MONROE COUNTY

MONROE COUNTY

BRIGHTON 260101
GATES CHILI 260401
GREECE 260501
E. IRONDEQUOIT 260801
W. IRONDEQUOIT 260803
HONEOYE FALLS 260901
SPENCERPORT 261001
HILTON 261101
PENFIELD 261201
FAIRPORT 261301
EAST ROCHESTER 261313
PITTSFORD 261401
CHURCHVILLE CH 261501
ROCHESTER 261600
RUSH HENRIETTA 261701
BROCKPORT 261801
WEBSTER 261901
WHEATLAND CHIL 262001
MONROE 1 BOCES 269100
MONROE 2 BOCES 269200
















Overdue Final Cost Reports

Projects Missing Substantial Completion Dates

Without the Substantial Completion Date We Cannot Warn You When the FCR is Due

THE STATE EDUCATION DEPARTMENT

FACILITIES PLANNING


UPDATED: 05/29/08 at 14:21:46




BRIGHTON CENTRAL SCHOOL DISTRICT SUBSTANTIAL COMPLETION DATE MISSING FOR APPROVED CAPITAL PROJECTS
District No.: 26-01-01-06
last updated on 05/29/08
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    ANTICIP   SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         COMPLETE  COMPLETE  MGR.
_______________________________________________________________________________________________________________________________________

           Twelve Corners Middle School:
06-0536    Reconstruction               0-002-017  01/31/07   2,4                            0       73,200     /  /        /  /    DDJ

           Brighton Senior High:
06-0537    Reconstruction               0-003-019  01/31/07   2,4,7                          0    1,464,000     /  /        /  /    DDJ

           Council Rock Elementary:
06-0538    Reconstruction               0-004-016  01/31/07   2,7,9                          0      902,800     /  /        /  /    DDJ


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




GATES CHILI CSD SUBSTANTIAL COMPLETION DATE MISSING FOR APPROVED CAPITAL PROJECTS
District No.: 26-04-01-06
last updated on 05/29/08
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    ANTICIP   SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         COMPLETE  COMPLETE  MGR.
_______________________________________________________________________________________________________________________________________

           Gates Chili High:
05-0897    Reconstruction               0-001-010  05/24/07   8,9,16                         0    1,252,366     /  /        /  /    DDJ

           Florence Brasser:
04-1068    Reconstruction               0-002-008  08/08/05   155,15,16                      0      334,399   09/30/05      /  /    DDJ

           Washington Irving School:
04-1069    Reconstruction               0-005-008  08/08/05   155,15,16                      0      202,623   09/30/05      /  /    DDJ
05-0898    Reconstruction               0-005-010  05/24/07   10,155,15,16                   0       13,243     /  /        /  /    DDJ

           Middle School:
04-1070    Reconstruction               0-006-006  08/08/05   155,15,16                      0      854,657   09/30/05      /  /    DDJ
05-0899    Reconstruction               0-006-008  05/24/07   10,155,15,16                   0      307,573     /  /        /  /    DDJ

           Paul Rd Elementary:
04-1071    Reconstruction               0-007-009  08/08/05   155,15,16                      0      363,297   09/30/05      /  /    DDJ
05-0900    Reconstruction               0-007-011  05/24/07   10,155,15,16                   0      148,892     /  /        /  /    DDJ

           Walt Disney School:
04-1072    Reconstruction               0-008-008  08/08/05   155,15,16                      0      234,393   09/30/05      /  /    DDJ

           Neil Armstrong Elementary:
04-1073    Reconstruction               0-009-008  08/08/05   155,15,16                      0      260,747   09/30/05      /  /    DDJ

           Trans.& Facilities Complex:
05-0904    Reconstruction               5-004-006  05/24/07   155,15,16                      0       65,784     /  /        /  /    DDJ

           New Transportation Building:
05-0052    New Construction             5-016-001  09/07/05   02 - 16                        0    4,647,830     /  /        /  /    DDJ

           Press Box:
05-1166    New Construction             7-018-001  05/11/06   02 - 16                        0       44,500     /  /        /  /    DDJ


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




GREECE CSD SUBSTANTIAL COMPLETION DATE MISSING FOR APPROVED CAPITAL PROJECTS
District No.: 26-05-01-06
last updated on 05/29/08
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    ANTICIP   SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         COMPLETE  COMPLETE  MGR.
_______________________________________________________________________________________________________________________________________

           Barnard Elementary:
00-0668    Additions and Alterations    0-001-011  04/30/01   02 - 16                        0      763,105   02/28/02      /  /    MGL
00-0914    Reconstruction               0-001-012  07/03/01   2,7                            0      167,492   08/17/01      /  /    MGL

           Greece Olympia High School:
01-1054    Reconstruction               0-004-021  01/08/03   15                             0      111,500   08/31/02      /  /    MGL
03-0596    Reconstruction               0-004-022  06/30/04   7                              0      191,680   10/01/04      /  /    JOD
06-0165    Reconstruction               0-004-025  11/13/06   10                             0       22,544     /  /        /  /    HCM

           Odyssey Mid/High (fmly Hoover):
00-0669    Reconstruction               0-005-015  04/30/01   2,7,8,9,155,15,16              0    1,502,280   02/28/02      /  /    MGL

           Paddy Hill School:
00-0915    Reconstruction               0-007-010  07/03/01   10                             0       15,800   08/17/01      /  /    MGL

           Autumn Lane Elementary:
03-0599    Reconstruction               0-009-011  06/30/04   7,9,155                        0      495,307   10/01/04      /  /    JOD

           English Village Elementary:
00-0916    Reconstruction               0-010-014  07/03/01   2,9,10,15,16                   0       21,100   08/17/01      /  /    MGL
03-0600    Reconstruction               0-010-015  06/30/04   7                              0      406,637   10/01/04      /  /    JOD

           Arcadia High/Middle School:
92-1470    Additions and Alterations    0-012-016  07/28/93   02 - 16                        0       53,160   10/29/93      /  /    PNL
00-0917    Reconstruction               0-012-026  07/03/01   2,8,9,155,16                   0       89,900   08/17/01      /  /    MGL
01-1055    Reconstruction               0-012-027  01/08/03   10                             0       59,700   08/31/02      /  /    MGL
06-0167    Reconstruction               0-012-030  12/05/06   10                             0       22,544     /  /        /  /    HCM
06-1103    Reconstruction               0-012-033  04/10/07   13                             0      114,290     /  /        /  /    JOD

           Brookside Elementary:
01-1056    Reconstruction               0-014-009  01/08/03   7                              0      325,000   08/31/02      /  /    MGL

           Athena Middle/High School:
01-0249    Reconstruction               0-017-024  12/24/01   13                             0       76,000   12/31/03      /  /    MGL
00-0918    Reconstruction               0-017-026  07/03/01   2,9,155,15                     0      213,894   08/17/01      /  /    MGL
01-1057    Reconstruction               0-017-027  01/08/03   4,9                            0      179,200   08/31/02      /  /    MGL

           Kirk Road Elem.:
94-1370    Reconstruction               0-018-006  05/15/95   7,155,16                       0      100,000   08/30/95      /  /    MGL
06-0168    Reconstruction               0-018-014  12/05/06   10                             0       17,903     /  /        /  /    HCM

           Apollo Middle School:
02-0094    Reconstruction               0-031-012  04/01/03   2,4,7,8,9,10,155,15,           0    8,439,000   12/31/04      /  /    MGL
00-0919    Reconstruction               0-031-013  07/03/01   2,8,9,155,16                   0      452,805   08/17/01      /  /    MGL
01-1058    Reconstruction               0-031-014  01/08/03   10,155,15,16                   0      309,000   08/31/02      /  /    MGL

           Pine Brook Elementary:
06-0169    Reconstruction               0-036-004  12/05/06   10                             0       17,903     /  /        /  /    HCM

           Transportation Annex:
00-0920    Reconstruction               5-023-006  07/03/01   2,155,15                       0      243,640   08/17/01      /  /    MGL
03-0608    Reconstruction               5-023-009  06/30/04   155,15,16                      0      270,954   10/01/04      /  /    JOD

           Bldg Grounds/Bus Storage:
00-0921    Additions and Alterations    5-024-005  07/03/01   02 - 16                        0      222,582   08/17/01      /  /    MGL

           Pressbox/Storage @ Athena Middle/HS:
04-1238    Reconstruction               7-053-001  09/20/05                                  0       60,460   08/15/04      /  /    JOD

           Districtwide:
00-0670    Reconstruction               7-999-002  04/30/01   16                             0    2,854,332   02/28/02      /  /    MGL


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




EAST IRONDEQUOIT CSD SUBSTANTIAL COMPLETION DATE MISSING FOR APPROVED CAPITAL PROJECTS
District No.: 26-08-01-06
last updated on 05/29/08
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    ANTICIP   SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         COMPLETE  COMPLETE  MGR.
_______________________________________________________________________________________________________________________________________

           NO MISSING SUBS. COMPLETION DATES:
  -        FOR THIS DISTRICT                         /  /                                    0            0     /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




WEST IRONDEQUOIT CSD SUBSTANTIAL COMPLETION DATE MISSING FOR APPROVED CAPITAL PROJECTS
District No.: 26-08-03-06
last updated on 05/29/08
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    ANTICIP   SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         COMPLETE  COMPLETE  MGR.
_______________________________________________________________________________________________________________________________________

           Irondequoit High School:
02-0282SC  Visual Structural Inspection 0-001-SC3  09/27/02   16                             0       22,470     /  /        /  /    MGL


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




HONEOYE FALLS - LIMA CSD SUBSTANTIAL COMPLETION DATE MISSING FOR APPROVED CAPITAL PROJECTS
District No.: 26-09-01-06
last updated on 05/29/08
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    ANTICIP   SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         COMPLETE  COMPLETE  MGR.
_______________________________________________________________________________________________________________________________________

           NO MISSING SUBS. COMPLETION DATES:
  -        FOR THIS DISTRICT                         /  /                                    0            0     /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




SPENCERPORT CSD SUBSTANTIAL COMPLETION DATE MISSING FOR APPROVED CAPITAL PROJECTS
District No.: 26-10-01-06
last updated on 05/29/08
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    ANTICIP   SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         COMPLETE  COMPLETE  MGR.
_______________________________________________________________________________________________________________________________________

           NO MISSING SUBS. COMPLETION DATES:
  -        FOR THIS DISTRICT                         /  /                                    0            0     /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




HILTON CSD SUBSTANTIAL COMPLETION DATE MISSING FOR APPROVED CAPITAL PROJECTS
District No.: 26-11-01-06
last updated on 05/29/08
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    ANTICIP   SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         COMPLETE  COMPLETE  MGR.
_______________________________________________________________________________________________________________________________________

           NO MISSING SUBS. COMPLETION DATES:
  -        FOR THIS DISTRICT                         /  /                                    0            0     /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




PENFIELD CSD SUBSTANTIAL COMPLETION DATE MISSING FOR APPROVED CAPITAL PROJECTS
District No.: 26-12-01-06
last updated on 05/29/08
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    ANTICIP   SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         COMPLETE  COMPLETE  MGR.
_______________________________________________________________________________________________________________________________________

           NO MISSING SUBS. COMPLETION DATES:
  -        FOR THIS DISTRICT                         /  /                                    0            0     /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




PENFIELD CSD SUBSTANTIAL COMPLETION DATE MISSING FOR APPROVED CAPITAL PROJECTS
District No.: 26-12-11-19
last updated on 05/29/08
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    ANTICIP   SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         COMPLETE  COMPLETE  MGR.
_______________________________________________________________________________________________________________________________________

           NO MISSING SUBS. COMPLETION DATES:
  -        FOR THIS DISTRICT                         /  /                                    0            0     /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




FAIRPORT CENTRAL SCHOOL DISTRICT SUBSTANTIAL COMPLETION DATE MISSING FOR APPROVED CAPITAL PROJECTS
District No.: 26-13-01-06
last updated on 05/29/08
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    ANTICIP   SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         COMPLETE  COMPLETE  MGR.
_______________________________________________________________________________________________________________________________________

           Minerva Deland HS (9-12):
97-0697    Reconstruction               0-002-008  01/27/98   7                              0      324,512   09/01/98      /  /    BJB

           Brooks Hill Elem (K-5):
97-0698    Reconstruction               0-004-005  01/27/98   7                              0      226,452     /  /        /  /    BJB

           White Brook Elementary:
00-0991    New Construction             0-021-001  09/05/01   02 - 16                        0   16,000,000   08/01/02      /  /    BJB


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




EAST ROCHESTER UFSD SUBSTANTIAL COMPLETION DATE MISSING FOR APPROVED CAPITAL PROJECTS
District No.: 26-13-13-03
last updated on 05/29/08
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    ANTICIP   SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         COMPLETE  COMPLETE  MGR.
_______________________________________________________________________________________________________________________________________

           E. Rochester Educ. Cmplx.(O'Bourn):
90-0565    Reconstruction               0-001-006  12/05/90   2,4,7                          0       85,000     /  /        /  /    BAL
05-0247    Additions and Alterations    0-001-013  05/19/06   02 - 16                        0    2,233,000     /  /        /  /    RDR
05-1245    Additions and Alterations    0-001-015  07/10/06   02 - 16                        0       34,000   12/31/06      /  /    RDR

           LE BIRD/TLRMorgan Middle School:
92-0223    Reconstruction               0-002-004  09/17/92   8,9,10,155,15,16               0      143,000   09/01/92      /  /    MEM

           Lois E. Bird Elementary:
05-1324    Reconstruction               0-003-008  07/10/06   2,4,7,9                        0       78,240     /  /        /  /    JOD


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




PITTSFORD CSD SUBSTANTIAL COMPLETION DATE MISSING FOR APPROVED CAPITAL PROJECTS
District No.: 26-14-01-06
last updated on 05/29/08
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    ANTICIP   SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         COMPLETE  COMPLETE  MGR.
_______________________________________________________________________________________________________________________________________

           Pittsford(Barker Rd.)MS:
04-1487    Reconstruction               0-007-016  01/26/06   15                             0      389,400   10/01/05      /  /    JOD
04-1225    Reconstruction               0-007-017  04/12/05   13,155,15,16                   0      451,000   09/01/06      /  /    JOD

           Pittsford High Sch. (Mendon):
92-0509    Reconstruction               0-009-010  01/04/93   8,9,16                         0      149,800   03/01/93      /  /    RDR
04-1227    Reconstruction               0-009-018  04/25/06   155,16                         0      310,000   09/01/05      /  /    JOD

           Manufactured Bldg. #3-Sutherland:
99-0746    New Construction             0-021-001  04/25/00   02 - 16                        0      100,000   08/18/00      /  /    MGL

           Bus Garage:
03-0128    Reconstruction               5-011-067  08/13/04   16                             0       36,360   09/30/05      /  /    JOD

           Press Box @ Mendon HS:
03-0476    New Construction             7-029-001  11/14/03   02 - 16                        0       30,000     /  /        /  /    JOD

           Press Box @ Sutherland HS:
03-0854    New Construction             7-032-001  06/14/04   02 - 16                        0       30,000   09/30/06      /  /    JOD


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




CHURCHVILLE CHILI CSD SUBSTANTIAL COMPLETION DATE MISSING FOR APPROVED CAPITAL PROJECTS
District No.: 26-15-01-06
last updated on 05/29/08
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    ANTICIP   SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         COMPLETE  COMPLETE  MGR.
_______________________________________________________________________________________________________________________________________

           NO MISSING SUBS. COMPLETION DATES:
  -        FOR THIS DISTRICT                         /  /                                    0            0     /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




ROCHESTER CITY SCHOOLS SUBSTANTIAL COMPLETION DATE MISSING FOR APPROVED CAPITAL PROJECTS
District No.: 26-16-00-01
last updated on 05/29/08
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    ANTICIP   SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         COMPLETE  COMPLETE  MGR.
_______________________________________________________________________________________________________________________________________

           #2 Clara Barton K-6:
05-0490    Reconstruction               0-002-014  03/16/06   2,4,9,16                       0      541,770     /  /        /  /    RDR

           #9 M.L.King    K-6:
06-0662    Reconstruction               0-009-017  02/09/07   8,10,13,155,16                 0      986,175     /  /        /  /    MGL

           Roberto Clemente New ES8:
06-0553    Reconstruction               0-010-007  03/30/07   2,4,8,9,10,13,155,15           0      739,616     /  /        /  /    MGL

           M McLeod Bethune #45(fmlyNE.Elem):
06-1099    Reconstruction               0-011-008  04/11/07   2,10,13,155,15,16              0      400,000     /  /        /  /    MGL

           #14 C.Dewey/W of Inquiry K-5:
06-0710    Reconstruction               0-014-021  02/09/07   2,4,7,8,9,14,155,15,           0      540,705     /  /        /  /    MGL

           #17 Enrico Fermi K-5:
04-0420    Reconstruction               0-017-019  01/19/05   2,7,9,155,15,16                0    1,930,914   08/31/05      /  /    RDR

           School of the Arts:
04-0902    Reconstruction               0-018-009  03/28/05   16                             0       56,752   08/31/05      /  /    RDR

           #22 Abe Lincoln K-6:
06-0711    Reconstruction               0-022-019  02/09/07   2,4,7,155,16                   0      200,000     /  /        /  /    MGL

           #25 N.Hawthorne K-6:
98-0950    Reconstruction               0-025-011  05/06/99   4,8,9,10,16                    0      546,600   08/30/99      /  /    RDR

           #30 Gen E.S.Otis K-6:
05-0491    Reconstruction               0-030-019  03/16/06   2,8,9,16                       0      495,000     /  /        /  /    RDR

           Dr. Freddie Thomas Lrng. Ctr.:
05-0562    Reconstruction               0-031-008  04/05/06   2,4,7,8,9,155,16               0      400,000     /  /        /  /    RDR

           J.Madison Sch. of Excellence:
06-0683    Reconstruction               0-032-005  03/19/07   9,10,13,155                    0      100,000     /  /        /  /    MGL

           #42 Abelard Reynolds K-6:
06-1047    Reconstruction               0-042-014  04/30/07   9,13,155,15,16                 0      385,167     /  /        /  /    MGL

           #44 Lincoln Park K-6:
06-0712    Reconstruction               0-044-021  02/09/07   8,9,10,15                      0      454,356     /  /        /  /    MGL

           Sch W/out Walls 9-12:
01-0680    Reconstruction               0-045-009  04/30/02   2,8,16                         0      130,643   08/30/02      /  /    RDR

           #50 H.B.Montgomery K-5:
06-0666    Reconstruction               0-050-018  04/02/07   8,10,13,15,16                  0      227,761     /  /        /  /    MGL

           #52 F.F.Dow K-5:
04-0916    Reconstruction               0-052-015  03/28/05   16                             0       74,733   08/31/05      /  /    RDR

           Franklin HS 9-12:
02-1101    Additions and Alterations    0-101-022  03/18/03   02 - 16                        0    3,754,763   08/22/03      /  /    RDR
04-0838    Reconstruction               0-101-025  04/13/05   7,8,9,155,15,16                0    3,463,485   08/31/05      /  /    RDR

           Charlotte M.S. 6-8:
03-1425    Reconstruction               0-102-023  05/20/04   2,4,9,155,15,16                0      274,918   08/30/04      /  /    RDR

           East High School  9-12:
96-0474    Reconstruction               0-103-016  12/11/96   2,4,8,9,10,155,15,16           0    3,120,623   06/30/97      /  /    RDR
05-0528    Reconstruction               0-103-025  03/31/06   2,4,9,155,15,16                0    1,561,758     /  /        /  /    RDR

           Jefferson M.S. 6-8:
03-1426    Reconstruction               0-105-021  05/20/04   2,4,9,155,15,16                0      265,274   08/30/04      /  /    RDR
05-0560    Reconstruction               0-105-022  04/07/06   2,4,8,9,155,15,16              0    1,664,257     /  /        /  /    RDR

           Monroe M.S. 6-8:
03-1427    Reconstruction               0-107-019  05/20/04   2,4,9,155,15,16                0      274,403   08/30/04      /  /    RDR

           Wilson HS 9-12:
06-0684    Reconstruction               0-108-019  03/19/07   2,9,13,155,15,16               0      744,504     /  /        /  /    MGL

           F. Douglass M.S. 6-8:
02-0845    Reconstruction               0-109-017  05/07/03   155,15,16                      0    1,285,473   08/15/04      /  /    RDR
06-0797    Reconstruction               0-109-021  03/22/07   4,8,9,10,13,15,16              0    1,175,139     /  /        /  /    MGL

           Marshall HS 9-12:
04-0547    Reconstruction               0-110-028  02/01/05   4,7,8,9,155,15,16              0    2,379,510   08/31/05      /  /    RDR

           Edison Tech/Occ H.S. 9-12:
04-0821    Reconstruction               0-111-021  04/12/05   4,8,9,155,15,16                0    3,685,423   08/31/05      /  /    RDR
05-0785    Reconstruction               0-111-022  04/12/06   9,155,15,16                    0    2,492,747     /  /        /  /    RDR
06-0655    Reconstruction               0-111-023  01/31/07   2,13,155,16                    0    1,400,000     /  /        /  /    MGL

           Relocatable 1 at Sch 2:
94-1612    New Construction             0-133-001  07/27/95   02 - 16                        0      113,000   06/30/96      /  /    MFK

           Trans. Bldg. @ Service Center:
06-0727    Reconstruction               5-078-107  04/19/07   2,10,16                        0    2,006,287     /  /        /  /    MGL

           Recreation Bldg:
05-0604    Reconstruction               7-058-001  04/10/06   2,4,8,9,15,16                  0      504,438     /  /        /  /    RDR
06-0663    Reconstruction               7-059-001  02/09/07   2,8,10,13,155,15,16            0      368,000     /  /        /  /    MGL

           Svce. Ctr. Storehouse, Kitchen, Offi:
06-0729    Additions and Alterations    7-081-002  04/19/07   02 - 16                        0      705,626     /  /        /  /    MGL

           Press Box@Marshall Ctr for Learning:
04-0548    Reconstruction               7-134-002  02/01/05   2,4,8,15,16                    0      250,000   08/31/05      /  /    RDR

           Grounds Department Building:
06-0730    New Construction             7-174-001  04/19/07   02 - 16                        0    3,182,932     /  /        /  /    MGL


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




RUSH HENRIETTA CSD SUBSTANTIAL COMPLETION DATE MISSING FOR APPROVED CAPITAL PROJECTS
District No.: 26-17-01-06
last updated on 05/29/08
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    ANTICIP   SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         COMPLETE  COMPLETE  MGR.
_______________________________________________________________________________________________________________________________________

           Roth Middle School:
06-0790    Reconstruction               0-003-021  04/20/07   2,4,7,8,9,155,15,16            0    4,200,000     /  /        /  /    HCM

           Ethel K Fyle Elementary:
91-0587    Reconstruction               0-007-004  01/27/92   2,9,10,13,155,15,16            0       45,800     /  /        /  /    PNL

           Emma Sherman Elementary:
91-0588    Reconstruction               0-008-004  01/27/92   2,9,10,155,15,16               0       46,800     /  /        /  /    PNL

           David Crane Elementary:
91-0589    Reconstruction               0-009-004  01/27/92   2,9,10,155,15,16               0       49,800     /  /        /  /    PNL
94-1175    Reconstruction               0-009-007  05/19/95   155,16                         0       23,600   08/25/95      /  /    MEM

           Burger Middle School:
06-0791    Additions and Alterations    0-010-012  04/20/07   02 - 16                        0   16,039,542     /  /        /  /    HCM


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




BROCKPORT CSD SUBSTANTIAL COMPLETION DATE MISSING FOR APPROVED CAPITAL PROJECTS
District No.: 26-18-01-06
last updated on 05/29/08
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    ANTICIP   SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         COMPLETE  COMPLETE  MGR.
_______________________________________________________________________________________________________________________________________

           Middle School:
05-0267    Reconstruction               0-001-012  03/06/06   2,4,7,8,9,15,16                0    1,238,591     /  /        /  /    JOD
06-0529    Reconstruction               0-001-013  02/13/07   2,7,8,9,155,16                 0      408,003     /  /        /  /    JOD

           E. Barclay Elementary School:
05-0268    Reconstruction               0-002-011  03/06/06   2,4,7,8,9,10,13,14,1           0    1,918,568     /  /        /  /    JOD
06-0530    Reconstruction               0-002-012  02/13/07   2,8,9,16                       0      134,749     /  /        /  /    JOD

           J. Ginther Elementary:
05-0269    Reconstruction               0-004-010  03/06/06   2,8,155,15,16                  0      448,443     /  /        /  /    JOD
06-0531    Reconstruction               0-004-011  02/13/07   2,8,9,16                       0      156,301     /  /        /  /    JOD

           Senior High School:
05-0270    Reconstruction               0-007-019  03/06/06   2,4,9,10,155,15,16             0    2,596,362     /  /        /  /    JOD
06-0532    Reconstruction               0-007-020  02/13/07   2,8,9,16                       0    1,173,827     /  /        /  /    JOD

           Fred Hill Intermediate School:
05-0271    Reconstruction               0-010-012  03/06/06   2,7,8,9,155,15,16              0      969,320     /  /        /  /    JOD
06-0533    Reconstruction               0-010-013  02/13/07   2,7,8,9,155,16                 0      153,188     /  /        /  /    JOD

           Bus Garage(see 1-003):
05-0274    Reconstruction               5-003-009  03/06/06   2,16                           0       48,173     /  /        /  /    JOD


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




WEBSTER CENTRAL SCHOOL DISTRICT SUBSTANTIAL COMPLETION DATE MISSING FOR APPROVED CAPITAL PROJECTS
District No.: 26-19-01-06
last updated on 05/29/08
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    ANTICIP   SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         COMPLETE  COMPLETE  MGR.
_______________________________________________________________________________________________________________________________________

           NO MISSING SUBS. COMPLETION DATES:
  -        FOR THIS DISTRICT                         /  /                                    0            0     /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




WHEATLAND CHILI CSD SUBSTANTIAL COMPLETION DATE MISSING FOR APPROVED CAPITAL PROJECTS
District No.: 26-20-01-04
last updated on 05/29/08
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    ANTICIP   SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         COMPLETE  COMPLETE  MGR.
_______________________________________________________________________________________________________________________________________

           Thomas J. Connor Elementary:
05-0445    Reconstruction               0-002-010  04/27/06   2,7,8,9,15,16                  0    1,773,957   12/31/06      /  /    RDR

           Junior Senior High School:
05-0446    Reconstruction               0-003-010  04/27/06   2,7,8,9,10,155,15,16           0    5,132,416   12/31/06      /  /    RDR

           Hist. Woodframe School House:
03-1632    New Construction             7-005-001  07/13/04   02 - 16                        0       34,000   07/30/05      /  /    RDR


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




BOCES MONROE #1 SUBSTANTIAL COMPLETION DATE MISSING FOR APPROVED CAPITAL PROJECTS
District No.: 26-91-00-00
last updated on 05/29/08
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    ANTICIP   SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         COMPLETE  COMPLETE  MGR.
_______________________________________________________________________________________________________________________________________

           Forman Center (fmlyPhase1,2,3):
03-1130    Reconstruction               0-002-006  06/22/04   16                             0      185,175     /  /        /  /    MAC

           Vocational Bldg-Foreman Center:
03-1131    Reconstruction               0-003-003  06/22/04   16                             0       69,175     /  /        /  /    MAC

           Greehhouse Rush:
03-1132    Reconstruction               0-014-001  06/22/04   16                             0       30,350     /  /        /  /    MAC


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




BOCES MONROE II-ORLEANS SUBSTANTIAL COMPLETION DATE MISSING FOR APPROVED CAPITAL PROJECTS
District No.: 26-92-00-00
last updated on 05/29/08
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    ANTICIP   SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         COMPLETE  COMPLETE  MGR.
_______________________________________________________________________________________________________________________________________

           We-mo-co Bldg North:
04-0293    Reconstruction               0-001-014  02/22/05   2,4,7,8,9,10,13,14,1           0    2,598,410   12/31/05      /  /    MAC

           We-mo-co Bldg South:
04-0294    Reconstruction               0-002-018  02/22/05   2,7,8,9,155,15,16              0      376,250   12/31/05      /  /    MAC


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition