Overdue Final Cost Reports

Projects Missing Substantial Completion Dates

Without the Substantial Completion Date We Cannot Warn You When the FCR is Due

THE STATE EDUCATION DEPARTMENT

FACILITIES PLANNING


UPDATED: 05/29/08 at 14:21:46




LEWISTON PORTER CSD SUBSTANTIAL COMPLETION DATE MISSING FOR APPROVED CAPITAL PROJECTS
District No.: 40-03-01-06
last updated on 05/29/08
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    ANTICIP   SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         COMPLETE  COMPLETE  MGR.
_______________________________________________________________________________________________________________________________________

           Middle School:
06-0716    Reconstruction               0-004-012  05/14/07   2,7,8,9,155,15,16              0    3,658,610     /  /        /  /    JOD

           Lewiston-Porter Inter.Edu.Ctr.:
98-1080    Reconstruction               0-005-010  04/12/99   10                             0       12,595   09/01/99      /  /    BJB
06-0717    Reconstruction               0-005-014  05/14/07   2,8,9,155,15,16                0    1,401,750     /  /        /  /    JOD

           Primary Education Center:
06-0718    Reconstruction               0-006-011  05/14/07   2,8,9,155,15,16                0    1,433,940     /  /        /  /    JOD

           Community Resource Center:
06-0719    Reconstruction               0-014-007  05/14/07   2,4,7,8,9,10,155,15,           0    1,975,563     /  /        /  /    JOD

           Senior High School:
06-0720    Reconstruction               0-015-012  05/14/07   2,7,8,9,155,15,16              0    2,421,475     /  /        /  /    JOD

           Lavatory Stadium:
06-0722    Reconstruction               7-009-001  05/14/07   2,4,7,8,9,15,16                0       98,831     /  /        /  /    JOD

           CONCESSION STAND:
06-0723    New Construction             7-019-001  05/14/07   02 - 16                        0      430,481     /  /        /  /    JOD

           Team Room Building:
06-0724    Reconstruction               7-020-001  05/14/07                                  0      443,740     /  /        /  /    JOD


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




LOCKPORT CITY SCHOOLS SUBSTANTIAL COMPLETION DATE MISSING FOR APPROVED CAPITAL PROJECTS
District No.: 40-04-00-01
last updated on 05/29/08
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    ANTICIP   SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         COMPLETE  COMPLETE  MGR.
_______________________________________________________________________________________________________________________________________

           Lockport Senior High School:
03-0958    Reconstruction               0-001-013  04/08/04   4,8,9,10,155,16                0      681,000   12/31/04      /  /    JOD
06-0640    Reconstruction               0-001-014  05/01/07   2,4,10,155,15,16               0    1,850,000     /  /        /  /    JOD

           Emmet Belknap Middle School:
03-0959    Reconstruction               0-002-009  04/08/04   4,7,9,10,155,16                0    1,870,000   12/31/04      /  /    JOD
06-0641    Reconstruction               0-002-010  05/01/07   2,4,9,155,15,16                0      682,500     /  /        /  /    JOD

           North Park Junior High:
03-0960    Reconstruction               0-003-007  04/08/04   7,8,9,10,155,16                0    1,074,000   12/31/04      /  /    JOD
06-0642    Reconstruction               0-003-008  05/01/07   2,4,7,8,155,15,16              0    1,482,000     /  /        /  /    JOD

           Dewitt Clinton Elementary:
03-0961    Reconstruction               0-004-008  04/08/04   2,155                          0      242,000   12/31/04      /  /    JOD
06-0643    Reconstruction               0-004-009  05/01/07   2,4,8,9,13,155,15,16           0      536,500     /  /        /  /    JOD

           Washington Hunt Elementary:
03-0962    Reconstruction               0-005-008  04/08/04   9,155                          0      298,000   12/31/04      /  /    JOD
06-0644    Reconstruction               0-005-009  05/01/07   2,8,10,155,16                  0      786,000     /  /        /  /    JOD

           John Pound Elementary:
03-0963    Reconstruction               0-006-005  04/08/04   9,155                          0       70,000   12/31/04      /  /    JOD
06-0645    Reconstruction               0-006-006  05/01/07   2,7,10,155,15,16               0      573,000     /  /        /  /    JOD

           Charlotte Cross Elementary:
03-0964    Reconstruction               0-007-007  04/08/04   7,155                          0      258,000   12/31/04      /  /    JOD
06-0646    Reconstruction               0-007-008  05/01/07   2,4,7,9,10,155,15,16           0      640,500     /  /        /  /    JOD

           Charles Upson Elementary:
03-0965    Reconstruction               0-008-009  04/08/04   155,16                         0      207,000   12/31/04      /  /    JOD
06-0647    Reconstruction               0-008-010  05/01/07   2,4,10,155,16                  0       97,000     /  /        /  /    JOD

           Roy B. Kelly Elementary:
03-0966    Reconstruction               0-009-008  04/08/04   2,15,16                        0       50,000   12/31/04      /  /    JOD
06-0648    Reconstruction               0-009-009  05/01/07   2,8,155,15,16                  0    1,260,000     /  /        /  /    JOD

           Anna Merritt Elementary:
06-0649    Reconstruction               0-010-005  05/01/07   2,4,7,10,16                    0      214,000     /  /        /  /    JOD

           George Southard Elementary:
03-0967    Reconstruction               0-011-007  04/08/04   9,10,15                        0       50,000   12/31/04      /  /    JOD
06-0650    Reconstruction               0-011-008  05/01/07   2,8,10,16                      0      324,000     /  /        /  /    JOD


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




NEWFANE CSD SUBSTANTIAL COMPLETION DATE MISSING FOR APPROVED CAPITAL PROJECTS
District No.: 40-06-01-06
last updated on 05/29/08
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    ANTICIP   SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         COMPLETE  COMPLETE  MGR.
_______________________________________________________________________________________________________________________________________

           NO MISSING SUBS. COMPLETION DATES:
  -        FOR THIS DISTRICT                         /  /                                    0            0     /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




NIAGARA WHEATFIELD CSD SUBSTANTIAL COMPLETION DATE MISSING FOR APPROVED CAPITAL PROJECTS
District No.: 40-07-01-06
last updated on 05/29/08
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    ANTICIP   SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         COMPLETE  COMPLETE  MGR.
_______________________________________________________________________________________________________________________________________

           Errick Road Elementary:
05-0206    Reconstruction               0-005-012  12/23/05   2,9,155,15,16                  0      922,306     /  /        /  /    DDJ

           Colonial Village Elementary:
05-0207    Reconstruction               0-011-016  12/23/05   2,155,15,16                    0      544,190     /  /        /  /    DDJ

           Senior High School:
01-1401    Reconstruction               0-013-020  06/10/02   2,9,16                         0      428,000   09/30/02      /  /    MAC
05-0208    Additions and Alterations    0-013-021  12/23/05   02 - 16                        0   18,990,130     /  /        /  /    DDJ
06-0406    Reconstruction               0-013-022  01/19/07   2,14,15,16                     0      636,444     /  /        /  /    DDJ

           Edward Town Middle School:
05-0209    Additions and Alterations    0-014-010  12/23/05   02 - 16                        0   12,609,946     /  /        /  /    DDJ
06-0407    Reconstruction               0-014-011  01/19/07   155,16                         0       98,000     /  /        /  /    DDJ

           West Street Elementary(New Elem):
05-0210    Additions and Alterations    0-029-003  12/23/05   02 - 16                        0    3,944,983     /  /        /  /    DDJ

           CONCESSION/COMFORT:
06-0408    New Construction             7-033-001  01/19/07   02 - 16                        0      386,325     /  /        /  /    DDJ


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




NIAGARA FALLS CITY SCHOOL DISTRICT SUBSTANTIAL COMPLETION DATE MISSING FOR APPROVED CAPITAL PROJECTS
District No.: 40-08-00-01
last updated on 05/29/08
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    ANTICIP   SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         COMPLETE  COMPLETE  MGR.
_______________________________________________________________________________________________________________________________________

           Gaskill Middle School:
92-1502    Reconstruction               0-001-002  07/27/93   4,8,9,155,15,16                0       60,500   09/01/93      /  /    MFK
96-1053    Reconstruction               0-001-006  04/10/97   2,4,8                          0      227,854   12/31/97      /  /    MGL
03-0142    Additions and Alterations    0-001-011  09/05/03   02 - 16                        0      936,329   08/29/03      /  /    HCM
05-1144    Reconstruction               0-001-012  12/01/06   2,4,8,9,10,155,15,16           0      415,876     /  /        /  /    HCM
04-1110    Reconstruction               0-001-013  05/09/06   13,155,15,16                   0      484,528   08/30/06      /  /    HCM

           79th Street Elementary School:
92-1503    Reconstruction               0-005-002  07/27/93   16                             0       60,500   09/01/93      /  /    MFK
94-0469    Reconstruction               0-005-003  01/03/95   8,9,16                         0      490,500   03/15/95      /  /    MFK
03-0143    Additions and Alterations    0-005-008  09/05/03   02 - 16                        0      683,717   08/29/03      /  /    HCM
05-1145    Reconstruction               0-005-009  12/01/06   2,4,7,8,9,10,14,155,           0      441,033     /  /        /  /    HCM
04-1111    Reconstruction               0-005-010  05/09/06   13,155,15,16                   0      326,655   08/30/06      /  /    HCM

           Geraldine J. Mann Elementary School:
03-0144    Reconstruction               0-011-007  09/05/03   4,8,155,15,16                  0      827,065   08/29/03      /  /    HCM
05-1146    Reconstruction               0-011-008  12/01/06   2,8,9,10,155,15,16             0      171,664     /  /        /  /    HCM
04-1112    Reconstruction               0-011-009  05/09/06   155,16                         0       62,673   08/30/06      /  /    HCM

           Kalfas Early Childhood Magnet School:
92-1504    Reconstruction               0-014-003  07/27/93   155,15                         0      134,800   09/01/93      /  /    MFK
94-0222    Reconstruction               0-014-004  09/28/94   2                              0       29,650   09/30/94      /  /    MFK
96-1054    Reconstruction               0-014-007  04/10/97   2,4,8                          0    1,343,787   12/31/97      /  /    MGL
03-0145    Reconstruction               0-014-012  09/05/03   2,8,9,10,155,15,16             0      161,354   08/29/03      /  /    HCM
05-1147    Additions and Alterations    0-014-013  12/01/06   02 - 16                        0      213,599     /  /        /  /    HCM
04-1113    Reconstruction               0-014-014  05/09/06   13,155,15,16                   0      429,380   08/30/06      /  /    HCM

           Maple Avenue Elementary School:
03-0146    Reconstruction               0-015-008  09/05/03   2,4,8,9,155,15,16              0      821,379   08/29/03      /  /    HCM
05-1148    Reconstruction               0-015-009  12/01/06   4,8,9,10,155,15,16             0      356,197     /  /        /  /    HCM
04-1114    Reconstruction               0-015-010  05/09/06   8,13,155,15,16                 0      927,755   08/30/06      /  /    HCM

           LaSalle Middle School:
92-1505    Reconstruction               0-020-003  07/27/93   16                             0       60,500   09/01/93      /  /    MFK
03-0147    Reconstruction               0-020-009  09/05/03                                  0      821,997   08/29/03      /  /    HCM
05-1149    Reconstruction               0-020-010  12/01/06   2,4,9,10,155,15,16             0      625,321     /  /        /  /    HCM
04-1115    Reconstruction               0-020-011  05/09/06   13,155,15,16                   0      765,893   08/30/06      /  /    HCM

           24th Street School:
05-1150    Reconstruction               0-021-008  12/01/06   2,8,9,10,155,15,16             0      458,814     /  /        /  /    HCM
04-1116    Reconstruction               0-021-009  05/09/06   155,15                         0      372,493   08/30/06      /  /    HCM

           66th Street School:
96-0273    Reconstruction               0-024-003  10/23/96   2                              0      120,000   10/25/96      /  /    MEM
03-0148    Additions and Alterations    0-024-008  09/05/03   02 - 16                        0      619,158   08/29/03      /  /    HCM
05-1151    Reconstruction               0-024-009  12/01/06   2,4,7,8,9,10,14,155,           0      172,032     /  /        /  /    HCM
04-1117    Reconstruction               0-024-010  05/09/06   155,16                         0      290,086   08/30/06      /  /    HCM

           LaSalle Senior High:
94-1667    Reconstruction               0-025-007  07/06/95   2,4,155,15,16                  0      116,650   08/30/95      /  /    MFK

           Hyde Park School:
03-0149    Additions and Alterations    0-026-007  09/05/03   02 - 16                        0       95,054   08/29/03      /  /    HCM
05-1152    Reconstruction               0-026-008  12/01/04   2,8,9,10,14,155,15,1           0      687,943     /  /        /  /    HCM
04-1118    Reconstruction               0-026-009  05/09/06   155,15,16                      0      259,096   08/30/06      /  /    HCM

           Niagara St. Elementary School:
98-1627    Reconstruction               0-032-006  09/28/99   4,155,15,16                    0      424,000   09/03/99      /  /    MGL

           60th Street Elementary School:
03-0151    Additions and Alterations    0-033-008  09/05/03   02 - 16                        0      375,321   08/29/03      /  /    HCM
05-1153    Reconstruction               0-033-009  12/01/06   2,4,7,8,9,10,14,155,           0      410,527     /  /        /  /    HCM
04-1119    Reconstruction               0-033-010  05/09/06   13,155,15,16                   0      259,321   08/30/06      /  /    HCM

           Abate Elementary School:
03-0152    Reconstruction               0-038-012  09/05/03   9,155,15,16                    0      401,366   08/29/03      /  /    HCM
05-1264    Reconstruction               0-038-013  12/01/06   2,9,10,155,15,16               0       11,968     /  /        /  /    HCM
04-1120    Reconstruction               0-038-014  05/09/06   13,155,15,16                   0      640,123   08/30/06      /  /    HCM

           Niagara Middle School:
93-1726    Reconstruction               0-039-002  08/05/94   2                              0      107,000   09/01/94      /  /    MFK
05-1154    Additions and Alterations    0-039-005  12/01/06   02 - 16                        0       42,743     /  /        /  /    HCM
04-1121    Reconstruction               0-039-006  05/09/06   13,155,15,16                   0      365,773   08/30/06      /  /    HCM

           Hyde Park High School:
05-1155    Additions and Alterations    0-043-002  12/01/06   02 - 16                        0      200,611     /  /        /  /    HCM
04-1122    Reconstruction               0-043-003  05/09/06   155,15,16                      0    2,169,044   08/30/06      /  /    HCM

           District Wide:
94-0457    Reconstruction               7-999-003  12/14/94   16                             0      996,287   06/30/96      /  /    MGL


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




NORTH TONAWANDA SCHOOLS SUBSTANTIAL COMPLETION DATE MISSING FOR APPROVED CAPITAL PROJECTS
District No.: 40-09-00-01
last updated on 05/29/08
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    ANTICIP   SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         COMPLETE  COMPLETE  MGR.
_______________________________________________________________________________________________________________________________________

           Meadow Dr ES K-5/NT HS 9-12:
04-1162    Reconstruction               0-015-010  04/27/05   2,8                            0    1,079,800   12/31/05      /  /    JOD


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




STARPOINT CSD SUBSTANTIAL COMPLETION DATE MISSING FOR APPROVED CAPITAL PROJECTS
District No.: 40-10-01-06
last updated on 05/29/08
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    ANTICIP   SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         COMPLETE  COMPLETE  MGR.
_______________________________________________________________________________________________________________________________________

           NO MISSING SUBS. COMPLETION DATES:
  -        FOR THIS DISTRICT                         /  /                                    0            0     /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




ROYALTON-HARTLAND CSD SUBSTANTIAL COMPLETION DATE MISSING FOR APPROVED CAPITAL PROJECTS
District No.: 40-12-01-06
last updated on 05/29/08
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    ANTICIP   SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         COMPLETE  COMPLETE  MGR.
_______________________________________________________________________________________________________________________________________

           Jr/Sr High School:
99-0010    Reconstruction               0-001-003  11/24/99   7,8,9,15,16                    0    3,409,704   12/21/00      /  /    MEM
98-0895    Reconstruction               0-001-004  03/10/99   2,15                           0       54,625   04/09/99      /  /    MEM

           Middleport Elem School:
99-0011    Reconstruction               0-002-002  11/24/99   7,8,9,15,16                    0    1,706,455   12/21/00      /  /    MEM

           Gasport Elementary:
99-0012    Reconstruction               0-003-002  11/24/99   7,8,9,15,16                    0    1,581,630   12/21/00      /  /    MEM


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




BARKER CSD SUBSTANTIAL COMPLETION DATE MISSING FOR APPROVED CAPITAL PROJECTS
District No.: 40-13-01-04
last updated on 05/29/08
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    ANTICIP   SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         COMPLETE  COMPLETE  MGR.
_______________________________________________________________________________________________________________________________________

           NO MISSING SUBS. COMPLETION DATES:
  -        FOR THIS DISTRICT                         /  /                                    0            0     /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




WILSON CSD SUBSTANTIAL COMPLETION DATE MISSING FOR APPROVED CAPITAL PROJECTS
District No.: 40-15-01-06
last updated on 05/29/08
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    ANTICIP   SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         COMPLETE  COMPLETE  MGR.
_______________________________________________________________________________________________________________________________________

           Industrial Arts Bldg:
03-0698    Additions and Alterations    0-001-003  05/06/04   02 - 16                        0      352,963   09/01/06      /  /    JOD

           Wilson Middle/High School:
03-0699    Additions and Alterations    0-002-011  05/06/04   02 - 16                        0    6,409,502   09/01/06      /  /    JOD

           Thomas Marks Elementary:
03-0700    Additions and Alterations    0-003-006  05/06/04   02 - 16                        0    6,299,199   09/01/06      /  /    JOD

           Stevenson Elementary:
03-0701    Additions and Alterations    0-004-005  05/06/04   02 - 16                        0    4,761,588   09/01/06      /  /    JOD


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition