IRS

Information and Reporting Services

Archive of SEDCAR's RSS Feed for 2015

Items listed below are in date posted order with the most current archive on the top and the oldest on the bottom. To search this document for specific key words press the 'Ctrl' key plus 'F' or select 'Edit' and then 'Find' on the toolbar. In the pop up box type the information you want to find (For example: a specific date, refresh, system down or even partial information) and click the 'Find Next' button until you find the desired result.

This page was last updated on:  December 7, 2015 12:18 PM

The SIRS Refresh for VR1-9 has Completed
The SIRS refresh for 2015-16 VR1-9 has completed and the verification reports have been refreshed.
Mon, 23 Nov 2015 10:00:00 EST

The SIRS Refresh for VR1-9 has Completed
The SIRS refresh for 2015-16 VR1-9 has completed and the verification reports have been refreshed.
Fri, 13 Nov 2015 08:45:00 EST

The SIRS Refresh for VR1-9 is being Re-run
The 2015-16 VR1-9 refresh is currently being rerun to correct an issue related to LEP status. This RSS feed will be updated once it has completed.
Thu, 12 Nov 2015 14:35:00 EST

The SIRS Refresh for VR1-9 has Completed
The SIRS refresh for 2015-16 VR1-9 has completed and the verification reports have been refreshed.
Mon, 9 Nov 2015 10:45:00 EST

The SIRS Refresh for VR1-9 has Completed
The SIRS refresh for 2015-16 VR1-9 has completed and the verification reports have been refreshed.
Mon, 2 Nov 2015 10:15:00 EST

The SIRS Refresh for VR1-9 has Completed
The SIRS refresh for 2015-16 VR1-9 has completed and the verification reports have been refreshed.
Mon, 26 Oct 2015 11:00:00 EST

The 2015-16 Data Requirements Page is Posted
The 2015-16 data requirements page is now available and had templates of all of our forms and their due dates and other information.
Tue, 6 Oct 2015 13:55:00 EST

The Final SIRS Refresh for VR11, VR12 and VR14 has Completed
The final SIRS refresh for VR11, VR12 and VR14 has completed and the verification reports have been refreshed. These reports are due to be certified by today.
Mon, 28 Sep 2015 10:30:00 EST

The SIRS Refresh for VR11, VR12 and VR14 has Completed
The SIRS refresh for VR11, VR12 and VR14 has completed and the verification reports have been refreshed.
Mon, 21 Sep 2015 10:10:00 EST

The 2015-16 Due Dates At a Glance is Now Available
The 2015-16 due dates at a glance document is now available for download.
Tue, 15 Sep 2015 10:35:00 EST

The PD System is Back Up
The PD System is back up and the certification buttons are back. We apologize for the inconvenience.
Tue, 15 Sep 2015 10:30:00 EST

The PD System is Temporarily Down
The PD System is temporarily down. We expect it to be back up tomorrow (9/15/15) by mid-morning. We have temporarily removed the certification buttons and these will be back up tomorrow when the system is fixed. We apologize for the inconvenience.
Mon, 14 Sep 2015 15:35:00 EST

The SIRS Refresh for VR11, VR12 and VR14 has Completed
The SIRS refresh for VR11, VR12 and VR14 has completed and the verification reports have been refreshed as of 9/7/15.
Mon, 14 Sep 2015 08:35:00 EST

The SIRS Refresh for VR11, VR12 and VR14 has Completed
The SIRS refresh for VR11, VR12 and VR14 has completed and the verification reports have been refreshed as of 9/7/15.
Tue, 8 Sep 2015 09:45:00 EST

The SIRS Refresh for VR11-16 has Completed and are Due Today
The SIRS refresh for VR11-16 has completed and the verification reports have been refreshed. This is the final refresh for VR13, VR15 and VR16 and these are due to be certified by today. The CDOS number and SR13 are also due by today as well.
Mon, 31 Aug 2015 09:45:00 EST

The SIRS Refresh for VR11-16 has Completed
The SIRS refresh for VR11-16 has completed and the verification reports have been refreshed.
Mon, 24 Aug 2015 09:00:00 EST

VR15 Has Been Fixed
The VR15 issue has been resolved and refreshed. We apologize for the delay.
Thu, 20 Aug 2015 16:00:00 EST

VR15 Bug
There is a problem with the VR15 and it did not refresh correctly. We are working to resolve this. We apologize for the delay.
Wed, 19 Aug 2015 13:00:00 EST

The SIRS Refresh for VR11-16 has Completed
The SIRS refresh for VR11-16 has completed and the verification reports have been refreshed.
Tues, 18 Aug 2015 16:15:00 EST

The SIRS Refresh for VR11-16 has NOT Completed
The SIRS refresh for VR11-16 has NOT completed and we are experiencing a major technical problem. We do not foresee this being fixed until at least tomorrow (8/18/15). We have also temporarily taken down the certification buttons at this time as the system did not refresh properly. We apologize for the inconvenience.
Mon, 17 Aug 2015 12:00:00 EST

The SIRS Refresh for VR11-16 has Completed
The SIRS refresh for VR11-16 has completed and the verification reports have been refreshed.
Mon, 10 Aug 2015 09:30:00 EST

The SIRS Refresh for VR11-16 has Completed
The SIRS refresh for VR11-16 has completed and the verification reports have been refreshed.
Mon, 3 Aug 2015 10:30:00 EST

The SIRS Refresh for VR11-16 has Completed
The SIRS refresh for VR11-16 has completed and the verification reports have been refreshed.
Mon, 27 Jul 2015 09:30:00 EST

The SIRS Refresh for VR11-16 has Completed
The SIRS refresh for VR11-16 has completed and the verification reports have been refreshed.
Mon, 20 Jul 2015 11:30:00 EST

The SIRS Refresh for VR11-16 has Completed
The SIRS refresh for VR11-16 has completed and the verification reports have been refreshed.
Mon, 13 Jul 2015 10:50:00 EST

The SIRS Refresh for VR11-16 has Completed
The SIRS refresh for VR11-16 has completed and the verification reports have been refreshed.
Mon, 6 Jul 2015 12:05:00 EST

The SIRS Refresh for VR11-16 has Completed
The SIRS refresh for VR11-16 has completed and the verification reports have been refreshed.
Mon, 29 Jun 2015 11:00:00 EST

The SIRS Refresh for VR11-16 has Completed
The SIRS refresh for VR11-16 has completed and the verification reports have been refreshed.
Mon, 22 Jun 2015 10:30:00 EST

Lists and SR13 are now available.
The inclusion, exclusion reports, the potential student lists and the SR13 are now available.
Wed, 17 Jun 2015 10:45:00 EST

The SIRS Refresh for VR11-16 has Completed
The SIRS refresh for VR11-16 has completed and the verification reports have been refreshed. At this time we are still working to put the corresponding lists of included, excluded and potential lists of students found in the 2015-16 drop down menu into production. This does not affect the ability of PD Contacts to drill down to the list of students behind each count that appears in the VR 11-16.
Mon, 15 Jun 2015 10:40:00 EST

The SIRS Refresh for VR11-16 has Completed
The SIRS refresh for VR11-16 has completed and the verification reports have been refreshed. At this time we are still working to put the corresponding lists of included, excluded and potential lists of students found in the 2015-16 drop down menu into production. This does not affect the ability of PD Contacts to drill down to the list of students behind each count that appears in the VR 11-16.
Tues, 9 Jun 2015 15:00:00 EST

The VR11-16 are expected to go up this week
The VR11-16 are expected to go up this week. This message will be updated once the refreshed reports are available.
Mon, 1 Jun 2015 11:00:00 EST

The SIRS Refresh for the 2014-15 VR1-9 has Completed
The SIRS refresh has completed for the 2014-15 VR1-9 and the verification reports have been refreshed. Since the refresh was delayed, the VR1-9 are now due to be certified by tomorrow, January 13, 2015.
Mon, 12 Jan 2015 16:40:00 EST

The SIRS Refresh for the 2014-15 VR1-9 has Completed
The SIRS refresh has completed for the 2014-15 VR1-9 and the verification reports have been refreshed. Please remember there is only 1 more refresh of the 2014-15 VR1-9. These are due to be certified by January 12, 2015.
Mon, 5 Jan 2015 09:05:00 EST

Top of Page

Last Updated: December 7, 2015 12:18 PM