Construction Project Status

Construction Project Status

THE STATE EDUCATION DEPARTMENT

FACILITIES PLANNING


UPDATED: 04/25/24 at 06:56:33




WHEELERVILLE UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 17-03-01-02
last updated on 04/25/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Wheelerville School:
18-0211   Reconstruction               0-002-009  04/29/19     DONE    DONE       DONE      08/07/18   08/06/18   05/24/18   02/07/17   2,9,10                    32,030        32,030  BMJ             0           0           0 Clark Patterson Lee                     0      10/16/19                       08/06/18           
20-0277   Reconstruction               0-002-010  11/22/19     DONE    DONE       DONE      08/28/20   08/14/20   12/17/19   11/22/19   15                        20,000        20,000  JSS             0           0           0 Clark Patterson Lee                     0      01/02/20                       08/14/20           
20-0262   Reconstruction               0-002-011  12/01/20     DONE    DONE       DONE      08/24/20   08/14/20   01/23/20   06/16/20   155                      100,000       100,000  JSS             0           0           0 Clark Patterson Lee                     0      06/15/21                       08/14/20           
21-0274   Reconstruction               0-002-012  09/24/21     DONE    DONE       DONE      09/03/21   09/03/21   03/08/21   05/19/21   2,155,16                 100,000       100,000  JLB             0           0           0 Clark Patterson Lee                     0      10/05/22                       09/03/21           
22-0557   Reconstruction               0-002-013  01/23/23     DONE    DONE       DONE      09/23/22   09/22/22   01/18/22   11/21/21   2,155,15,16            1,125,000     1,125,000  JLB             0           0           0 Clark Patterson Lee                     0      02/21/24                       09/22/22           
23-1026   Reconstruction               0-002-014                         UNREVIEWED         11/15/23   11/15/23   10/23/23   11/06/23   2,15                           0             0  JJH             0           0           0 Clark Patterson Lee                     0        /  /                         11/15/23           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




GLOVERSVILLE CITY SCHOOLS STATUS REPORT ON CAPITAL PROJECTS
District No.: 17-05-00-01
last updated on 04/25/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Boulevard School:
20-0094   Reconstruction               0-004-010  01/28/21     DONE    DONE       DONE      07/21/20   07/03/20   03/02/20   04/30/19   7,8,10,16                558,110       558,110  JLB             0           0           0 Collins & Scoville Architects     558,110      09/26/22                       07/03/20           
20-1138   Reconstruction               0-004-011  04/09/21     DONE    DONE       DONE      01/14/21   01/13/21   07/15/20   11/17/15   2,7                    1,206,754     1,206,754  JLB             0           0           0 Collins & Scoville Architects           0      12/05/21                       01/13/21           
21-0940   Reconstruction               0-004-012  06/08/22     DONE    DONE       DONE      12/22/21   12/21/21   03/24/21   12/15/20   2,4,7,8,9,10,155,16    2,917,131     2,917,131  WLC             0           0           0 Collins & Scoville Architects           0        /  /                         12/21/21           
22-1805FB Reconstruction               0-004-013  04/27/23     DONE    DONE       DONE      03/08/23   03/01/23   12/05/22   03/28/22   2,7,9,155,16           1,587,387             0  WLC             0           0           0 Collins & Scoville Architects           0        /  /                         03/01/23           

          McNab School:
20-0095   Reconstruction               0-007-009  01/28/21     DONE    DONE       DONE      07/21/20   07/03/20   03/02/20   04/30/19   7,8,10,16                244,085       244,085  JLB             0           0           0 Collins & Scoville Architects     244,085      09/26/22                       07/03/20           
21-0941   Reconstruction               0-007-010  06/08/22     DONE    DONE       DONE      12/22/21   12/21/21   03/24/21   12/15/20   2,4,7,8,9,10,155,16    1,945,054     1,945,054  WLC             0           0           0 Collins & Scoville Architects           0        /  /                         12/21/21           

          Park Terrace Elem.:
20-0096   Reconstruction               0-009-010  01/28/21     DONE    DONE       DONE      07/21/20   07/03/20   03/02/20   04/30/19   7,8,10,16                377,987       377,987  JLB             0           0           0 Collins & Scoville Architects     377,987      09/26/22                       07/03/20           
21-0942   Reconstruction               0-009-011  06/08/22     DONE    DONE       DONE      12/22/21   12/21/21   03/24/21   12/15/20   2,4,7,8,9,10,155,16    2,334,997     2,334,997  WLC             0           0           0 Collins & Scoville Architects           0        /  /                         12/21/21           
22-1806FB Reconstruction               0-009-012  04/27/23     DONE    DONE       DONE      03/10/23   03/01/23   12/05/22   03/28/22   2,7,9,155,16           2,260,167             0  WLC             0           0           0 Collins & Scoville Architects           0        /  /                         03/01/23           

          High School:
20-0097   Reconstruction               0-010-019  01/28/21     DONE    DONE       DONE      07/21/20   07/03/20   03/02/20   04/30/19   7,8,10,16              2,118,508     2,118,508  JLB             0           0           0 Collins & Scoville Architects   2,118,508      09/26/22                       07/03/20           
21-0943   Reconstruction               0-010-020  06/08/22     DONE    DONE       DONE      12/22/21   12/21/21   03/24/21   12/15/20   2,4,7,8,9,10,155,15,  12,781,526    12,781,526  WLC             0           0           0 Collins & Scoville Architects           0        /  /                         12/21/21           
22-1807FB Reconstruction               0-010-021  04/27/23     DONE    DONE       DONE      03/10/23   03/01/23   12/05/22   03/28/22   2,7,9,155,16           2,522,180             0  WLC             0           0           0 Collins & Scoville Architects           0        /  /                         03/01/23           

          Meco Elementary School:
20-0098   Reconstruction               0-014-009  01/28/21     DONE    DONE       DONE      07/21/20   07/03/20   03/02/20   04/30/19   7,8,10,16                149,821       149,821  JLB             0           0           0 Collins & Scoville Architects     149,821      09/26/22                       07/03/20           
21-0944   Reconstruction               0-014-010  06/08/22     DONE    DONE       DONE      12/22/21   12/21/21   03/24/21   12/15/20   2,4,7,8,9,10,155,16    1,300,375     1,300,375  WLC             0           0           0 Collins & Scoville Architects           0        /  /                         12/21/21           

          Kingsborough Elementary:
20-0099   Reconstruction               0-015-011  01/28/21     DONE    DONE       DONE      07/21/20   07/03/20   08/15/16   04/30/19   155,16                   560,175       560,175  JLB             0           0           0 Collins & Scoville Architects     560,175      09/26/22                       07/03/20           
19-0561   Reconstruction               0-015-012  09/25/19     DONE    DONE       DONE      10/16/19   10/09/19   08/16/19   08/26/19   2                        200,000       200,000  JLB             0           0           0 Collins & Scoville Architects           0      05/21/20                       10/09/19           
  -       Reconstruction               0-015-013                                              /  /       /  /     03/02/20     /  /     7,8,10,16                      0             0  JLB             0           0           0                                         0        /  /                           /  /             
21-0945   Reconstruction               0-015-014  06/08/22     DONE    DONE       DONE      12/22/21   12/21/21   03/24/21   12/15/20   2,4,7,8,9,10,155,16    7,748,418     5,198,959  WLC             0           0           0 Collins & Scoville Architects           0        /  /                         12/21/21           
22-1808FB Reconstruction               0-015-015  04/27/23     DONE    DONE       DONE      03/10/23   03/01/23   12/05/22   03/28/22   2,7,9,155,16           3,426,809             0  WLC             0           0           0 Collins & Scoville Architects           0        /  /                         03/01/23           

          Middle School:
20-0100   Reconstruction               0-019-010  01/28/21     DONE    DONE       DONE      07/21/20   07/03/20   03/02/20   04/30/19   7,8,9,16                 163,337       163,337  JLB             0           0           0 Collins & Scoville Architects     163,337      09/26/22                       07/03/20           
21-0946   Reconstruction               0-019-011  06/08/22     DONE    DONE       DONE      12/22/21   12/21/21   03/24/21   12/15/20   4,8,9,10,155,16        2,941,202     2,941,202  WLC             0           0           0 Collins & Scoville Architects           0        /  /                         12/21/21           

          Bus Maintenance Facility:
20-0101   Reconstruction               5-025-003  01/28/21     DONE    DONE       DONE      07/21/20   07/03/20   03/02/20   04/30/19   7,8,10,16                 95,077        95,077  JLB             0           0           0 Collins & Scoville Architects      95,077      09/26/22                       07/03/20           
21-0947   Reconstruction               5-025-004  06/08/22     DONE    DONE       DONE      12/22/21   12/21/21   03/24/21   12/15/20   2,8,9,10,155,16          163,985       163,985  WLC             0           0           0 Collins & Scoville Architects           0        /  /                         12/21/21           
  -       Reconstruction               5-025-005                                              /  /       /  /     03/24/23     /  /     2,16                           0             0  WLC             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




JOHNSTOWN CITY SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 17-06-00-01
last updated on 04/25/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Warrent Street Elementary:
  -       Reconstruction               0-003-011                                              /  /       /  /     01/10/22     /  /                                    0             0  SLC             0           0           0                                         0        /  /                           /  /             
23-0849   Reconstruction               0-003-012                         UNREVIEWED         11/01/23   10/30/23   01/05/23   11/15/22   2,4,8,9,155,15,16              0             0  WLC             0           0           0 Tetra Tech Engineers, Archite           0        /  /                         10/30/23           
22-2452   Reconstruction               0-003-013  01/22/24     DONE    DONE       DONE      06/26/23   06/23/23   01/05/23   11/15/22   8,9,155,16               171,203       171,203  JLB             0           0           0 Tetra Tech Engineers, Archite     171,203        /  /                         06/23/23           
  -       Reconstruction               0-003-014                                              /  /       /  /     04/18/24     /  /     4,7,9,10,155,15,16             0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Knox Middle School:
  -       Reconstruction               0-006-007                                              /  /       /  /     01/10/22     /  /                                    0             0  SLC             0           0           0                                         0        /  /                           /  /             
21-1943   Reconstruction               0-006-008  08/09/22     DONE    DONE       DONE      06/08/22   06/06/22   05/04/22   05/17/22   2,4,9,10,13,14,155,1   2,000,000     2,000,000  WLC             0           0           0 Tetra Tech Engineers, Archite           0      11/07/23                       06/06/22           
23-0850   Reconstruction               0-006-009                         UNREVIEWED         11/01/23   10/30/23   01/05/23   11/15/22   2,9,155,16                     0             0  WLC             0           0           0 Tetra Tech Engineers, Archite           0        /  /                         10/30/23           
22-2453   Reconstruction               0-006-010  01/22/24     DONE    DONE       DONE      06/26/23   06/23/23   01/05/23   11/15/22   8,9,155,16               597,937       597,937  JLB             0           0           0 Tetra Tech Engineers, Archite     597,937        /  /                         06/23/23           
23-0329   Reconstruction               0-006-011  11/30/23     DONE    DONE       DONE      08/28/23   08/25/23   06/23/23   05/16/23   2,15                     100,000       100,000  WLC             0           0           0 Tetra Tech Engineers, Archite           0        /  /                         08/25/23           
  -       Reconstruction               0-006-012                                              /  /       /  /     04/18/24     /  /     2,9,155,16                     0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Pleasant Ave Elementary School:
  -       Reconstruction               0-007-015                                              /  /       /  /     01/10/22     /  /                                    0     7,793,410  SLC             0           0           0                                         0        /  /                           /  /             
23-0851   Reconstruction               0-007-016                         UNREVIEWED         11/01/23   10/30/23   01/05/23   11/15/22   2,8,9,155,15,16                0     7,793,410  WLC             0           0           0 Tetra Tech Engineers, Archite           0        /  /                         10/30/23           
22-2454   Reconstruction               0-007-017  01/22/24     DONE    DONE       DONE      06/26/23   06/23/23   01/05/23   11/15/22   8,9,16                   163,982       163,982  JLB             0           0           0 Tetra Tech Engineers, Archite     163,982        /  /                         06/23/23           
23-0330   Reconstruction               0-007-018  11/30/23     DONE    DONE       DONE      08/28/23   08/25/23   06/23/23   05/16/23   2,15                     100,000       100,000  WLC             0           0           0 Tetra Tech Engineers, Archite           0        /  /                         08/25/23           
  -       Reconstruction               0-007-019                                              /  /       /  /     04/18/24     /  /     2,4,7,9,10,155,15,16           0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Senior High School:
21-0353   Reconstruction               0-009-011  12/22/21     DONE    DONE       DONE      09/14/21   09/09/21   08/03/21   05/18/21   4,9                      100,000       100,000  SLC             0           0           0 Tetra Tech Engineers, Archite           0      06/29/22                       09/09/21           
  -       Reconstruction               0-009-012                                              /  /       /  /     01/10/22     /  /                                    0             0  SLC             0           0           0                                         0        /  /                           /  /             
22-1332   Reconstruction               0-009-013  03/02/23     DONE    DONE       DONE      12/27/22   12/22/22   11/10/22   05/17/22   2,15                     100,000       100,000  WLC             0           0           0 Tetra Tech Engineers, Archite           0      10/19/23                       12/22/22           
23-0852   Reconstruction               0-009-014                         UNREVIEWED         11/01/23   10/30/23   01/05/23   11/15/22   2,4,8,9,155,15,16              0             0  WLC             0           0           0 Tetra Tech Engineers, Archite           0        /  /                         10/30/23           
22-2455   Reconstruction               0-009-015  01/22/24     DONE    DONE       DONE      06/26/23   06/23/23   01/05/23   11/15/22   8,9,155,15,16          1,406,698     1,406,698  JLB             0           0           0 Tetra Tech Engineers, Archite   1,406,698        /  /                         06/23/23           
  -       Reconstruction               0-009-016                                              /  /       /  /     04/18/24     /  /     4,8,9,155,15,16                0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Glebe Street Elem.:
  -       Reconstruction               0-010-009                                              /  /       /  /     01/10/22     /  /                                    0             0  SLC             0           0           0                                         0        /  /                           /  /             
23-0853   Reconstruction               0-010-010                         UNREVIEWED         11/01/23   10/30/23   01/05/23   11/16/22   7,8,9,155,16                   0             0  WLC             0           0           0 Tetra Tech Engineers, Archite           0        /  /                         10/30/23           
22-2456   Reconstruction               0-010-011  01/22/24     DONE    DONE       DONE      06/26/23   06/23/23   01/05/23   11/15/22   8,9,155,16               160,462       160,462  JLB             0           0           0 Tetra Tech Engineers, Archite     160,462        /  /                         06/23/23           

          Knox Press Box:
23-0854   Reconstruction               7-032-002                         UNREVIEWED         11/01/23   10/30/23   01/05/23   11/15/22   4,9                            0             0  WLC             0           0           0 Tetra Tech Engineers, Archite           0        /  /                         10/30/23           

          PTECH Shed:
  -    PR New Construction             7-051-001                                              /  /       /  /     08/14/20     /  /     02 - 16                        0             0  JSS             0           0           0                                         0        /  /                           /  /             

          PTECH Greenhouse:
  -    PR New Construction             7-052-001                                              /  /       /  /     08/14/20     /  /     02 - 16                        0             0  JSS             0           0           0                                         0        /  /                           /  /             

          District-Wide:
  -    SB Reconstruction               7-999-BA1               DONE                           /  /       /  /       /  /       /  /     16                             0             0  SLC             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




MAYFIELD CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 17-08-01-04
last updated on 04/25/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Jr/Sr High School:
20-1850   Reconstruction               0-001-021  06/28/21     DONE    DONE       DONE      06/09/21   06/04/21   04/16/21   05/18/21   16                       100,000       100,000  JLB             0           0           0 King & King Architects                  0      06/16/22                       06/04/21           
21-1801   Reconstruction               0-001-022  08/22/22     DONE    DONE       DONE      05/11/22   05/06/22   01/03/22   12/14/21   2,4,7,8,9,14,155,15,   5,335,000     5,335,000  JLB             0           0           0 King & King Architects                  0        /  /                         05/06/22           
21-1541   Reconstruction               0-001-023  06/01/22     DONE    DONE       DONE      03/21/22   03/21/22   03/01/22   05/17/22   7                        100,000       100,000  JLB             0           0           0 King & King Architects                  0      06/14/23                       03/21/22           
22-2281   Reconstruction               0-001-024  07/05/23     DONE    DONE       DONE      05/24/23   05/22/23   04/20/23   05/16/23   9                        100,000       100,000  JJH             0           0           0 King & King Architects                  0        /  /                         05/22/23           

          Elementary School:
21-1802   Reconstruction               0-002-018  08/22/22     DONE    DONE       DONE      05/11/22   05/06/22   01/03/22   12/17/21   2,9,15,16              1,365,000     1,365,000  JLB             0           0           0 King & King Architects                  0        /  /                         05/06/22           
  -       Reconstruction               0-002-019                                              /  /       /  /     03/06/24     /  /     16                             0             0  JJH             0           0           0                                         0        /  /                           /  /             

          Bus Maintenance Garage:
21-1803   Reconstruction               5-007-004  08/22/22     DONE    DONE       DONE      05/11/22   05/06/22   01/03/22   12/14/21   2,10,15,16               400,000       400,000  JLB             0           0           0 King & King Architects                  0        /  /                         05/06/22           
23-1701   Reconstruction               5-007-005                         UNREVIEWED         03/29/24   03/28/24   02/05/24   12/14/21   16                       100,000       100,000  JJH             0           0           0 King & King Architects                  0        /  /                         03/28/24           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




NORTHVILLE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 17-09-01-04
last updated on 04/25/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Northville Central School:
22-0540   Reconstruction               0-001-015  02/10/23     DONE    DONE       DONE      09/21/22   09/20/22   06/11/21   05/18/21   2,8,9,155,15,16        5,405,500     5,405,500  WLC             0           0           0 Mosaic Associates                       0        /  /                         09/20/22           
21-0715   Reconstruction               0-001-016  02/15/22     DONE    DONE       DONE      11/16/21   11/12/21   08/20/21   05/18/21   2,16                     100,000       100,000  SLC             0           0           0 Mosaic Associates                       0      06/09/22                       11/12/21           
22-0380   Reconstruction               0-001-017  10/27/22     DONE    DONE       DONE      08/31/22   08/30/22   06/14/22   05/17/22   8                        100,000       100,000  WLC             0           0           0 Mosaic Associates                       0      06/16/23                       08/30/22           
22-0141   Reconstruction               0-001-018  12/06/22     DONE    DONE       DONE      07/25/22   07/22/22   06/21/22   05/18/21   9,16                     575,000       575,000  JJH             0           0           0 Mosaic Associates                       0        /  /                         07/22/22           
23-0060   Reconstruction               0-001-019  09/13/23     DONE    DONE       DONE      07/12/23   07/11/23   06/08/23   05/18/21   4,9                      100,000       100,000  WLC             0           0           0 Mosaic Associates                       0        /  /                         07/11/23           

          Bus Garage:
19-0230   Reconstruction               5-004-006  12/06/19     DONE    DONE       DONE      08/08/19   07/17/19   05/29/19   05/21/19   4                        100,000       100,000  JSS             0           0           0 Mosaic Associates                       0      05/11/20                       07/17/19           
22-0541   Reconstruction               5-004-007  02/10/23     DONE    DONE       DONE      09/21/22   09/20/22   06/14/21   06/08/21   2                        350,000       350,000  WLC             0           0           0 Mosaic Associates                       0        /  /                         09/20/22           

          Pavilion:
22-0542   New Construction             7-012-001  02/10/23     DONE    DONE       DONE      09/21/22   09/20/22   06/11/21   06/08/21   02 - 16                  169,500             0  WLC             0           0           0 Mosaic Associates                       0        /  /                         09/20/22           

          Greenhouse:
  -    PR New Construction             7-013-001                                              /  /       /  /     05/16/23     /  /     02 - 16                        0             0  WLC             0           0           0                                         0        /  /                           /  /             
23-0432   New Construction             7-013-001               STARTED DONE       UNREVIEWED09/11/23   09/08/23   05/16/23   08/19/21   02 - 16                        0             0  WLC             0           0           0 Mosaic Associates                       0        /  /                         09/08/23           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




BROADALBIN-PERTH CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 17-11-02-04
last updated on 04/25/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Broadalbin Jr/Sr HS (Formerly ES/HS):
18-0989   Additions and Alterations    0-001-021  10/02/19     DONE    DONE       DONE      12/04/18   12/04/18   10/25/18   05/17/16   02 - 16               15,568,500    15,113,203  SLC             0           0           0 Collins & Scoville Architects           0      05/31/22                       12/04/18           

          P-6 Perth ES (frmrly Main Bldg Perth:
18-0990   Additions and Alterations    0-003-016  10/02/19     DONE    DONE       DONE      12/04/18   12/04/18   10/25/18   05/17/16   02 - 16               16,280,000    15,250,195  SLC             0           0           0 Collins & Scoville Architects           0      05/31/22                       12/04/18           

          Bus Repair/Training Center:
18-0991   Reconstruction               5-014-006  10/02/19     DONE    DONE       DONE      12/04/18   12/04/18   10/25/18   05/17/16   7,9,13,14,16             300,000       300,000  SLC             0           0           0 Collins & Scoville Architects           0      05/31/22                       12/04/18           

          Track Press Booth/Toilets Phase 3:
18-0992   New Construction             7-018-001  10/02/19     DONE    DONE       DONE      12/04/18   12/04/18   10/26/18   05/17/16   02 - 16                  300,000             0  SLC             0           0           0 Collins & Scoville Architects           0        /  /                         12/04/18           

          xxBaseball/Softball Toilets -Canceld:
18-0993XX New Construction             7-019-001  10/02/19               CANCELLED          12/04/18   12/04/18   10/26/18   05/17/16   02 - 16                   75,000             0  SLC             0           0           0 Collins & Scoville Architects           0        /  /                         12/04/18           

          Perth Pavilion:
  -    PR New Construction             7-020-001                                              /  /       /  /     04/26/22     /  /     02 - 16                        0             0  SLC             0           0           0                                         0        /  /                           /  /             
21-1974FA New Construction             7-020-001  01/26/23     DONE    DONE       DONE      06/15/22   06/13/22   04/26/22   01/23/23   02 - 16                  474,942             0  SLC             0           0           0 Collins & Scoville Architects           0        /  /                         06/13/22           

          Perth Greenhouse:
  -    PR New Construction             7-021-001                                              /  /       /  /     04/26/22     /  /     02 - 16                        0             0  SLC             0           0           0                                         0        /  /                           /  /             
21-1975FA New Construction             7-021-001  01/26/23     DONE    DONE       DONE      06/15/22   06/13/22   04/26/22   01/23/23   02 - 16                  316,858             0  SLC             0           0           0 Collins & Scoville Architects           0        /  /                         06/13/22           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED