GLENS FALLS CITY SCHOOLS STATUS REPORT ON CAPITAL PROJECTS
District No.: 63-03-00-01
last updated on 04/19/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Middle/High School:
20-0105 Reconstruction 0-001-030 09/18/20 DONE DONE DONE 07/21/20 07/14/20 02/13/20 05/16/17 2,4,7,8,9,155,15,16 1,830,000 1,830,000 SLC 0 0 0 Mosaic Associates 0 03/15/22 07/14/20
21-1794 Reconstruction 0-001-031 08/05/22 DONE DONE DONE 05/09/22 05/06/22 02/14/22 12/14/21 4,7,8,9,10,155,15,16 3,333,100 3,333,100 JLB 0 0 0 Mosaic Associates 0 12/01/23 05/06/22
22-0697 Reconstruction 0-001-032 01/24/23 DONE DONE DONE 10/12/22 10/11/22 09/07/22 12/14/21 2,4,7,8,9,10,155,15, 14,536,815 14,536,815 JLB 0 0 0 Mosaic Associates 0 / / 10/11/22
23-0706 Reconstruction 0-001-033 UNREVIEWED
DONE STARTED 10/13/23 10/11/23 05/17/23 12/14/21 2,4,7,8,9,10,14,155, 0 62,814,618 JJH 0 0 0 Mosaic Associates 0 / / 10/11/23
Big Cross St. Elementary:
20-0106 Reconstruction 0-003-013 09/18/20 DONE DONE DONE 07/21/20 07/14/20 02/13/20 05/16/17 4,8,16 117,150 117,150 SLC 0 0 0 Mosaic Associates 0 10/26/21 07/14/20
21-1795 Reconstruction 0-003-014 08/05/22 DONE DONE DONE 05/09/22 05/06/22 02/07/22 12/14/21 2,9,10,155,16 958,600 958,600 JLB 0 0 0 Mosaic Associates 0 12/01/23 05/06/22
22-0100 Reconstruction 0-003-015 10/11/22 DONE DONE DONE 07/18/22 07/15/22 05/04/22 06/22/22 155,16 114,000 0 JLB 0 0 0 Mosaic Associates 0 12/01/23 07/15/22
23-0707 Reconstruction 0-003-016 UNREVIEWED
DONE STARTED 10/13/23 10/11/23 05/17/23 12/14/21 2,7 0 0 JJH 0 0 0 Mosaic Associates 0 / / 10/11/23
Jackson Heights Elementary:
20-0107 Reconstruction 0-005-012 09/18/20 DONE DONE DONE 07/21/20 07/14/20 02/13/20 05/16/17 4,8,16 110,400 110,400 SLC 0 0 0 Mosaic Associates 0 10/26/21 07/14/20
22-0101 Reconstruction 0-005-013 10/11/22 DONE DONE DONE 07/18/22 07/15/22 03/07/22 12/14/21 2,155,16 16,500 0 JLB 0 0 0 Mosaic Associates 0 12/01/23 07/15/22
22-2476 Reconstruction 0-005-014 08/08/23 DONE DONE DONE 06/28/23 06/28/23 05/17/23 05/16/23 16 100,000 100,000 JJH 0 0 0 Mosaic Associates 0 / / 06/28/23
23-0708 Reconstruction 0-005-015 UNREVIEWED
DONE STARTED 10/13/23 10/11/23 05/17/23 12/14/21 7,8,9,16 0 0 JJH 0 0 0 Mosaic Associates 0 / / 10/11/23
- Reconstruction 0-005-016 / / / / 03/27/24 / / 16 0 0 JJH 0 0 0 0 / / / /
Sanford St. Elem-LeasedToBOCES:
18-2193 Reconstruction 0-006-011 07/02/19 DONE DONE DONE 06/24/19 06/19/19 05/14/19 05/13/19 155,15,16 600,000 600,000 SLC 0 0 0 Mosaic Associates 0 04/13/20 06/19/19
20-0108 Reconstruction 0-006-012 09/18/20 DONE DONE DONE 07/21/20 07/14/20 02/13/20 05/16/17 4,8,16 83,800 83,800 SLC 0 0 0 Mosaic Associates 0 10/26/21 07/14/20
Kensington Road Elementary:
20-0109 Reconstruction 0-007-012 09/18/20 DONE DONE DONE 07/21/20 07/14/20 02/13/20 05/16/17 4,8,16 73,735 73,735 SLC 0 0 0 Mosaic Associates 0 10/26/21 07/14/20
Administration Bldg:
20-0110 Reconstruction 1-008-007 09/18/20 DONE DONE DONE 07/21/20 07/14/20 02/13/20 05/16/17 2,4,7,8,16 147,200 0 SLC 0 0 0 Mosaic Associates 0 11/19/21 07/14/20
21-1796 Reconstruction 1-008-008 08/05/22 DONE DONE DONE 05/09/22 05/06/22 02/07/22 12/14/21 8 140,171 0 JLB 0 0 0 Mosaic Associates 0 12/01/23 05/06/22
35 Glenwood Avenue House:
18-2213DB Discovered Building 2-021-001 08/09/19 DONE DONE DONE 06/28/19 / / 01/11/19 / / 0 0 SLC 0 0 0 0 / / / /
35 Glenwood Avenue Barn:
18-2214DB Discovered Building 2-022-001 08/09/19 DONE DONE DONE 06/28/19 / / 01/11/19 / / 0 0 SLC 0 0 0 0 / / / /
Jackson Heights Storage:
19-1874DB Discovered Building 2-023-001 07/20/20 DONE DONE DONE 06/26/20 06/26/20 02/04/20 / / 0 0 SLC 0 0 0 0 / / 06/26/20
Stor/Concession/Toilet @ MS HS:
21-1797 Reconstruction 7-015-002 08/05/22 DONE DONE DONE 05/09/22 05/06/22 04/11/22 12/14/21 16 6,000 0 JLB 0 0 0 Mosaic Associates 0 12/01/23 05/06/22
Press Box:
18-2173DB Discovered Building 7-020-001 UNREVIEWED
DONE DONE 06/20/19 06/19/19 04/19/18 / / 0 0 SLC 0 0 0 0 / / 06/19/19
Kitchen Cooler/Freezer:
- PR New Construction 7-024-001 / / / / 03/08/22 / / 02 - 16 0 0 SLC 0 0 0 0 / / / /
22-0102 New Construction 7-024-001 10/11/22 DONE DONE DONE 07/18/22 07/15/22 03/08/22 12/14/21 02 - 16 117,000 0 JLB 0 0 0 Mosaic Associates 0 12/01/23 07/15/22
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
LAKE GEORGE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 63-07-01-04
last updated on 04/19/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Main Bldg.Jr/Sr High School:
19-0466 Reconstruction 0-004-012 12/26/19 DONE DONE DONE 09/20/19 09/17/17 01/22/19 12/04/18 2,8,9,10,155,15,16 4,130,207 4,130,207 BMJ 0 0 0 Tetra Tech Architects and Eng 0 04/18/22 09/17/17
21-1009FB Reconstruction 0-004-013 02/15/22 DONE DONE DONE 01/03/22 12/20/21 09/29/21 02/08/22 2,9,155,16 673,949 673,949 JLB 0 0 0 Tetra Tech Engineers, Archite 0 / / 12/20/21
21-1910 Reconstruction 0-004-014 08/10/22 DONE DONE DONE 06/01/22 05/27/22 04/26/22 05/17/22 155,16 100,000 100,000 JLB 0 0 0 Tetra Tech Engineers, Archite 0 06/23/23 05/27/22
23-0964 Reconstruction 0-004-015 12/21/23 DONE DONE DONE 11/10/23 11/10/23 10/30/23 05/16/23 155 100,000 100,000 JJH 0 0 0 Tetra Tech Engineers, Archite 0 / / 11/10/23
Lake George Elementary School:
19-0467 Reconstruction 0-006-018 12/26/19 DONE DONE DONE 09/20/19 09/17/17 01/22/19 12/04/18 2,8,9,16 1,141,984 1,141,984 BMJ 0 0 0 Tetra Tech Architects and Eng 0 04/18/22 09/17/17
21-1010FA Reconstruction 0-006-019 02/15/22 DONE DONE DONE 01/03/22 12/20/21 09/29/21 02/08/22 2,7,9,155,16 791,999 791,999 JLB 0 0 0 Tetra Tech Engineers, Archite 0 / / 12/20/21
COVID-19 Storage Shed:
20-0905 New Construction 2-010-001 01/18/22 DONE DONE DONE 12/01/20 11/30/20 10/23/20 12/04/18 02 - 16 22,000 0 JSS 0 0 0 Tetra Tech Architects and Eng 0 12/06/21 11/30/20
XXTransportation Facility #2 (EV):
- XX New Construction 5-014-001 CANCELLED / / / / 01/19/24 / / 02 - 16 0 0 JJH 0 0 0 0 / / / /
23-1472 New Construction 5-014-001 UNREVIEWED 02/06/24 02/05/24 01/19/24 12/06/22 02 - 16 0 0 JJH 0 0 0 Tetra Tech Engineers, Archite 0 / / 02/05/24
Transportation Facility:
23-1473 New Construction 7-013-001 UNREVIEWED 02/06/24 02/05/24 04/19/23 12/06/22 02 - 16 0 0 JJH 0 0 0 Tetra Tech Engineers, Archite 0 / / 02/05/24
Storage Container 1:
20-1115XX Alterations 8-011-001 CANCELLED 01/13/21 01/08/21 11/20/20 / / 0 0 JSS 0 0 0 0 / / 01/08/21
Storage Container 2:
20-1116XX Alterations 8-012-001 CANCELLED 01/13/21 01/08/21 11/20/20 / / 0 0 JSS 0 0 0 0 / / 01/08/21
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
QUEENSBURY UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 63-09-02-03
last updated on 04/19/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Middle School:
19-1190 Reconstruction 0-001-035 03/06/20 DONE DONE DONE 01/10/20 01/07/20 12/20/19 05/21/19 16 230,000 230,000 SLC 0 0 0 Collins & Scoville Architects 0 04/01/21 01/07/20
20-0160 Reconstruction 0-001-036 08/17/20 DONE DONE DONE 08/07/20 08/06/20 07/17/20 08/10/20 2,15 115,000 115,000 SLC 0 0 0 Collins & Scoville Architects 0 01/15/21 08/06/20
20-1055 Reconstruction 0-001-037 04/07/21 DONE DONE DONE 12/28/20 12/21/20 12/15/20 06/09/20 16 700,000 700,000 SLC 0 0 0 Collins & Scoville Architects 0 03/31/23 12/21/20
21-0662 Reconstruction 0-001-038 03/18/22 DONE DONE DONE 11/05/21 11/04/21 10/21/21 05/18/21 2,7,8,9,16 1,000,000 1,000,000 SLC 0 0 0 Collins & Scoville Architects 0 11/11/22 11/04/21
21-0754 Reconstruction 0-001-039 03/21/22 DONE DONE DONE 11/19/21 11/19/21 10/21/21 12/14/21 2,7,9,10,15,16 2,310,000 2,310,000 SLC 0 0 0 Collins & Scoville Architects 0 / / 11/19/21
22-0082 Reconstruction 0-001-040 11/28/22 DONE DONE DONE 07/13/22 07/13/22 06/13/22 12/14/21 2,9,155,15,16 295,000 295,000 JLB 0 0 0 Collins & Scoville Architects 0 09/07/23 07/13/22
22-0255 Reconstruction 0-001-041 01/19/23 DONE DONE DONE 08/15/22 08/09/22 07/22/22 05/17/22 2,8,9,10,155,15,16 890,000 890,000 JJH 0 0 0 Collins & Scoville Architects 0 / / 08/09/22
22-2425 Reconstruction 0-001-042 10/19/23 DONE DONE DONE 06/20/23 06/20/23 03/15/23 05/16/23 9,155,15,16 1,566,272 1,566,272 WLC 0 0 0 Mosaic Associates 0 / / 06/20/23
- Reconstruction 0-001-043 / / / / 04/10/23 / / 2,4,7,8,9,10,155,15, 0 0 WLC 0 0 0 0 / / / /
- SB Reconstruction 0-001-BA1 DONE / / / / / / / / 10 0 0 SLC 0 0 0 0 / / / /
High School:
19-1070 Reconstruction 0-002-026 03/25/20 DONE DONE DONE 12/26/19 12/16/19 11/04/19 01/12/16 9,16 1,200,000 1,200,000 SLC 0 0 0 Collins & Scoville Architects 0 09/28/20 12/16/19
19-1055 Reconstruction 0-002-027 06/16/20 DONE DONE DONE 12/26/19 12/16/19 11/12/19 11/12/19 9,15,16 125,000 0 SLC 0 0 0 Collins & Scoville Architects 0 10/30/20 12/16/19
20-0068 Reconstruction 0-002-028 08/17/20 DONE DONE DONE 07/20/20 07/20/20 06/12/20 07/13/20 155,16 367,178 367,178 SLC 0 0 0 Collins & Scoville Architects 0 04/15/21 07/20/20
22-1708 Reconstruction 0-002-029 11/08/21 DONE DONE DONE 02/21/23 02/21/23 02/08/22 11/08/21 15 47,500 47,500 WLC 0 0 0 Collins & Scoville Architects 0 12/15/21 02/21/23
21-1490 Reconstruction 0-002-030 08/04/22 DONE DONE DONE 03/10/22 03/10/22 03/02/22 05/17/22 7,8,9,10,155,15,16 410,000 410,000 WLC 0 0 0 Collins & Scoville Architects 0 / / 03/10/22
- Reconstruction 0-002-031 / / / / 04/11/22 / / 2 0 0 SLC 0 0 0 0 / / / /
22-0083 Reconstruction 0-002-032 11/28/22 DONE DONE DONE 07/13/22 07/13/22 06/13/22 12/14/21 2,155,16 4,080,000 4,080,000 JLB 0 0 0 Collins & Scoville Architects 0 09/07/23 07/13/22
- Reconstruction 0-002-033 / / / / 04/09/24 / / 2,4,8,9,10,155,15,16 0 0 WLC 0 0 0 0 / / / /
K-3 Elementary School:
18-1932 Reconstruction 0-003-018 06/13/19 DONE DONE DONE 05/08/19 05/06/19 03/29/19 05/21/19 7 100,000 100,000 SLC 0 0 0 Collins & Scoville Architects 0 05/12/20 05/06/19
19-1191 Reconstruction 0-003-019 03/06/20 DONE DONE DONE 01/10/20 01/07/20 12/20/19 05/21/19 16 200,000 200,000 SLC 0 0 0 Collins & Scoville Architects 0 04/01/21 01/07/20
22-1639 Reconstruction 0-003-020 09/13/21 DONE DONE DONE 02/08/23 02/07/23 08/20/21 09/13/21 15 40,690 40,690 WLC 0 0 0 Collins & Scoville Architects 0 09/30/21 02/07/23
21-0755 Reconstruction 0-003-021 03/21/22 DONE DONE DONE 11/19/21 11/19/21 10/21/21 12/14/21 2,7,9,15,16 5,425,000 5,425,000 SLC 0 0 0 Collins & Scoville Architects 0 / / 11/19/21
21-2056FA Reconstruction 0-003-022 10/05/22 DONE DONE DONE 06/29/22 06/08/22 04/17/22 04/11/22 9,155,16 1,046,000 1,046,000 WLC 0 0 0 Collins & Scoville Architects 0 / / 06/08/22
22-0084 Reconstruction 0-003-023 11/28/22 DONE DONE DONE 07/13/22 07/13/22 06/13/22 12/14/21 2,4,7,8,9,155,15,16 2,475,000 2,475,000 JLB 0 0 0 Collins & Scoville Architects 0 09/07/23 07/13/22
- Reconstruction 0-003-024 / / / / 02/14/23 / / 2,9,155,15,16 0 0 WLC 0 0 0 0 / / / /
23-1028PR Reconstruction 0-003-025 STARTED 11/16/23 / / 04/10/23 / / 2,4,7,8,9,10,155,15, 0 0 WLC 0 0 0 0 / / / /
- Reconstruction 0-003-026 / / / / 04/12/24 / / 2,4,7,8,9,10,155,15, 0 0 WLC 0 0 0 0 / / / /
William H. Barton Intermediate Schl:
19-1192 Reconstruction 0-019-008 03/06/20 DONE DONE DONE 01/10/20 01/07/20 12/20/19 05/21/19 16 170,000 170,000 SLC 0 0 0 Collins & Scoville Architects 0 04/01/21 01/07/20
21-0756 Reconstruction 0-019-009 03/21/22 DONE DONE DONE 11/19/21 11/19/21 10/21/21 12/14/21 7,10,15,16 1,512,500 1,512,500 SLC 0 0 0 Collins & Scoville Architects 0 / / 11/19/21
21-1744 Reconstruction 0-019-010 08/16/22 DONE DONE DONE 05/02/22 04/29/22 04/17/22 12/14/21 15,16 250,000 250,000 WLC 0 0 0 Collins & Scoville Architects 0 / / 04/29/22
- PR Additions and Alterations 0-019-011 / / / / 06/13/22 / / 02 - 16 0 0 WLC 0 0 0 0 / / / /
22-0085 Additions and Alterations 0-019-011 11/28/22 DONE DONE DONE 07/13/22 07/13/22 06/13/22 12/14/21 02 - 16 3,245,000 0 JLB 0 0 0 Collins & Scoville Architects 0 09/07/23 07/13/22
23-1609 Reconstruction 0-019-012 UNREVIEWED 03/12/24 03/08/24 11/29/22 12/12/22 14 120,000 0 WLC 0 0 0 Collins & Scoville Architects 0 / / 03/08/24
Modular - Admin. Bldg. (fmly 0-016):
- Reconstruction 1-016-002 / / / / 04/09/24 / / 7,8,9,10,155,15,16 0 0 WLC 0 0 0 0 / / / /
Field Storage:
- PR New Construction 2-028-001 / / / / 06/13/22 / / 02 - 16 0 0 WLC 0 0 0 0 / / / /
22-0086 New Construction 2-028-001 11/28/22 DONE DONE DONE 07/13/22 07/13/22 06/13/22 12/14/21 02 - 16 565,000 0 JLB 0 0 0 Collins & Scoville Architects 0 / / 07/13/22
Bus Garage B:
21-0757 Reconstruction 5-020-009 03/21/22 DONE DONE DONE 11/19/21 11/19/21 10/21/21 12/14/21 9,14,16 447,500 1,512,500 SLC 0 0 0 Collins & Scoville Architects 0 / / 11/19/21
- Reconstruction 5-020-010 / / / / 04/10/23 / / 2,9,155,15,16 0 0 WLC 0 0 0 0 / / / /
- Reconstruction 5-020-011 / / / / 02/12/24 / / 2,16 0 0 WLC 0 0 0 0 / / / /
Parks & Recreation Tent:
21-1755TQ Temporary Quarters 7-027-001 ADDENDUM REQ'D 05/03/22 / / 03/22/22 / / 02 - 16 0 0 WLC 0 0 0 0 / / / /
Press Box:
- PR New Construction 7-029-001 / / / / 10/19/22 / / 02 - 16 0 0 WLC 0 0 0 0 / / / /
22-0919 New Construction 7-029-001 03/07/23 DONE DONE DONE 11/07/22 11/03/22 10/19/22 12/14/21 02 - 16 161,000 0 WLC 0 0 0 Collins & Scoville Architects 0 01/25/24 11/03/22
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
WARRENSBURG CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 63-12-01-04
last updated on 04/19/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Elementary School (fmly Main Bldg):
20-1612 Reconstruction 0-001-018 06/18/21 DONE DONE DONE 04/22/21 04/22/21 03/29/21 06/09/20 16 100,000 100,000 JLB 0 0 0 Collins & Scoville Architects 0 04/27/22 04/22/21
20-1910 Reconstruction 0-001-019 08/09/21 DONE DONE DONE 06/23/21 06/11/21 05/12/21 05/18/21 4,155 170,000 170,000 JLB 0 0 0 Collins & Scoville Architects 0 09/13/22 06/11/21
- Reconstruction 0-001-020 / / / / 11/02/22 / / 2,4,155,15 0 0 JLB 0 0 0 0 / / / /
23-0989 Reconstruction 0-001-021 UNREVIEWED 11/14/23 11/08/23 11/22/22 10/25/22 2,4,7,8,9,155,16 2,834,000 0 JJH 0 0 0 Collins & Scoville Architects 0 / / 11/08/23
Middle/High School:
18-2176 Reconstruction 0-008-015 07/22/19 DONE DONE DONE 06/20/19 06/13/19 05/28/19 05/21/19 2,9 100,000 100,000 JLB 0 0 0 Bernier Carr Associates 0 06/23/20 06/13/19
- PR Additions and Alterations 0-008-016 / / / / 09/29/21 / / 02 - 16 0 0 JLB 0 0 0 0 / / / /
22-1396FC Additions and Alterations 0-008-016 06/21/23 DONE DONE DONE 01/04/23 12/27/22 09/29/21 05/09/22 02 - 16 683,300 0 JJH 0 0 0 Collins & Scoville Architects 0 / / 12/27/22
22-0199 Reconstruction 0-008-017 09/27/22 DONE DONE DONE 08/01/22 08/01/22 03/28/22 05/17/22 9,15,16 350,000 350,000 JLB 0 0 0 Collins & Scoville Architects 0 / / 08/01/22
22-1370 Reconstruction 0-008-018 03/28/23 DONE DONE DONE 12/28/22 12/27/22 11/02/22 05/17/22 9,10 100,000 100,000 JJH 0 0 0 Collins & Scoville Architects 0 06/28/23 12/27/22
23-0990 Reconstruction 0-008-019 UNREVIEWED 11/14/23 11/08/23 11/22/22 10/25/22 2,4,7,8,9,10,155,15, 9,586,945 9,586,945 JJH 0 0 0 Collins & Scoville Architects 0 / / 11/08/23
22-2482 Reconstruction 0-008-020 08/01/23 DONE DONE DONE 06/30/23 06/29/23 05/09/23 05/16/23 9 100,000 100,000 JJH 0 0 0 Collins & Scoville Architects 0 / / 06/29/23
- XX Reconstruction 0-008-021 CANCELLED / / / / 05/09/23 / / 9 0 0 JJH 0 0 0 0 / / / /
Maintenance Storage (Garage):
23-0991 Reconstruction 3-004-003 UNREVIEWED 11/14/23 11/08/23 11/22/22 10/25/22 2,9,155,16 131,600 0 JJH 0 0 0 Collins & Scoville Architects 0 / / 11/08/23
New Bus Garage:
23-0992 Reconstruction 5-010-004 UNREVIEWED 11/14/23 11/08/23 11/22/22 10/25/22 8,9,155,16 431,300 0 JJH 0 0 0 Collins & Scoville Architects 0 / / 11/08/23
District Wide Project:
18-0280 Reconstruction 7-999-001 04/26/19 DONE DONE DONE 08/23/18 08/15/18 11/02/17 11/04/14 9,10,16 750,000 750,000 JLB 0 0 0 Bernier Carr Associates 0 08/26/20 08/15/18
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED