Overdue Final Cost Reports

Projects Missing Substantial Completion Dates

Without the Substantial Completion Date We Cannot Warn You When the FCR is Due

THE STATE EDUCATION DEPARTMENT

FACILITIES PLANNING


UPDATED: 05/29/08 at 14:21:44




ALBANY CITY SCHOOLS SUBSTANTIAL COMPLETION DATE MISSING FOR APPROVED CAPITAL PROJECTS
District No.: 01-01-00-01
last updated on 05/29/08
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    ANTICIP   SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         COMPLETE  COMPLETE  MGR.
_______________________________________________________________________________________________________________________________________

           Public School #19:
06-0195    Additions and Alterations    0-019-006  01/08/07   02 - 16                        0   15,033,000     /  /        /  /    MGL

           Thomas O'Brien #24:
05-1235    Reconstruction               0-024-005  06/09/06   2,7,155,15,16                  0      385,000     /  /        /  /    HCM

           Hackett Middle School:
04-0452    Alterations                  0-044-010  02/09/05   02 - 16                        0    3,800,000     /  /        /  /    MGL
05-0048    Additions and Alterations    0-044-011  01/27/06   02 - 16                        0   29,700,000     /  /        /  /    HCM

           Giffen Memorial Elementary:
05-1228    Additions and Alterations    0-046-005  05/25/06   02 - 16                        0    2,290,000     /  /        /  /    MGL

           Albany High School:
06-0294    Reconstruction               0-048-011  02/26/07   155                            0    2,036,136     /  /        /  /    HCM

           Cathedral Academy School:
03-1611    Reconstruction               8-050-L03  01/16/04                                  0    1,005,334     /  /        /  /    HCM

           YMCA:
04-0722    Reconstruction               8-063-L01  02/11/05                                  0    2,000,000     /  /        /  /    MGL

           Alternative HS Program:
02-0183    Reconstruction               8-064-L01  09/03/02                                  0    2,545,975     /  /        /  /    MGL


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




BERNE-KNOX-WESTERLO CSD SUBSTANTIAL COMPLETION DATE MISSING FOR APPROVED CAPITAL PROJECTS
District No.: 01-02-01-04
last updated on 05/29/08
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    ANTICIP   SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         COMPLETE  COMPLETE  MGR.
_______________________________________________________________________________________________________________________________________

           NO MISSING SUBS. COMPLETION DATES:
  -        FOR THIS DISTRICT                         /  /                                    0            0     /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




BETHLEHEM CSD SUBSTANTIAL COMPLETION DATE MISSING FOR APPROVED CAPITAL PROJECTS
District No.: 01-03-06-06
last updated on 05/29/08
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    ANTICIP   SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         COMPLETE  COMPLETE  MGR.
_______________________________________________________________________________________________________________________________________

           Glenmont Elementary:
97-0234    Reconstruction               0-002-010  11/12/98   155,16                         0      111,815   12/01/98      /  /    RDR
05-0906    Reconstruction               0-002-012  09/22/06   2,9,155,15,16                  0    1,198,016     /  /        /  /    RDR

           Hamagrael Elementary (Playground):
97-0235    Reconstruction               0-003-012  11/12/98   155,16                         0       75,808   12/01/98      /  /    RDR
05-0907    Reconstruction               0-003-014  09/22/06   2,7,9,155,15,16                0    2,413,653     /  /        /  /    RDR

           Clarksville Elementary:
97-0236    Reconstruction               0-004-012  11/12/98   155,16                         0       96,478   12/01/98      /  /    RDR

           Senior High School:
97-0238    Reconstruction               0-006-018  11/12/98   155,16                         0    5,312,958   12/01/98      /  /    RDR
05-1017    Reconstruction               0-006-025  04/10/07   2,8                            0    1,654,100     /  /        /  /    MGL

           Elsmere Elementary:
94-0179    Reconstruction               0-008-007  10/03/94   2                              0       20,000   10/10/94      /  /    RDR
97-0239    Reconstruction               0-008-011  11/12/98   155,16                         0      157,056   12/01/98      /  /    RDR
04-1232    Additions and Alterations    0-008-016  07/05/05   02 - 16                        0      527,527   10/31/05      /  /    RDR

           Slingerlands Elementary:
97-0240    Reconstruction               0-009-008  11/12/98   155,16                         0      115,036   12/01/98      /  /    RDR
02-0723    Additions and Alterations    0-009-010  05/23/03   02 - 16                        0       69,000   03/30/03      /  /    RDR

           Districtwide:
03-1606    Reconstruction               7-999-001  06/16/04   16                             0    1,310,000   01/31/05      /  /    RDR


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




RAVENA COEYMANS SELKIRK CSD SUBSTANTIAL COMPLETION DATE MISSING FOR APPROVED CAPITAL PROJECTS
District No.: 01-04-02-06
last updated on 05/29/08
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    ANTICIP   SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         COMPLETE  COMPLETE  MGR.
_______________________________________________________________________________________________________________________________________

           Senior High School:
97-1792    Reconstruction               0-013-011  08/04/98   2,155                          0       82,300   12/31/98      /  /    RDR
00-1494    Reconstruction               0-013-013  07/12/01   2,7                            0    1,431,288   07/30/02      /  /    MAC

           Bus Garage:
97-1309    Additions and Alterations    5-001-005  06/19/98   02 - 16                        0      106,000     /  /        /  /    RDR
97-1794    Reconstruction               5-001-006  08/04/98   2,155                          0      248,650   12/31/98      /  /    RDR


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




COHOES CITY SCHOOLS SUBSTANTIAL COMPLETION DATE MISSING FOR APPROVED CAPITAL PROJECTS
District No.: 01-05-00-01
last updated on 05/29/08
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    ANTICIP   SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         COMPLETE  COMPLETE  MGR.
_______________________________________________________________________________________________________________________________________

           Cohoes Middle School:
05-1024    Reconstruction               0-001-013  04/27/06   14,16                          0       60,000     /  /        /  /    JOD
06-0544    Reconstruction               0-001-014  03/08/07   2,4,7,8,9,14,155,15,           0      886,076     /  /        /  /    JOD

           Abram Lansing School:
06-0545    Reconstruction               0-002-012  03/08/07   2,4,7,8,9,14,155,15,           0      728,352     /  /        /  /    JOD

           Van Schaick Elementary:
06-0546    Reconstruction               0-005-013  03/08/07   2,4,7,8,9,14,155,15,           0    2,644,800     /  /        /  /    JOD

           High School:
03-1478    Reconstruction               0-006-015  05/13/04   2,4,7,8,9,10,155,15,           0    1,435,824   08/01/04      /  /    JOD
06-0547    Reconstruction               0-006-016  03/08/07   2,4,7,8,9,10,13,14,1           0    3,298,408     /  /        /  /    JOD

           Harmony Hill School:
06-0548    Reconstruction               0-010-006  03/08/07   2,4,7,8,9,14,155,15,           0      814,800     /  /        /  /    JOD

           Page Avenue School formerly St.Micha:
06-0549    Reconstruction               0-015-002  03/08/07   2,4,7,8,9,14,155,15,           0      627,564     /  /        /  /    JOD

           District Wide:
05-0830    Reconstruction               7-999-003  05/23/06   16                             0      500,000     /  /        /  /    JOD


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




SOUTH COLONIE CSD SUBSTANTIAL COMPLETION DATE MISSING FOR APPROVED CAPITAL PROJECTS
District No.: 01-06-01-06
last updated on 05/29/08
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    ANTICIP   SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         COMPLETE  COMPLETE  MGR.
_______________________________________________________________________________________________________________________________________

           Colonie High School:
06-0822    Reconstruction               0-001-023  04/05/07   2,4,7,8,9,10,14,155,           0    1,360,000     /  /        /  /    MGL

           Lisha Kill Jr High School:
06-0823    Reconstruction               0-002-014  04/05/07   2,4,7,8,9,10,14,155,           0    1,750,000     /  /        /  /    MGL


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




NORTH COLONIE CSD SUBSTANTIAL COMPLETION DATE MISSING FOR APPROVED CAPITAL PROJECTS
District No.: 01-06-05-06
last updated on 05/29/08
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    ANTICIP   SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         COMPLETE  COMPLETE  MGR.
_______________________________________________________________________________________________________________________________________

           Blue Creek Elementary:
02-1163    Reconstruction               0-003-011  01/31/03   2                              0      100,000   12/31/04      /  /    RDR
06-0521    Reconstruction               0-003-012  02/23/07   9                              0       85,000     /  /        /  /    MGL

           Shaker High School:
93-0542    Reconstruction               0-005-012  02/01/94   2,15                           0       25,950   06/30/95      /  /    RDR
06-0522    Reconstruction               0-005-030  02/23/07   8,9,10,13,14,155,15,           0      353,000     /  /        /  /    MGL

           Fort Ferry School:
97-0727    Reconstruction               0-008-006  02/20/98   4,8,9,155,15,16                0      420,425   12/01/98      /  /    MEM
06-0523    Reconstruction               0-008-011  02/23/07   2,9                            0      105,000     /  /        /  /    MGL

           Shaker Junior High:
99-1648    Reconstruction               0-009-008  06/23/00   16                             0       65,000   12/31/00      /  /    MEM

           Bus Garage:
05-0058    Reconstruction               5-015-010  08/12/05   13                             0       85,000   10/13/05      /  /    RDR
06-0524    Reconstruction               5-015-011  02/23/07   16                             0      100,000     /  /        /  /    MGL


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




MENANDS UFSD SUBSTANTIAL COMPLETION DATE MISSING FOR APPROVED CAPITAL PROJECTS
District No.: 01-06-15-02
last updated on 05/29/08
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    ANTICIP   SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         COMPLETE  COMPLETE  MGR.
_______________________________________________________________________________________________________________________________________

           NO MISSING SUBS. COMPLETION DATES:
  -        FOR THIS DISTRICT                         /  /                                    0            0     /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




MAPLEWOOD-COLONIE COMMON SCHOOL SUBSTANTIAL COMPLETION DATE MISSING FOR APPROVED CAPITAL PROJECTS
District No.: 01-06-22-08
last updated on 05/29/08
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    ANTICIP   SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         COMPLETE  COMPLETE  MGR.
_______________________________________________________________________________________________________________________________________

           Main Building:
93-0491    Reconstruction               0-001-002  01/10/94   2,155,15,16                    0       54,000   03/30/94      /  /    MEM


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




GREEN ISLAND UFSD SUBSTANTIAL COMPLETION DATE MISSING FOR APPROVED CAPITAL PROJECTS
District No.: 01-07-01-03
last updated on 05/29/08
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    ANTICIP   SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         COMPLETE  COMPLETE  MGR.
_______________________________________________________________________________________________________________________________________

           NO MISSING SUBS. COMPLETION DATES:
  -        FOR THIS DISTRICT                         /  /                                    0            0     /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




GUILDERLAND CSD SUBSTANTIAL COMPLETION DATE MISSING FOR APPROVED CAPITAL PROJECTS
District No.: 01-08-02-06
last updated on 05/29/08
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    ANTICIP   SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         COMPLETE  COMPLETE  MGR.
_______________________________________________________________________________________________________________________________________

           Guilderland High School:
00-1739    Reconstruction               0-005-015  11/10/01   2,8,155,16                     0    2,973,000   12/31/02      /  /    BJB

           Farnsworth Middle School:
02-1501    Additions and Alterations    0-009-013  10/27/03   02 - 16                        0   19,754,000   08/31/04      /  /    MAC


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




VOORHEESVILLE CSD SUBSTANTIAL COMPLETION DATE MISSING FOR APPROVED CAPITAL PROJECTS
District No.: 01-10-03-06
last updated on 05/29/08
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    ANTICIP   SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         COMPLETE  COMPLETE  MGR.
_______________________________________________________________________________________________________________________________________

           Junior Senior High School:
06-0340    Reconstruction               0-001-012  03/02/07   2,4,7,8,9,10,14,155,           0      558,000     /  /        /  /    DDJ

           Elementary School/Bus Garage:
06-0341    Additions and Alterations    0-002-012  03/02/07   02 - 16                        0    5,262,000     /  /        /  /    DDJ


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




WATERVLIET CITY SCHOOLS SUBSTANTIAL COMPLETION DATE MISSING FOR APPROVED CAPITAL PROJECTS
District No.: 01-12-00-01
last updated on 05/29/08
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    ANTICIP   SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         COMPLETE  COMPLETE  MGR.
_______________________________________________________________________________________________________________________________________

           NO MISSING SUBS. COMPLETION DATES:
  -        FOR THIS DISTRICT                         /  /                                    0            0     /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




BOCES ALBANY-SCHOH-SCHEN SUBSTANTIAL COMPLETION DATE MISSING FOR APPROVED CAPITAL PROJECTS
District No.: 01-90-00-00
last updated on 05/29/08
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    ANTICIP   SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         COMPLETE  COMPLETE  MGR.
_______________________________________________________________________________________________________________________________________

           Albany Center Bldg. B:
04-1214    Reconstruction               0-008-003  07/27/05   7,9,10,155,15,16               0      182,400   08/30/05      /  /    MAC


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition