Construction Project Status

Construction Project Status

THE STATE EDUCATION DEPARTMENT

FACILITIES PLANNING


UPDATED: 04/26/24 at 09:29:44




FALLSBURG CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 59-05-01-06
last updated on 04/26/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Junior-Senior High School:
19-0643   Reconstruction               0-001-024  04/23/20     DONE    DONE       DONE      10/31/19   09/11/19   08/15/18   11/04/14   8                      1,022,055     1,022,055  JSS             0           0           0 Collins & Scoville Architects           0      06/28/22                       09/11/19           
21-1983FB Reconstruction               0-001-025  11/02/22     DONE    DONE       DONE      06/17/22   05/03/22   10/14/21   04/26/22   2,4,7,9,155,16         3,374,848     3,374,848  JLB             0           0           0 CS Arch                                 0        /  /                         05/03/22           

          Benjamin Cosor Elementary:
19-0644   Reconstruction               0-007-022  04/23/20     DONE    DONE       DONE      10/31/19   09/11/19   08/14/18   11/04/14   8                        700,399       700,399  JSS             0           0           0 Collins & Scoville Architects           0      06/28/22                       09/11/19           
21-1984FA Reconstruction               0-007-023  11/02/22     DONE    DONE       DONE      06/17/22   05/03/22   10/14/21   04/26/22   2,4,7,9,155,16         2,984,029     2,984,029  JLB             0           0           0 CS Arch                                 0        /  /                         05/03/22           

          Storage Building:
21-1985FC New Construction             2-025-001  11/02/22     DONE    DONE       DONE      06/17/22   05/03/22   10/14/21   04/26/22   02 - 16                1,392,758             0  JLB             0           0           0 CS Arch                                 0        /  /                         05/03/22           

          Benjamin Cosor Elementary:
  -    PR New Construction             7-023-001                                              /  /       /  /     10/14/21     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                           /  /             
21-1986FC New Construction             7-023-001  11/02/22     DONE    DONE       DONE      06/17/22   05/03/22   10/14/21   04/26/22   02 - 16                1,092,740             0  JLB             0           0           0 CS Arch                                 0      05/27/23                       05/03/22           

          Jun/Senior HS Annex:
  -    PR New Construction             7-024-001                                              /  /       /  /     10/14/21     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                           /  /             
21-1987FC New Construction             7-024-001  11/02/22     DONE    DONE       DONE      06/17/22   05/03/22   10/14/21   04/26/22   02 - 16                1,092,739             0  JLB             0           0           0 CS Arch                                 0        /  /                         05/03/22           

          Graduation Tent #1:
20-1776TQ Temporary Quarters           8-022-001  06/10/21     DONE    DONE       DONE      05/26/21     /  /     05/25/21     /  /                                    0             0  JLB             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




ELDRED CENTRAL SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 59-08-01-04
last updated on 04/26/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Eldred School:
23-0411   Reconstruction               0-001-015  03/19/24     DONE    DONE       DONE      09/06/23   08/29/23   07/06/23   12/06/22   2,4,7,8,9,155,15,16    9,055,670     5,227,422  JJH             0           0           0 KSQ Design                              0        /  /                         08/29/23           

          Mackenzie Elementary School:
23-0412   Reconstruction               0-009-009  03/19/24     DONE    DONE       DONE      09/06/23   08/29/23   07/06/23   12/06/22   2,4,7,8,9,155,15,16    1,923,148     1,923,148  JJH             0           0           0 KSQ Design                              0        /  /                         08/29/23           

          Press Box:
23-0413   New Construction             7-018-001  03/19/24     DONE    DONE       DONE      09/06/23   08/29/23   07/06/23   12/06/22   02 - 16                  186,281             0  JJH             0           0           0 KSQ Design                              0        /  /                         08/29/23           

          Field House:
23-0414   New Construction             7-019-001  03/19/24     DONE    DONE       DONE      09/06/23   08/29/23   07/06/23   10/19/22   02 - 16                1,564,900             0  JJH             0           0           0 KSQ Design                              0        /  /                         08/29/23           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




LIBERTY CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 59-09-01-06
last updated on 04/26/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Liberty Elementary School:
18-2087   Reconstruction               0-002-016  07/23/19     DONE    DONE       DONE      06/10/19   06/04/19   04/10/19   05/21/19   8,9,16                   350,000       350,000  JLB             0           0           0 Collins & Scoville Architects           0      09/04/20                       06/04/19           
  -       Reconstruction               0-002-017                                              /  /       /  /     03/12/24     /  /     2,155,15,16                    0             0  JJH             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-002-018                                              /  /       /  /     03/12/24     /  /     2,9                            0             0  JJH             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-002-019                                              /  /       /  /     03/12/24     /  /     2,4,8,9,155,15,16              0             0  JJH             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-002-020                                              /  /       /  /     03/12/24     /  /     7,9,16                         0             0  JJH             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-002-021                                              /  /       /  /     04/23/24     /  /     14,16                          0             0  JJH             0           0           0                                         0        /  /                           /  /             

          High School:
19-1843   Reconstruction               0-009-018  07/01/20     DONE    DONE       DONE      06/12/20   03/09/20   01/10/20   05/21/19   8,9,16                   100,000       100,000  JLB             0           0           0 CS Arch                                 0      07/20/21                       03/09/20           
23-1731   Reconstruction               0-009-019               UNREVIEWED
                                                                       STARTED    STARTED   04/02/24   04/01/24   06/21/23   05/16/23   2,9                            0             0  JJH             0           0           0 CS Arch                                 0        /  /                         04/01/24           
  -       Reconstruction               0-009-020                                              /  /       /  /     03/12/24     /  /     2,4,9,15,16                    0             0  JJH             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-009-021                                              /  /       /  /     03/12/24     /  /     2,4,7,8,9,155,15,16            0             0  JJH             0           0           0                                         0        /  /                           /  /             

          Middle School:
  -       Reconstruction               0-013-008                                              /  /       /  /     03/12/24     /  /     9,155,16                       0             0  JJH             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-013-009                                              /  /       /  /     03/12/24     /  /     2,4,9,15,16                    0             0  JJH             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-013-010                                              /  /       /  /     03/12/24     /  /     2,4,9,155,15,16                0             0  JJH             0           0           0                                         0        /  /                           /  /             

          Administration Bldg.:
  -       Reconstruction               1-010-005                                              /  /       /  /     03/12/24     /  /     2,4,9,15,16                    0             0  JJH             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               1-010-006                                              /  /       /  /     03/12/24     /  /     16                             0             0  JJH             0           0           0                                         0        /  /                           /  /             

          Maintenance Building:
22-0257   New Construction             3-016-001  10/21/22     DONE    DONE       DONE      08/15/22   08/09/22   09/21/21   12/16/21   02 - 16                1,469,131             0  JLB             0           0           0 CS Arch                                 0        /  /                         08/09/22           

          Press Box:
  -       New Construction             7-017-001                                              /  /       /  /     03/12/24     /  /     02 - 16                        0             0  JJH             0           0           0                                         0        /  /                           /  /             

          District Wide:
23-1732   Reconstruction               7-999-002                         UNREVIEWED         04/02/24   04/01/24   01/14/19   09/25/18   8,16                           0             0  JJH             0           0           0 CS Arch                                 0        /  /                         04/01/24           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




TRI-VALLEY CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 59-12-01-04
last updated on 04/26/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Main Building (High School):
  -    PR Additions and Alterations    0-001-030                                              /  /       /  /     06/14/19     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                           /  /             
19-0570   Additions and Alterations    0-001-030  04/01/20     DONE    DONE       DONE      10/18/19   10/02/19   06/14/19   05/21/19   02 - 16                8,964,384     8,643,968  JSS             0           0           0 SWBR Architects P.C.                    0      09/07/21           YES         10/02/19           
20-1310   Reconstruction               0-001-031  05/26/21     DONE    DONE       DONE      02/18/21   02/15/21   09/01/20   04/01/20   16                     1,734,556     1,734,556  JSS             0           0           0 SWBR Architects P.C.            1,734,556        /  /                         02/15/21           

          Elementary School:
19-0571   Reconstruction               0-002-014  04/01/20     DONE    DONE       DONE      10/18/19   10/02/19   06/14/19   05/21/19   2,8,9,10,155,15,16     2,035,616     2,035,616  JSS             0           0           0 SWBR Architects P.C.                    0      09/07/21           YES         10/02/19           
20-1311   Reconstruction               0-002-015  05/26/21     DONE    DONE       DONE      02/18/21   02/15/21   09/01/20   04/01/20   16                       434,840       434,840  JSS             0           0           0 SWBR Architects P.C.              434,840      10/01/23                       02/15/21           

          District Wide:
  -    SB Reconstruction               7-999-BA1               DONE                           /  /       /  /       /  /       /  /     16                             0             0  JSS             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




ROSCOE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 59-13-01-04
last updated on 04/26/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Roscoe School:
19-1562   Reconstruction               0-001-015  05/11/20     DONE    DONE       DONE      03/11/20   03/05/20   04/15/19   11/04/14   16                       256,761       256,761  SLC             0           0           0 SEI Design Group                        0        /  /                         03/05/20           
20-1535   Reconstruction               0-001-016  06/15/21     DONE    DONE       DONE      04/02/21   03/24/21   01/19/21   05/18/21   2,9,155                  100,000       100,000  SLC             0           0           0 SEI Design Group                        0      09/03/21                       03/24/21           
21-1615   Reconstruction               0-001-017  07/11/22     DONE    DONE       DONE      04/08/22   04/06/22   12/30/21   05/17/22   2,9,155                  100,000       100,000  FMJ             0           0           0 SEI Design Group                        0      10/07/22                       04/06/22           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




LIVINGSTON MANOR CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 59-13-02-04
last updated on 04/26/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Livingston Manor Central:
18-2076   Reconstruction               0-001-029  07/08/19     DONE    DONE       DONE      06/07/19   06/03/19   03/26/19   05/15/18   2,4                      100,000       100,000  SLC             0           0           0 SEI Design Group                        0      06/29/20                       06/03/19           
  -    PR Additions and Alterations    0-001-030                                              /  /       /  /     11/20/19     /  /     02 - 16                        0             0  BMJ             0           0           0                                         0        /  /                           /  /             
23-0930   Additions and Alterations    0-001-030                         UNREVIEWED         11/08/23   11/03/23   11/20/19   05/16/23   02 - 16                        0             0  JJH             0           0           0 SEI Design Group                        0        /  /                         11/03/23           
20-1901   Reconstruction               0-001-031  08/04/21     DONE    DONE       DONE      06/18/21   06/17/21   05/21/21   05/19/21   155,16                   820,000       820,000  JLB             0           0           0 SEI Design Group                        0      01/10/22                       06/17/21           

          District-Wide:
19-1586   Reconstruction               7-999-001  05/20/20     DONE    DONE       DONE      03/16/20   03/05/20   04/15/19   05/15/19   16                       617,438       617,438  JSS             0           0           0 SEI Design Group                        0        /  /                         03/05/20           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




MONTICELLO CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 59-14-01-06
last updated on 04/26/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Emma C Chase Elementary School:
18-1266   Reconstruction               0-001-014  05/20/19     DONE    DONE       DONE      01/15/19   01/14/19   12/14/18   11/14/18   2,7                      773,724       773,724  SLC             0           0           0 Clark Patterson Lee                     0      11/22/20                       01/14/19           
20-1456   Reconstruction               0-001-015  12/17/21     DONE    DONE       DONE      03/23/21   03/11/21   12/18/20   10/01/20   2,16                     557,641             0  SLC             0           0           0 ECG Engineering, LLC              557,641        /  /                         03/11/21           
22-1314FC Reconstruction               0-001-016  04/26/23     DONE    DONE       DONE      12/21/22   12/16/22   04/27/22   04/12/23   155                    1,727,594     1,727,594  JLB             0           0           0 Clark Patterson Lee                     0        /  /                         12/16/22           
  -       Reconstruction               0-001-017                                              /  /       /  /     03/05/24     /  /     2,8,9,155,15,16                0             0  MSK             0           0           0                                         0        /  /                           /  /             

          StJohnStrEducCtr PreK & Lsd BOCES:
  -       Reconstruction               0-003-015                                              /  /       /  /     03/12/21     /  /     4,7                            0             0  SLC             0           0           0                                         0        /  /                           /  /             

          George L Cooke School:
18-1267   Reconstruction               0-005-014  05/20/19     DONE    DONE       DONE      01/15/19   01/14/19   12/14/18   11/14/18   2,7                    1,356,835     1,356,835  SLC             0           0           0 Clark Patterson Lee                     0      11/22/20                       01/14/19           
19-0420   Reconstruction               0-005-015  12/20/19     DONE    DONE       DONE      09/18/19   08/22/19   05/14/19   05/21/19   2                         50,000        50,000  SLC             0           0           0 Clark Patterson Lee                     0      05/18/20                       08/22/19           
20-1457   Reconstruction               0-005-016  12/17/21     DONE    DONE       DONE      03/23/21   03/11/21   12/18/20   10/01/20   2,16                     287,097             0  SLC             0           0           0 ECG Engineering, LLC              287,097        /  /                         03/11/21           
22-1717FA Reconstruction               0-005-017  05/03/23     DONE    DONE       DONE      02/22/23   02/17/23   01/25/23   04/11/23   155                    2,644,714     2,644,714  JLB             0           0           0 Clark Patterson Lee                     0        /  /                         02/17/23           

          Kenneth Rutherford School:
18-1268   Reconstruction               0-006-014  05/20/19     DONE    DONE       DONE      01/15/19   01/14/19   12/14/18   11/14/18   2,7                    1,272,802     1,272,802  SLC             0           0           0 Clark Patterson Lee                     0      11/22/20                       01/14/19           
19-0421   Reconstruction               0-006-016  12/20/19     DONE    DONE       DONE      09/18/19   08/22/19   05/14/19   05/21/19   2                         50,000        50,000  SLC             0           0           0 Clark Patterson Lee                     0      05/18/20                       08/22/19           
20-1458   Reconstruction               0-006-017  12/17/21     DONE    DONE       DONE      03/23/21   03/11/21   12/18/20   10/01/20   2,16                     213,612             0  SLC             0           0           0 ECG Engineering, LLC              213,612        /  /                         03/11/21           
22-1718FA Reconstruction               0-006-018  05/03/23     DONE    DONE       DONE      02/22/23   02/17/23   01/25/23   04/11/23   155                    3,017,892     3,017,892  JLB             0           0           0 Clark Patterson Lee                     0        /  /                         02/17/23           
  -       Reconstruction               0-006-019                                              /  /       /  /     03/05/24     /  /     2                              0             0  MSK             0           0           0                                         0        /  /                           /  /             

          Middle/High School:
18-2130   Reconstruction               0-007-017  08/15/19     DONE    DONE       DONE      06/17/19   05/31/19   04/08/19   11/14/18   2,4,7,8,9,10,155,15,   1,595,614     1,595,614  SLC             0           0           0 Clark Patterson Lee                     0      07/13/20                       05/31/19           
19-1038   Reconstruction               0-007-018  03/24/20     DONE    DONE       DONE      12/24/19   12/24/19     /  /     11/14/18   2,4,7,8,9,10,155,15,  11,500,000    11,500,000  SLC             0           0           0 Clark Patterson Lee                     0        /  /                         12/24/19           
20-1459   Reconstruction               0-007-019  12/17/21     DONE    DONE       DONE      03/23/21   03/11/21   12/18/20   10/01/20   2,15,16                2,169,526             0  SLC             0           0           0 ECG Engineering, LLC            2,169,526        /  /                         03/11/21           
20-1881   Reconstruction               0-007-020  11/12/21     DONE    DONE       DONE      06/14/21   06/14/21   03/12/21   11/14/18   2                        738,000       738,000  SLC             0           0           0 Clark Patterson Lee                     0        /  /                         06/14/21           
  -       Reconstruction               0-007-021                                              /  /       /  /     03/05/24     /  /     2                              0             0  MSK             0           0           0                                         0        /  /                           /  /             

          XXStorage Building Demolition:
  -    XX Reconstruction               2-008-002                         CANCELLED            /  /       /  /     07/12/19     /  /     2                              0             0  SLC             0           0           0                                         0        /  /                           /  /             

          XXBus Garage (Demo 11/2022):
19-1039   Reconstruction               5-010-009  03/24/20     DONE    DONE       DONE      12/24/19   12/24/19   04/01/19   11/14/18   2                        500,000       500,000  SLC             0           0           0 Clark Patterson Lee                     0        /  /                         12/24/19           

          Bus Garage (74%BG/26%Facilities):
19-1040   New Construction             5-014-001  03/24/20     DONE    DONE       DONE      12/24/19   11/20/19   04/01/19   11/14/19   02 - 16                6,552,000     6,552,000  SLC             0           0           0 Clark Patterson Lee                     0      12/13/21           YES         11/20/19           

          District-Wide:
22-2288SB Reconstruction               7-999-004               DONE                           /  /       /  /     05/25/23     /  /     16                             0             0  MSK             0           0           0                                         0        /  /                           /  /             
23-1876   Reconstruction               7-999-004                         UNREVIEWED         04/19/24   04/19/24   05/25/23   06/01/23   16                             0             0  JLB             0           0           0 Clark Patterson Lee Architect           0        /  /                         04/19/24           

          Jefferson Prof Plaza Phase1-Admin:
18-1583TQ Temporary Quarters           8-013-001  07/11/19     DONE    DONE       DONE      03/01/19   03/01/19   12/21/18   12/20/18                                  0             0  SLC             0           0           0                                         0        /  /                         03/01/19           

          Fenced In Parking Lot:
20-0571SS Reconstruction               8-015-001  10/13/20     DONE    DONE       DONE      10/09/20   10/09/20   06/08/20   11/14/19                            120,000             0  SLC             0           0           0 Clark Patterson Lee                     0        /  /                         10/09/20           

          Verizon Parking Lot:
21-0392TQ Temporary Quarters           8-016-001  12/27/21     DONE    DONE       DONE      09/22/21   09/21/21   09/03/21     /  /                                8,400             0  SLC             0           0           0                                         0        /  /                         09/21/21           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




SULLIVAN WEST CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 59-15-02-04
last updated on 04/26/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Sullivan West Elementary:
20-0123   Reconstruction               0-001-016  08/05/20     DONE    DONE       DONE      07/27/20   07/27/20   04/23/20   06/09/20   2,8,9                  1,200,000     1,200,000  SLC             0           0           0 CS Arch                                 0      10/01/21                       07/27/20           
22-1625   Reconstruction               0-001-017  06/07/23     DONE    DONE       DONE      02/06/23   02/02/23   12/01/22   10/19/22   2,7,8,9,10,155,15,16   4,106,532     4,106,532  MSK             0           0           0 CS Arch                                 0        /  /                         02/02/23           
23-0599   Reconstruction               0-001-018               DONE    DONE       ADD. REQ'D10/04/23   10/02/23   12/01/22   10/19/22   2,4,7,8,9,10,155,15,   7,997,786             0  WLC             0           0           0 CS Arch                                 0        /  /                         10/02/23           

          Sullivan West High School:
22-1626   Reconstruction               0-026-008  06/07/23     DONE    DONE       DONE      02/06/23   02/02/23   12/01/22   10/19/22   8,9,16                   280,641       280,641  MSK             0           0           0 CS Arch                                 0        /  /                         02/02/23           
23-0502   Reconstruction               0-026-009                       ADDENDUM REQ'D       09/18/23   09/14/23   12/01/22   10/19/22   2,4,7,8,9,10,155,15,  12,796,135             0  MSK             0           0           0 CS Arch                                 0        /  /                         09/14/23           

          Storage Building:
  -    PR New Construction             2-034-001                                              /  /       /  /     12/01/22     /  /     02 - 16                        0             0  SLC             0           0           0                                         0        /  /                           /  /             
23-0503   New Construction             2-034-001                       ADDENDUM REQ'D       09/18/23   09/14/23   12/01/22   10/19/22   02 - 16                  673,906             0  MSK             0           0           0 CS Arch                                 0        /  /                         09/14/23           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




BOCES SULLIVAN COUNTY STATUS REPORT ON CAPITAL PROJECTS
District No.: 59-90-00-00
last updated on 04/26/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Rubin Pollack Ed. Ctr.:
22-1423   Reconstruction               0-013-021  05/04/23     DONE    DONE       DONE      01/06/23   01/05/23   02/05/21   12/27/22   2,7,155,15,16          2,996,634     2,996,634  WLC             0           0           0 CS Arch                                 0        /  /                         01/05/23           
21-1238   Reconstruction               0-013-022  05/10/22     DONE    DONE       DONE      02/07/22   02/03/22   10/25/21   12/21/21   155,15,16                720,024       720,024  JLB             0           0           0 CS Arch                                 0      04/23/23                       02/03/22           
  -       Reconstruction               0-013-023                                              /  /       /  /     07/03/23     /  /     16                             0             0  WLC             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-013-024                                              /  /       /  /     07/12/23     /  /     2,7,155,15,16                  0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Voc Ed/Ag Bldg:
23-0201   Reconstruction               0-023-005  01/24/24     DONE    DONE       DONE      08/04/23   08/02/23   03/22/23   07/13/23   9,10,155,16              945,778       945,778  WLC             0           0           0 CS Arch                                 0        /  /                         08/02/23           

          Ten Modular Classrooms (Leased):
20-0265   Reconstruction               0-024-002  11/03/20     DONE    DONE       DONE      08/25/20   08/21/20   02/14/20   03/10/20   7                        184,500             0  JSS             0           0           0 Collins & Scoville Architects           0        /  /                         08/21/20           
  -       Reconstruction               0-024-003                                              /  /       /  /     07/03/23     /  /     16                             0             0  WLC             0           0           0                                         0        /  /                           /  /             

          2018 RPEC Modular - Foundation:
19-1223   New Construction             0-033-001  07/25/18     DONE    DONE       DONE      06/20/18   06/18/18     /  /       /  /     02 - 16                  800,000       795,942  MTM             0           0           0                                         0      10/15/19                       06/18/18           

          Pollack Storage Unit 1:
  -    PR New Construction             2-037-001                                              /  /       /  /     07/27/22     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                           /  /             

          Pollack Storage Unit 2:
  -    PR New Construction             2-038-001                                              /  /       /  /     07/27/22     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                           /  /             

          Greenhouse@RPEC Campus:
  -    PR New Construction             7-039-001                                              /  /       /  /     03/22/23     /  /     02 - 16                        0             0  WLC             0           0           0                                         0        /  /                           /  /             
23-1611   New Construction             7-039-001                         UNREVIEWED         03/13/24   03/12/24   03/22/23   09/19/23   02 - 16                        0             0  WLC             0           0           0 CS Arch                                 0        /  /                         03/12/24           

          BOCES Center Annex:
  -       Reconstruction               8-019-004                                              /  /       /  /     07/03/23     /  /     16                             0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Sullivan's Building:
19-0362TQ Temporary Quarters           8-034-001  06/24/20     DONE    DONE       DONE      09/03/19   09/03/19   06/27/19     /  /                                    0             0  JSS             0           0           0                                         0        /  /                         09/03/19           

          SUNY Sullivan:
21-0604TQ Temporary Quarters           8-035-001                       ADDENDUM REQ'D       10/29/21   10/28/21   10/22/21     /  /                                    0             0  WLC             0           0           0                                         0        /  /                         10/28/21           

          Garnet Health:
21-0612TQ Temporary Quarters           8-036-001                       ADDENDUM REQ'D       10/29/21   10/28/21   10/26/21     /  /                                    0             0  WLC             0           0           0                                         0        /  /                         10/28/21           

          Sullivan Cty Emergey Contrl Ctr:
  -    TQ Temporary Quarters           8-040-001                                              /  /       /  /     04/11/23     /  /                                    0             0  WLC             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED