Construction Project Status

Construction Project Status

THE STATE EDUCATION DEPARTMENT

FACILITIES PLANNING


UPDATED: 10/17/17 at 06:42:57




FALLSBURG CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 59-05-01-06
last updated on 10/17/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Junior-Senior High School:
13-0959   Reconstruction               0-001-020  07/18/14     DONE    DONE       DONE      12/27/13   12/23/13   08/05/13   05/21/13   2,4,7,8,9,10,14,155,   3,187,008     3,187,008  MFS             0           0           0 Tetra Tech Architects and Eng           0      11/11/15                       06/30/16           
13-0831   Reconstruction               0-001-021  04/01/14     DONE    DONE       DONE      12/04/13   12/03/13   10/21/13   05/21/13   2,7                    2,085,093     2,085,093  MFS             0           0           0 Tetra Tech Architects and Eng           0      11/03/15                       06/30/16           
  -       Reconstruction               0-001-022                                              /  /       /  /     08/03/17     /  /     2,4,7,8,9,10,13,14,1           0             0  BMJ             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-001-023                                              /  /       /  /     08/03/17     /  /     2,4,8,9,16                     0             0  BMJ             0           0           0                                         0        /  /                           /  /             

          Benjamin Cosor Elementary:
13-0960   Reconstruction               0-007-018  07/18/14     DONE    DONE       DONE      12/27/13   12/23/13   08/05/13   05/21/13   2,4,8,9,10,155,15,16   2,235,985     2,235,985  MFS             0           0           0 Tetra Tech Architects and Eng           0      11/11/15                       06/30/16           
13-0832   Reconstruction               0-007-019  04/01/14     DONE    DONE       DONE      12/04/13   12/03/13   10/21/13   05/21/13   2,8,9                  3,219,400     3,219,400  MFS             0           0           0 Tetra Tech Architects and Eng           0      11/03/15                       06/30/16           
  -       Reconstruction               0-007-020                                              /  /       /  /     08/03/17     /  /     2,4,7,8,9,10,14,155,           0             0  BMJ             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-007-021                                              /  /       /  /     08/03/17     /  /     2,4,8,9,16                     0             0  BMJ             0           0           0                                         0        /  /                           /  /             

          XXTemp. Mfd Clrm Bldg. @ Corsor ES:
13-0961   Reconstruction               8-021-001  07/18/14     DONE    DONE       DONE      12/27/13   12/23/13   10/21/13     /  /                                    0             0  MFS             0           0           0 Tetra Tech Architects and Eng           0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




ELDRED CENTRAL SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 59-08-01-04
last updated on 10/17/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Eldred School:
  -       Reconstruction               0-001-009                                              /  /       /  /     11/19/12     /  /     2,4,8,9,13,155,15,16           0     4,688,376  JMB             0           0           0                                         0        /  /                           /  /             
16-0127   Reconstruction               0-001-014  10/03/16     DONE    DONE       DONE      07/18/16   07/18/16   07/12/16   07/14/16   8,9                       25,000             0  DDJ             0           0           0 BCK-IBI Group, a New York Gen           0        /  /                           /  /             

          Mackenzie Elementary School:
  -       Reconstruction               0-009-008                                              /  /       /  /     04/01/15     /  /     10,16                          0     9,394,980  DDJ             0           0           0                                         0        /  /                           /  /             

          District-Wide:
  -       Reconstruction               7-999-001                                              /  /       /  /       /  /       /  /     13,16                          0             0  DDJ             0           0           0                                         0        /  /                           /  /             
15-0892SB Reconstruction               7-999-001               DONE                           /  /       /  /     12/17/15     /  /     13,16                          0             0  DDJ             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




LIBERTY CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 59-09-01-06
last updated on 10/17/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Elementary School:
15-0304   Reconstruction               0-002-015  04/28/16     DONE    DONE       DONE      08/19/15   08/11/15   05/27/15   02/10/15   155,15,16                403,350       403,350  JMB             0           0           0 Ashley McGraw Architects          395,388        /  /                           /  /             

          High School:
15-0305   Reconstruction               0-009-012  04/28/16     DONE    DONE       DONE      08/19/15   08/11/15   05/27/15   02/10/15   155,15,16              2,272,872     2,272,872  JMB             0           0           0 Ashley McGraw Architects        2,233,253        /  /                           /  /             
15-1182   Reconstruction               0-009-013  09/20/16     DONE    DONE       DONE      02/04/16   02/04/16   11/12/15   05/19/15   2,4,7,8,9,10,13,155,   9,597,050     9,597,050  JMB             0           0           0 Ashley McGraw Architects                0        /  /                           /  /             
16-0329   Reconstruction               0-009-014  11/22/16     DONE    DONE       DONE      08/29/16   08/29/16   07/19/16   05/17/16   8                        100,000       100,000  AAA             0           0           0 Ashley McGraw Architects                0        /  /                           /  /             
16-0940   Reconstruction               0-009-015  11/07/16     DONE    DONE       DONE      12/08/16   12/08/16   10/01/16   09/13/16   2                        159,401       159,401  MTM             0           0           0 Ashley McGraw Architects                0      10/16/16                       03/23/17           
16-1638   Reconstruction               0-009-016  05/23/17     DONE    DONE       DONE      04/06/17   04/06/17   02/17/17   05/17/17   10                       100,000             0  MTM             0           0           0 Ashley McGraw Architects                0        /  /                           /  /             
  -       Reconstruction               0-009-017                                              /  /       /  /     07/28/17     /  /     2                              0             0  MTM             0           0           0                                         0        /  /                           /  /             

          Middle School:
14-0746   Reconstruction               0-013-006  02/18/15     DONE    DONE       DONE      12/15/14   12/11/14   08/12/14   05/20/14   8                        100,000       100,000  JMB             0           0           0 Ashley McGraw Architects                0      04/01/16                       06/13/16           
15-0306   Reconstruction               0-013-007  04/28/16     DONE    DONE       DONE      08/19/15   08/11/15   05/27/15   02/10/15   155,15,16              1,032,956     1,032,956  JMB             0           0           0 Ashley McGraw Architects        1,018,411        /  /                           /  /             

          Administration Bldg.:
15-0307   Reconstruction               1-010-004  04/28/16     DONE    DONE       DONE      08/19/15   08/11/15   05/27/15   02/10/15   16                        15,614             0  JMB             0           0           0 Ashley McGraw Architects           15,364        /  /                           /  /             

          Liberty Public Library:
16-2114   Additions and Alterations    6-012-002                         UNREVIEWED         06/23/17   06/23/17   03/10/17   09/13/16   02 - 16                        0             0  MTM             0           0           0 BUTLER ROWLAND MAYS ARCHITECT           0        /  /                           /  /             
17-0171SR Additions and Alterations    6-012-002  08/24/17     DONE    DONE       DONE      08/08/17     /  /     03/10/17   09/13/16   02 - 16                        0             0  MTM             0           0           0 BUTLER ROWLAND MAYS ARCHITECT           0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




TRI-VALLEY CENTRAL SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 59-12-01-04
last updated on 10/17/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Main Building (High School):
13-0531   Reconstruction               0-001-026  03/10/14     DONE    DONE       DONE      10/15/13   10/09/13   10/02/13   05/21/13   2,4,8,9,155,15,16        495,000       495,000  MFS             0           0           0 BCK-IBI Group, a New York Gen           0      08/20/15                       12/21/15           
13-1029   Reconstruction               0-001-027  03/04/14     DONE    DONE       DONE      01/15/14   01/14/14   12/12/13   05/21/13   2,4,8                  4,573,000     4,573,000  MFS             0           0           0 IBI GROUP                               0      08/20/15                       12/21/15           
15-1856   Reconstruction               0-001-028  06/23/16     DONE    DONE       DONE      06/02/16   06/01/16   04/12/16   05/17/16   7,8,9,16                 112,977       112,977  MFS             0           0           0 SWBR Architects P.C.                    0      12/05/16                       12/19/16           
16-0189   Reconstruction               0-001-029  12/27/16     DONE    DONE       DONE      08/02/16   08/02/16   05/25/16   05/17/16   4,8,16                 4,017,546             0  MFS             0           0           0 SWBR Architects P.C.                    0        /  /                           /  /             
  -    SB Reconstruction               0-001-BA1               DONE                           /  /       /  /       /  /       /  /     8,9,13,16                      0    27,811,016  MFS             0           0           0                                         0        /  /                           /  /             

          Elementary School:
13-1030   Reconstruction               0-002-012  03/04/14     DONE    DONE       DONE      01/15/14   01/14/14   10/02/13   05/21/13   2,8,9                    674,000       674,000  MFS             0           0           0 IBI GROUP                               0      08/20/15                       12/21/15           
16-0190   Reconstruction               0-002-013  12/27/16     DONE    DONE       DONE      08/02/16   08/02/16   04/12/16   05/17/16   2,8                    3,982,454             0  MFS             0           0           0 SWBR Architects P.C.                    0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




ROSCOE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 59-13-01-04
last updated on 10/17/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Roscoe School:
12-0551   Reconstruction               0-001-012  05/17/13     DONE    DONE       DONE      12/13/12   12/03/12   10/16/12   09/27/12   2,4,7,8,9,10,155,15,   3,756,000     3,756,000  JMB             0           0           0 SEI Design Group                        0      08/21/14                       10/20/14           
13-1597XX Reconstruction               0-001-013                         CANCELLED          06/04/14   06/02/14   03/19/14   04/23/14   13,16                          0    13,053,764  JMB             0           0           0 Solaris Global Energy LLC               0        /  /                           /  /             
14-0589   Reconstruction               0-001-014  09/23/14     DONE    DONE       DONE      11/06/14   11/05/14   09/22/14   08/15/14   2,9,16                   250,000       250,000  JMB             0           0           0 SEI Design Group                        0      12/17/14                       03/10/15           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




LIVINGSTON MANOR CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 59-13-02-04
last updated on 10/17/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Livingston Manor Central:
12-1124   Reconstruction               0-001-023  06/06/13     DONE    DONE       DONE      04/23/13   04/22/13   01/22/13   12/08/09   2,7,8,9                  285,000       285,000  JMB             0           0           0 BCK-IBI Group, a New York Gen           0      04/16/15                       05/07/15           
13-0950   Reconstruction               0-001-024  04/10/14     DONE    DONE       DONE      12/26/13   12/23/13   12/03/13   12/17/13   7                        325,500       325,500  JMB             0           0           0 BCK-IBI Group, a New York Gen           0        /  /                           /  /             
14-0242   Reconstruction               0-001-025  07/22/15     DONE    DONE       DONE      09/04/14   09/02/14   06/26/14   12/17/13   2,4,8,9,155,15,16      1,961,500     1,961,500  JMB             0           0           0 IBI GROUP                               0        /  /                           /  /             
15-1908   Reconstruction               0-001-026  06/24/16     DONE    DONE       DONE      06/10/16   06/10/16   06/09/16   12/17/13   2,9                       44,000        44,000  JMB             0           0           0 IBI GROUP                               0      10/10/16                       06/05/17           
16-1571   Reconstruction               0-001-027  09/14/17     DONE    DONE       DONE      03/29/17   03/29/17   03/27/17   12/17/13   2,8,9                    592,500             0  BMJ             0           0           0 BCK-IBI Group, a New York Gen           0        /  /                           /  /             
16-1753   Reconstruction               0-001-028  06/12/17     DONE    DONE       DONE      05/01/17   05/01/17   04/04/17   05/16/17   2,9                      100,000       100,000  BMJ             0           0           0 BCK-IBI Group, a New York Gen           0        /  /                           /  /             

          Storage Building #1:
16-0605DB Discovered Building          2-005-001  02/08/17     DONE    DONE       DONE      10/12/16   10/11/16   08/18/16     /  /                                    0             0  BMJ             0           0           0                                         0        /  /                           /  /             

          Storage Building #2:
16-0606DB Discovered Building          2-006-001  02/08/17     DONE    DONE       DONE      10/12/16   10/11/16   08/18/16     /  /                                    0             0  BMJ             0           0           0                                         0        /  /                           /  /             

          Storage Container #1:
16-0607DB Discovered Building          2-007-001  02/08/17     DONE    DONE       DONE      10/12/16   10/11/16   08/18/16     /  /                                    0             0  BMJ             0           0           0                                         0        /  /                           /  /             

          Storage Container #2:
16-0608DB Discovered Building          2-008-001  02/08/17     DONE    DONE       DONE      10/12/16   10/11/16   08/18/16     /  /                                    0             0  BMJ             0           0           0                                         0        /  /                           /  /             

          Storage Container #3:
16-0609DB Discovered Building          2-009-001  02/08/17     DONE    DONE       DONE      10/12/16   10/11/16   08/18/16     /  /                                    0             0  BMJ             0           0           0                                         0        /  /                           /  /             

          Press Box:
16-0610DB Discovered Building          7-010-001  02/08/17     DONE    DONE       DONE      10/12/16   10/11/16   08/18/16     /  /                                    0             0  BMJ             0           0           0                                         0        /  /                           /  /             

          Pump House:
16-0611DB Discovered Building          7-011-001  02/08/17     DONE    DONE       DONE      10/12/16   10/11/16   08/18/16     /  /                                    0             0  BMJ             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




MONTICELLO CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 59-14-01-06
last updated on 10/17/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Emma C Chase School:
  -       Reconstruction               0-001-013                                              /  /       /  /     12/18/15     /  /     8,9,16                         0     6,723,915  MFS             0           0           0                                         0        /  /                           /  /             

          Cornelius Duggan School:
  -       Reconstruction               0-004-014                                              /  /       /  /     12/18/15     /  /     8,9,16                         0     6,089,040  MFS             0           0           0                                         0        /  /                           /  /             

          George L Cooke School:
  -       Reconstruction               0-005-012                                              /  /       /  /     12/18/15     /  /     8,9,16                         0     9,469,710  MFS             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-005-013                                              /  /       /  /     03/29/17     /  /     2,9,16                         0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Kenneth Rutherford School:
14-1744   Reconstruction               0-006-011  07/06/15     DONE    DONE       DONE      06/25/15   06/24/15   06/05/15   06/04/15   9,16                     500,000       500,000  MFS             0           0           0 Savin Engineers, P.C.                   0      09/08/15                       10/13/15           
  -       Reconstruction               0-006-012                                              /  /       /  /     12/18/15     /  /     8,9,16                         0    11,189,223  MFS             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-006-013                                              /  /       /  /     03/29/17     /  /     2,9,16                         0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Middle/High School:
12-1072   Reconstruction               0-007-014  06/06/13     DONE    DONE       DONE      04/05/13   04/02/13   01/15/13   01/10/13   2,4,13,16                440,922       440,922  MFS             0           0     115,922 Savin Engineers, P.C.                   0      06/20/14                       11/03/14           
15-1137   Reconstruction               0-007-015  06/10/16     DONE    DONE       DONE      01/28/16   01/26/16   06/02/15   12/17/15   2,8                      650,000       650,000  MFS             0           0           0 Savin Engineers, P.C.                   0        /  /                           /  /             
17-0422   Reconstruction               0-007-016                       ADDENDUM REQ'D       09/19/17   09/18/17   03/29/17   05/04/17   2,9                            0             0  SLC             0           0           0 Clark Patterson Lee                     0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




SULLIVAN WEST CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 59-15-02-04
last updated on 10/17/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Sullivan West Elementary:
11-0819   Reconstruction               0-001-003  04/09/13     DONE    DONE       DONE      04/09/13   04/04/13   01/08/08   05/19/09   7                      1,547,169     1,547,169  HCM             0           0           0 Collins & Scoville Architects           0      11/15/13                       04/17/14           
15-0490   Reconstruction               0-001-012  04/29/16     DONE    DONE       DONE      09/23/15   09/22/15   09/03/15   10/23/12   2,155,16                 450,000       450,000  MFS             0           0           0 Collins & Scoville Architects           0        /  /                           /  /             
16-1462   Reconstruction               0-001-013                       ADDENDUM REQ'D       03/03/17   03/03/17   11/22/16   05/19/15   2,4,7,8,9,155,16               0     8,343,954  SLC             0           0           0 Collins & Scoville Architects           0        /  /                           /  /             
  -       Reconstruction               0-001-014                                              /  /       /  /     06/05/17     /  /     2,155,16                       0             0  SLC             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-001-015                                              /  /       /  /     08/31/17     /  /     2,8,16                         0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Sullivan West High School:
13-0017   Reconstruction               0-026-004  09/09/13     DONE    DONE       DONE      07/05/13   07/03/13   04/23/13   10/23/12   10,16                    348,152       348,152  MFS             0           0           0 Collins & Scoville Architects           0      08/25/15                       09/09/15           
13-0590   Reconstruction               0-026-005  04/17/14     DONE    DONE       DONE      10/18/13   10/16/13   03/25/11   10/23/12   2,16                   1,500,000     1,500,000  HCM             0           0           0 Collins & Scoville Architects           0        /  /                           /  /             
16-1463   Reconstruction               0-026-006                       ADDENDUM REQ'D       03/03/17   03/03/17   11/22/16   10/27/15   2,9                            0    26,015,943  SLC             0           0           0 Collins & Scoville Architects           0        /  /                           /  /             
  -       Reconstruction               0-026-007                                              /  /       /  /     08/31/17     /  /     2,8,16                         0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Mfd. Storage Bldg. #2 @ ES:
13-1076   New Construction             2-031-001  05/05/15     DONE    DONE       DONE      01/22/14   01/22/14   06/28/13   05/17/12   02 - 16                  600,000             0  MFS             0           0           0 Collins & Scoville Architects           0      08/03/16                       08/09/16           

          District-Wide:
  -    SB Reconstruction               7-999-BA1               DONE                           /  /       /  /       /  /       /  /     13                             0             0  SLC             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




BOCES SULLIVAN COUNTY STATUS REPORT ON CAPITAL PROJECTS
District No.: 59-90-00-00
last updated on 10/17/17
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Rubin Pollack Ed. Ctr.:
14-1701   Reconstruction               0-013-016  07/23/15     DONE    DONE       DONE      06/19/15   06/18/15   04/15/15   05/12/15   8,9                      146,000       146,000  MFS             0           0           0 BCK-IBI Group, a New York Gen           0      01/13/16                       06/05/17           
14-1702   Reconstruction               0-013-017  03/11/16     DONE    DONE       DONE      06/19/15   06/18/15   04/23/15   05/12/15   2,16                     275,000       275,000  MFS             0           0           0 BCK-IBI Group, a New York Gen           0      10/04/16                       06/05/17           
15-1641   Reconstruction               0-013-018  06/13/16     DONE    DONE       DONE      04/29/16   04/25/16   04/05/16   04/19/16   2,4                      381,000       381,000  MFS             0           0           0 IBI GROUP                               0        /  /                           /  /             
16-1155   Reconstruction               0-013-019  07/06/17     DONE    DONE       DONE      01/09/17   01/09/17   10/28/16   12/13/16   2,4,9,155,16             249,000             0  MTM             0           0           0 BCK-IBI Group, a New York Gen           0        /  /                           /  /             

          Voc Ed/Ag Bldg:
15-1642   Reconstruction               0-023-004  06/13/16     DONE    DONE       DONE      04/29/16   04/25/16   04/05/16   04/19/16   2,8                       89,000        89,000  MFS             0           0           0 IBI GROUP                               0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED