TIOGA COUNTY

TIOGA COUNTY

CANDOR 600301
NEWARK VALLEY 600402
OWEGO-APALACHI 600601
SPENCER VAN ET 600801
TIOGA 600903
WAVERLY 600101

















Construction Project Status

Construction Project Status

THE STATE EDUCATION DEPARTMENT

FACILITIES PLANNING


UPDATED: 08/28/15 at 09:37:29




WAVERLY CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 60-01-01-06
last updated on 08/28/15
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Elm Street Elementary School:
11-0873   Reconstruction               0-001-009  07/06/12     DONE    DONE       DONE      03/06/12   03/02/12   08/19/11   10/28/08   2,4,7,8,9,10,155,15,   1,703,000     1,703,000  HCM             0           0           0 Bearsch Compeau Knudson Archi           0      03/24/14                       05/12/14           
11-1234   Reconstruction               0-001-010  05/16/12     DONE    DONE       DONE      04/26/12   04/25/12   04/20/12   10/28/08   155,15,16                392,000       392,000  HCM             0           0           0 Bearsch Compeau Knudson Archi           0      02/14/13                       10/21/13           
  -       Reconstruction               0-001-011                                              /  /       /  /     08/30/12     /  /     2,4,8,9,10,13,155,15           0     7,448,210  JMB             0           0           0                                         0        /  /                           /  /             
14-0492   Reconstruction               0-001-012  07/28/15     DONE    DONE       DONE      10/21/14   10/14/14   08/07/14   05/20/14   2,4,8,9,10,155,15,16     450,000       450,000  JMB             0           0           0 BCK-IBI Group, a New York Gen           0        /  /                           /  /             
14-1259   Reconstruction               0-001-013               STARTED DONE       DONE      03/12/15   03/09/15   02/23/15   03/09/15   2,4,7,8,9,16                   0     7,448,210  JMB             0           0           0 IBI GROUP                               0        /  /                           /  /             

          Chemung #3 Elementary:
11-0874   Reconstruction               0-009-008  07/06/12     DONE    DONE       DONE      03/06/12   03/02/12   08/19/11   10/28/08   2,4,7,8,9,10,155,15,     518,000       518,000  HCM             0           0           0 Bearsch Compeau Knudson Archi           0      03/24/14                       05/12/14           
14-0493   Reconstruction               0-009-009  07/28/15     DONE    DONE       DONE      10/21/14   10/14/14   08/07/14   05/20/14   2,4,8,9,10,155,15,16     500,000             0  JMB             0           0           0 BCK-IBI Group, a New York Gen           0        /  /                           /  /             

          Lincoln St School:
11-0875   Reconstruction               0-016-008  07/06/12     DONE    DONE       DONE      03/06/12   03/02/12   08/19/11   10/28/08   2,4,7,8,9,10,155,15,   1,300,000     1,300,000  HCM             0           0           0 Bearsch Compeau Knudson Archi           0      03/24/14                       05/12/14           
14-0494   Reconstruction               0-016-009  07/28/15     DONE    DONE       DONE      10/21/14   10/14/14   08/07/14   05/20/14   2,4,8,9,155,15,16        600,000       600,000  JMB             0           0           0 BCK-IBI Group, a New York Gen           0        /  /                           /  /             
14-1090SR Reconstruction               0-016-009  02/27/15     DONE    DONE       DONE      02/18/15   02/18/15   08/07/14   05/20/14   2,4,8,9,155,15,16              0             0  JMB             0           0           0 BCK-IBI Group, a New York Gen           0        /  /                           /  /             
14-1422   Reconstruction               0-016-010  05/08/15     DONE    DONE       DONE      04/22/15   04/21/15   03/12/15   03/19/15   10,16                          0     5,962,410  JMB             0           0           0 BCK-IBI Group, a New York Gen           0        /  /                           /  /             

          Waverly Jr/Sr High School:
11-0876   Reconstruction               0-018-012  07/06/12     DONE    DONE       DONE      03/06/12   03/02/12   10/20/08   10/28/08   2,4,7,8,9,10,155,15,   6,800,000     6,800,000  HCM             0           0           0 Bearsch Compeau Knudson Archi           0      03/24/14                       05/28/15           
12-0306   Reconstruction               0-018-013  05/08/13     DONE    DONE       DONE      10/24/12   10/23/12   10/18/12   03/28/08   2,9,13,16              4,008,000     4,008,000  JMB             0           0           0 IBI GROUP                               0      09/05/14                       04/06/15           
14-0495   Reconstruction               0-018-014  07/28/15     DONE    DONE       DONE      10/21/14   10/14/14   08/07/14   05/20/14   2,4,8,9,10,155,15,16   3,050,000             0  JMB             0           0           0 BCK-IBI Group, a New York Gen           0        /  /                           /  /             
14-1091SR Reconstruction               0-018-014  02/27/15     DONE    DONE       DONE      02/18/15   02/18/15   08/07/14   05/20/14   2,4,8,9,10,155,15,16           0             0  JMB             0           0           0 BCK-IBI Group, a New York Gen           0        /  /                           /  /             

          Bus Garage:
11-0877   Reconstruction               5-002-005  07/06/12     DONE    DONE       DONE      03/06/12   03/02/12   08/19/11   10/28/08   2,4,7,8,9,10,155,15,     855,000       855,000  HCM             0           0           0 Bearsch Compeau Knudson Archi           0      03/24/14                       05/12/14           

          Concession Stand-Elm St(demo 2014):
12-0415DB Discovered Building          7-022-001  11/27/12     DONE    DONE       DONE      11/14/12   10/19/12   08/29/12     /  /                                    0             0  JMB             0           0           0 Bearsch Compeau Knudson Archi           0        /  /                           /  /             
12-0307XX Reconstruction               7-022-002  04/22/13               CANCELLED          10/24/12   10/23/12   10/24/12   10/28/08   4,7,8,9,10,155,15,16      30,000             0  JMB             0           0           0 IBI GROUP                               0        /  /                           /  /             

          Press Box:
12-0308   New Construction             7-023-001  04/22/13     DONE    DONE       DONE      10/24/12   10/23/12   08/30/12   10/28/08   02 - 16                   37,500             0  JMB             0           0           0 IBI GROUP                               0      08/21/14                       12/19/14           

          Toilet Facility:
12-0309   New Construction             7-024-001  04/22/13     DONE    DONE       DONE      10/24/12   10/23/12   10/18/12   10/28/08   02 - 16                  236,000             0  JMB             0           0           0 IBI GROUP                               0      08/21/14                       12/19/14           

          Ticket Booth #1:
12-0310   New Construction             7-025-001  04/22/13     DONE    DONE       DONE      10/24/12   10/23/12   10/18/12   10/28/08   02 - 16                   25,000             0  JMB             0           0           0 IBI GROUP                               0      08/21/14                       12/19/14           

          Ticket Booth #2:
12-0311   New Construction             7-026-001  04/22/13     DONE    DONE       DONE      10/24/12   10/23/12   10/18/12   10/28/08   02 - 16                   25,000             0  JMB             0           0           0 IBI GROUP                               0      08/21/14                       12/19/14           

          Concession Building:
13-1439   New Construction             7-027-001  04/11/14     DONE    DONE       DONE      04/09/14   04/09/14   03/21/14   10/28/08   02 - 16                  130,000             0  JMB             0           0           0 IBI GROUP                               0      08/26/14                       12/19/14           

          Ticket Booth #3:
14-1260   New Construction             7-028-001               STARTED DONE       DONE      03/12/15   03/09/15   03/02/15     /  /     02 - 16                        0             0  JMB             0           0           0 IBI GROUP                               0        /  /                           /  /             

          Districtwide:
11-1156   Reconstruction               7-999-002  06/20/12     DONE    DONE       DONE      04/19/12   04/18/12   01/31/12   12/08/08   16                       450,000       450,000  HCM             0           0           0 Bearsch Compeau Knudson Archi           0      01/31/13                       10/21/13           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




CANDOR CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 60-03-01-04
last updated on 08/28/15
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          High School Academy:
12-0622   Reconstruction               0-001-008  08/15/13     DONE    DONE       DONE      12/26/12   12/23/12   11/15/12   11/15/12   10,155,16                100,000       100,000  JMB             0           0           0 C&S Companies                           0      12/04/13                       12/09/13         YES
                                                                                                                                                                                                                                                                                                                                   
  -       Reconstruction               0-001-009                                              /  /       /  /     07/29/13     /  /     4,8,9,15,16                    0             0  JMB             0           0           0                                         0        /  /                           /  /             
14-1199   Reconstruction               0-001-010  05/26/15     DONE    DONE       DONE      02/26/15   02/24/15   09/26/14   11/05/14   2,4,7,8,9,155,15,16    2,632,461             0  JMB             0           0           0 Highland Associates                     0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   

          Elementary Academy:
11-0079XX Reconstruction               0-003-006                         CANCELLED          08/03/11   08/03/11   04/13/11     /  /     8,10                           0    10,559,160  HCM             0           0           0 Highland Associates                     0        /  /                           /  /             
14-1200   Reconstruction               0-003-007  05/26/15     DONE    DONE       DONE      02/26/15   02/24/15   09/26/14   11/05/14   2,4,7,8,9,155,15,16      974,857       974,857  JMB             0           0           0 Highland Associates                     0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   

          Bus Garage:
14-1637   New Construction             5-013-001               STARTED DONE       UNREVIEWED06/10/15   06/03/15   09/26/14   11/05/14   02 - 16                        0             0  JMB             0           0           0 Highland Associates                     0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   

          Bus Wash Building:
14-1638   New Construction             5-014-001               STARTED DONE       UNREVIEWED06/10/15   06/03/15   05/14/15   11/05/14   02 - 16                        0             0  JMB             0           0           0 Highland Associates                     0        /  /                           /  /           YES
                                                                                                                                                                                                                                                                                                                                   


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




NEWARK VALLEY CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 60-04-02-04
last updated on 08/28/15
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Nathan T. Hall Elementary:
11-1353   Reconstruction               0-002-013  06/08/12     DONE    DONE       DONE      05/25/12   05/25/12   03/28/12   05/15/12   2,7,155,15,16            100,000       100,000  DDJ             0           0           0 Keystone Assoc Architects, En           0      09/13/12                       11/02/12           
  -       Reconstruction               0-002-014                                              /  /       /  /     07/17/15     /  /     2,7,155,15,16                  0             0  DDJ             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-002-015                                              /  /       /  /     07/17/15     /  /     2,4,155,15,16                  0             0  DDJ             0           0           0                                         0        /  /                           /  /             

          Middle School:
  -       Reconstruction               0-003-017                                              /  /       /  /     07/17/15     /  /     2,7,155,15,16                  0             0  DDJ             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-003-018                                              /  /       /  /     07/17/15     /  /     2,4,7,8,9,10,155,15,           0             0  DDJ             0           0           0                                         0        /  /                           /  /             

          High School:
10-0100   Reconstruction               0-007-016  10/19/10     DONE    DONE       DONE      08/10/10   07/29/10   03/24/10   05/24/10   2,4,8,9,155,16           100,000       100,000  DDJ             0           0           0 Clark Patterson Lee                     0      01/07/11                         /  /             
11-0014   Reconstruction               0-007-017  08/25/11     DONE    DONE       DONE      07/12/11   07/07/11   05/20/11   06/13/11   2,4,9,10,155,16          100,000       100,000  DDJ             0           0           0 Clark Patterson Lee                     0      06/22/12                       11/19/12           
12-1219   Reconstruction               0-007-018  06/10/13     DONE    DONE       DONE      05/21/13   05/21/13   04/09/13   05/21/13   16                       100,000       100,000  DDJ             0           0           0 Keystone Assoc Architects, En           0      10/24/13                       03/31/14           
  -       Reconstruction               0-007-019                                              /  /       /  /     07/17/15     /  /     2,7,155,15,16                  0             0  DDJ             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-007-020                                              /  /       /  /     07/17/15     /  /     2,4,7,8,9,155,15,16            0             0  DDJ             0           0           0                                         0        /  /                           /  /             

          Bus Garage:
12-0089   Reconstruction               5-004-007  08/14/12     DONE    DONE       DONE      08/08/12   08/06/12   07/30/12   08/12/12   2,15,16                   85,500        85,500  DDJ             0           0           0 Keystone Assoc Architects, En           0      12/23/12                       07/16/13           
13-1492   Reconstruction               5-004-008  06/05/14     DONE    DONE       DONE      04/29/14   04/28/14   04/15/14   05/20/14   2,16                     100,000       100,000  DDJ             0           0           0 Keystone Assoc Architects, En           0      02/05/15                       02/27/15           
  -       Reconstruction               5-004-009                                              /  /       /  /     07/17/15     /  /     2,4,7,8,9,155,15,16            0             0  DDJ             0           0           0                                         0        /  /                           /  /             

          Transportation Building:
  -    PR New Construction             5-017-001                                              /  /       /  /     07/17/15     /  /     02 - 16                        0             0  DDJ             0           0           0                                         0        /  /                           /  /             

          District-Wide:
  -       Reconstruction               7-999-001                                              /  /       /  /     07/17/15     /  /                                    0             0  DDJ             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




OWEGO APALACHIN CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 60-06-01-06
last updated on 08/28/15
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Owego Elementary School:
  -       Reconstruction               0-007-010                                              /  /       /  /     09/22/11     /  /     2                              0             0  HCM             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-007-011                                              /  /       /  /     09/22/11     /  /     4,8,9,155,15,16                0             0  HCM             0           0           0                                         0        /  /                           /  /             
12-0933   Reconstruction               0-007-012  03/19/13     DONE    DONE       DONE      02/28/13   02/22/13   08/30/12   08/29/12   2                      1,542,031             0  JMB             0           0           0 Highland Associates                     0      08/27/14                       10/09/14           

          Owego Free Academy High:
  -       Reconstruction               0-009-015                                              /  /       /  /     09/22/11     /  /     2,4,8,9,155,15,16              0             0  HCM             0           0           0                                         0        /  /                           /  /             
12-1108   Reconstruction               0-009-016  09/26/13     DONE    DONE       DONE      04/15/13   04/15/13   03/13/12   09/06/12   4,8,9,10,155,15,16     1,801,200     1,801,200  JMB             0           0           0 Highland Associates                     0        /  /                           /  /             
13-0253   Reconstruction               0-009-017  04/01/14     DONE    DONE       DONE      08/20/13   08/20/13   05/29/13   07/25/13   10,14,155,16             100,000       100,000  JMB             0           0           0 C&S Engineers, Inc.                     0      06/27/14                       07/02/14           
13-0751   Reconstruction               0-009-018  04/11/14     DONE    DONE       DONE      11/22/13   11/18/13   08/09/13   07/25/13   155,16                   323,375       323,375  JMB             0           0           0 Keystone Assoc Architects, En     323,375      09/30/14                       03/16/15           
14-0550   Reconstruction               0-009-019  03/05/15     DONE    DONE       DONE      10/29/14   10/27/14   09/30/14   09/18/14   10,155,16                100,000       100,000  JMB             0           0           0 INTELLIGENT CONVERTED ENERGY,           0      06/10/15                       06/29/15           

          New Owego Elementary:
12-1220PR New Construction             0-014-001                         UNREVIEWED         05/16/13   05/16/13   12/26/12     /  /     02 - 16                        0             0  JMB             0           0           0 Highland Associates                     0        /  /                           /  /             
12-1233SR New Construction             0-014-001  07/18/13     DONE    DONE       DONE      05/29/13   05/24/13   12/26/12     /  /     02 - 16                        0             0  JMB             0           0           0 Highland Associates                     0        /  /                           /  /             
13-0364   New Construction             0-014-001  11/18/13     DONE    DONE       DONE      09/13/13   09/12/13   12/26/12   07/17/13   02 - 16               11,000,000    11,000,000  JMB             0           0           0 Highland Associates                     0        /  /                           /  /             

          Administration Bldg:
  -       Reconstruction               1-002-003                                              /  /       /  /     09/22/11     /  /     2,4,8,9,155,15,16              0             0  HCM             0           0           0                                         0        /  /                           /  /             

          Administration Building:
14-0890   New Construction             1-013-001  04/29/15     DONE    DONE       DONE      12/30/14   12/26/14   12/26/12   01/18/15   02 - 16                9,176,301             0  JMB             0           0           0 Highland Associates                     0        /  /                           /  /             

          Stadium Seating:
11-0817DB Discovered Building          2-012-001  03/02/12     DONE    DONE       DONE      02/14/12   02/13/12   06/14/11     /  /                                    0             0  HCM             0           0           0 Highland Associates                     0        /  /                           /  /             

          Maintenance Bldg:
  -       Reconstruction               3-004-003                                              /  /       /  /     09/22/11     /  /     2,4,8,155,15,16                0             0  HCM             0           0           0                                         0        /  /                           /  /             

          Maintenance Facility:
14-1326   New Construction             3-015-001  08/19/15     DONE    DONE       DONE      03/25/15   03/23/15   12/26/12   01/08/15   02 - 16               11,539,980             0  JMB             0           0           0 Highland Associates                     0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




SPENCER VAN ETTEN CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 60-08-01-04
last updated on 08/28/15
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Spencer Middle School:
12-0521   Reconstruction               0-001-013  04/09/14     DONE    DONE       DONE      12/11/12   12/10/12   05/17/12   12/13/11   2,4,7,8,9,155,15,16      567,897             0  DDJ             0           0           0 SEI Design Group                  567,897        /  /                           /  /             
14-1116   Reconstruction               0-001-014  04/02/15     DONE    DONE       DONE      02/11/15   02/11/15   01/14/15   12/09/14   2,7                      316,400             0  MFS             0           0           0 SEI Design Group                        0        /  /                           /  /             
15-0251   Reconstruction               0-001-015                         UNREVIEWED         08/06/15   08/03/15   03/19/15   12/09/14   2,4,7,8,9,10,155,15,           0             0  MFS             0           0           0 SEI Design Group                        0        /  /                           /  /             

          Van Etten Elementary:
12-0522   Reconstruction               0-006-012  04/09/14     DONE    DONE       DONE      12/11/12   12/10/12   05/17/12   12/13/11   2,4,7,8,9,155,15,16      379,849             0  DDJ             0           0           0 SEI Design Group                  379,849        /  /                           /  /             
15-0252   Reconstruction               0-006-013                         UNREVIEWED         08/06/15   08/03/15   03/19/15   12/09/14   2,4,7,8,9,10,155,15,           0             0  MFS             0           0           0 SEI Design Group                        0        /  /                           /  /             

          Senior High School:
11-0275   Reconstruction               0-010-012  11/08/11     DONE    DONE       DONE      10/25/11   10/24/11   05/10/11   03/18/08   2,7,8,9                  453,980       453,980  DDJ             0           0           0 SEI Design Group                        0      02/01/13                       05/30/13           
12-0523   Reconstruction               0-010-013  04/09/14     DONE    DONE       DONE      12/11/12   12/10/12   05/17/12   12/13/11   2,4,7,8,9,155,15,16      780,370             0  DDJ             0           0           0 SEI Design Group                  780,370        /  /                           /  /             
14-1117   Reconstruction               0-010-014  04/02/15     DONE    DONE       DONE      02/11/15   02/11/15   01/14/15   12/09/14   2,7                    1,522,050             0  MFS             0           0           0 SEI Design Group                        0        /  /                           /  /             
15-0253   Reconstruction               0-010-015                         UNREVIEWED         08/06/15   08/03/15   03/19/15   12/09/14   2,4,8,9,10,14,155,15           0             0  MFS             0           0           0 SEI Design Group                        0        /  /                           /  /             

          Maintenance Building:
15-0255   Additions and Alterations    2-019-002                         UNREVIEWED         08/06/15   08/03/15   07/17/15   12/09/14   02 - 16                        0             0  MFS             0           0           0 SEI Design Group                        0        /  /                           /  /             

          Bus Storage Maintenance:
12-0524   Reconstruction               5-002-006  04/09/14     DONE    DONE       DONE      12/11/12   12/10/12   05/17/12   12/13/11   2,4,7,8,9,155,15,16       60,674             0  DDJ             0           0           0 SEI Design Group                   60,674        /  /                           /  /             
14-1118   Reconstruction               5-002-007  04/02/15     DONE    DONE       DONE      02/11/15   02/11/15   01/14/15   12/09/14   2,7                      109,350             0  MFS             0           0           0 SEI Design Group                        0        /  /                           /  /             
15-0254   Reconstruction               5-002-008                         UNREVIEWED         08/06/15   08/03/15   03/19/15   12/09/14   2,4,8,9,155,15,16              0             0  MFS             0           0           0 SEI Design Group                        0        /  /                           /  /             

          Press Box/Concession stand:
15-0256   Reconstruction               7-018-002                         UNREVIEWED         08/06/15   08/03/15   07/17/15   12/09/14   8,9,16                         0             0  MFS             0           0           0 SEI Design Group                        0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




TIOGA CENTRAL SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 60-09-03-04
last updated on 08/28/15
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE             CERT. OCC.    CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Nichols Elementary:
10-0909   Reconstruction               0-003-009  08/12/11     DONE    DONE       DONE      02/24/11   02/22/11   08/06/10   12/23/10   10,155,15,16              16,500             0  JOD             0           0           0 DPC Engineering                         0        /  /                           /  /             

          K/12 Bldg.(Fmly SHS/MS/Elem):
10-0910   Reconstruction               0-007-009  08/12/11     DONE    DONE       DONE      02/24/11   02/22/11   08/06/10   12/23/10   8,9,10,155,15,16         426,900       426,900  JOD             0           0           0 DPC Engineering                         0      06/27/13                       07/08/13           
  -       Reconstruction               0-007-010                                              /  /       /  /     04/16/13     /  /     8,10,16                        0             0  JOB             0           0           0                                         0        /  /                           /  /             
13-1292   Reconstruction               0-007-011  05/21/14     DONE    DONE       DONE      02/26/14   02/25/14   10/02/13   09/18/13   2                      1,171,650     1,171,650  MFS             0           0           0 Foor & Associates                       0        /  /                           /  /             

          Old Garage Building:
10-0922   Reconstruction               5-005-005  08/12/11     DONE    DONE       DONE      02/24/11   02/23/11   08/06/10   12/23/10   4,7,13                    19,870        19,870  JOD             0           0           0 DPC Engineering                         0      06/27/13                       07/08/13           
  -       Reconstruction               5-005-006                         UNREVIEWED         03/01/11   02/22/11   03/02/11   12/23/10   10                             0             0  JOD             0           0           0 DPC Engineering                         0        /  /                           /  /             

          New Bus Garage:
10-0911   Reconstruction               5-026-002  08/12/11     DONE    DONE       DONE      02/24/11   02/23/11   08/06/10   12/23/10   2,9,14,15,16              86,730        86,730  JOD             0           0           0 DPC Engineering                         0      06/27/13                       07/08/13           
  -       Reconstruction               5-026-003                                              /  /       /  /     04/16/13     /  /     8,10,16                        0             0  JOB             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED