Construction Project Status

Construction Project Status

THE STATE EDUCATION DEPARTMENT

FACILITIES PLANNING


UPDATED: 04/17/24 at 08:22:13




ANDES CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 12-01-02-04
last updated on 04/17/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Main Building:
23-1564   Reconstruction               0-001-013                         UNREVIEWED         03/01/24   03/01/24   03/03/22   03/17/22   2,16                           0             0  MSK             0           0           0 SEI Design Group                        0        /  /                         03/01/24           
  -       Reconstruction               0-001-014                                              /  /       /  /     03/10/22     /  /     2                              0             0  SLC             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-001-015                                              /  /       /  /     03/13/23     /  /     2,13                           0             0  SLC             0           0           0                                         0        /  /                           /  /             
  -    SB Reconstruction               0-001-BA1               DONE                           /  /       /  /       /  /       /  /                                    0             0  JSS             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




DOWNSVILLE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 12-03-01-04
last updated on 04/17/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Central School:
21-0741FA Reconstruction               0-001-016  03/10/22     DONE    DONE       DONE      11/17/21   11/17/21   11/09/21   05/15/18   2,4,8,9                1,418,570     1,418,570  JLB             0           0           0 Hunt Engineers,Architects & l           0        /  /                         11/17/21           
23-1274   Reconstruction               0-001-017                         UNREVIEWED         12/22/23   12/21/23   11/09/23   10/23/23   2,7,16                         0             0  JJH             0           0           0 Hunt Engineers,Architects & l           0        /  /                         12/21/23           

          Concession Stand:
23-0057DB Discovered Building          7-006-001  11/02/23     DONE    DONE       DONE      07/12/23   07/11/23   06/05/23     /  /                                    0             0  JJH             0           0           0                                         0        /  /                         07/11/23           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




CHARLOTTE VALLEY CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 12-04-01-04
last updated on 04/17/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Main Building:
19-0788   Reconstruction               0-001-015  01/17/20     DONE    DONE       DONE      11/13/19   11/04/19   08/29/19   05/18/19   9,15,16                  100,000       100,000  JSS             0           0           0 Hunt Engineers,Architects & l           0      06/30/20                       11/04/19           
19-1770   Reconstruction               0-001-016  08/14/20     DONE    DONE       DONE      05/27/20   05/19/20   03/18/20   06/09/20   9,15,16                  100,000       100,000  JSS             0           0           0 Hunt Engineers,Architects & l           0      05/28/21                       05/19/20           
20-0234   Reconstruction               0-001-017  12/01/20     DONE    DONE       DONE      08/18/20   08/14/20   07/21/20   02/01/18   2,4,7,8,9,155,15,16      675,000       675,000  JSS             0           0           0 Hunt Engineers,Architects & l           0      05/28/21                       08/14/20           
21-0054   Reconstruction               0-001-018  08/16/21     DONE    DONE       DONE      07/16/21   06/29/21   05/13/21   05/18/21   9,15,16                  100,000       100,000  JLB             0           0           0 Hunt Engineers,Architects & l           0      06/15/22                       06/29/21           
21-1719   Reconstruction               0-001-019  06/22/22     DONE    DONE       DONE      04/29/22   04/25/22   01/31/22   05/17/22   9                        100,000       100,000  JLB             0           0           0 Hunt Engineers,Architects & l           0      03/02/23                       04/25/22           
22-2413   Reconstruction               0-001-020  07/27/23     DONE    DONE       DONE      06/20/23   06/16/23   02/11/22   05/16/23   9                        100,000       100,000  JJH             0           0           0 Hunt Engineers,Architects & l           0        /  /                         06/16/23           
22-0236FB Reconstruction               0-001-021  11/02/22     DONE    DONE       DONE      08/05/22   08/04/22   05/26/22   06/02/22   2                        250,000       250,000  JLB             0           0           0 Hunt Engineers,Architects & l           0      09/26/23                       08/04/22           
23-0007   Reconstruction               0-001-022               STARTED DONE       DONE      07/05/23   07/03/23   04/10/23   12/06/22   8,155,16               1,035,494             0  JJH             0           0           0 Hunt Engineers,Architects & l   1,035,494        /  /                         07/03/23           
23-0160   Reconstruction               0-001-023  01/03/24     DONE    DONE       DONE      07/28/23   07/24/23   04/10/23   12/06/22   2,4,7,8,9,10,14,155,   9,970,000     9,970,000  JJH             0           0           0 Hunt Engineers,Architects & l           0        /  /                         07/24/23           
23-1160   Reconstruction               0-001-024                         UNREVIEWED         12/13/23   12/07/23   10/25/23   12/06/22   2,4,9,15,16                    0             0  JJH             0           0           0 Hunt Engineers,Architects & l           0        /  /                         12/07/23           
  -    SB Reconstruction               0-001-BA1               DONE                           /  /       /  /       /  /       /  /     16                             0             0  JLB             0           0           0                                         0        /  /                           /  /             

          Outdoor Classroom:
  -    PR New Construction             0-011-001                                              /  /       /  /     02/24/22     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                           /  /             
22-0237FB New Construction             0-011-001  10/17/22     DONE    DONE       DONE      08/05/22   08/04/22   02/24/22   12/27/20   02 - 16                  135,000             0  JLB             0           0           0 Hunt Engineers,Architects & l           0        /  /                         08/04/22           

          Bus Garage:
23-0008   Reconstruction               5-002-004               STARTED DONE       DONE      07/05/23   07/03/23   04/10/23   12/06/22   8,155,16                  31,506             0  JJH             0           0           0 Hunt Engineers,Architects & l      31,506        /  /                         07/03/23           

          Greenhouse:
  -    PR New Construction             7-010-001                                              /  /       /  /     06/25/19     /  /     02 - 16                        0             0  BMJ             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




DELAWARE ACADEMY CSD AT DELHI STATUS REPORT ON CAPITAL PROJECTS
District No.: 12-05-01-04
last updated on 04/17/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Delaware Academy (6-12):
19-0217   Reconstruction               0-001-011  01/28/20     DONE    DONE       DONE      08/08/19   07/30/19   05/07/18   10/11/18   2,4,7,8,9,10,155,15,   4,454,747     4,454,747  SLC             0           0           0 Highland Associates                     0      09/01/22                       07/30/19           
19-0218   Reconstruction               0-001-012  01/28/20     DONE    DONE       DONE      08/08/19   07/30/19   06/27/19   10/11/18   2                        807,300             0  SLC             0           0           0 Highland Associates                     0      09/01/22                       07/30/19           
20-0403   Reconstruction               0-001-013  11/24/20     DONE    DONE       DONE      09/18/20   09/17/20   01/10/20   06/09/20   2                      1,100,000     1,100,000  SLC             0           0           0 Highland Associates                     0      05/20/22                       09/17/20           
19-1695   Reconstruction               0-001-014  06/08/20     DONE    DONE       DONE      04/13/20   04/11/20   02/24/20   05/21/19   9                        100,000       100,000  SLC             0           0           0 Highland Associates                     0        /  /                         04/11/20           
21-1434   Reconstruction               0-001-015  06/02/22     DONE    DONE       DONE      03/07/22   03/04/22   12/02/21   01/24/22   2,4                      602,011       602,011  SLC             0           0           0 Highland Associates                     0      10/05/22                       03/04/22           
23-0021   Reconstruction               0-001-016  11/09/23     DONE    DONE       DONE      07/07/23   07/06/23   09/09/22   01/30/23   2,4                      525,000       525,000  MSK             0           0           0 Highland Associates                     0      10/01/23                       07/06/23           
  -       Reconstruction               0-001-017                                              /  /       /  /     02/29/24     /  /     2,4,7,8,9,10,155,15,           0             0  MSK             0           0           0                                         0        /  /                           /  /             

          Delhi Elementary School:
19-0219   Reconstruction               0-004-007  01/28/20     DONE    DONE       DONE      08/08/19   07/30/19   05/07/18   10/11/18   2,4,7,8,9,10,155,15,   4,427,640     4,427,640  SLC             0           0           0 Highland Associates                     0      03/31/22                       07/30/19           
21-1530   Reconstruction               0-004-008  04/29/22     DONE    DONE       DONE      03/18/22   03/17/22   12/02/21   05/18/21   9                        100,000       100,000  SLC             0           0           0 Highland Associates                     0      09/01/22                       03/17/22           
  -       Reconstruction               0-004-009                                              /  /       /  /     01/25/22     /  /     155,16                         0             0  SLC             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-004-010                                              /  /       /  /     02/29/24     /  /     2,4,155                        0             0  MSK             0           0           0                                         0        /  /                           /  /             

          BusGarage- Frmrly Industrial Arts:
19-0220   Reconstruction               5-002-004  01/28/20     DONE    DONE       DONE      08/08/19   07/30/19   11/26/19   10/11/18   9                         86,360        86,360  SLC             0           0           0 Highland Associates                     0      02/18/22                       07/30/19           
  -       Reconstruction               5-002-005                                              /  /       /  /     02/29/24     /  /     2,4,9,155,15,16                0             0  MSK             0           0           0                                         0        /  /                           /  /             

          XXClass Storage 1 - cancelled:
20-1043XX Reconstruction               8-017-001                         CANCELLED          12/24/20   12/22/20   08/21/20     /  /                                    0             0  SLC             0           0           0                                         0        /  /                         12/22/20           

          XXClass Storage 2 - canceled:
20-1044XX Reconstruction               8-018-001                         CANCELLED          12/24/20   12/22/20   08/21/20     /  /                                    0             0  SLC             0           0           0                                         0        /  /                         12/22/20           

          XXClass Storage 3 - cancelled:
20-1045XX Reconstruction               8-019-001                         CANCELLED          12/24/20   12/22/20   08/21/20     /  /                                    0             0  SLC             0           0           0                                         0        /  /                         12/22/20           

          XXClass Storage 4 - Cancelled:
  -    XX Reconstruction               8-020-001                         CANCELLED            /  /       /  /     08/21/20     /  /                                    0             0  SLC             0           0           0                                         0        /  /                           /  /             

          XXClassroom Storage Unit 5-Canceled:
  -    XX Reconstruction               8-021-001                         CANCELLED            /  /       /  /     08/21/20     /  /                                    0             0  SLC             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




FRANKLIN CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 12-07-01-04
last updated on 04/17/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Main Building:
19-0517   Reconstruction               0-001-026  01/28/20     DONE    DONE       DONE      09/30/19   09/19/19   04/26/19   05/21/19   2,4,9                    100,000       100,000  SLC             0           0           0 IBI GROUP                               0      08/18/20                       09/19/19           
20-0583   Reconstruction               0-001-027  12/26/20     DONE    DONE       DONE      10/13/20   10/02/20   07/23/20   06/09/20   9,155,16                 100,000       100,000  SLC             0           0           0 IBI GROUP                               0      08/27/21                       10/02/20           
20-1949   Reconstruction               0-001-028  07/21/21     DONE    DONE       DONE      06/30/21   06/28/21   05/27/21   05/18/21   2,9                      100,000       100,000  SLC             0           0           0 IBI GROUP                               0      06/22/22                       06/28/21           
21-1756   Reconstruction               0-001-029  07/26/22     DONE    DONE       DONE      05/03/22   05/02/22   03/08/22   05/17/22   2,9                      100,000       100,000  SLC             0           0           0 IBI GROUP                               0      09/22/23                       05/02/22           
23-1040   Reconstruction               0-001-030  01/11/24     DONE    DONE       DONE      11/17/23   11/15/23   07/11/23   05/17/23   4,8,16                   100,000       100,000  MSK             0           0           0 Hunt Engineers,Architects & l           0        /  /                         11/15/23           

          District-Wide:
18-1915   Reconstruction               7-999-001  06/27/19     DONE    DONE       DONE      05/01/19   04/01/19     /  /     11/04/14   16                       272,000       272,000  SLC             0           0           0 IBI GROUP                               0      08/31/20                       04/01/19           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




HANCOCK CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 12-09-06-04
last updated on 04/17/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Jr/Sr High School:
20-0226   Reconstruction               0-001-014  11/23/20     DONE    DONE       DONE      08/14/20   07/15/20   03/05/19   12/05/19   2,4,7,8,9,10,155,15,   2,637,520     2,637,520  SLC             0           0           0 Highland Associates                     0      09/08/21                       07/15/20           
22-1493   Reconstruction               0-001-015  11/08/21     DONE    DONE       DONE      01/17/23   01/17/23   10/29/21   11/08/21   2,9                      367,325       367,325  MSK             0           0           0 Delta Engineers, Architects,            0      08/05/22                       01/17/23           
  -       Reconstruction               0-001-016                                              /  /       /  /     02/07/22     /  /     16                             0             0  SLC             0           0           0                                         0        /  /                           /  /             
21-1531FB Reconstruction               0-001-017  04/04/22     DONE    DONE       DONE      03/18/22   03/17/22   02/07/22   06/28/21   155,16                 1,091,200             0  SLC             0           0           0 Highland Associates                     0      10/26/22                       03/17/22           

          Elementary School:
20-0227   Reconstruction               0-004-011  11/23/20     DONE    DONE       DONE      08/14/20   07/15/20   03/05/19   12/05/19   2,4,7,8,9,155,15,16      269,588             0  SLC             0           0           0 Highland Associates                     0      09/08/21                       07/15/20           
22-0374   Reconstruction               0-004-012  08/20/21     DONE    DONE       DONE      08/29/22   08/29/22   04/04/22   08/19/21   13                       275,000       275,000  SLC             0           0           0 Delta Engineers, Architects,            0      03/04/22                       08/29/22           
22-2016   Reconstruction               0-004-014  07/12/23     DONE    DONE       DONE      04/12/23   04/07/23   11/10/22   03/27/23   2                        490,000       490,000  MSK             0           0           0 Highland Associates                     0      08/18/23                       04/07/23           

          Bus Garage:
18-2215PR Additions and Alterations    5-003-003               DONE                         06/28/19     /  /     03/05/19     /  /     02 - 16                        0             0  SLC             0           0           0                                         0        /  /                           /  /             
20-0228   Additions and Alterations    5-003-003  11/23/20     DONE    DONE       DONE      08/14/20   07/15/20   03/05/19   12/05/19   02 - 16                3,546,366     3,546,366  SLC             0           0           0 Highland Associates                     0      09/08/21                       07/15/20           

          Public Library (LouiseAdeliaReadMem):
20-0229   Reconstruction               6-002-003  11/23/20     DONE    DONE       DONE      08/14/20   07/15/20   05/01/19   12/05/19   2,16                     166,526             0  SLC             0           0           0 Highland Associates                     0      09/08/21                       07/15/20           
  -       Reconstruction               6-002-004                                              /  /       /  /     08/04/21     /  /     13                             0             0  SLC             0           0           0                                         0        /  /                           /  /             

          District-Wide:
  -    XX Reconstruction               7-999-001                         CANCELLED            /  /       /  /     09/21/21     /  /     16                             0             0  SLC             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




ROXBURY CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 12-15-02-04
last updated on 04/17/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Central School:
21-0602   Reconstruction               0-001-019  03/29/22     DONE    DONE       DONE      10/29/21   10/28/21   04/30/21   05/18/21   7,15,16                  100,000       100,000  JLB             0           0           0 Popli Design Group                      0      01/12/24                       10/28/21           
21-0603   Reconstruction               0-001-020  05/10/21     DONE    DONE       DONE      10/29/21   10/28/21   04/30/21   05/12/21   8                         50,000        50,000  JLB             0           0           0 William Taylor Architects, PL           0      11/01/21                       10/28/21           
21-1722FC Reconstruction               0-001-021  07/27/22     DONE    DONE       DONE      04/29/22   04/25/22   10/29/21   12/08/21   155                      441,527       441,527  JLB             0           0           0 Popli Design Group                      0      01/12/24                       04/25/22           
22-0320   Reconstruction               0-001-022  11/29/22     DONE    DONE       DONE      08/24/22   08/23/22   04/17/22   04/07/22   2,15,16                  950,000       950,000  JLB             0           0           0 POPLI DESIGN GROUP                      0        /  /                         08/23/22           
23-0581   Reconstruction               0-001-023  01/29/24     DONE    DONE       DONE      09/29/23   09/27/23   07/17/23   05/16/23   16                       100,000             0  JJH             0           0           0 Popli Design Group                      0        /  /                         09/27/23           
23-1307   Reconstruction               0-001-024  03/12/24     DONE    DONE       DONE      12/29/23   11/08/23   08/21/23   08/09/23   15                        40,000        40,000  JJH             0           0           0 POPLI DESIGN GROUP                      0        /  /                         11/08/23           

          Bus Garage:
  -       Reconstruction               5-009-006                                              /  /       /  /     04/17/22     /  /     2                              0             0  JLB             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




SIDNEY CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 12-16-01-06
last updated on 04/17/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Sidney Senior High:
19-1280   Reconstruction               0-001-020  06/18/20     DONE    DONE       DONE      01/27/20   01/13/20   06/17/19   05/21/19   2,4,7,8,9,10,155,15,   2,750,000     2,750,000  JSS             0           0           0 Delta Engineers, Architects,            0      11/12/21                       01/13/20           
21-0187   Reconstruction               0-001-021  10/04/21     DONE    DONE       DONE      08/18/21   08/17/21   07/08/21   05/18/21   13,16                    100,000       100,000  JLB             0           0           0 Highland Associates                     0      01/14/22                       08/17/21           
22-1323   Reconstruction               0-001-022  06/15/23     DONE    DONE       DONE      12/27/22   12/22/22   07/14/22   09/13/22   2,4,8,155,15,16        3,046,218     3,046,218  JJH             0           0           0 Highland Associates                     0        /  /                         12/22/22           
23-1048   Reconstruction               0-001-023  01/11/24     DONE    DONE       DONE      11/27/23   11/21/23   10/13/23   05/09/23   13                       100,000       100,000  JJH             0           0           0 Highland Associates                     0        /  /                         11/21/23           
  -    SB Reconstruction               0-001-BA1               DONE                           /  /       /  /       /  /       /  /     10,16                          0             0  JJH             0           0           0                                         0        /  /                           /  /             

          Pearl Street Elementary:
18-1973   Reconstruction               0-003-017  06/13/19     DONE    DONE       DONE      05/16/19   05/03/19     /  /     05/21/19   9                        100,000       100,000  BMJ             0           0           0 Delta Engineers, Architects,            0      08/08/19                       05/03/19           
19-1281   Reconstruction               0-003-018  06/18/20     DONE    DONE       DONE      01/27/20   01/13/20   06/17/19   05/21/19   2,4,7,8,9,10,155,15,     727,260       727,260  JSS             0           0           0 Delta Engineers, Architects,            0      11/12/21                       01/13/20           
22-1324   Reconstruction               0-003-019  06/15/23     DONE    DONE       DONE      12/27/22   12/22/22   07/14/22   09/13/22   2,4,15,16              2,835,247     2,835,247  JJH             0           0           0 Highland Associates                     0        /  /                         12/22/22           
22-1325   Reconstruction               0-003-020  06/15/23     DONE    DONE       DONE      12/27/22   12/22/22   11/04/22   05/21/19   2,4,8,9,16               147,750       147,750  JJH             0           0           0 Highland Associates                     0        /  /                         12/22/22           
22-2166FA Reconstruction               0-003-021  06/14/23     DONE    DONE       DONE      05/08/23   03/16/23   02/15/23   02/14/23   9,155,15,16            1,078,021     1,078,021  JJH             0           0           0 Highland Associates                     0        /  /                         03/16/23           

          Masonville Elementary:
22-1326   Reconstruction               0-006-010  06/15/23     DONE    DONE       DONE      12/27/22   12/22/22   07/14/22   09/13/22   2,4,8,155,15,16          439,070       439,070  JJH             0           0           0 Highland Associates                     0        /  /                         12/22/22           

          Middle School:
19-1282   Reconstruction               0-007-017  06/18/20     DONE    DONE       DONE      01/27/20   01/13/20   06/17/19   05/21/19   2,4,7,8,9,10,155,15,     641,740       641,740  JSS             0           0           0 Delta Engineers, Architects,            0      11/12/21                       01/13/20           
22-1327   Reconstruction               0-007-018  06/15/23     DONE    DONE       DONE      12/27/22   12/22/22   07/14/22   09/13/22   2,4,15,16                284,760       284,760  JJH             0           0           0 Highland Associates                     0        /  /                         12/22/22           
22-1328   Reconstruction               0-007-019  06/15/23     DONE    DONE       DONE      12/27/22   12/22/22   11/04/22   05/21/19   2,4,9,15,16            2,349,250     2,349,250  JJH             0           0           0 Highland Associates                     0        /  /                         12/22/22           

          Cullman Facility:
21-1517DB Discovered Building          0-023-001  05/25/22     DONE    DONE       DONE      03/15/22   03/15/22   11/29/21     /  /                                    0             0  JLB             0           0           0                                         0        /  /                         03/15/22           

          Cottage Facility:
21-1518DB Discovered Building          0-024-001  05/25/22     DONE    DONE       DONE      03/15/22   03/14/22   11/29/21     /  /                                    0             0  JLB             0           0           0                                         0        /  /                         03/14/22           

          Storage Barn @ HS:
  -    DB Discovered Building          2-022-001                                              /  /       /  /     01/16/20     /  /                                    0             0  JSS             0           0           0                                         0        /  /                           /  /             

          New Bus Garage:
19-1283   Reconstruction               5-016-002  06/18/20     DONE    DONE       DONE      01/27/20   01/13/20   06/17/19   05/21/19   9                        203,000       203,000  JSS             0           0           0 Delta Engineers, Architects,            0      11/12/21                       01/13/20           
22-1329   Reconstruction               5-016-003  06/15/23     DONE    DONE       DONE      12/27/22   12/22/22   07/14/22   09/13/22   2                      1,394,705     1,394,705  JJH             0           0           0 Highland Associates                     0        /  /                         12/22/22           

          District Wide:
21-1246FC Reconstruction               7-999-004  03/16/22     DONE    DONE       DONE      02/09/22   02/03/22   01/05/22   03/15/22   155,16                 1,324,734             0  JLB             0           0           0 Highland Associates                     0        /  /                         02/03/22           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




STAMFORD CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 12-17-01-04
last updated on 04/17/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Main Bldg.:
19-0249   Reconstruction               0-001-009  10/04/19     DONE    DONE       DONE      08/13/19   08/05/19   01/25/19   05/21/19   2,4,16                 2,500,000     2,500,000  JSS             0           0           0 March Associates                        0      11/12/21                       08/05/19           
22-0810FA Reconstruction               0-001-010  01/31/23     DONE    DONE       DONE      10/26/22   10/20/22   05/18/22   09/08/22   2,8,155,15,16            573,984       573,984  WLC             0           0           0 March Associates                        0        /  /                         10/20/22           
  -    PR Additions and Alterations    0-001-011                                              /  /       /  /     09/22/22     /  /     02 - 16                        0             0  WLC             0           0           0                                         0        /  /                           /  /             
22-2347   Additions and Alterations    0-001-011  11/02/23     DONE    DONE       DONE      06/09/23   06/08/23   09/22/22   12/13/22   02 - 16                3,940,980     3,940,980  WLC             0           0           0 March Associates                        0        /  /                         06/08/23           
22-1752   Reconstruction               0-001-012  06/05/23     DONE    DONE       DONE      02/27/23   02/23/23   02/07/23   12/13/22   7,15                   2,885,000     2,885,000  WLC             0           0           0 March Associates                        0        /  /                         02/23/23           

          Building #2:
  -    PR Additions and Alterations    0-003-003                                              /  /       /  /     09/22/22     /  /     02 - 16                        0             0  WLC             0           0           0                                         0        /  /                           /  /             
22-2348   Additions and Alterations    0-003-003  11/02/23     DONE    DONE       DONE      06/09/23   06/08/23   09/22/22   12/13/22   02 - 16                  241,000             0  WLC             0           0           0 March Associates                        0        /  /                         06/08/23           

          Bus Garage (Blt 2003):
21-1177   Reconstruction               5-004-002  11/04/21     DONE    DONE       DONE      01/19/22   01/19/22   09/02/21   08/26/21   155,16                   150,000       150,000  SLC             0           0           0 March Associates                        0      06/01/22                       01/19/22           
22-2349   Reconstruction               5-004-003  11/02/23     DONE    DONE       DONE      06/09/23   06/08/23   09/22/22   12/13/22   2,15,16                  250,000       250,000  WLC             0           0           0 March Associates                        0        /  /                         06/08/23           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




SOUTH KORTRIGHT CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 12-17-02-04
last updated on 04/17/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Central School:
20-0156   Reconstruction               0-003-016  09/03/20     DONE    DONE       DONE      08/05/20   07/31/20   01/06/20   06/16/20   2,8                      100,000       100,000  SLC             0           0           0 SEI Design Group                        0      06/30/21                       07/31/20           
19-1671   Reconstruction               0-003-017  06/18/20     DONE    DONE       DONE      04/09/20   03/30/20   01/06/20   01/13/20   2,4,7,9,16                70,000        70,000  SLC             0           0           0 SEI Design Group                        0      09/15/20                       03/30/20           
21-0506   Reconstruction               0-003-018  02/24/22     DONE    DONE       DONE      10/08/21   10/08/21   06/11/21   05/18/21   15                       100,000       100,000  SLC             0           0           0 SEI Design Group                        0      06/30/22                       10/08/21           
22-0788   Reconstruction               0-003-019  02/27/23     DONE    DONE       DONE      10/24/22   10/20/22   09/19/22   05/17/22   4,15                     100,000       100,000  WLC             0           0           0 SEI Design Group                        0      06/28/23                       10/20/22           
  -       Reconstruction               0-003-020                                              /  /       /  /     07/07/23     /  /     15                             0             0  WLC             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-003-021                                              /  /       /  /     07/07/23     /  /     8,15                           0             0  WLC             0           0           0                                         0        /  /                           /  /             

          District-Wide:
  -       Reconstruction               7-999-001                                              /  /       /  /     05/19/22     /  /     16                             0             0  SLC             0           0           0                                         0        /  /                           /  /             
21-1833SB Reconstruction               7-999-001               DONE                           /  /       /  /     05/19/22     /  /     16                             0             0  SLC             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




WALTON CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 12-19-01-04
last updated on 04/17/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Townsend Elementary School:
20-0952   Reconstruction               0-006-022  03/17/21     DONE    DONE       DONE      12/11/20   12/04/20   09/23/19   11/17/20   2,4,8,10,155,16        1,004,890     1,004,890  JLB             0           0           0 Bernier Carr Associates                 0      03/18/22                       12/04/20           
21-0041   Reconstruction               0-006-023  09/14/21     DONE    DONE       DONE      07/14/21   07/13/21   03/08/21   11/17/20   2,4,7,8,9,155,15,16      839,956       839,956  JLB             0           0           0 Bernier Carr Associates                 0      09/02/22                       07/13/21           
22-0245   Reconstruction               0-006-024  01/06/23     DONE    DONE       DONE      08/08/22   08/08/22   04/05/22   03/15/22   2,4,8,9,10,155,15,16   4,300,000     4,300,000  WLC             0           0           0 IBI GROUP                               0        /  /                         08/08/22           
22-1603   Reconstruction               0-006-025  05/25/23     DONE    DONE       DONE      02/01/23   02/01/23   01/10/23   05/16/23   9,16                     100,000       100,000  WLC             0           0           0 IBI GROUP                               0        /  /                         02/01/23           

          O'Neill Jr/Sr High School:
19-1755   Reconstruction               0-007-020  07/07/20     DONE    DONE       DONE      05/22/20   05/01/20   04/23/20   06/09/20   2,9                      100,000       100,000  JLB             0           0           0 BCAArchitects&Engineers                 0      11/18/20                       05/01/20           
20-1204   Reconstruction               0-007-021  03/16/21     DONE    DONE       DONE      01/27/21   01/20/21   12/18/20   11/17/20   7                      1,867,457     1,867,457  JLB             0           0           0 Bernier Carr Associates                 0      01/14/22                       01/20/21           
21-0042   Reconstruction               0-007-022  09/14/21     DONE    DONE       DONE      07/14/21   07/13/21   03/05/21   11/17/20   2,7,8,9,155,15,16      3,808,284     3,808,284  JLB             0           0           0 Bernier Carr Associates                 0      01/04/24                       07/13/21           
20-1625   Reconstruction               0-007-023  06/02/21     DONE    DONE       DONE      04/23/21   04/15/21   03/17/21   05/18/21   2,9                      100,000       100,000  JLB             0           0           0 Bernier Carr Associates                 0      08/16/21                       04/15/21           
21-1398   Reconstruction               0-007-024  05/31/22     DONE    DONE       DONE      02/28/22   02/24/22   01/25/22   05/17/22   2,9                      100,000       100,000  JLB             0           0           0 Bernier Carr Associates                 0      08/26/22                       02/24/22           
21-1826   Reconstruction               0-007-025  05/31/22     DONE    DONE       DONE      05/18/22   05/16/22   02/24/22   04/05/22   2,8,9,16               1,250,000     1,250,000  FMJ             0           0           0 IBI GROUP                               0        /  /                         05/16/22           

          District-Wide:
  -    SB Reconstruction               7-999-BA2               DONE                           /  /       /  /       /  /       /  /     13                             0             0  WLC             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




BOCES DEL-CHEN-MADISON-OTSEGO STATUS REPORT ON CAPITAL PROJECTS
District No.: 12-90-00-00
last updated on 04/17/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          W.Delaware Occ Bldg A:
19-1255   Reconstruction               0-001-023  07/30/20     DONE    DONE       DONE      01/22/20   01/16/20   06/28/19   06/12/19   7,9,155,15,16            461,903       461,903  JSS             0           0           0 IBI GROUP                         461,903        /  /                         01/16/20           
21-1151   Reconstruction               0-001-024  05/05/22     DONE    DONE       DONE      01/18/22   01/18/22   10/28/21   12/01/21   2,15,16                  231,000       231,000  JLB             0           0           0 March Associates                        0        /  /                         01/18/22           

          Pole Campus (frmly Chenango):
18-1830   Reconstruction               0-002-029  04/29/19     DONE    DONE       DONE      04/10/19   04/08/19   10/24/18   03/27/19   155,16                   500,000       500,000  JLB             0           0           0 IBI GROUP                               0      05/29/20                       04/08/19           
19-1300   Reconstruction               0-002-030  04/29/20     DONE    DONE       DONE      01/29/20   01/17/20   01/15/19   12/04/19   4,9,155,15,16            500,000       500,000  JSS             0           0           0 IBI GROUP                               0      02/19/21                       01/17/20           
19-1256   Reconstruction               0-002-031  07/30/20     DONE    DONE       DONE      01/22/20   01/16/20   06/27/19   06/12/19   7,9,155,15,16            454,540       454,540  JSS             0           0           0 IBI GROUP                         454,540        /  /                         01/16/20           
21-1152   Reconstruction               0-002-032  05/05/22     DONE    DONE       DONE      01/18/22   01/18/22   10/28/21   12/01/21   2,15,16                  397,000       397,000  JLB             0           0           0 March Associates                        0        /  /                         01/18/22           
23-0325   Reconstruction               0-002-033  03/07/24     DONE    DONE       DONE      08/25/23   08/25/23   03/31/23   04/26/23   155,15,16                240,000       240,000  WLC             0           0           0 March Associates                        0        /  /                         08/25/23           

          W. Delaware Ed. Campus Bldg. B:
19-1257   Reconstruction               0-003-022  07/30/20     DONE    DONE       DONE      01/22/20   01/16/20   06/27/19   06/12/19   2,7,9,155,15,16          926,936       926,936  JSS             0           0           0 IBI GROUP                         926,936        /  /                         01/16/20           
20-1378   Reconstruction               0-003-023  06/29/21     DONE    DONE       DONE      03/05/21   03/03/21   01/06/21   01/08/21   4,8,9,155,15,16          500,000       500,000  JSS             0           0           0 March Associates                        0        /  /                         03/03/21           
21-1153   Reconstruction               0-003-024  05/05/22     DONE    DONE       DONE      01/18/22   01/18/22   10/28/21   12/01/21   2,15,16                  279,000       279,000  JLB             0           0           0 March Associates                        0        /  /                         01/18/22           
23-0326   Reconstruction               0-003-025  03/07/24     DONE    DONE       DONE      08/25/23   08/25/23   03/31/23   04/26/23   155,15                   260,000       260,000  WLC             0           0           0 March Associates                        0        /  /                         08/25/23           

          Support Service Building:
19-1258   Reconstruction               1-032-004  07/30/20     DONE    DONE       DONE      01/22/20   01/16/20   06/27/19   05/21/19   7,9,155,15,16            639,525             0  JSS             0           0           0 IBI GROUP                         639,525        /  /                         01/16/20           
20-0792   Reconstruction               1-032-005  02/26/21     DONE    DONE       DONE      11/10/20   10/26/20   07/08/20     /  /     8,9,10,155,15,16         112,000             0  JSS             0           0           0 IBI GROUP                               0        /  /                         10/26/20           
22-2002   Reconstruction               1-032-006  08/23/23     DONE    DONE       DONE      04/05/23   04/04/23   02/09/23   04/06/22   155                      500,000             0  WLC             0           0           0 March Associates                        0        /  /                         04/04/23           

          Delaware Nat. Bank of Delhi:
20-0114TQ Temporary Quarters           1-047-001  09/23/20     DONE    DONE       DONE      07/24/20   07/23/20   02/05/20     /  /                                    0             0  JSS             0           0           0                                         0        /  /                         07/23/20           

          Sugar House @ Pole Campus:
21-1154   New Construction             7-048-001  05/09/22     DONE    DONE       DONE      01/18/22   01/18/22   10/28/21   11/03/21   02 - 16                   50,000             0  JLB             0           0           0 March Associates                        0        /  /                         01/18/22           

          Norwich Center Bldg (rms 206-208):
22-0522TQ Temporary Quarters           8-049-001  09/20/22     DONE    DONE       DONE      09/19/22     /  /     08/08/22     /  /                                    0             0  JLB             0           0           0                                         0        /  /                           /  /             

          5862 Bldg:
  -    TQ Temporary Quarters           8-050-001                                              /  /       /  /     01/09/23     /  /                                    0             0  JLB             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED