 0-036-010 02/04/10 DONE DONE DONE 07/22/09 07/16/09 01/26/09 10/16/08 16 722,283 722,283 JOD 0 0 262,189 Burton Behrendt Smith 0 / / / /
09-0027 Reconstruction 0-036-011 02/22/10 DONE DONE DONE 07/03/09 07/03/09 01/26/09 10/16/08 2,7 2,921,968 2,921,968 JOD 0 0 1,060,674 Burton Behrendt Smith 0 / / / /
09-0161 Reconstruction 0-036-012 03/10/10 DONE DONE DONE 08/25/09 08/20/09 01/26/09 10/16/08 8,16 73,425 73,425 JOD 0 0 26,654 Burton Behrendt Smith 0 / / / /
09-0162 Reconstruction 0-036-013 03/10/10 DONE DONE DONE 08/25/09 08/20/09 01/26/09 10/16/08 10,16 236,617 236,141 JOD 0 0 85,892 Burton Behrendt Smith 0 / / / /
11-0637 Reconstruction 0-036-014 06/21/12 DONE DONE DONE 01/11/12 01/06/11 09/28/11 09/01/11 2,155,15,16 1,168,330 0 JOD 0 0 0 ECG Eninering, LLC 1,168,330 / / / /
12-0972 Reconstruction 0-036-015 ADDENDUM REQ'D 03/14/13 03/14/13 01/15/13 06/19/01 4,9 0 0 JMB 0 0 0 Burton Behrendt Smith 0 / / / /
Maintenance Office:
11-0638 Reconstruction 1-002-003 06/21/12 DONE DONE DONE 01/11/12 01/06/12 09/28/11 09/01/11 2,155,15,16 61,458 0 JOD 0 0 0 ECG Eninering, LLC 61,458 / / / /
Hubbs Administration:
09-0028 Additions and Alterations 1-015-004 05/11/10 DONE DONE DONE 07/08/09 07/07/09 05/30/07 06/19/01 02 - 16 1,506,432 0 MGL 0 0 0 Burton Behrendt Smith 0 / / / /
08-0429 Reconstruction 1-015-005 02/04/09 DONE DONE DONE 09/29/08 09/29/08 05/31/07 06/19/01 155 56,645 0 MGL 0 0 0 Burton Behrendt Smith 0 / / / /
07-2164 Reconstruction 1-015-006 09/17/08 DONE DONE DONE 05/27/08 05/21/08 10/11/07 06/19/01 2,7,8,155,15,16 931,547 0 MGL 0 0 0 Burton Behrendt Smith 0 / / / /
07-2263 Reconstruction 1-015-007 09/04/08 DONE DONE DONE 06/16/08 06/06/08 / / 06/19/01 10,13 169,350 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
11-0639 Reconstruction 1-015-008 06/21/12 DONE DONE DONE 01/11/12 01/06/12 09/28/11 09/01/11 2,155,15,16 341,880 0 JOD 0 0 0 ECG Eninering, LLC 341,880 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Birchwood Intermediate:
07-2071 Reconstruction 0-001-020 12/22/08 DONE DONE DONE 05/05/08 04/28/08 10/17/07 03/03/07 2,4,7,8,9,15,16 1,661,615 1,661,615 DDJ 0 0 0 H2M Group 0 / / / /
09-1235 Reconstruction 0-001-021 02/15/11 DONE DONE DONE 04/06/10 04/01/10 01/20/10 12/09/09 2,155,15,16 971,601 971,601 DDJ 0 0 0 ECG Eninering, LLC 971,601 / / 09/26/12
10-0561 Additions and Alterations 0-001-022 06/08/11 DONE DONE DONE 12/08/10 11/26/10 10/25/10 03/03/07 02 - 16 568,946 568,946 DDJ 0 0 0 H2M Group 0 / / 08/20/12
- Reconstruction 0-001-023 / / / / 11/16/10 / / 16 0 9,828,891 DDJ 0 0 0 0 / / / /
10-0517 Reconstruction 0-001-023 01/27/11 DONE DONE DONE 12/03/10 11/19/10 / / 03/03/07 400,635 400,635 DDJ 0 0 0 H2M Group 0 / / 01/25/13
12-0815 Reconstruction 0-001-024 STARTED DONE UNREVIEWED02/12/13 02/08/13 / / 03/03/07 16 0 10,557,918 DDJ 0 0 0 H2M Group 0 / / / /
12-1058 Reconstruction 0-001-025 UNREVIEWED 04/02/13 04/01/13 01/09/13 03/03/07 16 0 10,557,918 DDJ 0 0 0 H2M Group 0 / / / /
Maplewood Intermediate School:
08-0830 Reconstruction 0-005-019 04/14/09 DONE DONE DONE 12/02/08 11/28/08 11/04/08 02/29/08 2,16 433,026 433,026 DDJ 0 0 0 H2M Group 0 / / / /
11-0493 Reconstruction 0-005-020 04/27/12 DONE DONE DONE 12/13/11 12/08/11 03/24/09 03/03/07 2,8,9,15,16 1,710,685 1,710,685 DDJ 0 0 0 H2M Group 0 / / / /
09-0951 Reconstruction 0-005-021 05/27/10 DONE DONE DONE 02/22/10 02/18/10 11/10/09 12/04/02 2,15 279,682 279,682 DDJ 0 0 0 H2M Group 0 / / / /
09-1236 Reconstruction 0-005-022 02/15/11 DONE DONE DONE 04/06/10 04/01/10 01/20/10 12/09/09 2,155,15,16 917,641 917,641 DDJ 0 0 0 ECG Eninering, LLC 917,641 / / 09/26/12
11-0525 Additions and Alterations 0-005-023 04/06/12 DONE DONE DONE 12/22/11 12/16/11 10/19/11 02/28/03 02 - 16 461,794 461,794 DDJ 0 0 0 H2M Group 0 / / / /
12-1059 Reconstruction 0-005-024 UNREVIEWED 04/02/13 04/01/13 01/09/13 03/03/07 16 0 10,557,918 DDJ 0 0 0 H2M Group 0 / / / /
Oakwood Elementary:
11-0524 Reconstruction 0-006-020 07/03/12 DONE DONE DONE 12/22/11 12/19/11 03/30/09 02/28/03 2,8,9,15,16 2,019,626 2,019,626 DDJ 0 0 0 H2M Group 0 / / 10/09/12
09-0948 Reconstruction 0-006-021 11/12/10 DONE DONE DONE 02/22/10 02/17/10 01/07/10 12/04/02 2,16 425,425 425,425 DDJ 0 0 0 H2M Group 0 / / 01/25/13
09-1237 Reconstruction 0-006-022 02/15/11 DONE DONE DONE 04/06/10 04/01/10 01/20/10 12/09/09 2,155,15,16 982,587 982,587 DDJ 0 0 0 ECG Eninering, LLC 982,587 / / 09/26/12
11-0526 Additions and Alterations 0-006-023 04/06/12 DONE DONE DONE 12/22/11 12/16/11 10/19/11 02/28/03 02 - 16 556,000 519,775 DDJ 0 0 0 H2M Group 0 / / / /
12-1060 Reconstruction 0-006-024 UNREVIEWED 04/02/13 04/01/13 01/09/13 03/03/07 16 0 12,260,808 DDJ 0 0 0 H2M Group 0 / / / /
SILAS WOOD 6TH GRADE CENTER:
07-1903 Reconstruction 0-008-027 03/28/13 DONE DONE DONE 04/01/08 03/25/08 10/29/07 03/03/07 2,8,9 358,450 358,450 DDJ 0 0 0 H2M Group 0 / / / /
07-2307 Additions and Alterations 0-008-028 01/22/09 DONE DONE DONE 07/07/08 06/18/08 11/23/07 03/07/07 02 - 16 616,266 616,266 DDJ 0 0 281,018 H2M Group 0 / / / /
09-0952 Reconstruction 0-008-029 05/27/10 DONE DONE DONE 02/22/10 02/18/10 11/10/09 12/04/02 2,15 103,007 103,007 DDJ 0 0 0 H2M Group 0 / / / /
09-0947 Reconstruction 0-008-030 11/12/10 DONE DONE DONE 02/22/10 02/17/10 01/07/10 03/03/07 2,16 425,425 425,425 DDJ 0 0 0 H2M Group 0 / / / /
09-1238 Reconstruction 0-008-031 02/15/11 DONE DONE DONE 04/06/10 04/01/10 01/20/10 12/09/09 2,155,15,16 1,093,220 1,093,220 DDJ 0 0 0 ECG Eninering, LLC 1,093,220 / / 09/26/12
Walt Whitman Senior High:
08-0473 Reconstruction 0-010-042 03/10/09 DONE DONE DONE 10/06/08 10/03/08 07/16/07 03/03/07 2,4,7,8,9,10,155,15, 1,211,239 1,211,239 DDJ 0 0 400,000 H2M Group 0 / / 06/23/11
08-0054 Reconstruction 0-010-043 03/30/10 DONE DONE DONE 07/21/08 07/08/08 10/03/07 02/29/08 2,4,8,9,10,16 337,752 337,752 DDJ 0 0 0 H2M Group 0 / / / /
07-2341 Reconstruction 0-010-044 01/16/09 DONE DONE DONE 07/08/08 06/27/08 03/17/08 03/07/07 2,4,7,8,9,10,155,16 740,888 740,888 DDJ 0 0 0 H2M Group 0 / / / /
08-0831 Reconstruction 0-010-045 04/14/09 DONE DONE DONE 12/02/08 11/28/08 11/04/08 02/29/08 2,16 1,041,410 1,041,410 DDJ 0 0 0 H2M Group 0 / / / /
09-0961 Reconstruction 0-010-046 05/28/10 DONE DONE DONE 02/25/10 02/18/10 11/10/09 12/04/02 2,15 1,042,012 1,042,012 DDJ 0 0 0 H2M Group 0 / / / /
09-1239 Reconstruction 0-010-047 02/15/11 DONE DONE DONE 04/06/10 04/01/10 01/20/10 12/09/09 2,155,15,16 1,420,938 1,420,938 DDJ 0 0 0 ECG Eninering, LLC 1,420,938 / / 09/26/12
09-1452 Reconstruction 0-010-048 07/29/10 DONE DONE DONE 05/20/10 05/18/10 04/02/10 03/07/07 2 63,303 63,303 DDJ 0 0 0 H2M Group 0 / / / /
10-0518 Reconstruction 0-010-049 04/11/11 DONE DONE DONE 12/03/10 11/19/10 04/02/10 03/03/07 2,16 228,438 228,438 DDJ 0 0 0 H2M Group 0 / / / /
12-1061 Reconstruction 0-010-050 UNREVIEWED 04/02/13 04/01/13 01/09/13 03/03/07 0 0 DDJ 0 0 0 H2M Group 0 / / / /
Countrywood Elementary:
08-0829 Reconstruction 0-011-020 04/13/09 DONE DONE DONE 12/02/08 11/28/08 11/04/08 02/29/08 2,16 451,490 451,490 DDJ 0 0 0 H2M Group 0 / / / /
10-0519 Reconstruction 0-011-021 04/19/11 DONE DONE DONE 12/03/10 11/19/10 03/30/09 03/03/07 2,8,9,15,16 1,796,966 1,796,966 DDJ 0 0 0 H2M Group 0 / / / /
09-0950 Reconstruction 0-011-022 05/27/10 DONE DONE DONE 02/22/10 02/18/10 11/10/09 12/04/02 2,15 78,462 78,462 DDJ 0 0 0 H2M Group 0 / / / /
09-1240 Reconstruction 0-011-023 02/15/11 DONE DONE DONE 04/06/10 04/01/10 01/20/10 12/09/09 2,155,15,16 660,652 660,652 DDJ 0 0 0 ECG Eninering, LLC 660,652 / / 09/26/12
10-0520 Reconstruction 0-011-024 04/11/11 DONE DONE DONE 12/03/10 11/19/10 04/02/10 03/03/07 2,13,15,16 189,376 189,376 DDJ 0 0 0 H2M Group 0 / / / /
- Reconstruction 0-011-025 / / / / 10/26/10 / / 2 0 0 DDJ 0 0 0 0 / / / /
12-1062 Reconstruction 0-011-026 UNREVIEWED 04/02/13 04/01/13 01/09/13 03/03/07 16 0 0 DDJ 0 0 0 H2M Group 0 / / / /
Stimson Middle School:
09-0953 Reconstruction 0-012-025 05/27/10 DONE DONE DONE 02/22/10 02/18/10 11/18/09 12/04/02 2,15 251,173 251,173 DDJ 0 0 0 H2M Group 0 / / / /
09-0954 Reconstruction 0-012-026 11/12/10 DONE DONE DONE 02/22/10 02/17/10 11/18/09 03/03/07 2,16 594,354 594,354 DDJ 0 0 0 H2M Group 0 / / 01/25/13
09-1208 Reconstruction 0-012-027 06/24/10 DONE DONE DONE 04/02/10 03/30/10 11/18/09 03/03/07 2,8,9,15,16 1,353,575 1,353,575 DDJ 0 0 0 H2M Group 0 / / / /
09-1241 Reconstruction 0-012-028 02/15/11 DONE DONE DONE 04/06/10 04/01/10 01/20/10 12/09/09 2,155,16 899,223 899,223 DDJ 0 0 0 ECG Eninering, LLC 899,223 / / 09/26/12
12-1063 Reconstruction 0-012-029 UNREVIEWED 04/02/13 04/01/13 01/09/13 03/03/07 16 0 0 DDJ 0 0 0 H2M Group 0 / / / /
Birchwood Portable:
09-1242 Reconstruction 0-020-002 02/15/11 DONE DONE DONE 04/06/10 04/01/10 01/20/10 12/09/09 2,7,155,15,16 611,930 611,930 DDJ 0 0 0 ECG Eninering, LLC 611,930 / / 09/26/12
Maplewood Portable:
09-1243 Reconstruction 0-021-002 02/15/11 DONE DONE DONE 04/06/10 04/01/10 01/20/10 12/09/09 2,7,155,15,16 634,680 634,680 DDJ 0 0 0 ECG Eninering, LLC 634,680 / / 09/26/12
Countrywood Portable:
09-1244 Reconstruction 0-022-002 02/15/11 DONE DONE DONE 04/06/10 04/01/10 01/20/10 12/09/09 2,7,8,155,15,16 778,609 778,609 DDJ 0 0 0 ECG Eninering, LLC 778,609 / / 09/26/12
Oakwood Portable:
09-1245 Reconstruction 0-023-002 02/15/11 DONE DONE DONE 04/06/10 04/01/10 01/20/10 12/09/09 2,7,155,15,16 787,421 787,421 DDJ 0 0 0 ECG Eninering, LLC 787,421 / / 09/26/12
Administration Bldg:
09-1246 Reconstruction 1-002-011 02/15/11 DONE DONE DONE 04/06/10 04/01/10 01/20/10 12/09/09 2,155,15,16 505,989 0 DDJ 0 0 0 ECG Eninering, LLC 505,989 / / 09/26/12
10-0521 Reconstruction 1-002-012 02/01/11 DONE DONE DONE 12/03/10 11/19/10 10/26/10 03/03/07 9,15 149,800 0 DDJ 0 0 0 H2M Group 0 / / / /
11-0546 Reconstruction 1-002-013 03/08/12 DONE DONE DONE 12/22/11 12/22/11 10/19/11 02/28/03 2,16 308,500 0 DDJ 0 0 0 H2M Group 0 / / / /
Bus Garage:
- XX Additions and Alterations 5-003-009 CANCELLED 09/09/08 09/04/08 10/11/07 03/29/03 02 - 16 0 0 DDJ 0 0 0 H2M Group 0 / / / /
Transportation Center:
08-0293 New Construction 5-025-001 03/17/09 DONE DONE DONE 11/13/08 11/12/08 09/26/08 02/28/03 02 - 16 5,229,193 5,229,193 DDJ 0 0 0 H2M Group 0 / / 06/23/11
Public Library:
08-1738 Reconstruction 6-024-003 06/30/09 DONE DONE DONE 06/26/09 06/17/09 02/23/09 10/20/08 9,155,15,16 40,524 0 DDJ 0 0 0 Beatty, Harvey & Associates 0 / / / /
10-1435 Reconstruction 6-024-004 08/08/11 DONE DONE DONE 06/29/11 06/23/11 04/15/11 04/25/11 4,8,9,155,15,16 661,847 0 DDJ 0 0 0 BEATTY HARVEY COCO 0 / / / /
- Reconstruction 6-024-005 / / / / 06/05/13 / / 2,15,16 0 0 DDJ 0 0 0 0 / / / /
Teen Center:
09-1247 Reconstruction 7-004-004 02/15/11 DONE DONE DONE 04/06/10 04/01/10 01/20/10 12/09/09 2,155,16 96,122 96,122 DDJ 0 0 0 ECG Eninering, LLC 96,122 / / 09/26/12
11-0568XX Reconstruction 7-004-005 CANCELLED 12/29/11 12/29/11 10/19/11 03/03/07 4 0 591,330 DDJ 0 0 0 H2M Group 0 / / / /
Memorial Junior High School:
09-1248 Reconstruction 7-009-015 02/15/11 DONE DONE DONE 04/06/10 04/01/10 01/20/10 12/09/09 2,155,15,16 677,052 0 DDJ 0 0 0 ECG Eninering, LLC 677,052 / / 09/26/12
10-0522 Reconstruction 7-009-016 04/12/11 DONE DONE DONE 12/03/10 11/19/10 10/26/10 03/03/07 8,9 508,230 0 DDJ 0 0 0 H2M Group 0 / / / /
11-0666 Reconstruction 7-009-017 04/27/12 DONE DONE DONE 01/17/12 01/12/12 10/19/11 03/03/07 2,16 267,500 0 DDJ 0 0 0 H2M Group 0 / / / /
12-1064 Reconstruction 7-009-018 UNREVIEWED 04/02/13 04/01/13 11/16/12 03/03/07 16 0 0 DDJ 0 0 0 H2M Group 0 / / / /
12-0816 Reconstruction 7-009-019 DONE DONE UNREVIEWED02/12/13 02/08/13 01/09/13 03/03/07 16 0 0 DDJ 0 0 0 H2M Group 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Brook Avenue Elementary School:
08-1197XX Reconstruction 0-001-010 07/13/09 CANCELLED 02/11/09 02/04/09 01/27/09 05/22/07 8,155,16 225,000 225,000 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
Fifth Avenue Elementary:
08-1198XX Reconstruction 0-002-012 07/13/09 CANCELLED 02/11/09 02/04/09 01/27/09 05/22/07 8,155,16 225,000 225,000 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
Gardiner Manor Elementary:
08-1128 Reconstruction 0-003-010 06/08/09 DONE DONE DONE 01/26/09 01/22/09 06/05/07 05/15/07 2,8,9,155,15,16 970,000 970,000 DDJ 0 0 420,000 Burton Behrendt Smith 0 / / / /
Middle School:
08-0823 Reconstruction 0-005-017 03/24/09 DONE DONE DONE 11/26/08 11/26/08 08/23/07 05/20/08 16 169,745 169,745 DDJ 0 0 57,490 Burton Behrendt Smith 0 / / 01/04/13
08-1188 Reconstruction 0-005-018 03/11/09 DONE DONE DONE 02/10/09 02/04/09 01/26/09 05/15/07 8,9 350,000 350,000 DDJ 0 0 150,000 Burton Behrendt Smith 0 / / / /
08-1199XX Reconstruction 0-005-019 07/13/09 CANCELLED 02/11/09 02/04/09 01/27/09 05/22/07 155,16 170,000 170,000 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
Bay Shore Senior High:
07-1916 Reconstruction 0-006-024 10/21/08 DONE DONE DONE 04/03/08 03/27/08 06/05/07 05/15/07 4,8,155 815,000 815,000 DDJ 0 0 350,000 Burton Behrendt Smith 0 / / / /
08-0950 Reconstruction 0-006-026 03/24/09 DONE DONE DONE 12/18/08 12/18/08 08/23/07 05/20/08 16 381,565 381,565 DDJ 0 0 110,000 Burton Behrendt Smith 0 / / 01/04/13
08-1200XX Reconstruction 0-006-027 07/13/09 CANCELLED 02/11/09 02/04/09 01/27/09 05/22/07 8,155,16 485,000 485,000 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
- PR Additions and Alterations 0-006-028 / / / / 02/18/11 / / 02 - 16 0 0 DDJ 0 0 0 0 / / / /
Mary G Clarkson:
08-1189 Reconstruction 0-007-008 03/11/09 DONE DONE DONE 02/10/09 02/04/09 01/26/09 05/15/07 2,8 485,000 485,000 DDJ 0 0 209,000 Burton Behrendt Smith 0 / / / /
08-1201XX Reconstruction 0-007-009 07/13/09 CANCELLED 02/11/09 02/04/09 01/27/09 05/22/07 155,16 145,700 145,700 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
Armory Pre-K:
12-0501 Reconstruction 0-019-001 12/13/12 DONE DONE DONE 11/30/12 11/30/12 11/13/12 11/20/12 2,4,7,8,9,155,15,16 0 0 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
Storage Field House:
10-1097 Additions and Alterations 2-008-001 06/08/11 DONE DONE DONE 03/23/11 03/18/11 03/21/11 / / 02 - 16 181,600 0 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Sherwood Elementary:
07-1285 Reconstruction 0-002-008 09/29/08 DONE DONE DONE 01/02/08 12/27/07 07/23/07 01/23/07 8,155,15,16 231,702 231,702 JOD 0 0 0 EISENBACH-& RUUHNKE ENGINERIN 228,734 / / / /
09-0244 Reconstruction 0-002-009 02/10/10 DONE DONE DONE 09/22/09 09/18/09 06/11/09 02/10/09 2,8,10,155,15,16 170,510 0 JOD 0 0 54,734 Burton Behrendt Smith 0 / / / /
09-1173 Reconstruction 0-002-010 05/13/11 DONE DONE DONE 03/31/10 03/25/10 10/02/09 02/10/09 155,15,16 54,125 54,125 JOD 0 0 17,374 Burton Behrendt Smith 0 / / 01/04/13
- Reconstruction 0-002-011 / / / / 10/08/09 / / 155,15,16 0 0 JOD 0 0 0 0 / / / /
10-1001 Reconstruction 0-002-012 07/14/11 DONE DONE DONE 03/08/11 03/03/11 03/26/10 05/17/11 2,4,8,9,10,155,15,16 185,500 185,500 JOD 0 0 0 Burton Behrendt Smith 0 / / 01/04/13
- Reconstruction 0-002-013 / / / / 02/05/13 / / 2,4,8,9 0 0 MFS 0 0 0 0 / / / /
- Reconstruction 0-002-014 / / / / 02/05/13 / / 2 0 0 MFS 0 0 0 0 / / / /
Winganhauppauge Elementary:
07-1286 Reconstruction 0-003-014 09/29/08 DONE DONE DONE 01/02/08 12/27/07 07/23/07 01/23/07 8,155,15,16 1,035,713 1,035,713 JOD 0 0 0 EISENBACH-& RUUHNKE ENGINERIN 1,029,889 / / / /
09-0245 Reconstruction 0-003-015 02/10/10 DONE DONE DONE 09/22/09 09/18/09 06/11/09 02/10/09 2,4,8,10,155,15,16 114,166 0 JOD 0 0 36,647 Burton Behrendt Smith 0 / / / /
09-0553 Reconstruction 0-003-016 02/12/10 DONE DONE DONE 12/07/09 12/03/09 08/25/09 02/10/09 7 562,972 562,972 JOD 0 0 180,714 Burton Behrendt Smith 0 / / / /
09-1174 Reconstruction 0-003-017 05/13/11 DONE DONE DONE 03/31/10 03/25/10 10/02/09 02/10/09 155,15,16 54,125 54,125 JOD 0 0 17,374 Burton Behrendt Smith 0 / / 08/06/12
- Reconstruction 0-003-018 / / / / 10/08/09 / / 155,15,16 0 0 JOD 0 0 0 0 / / / /
- Reconstruction 0-003-019 / / / / 02/05/13 / / 2,4,8,9 0 0 MFS 0 0 0 0 / / / /
- Reconstruction 0-003-020 / / / / 02/05/13 / / 2 0 0 MFS 0 0 0 0 / / / /
Senior High School:
07-1287 Reconstruction 0-007-011 09/29/08 DONE DONE DONE 01/02/08 12/27/07 07/19/07 01/23/07 8,155,15,16 726,577 726,577 JOD 0 0 0 EISENBACH-& RUUHNKE ENGINERIN 716,521 / / / /
08-0191 Reconstruction 0-007-012 08/26/08 DONE DONE DONE 08/19/08 08/12/08 03/12/08 03/14/00 8,16 55,000 55,000 JOD 0 0 0 Wiedersum Associates Architec 0 / / 01/04/13
09-0246 Reconstruction 0-007-013 02/10/10 DONE DONE DONE 09/22/09 09/18/09 06/11/09 02/10/09 8,155,15,16 119,362 0 JOD 0 0 38,315 Burton Behrendt Smith 0 / / / /
09-1175 Reconstruction 0-007-014 05/13/11 DONE DONE DONE 03/31/10 03/25/10 10/02/09 02/10/09 155,15,16 240,233 240,233 JOD 0 0 77,115 Burton Behrendt Smith 0 / / 08/06/12
- Reconstruction 0-007-015 / / / / 10/08/09 / / 155,15,16 0 0 JOD 0 0 0 0 / / / /
- Reconstruction 0-007-016 / / / / 02/05/13 / / 2,4,8,9 0 0 MFS 0 0 0 0 / / / /
- Reconstruction 0-007-017 / / / / 02/05/13 / / 16 0 0 MFS 0 0 0 0 / / / /
- Reconstruction 0-007-018 / / / / 03/08/13 / / 10 0 0 MFS 0 0 0 0 / / / /
Commack Road Elementary:
07-1288 Reconstruction 0-008-010 09/29/08 DONE DONE DONE 01/02/08 12/27/07 07/23/07 01/23/07 8,155,15,16 336,293 336,293 JOD 0 0 0 EISENBACH-& RUUHNKE ENGINERIN 332,897 / / / /
09-0247 Reconstruction 0-008-011 02/10/10 DONE DONE DONE 09/22/09 09/18/09 06/11/09 02/10/09 2,8,10,155,15,16 517,291 0 JOD 0 0 166,051 Burton Behrendt Smith 0 / / / /
09-1176 Reconstruction 0-008-012 05/13/11 DONE DONE DONE 03/31/10 03/25/10 10/02/09 02/10/09 155,15,16 54,125 54,125 JOD 0 0 17,374 Burton Behrendt Smith 0 / / 08/06/12
- Reconstruction 0-008-013 / / / / 10/08/09 / / 155,15,16 0 0 JOD 0 0 0 0 / / / /
- Reconstruction 0-008-014 / / / / 02/05/13 / / 2,4,8,9 0 0 MFS 0 0 0 0 / / / /
- Reconstruction 0-008-015 / / / / 02/05/13 / / 2 0 0 MFS 0 0 0 0 / / / /
Islip Union Free High School:
07-1289 Reconstruction 0-011-010 09/29/08 DONE DONE DONE 01/02/08 12/27/07 07/23/07 01/23/07 8,155,15,16 481,172 481,172 JOD 0 0 0 EISENBACH-& RUUHNKE ENGINERIN 477,576 / / / /
09-0248 Reconstruction 0-011-011 02/10/10 DONE DONE DONE 09/22/09 09/18/09 06/11/09 02/10/09 8,155,15,16 146,237 0 JOD 0 0 46,943 Burton Behrendt Smith 0 / / / /
09-1177 Reconstruction 0-011-012 05/13/11 DONE DONE DONE 03/31/10 03/25/10 10/02/09 02/10/09 155,15,16 54,295 54,295 JOD 0 0 17,429 Burton Behrendt Smith 0 / / 08/06/12
- Reconstruction 0-011-013 / / / / 10/08/09 / / 155,15,16 0 0 JOD 0 0 0 0 / / / /
12-1163 Reconstruction 0-011-014 UNREVIEWED 05/07/13 05/06/13 02/05/13 12/13/12 2,4,7 0 0 MFS 0 0 0 Burton Behrendt Smith 0 / / / /
- Reconstruction 0-011-015 / / / / 02/05/13 / / 2,4,8,9 0 0 MFS 0 0 0 0 / / / /
- Reconstruction 0-011-016 / / / / 03/08/13 / / 10 0 0 MFS 0 0 0 0 / / / /
Administration Building:
07-1290 Reconstruction 1-001-005 09/29/08 DONE DONE DONE 01/02/08 12/27/07 07/31/07 01/23/07 16 254,719 0 JOD 0 0 0 EISENBACH-& RUUHNKE ENGINERIN 254,719 / / / /
09-1178 Reconstruction 1-001-006 05/13/11 DONE DONE DONE 03/31/10 03/25/10 06/11/09 02/10/09 8,155,15,16 49,925 0 JOD 0 0 0 Burton Behrendt Smith 0 / / 01/04/13
Storage @ Maintenance Building:
10-0283DB Discovered Building 2-012-001 04/11/11 DONE DONE DONE 09/29/10 09/20/10 10/17/07 / / 0 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
Storage @ Commack Elementary School:
10-0284DB Discovered Building 2-013-001 04/11/11 DONE DONE DONE 09/29/10 09/20/10 10/17/07 / / 0 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
Storage @ Elementary School Wing:
10-0285DB Discovered Building 2-014-001 04/11/11 DONE DONE DONE 09/29/10 09/20/10 10/17/07 / / 0 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
Storage #1 @ Sherwood ES:
10-0286DB Discovered Building 2-015-001 04/11/11 DONE DONE DONE 09/29/10 09/20/10 10/17/07 / / 0 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
Storage #2 @ Sherwood ES:
10-0287DB Discovered Building 2-016-001 04/11/11 DONE DONE DONE 09/29/10 09/20/10 10/17/07 / / 0 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
Storage #1 @ HS:
10-0288DB Discovered Building 2-017-001 04/11/11 DONE DONE DONE 09/29/10 09/20/10 10/17/07 / / 0 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
Storage #2 @ HS:
10-0289DB Discovered Building 2-018-001 04/11/11 DONE DONE DONE 09/29/10 09/20/10 10/17/07 / / 0 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
Storage #3 @ HS:
10-0290DB Discovered Building 2-019-001 04/11/11 DONE DONE DONE 09/29/10 09/20/10 10/17/07 / / 0 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
Storage #4 @ HSb:
10-0291DB Discovered Building 2-020-001 04/11/11 DONE DONE DONE 09/29/10 09/20/10 10/17/07 / / 0 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
Storage #5 @ High School:
10-0292DB Discovered Building 2-021-001 04/11/11 DONE DONE DONE 09/29/10 09/20/10 05/14/09 / / 0 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
Maintenance Bldg:
07-1291 Reconstruction 3-004-002 09/29/08 DONE DONE DONE 01/02/08 12/27/07 07/23/07 01/23/07 8,155,15,16 24,184 0 JOD 0 0 0 EISENBACH-& RUUHNKE ENGINERIN 24,184 / / / /
09-1179 Reconstruction 3-004-003 05/13/11 DONE DONE DONE 03/31/10 03/25/10 06/11/09 02/10/09 8,155,15,16 49,925 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
Islip Public Library:
- Reconstruction 6-010-006 / / / / 07/31/08 / / 16 0 0 JOD 0 0 0 0 / / / /
10-0028 Reconstruction 6-010-007 08/19/10 DONE DONE DONE 07/22/10 07/09/10 06/17/09 06/10/10 7,9,13,155,16 1,069,642 0 JOD 0 0 0 Beatty, Harvey & Associates 0 / / / /
09-0222 Reconstruction 6-010-008 09/29/09 DONE DONE DONE 09/16/09 09/15/09 08/14/09 09/10/09 7 215,868 0 JOD 0 0 0 Beatty, Harvey & Associates 0 / / / /
Districtwide:
09-0258 Reconstruction 7-999-003 10/30/09 DONE DONE DONE 09/22/09 09/22/09 06/11/09 02/10/09 10,16 584,403 584,403 JOD 0 0 187,593 Burton Behrendt Smith 0 / / 01/04/13
09-0259 Reconstruction 7-999-004 10/30/09 DONE DONE DONE 09/22/09 09/22/09 06/11/09 02/10/09 10,16 385,625 385,625 JOD 0 0 123,785 Burton Behrendt Smith 0 / / 01/04/13
09-0260 Reconstruction 7-999-005 10/30/09 DONE DONE DONE 09/22/09 09/22/09 06/11/09 02/10/09 10,16 523,225 523,225 JOD 0 0 167,955 Burton Behrendt Smith 0 / / 01/04/13
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Terrace Junior High:
08-1771 Reconstruction 0-002-016 07/07/09 DONE DONE DONE 06/30/09 06/25/09 05/06/09 07/11/00 7,13 73,263 73,263 JOD 0 0 0 Tetra Tech Architects & Engi 0 / / / /
11-0711 Reconstruction 0-002-017 07/05/12 DONE DONE DONE 01/25/12 01/19/12 09/28/11 06/20/00 8,9,155,15,16 722,120 775,665 JOD 0 0 0 Tetra Tech Architects & Engi 0 / / / /
Timber Point Elementary:
11-0712 Reconstruction 0-003-009 07/05/12 DONE DONE DONE 01/25/12 01/19/12 09/28/11 06/20/00 4,8,9,155,15,16 457,262 635,330 JOD 0 0 0 Tetra Tech Architects & Engi 0 / / / /
Connetquot Elementary:
11-0713 Reconstruction 0-005-009 07/05/12 DONE DONE DONE 01/25/12 01/19/12 09/28/11 06/20/00 4,8,9,155,15,16 286,333 370,415 JOD 0 0 0 Tetra Tech Architects & Engi 0 / / / /
JF Kennedy Elementary:
11-0714 Reconstruction 0-007-011 07/05/12 DONE DONE DONE 01/25/12 01/19/12 09/28/11 06/20/00 2,4,8,9,155,15,16 340,239 503,285 JOD 0 0 0 Tetra Tech Architects & Engi 0 / / / /
Ruth Kinney Elementary:
11-0715 Reconstruction 0-008-011 07/05/12 DONE DONE DONE 01/25/12 01/19/12 09/28/11 06/20/00 4,8,9,155,15,16 516,794 483,975 JOD 0 0 0 Tetra Tech Architects & Engi 0 / / / /
Early Childhood Center:
11-0716 Reconstruction 0-009-010 07/05/12 DONE DONE DONE 01/25/12 01/19/12 09/28/11 06/20/00 4,8,155,15,16 567,069 446,400 JOD 0 0 0 Tetra Tech Architects & Engi 0 / / / /
East Islip Senior High:
11-0656 Reconstruction 0-010-019 04/06/12 DONE DONE DONE 01/12/12 01/10/12 06/30/11 11/17/11 10,16 0 0 JOD 0 0 0 Tetra Tech Architects & Engi 0 / / / /
11-0717 Reconstruction 0-010-020 07/05/12 DONE DONE DONE 01/25/12 01/19/12 09/28/11 06/20/00 2,9,155,15,16 1,312,427 1,284,930 JOD 0 0 0 Tetra Tech Architects & Engi 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Old Sayville Jr. High School:
09-1582 Reconstruction 0-001-007 03/28/11 DONE DONE DONE 07/06/10 06/30/10 04/01/10 02/23/10 2,155,15,16 240,109 0 JOD 0 0 0 ECG Eninering, LLC 240,109 / / 11/19/12
Greene Elementary School:
12-0943 Reconstruction 0-002-009 DONE STARTED UNREVIEWED03/06/13 03/04/13 12/17/12 11/29/07 4,7,8,9,155,15,16 0 5,979,036 MFS 0 0 0 James M. Campbell Architects 0 / / / /
Sunrise Drive Elementary:
08-0993 Additions and Alterations 0-003-014 06/16/09 DONE DONE DONE 01/02/09 12/19/08 09/27/07 11/29/07 02 - 16 2,625,000 1,422,800 MGL 0 0 0 James M. Campbell Architects 0 / / / /
09-1583 Reconstruction 0-003-015 03/28/11 DONE DONE DONE 07/06/10 06/30/10 04/01/10 02/23/10 2,7,155,15,16 1,353,635 1,353,635 JOD 0 0 0 ECG Eninering, LLC 1,353,635 / / 11/19/12
Sayville High School:
08-0057 Additions and Alterations 0-004-019 04/10/09 DONE DONE DONE 07/21/08 07/09/08 09/27/07 11/29/07 02 - 16 2,330,000 0 MGL 0 0 0 James M. Campbell Architects 0 / / 04/26/13
08-1488 Reconstruction 0-004-021 09/18/09 DONE DONE DONE 04/13/09 04/08/09 02/28/08 11/29/07 2,4,7,8,9,155,15,16 1,402,878 1,402,878 MGL 0 0 0 James M. Campbell Architects 0 / / 03/21/13
08-0899 Reconstruction 0-004-022 04/14/09 DONE DONE DONE 12/09/08 12/08/08 09/03/08 05/20/08 9,10,155,15,16 100,000 100,000 JOD 0 0 0 James M. Campbell Architects 0 / / / /
09-1584 Reconstruction 0-004-023 03/28/11 DONE DONE DONE 07/06/10 06/30/10 04/01/10 02/23/10 2,8,155,15,16 1,506,828 1,506,828 JOD 0 0 0 ECG Eninering, LLC 1,506,828 / / 11/19/12
Cherry Ave. Elementary:
08-1377 Additions and Alterations 0-005-010 04/15/10 DONE DONE DONE 03/16/09 03/10/09 09/27/07 11/29/07 02 - 16 2,312,000 1,775,708 MGL 0 0 0 James M. Campbell Architects 0 / / 09/04/12
09-1585 Reconstruction 0-005-011 03/28/11 DONE DONE DONE 07/06/10 06/30/10 04/01/10 02/23/10 2,8,155,15,16 621,721 621,721 JOD 0 0 0 ECG Eninering, LLC 621,721 / / 11/19/12
Lincoln Ave. Elementary:
08-0890 Additions and Alterations 0-006-010 07/27/09 DONE DONE DONE 12/09/08 12/08/08 09/27/07 11/29/07 02 - 16 4,125,000 3,076,059 MGL 0 0 1,140,517 James M. Campbell Architects 0 / / / /
09-1586 Reconstruction 0-006-011 03/28/11 DONE DONE DONE 07/06/10 06/30/10 04/02/10 02/23/10 2,155,15,16 642,916 642,916 JOD 0 0 0 ECG Eninering, LLC 642,916 / / 11/19/12
Sayville Junior High School:
08-0077 Reconstruction 0-008-016 03/26/09 DONE DONE DONE 07/22/08 07/16/08 09/27/07 11/29/07 2,9,155,16 303,012 303,012 MGL 0 0 0 James M. Campbell Architects 0 / / 10/19/12
09-1587 Reconstruction 0-008-017 03/28/11 DONE DONE DONE 07/06/10 06/30/10 04/01/10 02/23/10 2,155,15,16 1,833,970 1,833,970 JOD 0 0 0 ECG Eninering, LLC 1,833,970 / / 11/19/12
Administration Bldg:
09-1588 Reconstruction 1-011-005 03/28/11 DONE DONE DONE 07/06/10 06/30/10 04/01/10 02/23/10 2,8,155,15,16 967,625 0 JOD 0 0 0 ECG Eninering, LLC 967,625 / / 11/19/12
HS Sports Stor #1:
12-0948DB Discovered Building 2-019-001 03/08/13 DONE DONE DONE 03/08/13 02/27/13 10/07/11 / / 0 0 JOD 0 0 0 0 / / / /
HS Sports Stor #2:
12-0949DB Discovered Building 2-020-001 03/08/13 DONE DONE DONE 03/08/13 02/27/13 10/07/11 / / 0 0 JOD 0 0 0 0 / / / /
MS Drama Stor:
11-1309DB Discovered Building 2-021-001 05/22/12 DONE DONE DONE 05/22/12 05/04/12 10/07/11 / / 0 0 JOD 0 0 0 0 / / / /
- DB Discovered Building 2-021-002 / / / / / / / / 0 0 JOD 0 0 0 0 / / / /
Cherry Avenue Storage Shed:
12-0947DB Discovered Building 2-022-001 03/08/13 DONE DONE DONE 03/08/13 02/27/13 10/14/11 / / 02 - 16 0 0 JOD 0 0 0 0 / / / /
Garfield Avenue Maintenance Facility:
09-1530 New Construction 3-018-001 08/17/11 DONE DONE DONE 06/15/10 06/07/10 07/16/08 05/19/09 02 - 16 1,108,000 0 JOD 0 0 0 James M. Campbell Architects 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Bayport Blue Point Elementary:
09-0897 Reconstruction 0-001-015 02/22/10 DONE DONE DONE 02/18/10 02/10/10 01/29/09 10/15/03 7 126,000 126,000 DDJ 0 0 0 Wiedersum Associates Architec 0 / / 12/23/12
11-1268 Reconstruction 0-001-016 11/21/12 DONE DONE DONE 05/07/12 05/04/12 03/08/12 02/07/12 2,155,15,16 778,743 778,743 DDJ 0 0 0 ECG Eninering, LLC 778,743 / / / /
Academy Street Elementary:
11-1269 Reconstruction 0-002-015 11/21/12 DONE DONE DONE 05/07/12 05/04/12 03/08/12 02/07/12 2,155,15,16 367,367 367,367 DDJ 0 0 0 ECG Eninering, LLC 367,367 / / / /
Bayport High School:
09-0898 Reconstruction 0-004-019 02/22/10 DONE DONE DONE 02/18/10 02/10/10 01/29/09 10/15/03 7 585,000 585,000 DDJ 0 0 0 Wiedersum Associates Architec 0 / / 12/23/12
11-1270 Reconstruction 0-004-020 11/21/12 DONE DONE DONE 05/07/12 05/04/12 03/08/12 02/07/12 2,8,155,15,16 1,298,166 1,298,166 DDJ 0 0 0 ECG Eninering, LLC 1,298,166 / / / /
Sylvan Avenue Elementary:
11-1271 Reconstruction 0-006-011 11/21/12 DONE DONE DONE 05/07/12 05/04/12 03/08/12 02/07/12 2,8,155,15,16 983,113 983,113 DDJ 0 0 0 ECG Eninering, LLC 983,113 / / / /
J. W. Young Jr. High School:
11-1272 Reconstruction 0-011-012 11/21/12 DONE DONE DONE 05/07/12 05/04/12 03/08/12 02/07/12 2,4,8,155,15 889,412 889,412 DDJ 0 0 0 ECG Eninering, LLC 889,412 / / / /
Barn:
11-1273 Reconstruction 2-012-003 11/21/12 DONE DONE DONE 05/07/12 05/04/12 03/08/12 02/07/12 8,15,16 86,459 0 DDJ 0 0 0 ECG Eninering, LLC 86,459 / / / /
Bayport Blue Point Public Library:
10-0089 Reconstruction 6-009-005 08/10/10 DONE DONE DONE 08/09/10 08/05/10 07/06/10 07/14/10 7 52,360 0 DDJ 0 0 0 Beatty, Harvey & Associates 0 / / / /
DistrictWide:
07-2267 Reconstruction 7-999-001 08/20/08 DONE DONE DONE 06/16/08 06/06/08 04/03/08 03/18/08 10,13,16 2,543,525 2,543,525 DDJ 0 0 808,841 Wiedersum Associates Architec 0 / / 09/04/12
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Middle School:
07-1447 Reconstruction 0-002-023 06/19/08 DONE DONE DONE 01/26/08 01/22/08 06/12/07 05/15/07 2,9,13,15,16 284,000 284,000 JOD 0 0 60,093 John A Grillo-ARCHITECTS PC 0 / / / /
08-1418PR Additions and Alterations 0-002-024 UNREVIEWED 03/24/09 03/16/09 01/17/08 / / 02 - 16 0 0 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
09-0003 Additions and Alterations 0-002-024 11/02/09 DONE DONE DONE 07/01/09 07/01/09 01/17/08 10/15/08 02 - 16 16,481,897 14,121,526 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
08-0355 Reconstruction 0-002-026 01/29/09 DONE DONE DONE 09/18/08 09/17/08 04/23/08 05/20/08 2,155,16 1,109,640 1,109,640 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
11-0751 Reconstruction 0-002-027 06/25/12 DONE DONE DONE 02/02/12 02/01/12 01/19/11 10/15/08 2,9,155,16 647,460 0 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Pines Elementary School:
08-0356 Reconstruction 0-006-019 01/29/09 DONE DONE DONE 09/18/08 09/17/08 04/23/08 05/20/08 4,9,155,16 100,890 100,890 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
09-0840 Reconstruction 0-006-020 05/24/10 DONE DONE DONE 02/02/10 01/28/10 05/27/09 05/19/09 2,8,9,10,15,16 255,103 255,103 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
12-0739 Reconstruction 0-006-021 DONE STARTED UNREVIEWED01/31/13 01/30/13 10/18/12 05/15/12 2,4,9,155,15,16 0 12,386,948 JMB 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
- Reconstruction 0-006-022 / / / / 06/13/13 / / 8,9,16 0 0 MFS 0 0 0 0 / / / /
Bretton Woods Elementary:
08-0357 Reconstruction 0-007-015 01/29/09 DONE DONE DONE 09/18/08 09/17/08 04/23/08 05/20/08 4,9,155,15,16 168,810 168,810 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
09-0841 Reconstruction 0-007-016 05/24/10 DONE DONE DONE 02/02/10 01/28/10 05/27/09 05/19/09 2,8,16 146,230 146,230 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
10-0614 Reconstruction 0-007-017 04/13/11 DONE DONE DONE 12/23/10 12/15/10 08/10/10 05/18/10 9,16 100,000 100,000 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
10-0461 Reconstruction 0-007-018 02/18/11 DONE DONE DONE 11/12/10 11/08/10 08/10/10 05/18/10 155,15,16 635,700 635,700 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
11-0196 Reconstruction 0-007-019 09/28/11 DONE DONE DONE 09/23/11 09/20/11 09/07/10 05/17/11 9,16 250,000 250,000 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 09/12/12
- Reconstruction 0-007-020 / / / / 06/16/11 / / 9,16 0 0 JOD 0 0 0 0 / / / /
- Reconstruction 0-007-021 / / / / 06/13/13 / / 2,8,9,16 0 0 MFS 0 0 0 0 / / / /
Hauppauge High School:
08-1074 Reconstruction 0-008-038 03/25/09 DONE DONE DONE 01/09/09 01/09/09 01/17/08 11/15/08 2,4,7,8,9,155,15,16 3,932,940 3,932,940 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
08-0358 Reconstruction 0-008-039 01/29/09 DONE DONE DONE 09/18/08 09/17/08 04/22/08 05/20/07 4,8,9,16 33,040 33,040 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
09-0004 Reconstruction 0-008-040 11/02/09 DONE DONE DONE 07/01/09 07/01/09 01/08/09 10/15/08 2,4,7,8,9,155,15,16 7,458,418 7,458,418 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / 09/29/11
11-0752 Reconstruction 0-008-041 06/25/12 DONE DONE DONE 02/02/12 02/01/12 12/01/11 10/15/08 7,9,155,16 468,460 0 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
12-0740 Reconstruction 0-008-042 DONE STARTED UNREVIEWED01/31/13 01/30/13 10/18/12 05/15/12 2 0 0 JMB 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
- Reconstruction 0-008-043 / / / / 06/13/13 / / 2,8,9,10,155,15,16 0 0 MFS 0 0 0 0 / / / /
Forest Brook Elementary:
08-0359 Reconstruction 0-010-014 01/29/09 DONE DONE DONE 09/18/08 09/17/08 04/23/08 05/20/08 4,155,16 187,620 187,620 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
09-0842 Reconstruction 0-010-015 05/24/10 DONE DONE DONE 02/02/10 01/28/10 05/27/09 05/19/09 2,8,16 98,667 98,667 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
10-0739 Reconstruction 0-010-016 02/25/11 DONE DONE DONE 01/25/11 01/25/11 08/10/10 05/18/10 9,15,16 150,000 150,000 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
12-0741 Reconstruction 0-010-017 DONE STARTED UNREVIEWED01/31/13 01/30/13 10/18/12 05/15/12 2,4,9,155,15,16 0 0 JMB 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
- Reconstruction 0-010-018 / / / / 06/13/13 / / 8,9,16 0 0 MFS 0 0 0 0 / / / /
Whiporwil Dist.Office/Storage:
- Reconstruction 2-004-016 / / / / 06/13/13 / / 2,8 0 0 MFS 0 0 0 0 / / / /
Container #8:
08-0254DB Discovered Building 2-019-001 09/25/08 DONE DONE DONE 09/05/08 08/28/08 03/24/06 / / 0 0 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Container #9 @ Pines Elementary:
08-1458DB Discovered Building 2-020-001 07/29/09 DONE DONE DONE 04/02/09 03/26/09 11/12/08 / / 02 - 16 0 0 JOD 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Districtwide:
- Reconstruction 7-999-004 / / / / 03/24/09 / / 16 0 0 JOD 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Sycamore Avenue Elementary:
08-0296 Reconstruction 0-001-012 03/20/09 DONE DONE DONE 09/10/08 09/05/08 11/21/07 12/12/07 4,8,16 41,000 41,000 DDJ 0 0 0 Wiedersum Associates Architec 0 / / 12/17/12
07-2052 Reconstruction 0-001-013 02/13/09 DONE DONE DONE 05/02/08 04/25/08 11/21/07 10/09/07 155,16 415,427 415,427 DDJ 0 0 0 ECG Eninering, LLC 415,427 / / 04/15/13
10-1260XX Reconstruction 0-001-014 11/08/11 CANCELLED 05/10/11 05/05/11 11/24/10 12/12/07 155 95,000 95,000 DDJ 0 0 0 Wiedersum Associates Architec 0 / / / /
12-0793 Reconstruction 0-001-015 ADDENDUM REQ'D 02/08/13 01/29/13 11/24/10 02/01/11 2,4,8,9,14,155,15,16 0 0 DDJ 0 0 0 Wiedersum Associates Architec 0 / / / /
John Pearl Elementary School:
08-0297 Reconstruction 0-002-014 03/20/09 DONE DONE DONE 09/10/08 09/05/08 11/21/07 12/12/07 8,16 41,000 41,000 DDJ 0 0 0 Wiedersum Associates Architec 0 / / 12/17/12
07-2053 Reconstruction 0-002-015 02/13/09 DONE DONE DONE 05/02/08 04/25/08 11/21/07 10/09/07 155,16 398,276 398,276 DDJ 0 0 0 ECG Eninering, LLC 398,276 / / 04/15/13
09-0547 Reconstruction 0-002-016 12/21/09 DONE DONE DONE 12/04/09 12/02/09 09/22/09 12/12/07 7,155 1,330,000 1,330,000 DDJ 0 0 0 Wiedersum Associates Architec 0 / / 04/03/13
10-1261XX Reconstruction 0-002-017 11/08/11 CANCELLED 05/10/11 05/05/11 11/23/10 12/12/07 155 95,000 95,000 DDJ 0 0 0 Wiedersum Associates Architec 0 / / / /
12-0794 Reconstruction 0-002-018 DONE STARTED UNREVIEWED02/08/13 01/29/13 11/24/10 02/01/11 2,4,8,9,14,155,15,16 0 9,041,188 MFS 0 0 0 Wiedersum Associates Architec 0 / / / /
Edith L Slocum Elementary:
08-0298 Reconstruction 0-004-017 03/20/09 DONE DONE DONE 09/10/08 09/05/08 11/21/07 12/12/07 8,16 41,500 41,500 DDJ 0 0 0 Wiedersum Associates Architec 0 / / 12/17/12
07-2054 Reconstruction 0-004-019 02/13/09 DONE DONE DONE 05/02/08 04/25/08 11/21/07 10/09/07 155,15,16 473,066 473,066 DDJ 0 0 0 ECG Eninering, LLC 473,066 / / 04/15/13
10-1262 Reconstruction 0-004-020 11/08/11 DONE DONE DONE 05/10/11 05/05/11 11/23/10 12/12/07 155 95,000 95,000 DDJ 0 0 0 Wiedersum Associates Architec 0 / / 10/20/12
12-0852 Reconstruction 0-004-021 STARTED STARTED UNREVIEWED02/15/13 02/14/13 11/24/10 02/01/11 2,4,8,9,14,155,15,16 0 7,994,190 MFS 0 0 0 Wiedersum Associates Architec 0 / / / /
- Reconstruction 0-004-022 / / / / 05/09/13 / / 0 0 MFS 0 0 0 0 / / / /
- Reconstruction 0-004-023 / / / / 05/29/13 / / 155 0 0 MFS 0 0 0 0 / / / /
Helen B Duffield Elementary:
08-0299 Reconstruction 0-005-015 03/20/09 DONE DONE DONE 09/10/08 09/05/08 11/21/07 12/12/07 8,16 41,000 41,000 DDJ 0 0 0 Wiedersum Associates Architec 0 / / 12/17/12
07-2055 Reconstruction 0-005-016 02/13/09 DONE DONE DONE 05/02/08 04/25/08 11/21/07 10/09/07 155,15,16 417,285 417,285 DDJ 0 0 0 ECG Eninering, LLC 417,285 / / 04/15/13
09-0548 Reconstruction 0-005-017 12/21/09 DONE DONE DONE 12/04/09 12/02/09 09/22/09 12/12/07 7,155 1,300,000 1,300,000 DDJ 0 0 0 Wiedersum Associates Architec 0 / / 04/03/13
10-1263XX Reconstruction 0-005-018 11/08/11 CANCELLED 05/10/11 05/05/11 11/23/10 12/12/07 155 95,000 95,000 DDJ 0 0 0 Wiedersum Associates Architec 0 / / / /
12-0853 Reconstruction 0-005-019 DONE STARTED UNREVIEWED02/15/13 02/14/13 11/24/10 02/01/11 2,4,8,9,14,155,15,16 0 0 DDJ 0 0 0 Wiedersum Associates Architec 0 / / / /
Arthur Premm Learning Center:
08-0821 Reconstruction 0-006-008 02/04/09 DONE DONE DONE 11/26/08 11/26/08 11/21/07 12/12/07 7 691,500 691,500 DDJ 0 0 0 Wiedersum Associates Architec 0 / / / /
12-0854 Reconstruction 0-006-009 DONE STARTED UNREVIEWED02/15/13 02/14/13 11/22/10 02/01/11 2,4,8,9,14,155,15,16 0 10,665,668 MFS 0 0 0 Wiedersum Associates Architec 0 / / / /
Connetquot High School:
08-0300 Reconstruction 0-007-030 03/20/09 DONE DONE DONE 09/10/08 09/05/08 11/21/07 12/12/07 2,9,10,155,15,16 2,433,000 2,433,000 DDJ 0 0 0 Wiedersum Associates Architec 0 / / 12/17/12
07-2056 Reconstruction 0-007-032 02/13/09 DONE DONE DONE 05/02/08 04/25/08 11/21/07 10/09/07 155,16 1,421,955 1,421,955 DDJ 0 0 0 ECG Eninering, LLC 1,421,955 / / 04/15/13
- Reconstruction 0-007-033 / / / / 10/01/09 / / 7,16 0 0 DDJ 0 0 0 0 / / / /
10-0834 Reconstruction 0-007-034 06/17/11 DONE DONE DONE 02/08/11 02/08/11 10/14/10 12/12/07 155,16 362,665 362,665 DDJ 0 0 0 Wiedersum Associates Architec 0 / / 04/03/13
11-0261 Additions and Alterations 0-007-035 02/08/12 DONE DONE DONE 10/17/11 10/13/11 11/03/10 02/01/11 02 - 16 12,292,600 11,150,632 DDJ 0 0 0 Wiedersum Associates Architec 0 / / 09/10/12
- PR Additions and Alterations 0-007-036 / / / / 07/19/11 / / 02 - 16 0 0 DDJ 0 0 0 0 / / / /
Idle Hour Elementary:
08-0301 Reconstruction 0-009-010 03/20/09 DONE DONE DONE 09/10/08 09/05/08 11/21/07 12/12/07 8,16 41,000 41,000 DDJ 0 0 0 Wiedersum Associates Architec 0 / / 12/17/12
07-2057 Reconstruction 0-009-011 02/13/09 DONE DONE DONE 05/02/08 04/25/08 11/21/07 10/09/07 155,16 435,891 435,891 DDJ 0 0 0 ECG Eninering, LLC 435,891 / / 04/15/13
09-0549 Reconstruction 0-009-012 12/21/09 DONE DONE DONE 12/04/09 12/02/09 09/22/09 12/12/07 7,155 1,400,000 1,400,000 DDJ 0 0 0 Wiedersum Associates Architec 0 / / 04/03/13
10-1264XX Reconstruction 0-009-013 11/08/11 CANCELLED 05/10/11 05/05/11 11/23/10 12/12/07 155 95,000 95,000 DDJ 0 0 0 Wiedersum Associates Architec 0 / / / /
12-0855 Reconstruction 0-009-014 DONE STARTED UNREVIEWED02/15/13 02/14/13 11/24/10 02/01/11 2,4,8,9,14,155,15,16 0 9,517,398 MFS 0 0 0 Wiedersum Associates Architec 0 / / / /
Oakdale-Bohemia Jr. High:
08-0302 Reconstruction 0-010-017 03/20/09 DONE DONE DONE 09/10/08 09/05/08 11/21/07 12/12/07 8,16 25,000 25,000 DDJ 0 0 0 Wiedersum Associates Architec 0 / / 12/17/12
07-2058 Reconstruction 0-010-019 02/13/09 DONE DONE DONE 05/02/08 04/25/08 11/21/07 10/09/07 2,8,155,15,16 2,002,841 2,002,841 DDJ 0 0 0 ECG Eninering, LLC 2,002,841 / / 04/15/13
- XX Reconstruction 0-010-020 CANCELLED / / / / 11/19/10 / / 155 0 22,072,824 DDJ 0 0 0 0 / / / /
12-0795 Reconstruction 0-010-021 DONE STARTED UNREVIEWED02/08/13 01/29/13 11/22/10 02/01/11 2,4,7,8,9,14,155,15, 0 22,847,832 MFS 0 0 0 Wiedersum Associates Architec 0 / / / /
12-0953 Reconstruction 0-010-022 06/17/13 DONE DONE DONE 03/11/13 03/08/13 01/31/13 05/15/12 8,16 0 0 MFS 0 0 0 Wiedersum Associates Architec 0 / / / /
Ronkonkoma Junior High:
08-0303 Reconstruction 0-011-020 03/20/09 DONE DONE DONE 09/10/08 09/05/08 11/21/07 12/12/07 8,16 25,000 25,000 DDJ 0 0 0 Wiedersum Associates Architec 0 / / 12/17/12
07-2059 Reconstruction 0-011-022 02/13/09 DONE DONE DONE 05/02/08 04/25/08 11/21/07 10/09/07 155,15,16 1,871,345 1,871,345 DDJ 0 0 0 ECG Eninering, LLC 1,871,345 / / 04/15/13
12-0796 Reconstruction 0-011-023 DONE STARTED UNREVIEWED02/08/13 01/29/13 11/22/10 02/01/11 2,4,7,8,9,14,155,15, 0 0 DDJ 0 0 0 Wiedersum Associates Architec 0 / / / /
- XX Reconstruction 0-011-024 CANCELLED / / / / 11/23/10 / / 155 0 0 DDJ 0 0 0 0 / / / /
12-0954 Reconstruction 0-011-025 STARTED DONE DONE 03/11/13 03/08/13 01/30/13 05/15/12 8,16 0 0 MFS 0 0 0 Wiedersum Associates Architec 0 / / / /
Cherokee St Elementary:
08-0304 Reconstruction 0-012-013 03/20/09 DONE DONE DONE 09/10/08 09/05/08 11/21/07 12/12/07 8,16 41,500 41,500 DDJ 0 0 0 Wiedersum Associates Architec 0 / / 12/17/12
07-2060 Reconstruction 0-012-015 02/13/09 DONE DONE DONE 05/02/08 04/25/08 11/21/07 10/09/07 2,8,155,16 587,697 587,697 DDJ 0 0 0 ECG Eninering, LLC 587,697 / / 04/15/13
10-1265XX Reconstruction 0-012-016 11/08/11 CANCELLED 05/10/11 05/05/11 11/23/10 12/12/07 155 95,000 95,000 DDJ 0 0 0 Wiedersum Associates Architec 0 / / / /
12-0797 Reconstruction 0-012-017 DONE STARTED UNREVIEWED02/08/13 01/29/13 11/24/10 02/01/11 2,4,8,9,14,155,15,16 0 11,830,389 MFS 0 0 0 Wiedersum Associates Architec 0 / / / /
12-0955 Reconstruction 0-012-018 STARTED DONE DONE 03/11/13 03/08/13 01/31/13 05/15/12 8,16 0 0 MFS 0 0 0 Wiedersum Associates Architec 0 / / / /
- Reconstruction 0-012-019 / / / / 05/29/13 / / 155 0 0 MFS 0 0 0 0 / / / /
Edward J Bosti School:
08-0305 Reconstruction 0-013-011 03/20/09 DONE DONE DONE 09/10/08 09/05/08 11/21/07 12/12/07 8,16 42,000 42,000 DDJ 0 0 0 Wiedersum Associates Architec 0 / / 12/17/12
07-2061 Reconstruction 0-013-013 02/13/09 DONE DONE DONE 05/02/08 04/25/08 11/21/07 10/09/07 155,16 515,314 515,314 DDJ 0 0 0 ECG Eninering, LLC 515,314 / / 04/15/13
12-0798 Reconstruction 0-013-014 DONE STARTED UNREVIEWED02/08/13 01/29/13 11/23/10 02/01/11 2,4,8,9,14,155,15,16 0 9,015,924 MFS 0 0 0 Wiedersum Associates Architec 0 / / / /
10-1266XX Reconstruction 0-013-015 11/08/11 CANCELLED 05/10/11 05/05/11 11/23/10 12/12/07 155 95,000 95,000 DDJ 0 0 0 Wiedersum Associates Architec 0 / / / /
12-0956 Reconstruction 0-013-016 STARTED DONE DONE 03/11/13 03/08/13 01/31/13 05/15/12 8,16 0 0 MFS 0 0 0 Wiedersum Associates Architec 0 / / / /
Administration Building:
- Reconstruction 1-015-012 / / / / 11/22/10 / / 2,4,7,8,9,14,155,15, 0 0 DDJ 0 0 0 0 / / / /
Field Storage Container:
12-0116DB Discovered Building 2-022-001 08/24/12 DONE DONE DONE 08/24/12 08/24/12 11/16/11 / / 0 0 DDJ 0 0 0 Wiedersum Associates Architec 0 / / / /
Bus Garage/Adm(frmrly Admin_):
07-2062 Reconstruction 5-015-012 02/13/09 DONE DONE DONE 05/02/08 04/25/08 11/21/07 10/09/07 2,8,155,15,16 2,730,594 2,730,594 DDJ 0 0 0 ECG Eninering, LLC 2,730,594 / / 04/15/13
- PR Additions and Alterations 5-015-013 / / / / 03/25/11 / / 02 - 16 0 0 DDJ 0 0 0 0 / / / /
12-0856 Additions and Alterations 5-015-013 STARTED STARTED UNREVIEWED02/15/13 02/14/13 03/25/11 02/01/11 02 - 16 0 0 MFS 0 0 0 Wiedersum Associates Architec 0 / / / /
Connetquot Public Library:
08-1629 Reconstruction 6-016-002 05/20/09 DONE DONE DONE 05/18/09 05/14/09 10/06/08 04/01/08 16 61,787 0 DDJ 0 0 0 Planning & Design Inc 0 / / / /
09-1449 Reconstruction 6-016-003 06/04/10 DONE DONE DONE 05/20/10 05/14/10 11/05/09 11/12/09 2,9 403,535 0 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
- Reconstruction 6-016-004 / / / / 04/12/13 / / 4,7,8,9,14,15,16 0 0 MFS 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Captree Elementary:
07-1550 Reconstruction 0-001-011 06/28/10 DONE DONE DONE 02/06/08 02/04/08 09/06/06 08/17/06 155,15,16 240,813 240,813 MGL 0 0 0 John A Grillo-ARCHITECTS PC 240,393 / / / /
08-0722 Reconstruction 0-001-012 06/04/09 DONE DONE DONE 11/07/08 11/06/08 08/28/07 10/02/07 2,8 57,056 57,056 MGL 0 0 0 Burton Behrendt Smith 0 / / / /
Manetuck Elementary:
07-1551 Reconstruction 0-003-014 06/28/10 DONE DONE DONE 02/06/08 02/04/08 09/06/06 08/17/06 155,15,16 245,887 245,887 MGL 0 0 0 John A Grillo-ARCHITECTS PC 244,447 / / / /
08-0723 Reconstruction 0-003-015 06/04/09 DONE DONE DONE 11/07/08 11/06/08 08/29/07 10/02/07 2,4,10,155,15,16 893,019 893,019 MGL 0 0 308,176 Burton Behrendt Smith 0 / / / /
Masera Elementary School:
08-0939 Reconstruction 0-004-009 06/11/09 DONE DONE DONE 12/17/08 12/12/08 08/29/07 10/02/07 2,4,8,9,10,155,15,16 6,362,332 6,362,332 MGL 0 0 0 Burton Behrendt Smith 0 / / / /
12-1008 Reconstruction 0-004-010 04/09/13 DONE DONE DONE 03/21/13 03/18/13 02/15/13 12/13/12 2,16 800,000 0 MFS 0 0 0 Burton Behrendt Smith 0 / / / /
Paul J. Bellew Elementary:
07-1552 Reconstruction 0-005-017 06/28/10 DONE DONE DONE 02/06/08 02/04/08 09/06/06 08/17/06 155,15,16 335,931 335,931 MGL 0 0 0 John A Grillo-ARCHITECTS PC 333,911 / / / /
08-0724 Reconstruction 0-005-018 06/04/09 DONE DONE DONE 11/07/08 11/06/08 08/28/07 10/02/07 2,4,10,155,15,16 1,429,468 1,429,468 MGL 0 0 308,175 Burton Behrendt Smith 0 / / 01/04/13
Wdall Road Jr. High School:
07-1553 Reconstruction 0-007-013 06/28/10 DONE DONE DONE 02/06/08 02/04/08 09/06/06 08/17/06 155,15,16 1,344,587 1,344,587 MGL 0 0 0 John A Grillo-ARCHITECTS PC 1,340,927 / / / /
08-0725 Reconstruction 0-007-014 06/04/09 DONE DONE DONE 11/07/08 11/06/08 08/28/07 10/02/07 2,4,8,9,10,155,15,16 1,650,606 1,650,606 MGL 0 0 0 Burton Behrendt Smith 0 / / 01/04/13
West Islip Senior High School:
07-1554 Reconstruction 0-008-024 06/28/10 DONE DONE DONE 02/06/08 02/04/08 09/06/06 08/17/06 155,15,16 4,951,826 4,951,826 MGL 0 0 0 John A Grillo-ARCHITECTS PC 4,789,946 / / / /
08-0726 Reconstruction 0-008-026 06/04/09 DONE DONE DONE 11/07/08 11/06/08 08/28/07 10/02/07 2,4,8,9,10,155,15,16 6,347,232 6,347,232 MGL 0 0 0 Burton Behrendt Smith 0 / / / /
10-1061 Reconstruction 0-008-027 06/29/11 DONE DONE DONE 03/17/11 03/15/11 12/29/10 10/02/07 2,4,8,9,10,155,15,16 692,121 692,121 JOD 0 0 0 Burton Behrendt Smith 0 / / 10/23/12
12-0999 Reconstruction 0-008-029 06/12/13 DONE DONE DONE 03/20/13 03/20/13 02/15/13 12/13/12 2 1,220,000 1,220,000 MFS 0 0 0 Burton Behrendt Smith 0 / / / /
Westbrook Elementary:
07-1555 Reconstruction 0-009-014 06/28/10 DONE DONE DONE 02/06/08 02/04/08 09/06/06 08/17/06 155,15,16 247,911 247,911 MGL 0 0 0 John A Grillo-ARCHITECTS PC 245,731 / / / /
08-0727 Reconstruction 0-009-015 06/04/09 DONE DONE DONE 11/07/08 11/06/08 08/29/07 10/02/08 2,4,10,155,15,16 1,203,073 1,203,073 MGL 0 0 308,175 Burton Behrendt Smith 0 / / 01/04/13
Beach Street Middle School:
07-1556 Reconstruction 0-010-018 06/28/10 DONE DONE DONE 02/06/08 02/04/08 09/06/06 08/17/06 155,15,16 376,508 376,508 MGL 0 0 0 John A Grillo-ARCHITECTS PC 371,978 / / / /
08-0728 Reconstruction 0-010-019 06/04/09 DONE DONE DONE 11/07/08 11/06/08 08/28/07 10/02/08 2,4,7,8,9,10,155,15, 2,497,918 2,497,918 MGL 0 0 308,176 Burton Behrendt Smith 0 / / / /
10-1062 Reconstruction 0-010-020 06/29/11 DONE DONE DONE 03/17/11 03/15/11 02/15/11 10/02/07 2,4,8,9,155,15,16 76,320 76,320 JOD 0 0 0 Burton Behrendt Smith 0 / / 10/23/12
Bayview School:
07-1557 Reconstruction 0-011-012 06/28/10 DONE DONE DONE 02/06/08 02/04/08 09/06/06 08/17/06 155,15,16 220,767 220,767 MGL 0 0 0 John A Grillo-ARCHITECTS PC 220,467 / / / /
08-0729 Reconstruction 0-011-013 06/04/09 DONE DONE DONE 11/07/08 11/06/08 08/28/07 10/02/07 2,4,10,155,15,16 922,785 922,785 MGL 0 0 308,176 Burton Behrendt Smith 0 / / / /
12-1000 Reconstruction 0-011-014 06/12/13 DONE DONE DONE 03/20/13 03/20/13 02/15/13 12/13/12 2 500,000 500,000 MFS 0 0 0 Burton Behrendt Smith 0 / / / /
Oquenock School:
07-1558 Reconstruction 0-012-014 06/28/10 DONE DONE DONE 02/06/08 02/04/08 09/06/06 08/17/06 155,15,16 223,593 223,593 MGL 0 0 0 John A Grillo-ARCHITECTS PC 221,913 / / / /
08-0730 Reconstruction 0-012-015 06/04/09 DONE DONE DONE 11/07/08 11/06/08 08/29/07 10/02/08 2,4,10,155,15,16 1,336,511 1,336,511 MGL 0 0 308,176 Burton Behrendt Smith 0 / / 01/04/12
- Reconstruction 0-012-016 / / / / 01/08/09 / / 2,10 0 0 JOD 0 0 0 0 / / / /
West Islip High School:
10-1237 New Construction 2-030-001 02/22/12 DONE DONE DONE 04/29/11 04/28/11 02/15/11 10/02/07 02 - 16 55,968 0 JOD 0 0 0 Burton Behrendt Smith 0 / / 04/08/13
New Storage Building 2:
10-1238 New Construction 2-031-001 02/22/12 DONE DONE DONE 04/29/11 04/28/11 02/15/11 10/02/07 02 - 16 42,612 0 JOD 0 0 0 Burton Behrendt Smith 0 / / 04/08/13
New Storage Building:
10-1239 New Construction 2-032-001 02/22/12 DONE DONE DONE 04/29/11 04/28/11 02/15/11 10/02/07 02 - 16 42,612 0 JOD 0 0 0 Burton Behrendt Smith 0 / / 04/08/13
Bus Maintenance Garage:
07-1559 Reconstruction 5-002-004 06/28/10 DONE DONE DONE 02/06/08 02/04/08 09/06/06 08/17/06 155,15,16 42,676 42,676 MGL 0 0 0 John A Grillo-ARCHITECTS PC 40,786 / / / /
West Islip Public Library:
08-0159 Reconstruction 6-013-004 08/19/08 DONE DONE DONE 08/13/08 08/07/08 07/16/08 05/20/08 10,15,16 36,000 0 JOD 0 0 0 Beatty, Harvey & Associates 0 / / / /
District Wide:
- Reconstruction 7-999-006 / / / / 02/15/11 / / 16 0 0 JOD 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Ross/Sonderling High School:
07-1264 Additions and Alterations 0-002-009 07/03/08 DONE DONE DONE 12/31/07 12/26/07 08/02/07 12/12/06 02 - 16 2,550,000 0 HCM 0 0 331,500 ThomasAssociates, PC 0 / / / /
08-1309 Reconstruction 0-002-010 07/09/09 DONE DONE DONE 03/02/09 02/27/09 12/02/08 12/12/06 2,4,9,155,15,16 2,306,895 1,375,790 HCM 0 0 389,865 Tetra Tech Architects & Engi 0 / / / /
10-0032 Reconstruction 0-002-011 12/20/10 DONE DONE DONE 07/22/10 07/09/10 03/25/10 12/12/06 2,15,16 423,647 598,000 HCM 0 0 71,596 Tetra Tech Architects & Engi 0 / / / /
11-0321 Reconstruction 0-002-012 05/29/12 DONE DONE DONE 11/02/11 10/26/11 03/25/10 02/17/11 2,155,15,16 1,383,837 0 HCM 0 0 0 Tetra Tech Architects & Engi 1,383,837 / / / /
11-1213 Reconstruction 0-002-013 05/11/12 DONE DONE DONE 04/26/12 04/25/12 04/14/11 12/12/06 155,16 127,030 0 HCM 0 0 19,054 Tetra Tech Architects & Engi 0 / / / /
- Reconstruction 0-002-014 / / / / 03/13/12 / / 7 0 0 HCM 0 0 0 0 / / / /
Southeast Elementary:
08-0977 Reconstruction 0-003-008 03/11/09 DONE DONE DONE 12/30/08 12/18/08 09/22/06 12/12/06 2,4,7,8,9,155,15,16 250,000 250,000 HCM 0 0 32,750 Tetra Tech Architects & Engi 0 / / / /
08-1310 Reconstruction 0-003-009 07/09/09 DONE DONE DONE 03/02/09 02/27/09 12/29/08 12/12/06 2,8,9,155,15,16 2,730,960 2,257,610 HCM 0 0 460,000 Tetra Tech Architects & Engi 0 / / / /
11-0322 Reconstruction 0-003-010 05/29/12 DONE DONE DONE 11/02/11 10/26/11 04/14/11 02/17/11 2,9,155,16 661,318 0 HCM 0 0 0 Tetra Tech Architects & Engi 661,318 / / / /
11-1217 Reconstruction 0-003-011 12/10/12 DONE DONE DONE 04/26/12 04/25/12 03/20/12 12/12/06 2,9,155,16 135,000 0 HCM 0 0 20,250 Tetra Tech Architects & Engi 0 / / / /
Southwest Elementary:
07-2145 Reconstruction 0-004-007 07/31/08 DONE DONE DONE 05/23/08 05/15/08 11/09/07 12/12/07 2,7 709,940 709,940 HCM 0 0 93,002 ThomasAssociates, PC 0 / / / /
08-1311 Reconstruction 0-004-008 07/09/09 DONE DONE DONE 03/02/09 02/27/09 12/02/08 12/12/06 2,8,155,15,16 2,715,061 2,139,440 HCM 0 0 458,845 Tetra Tech Architects & Engi 0 / / / /
10-0033 Reconstruction 0-004-009 12/20/10 DONE DONE DONE 07/22/10 07/09/10 03/24/10 12/12/06 2,155,15,16 450,984 625,000 HCM 0 0 76,216 Tetra Tech Architects & Engi 0 / / / /
11-0323 Reconstruction 0-004-010 05/29/12 DONE DONE DONE 11/02/11 10/26/11 04/14/11 02/17/11 2,9,155,16 1,374,290 0 HCM 0 0 0 Tetra Tech Architects & Engi 1,374,290 / / / /
11-1218 Reconstruction 0-004-011 12/10/12 DONE DONE DONE 04/26/12 04/25/12 03/20/12 12/12/06 2,9,155,16 320,000 0 HCM 0 0 48,000 Tetra Tech Architects & Engi 0 / / / /
South Middle School:
08-0978 Reconstruction 0-005-007 03/11/09 DONE DONE DONE 12/30/08 12/18/08 08/03/06 12/12/06 9 378,547 180,000 HCM 0 0 60,000 Tetra Tech Architects & Engi 0 / / / /
08-1312 Reconstruction 0-005-010 07/09/09 DONE DONE DONE 03/02/09 02/27/09 12/29/08 12/12/06 2,8,9,155,15,16 3,730,806 3,747,960 HCM 0 0 630,506 Tetra Tech Architects & Engi 0 / / / /
10-0003 Reconstruction 0-005-012 08/18/10 DONE DONE DONE 07/06/10 07/01/10 03/25/10 12/12/06 7,16 864,667 1,590,000 HCM 0 0 146,129 Tetra Tech Architects & Engi 0 / / / /
11-0324 Reconstruction 0-005-013 05/29/12 DONE DONE DONE 11/02/11 10/26/11 04/14/11 02/17/11 2,9,155,16 1,493,831 0 HCM 0 0 0 Tetra Tech Architects & Engi 1,493,831 / / / /
11-1219 Reconstruction 0-005-014 12/10/12 DONE DONE DONE 04/26/12 04/25/12 03/20/12 12/12/06 155,16 55,000 0 HCM 0 0 8,250 Tetra Tech Architects & Engi 0 / / / /
FRESHMAN ANNEX (SEE 1-006-001):
08-1645 Reconstruction 0-006-001 12/23/10 DONE DONE DONE 05/20/09 05/07/09 05/21/09 12/12/06 2,4,8,9,155,15,16 397,250 0 HCM 0 0 0 Tetra Tech Architects & Engi 0 / / / /
- Reconstruction 0-006-002 / / / / 07/03/09 / / 2,8 0 0 HCM 0 0 0 0 / / / /
Northeast Elementary:
07-1265 Reconstruction 0-007-006 07/03/08 DONE DONE DONE 12/31/07 12/26/07 08/03/06 12/12/06 9 3,430,145 2,946,000 HCM 0 0 484,170 ThomasAssociates, PC 0 / / / /
10-0034 Reconstruction 0-007-008 12/20/10 DONE DONE DONE 07/22/10 07/09/10 03/25/10 12/12/06 2,155,15,16 422,894 569,880 HCM 0 0 71,469 Tetra Tech Architects & Engi 0 / / / /
11-0325 Reconstruction 0-007-009 05/29/12 DONE DONE DONE 11/02/11 10/26/11 04/14/11 02/17/11 2,9,155,16 1,168,892 1,168,892 0 0 0 Tetra Tech Architects & Engi 1,168,892 / / / /
11-1220 Reconstruction 0-007-010 12/10/12 DONE DONE DONE 04/26/12 04/25/12 03/20/12 12/12/06 155,16 260,000 0 HCM 0 0 39,000 Tetra Tech Architects & Engi 0 / / / /
North Elementary:
07-1266 Additions and Alterations 0-008-005 07/03/08 DONE DONE DONE 12/31/07 12/26/07 08/02/07 12/12/06 02 - 16 2,817,644 2,684,139 HCM 0 0 382,416 ThomasAssociates, PC 0 / / / /
10-0035 Reconstruction 0-008-006 12/20/10 DONE DONE DONE 07/22/10 07/09/10 01/30/08 12/12/06 2,4,155,16 399,007 451,800 HCM 0 0 67,432 Tetra Tech Architects & Engi 0 / / / /
11-0326 Reconstruction 0-008-008 05/29/12 DONE DONE DONE 11/02/11 10/26/11 04/14/11 02/17/11 2,9,155,16 1,226,520 1,226,520 HCM 0 0 0 Tetra Tech Architects & Engi 1,226,520 / / / /
11-1221 Reconstruction 0-008-009 12/10/12 DONE DONE DONE 04/26/12 04/25/12 03/20/12 12/12/06 155,16 790,000 0 HCM 0 0 118,500 Tetra Tech Architects & Engi 0 / / / /
East ES (K):
07-1267 Additions and Alterations 0-009-006 07/03/08 DONE DONE DONE 12/31/07 12/26/07 09/25/06 12/12/06 02 - 16 9,894,626 8,495,239 HCM 0 0 1,286,301 ThomasAssociates, PC 0 / / / /
09-0085 Reconstruction 0-009-007 08/18/09 DONE DONE DONE 07/24/09 07/22/09 07/03/09 07/07/09 7 788,960 845,000 HCM 0 0 131,000 Tetra Tech Architects & Engi 0 / / / /
10-0036 Reconstruction 0-009-008 12/20/10 DONE DONE DONE 07/22/10 07/09/10 03/24/10 12/12/06 2,155,15,16 397,489 636,258 HCM 0 0 67,176 Tetra Tech Architects & Engi 0 / / / /
11-0327 Reconstruction 0-009-009 05/29/12 DONE DONE DONE 11/02/11 10/26/11 04/14/11 02/17/11 2,9,155,16 726,828 0 HCM 0 0 0 Tetra Tech Architects & Engi 726,828 / / / /
11-1222 Reconstruction 0-009-010 12/10/12 DONE DONE DONE 04/26/12 04/25/12 03/20/12 12/12/06 7,155,16 502,000 0 HCM 0 0 75,300 Tetra Tech Architects & Engi 0 / / / /
Freshman Center:
08-0979 Additions and Alterations 0-010-007 03/11/09 DONE DONE DONE 12/30/08 12/18/08 09/25/06 / / 02 - 16 250,000 0 HCM 0 0 32,750 Tetra Tech Architects & Engi 0 / / / /
08-1646 Additions and Alterations 0-010-008 12/23/10 DONE DONE DONE 05/20/09 05/07/09 12/29/08 12/12/06 02 - 16 4,158,915 3,766,915 HCM 0 0 544,818 Tetra Tech Architects & Engi 0 / / 09/04/12
10-0004 Reconstruction 0-010-009 08/18/10 DONE DONE DONE 07/06/10 07/01/10 03/24/10 12/12/06 7 46,000 0 HCM 0 0 6,900 Tetra Tech Architects & Engi 0 / / / /
11-0328 Reconstruction 0-010-010 05/29/12 DONE DONE DONE 11/02/11 10/26/11 04/14/11 02/17/11 2,9,155,16 635,537 0 HCM 0 0 0 Tetra Tech Architects & Engi 635,537 / / / /
11-1214 Reconstruction 0-010-011 05/11/12 DONE DONE DONE 04/26/12 04/25/12 03/13/12 12/12/06 7 1,943,565 0 HCM 0 0 291,535 Tetra Tech Architects & Engi 0 / / / /
11-1223 Reconstruction 0-010-012 12/10/12 DONE DONE DONE 04/26/12 04/25/12 03/20/12 12/12/06 2,155,15,16 500,000 0 HCM 0 0 75,000 Tetra Tech Architects & Engi 0 / / / /
North Middle School:
07-1268 Additions and Alterations 0-011-009 07/03/08 DONE DONE DONE 12/31/07 12/26/07 08/02/07 12/12/06 02 - 16 1,580,864 1,580,864 HCM 0 0 248,552 ThomasAssociates, PC 0 / / / /
10-0800 Reconstruction 0-011-010 03/24/11 DONE DONE DONE 02/07/11 02/03/11 06/15/10 10/01/09 7,8,15 1,086,333 1,905,000 HCM 0 0 183,590 Tetra Tech Architects & Engi 0 / / / /
11-0329 Reconstruction 0-011-011 05/29/12 DONE DONE DONE 11/02/11 10/26/11 04/15/11 02/17/11 2,9,155,16 966,917 966,917 HCM 0 0 0 Tetra Tech Architects & Engi 966,917 / / / /
Loretta Park Elementary:
08-0980 Reconstruction 0-012-004 03/11/09 DONE DONE DONE 12/30/08 12/18/08 09/25/06 12/12/06 2,4,8,9,10,155,15,16 250,000 0 HCM 0 0 32,750 Tetra Tech Architects & Engi 0 / / / /
08-1313 Reconstruction 0-012-005 07/09/09 DONE DONE DONE 03/02/09 02/27/09 12/29/08 12/12/06 2,8,9,155,15,16 2,281,256 2,806,790 HCM 0 0 385,532 Tetra Tech Architects & Engi 0 / / / /
09-1310 Reconstruction 0-012-006 05/20/10 DONE DONE DONE 04/15/10 04/09/10 03/03/10 12/12/06 2,7 2,128,560 0 HCM 0 0 319,284 Tetra Tech Architects & Engi 0 / / / /
11-0330 Reconstruction 0-012-007 05/31/12 DONE DONE DONE 11/02/11 10/26/11 04/15/11 02/17/11 2,9,155,16 876,702 0 HCM 0 0 0 Tetra Tech Architects & Engi 876,702 / / / /
11-1224 Reconstruction 0-012-008 12/10/12 DONE DONE DONE 04/26/12 04/25/12 / / 12/12/06 7,155,16 505,000 0 HCM 0 0 75,750 Tetra Tech Architects & Engi 0 / / / /
Pine Park Elementary:
08-1314 Reconstruction 0-013-005 07/09/09 DONE DONE DONE 03/02/09 02/27/09 08/02/07 12/12/06 8 2,058,011 1,733,215 HCM 0 0 347,804 Tetra Tech Architects & Engi 0 / / / /
09-1311 Reconstruction 0-013-006 05/20/10 DONE DONE DONE 04/15/10 04/09/10 03/03/10 12/12/06 7 1,943,188 0 HCM 0 0 291,478 Tetra Tech Architects & Engi 0 / / / /
10-0037 Reconstruction 0-013-007 12/20/10 DONE DONE DONE 07/22/10 07/09/10 03/25/10 12/12/06 2,16 235,213 235,213 HCM 0 0 39,751 Tetra Tech Architects & Engi 0 / / / /
11-0331 Reconstruction 0-013-008 05/29/12 DONE DONE DONE 11/02/11 10/26/11 04/15/11 02/17/11 2,9,155,16 721,144 0 HCM 0 0 0 Tetra Tech Architects & Engi 721,144 / / / /
11-1225 Reconstruction 0-013-009 12/10/12 DONE DONE DONE 04/26/12 04/25/12 03/20/12 12/12/06 7,155,16 520,000 0 HCM 0 0 78,000 Tetra Tech Architects & Engi 0 / / / /
Oak Park Elementary:
07-1269 Additions and Alterations 0-014-006 07/03/08 DONE DONE DONE 12/31/07 12/26/07 09/25/06 12/12/06 02 - 16 8,301,024 7,541,433 HCM 0 0 1,079,133 ThomasAssociates, PC 0 / / / /
10-0038 Reconstruction 0-014-007 12/20/10 DONE DONE DONE 07/22/10 07/09/10 03/25/10 12/12/06 2,16 137,574 336,000 HCM 0 0 23,250 Tetra Tech Architects & Engi 0 / / / /
10-0801 Reconstruction 0-014-008 03/24/11 DONE DONE DONE 02/07/11 02/03/11 06/15/10 10/01/09 2,7,15 1,155,123 2,115,000 HCM 0 0 195,216 Tetra Tech Architects & Engi 0 / / / /
11-0332 Reconstruction 0-014-009 05/29/12 DONE DONE DONE 11/02/11 10/26/11 04/15/11 02/17/11 2,9,155,16 914,430 0 HCM 0 0 0 Tetra Tech Architects & Engi 914,430 / / / /
11-1226 Reconstruction 0-014-010 12/10/12 DONE DONE DONE 04/26/12 04/25/12 03/20/12 12/12/06 7,155,16 500,000 0 HCM 0 0 75,000 Tetra Tech Architects & Engi 0 / / / /
West Middle School:
07-1270 Reconstruction 0-015-008 07/03/08 DONE DONE DONE 12/31/07 12/26/07 09/25/06 12/12/07 2,4,7,8,9,10,155,15, 4,970,000 0 HCM 0 0 646,100 ThomasAssociates, PC 0 / / / /
10-0802 Reconstruction 0-015-009 03/24/11 DONE DONE DONE 02/07/11 02/03/07 06/15/10 10/01/09 7,15 1,121,307 1,945,000 HCM 0 0 189,501 Tetra Tech Architects & Engi 0 / / / /
11-0333 Reconstruction 0-015-010 05/29/12 DONE DONE DONE 11/02/11 10/26/11 04/15/11 02/17/11 2,9,155,16 1,181,455 0 HCM 0 0 0 Tetra Tech Architects & Engi 1,181,455 / / / /
11-1227 Reconstruction 0-015-011 12/10/12 DONE DONE DONE 04/26/12 04/25/12 03/20/12 12/12/06 16 85,000 0 HCM 0 0 12,750 Tetra Tech Architects & Engi 0 / / / /
Sounderling Sr High:
08-0981 Reconstruction 0-016-005 03/11/09 DONE DONE DONE 12/30/08 12/18/08 09/25/06 12/12/06 2,4,8,9,155,15,16 500,000 0 HCM 0 0 65,500 Tetra Tech Architects & Engi 0 / / / /
08-1315 Reconstruction 0-016-006 07/09/09 DONE DONE DONE 03/02/09 02/27/09 12/29/08 12/12/06 2,8,9,155,15,16 5,637,315 0 HCM 0 0 738,488 Tetra Tech Architects & Engi 0 / / / /
10-0039 Reconstruction 0-016-007 12/20/10 DONE DONE DONE 07/22/10 07/09/10 06/15/10 12/12/06 2,155,15,16 663,102 1,185,000 HCM 0 0 112,065 Tetra Tech Architects & Engi 0 / / / /
11-0334 Reconstruction 0-016-008 05/29/12 DONE DONE DONE 11/02/11 10/26/11 04/15/11 02/17/11 155,16 998,850 0 HCM 0 0 0 Tetra Tech Architects & Engi 998,850 / / / /
Hemlock Elem:
08-0982 Reconstruction 0-017-004 03/11/09 DONE DONE DONE 12/30/08 12/18/08 09/25/06 12/12/06 2,4,8,9,10,155,15,16 250,000 0 HCM 0 0 32,750 Tetra Tech Architects & Engi 0 / / / /
08-1316 Reconstruction 0-017-005 07/09/09 DONE DONE DONE 03/02/09 02/27/09 12/29/08 12/12/06 2,8,9,155,15,16 2,083,947 2,657,325 HCM 0 0 352,187 Tetra Tech Architects & Engi 0 / / / /
10-0803 Reconstruction 0-017-006 03/24/11 DONE DONE DONE 02/07/11 02/03/11 06/15/10 10/01/09 2,7 1,265,564 2,135,000 HCM 0 0 213,880 Tetra Tech Architects & Engi 0 / / / /
11-0338 Reconstruction 0-017-007 05/29/12 DONE DONE DONE 11/02/11 10/26/11 04/15/11 02/17/11 2,9,155,16 996,488 0 HCM 0 0 0 Tetra Tech Architects & Engi 996,488 / / / /
11-1228 Reconstruction 0-017-008 12/10/12 DONE DONE DONE 04/26/12 04/25/12 03/20/12 12/12/06 7,155,16 500,000 0 HCM 0 0 75,000 Tetra Tech Architects & Engi 0 / / / /
Laurel Park Elementary:
08-1317 Reconstruction 0-018-005 07/09/09 DONE DONE DONE 03/02/09 02/27/09 01/30/08 12/12/06 2,4,155,16 2,329,661 2,827,670 HCM 0 0 393,713 Tetra Tech Architects & Engi 0 / / / /
09-1312 Reconstruction 0-018-006 05/20/10 DONE DONE DONE 04/15/10 04/09/10 04/22/08 12/12/06 13 1,914,000 0 HCM 0 0 287,100 Tetra Tech Architects & Engi 0 / / / /
11-0335 Reconstruction 0-018-007 05/31/12 DONE DONE DONE 11/02/11 10/26/11 04/15/11 02/17/11 2,9,155,16 868,362 0 HCM 0 0 0 Tetra Tech Architects & Engi 868,362 / / / /
11-1229 Reconstruction 0-018-008 12/10/12 DONE DONE DONE 04/26/12 04/25/12 03/20/12 12/12/06 7,155,16 500,000 0 HCM 0 0 75,000 Tetra Tech Architects & Engi 0 / / / /
Twin Pines Elementary:
07-1271 Reconstruction 0-019-007 07/03/08 DONE DONE DONE 12/31/07 12/26/07 09/25/06 12/12/06 2,4,8,9,155,15,16 2,280,577 2,705,000 HCM 0 0 351,650 ThomasAssociates, PC 0 / / / /
11-0336 Reconstruction 0-019-008 05/29/12 DONE DONE DONE 11/02/11 10/26/11 04/15/11 02/17/11 2,9,155,16 912,019 912,019 HCM 0 0 0 Tetra Tech Architects & Engi 912,019 / / / /
11-1230 Reconstruction 0-019-009 12/10/12 DONE DONE DONE 04/26/12 04/25/12 03/20/12 12/12/06 7,155,16 550,000 0 HCM 0 0 82,500 Tetra Tech Architects & Engi 0 / / / /
East Middle School:
08-0983 Reconstruction 0-020-008 03/11/09 DONE DONE DONE 12/30/08 12/18/08 09/25/06 12/12/06 2,4,7,8,10,155,15,16 315,000 0 HCM 0 0 41,265 Tetra Tech Architects & Engi 0 / / / /
07-2146 Reconstruction 0-020-009 07/31/08 DONE DONE DONE 05/23/08 05/15/08 02/21/08 12/12/07 2,4,7 189,937 189,937 HCM 0 0 24,882 ThomasAssociates, PC 0 / / / /
08-1318 Reconstruction 0-020-010 07/09/09 DONE DONE DONE 03/02/09 02/27/09 02/27/09 12/12/06 2,8,155,15,16 5,105,310 0 HCM 0 0 668,796 Tetra Tech Architects & Engi 0 / / / /
09-1313 Reconstruction 0-020-011 05/20/10 DONE DONE DONE 04/15/10 04/09/10 03/03/10 12/12/06 7 1,938,554 0 HCM 0 0 290,783 Tetra Tech Architects & Engi 0 / / / /
11-0337 Reconstruction 0-020-012 05/29/12 DONE DONE DONE 11/02/11 10/26/11 04/15/11 02/17/11 2,9,155,16 1,789,974 0 HCM 0 0 0 Tetra Tech Architects & Engi 1,789,974 / / / /
11-1231 Reconstruction 0-020-013 12/10/12 DONE DONE DONE 04/26/12 04/25/12 03/20/12 12/12/06 155,16 135,000 0 HCM 0 0 20,250 Tetra Tech Architects & Engi 0 / / / /
Felicio Administration Bldg:
11-0339 Reconstruction 1-023-003 05/29/12 DONE DONE DONE 11/02/11 10/26/11 09/25/06 02/17/11 2,4,10,155,16 89,613 0 HCM 0 0 0 Tetra Tech Architects & Engi 89,613 / / / /
- Reconstruction 1-023-004 / / / / 04/15/11 / / 155 0 0 HCM 0 0 0 0 / / / /
Library Building:
12-1120 Reconstruction 6-021-009 UNREVIEWED 04/22/13 04/22/13 02/15/13 03/21/13 7,16 0 0 JMB 0 0 0 Beatty, Harvey & Associates 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Ralph G. Reed:
08-0071 Reconstruction 0-001-008 07/25/08 DONE DONE DONE 07/21/08 07/14/08 02/01/08 04/02/08 2,7,9,10,155 330,000 330,000 JOD 0 0 68,970 ThomasAssociates, PC 0 / / / /
08-0904 Reconstruction 0-001-009 04/22/09 DONE DONE DONE 12/15/08 12/10/08 07/15/08 04/02/08 7 457,000 521,750 JOD 0 0 95,970 ThomasAssociates, PC 0 / / / /
08-1143 Reconstruction 0-001-010 05/20/09 DONE DONE DONE 01/29/09 01/26/09 01/27/09 04/02/08 7,9,10,155,16 2,780,000 3,063,250 JOD 0 0 583,800 Tetra Tech Architects & Engi 0 / / / /
09-1536 Reconstruction 0-001-011 03/17/11 DONE DONE DONE 06/15/10 06/08/10 02/26/10 02/08/10 2,155,15,16 1,999,162 1,999,162 JOD 0 0 0 ECG Eninering, LLC 1,999,162 / / 04/15/13
- Reconstruction 0-001-012 / / / / 04/05/12 / / 2,9,10 0 0 JOD 0 0 0 0 / / / /
12-0726 Reconstruction 0-001-013 05/15/13 DONE DONE DONE 01/28/13 01/16/13 11/15/12 04/02/08 2,4,7,8,9,155,15,16 315,000 0 JMB 0 0 66,150 Tetra Tech Architects And Eni 0 / / / /
Alfano Elementary:
09-0710PR Reconstruction 0-002-008 UNREVIEWED 01/07/10 01/06/10 01/31/08 / / 2,4,8,9,10,13,14,155 0 0 JOD 0 0 0 Tetra Tech Architects & Engi 0 / / / /
09-1097 Reconstruction 0-002-008 08/16/10 DONE DONE DONE 03/18/10 03/10/10 01/31/08 05/12/08 2,4,8,9,10,13,14,155 9,018,500 8,246,333 JOD 0 0 3,494,430 Tetra Tech Architects & Engi 0 / / 08/31/12
09-1537 Reconstruction 0-002-009 03/17/11 DONE DONE DONE 06/15/10 06/08/10 02/26/10 02/08/10 2,8,15,16 992,694 992,694 JOD 0 0 0 ECG Eninering, LLC 992,694 / / 04/15/13
Marguerite L Mulvey Elem.:
08-1144 Reconstruction 0-003-011 05/20/09 DONE DONE DONE 01/29/09 01/26/09 02/01/08 04/02/08 2,4,10,155 809,000 816,865 JOD 0 0 169,890 Tetra Tech Architects & Engi 0 / / / /
09-1538 Reconstruction 0-003-012 03/17/11 DONE DONE DONE 06/15/10 06/08/10 02/26/10 02/08/10 2,155,15,16 974,529 974,529 JOD 0 0 0 ECG Eninering, LLC 974,529 / / 04/15/13
Cordello Ave. School:
08-0905 Reconstruction 0-004-008 04/22/09 DONE DONE DONE 12/15/08 12/10/08 02/01/08 04/02/08 9,10 272,000 365,570 JOD 0 0 57,120 ThomasAssociates, PC 0 / / / /
09-1539 Reconstruction 0-004-009 03/17/11 DONE DONE DONE 06/15/10 06/08/10 02/26/10 02/08/10 2,155,15,16 632,587 632,587 JOD 0 0 0 ECG Eninering, LLC 632,587 / / 04/15/13
Mulligan Elem. School:
08-1145 Reconstruction 0-005-009 05/20/09 DONE DONE DONE 01/29/09 01/26/09 02/01/08 04/02/08 2,8,9,10,16 910,000 910,000 JOD 0 0 191,100 Tetra Tech Architects & Engi 0 / / / /
09-1540 Reconstruction 0-005-010 03/17/11 DONE DONE DONE 06/15/10 06/08/10 02/26/10 02/08/10 2,155,15,16 1,580,515 1,580,515 JOD 0 0 0 ECG Eninering, LLC 1,580,515 / / 04/15/13
12-0727 Reconstruction 0-005-011 05/15/13 DONE DONE DONE 01/28/13 01/16/13 11/15/12 04/02/08 2,4,8,9,10,155,15,16 2,380,000 2,380,000 JMB 0 0 499,800 Tetra Tech Architects And Eni 0 / / / /
Francis O'Neil Elementary:
08-0906 Reconstruction 0-006-008 04/22/09 DONE DONE DONE 12/15/08 12/10/08 07/15/08 04/02/08 9,10 360,000 360,000 JOD 0 0 75,600 ThomasAssociates, PC 0 / / / /
09-1541 Reconstruction 0-006-009 03/17/11 DONE DONE DONE 06/15/10 06/08/10 02/26/10 02/08/10 2,155,15,16 801,091 801,091 JOD 0 0 0 ECG Eninering, LLC 801,091 / / 04/15/13
Andrew Morrow Elementary:
08-0907 Reconstruction 0-007-008 04/22/09 DONE DONE DONE 12/15/08 12/10/08 02/01/08 04/02/08 9,10,155 520,000 517,320 JOD 0 0 109,200 ThomasAssociates, PC 0 / / / /
09-1542 Reconstruction 0-007-009 03/17/11 DONE DONE DONE 06/15/10 06/08/10 02/26/10 02/08/10 2,155,15,16 1,229,095 1,229,095 JOD 0 0 0 ECG Eninering, LLC 1,229,095 / / 04/15/13
Senior High:
08-0908 Reconstruction 0-008-010 04/22/09 DONE DONE DONE 12/15/08 12/10/08 02/01/08 04/02/08 9,10 760,000 653,720 JOD 0 0 159,600 ThomasAssociates, PC 0 / / / /
08-1146 Reconstruction 0-008-011 05/20/09 DONE DONE DONE 01/29/09 01/26/09 02/01/08 04/02/08 8,10,155,15,16 309,000 494,500 JOD 0 0 64,890 Tetra Tech Architects & Engi 0 / / / /
- Reconstruction 0-008-012 / / / / 08/25/09 / / 2,16 0 0 JOD 0 0 0 0 / / / /
09-1543 Reconstruction 0-008-013 03/17/11 DONE DONE DONE 06/15/10 06/08/10 02/26/10 02/08/10 2,8,155,15,16 3,376,148 3,376,148 JOD 0 0 0 ECG Eninering, LLC 3,376,148 / / 04/15/13
Early Childhood @ Alfeno:
09-1544 Reconstruction 0-014-005 03/17/11 DONE DONE DONE 06/15/10 06/08/10 02/26/10 02/08/10 2,155,16 18,009 0 JOD 0 0 0 ECG Eninering, LLC 18,009 / / 04/15/13
Mulvey Annex:
09-1545 Reconstruction 2-010-002 03/17/11 DONE DONE DONE 06/15/10 06/08/10 02/26/10 02/08/10 2,155,16 86,780 0 JOD 0 0 0 ECG Eninering, LLC 86,780 / / 04/15/13
Storage Building @ Library:
07-1873 New Construction 2-018-001 08/20/08 DONE DONE DONE 03/29/08 03/20/08 05/22/07 01/22/08 02 - 16 680,000 0 JOD 0 0 0 Beatty, Harvey & Associates 0 / / / /
Central Islip Public Library:
07-1874 Reconstruction 6-011-003 08/20/08 DONE DONE DONE 03/29/08 03/20/08 05/22/07 01/22/08 2,4,8,9,10,155,15,16 1,020,000 0 JOD 0 0 0 Beatty, Harvey & Associates 0 / / / /
Districtwide:
- Reconstruction 7-999-002 / / / / 05/01/12 / / 155 0 0 JOD 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Woodhull School:
09-0585 Reconstruction 0-001-008 04/07/10 DONE DONE DONE 12/21/09 12/11/09 01/29/09 05/19/09 4,7,8,9 1,132,034 1,132,034 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
09-0288 Reconstruction 0-001-009 11/03/09 DONE DONE DONE 10/06/09 10/05/09 06/17/09 05/19/09 2,4,8 173,270 173,270 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
- Reconstruction 0-001-010 / / / / 01/06/12 / / 0 0 HCM 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Wading River School:
08-0457 Additions and Alterations 0-003-010 11/17/08 DONE DONE DONE 10/06/08 10/03/08 07/16/08 06/17/08 02 - 16 50,000 50,000 HCM 0 0 50,000 Burton Behrendt Smith 0 / / / /
- Reconstruction 0-003-011 / / / / 03/30/11 / / 9,10,155,15 0 4,927,750 HCM 0 0 0 0 / / / /
11-0489 Reconstruction 0-003-012 02/17/12 DONE DONE DONE 12/13/11 12/08/11 08/19/11 05/17/11 13,15,16 160,000 160,000 HCM 0 0 0 Burton Behrendt Smith 0 / / 05/30/13
12-0857 Reconstruction 0-003-013 05/09/13 DONE DONE DONE 02/15/13 02/14/13 / / 10/02/12 16 174,475 174,475 JMB 0 0 0 Burton Behrendt Smith 0 / / / /
Briarcliff Elementary:
09-0679 Reconstruction 0-004-011 02/23/10 DONE DONE DONE 01/05/10 12/30/09 03/24/09 10/14/09 8,155 404,437 404,437 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
10-1246 Reconstruction 0-004-012 05/11/11 DONE DONE DONE 05/06/11 05/02/11 03/02/11 03/11/11 10 795,000 795,000 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
- Reconstruction 0-004-013 / / / / 04/14/11 / / 2,7,155,15,16 0 0 HCM 0 0 0 0 / / / /
- Reconstruction 0-004-014 / / / / 06/07/11 / / 10,15,16 0 0 HCM 0 0 0 0 / / / /
11-0490 Reconstruction 0-004-015 02/17/12 DONE DONE DONE 12/13/11 12/08/11 08/19/11 05/17/11 13,15,16 191,144 191,144 HCM 0 0 0 Burton Behrendt Smith 0 / / 05/30/13
12-0858 Reconstruction 0-004-016 05/09/13 DONE DONE DONE 02/15/13 02/14/13 11/13/12 10/02/12 16 124,975 124,975 JMB 0 0 0 Burton Behrendt Smith 0 / / / /
12-1097 Reconstruction 0-004-017 04/26/13 DONE DONE DONE 04/12/13 04/12/13 03/08/13 05/15/12 7 228,487 228,487 JMB 0 0 0 Burton Behrendt Smith 0 / / / /
Albert Prodell Middle School:
09-0680 Reconstruction 0-005-011 02/23/10 DONE DONE DONE 01/05/10 12/30/09 03/24/09 10/14/09 8,9,155,15,16 2,667,213 2,667,213 HCM 0 0 371,651 Burton Behrendt Smith 0 / / / /
12-0859 Reconstruction 0-005-012 05/09/13 DONE DONE DONE 02/15/13 02/14/13 11/13/12 10/02/12 16 296,250 296,250 JMB 0 0 0 Burton Behrendt Smith 0 / / / /
Miller Avenue School:
08-0458 Additions and Alterations 0-006-009 11/17/08 DONE DONE DONE 10/06/08 10/02/08 07/16/08 06/17/08 02 - 16 50,000 50,000 HCM 0 0 50,000 Burton Behrendt Smith 0 / / / /
- Reconstruction 0-006-010 / / / / 03/30/11 / / 10,15,16 0 0 HCM 0 0 0 0 / / / /
11-0491 Reconstruction 0-006-011 02/17/12 DONE DONE DONE 12/13/11 12/08/11 08/19/11 05/17/11 13,15,16 190,000 190,000 HCM 0 0 0 Burton Behrendt Smith 0 / / 05/30/13
12-0860 Reconstruction 0-006-012 05/09/13 DONE DONE DONE 02/15/13 02/14/13 11/13/12 10/02/12 16 149,375 149,375 JMB 0 0 0 Burton Behrendt Smith 0 / / / /
High School/Public Library:
- Reconstruction 0-007-016 / / / / 04/09/09 / / 9,10,15,16 0 98,555 HCM 0 0 0 0 / / / /
- Reconstruction 0-007-017 / / / / 06/10/09 / / 2,10,155,15,16 0 98,555 HCM 0 0 0 0 / / / /
- Reconstruction 0-007-018 / / / / 03/30/11 / / 10,15,16 0 98,555 HCM 0 0 0 0 / / / /
12-1098 Reconstruction 0-007-019 04/26/13 DONE DONE DONE 04/12/13 04/12/13 03/08/13 05/15/12 7 451,502 451,502 JMB 0 0 0 Burton Behrendt Smith 0 / / / /
11-0492 Reconstruction 0-007-020 02/17/12 DONE DONE DONE 12/13/11 12/08/11 08/19/11 05/17/11 13,15,16 350,000 350,000 HCM 0 0 0 Burton Behrendt Smith 0 / / 05/30/13
12-0861 Reconstruction 0-007-021 05/09/13 DONE DONE DONE 02/15/13 02/14/13 11/13/12 10/02/12 2,10,16 729,625 729,625 JMB 0 0 0 Burton Behrendt Smith 0 / / / /
Container 1 @ Wading River ES:
12-0265DB Discovered Building 2-047-001 02/06/13 DONE DONE DONE / / / / 10/11/12 / / 0 0 JMB 0 0 0 0 / / / /
Container 2 @ Wading River ES:
12-0266DB Discovered Building 2-048-001 02/05/13 DONE DONE DONE / / / / 10/11/12 / / 0 0 JMB 0 0 0 0 / / / /
Press Box:
12-0075 New Construction 7-046-001 10/03/12 DONE DONE DONE 08/02/12 07/23/12 02/15/12 02/14/12 02 - 16 60,000 0 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
Concession Stand:
12-0981 New Construction 7-049-001 DONE STARTED UNREVIEWED03/18/13 03/15/13 11/16/12 06/19/12 02 - 16 0 0 JMB 0 0 0 Burton Behrendt Smith 0 / / / /
District wide:
08-0676 Reconstruction 7-999-003 03/24/09 DONE DONE DONE 11/05/08 11/03/08 07/17/08 06/17/08 10,13,16 600,000 600,000 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Phillips Avenue School:
07-2286 Reconstruction 0-001-012 12/09/08 DONE DONE DONE 07/01/08 06/13/08 04/05/07 02/06/07 10,15,16 267,785 267,785 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
09-1593 Reconstruction 0-001-013 07/02/12 DONE DONE DONE 07/06/10 06/23/10 11/20/09 07/08/09 10,155,15,16 1,555,576 0 HCM 0 0 0 Burton Behrendt Smith 1,555,576 / / / /
10-0584 Reconstruction 0-001-014 03/31/11 DONE DONE DONE 12/15/10 12/13/10 11/04/10 02/06/07 10,155,15,16 64,735 64,735 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
- PR Additions and Alterations 0-001-015 / / / / 10/26/11 / / 02 - 16 0 6,415,200 HCM 0 0 0 0 / / / /
11-0889 Additions and Alterations 0-001-015 07/03/12 DONE DONE DONE 03/06/12 03/05/12 10/26/11 10/11/11 02 - 16 4,025,891 4,025,891 HCM 0 0 0 Burton Behrendt Smith 0 / / 03/08/13
Roanoke Avenue Elementary:
09-1594 Reconstruction 0-003-012 07/02/12 DONE DONE DONE 07/06/10 06/23/10 04/05/07 07/08/09 10,15,16 271,437 0 HCM 0 0 0 Burton Behrendt Smith 271,437 / / / /
10-0833 Reconstruction 0-003-013 07/20/11 DONE DONE DONE 02/08/11 02/08/11 06/10/10 02/07/08 4,7,14,16 565,000 565,000 HCM 0 0 0 Burton Behrendt Smith 0 / / 08/16/11
- PR Additions and Alterations 0-003-014 / / / / 10/26/11 / / 02 - 16 0 0 HCM 0 0 0 0 / / / /
Pulaski Street Elementary:
07-2287 Reconstruction 0-004-014 12/09/08 DONE DONE DONE 07/01/08 06/13/08 04/05/07 02/06/07 2,8,10,15,16 339,012 339,012 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
09-1595 Reconstruction 0-004-015 07/02/12 DONE DONE DONE 07/06/10 06/23/10 03/17/08 07/08/09 7 521,376 0 HCM 0 0 0 Burton Behrendt Smith 521,376 / / / /
- Reconstruction 0-004-016 / / / / 04/09/09 / / 8 0 0 HCM 0 0 0 0 / / / /
- PR Additions and Alterations 0-004-017 / / / / 10/26/11 / / 02 - 16 0 0 HCM 0 0 0 0 / / / /
Aquebogue Elementary:
07-2288 Reconstruction 0-005-012 12/09/08 DONE DONE DONE 07/01/08 06/13/08 04/05/07 02/06/07 2,10,15,16 40,831 40,831 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
08-0113 Reconstruction 0-005-013 11/06/08 DONE DONE DONE 08/04/08 07/30/08 02/05/08 12/12/06 10,155 165,432 165,432 HCM 0 0 0 Burton Behrendt Smith 0 / / 05/09/11
09-1596 Reconstruction 0-005-014 07/02/12 DONE DONE DONE 07/06/10 06/23/10 11/25/09 07/08/09 2,7,8,10,155,15,16 429,340 0 HCM 0 0 0 Burton Behrendt Smith 429,340 / / / /
11-1067 Additions and Alterations 0-005-015 08/17/12 DONE DONE DONE 04/05/12 04/03/12 10/26/11 10/11/11 02 - 16 3,807,996 0 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
Relocatable Aquebog:
- Reconstruction 0-006-003 / / / / 04/02/10 / / 2,7,8,10,155,15,16 0 0 HCM 0 0 0 0 / / / /
Pulaski St. Music Annex:
09-1597 Reconstruction 0-008-002 07/02/12 DONE DONE DONE 07/06/10 06/23/10 03/31/10 07/08/09 2,7,8,10,155,15,16 4,001 0 HCM 0 0 0 Burton Behrendt Smith 4,001 / / / /
Riley Ave. Elementary:
09-1598 Reconstruction 0-009-011 07/02/12 DONE DONE DONE 07/06/10 06/23/10 06/08/05 07/08/09 8,9,16 1,612,799 1,612,799 HCM 0 0 0 Burton Behrendt Smith 1,612,799 / / / /
07-2289 Reconstruction 0-009-013 12/09/08 DONE DONE DONE 07/01/08 06/13/08 04/05/07 02/06/07 10,15,16 221,396 221,396 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
10-0355 Reconstruction 0-009-014 03/31/11 DONE DONE DONE 10/13/10 10/06/10 11/23/09 02/06/07 10,155,15,16 161,838 161,838 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
- PR Additions and Alterations 0-009-015 / / / / 10/26/11 / / 02 - 16 0 0 HCM 0 0 0 0 / / / /
11-1252 Additions and Alterations 0-009-015 10/09/12 DONE DONE DONE 05/01/12 04/30/12 10/26/11 10/11/11 02 - 16 5,667,830 4,761,156 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
Middle School:
09-1599 Reconstruction 0-010-011 07/02/12 DONE DONE DONE 07/06/10 06/23/10 06/08/05 07/08/09 155 887,583 0 HCM 0 0 0 Burton Behrendt Smith 887,583 / / / /
07-2290 Reconstruction 0-010-014 12/09/08 DONE DONE DONE 07/01/08 06/13/08 04/05/07 02/06/07 2,4,8,10,14,15,16 380,524 380,524 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
10-0733 Reconstruction 0-010-015 12/09/11 DONE DONE DONE 01/25/11 01/12/11 11/20/09 02/06/07 4,8,13,155,16 2,200,770 2,200,770 HCM 0 0 0 Burton Behrendt Smith 0 / / 10/03/12
09-1038 Reconstruction 0-010-016 04/13/10 DONE DONE DONE 03/09/10 03/05/10 11/20/09 02/06/07 10 173,347 173,347 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
10-0356 Reconstruction 0-010-017 03/31/11 DONE DONE DONE 10/13/10 10/06/10 11/23/09 02/06/07 10,155,15,16 122,997 122,997 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
- PR Additions and Alterations 0-010-018 / / / / 10/26/11 / / 02 - 16 0 0 HCM 0 0 0 0 / / / /
Riverhead Senior High:
09-1600 Reconstruction 0-012-016 07/02/12 DONE DONE DONE 07/06/10 06/23/10 06/08/05 07/08/09 10 1,730,587 0 HCM 0 0 0 Burton Behrendt Smith 1,730,587 / / / /
07-2291 Reconstruction 0-012-019 12/09/08 DONE DONE DONE 07/01/08 06/13/08 04/05/07 02/06/07 10,155,15,16 712,618 712,618 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
10-0357 Reconstruction 0-012-020 03/31/11 DONE DONE DONE 10/13/10 10/06/10 11/23/09 02/06/07 10,155,15,16 226,573 226,573 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
12-0111 Additions and Alterations 0-012-021 06/05/13 DONE DONE DONE 08/15/12 08/03/12 10/26/11 10/11/11 02 - 16 32,572,521 0 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
Temp Classroom:
- Reconstruction 0-013-002 / / / / 03/31/10 / / 2,7,8,10,155,15,16 0 0 HCM 0 0 0 0 / / / /
Phillips Ave Portables (2):
09-1601 Reconstruction 0-035-003 07/02/12 DONE DONE DONE 07/06/10 06/23/10 03/31/10 07/08/09 2,7,8,10,155,15,16 7,575 0 HCM 0 0 0 Burton Behrendt Smith 7,575 / / / /
Phillips Avenue Portable:
- Reconstruction 0-036-002 / / / / 04/01/10 / / 2,7,8,10,155,15,16 0 0 HCM 0 0 0 0 / / / /
Roanoke School Portable:
09-1602 Reconstruction 0-038-002 07/02/12 DONE DONE DONE 07/06/10 06/23/10 04/01/10 07/08/09 2,8,10,155,15,16 5,170 0 HCM 0 0 0 Burton Behrendt Smith 5,170 / / / /
Middle School Portable:
09-1603 Reconstruction 0-039-002 07/02/12 DONE DONE DONE 07/06/10 07/08/09 04/01/10 07/08/09 2,7,8,10,155,15,16 16,385 0 HCM 0 0 0 Burton Behrendt Smith 16,385 / / / /
Portable A @ Riverhead High:
09-1604 Reconstruction 0-043-002 07/02/12 DONE DONE DONE 07/06/10 06/23/10 04/01/10 07/08/09 2,7,8,10,155,15,16 12,397 0 HCM 0 0 0 Burton Behrendt Smith 12,397 / / / /
Portable B @ Riverhead High:
09-1605 Reconstruction 0-044-002 07/02/12 DONE DONE DONE 07/06/10 06/23/10 04/01/10 07/08/09 2,7,8,10,155,15,16 6,485 0 HCM 0 0 0 Burton Behrendt Smith 6,485 / / / /
Portable C @ Riverhead High:
- Reconstruction 0-045-002 / / / / 04/01/10 / / 2,7,8,10,155,15,16 0 0 HCM 0 0 0 0 / / / /
4 Double Units @ Riverhead HS:
- Reconstruction 0-047-002 / / / / 04/01/10 / / 2,7,8,10,155,15,16 0 0 HCM 0 0 0 0 / / / /
Administration Bldg:
09-1606 Additions and Alterations 1-002-002 07/02/12 DONE DONE DONE 07/06/10 06/23/10 05/03/07 07/08/09 02 - 16 24,368 0 HCM 0 0 0 Burton Behrendt Smith 24,368 / / / /
Maintenance Shop/Bus Garage:
08-0992 Reconstruction 5-011-002 03/16/09 DONE DONE DONE 01/02/09 12/19/08 02/05/08 05/20/08 10,155 375,000 375,000 HCM 0 0 0 Burton Behrendt Smith 0 / / 05/09/11
09-1607 Reconstruction 5-011-003 07/02/12 DONE DONE DONE 07/06/10 06/23/10 11/25/09 07/08/09 2,7,8,10,155,15,16 43,057 0 HCM 0 0 0 Burton Behrendt Smith 43,057 / / / /
Radio Booth:
- Additions and Alterations 7-022-001 / / / / 10/26/11 / / 02 - 16 0 0 HCM 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Respite Infirmory:
09-0724TQ Temporary Quarters 8-004-001 01/20/10 DONE DONE DONE 01/12/10 01/12/10 01/11/10 / / 0 0 DDJ 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Shelter Island School:
08-0423 Reconstruction 0-001-019 11/20/08 DONE DONE DONE 09/29/08 09/26/08 03/25/08 05/20/08 2,9,155,15,16 97,446 97,446 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
08-1403 Reconstruction 0-001-020 04/20/09 DONE DONE DONE 03/19/09 03/16/09 01/09/09 05/20/08 2,9 88,500 88,500 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
08-1402 Reconstruction 0-001-021 04/20/09 DONE DONE DONE 03/19/09 03/16/09 01/09/09 05/20/08 9,16 264,054 264,054 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
09-0550 Reconstruction 0-001-022 12/31/09 DONE DONE DONE 12/07/09 12/03/09 07/22/09 05/01/09 2,4,7,15,16 925,000 925,000 DDJ 0 0 0 Mosaic Associates 0 / / / /
11-0671 Reconstruction 0-001-023 05/09/12 DONE DONE DONE 01/17/12 01/13/12 06/14/11 05/17/11 2,4,8,9,10,155,15,16 2,837,000 0 DDJ 0 0 0 Mosaic Associates 0 / / / /
St. Gabriel's Retreat:
09-1577XX New Construction 8-002-001 CANCELLED 07/02/10 06/30/10 / / / / 02 - 16 0 0 DDJ 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Nesconset Elementary School:
05-0845 Reconstruction 0-001-019 06/20/08 DONE DONE DONE 03/01/06 02/28/06 05/26/05 06/14/05 4,8,155,16 70,230 70,230 DDJ 0 0 0 McClave Engineering 70,230 / / / /
08-1234 Reconstruction 0-001-020 05/05/09 DONE DONE DONE 02/19/09 02/11/09 08/14/08 05/15/08 2,9,155,16 182,420 182,420 DDJ 0 0 76,069 H2M Group 0 / / / /
12-0420 Reconstruction 0-001-021 ADDENDUM REQ'D 11/14/12 11/08/12 05/31/12 09/28/12 7,8,9,155,15,16 0 0 DDJ 0 0 0 H2M Group 0 / / / /
Smithtown Elementary:
05-0846 Reconstruction 0-006-021 06/20/08 DONE DONE DONE 03/01/06 02/28/06 05/26/05 06/14/05 4,8,155,16 201,331 201,331 DDJ 0 0 0 McClave Engineering 201,331 / / / /
08-0431 Reconstruction 0-006-022 02/11/09 DONE DONE DONE 10/02/08 09/30/08 05/14/08 10/08/02 9,10,155,15,16 293,094 293,094 DDJ 0 0 0 Tagi A. Gargizu 0 / / / /
St. James Elementary:
05-0847 Reconstruction 0-016-019 06/20/08 DONE DONE DONE 03/01/06 02/28/06 05/26/05 06/14/05 4,8,155,16 207,257 207,257 DDJ 0 0 0 McClave Engineering 207,257 / / / /
08-1140 Reconstruction 0-016-020 03/18/09 DONE DONE DONE 01/28/09 01/26/09 08/14/08 05/15/08 9,155,16 134,439 134,439 DDJ 0 0 56,061 H2M Group 0 / / / /
10-0224 Reconstruction 0-016-021 01/24/11 DONE DONE DONE 09/17/10 09/15/10 04/16/10 06/15/00 13,16 15,825 15,825 DDJ 0 0 0 H2M Group 0 / / 09/26/12
Smithtown Middle School (H.S. East):
05-0848 Reconstruction 0-023-022 06/20/08 DONE DONE DONE 03/01/06 02/28/06 05/26/05 06/14/05 8,155,16 408,001 408,001 DDJ 0 0 0 McClave Engineering 408,001 / / / /
07-2086 Reconstruction 0-023-023 10/24/08 DONE DONE DONE 05/05/08 05/02/08 02/22/08 03/03/07 10 430,730 430,730 DDJ 0 0 0 H2M Group 0 / / / /
08-0376XX Reconstruction 0-023-024 CANCELLED 09/23/08 09/22/08 08/18/08 08/01/08 2,4,7,9 0 46,853,316 DDJ 0 0 0 H2M Group 0 / / / /
08-1321 Reconstruction 0-023-025 03/31/10 DONE DONE DONE 03/03/09 02/27/09 09/29/08 03/03/07 2,4,7,8,9,10,155,15, 2,578,500 2,578,500 DDJ 0 0 0 H2M Group 0 / / / /
08-1414 Reconstruction 0-023-026 05/19/09 DONE DONE DONE 03/23/09 03/19/09 09/29/08 03/03/07 2,7,9,10 2,168,201 2,168,201 DDJ 0 0 904,140 H2M Group 0 / / / /
12-0823 Reconstruction 0-023-027 02/22/13 DONE DONE DONE 02/12/13 02/12/13 12/19/12 04/17/08 2,7 1,172,920 0 DDJ 0 0 444,071 John A Grillo-ARCHITECTS PC 0 / / / /
10-0225 Reconstruction 0-023-028 01/24/11 DONE DONE DONE 09/17/10 09/15/10 04/16/10 06/15/00 13,16 42,200 42,200 DDJ 0 0 0 H2M Group 0 / / 09/26/12
10-1399 Reconstruction 0-023-029 03/11/13 DONE DONE DONE 06/17/11 06/13/11 05/19/11 03/03/07 2,4,7,8,9,10,13,155, 1,503,375 0 DDJ 0 0 626,907 H2M Group 0 / / / /
12-1096 Reconstruction 0-023-030 04/22/13 DONE DONE DONE 04/12/13 04/12/13 03/13/13 05/15/07 2 580,525 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Dogwood Elementary School:
05-0849 Reconstruction 0-024-015 06/20/08 DONE DONE DONE 03/01/06 02/28/06 05/26/05 06/14/05 4,8,155,16 207,800 207,800 DDJ 0 0 0 McClave Engineering 207,800 / / / /
08-0751 Reconstruction 0-024-016 04/02/09 DONE DONE DONE 11/12/08 11/10/08 07/16/08 05/15/07 2,13,15,16 350,680 350,680 DDJ 0 0 146,234 H2M Group 0 / / / /
Mt. Pleasant Elementary:
05-0850 Reconstruction 0-025-017 06/20/08 DONE DONE DONE 03/01/06 02/28/06 05/26/05 06/14/05 4,8,155,16 211,252 211,252 DDJ 0 0 0 McClave Engineering 211,252 / / / /
08-0769 Reconstruction 0-025-018 04/02/09 DONE DONE DONE 11/20/08 11/19/08 07/16/08 05/15/07 2,13,15,16 371,026 371,026 DDJ 0 0 154,718 H2M Group 0 / / / /
Great Hollow Jr. High:
05-0851 Reconstruction 0-027-014 06/20/08 DONE DONE DONE 03/01/06 02/28/06 05/26/05 06/14/05 8,155,16 185,161 185,161 DDJ 0 0 0 McClave Engineering 185,161 / / / /
09-0906 Reconstruction 0-027-016 02/25/10 DONE DONE DONE 02/18/10 02/11/10 12/31/09 04/17/07 2,9 132,944 132,944 DDJ 0 0 0 H2M Group 0 / / / /
10-0226 Reconstruction 0-027-017 01/24/11 DONE DONE DONE 09/17/10 09/15/10 04/16/10 06/15/00 15,16 226,825 226,825 DDJ 0 0 0 H2M Group 0 / / 09/26/12
12-0824 Reconstruction 0-027-018 02/22/13 DONE DONE DONE 02/12/13 02/12/13 12/19/12 05/15/00 7 1,684,450 0 DDJ 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Mills Pond Elementary:
05-0852 Reconstruction 0-028-007 06/20/08 DONE DONE DONE 03/01/06 02/28/06 05/26/05 06/14/05 4,8,155,16 206,812 206,812 DDJ 0 0 0 McClave Engineering 206,812 / / / /
08-1133 Reconstruction 0-028-008 06/02/09 DONE DONE DONE 01/27/09 01/26/09 08/14/08 05/15/08 8,155,15,16 1,395,500 1,395,500 DDJ 0 0 581,923 H2M Group 0 / / / /
Accompsett Elementary:
05-0853 Reconstruction 0-029-018 06/20/08 DONE DONE DONE 03/01/06 02/28/06 05/26/05 06/14/05 4,8,155,16 222,624 222,624 DDJ 0 0 0 McClave Engineering 222,624 / / / /
07-2044 Reconstruction 0-029-019 08/14/08 DONE DONE DONE 05/01/08 04/24/08 / / 05/15/07 35,225 35,225 DDJ 0 0 0 H2M Group 0 / / / /
08-1127 Reconstruction 0-029-021 03/10/09 DONE DONE DONE 01/26/09 01/22/09 11/14/08 05/15/08 7 910,000 910,000 DDJ 0 0 379,470 H2M Group 0 / / / /
Branch Brook Elementary:
05-0854 Reconstruction 0-030-016 06/20/08 DONE DONE DONE 03/01/06 02/28/06 05/26/05 06/14/05 4,8,155,16 206,848 206,848 DDJ 0 0 0 McClave Engineering 206,848 / / / /
08-0754 Reconstruction 0-030-019 04/16/09 DONE DONE DONE 11/12/08 11/12/08 07/16/08 05/15/07 2,13,15,16 333,644 333,644 DDJ 0 0 139,130 H2M Group 0 / / / /
Tackan Elementary School:
05-0855 Reconstruction 0-031-016 06/20/08 DONE DONE DONE 03/01/06 02/28/06 05/26/05 06/14/05 4,8,155,16 190,988 190,988 DDJ 0 0 0 McClave Engineering 190,988 / / / /
09-0651 Reconstruction 0-031-017 04/06/10 DONE DONE DONE 12/30/09 12/23/09 01/09/09 05/15/08 2,4 400,000 400,000 DDJ 0 0 0 H2M Group 0 / / / /
Nesaquake Intermediate:
05-0856 Reconstruction 0-033-012 06/20/08 DONE DONE DONE 03/01/06 02/28/06 05/24/05 06/14/05 8,155,16 1,116,015 1,116,015 DDJ 0 0 0 McClave Engineering 1,116,015 / / / /
10-0227 Reconstruction 0-033-014 01/24/11 DONE DONE DONE 09/17/10 09/15/10 04/16/10 06/15/00 13,16 226,825 226,825 DDJ 0 0 0 H2M Group 0 / / 09/26/12
Smithtown 9th Grade Annex:
05-0857 Reconstruction 0-034-023 06/20/08 DONE DONE DONE 03/01/06 02/28/06 05/26/05 06/14/05 8,155,16 194,512 194,512 DDJ 0 0 0 McClave Engineering 194,512 / / / /
08-1022 Reconstruction 0-034-025 06/18/09 DONE DONE DONE 01/05/09 12/30/08 09/16/08 05/15/07 2,9,10 432,280 432,280 DDJ 0 0 0 H2M Group 0 / / 01/19/12
10-0228 Reconstruction 0-034-026 01/24/11 DONE DONE DONE 09/17/10 09/15/10 04/16/10 06/15/00 13,16 211,000 211,000 DDJ 0 0 0 H2M Group 0 / / 09/26/12
Smithtown H.S. West:
05-0858 Reconstruction 0-038-018 06/20/08 DONE DONE DONE 03/01/06 02/28/06 05/26/05 06/14/05 8,155,16 650,563 650,563 DDJ 0 0 0 McClave Engineering 650,563 / / / /
07-2080 Reconstruction 0-038-019 09/24/08 DONE DONE DONE 05/05/08 04/30/08 02/22/08 05/15/07 10 128,400 128,400 DDJ 0 0 0 H2M Group 0 / / / /
08-1474 Reconstruction 0-038-020 08/31/09 DONE DONE DONE 04/09/09 04/07/09 03/17/08 05/15/07 2,4,9,155,15,16 208,271 208,271 DDJ 0 0 0 H2M Group 0 / / / /
08-1076 Reconstruction 0-038-021 08/07/09 DONE DONE DONE 01/09/09 01/09/09 07/16/08 05/15/07 2,7,9,155,15,16 2,240,250 2,240,250 DDJ 0 0 0 H2M Group 0 / / / /
10-0229 Reconstruction 0-038-022 01/24/11 DONE DONE DONE 09/17/10 09/15/10 04/16/10 06/15/00 13,16 221,550 221,550 DDJ 0 0 0 H2M Group 0 / / 09/26/12
09-1573 Reconstruction 0-038-023 07/28/10 DONE DONE DONE 07/02/10 06/21/10 06/18/10 05/25/10 15 645,000 0 DDJ 0 0 0 H2M Group 0 / / / /
10-0106 Reconstruction 0-038-024 12/08/10 DONE DONE DONE 08/11/10 07/30/10 06/18/10 09/12/00 2,16 149,800 149,800 DDJ 0 0 0 H2M Group 0 / / / /
J. Barton Admin./Ahern Annex:
05-0859 Reconstruction 1-008-013 06/20/08 DONE DONE DONE 03/01/06 02/28/06 05/26/05 06/14/05 8,155,16 206,660 0 DDJ 0 0 0 McClave Engineering 206,660 / / / /
10-0230 Reconstruction 1-008-014 01/24/11 DONE DONE DONE 09/17/10 09/15/10 04/16/10 06/15/00 13,16 33,760 0 DDJ 0 0 0 H2M Group 0 / / 09/26/12
Transportation Admin.:
07-0592 Reconstruction 1-009-003 06/24/08 DONE DONE DONE 10/19/07 10/18/07 01/28/03 10/24/06 2,9 130,704 0 DDJ 0 0 0 Tagi A. Gargizu 0 / / / /
District Storage:
08-1104DB Discovered Building 2-073-002 09/16/09 DONE DONE DONE 01/21/09 01/15/09 07/16/08 / / 2,13 0 0 DDJ 0 0 0 H2M Group 0 / / / /
Storage Container @ Branch Brook:
08-1190DB Discovered Building 2-077-001 09/16/09 DONE DONE DONE 02/10/09 02/04/09 01/29/09 / / 0 0 DDJ 0 0 0 H2M Group 0 / / / /
Storage Container @ Accompsett:
08-1191DB Discovered Building 2-078-001 09/16/09 DONE DONE DONE 02/10/09 02/04/09 01/30/09 / / 0 0 DDJ 0 0 0 H2M Group 0 / / / /
Storage Building @ High School East:
10-1179DB Discovered Building 2-079-001 06/14/11 DONE DONE DONE 04/12/11 04/08/11 04/02/10 / / 0 0 DDJ 0 0 0 H2M Group 0 / / / /
Storage Building @ DogwoodElementary:
10-1180DB Discovered Building 2-080-001 06/14/11 DONE DONE DONE 04/12/11 04/08/11 04/02/10 / / 0 0 DDJ 0 0 0 H2M Group 0 / / / /
Storage FDR Kickers:
10-0045DB Discovered Building 2-081-001 08/12/10 DONE DONE DONE 07/27/10 07/27/10 07/23/10 / / 0 0 DDJ 0 0 0 Petracca Design & Engineering 0 / / / /
New Maintenance Building:
12-0280 New Construction 3-082-001 DONE ADD. REQ'D STARTED 10/15/12 10/15/12 12/13/11 09/28/12 02 - 16 0 0 DDJ 0 0 0 H2M Group 0 / / / /
TRANSPORTATION BUS GARAGE:
07-0994 New Construction 5-076-001 06/24/08 DONE DONE DONE 11/30/07 11/28/07 11/15/07 10/24/06 02 - 16 619,129 0 DDJ 0 0 0 Tagi A. Gargizu 0 / / / /
Commissary Warehouse:
08-1156 Reconstruction 7-022-005 03/18/09 DONE DONE DONE 02/02/09 01/28/09 11/06/08 05/15/08 13,16 250,000 0 DDJ 0 0 0 H2M Group 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
RJO Intermediate:
08-0775 Reconstruction 0-002-015 04/20/09 DONE DONE DONE 11/21/08 11/20/08 11/20/07 04/15/08 155 62,500 62,500 HCM 0 0 18,750 H2M Group 0 / / / /
08-0776 Reconstruction 0-002-016 04/20/09 DONE DONE DONE 11/21/08 11/20/08 11/20/07 04/15/08 155,15,16 351,000 351,000 HCM 0 0 115,830 H2M Group 0 / / / /
10-1291 Additions and Alterations 0-002-017 07/11/11 DONE DONE DONE 05/12/11 05/06/11 04/14/11 05/17/11 02 - 16 1,008,341 1,008,341 HCM 0 0 0 H2M Group 0 / / / /
12-0239 Reconstruction 0-002-018 ADDENDUM REQ'D 10/03/12 09/24/12 06/29/12 05/08/12 155,15,16 0 0 HCM 0 0 0 H2M Group 0 / / / /
Kings Park High:
08-0777 Reconstruction 0-004-023 04/20/09 DONE DONE DONE 11/21/08 11/20/08 11/20/07 04/15/08 155 62,500 62,500 HCM 0 0 18,750 H2M Group 0 / / / /
08-0778 Reconstruction 0-004-024 04/20/09 DONE DONE DONE 11/21/08 11/20/08 11/20/07 04/15/08 10 135,001 135,001 HCM 0 0 44,550 H2M Group 0 / / / /
- Reconstruction 0-004-025 / / / / 07/07/10 / / 2,13 0 0 HCM 0 0 0 0 / / / /
12-0240 Reconstruction 0-004-026 ADDENDUM REQ'D 10/03/12 09/24/12 06/29/12 05/08/12 155,15,16 0 0 HCM 0 0 0 H2M Group 0 / / / /
Parkview Elementary:
08-0779 Reconstruction 0-005-017 04/20/09 DONE DONE DONE 11/21/08 11/20/08 11/20/07 04/15/08 155 31,250 31,250 HCM 0 0 10,312 H2M Group 0 / / / /
08-0780 Reconstruction 0-005-018 04/20/09 DONE DONE DONE 11/21/08 11/20/08 11/20/07 04/15/08 2,4,8,10 1,355,448 1,355,448 HCM 0 0 447,298 H2M Group 0 / / / /
12-0241 Reconstruction 0-005-019 ADDENDUM REQ'D 10/03/12 09/24/12 06/29/12 05/08/12 155,15,16 0 0 HCM 0 0 0 H2M Group 0 / / / /
- Reconstruction 0-005-020 / / / / 02/21/13 / / 4,7 0 0 JMB 0 0 0 0 / / / /
Fort Salonga Elementary:
08-0781 Reconstruction 0-006-019 04/20/09 DONE DONE DONE 11/21/08 11/20/08 11/20/07 04/15/08 155 31,250 31,250 HCM 0 0 10,312 H2M Group 0 / / / /
08-0782 Reconstruction 0-006-020 04/20/09 DONE DONE DONE 11/21/08 11/20/08 11/20/07 04/15/08 2,4,8,10 1,355,448 1,355,448 HCM 0 0 447,298 H2M Group 0 / / / /
12-0242 Reconstruction 0-006-021 ADDENDUM REQ'D 10/03/12 09/24/12 06/29/12 05/08/12 155,15,16 0 0 HCM 0 0 0 H2M Group 0 / / / /
W.T.Rogers Middle School:
08-0783 Reconstruction 0-008-019 04/20/09 DONE DONE DONE 11/21/08 11/20/08 11/20/07 04/15/08 155 62,500 62,500 HCM 0 0 18,750 H2M Group 0 / / / /
08-0784 Reconstruction 0-008-020 04/20/09 DONE DONE DONE 11/21/08 11/20/08 11/20/07 04/15/08 10 90,000 90,000 HCM 0 0 30,000 H2M Group 0 / / / /
12-0243 Reconstruction 0-008-021 ADDENDUM REQ'D 10/03/12 09/24/12 06/29/12 05/08/12 155,15,16 0 0 HCM 0 0 0 H2M Group 0 / / / /
San Remo School:
12-0244 Reconstruction 0-009-008 ADDENDUM REQ'D 10/03/12 09/24/12 06/29/12 05/08/12 155,15,16 0 0 HCM 0 0 0 H2M Group 0 / / / /
Press Box:
12-0060 New Construction 2-013-001 04/09/13 DONE DONE DONE 07/26/12 07/18/12 06/08/12 06/12/12 02 - 16 75,000 0 HCM 0 0 0 H2M Group 0 / / / /
Bus/Maintenance Garage:
12-0245 Reconstruction 5-003-010 ADDENDUM REQ'D 10/03/12 09/24/12 06/29/12 05/08/12 155,15,16 0 0 HCM 0 0 0 H2M Group 0 / / / /
R.J.O. Band Shell:
- PR New Construction 7-012-001 / / / / 10/22/08 / / 02 - 16 0 0 HCM 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Remsenburg Elementary:
09-0465 Additions and Alterations 0-002-011 02/24/10 DONE DONE DONE 11/25/09 11/19/09 07/13/09 03/04/08 02 - 16 27,500 27,500 DDJ 0 0 0 James M. Campbell Architects 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Middle School:
10-0907 Additions and Alterations 0-002-013 03/25/11 DONE DONE DONE 02/24/11 02/22/11 12/28/10 06/09/10 02 - 16 196,250 196,250 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
Senior High School:
10-0446 Reconstruction 0-004-017 04/01/11 DONE DONE DONE 11/08/10 11/04/10 01/11/10 05/15/07 8,9,155,16 116,900 116,900 DDJ 0 0 116,900 Burton Behrendt Smith 0 / / 08/06/12
09-1380 Reconstruction 0-004-018 05/20/10 DONE DONE DONE 05/04/10 04/27/10 04/02/10 05/18/10 2 1,600,000 0 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
10-0908 Additions and Alterations 0-004-019 03/25/11 DONE DONE DONE 02/23/11 02/22/11 12/28/10 06/09/10 02 - 16 196,250 196,250 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Quogue Elementary:
10-0585 Reconstruction 0-001-011 03/30/11 DONE DONE DONE 12/20/10 12/08/10 09/09/10 04/14/09 2 36,900 36,900 JOD 0 0 0 ECG Eninering, LLC 0 / / 06/25/12
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Hampton Bays Elementary:
09-1458 Alterations 0-003-009 06/11/10 DONE DONE DONE 05/20/10 05/13/10 04/13/10 05/18/10 02 - 16 250,000 250,000 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
12-0742 Reconstruction 0-003-010 04/25/13 DONE DONE DONE 01/31/13 01/30/13 12/07/12 11/27/12 2,4 1,053,850 1,053,850 JMB 0 0 0 Burton Behrendt Smith 0 / / / /
12-0977 Reconstruction 0-003-011 STARTED STARTED UNREVIEWED03/14/13 03/14/13 01/24/13 11/13/12 8,155,15,16 0 10,255,182 JMB 0 0 0 Burton Behrendt Smith 0 / / / /
High School:
12-0743 Reconstruction 0-010-005 04/25/13 DONE DONE DONE 01/31/13 01/30/13 12/07/12 11/27/12 2,8,9,16 2,901,219 2,901,219 JMB 0 0 0 Burton Behrendt Smith 0 / / / /
07-1560 Reconstruction 0-010-006 06/30/08 DONE DONE DONE 02/06/08 02/05/08 12/26/07 10/23/07 2,4,9,16 590,750 590,750 HCM 0 0 181,675 Burton Behrendt Smith 0 / / / /
09-1552 Reconstruction 0-010-007 07/23/10 DONE DONE DONE 06/21/10 06/10/10 04/13/10 05/18/10 2,10,15,16 93,440 93,440 HCM 0 0 0 Burton Behrendt Smith 0 / / 01/24/13
10-1300 Reconstruction 0-010-008 08/12/11 DONE DONE DONE 05/19/11 05/12/11 03/23/11 05/18/10 2,4,8,9,10,155,15,16 300,000 300,000 HCM 0 0 0 Burton Behrendt Smith 0 / / / /
11-1081 Reconstruction 0-010-009 09/07/12 DONE DONE DONE 04/05/12 04/02/12 01/05/12 05/22/12 2,4,8,9,155,15,16 548,282 548,282 HCM 0 0 0 Burton Behrendt Smith 0 / / 01/24/13
12-0978 Reconstruction 0-010-010 STARTED STARTED UNREVIEWED03/14/13 03/14/13 01/09/13 11/13/12 8,155,15,16 0 12,195,675 JMB 0 0 0 Burton Behrendt Smith 0 / / / /
12-1250 Reconstruction 0-010-011 UNREVIEWED 06/05/13 05/31/13 02/05/13 11/27/12 155,16 0 12,195,675 JMB 0 0 0 Burton Behrendt Smith 0 / / / /
New Middle School:
12-0979 Reconstruction 0-016-002 STARTED STARTED UNREVIEWED03/14/13 03/14/13 01/24/13 11/13/12 8,155,15,16 0 14,155,853 JMB 0 0 0 Burton Behrendt Smith 0 / / / /
District Office:
12-0980 Reconstruction 1-001-001 STARTED STARTED UNREVIEWED03/14/13 03/14/13 01/09/13 11/13/12 8,155,15,16 0 0 JMB 0 0 0 Burton Behrendt Smith 0 / / / /
High School Press Box:
- New Construction 2-018-001 / / / / 06/05/13 / / 02 - 16 0 0 JMB 0 0 0 0 / / / /
High School Concession Stand:
- New Construction 7-017-001 / / / / 06/05/13 / / 02 - 16 0 0 JMB 0 0 0 0 / / / /
Elem School Comfort Station:
- New Construction 7-019-001 / / / / 06/05/13 / / 02 - 16 0 0 JMB 0 0 0 0 / / / /
Districtwide:
- Reconstruction 7-999-002 / / / / 03/26/13 / / 16 0 0 JMB 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Southampton Elementary:
09-0986 Reconstruction 0-001-023 04/19/10 DONE DONE DONE 03/02/10 02/25/10 09/23/08 05/19/09 4,7 2,229,078 2,229,078 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
- XX Reconstruction 0-001-024 CANCELLED / / / / 10/06/08 / / 10 0 12,897,657 JOD 0 0 0 0 / / / /
11-0452 Reconstruction 0-001-025 03/23/12 DONE DONE DONE 12/02/11 12/01/11 02/15/11 05/17/11 2,4,8,9,155,16 1,030,571 1,030,571 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
10-1119 Reconstruction 0-001-026 03/19/13 DONE DONE DONE 03/30/11 03/28/11 02/15/11 09/07/10 155,15,16 430,031 0 JOD 0 0 0 Burton Behrendt Smith 430,031 / / / /
Intermediate School:
07-1742 Additions and Alterations 0-003-015 12/07/08 DONE DONE DONE 03/04/08 02/27/08 07/21/05 02/06/07 02 - 16 12,411,732 12,382,112 JOD 0 0 0 Burton Behrendt Smith 0 / / 12/18/12
- Reconstruction 0-003-018 / / / / 09/23/08 / / 2,9,13,155,15,16 0 0 JOD 0 0 0 0 / / / /
11-0453 Reconstruction 0-003-019 03/23/12 DONE DONE DONE 12/02/11 12/01/11 02/15/11 05/17/11 2,9,10,155,15,16 1,194,298 1,194,298 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
10-1120 Reconstruction 0-003-020 03/19/13 DONE DONE DONE 03/30/11 03/28/11 02/15/11 09/07/10 155,15,16 207,654 0 JOD 0 0 0 Burton Behrendt Smith 207,654 / / / /
- Reconstruction 0-003-021 / / / / 05/24/13 / / 4 0 0 JOB 0 0 0 0 / / / /
High School:
09-0851 Additions and Alterations 0-007-010 04/26/10 DONE DONE DONE 02/03/10 02/01/10 07/21/05 02/06/07 02 - 16 17,984,221 12,701,435 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
07-2169 Reconstruction 0-007-013 09/09/08 DONE DONE DONE 05/28/08 05/25/08 04/03/08 05/20/07 8 1,805,567 1,805,567 JOD 0 0 0 Burton Behrendt Smith 0 / / 01/04/13
- Reconstruction 0-007-014 / / / / 09/23/08 / / 2,9,13,155,15,16 0 0 JOD 0 0 0 0 / / / /
11-0836 Reconstruction 0-007-015 01/28/13 DONE DONE DONE 02/23/12 02/21/12 03/02/10 02/06/07 4,8,9,10,13,155,15,1 744,000 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
11-0605 Reconstruction 0-007-016 03/20/12 DONE DONE DONE 01/06/12 01/03/12 04/08/10 05/17/11 9,10,13,155,15,16 1,166,000 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
10-1121 Reconstruction 0-007-017 03/19/13 DONE DONE DONE 03/30/11 03/28/11 02/15/11 09/07/10 10,155,15,16 2,116,415 0 JOD 0 0 0 Burton Behrendt Smith 2,116,415 / / / /
11-0454 Reconstruction 0-007-018 03/23/12 DONE DONE DONE 12/02/11 12/01/11 06/30/11 05/17/11 2,4,8,9,155,15,16 858,285 858,285 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
- Reconstruction 0-007-019 / / / / 05/24/13 / / 4 0 0 JOB 0 0 0 0 / / / /
New District Office:
- PR New Construction 1-020-001 / / / / 02/15/11 / / 02 - 16 0 0 JOD 0 0 0 0 / / / /
Bus Garage:
09-0345 Alterations 5-005-005 01/07/10 DONE DONE DONE 10/27/09 10/22/09 11/03/06 05/19/09 02 - 16 360,000 122,720 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
11-0855 Reconstruction 5-005-007 06/11/12 DONE DONE DONE 02/28/12 02/27/12 01/04/11 05/17/11 2,7,8,9,155,15,16 1,100,000 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
Broadcast Booth:
08-1336 New Construction 7-016-001 07/28/09 DONE DONE DONE 03/10/09 03/03/09 03/19/08 02/06/07 02 - 16 710,392 0 JOD 0 0 0 Burton Behrendt Smith 0 / / 04/06/12
New Concession Stand @ High School:
10-0903 New Construction 7-018-001 06/29/11 DONE DONE DONE 02/24/11 02/22/11 12/28/09 02/06/07 02 - 16 778,357 0 JOD 0 0 0 Burton Behrendt Smith 0 / / 05/14/13
Athletic Support Facility:
- XX New Construction 7-019-001 CANCELLED / / / / 01/10/11 / / 02 - 16 0 0 JOD 0 0 0 0 / / / /
District Wide:
08-0998 Reconstruction 7-999-003 02/03/09 DONE DONE DONE 01/02/09 12/22/08 / / 05/01/06 610,000 610,000 JOD 0 0 522,349 Burton Behrendt Smith 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Bridgehampton High:
11-0482 Reconstruction 0-001-014 06/04/12 DONE DONE DONE 12/12/11 12/12/11 04/12/05 11/30/11 10 136,000 136,000 HCM 0 0 0 Chaleff & Rogers Architects,P 0 / / / /
10-0616 Reconstruction 0-001-015 01/14/11 DONE DONE DONE 12/23/10 12/10/10 05/08/07 05/18/10 7,8,13 1,395,505 0 HCM 0 0 45,505 Chaleff & Rogers Architects,P 0 / / / /
Greenhouse:
10-0358 New Construction 0-008-001 11/04/10 DONE DONE DONE 10/14/10 10/07/10 07/09/10 03/24/10 02 - 16 0 0 HCM 0 0 0 Chaleff & Rogers Architects,P 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Eastport Elementary:
09-0330PR Additions and Alterations 0-001-001 UNREVIEWED 10/22/09 10/16/09 08/25/05 / / 02 - 16 7,550,000 1,883,218 DDJ 0 0 0 Wiedersum Associates Architec 0 / / / /
10-1394 Reconstruction 0-001-001 02/21/12 DONE DONE DONE 06/15/11 06/10/11 / / 12/09/09 4,267,324 4,201,223 0 0 0 Wiedersum Associates Architec 0 / / / /
10-0937 Reconstruction 0-001-003 05/20/11 DONE DONE DONE 03/04/11 02/18/11 02/13/07 12/08/09 2,8,9,155,15,16 3,140,000 3,140,000 DDJ 0 0 0 Wiedersum Associates Architec 0 / / / /
08-0820 Reconstruction 0-001-004 06/08/09 DONE DONE DONE 11/26/08 11/26/08 02/11/08 12/04/07 9,155,15,16 6,150,000 0 DDJ 0 0 230,000 Wiedersum Associates Architec 0 / / / /
09-0368 Reconstruction 0-001-005 STARTED DONE ADD. REQ'D10/29/09 10/26/09 05/14/09 10/21/09 10,155,16 0 0 DDJ 0 0 0 Wiedersum Associates Architec 0 / / / /
- Reconstruction 0-001-006 / / / / 12/06/12 / / 2,4,7,8,9,10,155,15, 0 0 DDJ 0 0 0 0 / / / /
12-0987 Reconstruction 0-001-007 05/21/13 DONE DONE DONE 03/19/13 03/19/13 02/14/13 12/08/09 2,4,7,8,9 543,000 543,000 DDJ 0 0 0 Wiedersum Associates Architec 0 / / / /
Relocatable I(demo):
11-0290 Reconstruction 0-002-001 11/03/11 DONE DONE DONE 10/26/11 10/25/11 10/07/11 12/08/09 2 44,000 44,000 DDJ 0 0 0 Wiedersum Associates Architec 0 / / / /
Relocatable 2 (demo):
11-0291 Reconstruction 0-005-001 11/03/11 DONE DONE DONE 10/26/11 10/25/11 10/07/11 12/08/09 2 55,000 0 DDJ 0 0 0 Wiedersum Associates Architec 0 / / / /
Eastport-South Manor Jr/Sr HS:
07-2336 Reconstruction 0-011-001 12/05/08 DONE DONE DONE 07/08/08 06/23/08 02/12/08 12/04/07 2,8,14,155,16 5,857,000 5,857,000 DDJ 0 0 0 Wiedersum Associates Architec 0 / / / /
09-0369 Reconstruction 0-011-002 STARTED DONE ADD. REQ'D10/29/09 10/26/09 05/14/09 10/21/09 10,155,16 0 59,903,712 DDJ 0 0 0 Wiedersum Associates Architec 0 / / / /
- Reconstruction 0-011-003 / / / / 12/06/12 / / 2,4,8,9,10,155,15,16 0 0 DDJ 0 0 0 0 / / / /
12-1102PR Reconstruction 0-011-004 UNREVIEWED 04/12/13 04/12/13 04/09/13 / / 2,4,7,8,9,155,15,16 0 0 DDJ 0 0 0 Wiedersum Associates Architec 0 / / / /
South Street ES (frmrly South Manor):
09-0331PR Additions and Alterations 0-012-002 UNREVIEWED 10/22/09 10/16/09 12/01/05 / / 02 - 16 12,300,000 7,233,510 DDJ 0 0 0 Wiedersum Associates Architec 0 / / / /
10-0618 Additions and Alterations 0-012-002 05/12/11 DONE DONE DONE 12/24/10 12/16/10 12/01/05 12/08/09 02 - 16 12,300,000 11,705,440 DDJ 0 0 0 Wiedersum Associates Architec 0 / / / /
- Reconstruction 0-012-003 / / / / 12/06/12 / / 4,9,10,155,15,16 0 6,134,400 DDJ 0 0 0 0 / / / /
08-0790 Reconstruction 0-012-004 06/01/09 DONE DONE DONE 11/24/08 11/24/08 02/11/08 12/04/07 2,4,8,9,10,155,15,16 4,750,000 4,750,000 DDJ 0 0 237,500 Wiedersum Associates Architec 0 / / / /
09-0370 Reconstruction 0-012-005 STARTED DONE ADD. REQ'D10/29/09 10/26/09 05/14/09 10/21/09 8,10,155,16 0 6,134,400 DDJ 0 0 0 Wiedersum Associates Architec 0 / / / /
South St. Portables:
10-1247 Reconstruction 0-013-001 05/12/11 DONE DONE DONE 05/03/11 04/29/11 04/29/11 12/08/09 2 55,000 0 DDJ 0 0 0 Wiedersum Associates Architec 0 / / / /
Dayton Ave. School:
09-0332PR Additions and Alterations 0-014-002 UNREVIEWED 10/22/09 10/16/09 12/01/05 / / 02 - 16 16,200,000 9,745,110 DDJ 0 0 0 Wiedersum Associates Architec 0 / / / /
09-1139 Additions and Alterations 0-014-002 09/01/10 DONE DONE DONE 03/25/10 03/16/10 12/01/05 12/08/09 02 - 16 16,200,000 15,981,416 DDJ 0 0 0 Wiedersum Associates Architec 0 / / / /
- Reconstruction 0-014-004 / / / / 12/06/12 / / 2,7,8,9,10,155,15,16 0 0 DDJ 0 0 0 0 / / / /
08-1100 Reconstruction 0-014-005 06/24/09 DONE DONE DONE 01/21/09 01/13/09 05/21/08 12/04/07 4,7,8,9,10,16 10,250,000 10,250,000 DDJ 0 0 512,500 Wiedersum Associates Architec 0 / / / /
09-0601 Reconstruction 0-014-006 DONE DONE ADD. REQ'D12/23/09 12/21/09 05/14/09 10/21/09 16 0 0 DDJ 0 0 0 Wiedersum Associates Architec 0 / / / /
- Reconstruction 0-014-007 / / / / 02/21/12 / / 16 0 0 DDJ 0 0 0 0 / / / /
Tuttle Elementary:
09-0333PR New Construction 0-022-001 UNREVIEWED 10/22/09 10/16/09 12/06/05 / / 02 - 16 24,785,000 9,684,636 DDJ 0 0 0 Wiedersum Associates Architec 0 / / / /
10-1395 Reconstruction 0-022-001 02/21/12 DONE DONE DONE 06/15/11 06/10/11 / / 12/09/09 2,4,7,8,9,10,13,14,1 23,177,830 16,935,938 DDJ 0 0 0 Wiedersum Associates Architec 0 / / / /
Maintenance Garage:
- Reconstruction 3-004-001 / / / / 12/07/12 / / 2,7,8,9,155,15,16 0 0 DDJ 0 0 0 0 / / / /
Concession/Storage/Toilet Facilties:
08-1373 New Construction 7-023-001 07/23/09 DONE DONE DONE 03/13/09 03/06/09 01/26/09 12/04/07 02 - 16 500,000 0 DDJ 0 0 0 Wiedersum Associates Architec 0 / / / /
District Wide:
08-1389 Reconstruction 7-999-001 05/20/09 DONE DONE DONE 03/16/09 03/11/09 12/09/08 12/04/07 16 4,787,000 0 DDJ 0 0 239,350 Wiedersum Associates Architec 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Tuckahoe Common School:
10-1213 Reconstruction 0-001-009 05/02/11 DONE DONE DONE 04/20/11 04/18/11 03/07/08 02/15/11 10,155,16 120,186 120,186 JOD 0 0 102,867 Chaleff & Rogers Architects,P 0 / / 01/30/13
- Reconstruction 0-001-010 / / / / 12/07/11 / / 15 0 0 JOD 0 0 0 0 / / / /
11-1025 Reconstruction 0-001-011 03/21/12 DONE DONE DONE 03/28/12 03/22/12 03/07/12 02/27/12 2 180,392 180,392 JOD 0 0 0 Chaleff & Rogers Architects,P 0 / / / /
11-1249 Reconstruction 0-001-012 12/12/12 DONE DONE DONE 05/01/12 04/30/12 03/21/12 01/23/12 8,10,15,16 583,217 583,217 JOD 0 0 0 Savin Engineers, P.C. 583,217 / / / /
- Reconstruction 0-001-013 / / / / 04/17/12 / / 8,10,15,16 0 0 JOD 0 0 0 0 / / / /
- Reconstruction 0-001-014 / / / / 11/09/12 / / 7 0 0 JMB 0 0 0 0 / / / /
- Reconstruction 0-001-015 / / / / 05/03/13 / / 15 0 0 JMB 0 0 0 0 / / / /
Residence:
- PR New Construction 1-005-001 / / / / 09/30/10 / / 02 - 16 0 0 JOD 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
East Quogue Elementary School:
09-0083 Reconstruction 0-001-010 07/31/09 DONE DONE DONE 07/23/09 07/21/09 12/18/03 07/01/09 155 499,995 499,995 HCM 0 0 149,975 Savin Engineers, P.C. 0 / / / /
House (demo):
12-0430 Reconstruction 7-005-001 01/25/13 DONE DONE DONE 11/16/12 11/02/12 09/20/12 02/28/12 2 77,100 0 JMB 0 0 0 Burton Behrendt Smith 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Oysterponds Elementary:
09-0511 Reconstruction 0-001-006 12/10/09 DONE DONE DONE 11/27/09 11/24/09 06/29/06 05/15/08 8 150,000 0 JOD 0 0 0 Beatty Harvey & Associates 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Bowling Alley:
- Reconstruction 7-007-001 / / / / / / / / 8,9,155,15,16 0 0 DDJ 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Southold High & Middle:
08-1210 Reconstruction 0-001-008 02/27/09 DONE DONE DONE 02/18/09 02/06/09 07/18/06 11/15/07 2,15,16 321,107 321,107 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
07-1533 Reconstruction 0-001-009 06/17/09 DONE DONE DONE 02/04/08 02/01/08 03/07/07 05/15/07 16 193,403 193,403 DDJ 0 0 193,403 Bartlett,Amoruso, & Recce-Arc 0 / / / /
08-0545 Reconstruction 0-001-010 06/17/09 DONE DONE DONE 10/16/08 10/14/08 03/07/07 11/15/07 2,4,8,10,155,15 1,441,911 1,441,911 DDJ 0 0 133,786 Burton Behrendt Smith 0 / / / /
09-0449 Reconstruction 0-001-011 02/22/10 DONE DONE DONE 11/19/09 11/16/09 08/25/09 11/15/07 2 91,742 91,742 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
10-0048 Reconstruction 0-001-012 04/12/11 DONE DONE DONE 07/28/10 07/14/10 03/02/10 09/10/08 2,155,15,16 1,304,696 0 DDJ 0 0 0 Burton Behrendt Smith 1,304,696 / / / /
12-0760 Reconstruction 0-001-013 02/14/13 DONE DONE DONE 02/01/13 01/22/13 12/07/12 10/16/12 2,4,7 1,999,219 0 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
Elementary School:
08-1211 Reconstruction 0-014-003 02/27/09 DONE DONE DONE 02/18/09 02/06/09 03/07/07 11/15/07 2,4,8 295,548 295,548 DDJ 0 0 0 Burton Behrendt Smith 0 / / / /
10-0049 Reconstruction 0-014-004 04/12/11 DONE DONE DONE 07/28/10 07/14/10 03/02/10 09/10/08 2,155,16 235,799 0 DDJ 0 0 0 Burton Behrendt Smith 235,799 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Main Building:
07-2046 Reconstruction 0-001-007 10/21/08 DONE DONE DONE 05/01/08 04/24/08 01/19/07 05/15/07 4,8,13 216,630 216,630 JOD 0 0 216,630 Bartlett,Amoruso, & Recce-Arc 0 / / / /
08-0238 Reconstruction 0-001-008 07/03/09 DONE DONE DONE 09/03/08 08/26/08 06/20/08 05/13/08 2,155,15,16 674,825 674,825 JOD 0 0 0 ECG Eninering, LLC 674,825 / / / /
10-0709 Reconstruction 0-001-009 03/07/11 DONE DONE DONE 01/03/11 12/27/10 08/19/10 12/07/10 2,4,7,8,9,155,15,16 2,746,810 0 JOD 0 0 0 Tetra Tech Architects & Engi 0 / / / /
10-0947 Reconstruction 0-001-010 05/17/11 DONE DONE DONE 03/04/11 02/23/11 02/22/11 12/07/10 155,15,16 2,325,000 0 JOD 0 0 0 Tetra Tech Architects & Engi 0 / / / /
10-1068 Reconstruction 0-001-011 04/01/11 DONE DONE DONE 03/17/11 03/15/11 03/04/11 12/07/10 2,4,8,9,155,15,16 680,000 680,000 JOD 0 0 0 Tetra Tech Architects & Engi 0 / / 06/13/13
10-1177 Reconstruction 0-001-012 06/30/11 DONE DONE DONE 04/12/11 04/07/11 03/28/11 12/07/10 2,4,8,9,155,15,16 1,506,550 1,506,550 0 0 0 Tetra Tech Architects & Engi 0 / / 06/13/13
11-0657 Reconstruction 0-001-013 10/15/12 DONE DONE DONE 01/12/12 01/10/12 12/20/11 12/07/10 2,16 1,496,640 0 JOD 0 0 0 Tetra Tech Architects & Engi 0 / / / /
12-1036 Reconstruction 0-001-014 06/03/13 DONE DONE DONE 03/27/13 03/27/13 01/30/13 12/07/10 2,4 470,000 470,000 MFS 0 0 0 Tetra Tech Architects & Engi 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Mattituck-Cutchogue Jr./Sr. HS:
07-1522 Reconstruction 0-001-003 09/11/08 DONE DONE DONE 02/01/08 01/31/07 10/23/07 07/19/07 7,8,10,155,15,16 1,232,732 1,232,732 HCM 0 0 0 John A Grillo-ARCHITECTS PC 1,232,732 / / / /
- Reconstruction 0-001-004 / / / / 01/29/09 / / 2,13 0 0 HCM 0 0 0 0 / / / /
Cutchogue East School:
07-1523 Reconstruction 0-007-002 09/11/08 DONE DONE DONE 02/01/08 01/31/08 10/23/07 07/19/07 8,10,155,15,16 371,602 371,602 HCM 0 0 0 John A Grillo-ARCHITECTS PC 371,602 / / / /
09-1371 Reconstruction 0-007-003 05/24/10 DONE DONE DONE 05/03/10 04/26/10 03/26/10 05/18/10 2,8 90,000 0 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
11-0557 Reconstruction 0-007-004 STARTED DONE DONE 12/28/11 12/27/11 09/19/11 / / 2,8 100,000 0 HCM 0 0 0 John A Grillo-ARCHITECTS PC 0 / / / /
Cutchogue West Schl:
07-1524 Reconstruction 0-009-002 09/11/08 DONE DONE DONE 02/01/08 01/31/08 10/23/07 07/19/07 2,8,155,15,16 40,568 40,568 HCM 0 0 0 John A Grillo-ARCHITECTS PC 40,568 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Carmine Antonelli (Central):
- Reconstruction 0-001-009 / / / / 02/03/09 / / 16 0 0 JOD 0 0 0 0 / / / /
- Reconstruction 0-001-010 / / / / 04/09/09 / / 155,16 0 0 JOD 0 0 0 0 / / / /
09-1553 Reconstruction 0-001-011 04/11/11 DONE DONE DONE 06/21/10 06/11/10 11/02/09 12/15/08 155,16 194,800 0 JOD 0 0 0 Wiedersum Associates Architec 0 / / / /
Shop Bldg - Riverhead Vocational:
- Reconstruction 0-002-009 / / / / 02/04/09 / / 16 0 0 JOD 0 0 0 0 / / / /
09-1554 Reconstruction 0-002-010 04/11/11 DONE DONE DONE 06/21/10 06/11/10 02/09/10 12/15/08 155,16 168,000 0 JOD 0 0 0 Wiedersum Associates Architec 0 / / / /
- Reconstruction 0-002-011 / / / / 04/30/10 / / 2 0 0 JOD 0 0 0 0 / / / /
Jefferson Academic Center:
- Reconstruction 0-003-007 / / / / 02/03/09 / / 16 0 0 JOD 0 0 0 0 / / / /
09-1555 Reconstruction 0-003-008 04/11/11 DONE DONE DONE 06/21/10 06/11/10 02/09/10 12/15/08 155,16 83,900 0 JOD 0 0 0 Wiedersum Associates Architec 0 / / / /
11-1070 Reconstruction 0-003-009 10/12/12 DONE DONE DONE 04/04/12 03/29/12 03/31/11 12/12/11 8,9 175,000 175,000 JOD 0 0 0 Burton Behrendt Smith 0 / / 04/08/13
Hort./Small Engine Building:
- Reconstruction 0-004-010 / / / / 02/04/09 / / 16 0 0 JOD 0 0 0 0 / / / /
Special Education Center:
11-0643 Reconstruction 0-013-010 03/12/12 DONE DONE DONE 01/12/12 01/10/12 03/31/11 01/27/10 8 350,000 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
Cranberry Bldg:
- Reconstruction 0-014-007 / / / / 02/03/09 / / 16 0 0 JOD 0 0 0 0 / / / /
BOCES I Learning Center:
11-0644 Reconstruction 0-022-009 03/12/12 DONE DONE DONE 01/12/12 01/10/12 03/31/11 01/27/10 8 50,000 50,000 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
High School Ward Tech Cen.:
- Reconstruction 0-025-006 / / / / 02/04/09 / / 16 0 0 JOD 0 0 0 0 / / / /
09-1556 Reconstruction 0-025-007 04/11/11 DONE DONE DONE 06/21/10 06/11/10 02/09/10 12/15/08 155,16 51,400 0 JOD 0 0 0 Wiedersum Associates Architec 0 / / / /
Brookhaven Technical Center:
- Reconstruction 0-048-014 / / / / 02/03/09 / / 16 0 0 JOD 0 0 0 0 / / / /
09-1142 Reconstruction 0-048-015 07/06/10 DONE DONE DONE 03/25/10 03/18/10 06/09/09 01/27/10 2,155,16 168,500 168,500 JOD 0 0 0 Wiedersum Associates Architec 0 / / 12/12/12
- Reconstruction 0-048-016 / / / / 04/30/10 / / 2 0 0 JOD 0 0 0 0 / / / /
Islip Academic Center:
08-1621 Reconstruction 0-057-004 05/21/09 DONE DONE DONE 05/12/09 05/08/09 04/23/09 12/15/08 4,8 1,000,000 1,000,000 JOD 0 0 0 Wiedersum Associates Architec 0 / / 12/12/12
09-1557 Reconstruction 0-057-005 04/11/11 DONE DONE DONE 06/21/10 06/11/10 02/09/10 12/15/08 155,16 376,800 376,800 JOD 0 0 0 Wiedersum Associates Architec 0 / / 12/12/12
09-1507 Reconstruction 0-057-006 06/24/10 DONE DONE DONE 06/09/10 06/02/10 04/08/10 01/27/10 2,7 540,000 540,000 JOD 0 0 0 Burton Behrendt Smith 0 / / 12/12/12
Brookhaven Learning Center:
09-1558 Reconstruction 0-058-007 04/11/11 DONE DONE DONE 06/21/10 06/11/10 11/05/09 12/15/08 155,16 229,600 0 JOD 0 0 0 Wiedersum Associates Architec 0 / / / /
11-0645 Reconstruction 0-058-008 03/12/12 DONE DONE DONE 01/12/12 01/10/12 03/31/11 01/27/10 8 230,000 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
Brookhaven Career Center:
09-1559 Reconstruction 0-059-007 04/11/11 DONE DONE DONE 06/21/10 06/11/10 11/05/09 12/15/08 155,16 264,300 264,300 JOD 0 0 0 Wiedersum Associates Architec 0 / / 01/17/13
11-0646 Reconstruction 0-059-008 03/12/12 DONE DONE DONE 01/12/12 01/10/12 03/31/11 01/27/10 8 25,000 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
Islip Career Center:
09-1560 Reconstruction 0-061-008 04/11/11 DONE DONE DONE 06/21/10 06/11/10 11/05/09 12/15/08 155,16 291,200 291,200 JOD 0 0 0 Wiedersum Associates Architec 0 / / 01/17/13
11-0647 Reconstruction 0-061-009 03/12/12 DONE DONE DONE 01/10/12 01/10/12 03/31/11 01/27/10 8 520,000 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
Educ. Communic. Office:
- Reconstruction 1-029-002 / / / / 02/04/09 / / 16 0 0 JOD 0 0 0 0 / / / /
09-1561 Reconstruction 1-029-003 04/11/11 DONE DONE DONE 06/21/10 06/11/10 11/05/09 12/15/08 155,16 48,100 0 JOD 0 0 0 Wiedersum Associates Architec 0 / / / /
Sherwood Corporate Center:
- Reconstruction 1-050-002 / / / / 04/09/09 / / 10,16 0 0 JOD 0 0 0 0 / / / /
EAP @ Crooked Hill Road Facility:
08-0017TQ Temporary Quarters 1-092-001 ADDENDUM REQ'D 07/17/08 07/17/08 04/01/08 / / 0 0 JOD 0 0 0 0 / / / /
Colin Drive Support Center:
- TQ Temporary Quarters 1-097-001 / / / / 02/05/09 / / 0 0 JOD 0 0 0 0 / / / /
North Ocean Facilty/EAP:
- TQ Temporary Quarters 1-098-001 / / / / 02/05/09 / / 0 0 JOD 0 0 0 0 / / / /
Nursing program @ NYIT Kennedy Hall:
08-0016TQ Temporary Quarters 8-094-001 ADDENDUM REQ'D 07/17/08 07/17/08 04/01/08 / / 0 0 JOD 0 0 0 0 / / / /
Kennedy Hall @ NYIT:
- TQ Temporary Quarters 8-096-001 / / / / 02/05/09 / / 0 0 JOD 0 0 0 0 / / / /
St Joseph's Academy:
12-1180TQ Temporary Quarters 8-099-001 UNREVIEWED 05/10/13 05/08/13 04/08/13 / / 0 0 MFS 0 0 0 Burton Behrendt Smith 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CERT. OCC. CSC REC'D
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
McGuire Hall #1:
09-0271 Reconstruction 0-001-013 10/27/09 DONE DONE DONE 09/28/09 09/28/09 05/01/07 05/08/07 155,16 300,000 300,000 JOD 0 0 0 Bladykas Engineering,P.C. 0 / / / /
09-0672 Reconstruction 0-001-014 08/25/10 DONE DONE DONE 01/04/10 12/30/09 06/29/09 05/12/09 155,16 200,000 200,000 JOD 0 0 0 Bladykas Engineering,P.C. 0 / / 04/18/13
09-1484 Reconstruction 0-001-015 03/10/11 DONE DONE DONE 06/04/10 05/27/10 08/26/09 05/12/09 2,4 140,000 140,000 JOD 0 0 0 James M. Campbell Architects 0 / / 02/08/12
10-0923 Reconstruction 0-001-016 06/07/11 DONE DONE DONE 03/03/11 02/18/11 06/21/10 06/21/10 16 75,000 75,000 JOD 0 0 0 Bladykas Engineering,P.C. 0 / / 02/07/13
10-1167 Reconstruction 0-001-017 06/16/11 DONE DONE DONE 04/11/11 04/06/11 03/30/11 05/04/10 9 15,360 15,360 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
11-0206 Reconstruction 0-001-018 04/17/12 DONE DONE DONE 09/29/11 09/28/11 06/01/11 05/10/11 155 7,000 0 JOD 0 0 0 Bladykas Engineering,P.C. 0 / / / /
11-1047 Reconstruction 0-001-019 04/27/12 DONE DONE DONE 03/28/12 03/23/12 01/31/12 05/11/11 8 250,000 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
12-0807 Reconstruction 0-001-020 04/29/13 DONE DONE DONE 02/12/13 02/01/13 10/04/12 05/11/12 8,9,155,15,16 58,000 0 MFS 0 0 0 Burton Behrendt Smith 0 / / / /
12-0880 Reconstruction 0-001-021 ADDENDUM REQ'D 02/20/13 02/11/13 11/02/12 05/08/12 2,16 0 12,220,820 MFS 0 0 0 H2M Group 0 / / / /
12-0881 Reconstruction 0-001-022 05/22/13 DONE DONE DONE 02/20/13 02/11/13 02/20/13 05/08/12 2,10,16 21,000 0 MFS 0 0 0 H2M Group 0 / / / /
Wilson Tech Career Center:
10-0217 Reconstruction 0-015-007 01/14/11 DONE DONE DONE 09/14/10 09/08/10 06/21/10 06/21/10 2,155,16 257,000 257,000 JOD 0 0 0 Bladykas Engineering,P.C. 0 / / 01/28/13
11-0720 Reconstruction 0-015-008 04/17/12 DONE DONE DONE 01/25/12 01/24/12 06/01/11 05/10/11 2,15 129,000 0 JOD 0 0 0 Bladykas Engineering,P.C. 0 / / 01/29/13
12-0882 Reconstruction 0-015-009 ADDENDUM REQ'D 02/20/13 02/11/13 11/02/12 05/08/12 2,16 0 2,562,430 MFS 0 0 0 H2M Group 0 / / / /
- XX Reconstruction 0-015-010 CANCELLED / / / / 11/02/12 / / 2,10,16 0 2,562,430 JMB 0 0 0 0 / / / /
JE Allen Jr/Sr High School Mellville:
07-2043 Reconstruction 0-016-015 11/12/08 DONE DONE DONE 05/01/08 04/23/08 02/27/08 / / 2,16 275,000 275,000 JOD 0 0 0 0 / / / /
07-1971 Reconstruction 0-016-016 08/13/08 DONE DONE DONE 04/15/08 04/07/08 03/07/08 03/14/06 16 150,000 150,000 JOD 0 0 0 0 / / 02/08/12
08-0731 Reconstruction 0-016-017 02/10/09 DONE DONE DONE 11/07/08 11/06/08 08/14/08 04/08/08 2,16 1,925,000 0 JOD 0 0 0 Bladykas Engineering,P.C. 0 / / / /
09-0823 Reconstruction 0-016-018 07/20/10 DONE DONE DONE 01/27/10 01/25/10 03/10/09 12/08/09 9,155,15,16 262,000 262,000 JOD 0 0 0 James M. Campbell Architects 0 / / / /
09-0241 Reconstruction 0-016-019 10/05/09 DONE DONE DONE 09/17/09 09/16/09 07/14/09 05/12/09 2,7 1,075,000 1,075,000 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
09-0673 Reconstruction 0-016-020 08/10/10 DONE DONE DONE 01/05/10 12/30/09 08/25/09 12/08/09 155,15 120,000 120,000 JOD 0 0 0 Bladykas Engineering,P.C. 0 / / 11/19/12
09-1226 Reconstruction 0-016-021 08/04/10 DONE DONE DONE 04/05/10 03/31/10 09/08/09 05/12/09 4,16 90,500 90,500 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
09-1482 Reconstruction 0-016-022 06/24/10 DONE DONE DONE 06/03/10 05/27/10 09/08/09 07/07/09 10 32,000 32,000 JOD 0 0 0 James M. Campbell Architects 0 / / / /
- XX Reconstruction 0-016-023 CANCELLED / / / / 11/04/09 / / 2,8 0 11,960,256 JOD 0 0 0 0 / / / /
09-0984 Additions and Alterations 0-016-024 05/25/10 DONE DONE DONE 03/02/10 02/25/10 11/20/09 10/28/09 02 - 16 2,858,800 2,858,800 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
10-0924 Reconstruction 0-016-025 06/07/11 DONE DONE DONE 03/03/11 02/18/11 06/21/10 06/21/10 155,15,16 147,000 147,000 JOD 0 0 0 Bladykas Engineering,P.C. 0 / / 02/07/13
11-0207 Reconstruction 0-016-026 04/17/12 DONE DONE DONE 09/29/11 09/28/11 06/01/11 05/10/11 16 20,000 0 JOD 0 0 0 Bladykas Engineering,P.C. 0 / / / /
11-0386 Reconstruction 0-016-027 03/19/12 DONE DONE DONE 11/15/11 11/14/11 06/07/11 05/10/11 16 170,000 0 JOD 0 0 0 Bladykas Engineering,P.C. 0 / / / /
11-0853 Reconstruction 0-016-028 06/26/12 DONE DONE DONE 02/28/12 02/27/12 07/21/11 04/07/11 16 200,000 200,000 JOD 0 0 0 Bladykas Engineering,P.C. 0 / / / /
12-0806 Reconstruction 0-016-029 05/15/13 DONE DONE DONE 02/11/13 01/08/13 09/26/12 05/10/11 155,16 700,000 0 MFS 0 0 0 Bladykas Engineering,P.C. 0 / / / /
12-0808 Reconstruction 0-016-030 04/29/13 DONE DONE DONE 02/12/13 02/01/13 10/04/12 05/10/12 8,16 85,200 0 JMB 0 0 0 Burton Behrendt Smith 0 / / / /
12-0883 Reconstruction 0-016-031 ADDENDUM REQ'D 02/20/13 02/11/13 11/02/12 05/08/12 155,15,16 0 15,807,821 MFS 0 0 0 H2M Group 0 / / / /
JE Allen Elementary-Dix Hills:
07-1972 Reconstruction 0-017-018 08/13/08 DONE DONE DONE 04/15/08 04/07/08 05/01/07 03/14/06 16 205,000 205,000 JOD 0 0 0 0 / / 02/08/12
08-0215 Reconstruction 0-017-019 10/24/08 DONE DONE DONE 08/27/08 08/18/08 10/23/07 / / 16 60,000 60,000 JOD 0 0 0 Bladykas Engineering,P.C. 0 / / / /
08-0455 Reconstruction 0-017-021 11/13/08 DONE DONE DONE 10/06/08 10/02/08 07/16/08 04/08/08 2,7 1,174,350 1,174,350 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
08-0664 Reconstruction 0-017-022 01/12/09 DONE DONE DONE 11/04/08 10/31/08 10/10/08 04/08/08 8,16 115,597 115,597 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
09-1483 Reconstruction 0-017-023 06/24/10 DONE DONE DONE 06/03/10 05/27/10 08/26/09 07/07/09 10 32,000 32,000 JOD 0 0 0 James M. Campbell Architects 0 / / / /
09-0674 Reconstruction 0-017-024 08/10/10 DONE DONE DONE 01/05/10 12/30/09 08/25/09 12/08/09 155,15,16 244,847 244,847 JOD 0 0 0 Bladykas Engineering,P.C. 0 / / / /
10-0925 Reconstruction 0-017-025 06/07/11 DONE DONE DONE 03/03/11 02/18/11 06/21/10 06/21/10 10,155,16 259,200 259,200 JOD 0 0 0 Bladykas Engineering,P.C. 0 / / 02/07/13
11-0208 Reconstruction 0-017-026 04/17/12 DONE DONE DONE 09/29/11 09/28/11 06/01/11 05/10/11 155,16 40,000 0 JOD 0 0 0 Bladykas Engineering,P.C. 0 / / / /
11-0215 Reconstruction 0-017-027 10/18/11 DONE DONE DONE 09/29/11 09/28/11 06/07/11 05/10/11 155,16 885,000 0 JOD 0 0 0 Bladykas Engineering,P.C. 0 / / / /
11-0854 Reconstruction 0-017-028 06/26/12 DONE DONE DONE 02/28/11 02/27/11 07/21/11 04/07/11 16 200,000 0 JOD 0 0 0 Bladykas Engineering,P.C. 0 / / / /
12-0884 Reconstruction 0-017-029 ADDENDUM REQ'D 02/20/13 02/11/13 11/02/12 05/08/12 2,8,16 0 11,235,270 MFS 0 0 0 H2M Group 0 / / / /
Wilson Tech Northport:
12-0885 Reconstruction 0-018-017 ADDENDUM REQ'D 02/20/13 02/11/13 11/02/12 05/08/12 16 0 8,672,840 MFS 0 0 0 H2M Group 0 / / / /
09-1227 Reconstruction 0-018-018 08/04/10 DONE DONE DONE 04/05/10 03/31/10 08/26/09 05/12/09 8 98,400 98,400 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
09-0675 Reconstruction 0-018-019 08/10/10 DONE DONE DONE 01/05/10 12/30/09 09/01/09 12/08/09 4,15,16 118,000 118,000 JOD 0 0 0 Bladykas Engineering,P.C. 0 / / 11/19/12
09-1564 Reconstruction 0-018-020 10/21/10 DONE DONE DONE 06/22/10 06/14/10 09/11/09 12/08/09 2,155,15,16 606,000 606,000 JOD 0 0 0 Bladykas Engineering,P.C. 0 / / 12/10/12
10-0666 Reconstruction 0-018-021 01/26/11 DONE DONE DONE 12/30/10 12/23/10 11/04/10 05/11/10 7 855,000 855,000 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
10-0667 Reconstruction 0-018-022 01/26/11 DONE DONE DONE 12/30/10 12/23/10 12/03/10 05/11/10 8 780,000 780,000 JOD 0 0 0 Burton Behrendt Smith 0 / / 01/22/13
10-1168 Reconstruction 0-018-023 06/16/11 DONE DONE DONE 04/11/11 04/08/11 03/28/11 05/04/10 8,9,10 70,000 70,000 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
11-0288 Reconstruction 0-018-025 12/20/11 DONE DONE DONE 10/26/11 10/25/11 06/01/11 05/10/11 16 85,000 85,000 JOD 0 0 0 Bladykas Engineering,P.C. 0 / / 01/28/13
11-0209 Reconstruction 0-018-026 04/17/12 DONE DONE DONE 09/29/11 09/28/11 06/01/11 05/10/11 15 11,000 0 JOD 0 0 0 Bladykas Engineering,P.C. 0 / / / /
12-0886 Reconstruction 0-018-027 ADDENDUM REQ'D 02/20/13 02/11/13 11/02/12 05/08/12 16 0 8,672,840 MFS 0 0 0 H2M Group 0 / / / /
Jones Hall #2:
10-1169 Reconstruction 0-019-006 06/16/11 DONE DONE DONE 04/11/11 04/08/11 03/30/11 05/04/10 8 15,800 15,800 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
12-0887 Reconstruction 0-019-007 ADDENDUM REQ'D 02/20/13 02/11/13 11/02/12 05/08/12 2,16 0 11,629,490 MFS 0 0 0 H2M Group 0 / / / /
McGuire Hall #2:
- XX Reconstruction 0-021-007 CANCELLED / / / / 11/02/12 / / 2,16 0 1,182,660 JMB 0 0 0 0 / / / /
12-0888 Reconstruction 0-021-009 05/22/13 DONE DONE DONE 02/20/13 02/11/13 11/28/12 05/08/12 2,16 21,000 0 MFS 0 0 0 H2M Group 0 / / / /
08-0793 Reconstruction 0-021-010 04/09/09 DONE DONE DONE 11/25/08 11/24/08 06/20/08 05/13/08 8,9,155,16 382,000 382,000 JOD 0 0 0 James M Campbell 0 / / 12/10/12
09-1485 Reconstruction 0-021-011 03/10/11 DONE DONE DONE 06/04/10 05/27/10 08/26/09 05/12/09 9,15,16 196,000 196,000 JOD 0 0 0 James M. Campbell Architects 0 / / / /
10-1170 Reconstruction 0-021-012 06/16/11 DONE DONE DONE 04/12/11 04/08/11 03/30/11 05/04/10 8 15,000 15,000 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
12-0889 Reconstruction 0-021-013 ADDENDUM REQ'D 02/20/13 02/11/13 02/20/13 05/08/12 2,16 0 0 MFS 0 0 0 H2M Group 0 / / / /
Jones Hall #1:
08-1277 Reconstruction 0-022-007 05/05/09 DONE DONE DONE 02/24/09 02/19/09 10/22/08 04/08/08 155,16 100,000 100,000 JOD 0 0 0 Bladykas Engineering,P.C. 0 / / / /
- XX Reconstruction 0-022-008 CANCELLED / / / / 01/02/09 / / 155 0 357,640 JOD 0 0 0 0 / / / /
10-0926 Reconstruction 0-022-009 06/07/11 DONE DONE DONE 03/03/11 02/18/11 06/21/10 06/21/10 155 10,500 10,500 JOD 0 0 0 Bladykas Engineering,P.C. 0 / / 02/07/13
10-1171 Reconstruction 0-022-010 06/16/11 DONE DONE DONE 04/12/11 04/08/11 03/30/11 05/04/10 8 16,000 16,000 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
11-0210 Reconstruction 0-022-011 04/17/12 DONE DONE DONE 09/29/11 09/28/11 06/01/11 05/10/11 155,16 190,000 0 JOD 0 0 0 Bladykas Engineering,P.C. 0 / / / /
12-0809 Reconstruction 0-022-012 04/29/13 DONE DONE DONE 02/12/13 02/01/13 10/04/12 05/10/12 8 56,000 0 MFS 0 0 0 Burton Behrendt Smith 0 / / / /
12-0890 Reconstruction 0-022-013 ADDENDUM REQ'D 02/20/13 02/11/13 11/02/12 05/08/12 2,16 0 394,220 MFS 0 0 0 H2M Group 0 / / / /
Taukomas School(Brennen Sch.):
07-1670 Reconstruction 0-025-014 08/11/08 DONE DONE DONE 02/23/08 02/20/08 12/26/07 11/13/07 2,4,8,9,155,15,16 1,050,000 1,050,000 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
12-0891 Reconstruction 0-025-015 06/05/13 DONE DONE DONE 02/20/13 02/11/13 11/02/12 05/08/12 16 150,000 0 JMB 0 0 0 H2M Group 0 / / / /
10-0927 Reconstruction 0-025-016 06/07/11 DONE DONE DONE 03/03/11 02/18/11 06/21/10 06/21/10 16 51,500 51,500 JOD 0 0 0 Bladykas Engineering,P.C. 0 / / 02/07/13
10-0879 Reconstruction 0-025-017 05/26/11 DONE DONE DONE 02/18/11 02/14/11 11/10/10 10/01/10 4,8,9,155,16 869,950 869,950 JOD 0 0 0 Burton Behrendt Smith 0 / / 01/22/13
10-1172 Reconstruction 0-025-018 06/16/11 DONE DONE DONE 04/12/11 04/08/11 03/30/11 05/04/10 9,16 25,000 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
11-0721 Reconstruction 0-025-019 04/17/12 DONE DONE DONE 01/25/12 01/24/12 06/01/11 05/10/11 2,15 350,000 0 JOD 0 0 0 Bladykas Engineering,P.C. 0 / / 01/29/13
- XX Reconstruction 0-025-020 CANCELLED / / / / 07/21/11 / / 16 0 7,573,704 JOD 0 0 0 0 / / / /
Manor Plains School:
08-0721 Reconstruction 0-029-015 11/17/08 DONE DONE DONE 11/07/08 11/06/08 / / 05/08/07 155,16 600,000 600,000 JOD 0 0 0 Bladykas Engineering,P.C. 0 / / / /
07-1973 Reconstruction 0-029-016 08/13/08 DONE DONE DONE 04/15/08 04/07/08 07/16/07 03/14/06 16 75,000 75,000 JOD 0 0 0 0 / / 02/08/09
07-2253 Reconstruction 0-029-017 10/02/08 DONE DONE DONE 06/13/08 06/05/08 07/24/07 05/08/07 2,9 135,000 135,000 JOD 0 0 0 James M. Campbell Architects 0 / / 02/08/09
10-0928 Reconstruction 0-029-018 06/07/11 DONE DONE DONE 03/03/11 02/18/11 06/21/10 06/21/10 16 10,500 10,500 JOD 0 0 0 Bladykas Engineering,P.C. 0 / / 02/07/13
10-1173 Reconstruction 0-029-019 06/16/11 DONE DONE DONE 04/12/11 04/08/11 03/30/11 05/04/10 9,16 126,878 126,878 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
11-0211 Reconstruction 0-029-020 04/17/12 DONE DONE DONE 09/29/11 09/28/11 06/01/11 05/10/11 15 80,000 0 JOD 0 0 0 Bladykas Engineering,P.C. 0 / / / /
11-1048 Reconstruction 0-029-021 04/27/12 DONE DONE DONE 03/28/12 03/23/12 01/31/12 05/11/11 8 500,000 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
12-0810 Reconstruction 0-029-022 04/29/13 DONE DONE DONE 02/12/13 02/01/13 10/04/12 05/10/12 8 520,000 520,000 MFS 0 0 0 Burton Behrendt Smith 0 / / / /
12-0892 Reconstruction 0-029-023 ADDENDUM REQ'D 02/20/13 02/11/13 11/02/12 05/08/12 155,15,16 0 15,768,440 MFS 0 0 0 H2M Group 0 / / / /
Aviation Center:
- XX Reconstruction 0-052-002 CANCELLED / / / / 07/21/11 / / 16 0 5,346,432 JOD 0 0 0 0 / / / /
Central Office:
07-2025 Additions and Alterations 1-035-005 10/08/08 DONE DONE DONE 04/24/08 04/17/08 07/27/06 01/29/08 02 - 16 3,335,000 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
09-0275 Reconstruction 1-035-009 11/13/09 DONE DONE DONE 10/01/09 09/30/09 06/29/09 06/10/09 2,8,9,155,16 395,000 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
09-1451 Reconstruction 1-035-010 06/10/10 DONE DONE DONE 05/20/10 05/17/10 01/06/10 06/10/08 2,8,9,155,16 237,000 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
11-0212 Reconstruction 1-035-011 04/17/12 DONE DONE DONE 09/29/11 09/28/11 06/01/11 05/10/11 155 15,000 0 JOD 0 0 0 Bladykas Engineering,P.C. 0 / / / /
- XX Reconstruction 1-035-012 CANCELLED / / / / 07/21/11 / / 16 0 0 JOD 0 0 0 0 / / / /
11-0675 Reconstruction 1-035-013 05/01/12 DONE DONE DONE 01/18/12 01/17/12 10/05/11 04/07/10 2,8,9,10,155,15,16 543,000 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
Manor Plains Md#3:
09-0983 Reconstruction 2-032-001 06/10/10 DONE DONE DONE 03/02/10 02/25/10 10/22/08 07/08/08 2,16 99,000 0 JOD 0 0 0 Bladykas Engineering,P.C. 0 / / / /
Storage @ Wilson Tech:
10-0435 New Construction 2-056-001 11/30/10 DONE DONE DONE 11/05/10 10/28/10 06/02/10 10/28/09 02 - 16 1,385,500 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
Maintenace / Grounds Facilty:
10-0107 New Construction 3-055-001 08/16/10 DONE DONE DONE 08/11/10 08/02/10 06/18/10 10/28/09 02 - 16 146,500 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
11-0216 Reconstruction 3-055-002 10/18/11 DONE DONE DONE 09/29/11 09/28/11 05/27/11 05/10/11 155 15,000 0 JOD 0 0 0 Bladykas Engineering,P.C. 0 / / / /
- XX Reconstruction 3-055-003 CANCELLED / / / / 07/21/11 / / 16 0 0 JOD 0 0 0 0 / / / /
Dix Hills:
10-1439PR New Construction 7-060-001 UNREVIEWED 06/30/11 06/23/11 05/23/11 / / 02 - 16 0 0 JOD 0 0 0 Burton Behrendt Smith 0 / / / /
11-0276 New Construction 7-060-001 11/08/11 DONE DONE DONE 10/25/11 10/21/11 05/23/11 06/09/09 02 - 16 950,000 0 JOD 0 0 0 Burton Behrendt Smith 0 / / 07/27/12
P.J. Brennan - North Babylon:
07-1974 Reconstruction 8-048-007 08/13/08 DONE DONE DONE 04/15/08 04/07/08 07/16/07 03/14/06 16 50,000 0 JOD 0 0 0 0 / / 02/08/12
11-0213 Reconstruction 8-048-009 04/17/12 DONE DONE DONE 09/29/11 09/28/11 06/07/11 05/10/11 155,16 75,000 0 JOD 0 0 0 Bladykas Engineering,P.C. 0 / / / /
- XX Reconstruction 8-048-010 CANCELLED / / / / 07/21/11 / / 16 0 0 JOD 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED