Construction Project Status

Construction Project Status

THE STATE EDUCATION DEPARTMENT

FACILITIES PLANNING


UPDATED: 07/03/15 at 12:57:41




FALLSBURG CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 59-05-01-06
last updated on 07/03/15
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Junior-Senior High School:
10-0097   Reconstruction               0-001-018  03/25/11     DONE    DONE       DONE      08/10/10   07/28/10   08/14/09   07/15/09   2,8,155,15,16          1,430,515     1,430,515  DDJ             0           0      96,310 Tetra Tech Architects and Eng   1,334,205      03/22/12                       08/21/13           
13-0959   Reconstruction               0-001-020  07/18/14     DONE    DONE       DONE      12/27/13   12/23/13   08/05/13   05/21/13   2,4,7,8,9,10,14,155,   3,187,008             0  MFS             0           0           0 Tetra Tech Architects and Eng           0        /  /                           /  /             
13-0831   Reconstruction               0-001-021  04/01/14     DONE    DONE       DONE      12/04/13   12/03/13   10/21/13   05/21/13   2,7                    1,907,607             0  MFS             0           0           0 Tetra Tech Architects and Eng           0        /  /                           /  /             

          Benjamin Cosor Elementary:
10-0098   Reconstruction               0-007-017  03/25/11     DONE    DONE       DONE      08/10/10   07/28/10   08/14/09   07/15/09   2,8,155,15,16            589,905       589,905  DDJ             0           0      96,310 Tetra Tech Architects and Eng     493,595      03/22/12                       08/21/13           
13-0960   Reconstruction               0-007-018  07/18/14     DONE    DONE       DONE      12/27/13   12/23/13   08/05/13   05/21/13   2,4,8,9,10,155,15,16   2,235,985             0  MFS             0           0           0 Tetra Tech Architects and Eng           0        /  /                           /  /             
13-0832   Reconstruction               0-007-019  04/01/14     DONE    DONE       DONE      12/04/13   12/03/13   10/21/13   05/21/13   2,8,9                  3,219,400             0  MFS             0           0           0 Tetra Tech Architects and Eng           0        /  /                           /  /             

          XXTemp. Mfd Clrm Bldg. @ Corsor ES:
13-0961   Reconstruction               8-021-001  07/18/14     DONE    DONE       DONE      12/27/13   12/23/13   10/21/13     /  /                                    0             0  MFS             0           0           0 Tetra Tech Architects and Eng           0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




ELDRED CENTRAL SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 59-08-01-04
last updated on 07/03/15
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Eldred School:
  -       Reconstruction               0-001-009                                              /  /       /  /     11/19/12     /  /     2,4,8,9,13,155,15,16           0     3,876,642  JMB             0           0           0                                         0        /  /                           /  /             
10-1290   Reconstruction               0-001-013  06/07/11     DONE    DONE       DONE      05/12/11   05/02/11   03/25/10   03/15/11   2,9,15,16                650,000       650,000  JOD             0           0           0 Collins & Scoville Architects           0      05/31/12                       03/15/13           

          Mackenzie Elementary School:
  -       Reconstruction               0-009-008                                              /  /       /  /     04/01/15     /  /     10,16                          0             0  DDJ             0           0           0                                         0        /  /                           /  /             

          Athletic Field Pump House:
  -    PR New Construction             7-017-001                                              /  /       /  /     12/10/10     /  /     02 - 16                        0             0  JOD             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




LIBERTY CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 59-09-01-06
last updated on 07/03/15
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Elementary School:
  -       Reconstruction               0-002-015                                              /  /       /  /     05/27/15     /  /     155,15,16                      0             0  JMB             0           0           0                                         0        /  /                           /  /             

          High School:
  -       Reconstruction               0-009-012                                              /  /       /  /     05/27/15     /  /     155,15,16                      0             0  JMB             0           0           0                                         0        /  /                           /  /             

          Middle School:
14-0746   Reconstruction               0-013-006  02/18/15     DONE    DONE       DONE      12/15/14   12/11/14   08/12/14   05/20/14   8                        100,000             0  JMB             0           0           0 Ashley McGraw Architects                0        /  /                           /  /             
  -       Reconstruction               0-013-007                                              /  /       /  /     05/27/15     /  /     155,15,16                      0             0  JMB             0           0           0                                         0        /  /                           /  /             

          Administration Bldg.:
  -       Reconstruction               1-010-004                                              /  /       /  /     05/27/15     /  /     16                             0             0  JMB             0           0           0                                         0        /  /                           /  /             

          Liberty Public Library:
10-0130   Reconstruction               6-012-001  09/01/10     DONE    DONE       DONE      08/20/10   08/17/10   07/08/10   04/13/10   8                        201,271             0  HCM             0           0           0 BUTLER ROWLAND MAYS ARCHITECT           0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




TRI-VALLEY CENTRAL SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 59-12-01-04
last updated on 07/03/15
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Main Building (High School):
11-1060   Reconstruction               0-001-025  04/06/12     DONE    DONE       DONE      04/03/12   03/26/12   03/14/12   05/15/11   7                        350,000       350,000  JOD             0           0           0 Bearsch Compeau Knudson Archi           0      12/04/12                       01/28/13           
13-0531   Reconstruction               0-001-026  03/10/14     DONE    DONE       DONE      10/15/13   10/09/13   10/02/13   05/21/13   2,4,8,9,155,15,16        495,000       495,000  MFS             0           0           0 BCK-IBI Group, a New York Gen           0        /  /                           /  /             
13-1029   Reconstruction               0-001-027  03/04/14     DONE    DONE       DONE      01/15/14   01/14/14   12/12/13   05/21/13   2,4,8                  4,573,000     4,573,000  MFS             0           0           0 IBI GROUP                               0        /  /                           /  /             

          Elementary School:
13-1030   Reconstruction               0-002-012  03/04/14     DONE    DONE       DONE      01/15/14   01/14/14   10/02/13   05/21/13   2,8,9                    674,000       674,000  MFS             0           0           0 IBI GROUP                               0        /  /                           /  /             

          Athletic Storage:
11-1409DB Discovered Building          2-016-001  09/24/12     DONE    DONE       DONE      06/15/12   06/07/12   04/19/12     /  /                                    0             0  JOD             0           0           0 Bearsch Compeau Knudson Archi           0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




ROSCOE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 59-13-01-04
last updated on 07/03/15
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Roscoe School:
  -       Reconstruction               0-001-011                                              /  /       /  /     03/20/12     /  /     2,4,9,155,15,16                0    13,184,742  HCM             0           0           0                                         0        /  /                           /  /             
12-0551   Reconstruction               0-001-012  05/17/13     DONE    DONE       DONE      12/13/12   12/03/12   10/16/12   09/27/12   2,4,7,8,9,10,155,15,   3,756,000     3,756,000  JMB             0           0           0 SEI Design Group                        0      08/21/14                       10/20/14           
13-1597XX Reconstruction               0-001-013                         CANCELLED          06/04/14   06/02/14   03/19/14   04/23/14   13,16                          0    13,245,934  JMB             0           0           0 Solaris Global Energy LLC               0        /  /                           /  /             
14-0589   Reconstruction               0-001-014  09/23/14     DONE    DONE       DONE      11/06/14   11/05/14   09/22/14   08/15/14   2,9,16                   250,000       250,000  JMB             0           0           0 SEI Design Group                        0      12/17/14                       03/10/15           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




LIVINGSTON MANOR CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 59-13-02-04
last updated on 07/03/15
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Livingston Manor Central:
09-1532   Reconstruction               0-001-022  10/14/10     DONE    DONE       DONE      06/15/10   06/07/10   05/21/10   12/08/09   2,4,7,8,9,13,14,155,   1,021,692     1,021,692  HCM             0           0           0 Bearsch Compeau Knudson Archi           0      01/31/13                       02/28/13           
12-1124   Reconstruction               0-001-023  06/06/13     DONE    DONE       DONE      04/23/13   04/22/13   01/22/13   12/08/09   2,7,8,9                  285,000       285,000  JMB             0           0           0 BCK-IBI Group, a New York Gen           0      04/16/15                       05/07/15           
13-0950   Reconstruction               0-001-024  04/10/14     DONE    DONE       DONE      12/26/13   12/23/13   12/03/13   12/17/13   7                        325,500             0  JMB             0           0           0 BCK-IBI Group, a New York Gen           0        /  /                           /  /             
14-0242   Reconstruction               0-001-025               DONE    DONE       ADD. REQ'D09/04/14   09/02/14   06/26/14   12/17/13   2,4,8,9,155,15,16              0             0  JMB             0           0           0 IBI GROUP                               0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




MONTICELLO CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 59-14-01-06
last updated on 07/03/15
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Kenneth Rutherford School:
14-1744   Reconstruction               0-006-011                         UNREVIEWED         06/25/15   06/24/15   06/05/15   06/04/15   9,16                           0             0  MFS             0           0           0 Savin Engineers, P.C.                   0        /  /                           /  /             

          Middle/High School:
12-1072   Reconstruction               0-007-014  06/06/13     DONE    DONE       DONE      04/05/13   04/02/13   01/15/13   01/10/13   2,4,13,16                440,922       440,922  MFS             0           0     115,922 Savin Engineers, P.C.                   0      06/20/14                       11/03/14           
  -       Reconstruction               0-007-015                                              /  /       /  /     06/02/15     /  /     2,8                            0             0  MFS             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




SULLIVAN WEST CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 59-15-02-04
last updated on 07/03/15
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Sullivan West Elementary:
11-0819   Reconstruction               0-001-003  04/09/13     DONE    DONE       DONE      04/09/13   04/04/13   01/08/08   05/19/09   7                      1,547,169     1,547,169  HCM             0           0           0 Collins & Scoville Architects           0      11/15/13                       04/17/14           

          New High School:
10-1059   Reconstruction               0-026-003  06/03/11     DONE    DONE       DONE      03/17/11   03/14/11   12/27/07   05/19/10   2,10,155,15            1,317,357     1,317,357  HCM             0           0           0 Bertsche Engineering                    0        /  /                           /  /             
13-0017   Reconstruction               0-026-004  09/09/13     DONE    DONE       DONE      07/05/13   07/03/13   04/23/13   10/23/12   10,16                    348,152             0  MFS             0           0           0 Collins & Scoville Architects           0        /  /                           /  /             
13-0590   Reconstruction               0-026-005  04/17/14     DONE    DONE       DONE      10/18/13   10/16/13   03/25/11   10/23/12   2,16                   1,500,000     1,500,000  HCM             0           0           0 Collins & Scoville Architects           0        /  /                           /  /             

          Mfd. Storage @ High School:
10-0410   New Construction             2-028-001  05/24/11     DONE    DONE       DONE      11/02/10   10/21/10   12/27/07   05/17/11   02 - 16                  190,000             0  HCM             0           0           0 Bertsche Engineering,Inc                0        /  /                           /  /             

          Mfd. Storage Bldg. #1 @ ES:
10-0403   New Construction             2-030-001  05/24/11     DONE    DONE       DONE      11/01/10   10/20/10   04/14/08   05/17/11   02 - 16                  190,000             0  HCM             0           0           0 Bertsche Engineering,Inc                0        /  /                           /  /             

          Mfd. Storage Bldg. #2 @ ES:
13-1076   New Construction             2-031-001  05/05/15     DONE    DONE       DONE      01/22/14   01/22/14   06/28/13   05/17/12   02 - 16                  600,000             0  MFS             0           0           0 Collins & Scoville Architects           0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




BOCES SULLIVAN COUNTY STATUS REPORT ON CAPITAL PROJECTS
District No.: 59-90-00-00
last updated on 07/03/15
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Rubin Pollack Ed. Ctr.:
10-1226   Reconstruction               0-013-014  06/23/11     DONE    DONE       DONE      04/27/11   04/25/11   04/15/11   04/19/11   7                         61,500        61,500  JOD             0           0           0 Bearsch Compeau Knudson Archi           0      06/27/12                       10/11/13           
11-0948   Reconstruction               0-013-015  04/06/12     DONE    DONE       DONE      03/14/12   03/12/12   02/17/12     /  /     7                        645,000             0  JOD             0           0           0 Bearsch Compeau Knudson Archi           0        /  /                           /  /             
14-1701   Reconstruction               0-013-016                         UNREVIEWED         06/19/15   06/18/15   04/15/15   05/12/15   8,9                            0             0  MFS             0           0           0 BCK-IBI Group, a New York Gen           0        /  /                           /  /             
14-1702   Reconstruction               0-013-017                         UNREVIEWED         06/19/15   06/18/15   04/23/15   05/12/15   2,16                           0             0  MFS             0           0           0 BCK-IBI Group, a New York Gen           0        /  /                           /  /             

          Boces Center Annex:
10-1227   Reconstruction               0-015-003  06/23/11     DONE    DONE       DONE      04/27/11   04/25/11   04/15/11   04/19/11   7                         65,700        65,700  JOD             0           0           0 Bearsch Compeau Knudson Archi           0      06/27/12                       07/01/13           

          Youngsville Elementary:
10-1398   Reconstruction               0-030-005  07/12/11     DONE    DONE       DONE      06/17/11   06/13/11   04/15/11   04/19/11   2,9,13                   210,000             0  JOD             0           0           0 Bearsch Compeau Knudson Archi           0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED