GATES CHILI CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 26-04-01-06
last updated on 04/25/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Gates Chili High:
18-0732 Reconstruction 0-001-020 10/03/19 DONE DONE DONE 10/26/18 10/22/18 04/21/18 05/15/18 13,155,15,16 2,257,812 2,257,812 SLC 0 0 0 SEI Design Group 2,234,416 12/21/20 10/22/18
21-0547 Reconstruction 0-001-021 02/28/22 DONE DONE DONE 10/20/21 10/18/21 09/09/21 05/16/17 2,16 892,000 0 SLC 0 0 0 SEI Design Group 0 10/10/22 10/18/21
22-1263 Reconstruction 0-001-022 04/25/22 DONE DONE DONE 12/15/22 12/15/22 03/10/22 03/22/22 7 2,000,000 2,000,000 MSK 0 0 0 SEI Design Group 0 08/31/22 12/15/22
22-0504 Reconstruction 0-001-023 01/23/23 DONE DONE DONE 09/16/22 09/15/22 07/18/22 02/02/22 4,7,8,9,10,155,15,16 472,215 472,215 SLC 0 0 0 SEI Design Group 0 / / 09/15/22
22-1785FB Reconstruction 0-001-024 05/01/23 DONE DONE DONE 03/06/23 01/24/23 10/04/22 12/20/22 7,9,155,15,16 746,574 746,574 JLB 0 0 0 SEI Design Group 0 / / 01/24/23
- PR Additions and Alterations 0-001-025 / / / / 01/17/23 / / 02 - 16 0 0 SLC 0 0 0 0 / / / /
22-2003 Reconstruction 0-001-025 11/28/23 DONE DONE DONE 04/05/23 04/04/23 01/17/23 02/02/22 2,4,7,8,9,155,15,16 11,794,144 10,897,511 JLB 0 0 0 SEI Design Group 0 / / 04/04/23
23-1480 Reconstruction 0-001-026 UNREVIEWED 02/07/24 02/06/24 12/05/23 02/02/22 2,4,7,8,9,10,155,15, 0 0 MSK 0 0 0 SEI Design Group 0 / / 02/06/24
- Reconstruction 0-001-027 / / / / 12/05/23 / / 155,15,16 0 0 MSK 0 0 0 0 / / / /
Florence Brasser:
18-0733 Reconstruction 0-002-017 10/03/19 DONE DONE DONE 10/26/18 10/22/18 04/21/18 05/15/18 10,15,16 218,207 218,207 SLC 0 0 0 SEI Design Group 214,834 12/21/20 10/22/18
20-0211 Reconstruction 0-002-018 08/26/20 DONE DONE DONE 08/13/20 / / 05/15/20 06/09/20 2 65,000 65,000 SLC 0 0 0 SEI Design Group 0 09/01/20 / /
- PR Additions and Alterations 0-002-019 / / / / 12/05/23 / / 02 - 16 0 0 MSK 0 0 0 0 / / / /
23-1481 Additions and Alterations 0-002-019 UNREVIEWED 02/07/24 02/05/24 12/05/23 02/02/22 02 - 16 0 0 MSK 0 0 0 SEI Design Group 0 / / 02/05/24
Pre-K fmly Admin Bldg:
22-2004 Additions and Alterations 0-003-011 11/28/23 DONE DONE DONE 04/05/23 04/04/23 10/08/21 02/02/22 02 - 16 4,439,000 0 JLB 0 0 0 SEI Design Group 0 / / 04/04/23
23-0908PR Reconstruction 0-003-011 UNREVIEWED 11/08/23 09/19/23 10/08/21 / / 2,4,8,9,10,155,15,16 0 0 SLC 0 0 0 0 / / 09/19/23
Middle School:
18-0734 Reconstruction 0-006-015 10/03/19 DONE DONE DONE 10/26/18 10/22/18 04/21/18 05/15/18 15,16 448,249 448,249 SLC 0 0 0 SEI Design Group 436,909 12/21/20 10/22/18
22-1786FB Reconstruction 0-006-016 05/01/23 DONE DONE DONE 03/06/23 01/24/23 10/04/22 12/20/22 7,9,155,15,16 796,575 796,575 JLB 0 0 0 SEI Design Group 0 / / 01/24/23
- PR Additions and Alterations 0-006-017 / / / / 01/17/23 / / 02 - 16 0 0 SLC 0 0 0 0 / / / /
22-2005 Additions and Alterations 0-006-017 11/28/23 DONE DONE DONE 04/05/23 04/04/23 01/17/23 02/02/22 02 - 16 9,233,186 7,581,486 JLB 0 0 0 SEI Design Group 0 / / 04/04/23
23-1482 Reconstruction 0-006-018 UNREVIEWED 02/07/24 02/06/24 12/05/23 02/02/22 2,4,7,8,9,10,155,15, 0 0 MSK 0 0 0 SEI Design Group 0 / / 02/06/24
Paul Rd Elementary:
18-0735 Reconstruction 0-007-017 10/03/19 DONE DONE DONE 10/26/18 10/22/18 04/21/18 05/15/18 13,155,15,16 265,868 265,868 SLC 0 0 0 SEI Design Group 261,816 12/21/20 10/22/18
Walt Disney School:
18-2042 Additions and Alterations 0-008-015 02/03/20 DONE DONE DONE 06/03/19 05/28/19 08/25/16 05/16/17 02 - 16 5,861,301 5,331,375 SLC 0 0 0 SEI Design Group 0 09/01/21 05/28/19
18-0736 Reconstruction 0-008-016 10/03/19 DONE DONE DONE 10/26/18 10/22/18 04/21/18 05/15/18 13,155,15,16 324,058 324,058 SLC 0 0 0 SEI Design Group 320,083 12/21/20 10/22/18
Neil Armstrong Elementary:
18-2043 Additions and Alterations 0-009-015 02/03/20 DONE DONE DONE 06/03/19 05/28/19 08/25/16 05/16/17 02 - 16 5,372,041 5,372,041 SLC 0 0 0 SEI Design Group 0 09/01/21 05/28/19
18-0737 Reconstruction 0-009-016 10/03/19 DONE DONE DONE 10/26/18 10/22/18 04/21/18 05/15/18 155,15,16 395,010 395,010 SLC 0 0 0 SEI Design Group 391,258 12/21/20 10/22/18
22-1787FA Reconstruction 0-009-017 05/01/23 DONE DONE DONE 03/06/23 01/24/23 10/04/22 12/20/22 7,9,155,15,16 600,000 600,000 JLB 0 0 0 SEI Design Group 0 / / 01/24/23
:
18-0738 Reconstruction 1-003-010 10/03/19 DONE DONE DONE 10/26/18 10/22/18 04/21/18 05/15/18 13,155,15,16 70,759 0 SLC 0 0 0 SEI Design Group 69,889 12/21/20 10/22/18
Transportation Bldg (BltApprx2011):
18-0739 Reconstruction 5-019-002 10/03/19 DONE DONE DONE 10/26/18 10/22/18 04/21/18 05/15/18 15,16 120,037 120,037 SLC 0 0 0 SEI Design Group 118,794 12/21/20 10/22/18
21-1193 Reconstruction 5-019-003 01/26/23 DONE DONE DONE 01/24/22 01/20/22 11/30/21 05/18/21 2,16 234,000 234,000 SLC 0 0 0 SEI Design Group 0 12/11/23 01/20/22
District-Wide:
22-1773 Reconstruction 7-999-005 07/13/23 DONE DONE DONE 03/03/23 03/01/23 07/08/22 02/02/22 198,045 198,045 MSK 0 0 0 SEI Design Group 0 / / 03/01/23
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
GREECE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 26-05-01-06
last updated on 04/25/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Craig Hill Elementary School:
19-0678 Reconstruction 0-003-013 02/13/20 DONE DONE DONE 11/04/19 10/24/19 04/01/19 12/04/18 7,8,9,155,16 91,070 91,070 JLB 0 0 0 Clark Patterson Lee 0 10/14/20 10/24/19
21-0036 Reconstruction 0-003-014 01/10/22 DONE DONE DONE 07/13/21 07/09/21 02/18/21 12/04/18 2,7,8,9,10,155,15,16 585,670 585,670 JLB 0 0 0 Clark Patterson Lee 0 / / 07/09/21
22-1846FC Reconstruction 0-003-015 04/14/23 DONE DONE DONE 03/15/23 02/28/23 01/31/23 09/06/22 2 375,000 0 WLC 0 0 0 Clark Patterson Lee Architect 0 09/16/23 02/28/23
22-1841FC Reconstruction 0-003-016 04/14/23 DONE DONE DONE 03/15/23 02/28/23 01/31/23 09/06/22 2,9 250,000 0 WLC 0 0 0 Clark Patterson Lee Architect 0 01/29/24 02/28/23
Greece Olympia High School:
19-0679 Reconstruction 0-004-039 02/13/20 DONE DONE DONE 11/04/19 10/24/19 04/01/19 12/04/18 7,8,9,155,16 73,270 73,270 JLB 0 0 0 Clark Patterson Lee 0 09/13/21 10/24/19
19-0696 Reconstruction 0-004-040 02/06/20 DONE DONE DONE 11/05/19 10/24/19 10/30/19 12/04/18 2,16 5,267,993 5,267,993 JLB 0 0 0 Clark Patterson Lee 0 06/29/21 10/24/19
19-0755 Reconstruction 0-004-041 02/18/20 DONE DONE DONE 11/12/19 10/24/19 08/01/19 12/04/18 2,16 2,858,000 2,858,000 JLB 0 0 0 Clark Patterson Lee 0 10/25/21 10/24/19
23-1884 Reconstruction 0-004-042 UNREVIEWED 04/22/24 04/22/24 02/16/23 04/17/23 2,7,155,16 0 0 WLC 0 0 0 Bell&Spina, P.C 0 / / 04/22/24
Longridge School:
19-0680 Reconstruction 0-006-015 02/13/20 DONE DONE DONE 11/04/19 10/24/19 04/01/19 12/04/18 7,8,9,155,16 35,400 35,400 JLB 0 0 0 Clark Patterson Lee 0 10/14/20 10/24/19
- Reconstruction 0-006-016 / / / / 08/01/19 / / 2,16 0 0 JLB 0 0 0 0 / / / /
21-0037 Reconstruction 0-006-017 01/10/22 DONE DONE DONE 07/13/21 07/09/21 02/18/21 12/04/18 2,7,8,9,10,155,15,16 2,351,575 2,351,575 JLB 0 0 0 Clark Patterson Lee 0 / / 07/09/21
22-1847FC Reconstruction 0-006-018 04/14/23 DONE DONE DONE 03/15/23 02/28/23 02/01/23 09/06/22 2 375,000 0 WLC 0 0 0 Clark Patterson Lee Architect 0 09/16/23 02/28/23
23-1885 Reconstruction 0-006-019 UNREVIEWED 04/22/24 04/22/24 06/01/23 04/17/23 7,155,16 0 0 WLC 0 0 0 Bell&Spina, P.C 0 / / 04/22/24
Paddy Hill School:
19-0681 Reconstruction 0-007-016 02/13/20 DONE DONE DONE 11/04/19 10/24/19 04/01/19 12/04/18 7,8,9,155,16 35,400 35,400 JLB 0 0 0 Clark Patterson Lee 0 10/14/20 10/24/19
21-0152 Reconstruction 0-007-017 08/11/22 DONE DONE DONE 08/11/21 08/09/21 02/18/21 12/04/18 2,7,8,9,10,155,15,16 4,663,350 2,639,665 JLB 0 0 0 Clark Patterson Lee 0 / / 08/09/21
- Reconstruction 0-007-018 / / / / 01/17/24 / / 2 0 0 WLC 0 0 0 0 / / / /
Alcott Rd Facil.(fmly West Ridge ES):
19-0682 Reconstruction 0-008-016 02/13/20 DONE DONE DONE 11/04/19 10/24/19 10/02/19 12/04/18 2,8,9,155,16 40,800 0 JLB 0 0 0 Clark Patterson Lee 0 / / 10/24/19
Autumn Lane Elementary:
19-0683 Reconstruction 0-009-016 02/13/20 DONE DONE DONE 11/04/19 10/24/19 04/01/19 12/04/18 7,8,9,155,16 52,380 43,650 JLB 0 0 0 Clark Patterson Lee 0 10/14/20 10/24/19
19-0756 Reconstruction 0-009-017 02/18/20 DONE DONE DONE 11/12/19 12/04/18 10/18/19 12/04/18 2,4,7,8,9,10,155,15, 2,419,700 2,419,700 JLB 0 0 0 Clark Patterson Lee 0 09/13/21 12/04/18
22-1842FC Reconstruction 0-009-018 04/14/23 DONE DONE DONE 03/15/23 02/28/23 02/01/23 09/06/22 2,9 250,000 0 WLC 0 0 0 Clark Patterson Lee Architect 0 01/29/24 02/28/23
22-1848FC Reconstruction 0-009-019 04/14/23 DONE DONE DONE 03/15/23 02/28/23 02/01/23 09/06/22 2 375,000 0 WLC 0 0 0 Clark Patterson Lee Architect 0 09/16/23 02/28/23
English Village Elementary School:
19-0684 Reconstruction 0-010-020 02/13/20 DONE DONE DONE 11/04/19 10/24/19 04/01/19 12/04/18 7,8,9,155,16 58,200 58,200 JLB 0 0 0 Clark Patterson Lee 0 10/14/20 10/24/19
- Reconstruction 0-010-021 / / / / 02/18/21 / / 2,7,8,9,10,155,15,16 0 0 JLB 0 0 0 0 / / / /
23-0426 Reconstruction 0-010-022 ADDENDUM REQ'D 09/11/23 09/08/23 01/19/23 12/04/18 2,8,9,10,14,155,15,1 2,604,000 0 WLC 0 0 0 Clark Patterson Lee Architect 0 / / 09/08/23
- Reconstruction 0-010-023 / / / / 01/17/24 / / 2 0 0 WLC 0 0 0 0 / / / /
Lakeshore Elementary School:
19-0685 Reconstruction 0-011-016 02/13/20 DONE DONE DONE 11/04/19 10/24/19 04/01/19 12/04/18 7,8,9,155,16 58,200 58,200 JLB 0 0 0 Clark Patterson Lee 0 10/14/20 10/24/19
21-0153 Reconstruction 0-011-017 01/10/22 DONE DONE DONE 08/11/21 08/09/21 02/18/21 12/04/18 2,7,8,9,10,155,15,16 1,976,201 1,291,116 JLB 0 0 0 Clark Patterson Lee 0 / / 08/09/21
22-1849FC Reconstruction 0-011-018 04/14/23 DONE DONE DONE 03/15/23 02/28/23 02/01/23 02/07/23 2 375,000 0 WLC 0 0 0 Clark Patterson Lee Architect 0 08/23/23 02/28/23
Arcadia Middle/High School:
19-0686 Reconstruction 0-012-046 02/13/20 DONE DONE DONE 11/04/19 10/24/19 04/01/19 12/04/18 7,8,9,155,16 170,370 170,370 JLB 0 0 0 Clark Patterson Lee 0 09/13/21 10/24/19
19-0697 Reconstruction 0-012-047 02/06/20 DONE DONE DONE 11/05/19 10/24/19 08/01/19 12/04/18 2,16 4,838,925 4,838,925 JLB 0 0 0 Clark Patterson Lee 0 08/12/21 10/24/19
21-0154 Reconstruction 0-012-048 01/10/22 DONE DONE DONE 08/11/21 08/09/21 02/18/21 12/04/18 2,4,8,9,155,15,16 7,248,614 7,248,614 JLB 0 0 0 Clark Patterson Lee 0 / / 08/09/21
Buckman Heights Elementary School:
19-0687 Reconstruction 0-013-012 02/13/20 DONE DONE DONE 11/04/19 10/24/19 04/01/19 12/04/18 7,8,9,155,16 58,200 58,200 JLB 0 0 0 Clark Patterson Lee 0 10/14/20 10/24/19
21-0038 Reconstruction 0-013-013 01/10/22 DONE DONE DONE 07/13/21 07/09/21 02/18/21 12/04/18 2,7,8,9,10,155,15,16 1,903,575 1,903,575 JLB 0 0 0 Clark Patterson Lee 0 / / 07/09/21
- Reconstruction 0-013-014 / / / / 01/17/24 / / 2 0 0 WLC 0 0 0 0 / / / /
Brookside Elementary:
19-0688 Reconstruction 0-014-017 02/13/20 DONE DONE DONE 11/04/19 10/24/19 04/01/19 12/04/18 7,8,9,155,16 52,380 52,380 JLB 0 0 0 Clark Patterson Lee 0 10/14/20 10/24/19
19-0757 Reconstruction 0-014-018 02/18/20 DONE DONE DONE 11/12/19 10/24/19 10/18/19 12/04/18 2,4,7,8,9,10,14,155, 1,679,700 1,679,700 JLB 0 0 0 Clark Patterson Lee 0 09/13/21 10/24/19
22-1843FC Reconstruction 0-014-019 04/14/23 DONE DONE DONE 03/15/23 02/28/23 02/01/23 09/06/22 2,9 250,000 0 WLC 0 0 0 Clark Patterson Lee Architect 0 / / 02/28/23
22-1850FC Reconstruction 0-014-020 04/14/23 DONE DONE DONE 03/15/23 02/28/23 02/01/23 09/06/22 2 375,000 0 WLC 0 0 0 Clark Patterson Lee Architect 0 09/16/23 02/28/23
West Ridge ES (fmly Parkland ES):
19-0689 Reconstruction 0-015-016 02/13/20 DONE DONE DONE 11/04/19 10/24/19 04/01/19 12/04/18 7,8,9,155,16 35,400 35,400 JLB 0 0 0 Clark Patterson Lee 0 10/14/20 10/24/19
21-0155 Reconstruction 0-015-017 01/10/22 DONE DONE DONE 08/11/21 08/09/21 02/18/21 12/04/18 2,7,8,9,10,155,15,16 759,996 759,996 JLB 0 0 0 Clark Patterson Lee 0 / / 08/09/21
22-0144 Reconstruction 0-015-018 10/26/22 DONE DONE DONE 07/25/22 07/22/22 05/09/22 05/17/22 2,10,16 100,000 100,000 WLC 0 0 0 Clark Patterson Lee Architect 0 / / 07/22/22
- PR Additions and Alterations 0-015-019 / / / / 10/11/23 / / 02 - 16 0 0 WLC 0 0 0 0 / / / /
Holmes Road Elementary:
19-0690 Reconstruction 0-016-012 02/13/20 DONE DONE DONE 11/04/19 10/24/19 04/01/19 12/04/18 7,8,9,155,16 63,670 63,670 JLB 0 0 0 Clark Patterson Lee 0 10/14/20 10/24/19
19-0758 Reconstruction 0-016-013 02/18/20 DONE DONE DONE 11/12/19 10/24/19 10/18/19 12/04/18 2,4,7,8,9,10,155,15, 1,434,000 1,434,000 JLB 0 0 0 Clark Patterson Lee 0 09/13/21 10/24/19
22-1844FC Reconstruction 0-016-014 04/14/23 DONE DONE DONE 03/15/23 02/28/23 02/01/23 09/06/22 2,9 250,000 0 WLC 0 0 0 Clark Patterson Lee Architect 0 01/29/24 02/28/23
- Reconstruction 0-016-015 / / / / 01/17/24 / / 2 0 0 WLC 0 0 0 0 / / / /
Athena Middle/High school:
19-0691 Reconstruction 0-017-036 02/13/20 DONE DONE DONE 11/04/19 10/24/19 04/01/19 12/04/18 7,8,9,155,16 46,800 46,800 JLB 0 0 0 Clark Patterson Lee 0 09/13/21 10/24/19
19-0698 Reconstruction 0-017-037 02/06/20 DONE DONE DONE 11/05/19 10/24/19 08/01/19 12/04/18 2,16 7,555,853 7,555,853 JLB 0 0 0 Clark Patterson Lee 0 06/24/22 10/24/19
21-0039 Reconstruction 0-017-038 01/10/22 DONE DONE DONE 07/13/21 07/09/21 04/16/21 12/04/18 2,9,10 325,931 325,931 JLB 0 0 0 Clark Patterson Lee 0 11/03/23 07/09/21
22-2265 Reconstruction 0-017-039 09/07/23 DONE DONE DONE 05/22/23 05/19/23 01/19/23 12/04/18 2,8,9,155,16 4,193,660 4,193,660 WLC 0 0 0 Clark Patterson Lee Architect 0 / / 05/19/23
23-0427 Reconstruction 0-017-040 ADDENDUM REQ'D 09/11/23 09/08/23 01/19/23 12/04/18 2,4,8,9,10,14,155,15 6,980,000 0 WLC 0 0 0 Clark Patterson Lee Architect 0 / / 09/08/23
Odyssey Academy (fmly Apollo MS):
19-0692 Reconstruction 0-031-026 02/13/20 DONE DONE DONE 11/04/19 10/24/19 04/01/19 12/04/18 7,8,9,155,16 198,000 198,000 JLB 0 0 0 Clark Patterson Lee 0 09/13/21 10/24/19
19-0699 Reconstruction 0-031-027 02/06/20 DONE DONE DONE 11/05/19 10/24/19 08/01/19 12/04/18 2,16 6,022,612 6,022,612 JLB 0 0 0 Clark Patterson Lee 0 06/29/21 10/24/19
21-0040 Reconstruction 0-031-028 01/10/22 DONE DONE DONE 07/13/21 07/09/21 02/18/21 12/04/18 2,4,8,9,10,155,15,16 10,252,943 9,911,157 JLB 0 0 0 Clark Patterson Lee 0 / / 07/09/21
- Reconstruction 0-031-029 / / / / / / / / 2 0 0 WLC 0 0 0 0 / / / /
Pine Brook Elementary:
19-0693 Reconstruction 0-036-011 02/13/20 DONE DONE DONE 11/04/19 10/24/19 04/01/19 12/04/18 7,8,9,155,16 63,670 63,670 JLB 0 0 0 Clark Patterson Lee 0 10/14/20 10/24/19
19-0759 Reconstruction 0-036-012 02/18/20 DONE DONE DONE 11/12/19 10/24/19 10/18/19 12/04/18 2,8,9,10,155,15,16 1,492,023 1,492,023 JLB 0 0 0 Clark Patterson Lee 0 09/04/20 10/24/19
- Reconstruction 0-036-013 / / / / 01/17/24 / / 2 0 0 WLC 0 0 0 0 / / / /
Alcott Rd Facility Annex:
21-0254DB Discovered Building 1-103-001 04/06/23 DONE DONE DONE 08/31/21 08/11/21 07/02/20 / / 0 0 JLB 0 0 0 0 / / 08/11/21
- Reconstruction 1-103-002 / / / / 12/02/21 / / 2,8,9 0 0 JLB 0 0 0 0 / / / /
Field House - Arcadia Mid/HS:
- PR Additions and Alterations 2-021-002 / / / / 10/30/19 / / 02 - 16 0 0 JLB 0 0 0 0 / / / /
19-0700 Additions and Alterations 2-021-002 02/06/20 DONE DONE DONE 11/05/19 10/24/19 10/30/19 12/04/18 02 - 16 388,832 0 JLB 0 0 0 Clark Patterson Lee 0 11/13/20 10/24/19
XXEquip Strge-Trans (Demo 7/2020):
19-1139 Reconstruction 2-026-002 03/13/20 DONE DONE DONE 01/03/20 12/13/19 09/07/18 12/04/18 41,980 0 JLB 0 0 0 Bergmann Associates 0 07/22/20 12/13/19
Longridge Storage Building #2:
- PR Additions and Alterations 2-070-002 / / / / 08/01/19 / / 02 - 16 0 0 JLB 0 0 0 0 / / / /
Storage Building @ Brookside Elem:
19-0760 New Construction 2-078-001 02/18/20 DONE DONE DONE 11/12/19 10/24/19 06/01/16 12/04/18 02 - 16 216,000 0 JLB 0 0 0 Clark Patterson Lee 0 / / 10/24/19
Storage Building @ Autumn Lane ES:
19-0761 New Construction 2-079-001 02/18/20 DONE DONE DONE 11/12/19 10/24/19 06/01/16 12/04/18 02 - 16 213,499 0 JLB 0 0 0 Clark Patterson Lee 0 / / 10/24/19
Arcadia New Storage Building:
- PR New Construction 2-094-001 / / / / 08/01/19 / / 02 - 16 0 0 JLB 0 0 0 0 / / / /
Equipment Storage Building:
19-1140 New Construction 2-101-001 03/13/20 DONE DONE DONE 01/03/20 12/13/19 10/23/19 12/04/18 02 - 16 838,000 0 JLB 0 0 0 Bergmann Associates 0 07/21/21 12/13/19
Storage Trailer #2 @ Olympia:
21-1183DB Discovered Building 2-107-001 01/31/22 DONE DONE DONE 01/21/22 01/19/22 08/04/21 / / 0 0 FMJ 0 0 0 Hunt Engineers,Architects & l 0 / / 01/19/22
Storage Trailer #2 @ Athena:
21-1184DB Discovered Building 2-108-001 01/31/22 DONE DONE DONE 01/21/22 01/19/22 09/27/21 / / 0 0 FMJ 0 0 0 Hunt Engineers,Architects & l 0 / / 01/19/22
Brookside A_Verdi Storage Trailer:
22-0615DB Discovered Building 2-109-001 11/16/22 DONE DONE DONE 09/30/22 / / 04/21/22 / / 0 0 JLB 0 0 0 0 / / / /
Transport Averdi-Train Stor Trailer:
23-0421DB Discovered Building 2-110-001 09/13/23 DONE DONE DONE 09/08/23 09/06/23 12/15/22 / / 0 0 WLC 0 0 0 0 / / 09/06/23
Longridge AVERDI Trailer #2:
23-0019DB Discovered Building 2-111-001 10/17/23 DONE DONE DONE 07/07/23 07/05/23 05/02/23 / / 0 0 WLC 0 0 0 0 / / 07/05/23
Arcadia High AVERDI Athletic Storage:
23-0020DB Discovered Building 2-112-001 10/17/23 DONE DONE DONE 07/07/23 07/05/23 06/12/23 / / 0 0 WLC 0 0 0 0 / / 07/05/23
Trans Annex Demo'd 08/2020:
19-1142 Reconstruction 5-023-014 03/13/20 DONE DONE DONE 01/03/20 12/13/19 09/07/18 12/04/18 458,000 458,000 JLB 0 0 0 Bergmann Associates 0 08/28/20 12/13/19
Bldg Grounds/Bus Storage Demolition:
19-1143 Reconstruction 5-024-016 03/13/20 DONE DONE DONE 01/03/20 12/13/19 09/07/18 12/04/18 716,000 716,000 JLB 0 0 0 Bergmann Associates 0 12/02/21 12/13/19
Transportation Center & Support Svcs:
19-1141 New Construction 5-091-001 03/13/20 DONE DONE DONE 01/03/20 12/13/19 09/07/18 12/04/18 02 - 16 35,260,000 35,260,000 JLB 0 0 0 Bergmann Associates 0 / / 12/13/19
Odyssey Academy Concession/Stg:
- PR Additions and Alterations 7-035-005 / / / / 08/01/19 / / 02 - 16 0 0 JLB 0 0 0 0 / / / /
19-0701 Additions and Alterations 7-035-005 02/06/20 DONE DONE DONE 11/05/19 10/24/19 08/01/19 12/04/18 02 - 16 346,638 0 JLB 0 0 0 Clark Patterson Lee 0 11/19/20 10/24/19
Arcadia Softball Dugout:
19-1322 Reconstruction 7-063-002 02/07/20 DONE DONE DONE 01/31/20 01/24/20 12/23/19 12/04/18 2,4,7,8,9 80,000 0 JLB 0 0 0 Clark Patterson Lee 0 08/19/21 01/24/20
XXOlympia Ticket Booth(rmvd 11/2019):
19-0516DB Discovered Building 7-092-001 01/17/20 DONE DONE DONE 09/30/19 09/27/19 01/11/19 / / 0 0 JLB 0 0 0 0 / / 09/27/19
Press Box @ Odyssey Academy:
18-1908 New Construction 7-093-001 05/30/19 DONE DONE DONE 04/26/19 06/02/17 04/26/19 03/24/15 02 - 16 75,000 0 JLB 0 0 0 Clark Patterson Lee 0 10/01/19 06/02/17
Arcadia New Ticket Booth:
- PR New Construction 7-095-001 / / / / 08/01/19 / / 02 - 16 0 0 JLB 0 0 0 0 / / / /
19-0702 New Construction 7-095-001 02/06/20 DONE DONE DONE 11/05/19 10/24/19 08/01/19 12/04/18 02 - 16 91,295 0 JLB 0 0 0 Clark Patterson Lee 0 12/28/20 10/24/19
Olympia New Ticket Booth:
- PR New Construction 7-096-001 / / / / 08/01/19 / / 02 - 16 0 0 JLB 0 0 0 0 / / / /
19-0703 New Construction 7-096-001 02/06/20 DONE DONE DONE 11/05/19 10/24/19 08/01/19 12/04/18 02 - 16 88,772 0 JLB 0 0 0 Clark Patterson Lee 0 10/26/20 10/24/19
Odyssey New Ticket Booth:
- PR New Construction 7-097-001 / / / / 08/01/19 / / 02 - 16 0 0 JLB 0 0 0 0 / / / /
19-0704 New Construction 7-097-001 02/06/20 DONE DONE DONE 11/05/19 10/24/19 08/01/19 12/04/18 02 - 16 88,789 0 JLB 0 0 0 Clark Patterson Lee 0 12/28/20 10/24/19
Olympia New Toilet Room/Concession:
- PR New Construction 7-098-001 / / / / 08/01/19 / / 02 - 16 0 0 JLB 0 0 0 0 / / / /
19-0705 New Construction 7-098-001 02/06/20 DONE DONE DONE 11/05/19 10/24/19 08/01/19 12/04/18 02 - 16 643,126 0 JLB 0 0 0 Clark Patterson Lee 0 10/26/20 10/24/19
Athena New Toilet Room/Concession:
- PR New Construction 7-099-001 / / / / 08/01/19 / / 02 - 16 0 0 JLB 0 0 0 0 / / / /
19-0706 New Construction 7-099-001 02/06/20 DONE DONE DONE 11/05/19 10/24/19 08/01/19 12/04/18 02 - 16 676,134 0 JLB 0 0 0 Clark Patterson Lee 0 12/28/20 10/24/19
Athena Pressbox:
19-0707 New Construction 7-100-001 02/06/20 DONE DONE DONE 11/05/19 10/24/19 10/18/19 12/04/18 02 - 16 234,000 0 JLB 0 0 0 Clark Patterson Lee 0 11/03/20 10/24/19
Athena New Ticket Booth:
- PR New Construction 7-102-001 / / / / 02/21/20 / / 02 - 16 0 0 JLB 0 0 0 0 / / / /
19-1616 New Construction 7-102-001 05/15/20 DONE DONE DONE 03/20/20 03/12/20 02/21/20 12/04/18 02 - 16 88,789 0 JLB 0 0 0 Clark Patterson Lee 0 12/28/20 03/12/20
Olympia Baseball Ticket Booth:
- PR New Construction 7-104-001 / / / / 10/23/20 / / 02 - 16 0 0 JLB 0 0 0 0 / / / /
21-1185DB Discovered Building 7-104-002 NEED AUTH DONE DONE DONE 01/21/22 01/19/22 12/01/20 / / 02 - 16 0 0 FMJ 0 0 0 Hunt Engineers,Architects & l 0 / / 01/19/22
Pavilion @ Brookside Elementary:
- New Construction 7-113-001 / / / / 03/14/24 / / 02 - 16 0 0 WLC 0 0 0 0 / / / /
Pavilion @ Pinebrook Elementary:
- New Construction 7-114-001 / / / / 03/14/24 / / 02 - 16 0 0 WLC 0 0 0 0 / / / /
District-Wide:
20-1282 Reconstruction 7-999-007 04/21/21 DONE DONE DONE 02/11/21 08/12/20 11/07/18 11/04/14 16 1,836,200 0 JLB 0 0 0 Clark Patterson Lee 0 / / 08/12/20
20-0651 Reconstruction 7-999-008 02/23/21 DONE DONE DONE 10/21/20 10/15/20 11/07/18 12/06/11 8,16 412,440 442,040 JLB 0 0 0 SWBR Architects P.C. 0 / / 10/15/20
40x120 Temp Prom Tent:
20-1723TQ Temporary Quarters 8-105-001 STARTED DONE DONE 05/18/21 05/11/21 04/29/21 / / 0 0 JLB 0 0 0 0 / / 05/11/21
20x40 Temp Prom Tent:
20-1724TQ Temporary Quarters 8-106-001 STARTED DONE DONE 05/18/21 05/11/21 04/29/21 / / 0 0 JLB 0 0 0 0 / / 05/11/21
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
WEST IRONDEQUOIT CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 26-08-03-06
last updated on 04/25/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Irondequoit High School:
18-1178 Reconstruction 0-001-030 05/15/19 DONE DONE DONE 01/04/19 12/28/18 05/22/18 05/15/18 2,4,7,8,9,155,15,16 3,738,475 3,738,475 BMJ 0 0 0 Clark Patterson Lee 0 11/14/20 12/28/18
19-0233 Reconstruction 0-001-031 10/28/19 DONE DONE DONE 08/08/19 07/26/19 07/12/19 07/26/19 8 100,000 100,000 BMJ 0 0 0 Clark Patterson Lee 0 06/29/20 07/26/19
19-1699 Reconstruction 0-001-032 12/19/19 DONE DONE DONE 04/17/20 04/15/20 12/19/19 12/19/19 16 120,000 120,000 JSS 0 0 0 Clark Patterson Lee 0 02/10/20 04/15/20
21-1790FC Reconstruction 0-001-033 05/17/22 DONE DONE DONE 05/09/22 05/06/22 02/24/22 01/21/22 7,155,16 1,000,000 1,000,000 FMJ 0 0 0 Clark Patterson Lee Architect 0 / / 05/06/22
22-2162 Reconstruction 0-001-034 STARTED DONE DONE 05/08/23 05/05/23 09/06/22 04/07/22 155,15,16 544,295 0 WLC 0 0 0 Clark Patterson Lee Architect 0 / / 05/05/23
23-0896 Reconstruction 0-001-035 UNREVIEWED 11/06/23 10/24/23 06/26/23 05/16/23 2,4,7,8,9,155,15,16 0 59,255,130 WLC 0 0 0 Clark Patterson Lee Architect 0 / / 10/24/23
Ruben Dake JH School 7-8:
18-1179 Reconstruction 0-002-019 05/15/19 DONE DONE DONE 01/04/19 12/28/18 05/22/18 05/15/18 2,4,7,8,9,155,15,16 2,118,881 2,118,881 BMJ 0 0 0 Clark Patterson Lee 0 11/14/20 12/28/18
23-0897 Reconstruction 0-002-020 UNREVIEWED 11/06/23 10/24/23 06/26/23 05/16/23 2,4,7,8,9,155,15,16 0 20,979,872 WLC 0 0 0 Clark Patterson Lee Architect 0 / / 10/24/23
Rogers/Southlawn School:
18-1180 Reconstruction 0-003-021 05/15/19 DONE DONE DONE 01/04/19 12/28/18 05/22/18 05/15/18 2,7,9,15,16 745,147 745,147 BMJ 0 0 0 Clark Patterson Lee 0 10/01/20 12/28/18
21-2031 Reconstruction 0-003-022 10/06/22 DONE DONE DONE 06/24/22 06/23/22 02/24/22 05/17/22 2,4,8,9,155,16 100,000 100,000 WLC 0 0 0 Clark Patterson Lee Architect 0 06/19/23 06/23/22
23-0898 Reconstruction 0-003-023 UNREVIEWED 11/06/23 10/24/23 06/26/23 05/16/23 4,8,9,155,15,16 0 0 WLC 0 0 0 Clark Patterson Lee Architect 0 / / 10/24/23
Iroquois School:
18-1181 Reconstruction 0-004-018 05/15/19 DONE DONE DONE 01/04/19 12/28/18 05/22/18 05/15/18 2,4,7,155,15,16 741,398 741,398 BMJ 0 0 0 Clark Patterson Lee 0 10/01/20 12/28/18
22-2158 Reconstruction 0-004-019 01/20/22 DONE DONE DONE 05/05/23 05/05/23 02/24/22 01/20/22 2,4,8,9,155,16 220,127 220,127 WLC 0 0 0 Clark Patterson Lee Architect 0 / / 05/05/23
23-0899 Reconstruction 0-004-020 UNREVIEWED 11/06/23 10/24/23 06/26/23 05/16/23 2,4,8,9,10,155,15,16 0 14,228,532 WLC 0 0 0 Clark Patterson Lee Architect 0 / / 10/24/23
Seneca Elem School K-3:
18-1182 Reconstruction 0-006-009 05/15/19 DONE DONE DONE 01/04/19 12/28/18 05/22/18 05/15/18 2,7 626,556 626,556 BMJ 0 0 0 Clark Patterson Lee 0 09/04/20 12/28/18
19-1759 Reconstruction 0-006-010 07/07/20 DONE DONE DONE 05/22/20 05/05/20 03/30/20 06/09/20 7 100,000 0 JSS 0 0 0 Clark Patterson Lee 0 09/25/20 05/05/20
20-1646 Reconstruction 0-006-011 06/12/21 DONE DONE DONE 04/27/21 04/26/21 03/10/21 05/18/21 15,16 100,000 100,000 JSS 0 0 0 Clark Patterson Lee 0 06/03/22 04/26/21
22-2279 Reconstruction 0-006-012 06/29/23 DONE DONE DONE 05/24/23 05/22/23 04/24/23 05/16/23 2,8,9,155,16 100,000 100,000 WLC 0 0 0 Clark Patterson Lee Architect 0 / / 05/22/23
23-0900 Reconstruction 0-006-013 UNREVIEWED 11/06/23 10/24/23 09/05/23 05/16/23 8,9 0 4,826,688 WLC 0 0 0 Clark Patterson Lee Architect 0 / / 10/24/23
Gym Building:
18-1183 Reconstruction 0-021-006 05/15/19 DONE DONE DONE 01/04/19 12/28/18 05/22/18 05/15/18 2,9,155,16 183,425 183,425 BMJ 0 0 0 Clark Patterson Lee 0 12/04/20 12/28/18
Listwood Sch K-3:
18-1184 Reconstruction 0-027-007 05/15/19 DONE DONE DONE 01/04/19 12/28/18 05/22/18 05/15/18 2,9 248,515 248,515 BMJ 0 0 0 Clark Patterson Lee 0 09/04/20 12/28/18
23-0901 Reconstruction 0-027-008 UNREVIEWED 11/06/23 10/24/23 06/26/23 05/16/23 8,9 0 4,528,548 WLC 0 0 0 Clark Patterson Lee Architect 0 / / 10/24/23
Brookview Sch K-3:
18-1185 Reconstruction 0-028-007 05/15/19 DONE DONE DONE 01/04/19 12/28/18 05/22/18 05/15/18 2,9 248,515 248,515 BMJ 0 0 0 Clark Patterson Lee 0 09/04/20 12/28/18
23-0902 Reconstruction 0-028-008 UNREVIEWED 11/06/23 10/24/23 06/26/23 05/16/23 8,9 0 4,528,548 WLC 0 0 0 Clark Patterson Lee Architect 0 / / 10/24/23
Briarwood Sch K-3:
18-1186 Reconstruction 0-029-007 05/15/19 DONE DONE DONE 01/04/19 12/28/18 05/22/18 05/15/18 2,9 248,515 248,515 BMJ 0 0 0 Clark Patterson Lee 0 09/04/20 12/28/18
23-0903 Reconstruction 0-029-008 UNREVIEWED 11/06/23 10/24/23 06/26/23 05/16/23 9,13 0 4,528,548 WLC 0 0 0 Clark Patterson Lee Architect 0 / / 10/24/23
Colebrook Sch K-3:
18-1187 Reconstruction 0-032-007 05/15/19 DONE DONE DONE 01/04/19 12/28/18 05/22/18 05/15/18 2,9 248,455 248,455 BMJ 0 0 0 Clark Patterson Lee 0 09/04/20 12/28/18
23-0904 Reconstruction 0-032-008 UNREVIEWED 11/06/23 10/24/23 06/26/23 05/16/23 8,9 0 4,528,548 WLC 0 0 0 Clark Patterson Lee Architect 0 / / 10/24/23
Cooper Rd Bldg (fmr Public Library):
18-1188 Reconstruction 1-037-003 05/15/19 DONE DONE DONE 01/04/19 12/28/18 05/22/18 05/15/18 2,8,155,15,16 157,000 0 BMJ 0 0 0 Clark Patterson Lee 0 10/01/20 12/28/18
Field Storage Building:
18-1189 New Construction 2-038-001 05/14/19 DONE DONE DONE 01/04/19 12/28/18 05/21/18 05/15/18 02 - 16 320,500 0 BMJ 0 0 0 Clark Patterson Lee 0 / / 12/28/18
Lakeview Bldg -leased:
23-0905 Reconstruction 7-013-004 UNREVIEWED 11/06/23 10/24/23 06/26/23 05/16/23 2,4,7,8,9,10,155,15, 0 0 WLC 0 0 0 Clark Patterson Lee Architect 0 / / 10/24/23
Districtwide:
19-0915SB Reconstruction 7-999-003 DONE / / / / 12/04/19 / / 16 0 0 BMJ 0 0 0 0 / / / /
21-0079 Reconstruction 7-999-003 03/04/22 DONE DONE DONE 07/21/21 07/15/21 12/04/19 11/04/14 16 864,959 0 SLC 0 0 0 Clark Patterson Lee 0 / / 07/15/21
- Reconstruction 7-999-004 / / / / 06/15/23 / / 16 0 0 WLC 0 0 0 0 / / / /
22-2384SB Reconstruction 7-999-004 DONE / / / / 06/15/23 / / 16 0 0 WLC 0 0 0 0 / / / /
- SB Reconstruction 7-999-BA1 / / / / / / / / 16 0 0 WLC 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
HONEOYE FALLS-LIMA CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 26-09-01-06
last updated on 04/25/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Manor Elementary:
20-0125 Reconstruction 0-001-014 09/23/20 DONE DONE DONE 07/28/20 07/15/20 02/24/20 12/17/19 2,8,9,155,15,16 297,061 297,061 JLB 0 0 0 SEI Design Group 0 11/11/21 07/15/20
19-1644 Reconstruction 0-001-015 03/05/20 DONE DONE DONE 03/31/20 03/26/20 03/05/20 03/10/20 16 40,000 40,000 BMJ 0 0 0 SEI Design Group 0 03/11/20 03/26/20
20-0600 Reconstruction 0-001-016 05/19/21 DONE DONE DONE 10/15/20 10/07/20 07/27/20 06/09/20 7,155,16 426,900 426,900 JLB 0 0 0 SEI Design Group 426,900 06/07/22 10/07/20
- Reconstruction 0-001-017 / / / / 02/14/23 / / 2,4,8,9,155,15,16 0 0 WLC 0 0 0 0 / / / /
High School:
18-2004 Reconstruction 0-003-022 07/16/19 DONE DONE DONE 05/23/19 05/17/19 04/03/19 05/21/19 9,155,16 100,000 100,000 BMJ 0 0 0 SEI Design Group 0 01/09/20 05/17/19
20-0126 Reconstruction 0-003-023 09/23/20 DONE DONE DONE 07/28/20 12/17/19 02/24/20 12/17/19 2,4,7,8,9,155,15,16 4,397,500 4,397,500 JLB 0 0 0 SEI Design Group 0 11/19/21 12/17/19
20-0601 Reconstruction 0-003-024 05/19/21 DONE DONE DONE 10/15/20 10/07/20 07/27/20 06/09/20 7,155,16 785,911 785,911 JLB 0 0 0 SEI Design Group 785,911 06/07/22 10/07/20
22-0002 Reconstruction 0-003-025 10/11/22 DONE DONE DONE 07/01/22 06/28/22 03/28/22 05/17/22 9 100,000 100,000 WLC 0 0 0 SEI Design Group 0 05/04/23 06/28/22
23-0922 Reconstruction 0-003-026 UNREVIEWED 11/08/23 11/06/23 02/14/23 12/13/22 2,4,7,8,9,14,155,15, 0 0 WLC 0 0 0 SEI Design Group 0 / / 11/06/23
22-2488 Reconstruction 0-003-027 08/24/23 DONE DONE DONE 06/30/23 06/29/23 05/30/23 05/16/23 4,8,9,16 100,000 100,000 WLC 0 0 0 SEI Design Group 0 / / 06/29/23
Lima Elementary:
20-1232 Reconstruction 0-004-015 03/18/21 DONE DONE DONE 02/02/21 01/26/21 02/24/20 12/17/19 2,4,7,8,9,10,155,15, 1,722,500 1,722,500 JLB 0 0 0 SEI Design Group 0 07/22/22 01/26/21
20-0602 Reconstruction 0-004-016 05/19/21 DONE DONE DONE 10/15/20 10/07/20 07/27/20 06/09/20 7,155,16 223,248 223,248 JLB 0 0 0 SEI Design Group 223,248 06/07/22 10/07/20
- Reconstruction 0-004-017 / / / / 02/14/23 / / 2,4,7,8,9,155,15,16 0 0 WLC 0 0 0 0 / / / /
Middle School:
20-0127 Reconstruction 0-013-010 09/23/20 DONE DONE DONE 07/28/20 07/15/20 02/24/20 12/17/19 2,4,7,8,9,10,155,15, 3,293,700 3,293,700 JLB 0 0 0 SEI Design Group 0 11/11/21 07/15/20
19-1645 Reconstruction 0-013-011 06/26/20 DONE DONE DONE 03/31/20 03/29/20 03/04/20 06/09/20 9 100,000 100,000 JLB 0 0 0 SEI Design Group 0 05/06/21 03/29/20
20-0603 Reconstruction 0-013-012 05/19/21 DONE DONE DONE 10/15/20 10/07/20 07/27/20 06/09/20 7,8,155,16 846,838 846,838 JLB 0 0 0 SEI Design Group 846,838 06/07/22 10/07/20
20-1855 Reconstruction 0-013-013 07/06/21 DONE DONE DONE 06/10/21 05/29/21 03/05/21 05/18/21 9 100,000 100,000 JLB 0 0 0 SEI Design Group 0 04/26/22 05/29/21
21-0368 Reconstruction 0-013-014 10/26/21 DONE DONE DONE 09/17/21 09/16/21 06/18/21 12/17/19 8,16 899,400 899,400 JLB 0 0 0 SEI Design Group 0 02/09/23 09/16/21
- Reconstruction 0-013-015 / / / / 02/14/23 / / 4,7,8,9,155,15,16 0 0 WLC 0 0 0 0 / / / /
22-2007 Reconstruction 0-013-016 07/19/23 DONE DONE DONE 04/05/23 04/05/23 03/13/23 03/28/23 2 373,600 373,600 WLC 0 0 0 SEI Design Group 0 / / 04/05/23
Transportation Building:
20-0128 Reconstruction 5-014-006 09/23/20 DONE DONE DONE 07/28/20 07/15/20 02/24/20 12/17/19 2,16 75,900 75,900 JLB 0 0 0 SEI Design Group 0 04/21/22 07/15/20
22-1825 Reconstruction 5-014-007 06/30/23 DONE DONE DONE 03/13/23 03/10/23 02/14/23 12/13/22 9,15,16 812,130 812,130 WLC 0 0 0 SEI Design Group 0 10/23/23 03/10/23
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
SPENCERPORT CENTRAL SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 26-10-01-06
last updated on 04/25/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Admin/BOCES Bldg (inclSpecEd):
18-1421 Reconstruction 0-001-008 05/31/19 DONE DONE DONE 02/12/19 01/18/19 05/29/18 05/15/18 2,4,8,9,10,155,15,16 171,240 171,240 SLC 0 0 0 LaBella Associates P.C. 0 09/17/21 01/18/19
23-1206 Reconstruction 0-001-009 UNREVIEWED 12/18/23 12/13/23 03/20/23 12/13/22 2,8,9,155,16 0 0 MSK 0 0 0 Ashley McGraw 0 / / 12/13/23
Bernabi Elem:
18-1422 Reconstruction 0-002-013 05/31/19 DONE DONE DONE 02/12/19 01/18/19 05/29/18 05/15/18 2,4,7,8,9,10,155,15, 986,667 986,667 SLC 0 0 0 LaBella Associates P.C. 0 09/17/21 01/18/19
22-2180 Reconstruction 0-002-014 10/24/23 DONE DONE DONE 05/10/23 05/09/23 03/17/23 12/13/22 2,4,8,9,155,16 2,117,862 2,117,862 MSK 0 0 0 Ashley McGraw 0 / / 05/09/23
Cosgrove MS 7-8:
18-1423 Reconstruction 0-005-018 05/31/19 DONE DONE DONE 02/12/19 01/18/19 05/29/18 05/15/18 2,4,7,8,9,10,155,15, 2,295,431 2,295,431 SLC 0 0 0 LaBella Associates P.C. 0 09/17/21 01/18/19
21-0017 Reconstruction 0-005-019 12/01/21 DONE DONE DONE 07/08/21 07/07/21 05/17/21 05/15/18 2,9,10,155,15,16 1,340,000 1,340,000 SLC 0 0 0 LaBella Associates P.C. 0 09/26/22 07/07/21
22-2181 Reconstruction 0-005-020 10/24/23 DONE DONE DONE 05/10/23 05/09/23 03/17/23 12/13/22 7 664,647 664,647 MSK 0 0 0 Ashley McGraw 0 / / 05/09/23
23-1207 Reconstruction 0-005-021 UNREVIEWED 12/18/23 12/13/23 03/20/23 12/13/22 2,4,8,9,155,15,16 0 0 MSK 0 0 0 Ashley McGraw 0 / / 12/13/23
Wm Munn Elementary:
18-1424 Reconstruction 0-006-017 05/31/19 DONE DONE DONE 02/12/19 01/18/19 05/29/18 05/15/18 2,4,7,8,9,10,155,15, 1,911,485 1,911,485 SLC 0 0 0 LaBella Associates P.C. 0 09/17/21 01/18/19
22-2182 Reconstruction 0-006-018 10/24/23 DONE DONE DONE 05/10/23 05/09/23 03/17/23 12/13/22 2,7 4,733,680 4,733,680 MSK 0 0 0 Ashley McGraw 0 / / 05/09/23
23-1208 Reconstruction 0-006-019 UNREVIEWED 12/18/23 12/13/23 03/17/23 12/13/22 2,4,8,9,155,16 0 0 MSK 0 0 0 Ashley McGraw 0 / / 12/13/23
- Reconstruction 0-006-020 / / / / 12/08/23 / / 8 0 0 MSK 0 0 0 0 / / / /
Terry A. Taylor ES:
18-1425 Reconstruction 0-007-015 05/31/19 DONE DONE DONE 02/12/19 01/18/19 / / 05/15/18 2,4,7,8,9,10,155,15, 1,255,759 1,255,759 SLC 0 0 0 LaBella Associates P.C. 0 09/17/21 01/18/19
22-2183 Reconstruction 0-007-016 10/24/23 DONE DONE DONE 05/10/23 05/09/23 03/17/23 12/13/22 2,4,8,9,155,16 742,733 742,733 MSK 0 0 0 Ashley McGraw 0 / / 05/09/23
23-1209 Reconstruction 0-007-017 UNREVIEWED 12/18/23 12/13/23 03/20/23 12/13/22 2,4,7,8,9,155,15,16 0 0 MSK 0 0 0 Ashley McGraw 0 / / 12/13/23
S'port HS 9-12:
18-1426 Reconstruction 0-008-016 05/31/19 DONE DONE DONE 02/12/19 01/18/19 05/29/18 05/15/18 2,4,7,8,9,10,155,15, 2,794,686 2,794,686 SLC 0 0 0 LaBella Associates P.C. 0 09/17/21 01/18/19
22-2184 Reconstruction 0-008-017 10/24/23 DONE DONE DONE 05/10/23 05/09/23 03/17/23 12/13/22 2,7,16 3,603,442 3,603,442 MSK 0 0 0 Ashley McGraw 0 / / 05/09/23
23-1210 Reconstruction 0-008-018 UNREVIEWED 12/18/23 12/13/23 03/20/23 12/13/22 2,4,8,9,155,15,16 0 0 MSK 0 0 0 Ashley McGraw 0 / / 12/13/23
Canal View Elementary:
18-1427 Reconstruction 0-015-008 05/31/19 DONE DONE DONE 02/12/19 01/18/19 05/29/18 05/15/18 2,4,7,8,9,10,155,15, 762,425 762,425 SLC 0 0 0 LaBella Associates P.C. 0 10/30/21 01/18/19
- PR Additions and Alterations 0-015-009 / / / / 03/20/23 / / 02 - 16 0 0 JLB 0 0 0 0 / / / /
23-1211 Additions and Alterations 0-015-009 UNREVIEWED 12/18/23 12/13/23 03/20/23 12/13/22 02 - 16 0 0 MSK 0 0 0 Ashley McGraw 0 / / 12/13/23
Bus Garage:
18-1428 Reconstruction 5-014-008 05/31/19 DONE DONE DONE 02/12/19 01/18/19 05/29/18 05/15/18 2,8,9,13,155,15,16 1,443,307 1,443,307 SLC 0 0 0 LaBella Associates P.C. 0 09/17/21 01/18/19
23-1212 Reconstruction 5-014-009 UNREVIEWED 12/18/23 12/13/23 03/20/23 12/13/22 2,4,8,9,155,16 0 0 MSK 0 0 0 Ashley McGraw 0 / / 12/13/23
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
HILTON CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 26-11-01-06
last updated on 04/25/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Quest Elementary:
21-0174 Reconstruction 0-001-015 11/18/21 DONE DONE DONE 08/16/21 06/29/21 08/28/20 12/15/16 2,8,9,16 987,563 987,563 JLB 0 0 0 LaBella Associates, P.C. 0 09/07/22 06/29/21
22-1003FA Reconstruction 0-001-016 01/31/23 DONE DONE DONE 11/18/22 10/27/22 10/21/21 10/11/22 2,7,155,16 375,000 375,000 JLB 0 0 0 LaBella Associates P.C. 0 / / 10/27/22
- Reconstruction 0-001-017 / / / / 11/29/23 / / 2,4,7,8,9,155,15,16 0 0 JJH 0 0 0 0 / / / /
Northwood Elementary School:
21-0175 Reconstruction 0-003-018 11/18/21 DONE DONE DONE 08/16/21 06/29/21 08/28/20 12/15/16 2,8,9,16 363,120 363,120 JLB 0 0 0 LaBella Associates, P.C. 0 09/07/22 06/29/21
22-1004FA Reconstruction 0-003-019 01/31/23 DONE DONE DONE 11/18/22 10/27/22 10/21/21 10/11/22 2,7,155,16 375,000 375,000 JLB 0 0 0 LaBella Associates P.C. 0 / / 10/27/22
21-0929 Reconstruction 0-003-020 11/09/21 DONE DONE DONE 12/17/21 12/17/21 11/12/21 11/09/21 7,8,9,155,16 336,713 336,713 JLB 0 0 0 LaBella Associates, P.C. 0 08/12/22 12/17/21
22-1358 Reconstruction 0-003-021 08/02/23 DONE DONE DONE 12/28/22 12/23/22 03/23/22 05/24/22 155,16 314,966 314,966 JJH 0 0 0 LaBella Associates P.C. 0 / / 12/23/22
23-0565 Reconstruction 0-003-022 UNREVIEWED
DONE DONE 09/29/23 09/27/23 05/19/23 03/14/23 2,9,16 0 0 JJH 0 0 0 LaBella Associates P.C. 0 / / 09/27/23
- Reconstruction 0-003-023 / / / / 11/29/23 / / 2,155,16 0 0 JJH 0 0 0 0 / / / /
Village Elementary School:
20-1280 Reconstruction 0-004-017 03/05/21 DONE DONE DONE 02/10/21 01/22/21 07/09/20 06/09/20 2,9 100,000 100,000 JLB 0 0 0 LaBella Associates, P.C. 0 08/31/21 01/22/21
21-0176 Reconstruction 0-004-018 11/18/21 DONE DONE DONE 08/16/21 06/29/21 08/28/20 12/15/16 2,8,9,16 382,367 382,367 JLB 0 0 0 LaBella Associates, P.C. 0 09/07/22 06/29/21
22-1005FA Reconstruction 0-004-019 01/31/23 DONE DONE DONE 11/18/22 10/27/22 10/21/21 10/11/22 2,7,155,16 375,000 375,000 JLB 0 0 0 LaBella Associates P.C. 0 / / 10/27/22
21-1506 Reconstruction 0-004-020 05/24/22 DONE DONE DONE 03/14/22 03/14/22 03/08/22 05/18/21 2,9 100,000 100,000 JLB 0 0 0 LaBella Associates, P.C. 0 08/12/22 03/14/22
22-1691 Reconstruction 0-004-021 07/19/23 DONE DONE DONE 02/15/23 02/15/23 01/03/23 05/16/23 2,7,9 100,000 100,000 JJH 0 0 0 LaBella Associates P.C. 0 08/23/23 02/15/23
23-0566 Reconstruction 0-004-022 UNREVIEWED
DONE DONE 09/29/23 09/27/23 05/19/23 03/14/23 7 0 0 JJH 0 0 0 LaBella Associates P.C. 0 / / 09/27/23
23-1407 Reconstruction 0-004-023 04/01/24 DONE DONE DONE 01/24/24 01/19/24 11/21/23 05/16/23 2,4,9,15 100,000 100,000 JJH 0 0 0 LaBella Associates P.C. 0 / / 01/19/24
- Reconstruction 0-004-024 / / / / 11/29/23 / / 2,4,8,9,155,15,16 0 0 JJH 0 0 0 0 / / / /
Merton Williams Middle School:
21-0177 Reconstruction 0-005-016 11/18/21 DONE DONE DONE 08/16/21 06/29/21 08/28/20 12/15/16 2,8,9,16 453,680 453,680 JLB 0 0 0 LaBella Associates, P.C. 0 09/07/22 06/29/21
- Reconstruction 0-005-017 / / / / 10/21/21 / / 2,7,155,16 0 0 JLB 0 0 0 0 / / / /
23-0567 Reconstruction 0-005-018 UNREVIEWED
DONE DONE 09/29/23 09/27/23 05/19/23 03/14/23 2,16 0 0 JJH 0 0 0 LaBella Associates P.C. 0 / / 09/27/23
- Reconstruction 0-005-019 / / / / / / / / 0 0 JJH 0 0 0 0 / / / /
- Reconstruction 0-005-020 / / / / 11/29/23 / / 2,4,7,8,9,155,15,16 0 0 JJH 0 0 0 0 / / / /
High School:
21-0178 Reconstruction 0-007-017 11/18/21 DONE DONE DONE 08/16/21 06/29/21 08/28/20 12/15/16 2,8,9,16 1,670,224 1,670,224 JLB 0 0 0 LaBella Associates, P.C. 0 09/07/22 06/29/21
22-1006FA Reconstruction 0-007-018 01/31/23 DONE DONE DONE 11/18/22 10/27/22 10/21/21 10/11/22 2,7,155,16 375,000 375,000 JLB 0 0 0 LaBella Associates P.C. 0 / / 10/27/22
22-1359 Reconstruction 0-007-019 08/02/23 DONE DONE DONE 12/28/22 12/23/22 03/23/22 05/24/22 155,16 21,250 21,250 JJH 0 0 0 LaBella Associates P.C. 0 / / 12/23/22
22-0569XX Additions and Alterations 0-007-020 CANCELLED 09/23/22 / / 08/26/22 / / 02 - 16 0 0 JJH 0 0 0 0 / / / /
23-0568 Reconstruction 0-007-021 UNREVIEWED
DONE DONE 09/29/23 09/27/23 05/19/23 03/14/23 2,7,16 0 0 JJH 0 0 0 LaBella Associates P.C. 0 / / 09/27/23
23-0712 Reconstruction 0-007-022 ADDENDUM REQ'D 10/13/23 10/07/23 08/01/23 05/16/23 8,9,155,15,16 0 0 JJH 0 0 0 LaBella Associates P.C. 0 / / 10/07/23
- Reconstruction 0-007-023 / / / / 11/29/23 / / 2,16 0 0 JJH 0 0 0 0 / / / /
Transportation Maint. Facility:
19-1090 Reconstruction 5-010-015 02/13/20 DONE DONE DONE 01/02/20 12/06/19 02/28/17 05/21/19 2,4,8,9 100,000 100,000 JLB 0 0 0 LaBella Associates P.C. 0 06/22/20 12/06/19
21-0179 Reconstruction 5-010-016 11/18/21 DONE DONE DONE 08/16/21 06/29/21 08/28/20 12/15/16 2,8,9,16 28,073 28,073 JLB 0 0 0 LaBella Associates, P.C. 0 09/07/22 06/29/21
23-0569 Reconstruction 5-010-017 UNREVIEWED
DONE DONE 09/29/23 09/27/23 05/19/23 03/14/23 2,15,16 0 0 JJH 0 0 0 LaBella Associates P.C. 0 / / 09/27/23
Concess./Storage/Restrms.LaBea Ath.F:
23-0570 Reconstruction 7-015-002 UNREVIEWED
DONE DONE 09/29/23 09/27/23 09/05/23 03/14/23 7,16 0 0 JJH 0 0 0 LaBella Associates P.C. 0 / / 09/27/23
High School Ticket Booth #1:
- DB Discovered Building 7-020-001 / / / / 10/04/21 / / 0 0 JLB 0 0 0 0 / / / /
High School Ticket Booth #2:
- DB Discovered Building 7-021-001 / / / / 10/04/21 / / 0 0 JLB 0 0 0 0 / / / /
Quest ES Schwonke Field Press Box:
- DB Discovered Building 7-022-001 / / / / 02/22/22 / / 0 0 JLB 0 0 0 0 / / / /
Quest ES Schwonke Field Dugout #1:
- DB Discovered Building 7-023-001 / / / / 02/28/22 / / 0 0 JLB 0 0 0 0 / / / /
Quest ES Schwonke Field Dugout #2:
- DB Discovered Building 7-024-001 / / / / 02/28/22 / / 0 0 JLB 0 0 0 0 / / / /
District-Wide:
- SB Reconstruction 7-999-BA1 DONE / / / / / / / / 16 0 0 JJH 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
PENFIELD CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 26-12-01-06
last updated on 04/25/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Indian Landing Elementary School:
18-1562 Additions and Alterations 0-002-018 08/09/19 DONE DONE DONE 02/27/19 02/26/19 08/07/17 05/15/18 02 - 16 5,708,733 4,963,469 SLC 0 0 0 SEI Design Group 0 08/13/21 02/26/19
19-0770 Reconstruction 0-002-019 03/25/20 DONE DONE DONE 11/13/19 11/07/19 05/31/19 05/21/19 2,7 449,208 449,208 SLC 0 0 0 SEI Design Group 0 07/15/21 11/07/19
21-0953FC Reconstruction 0-002-020 05/24/22 DONE DONE DONE 12/22/21 12/22/21 09/24/21 11/23/21 2,4,7,8,9,155,15,16 3,751,919 3,751,919 FMJ 0 0 0 SEI Design Group 0 / / 12/22/21
- Reconstruction 0-002-021 / / / / 10/25/23 / / 2,4,7,8,9,14,155,15, 0 0 WLC 0 0 0 0 / / / /
Penfield Senior High:
18-1563 Reconstruction 0-005-021 08/09/19 DONE DONE DONE 02/27/19 02/20/19 01/08/19 05/15/18 2,4,7,14,155,15,16 1,865,942 1,865,942 SLC 0 0 0 SEI Design Group 0 10/26/20 02/20/19
19-0771 Reconstruction 0-005-022 03/25/20 DONE DONE DONE 11/13/19 11/07/19 05/31/19 05/21/19 2,7 3,519,778 3,519,778 SLC 0 0 0 SEI Design Group 0 07/15/21 11/07/19
20-1205 Reconstruction 0-005-023 04/29/21 DONE DONE DONE 01/28/21 01/18/21 10/29/20 05/21/19 7 2,593,238 2,593,238 SLC 0 0 0 SEI Design Group 0 09/15/21 01/18/21
23-0225 Reconstruction 0-005-024 01/25/24 DONE DONE DONE 08/09/23 08/07/23 10/03/22 12/14/21 2,4,7,8,9,10,14,155, 20,819,918 20,449,842 WLC 0 0 0 SEI Design Group 0 / / 08/07/23
Cobbles Elementary:
18-1564 Additions and Alterations 0-006-018 08/09/19 DONE DONE DONE 02/27/19 02/20/19 08/07/17 05/15/18 02 - 16 3,947,839 3,411,635 SLC 0 0 0 SEI Design Group 0 08/30/21 02/20/19
19-0772 Reconstruction 0-006-019 03/25/20 DONE DONE DONE 11/13/19 11/07/19 05/31/19 05/21/19 2,7,155,16 3,519,680 3,519,680 SLC 0 0 0 SEI Design Group 0 07/15/21 11/07/19
- Reconstruction 0-006-020 / / / / 05/31/19 / / 0 0 SLC 0 0 0 0 / / / /
- Reconstruction 0-006-021 / / / / 10/25/23 / / 2,4,8,9,10,155,15,16 0 0 WLC 0 0 0 0 / / / /
Scribner Elementary School:
18-1565 Additions and Alterations 0-007-017 08/09/19 DONE DONE DONE 02/27/19 02/20/19 08/07/17 05/15/18 02 - 16 8,045,680 6,564,028 SLC 0 0 0 SEI Design Group 0 08/13/21 02/20/19
22-1150 Reconstruction 0-007-018 04/24/23 DONE DONE DONE 12/05/22 12/01/22 10/03/22 05/18/21 2,4,7,8,9,10,155,15, 1,100,804 1,100,804 WLC 0 0 0 SEI Design Group 0 / / 12/01/22
- Reconstruction 0-007-019 / / / / 10/25/23 / / 2,4,7,8,9,155,15,16 0 0 WLC 0 0 0 0 / / / /
Bay Trail Junior High School:
18-1566 Reconstruction 0-008-016 08/09/19 DONE DONE DONE 02/27/19 02/20/19 01/08/19 05/15/18 2,4,9,14,155,15,16 2,738,817 2,738,817 SLC 0 0 0 SEI Design Group 0 10/23/21 02/20/19
21-1389FA Reconstruction 0-008-017 07/25/22 DONE DONE DONE 02/28/22 02/22/22 01/31/22 01/26/22 155 264,255 264,255 FMJ 0 0 0 SEI Design Group 0 / / 02/22/22
22-1151 Reconstruction 0-008-018 04/24/23 DONE DONE DONE 12/05/22 12/01/22 10/03/22 05/08/21 2,4,7,8,9,10,14,155, 1,867,026 1,867,026 WLC 0 0 0 SEI Design Group 0 / / 12/01/22
- Reconstruction 0-008-019 / / / / 12/12/22 / / 2,4,7,8,9,10,155,15, 0 0 WLC 0 0 0 0 / / / /
Harris Hill Elementary School:
22-1152 Reconstruction 0-009-019 04/24/23 DONE DONE DONE 12/05/22 12/01/22 10/03/22 05/18/21 2,8,9,10,155,15,16 1,053,640 1,053,640 WLC 0 0 0 SEI Design Group 0 / / 12/01/22
District Office:
23-0226 Reconstruction 1-001-010 01/25/24 DONE DONE DONE 08/09/23 08/07/23 10/03/22 12/14/21 2,7,9,155,15,16 774,104 0 WLC 0 0 0 SEI Design Group 0 / / 08/07/23
Storage Building:
21-1695XX New Construction 2-030-001 CANCELLED 04/25/22 / / 01/04/22 / / 02 - 16 0 0 WLC 0 0 0 0 / / / /
22-0546 Alterations 2-030-001 04/27/23 DONE DONE DONE 09/21/22 09/21/22 01/04/22 05/08/21 02 - 16 1,290,697 0 WLC 0 0 0 SEI Design Group 0 / / 09/21/22
PE Storage Bldg:
- PR New Construction 2-031-001 / / / / 10/03/22 / / 02 - 16 0 0 WLC 0 0 0 0 / / / /
23-0227 New Construction 2-031-001 01/25/24 DONE DONE DONE 08/09/23 08/07/23 10/03/22 12/14/21 02 - 16 306,653 0 WLC 0 0 0 SEI Design Group 0 / / 08/07/23
Maintenance Bldg:
- Reconstruction 3-004-005 / / / / 10/03/22 / / 2,4,7,8,9,155,15,16 0 0 WLC 0 0 0 0 / / / /
Bus Garage:
- Reconstruction 5-010-009 / / / / 10/03/22 / / 2,7,8,9,10,155,15,16 0 0 WLC 0 0 0 0 / / / /
Transportation Facility:
21-1696PR New Construction 5-029-001 DONE 04/25/22 / / 01/04/22 / / 02 - 16 0 0 WLC 0 0 0 0 / / / /
22-0547 New Construction 5-029-001 04/27/23 DONE DONE DONE 09/21/22 09/21/22 01/04/22 05/08/21 02 - 16 34,599,400 34,599,400 WLC 0 0 0 SEI Design Group 0 / / 09/21/22
High School - Press Box #1:
23-0228 New Construction 7-032-001 01/25/24 DONE DONE DONE 08/09/23 08/07/23 02/17/23 12/14/21 02 - 16 200,421 0 WLC 0 0 0 SEI Design Group 0 / / 08/07/23
High School - Press Box #2:
23-0229 New Construction 7-033-001 01/25/24 DONE DONE DONE 08/09/23 08/07/23 02/17/23 12/14/21 02 - 16 200,421 0 WLC 0 0 0 SEI Design Group 0 / / 08/07/23
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
FAIRPORT CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 26-13-01-06
last updated on 04/25/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
J. Perrin Middle School:
20-1613 Reconstruction 0-001-014 11/09/21 DONE DONE DONE 04/22/21 04/22/21 01/19/21 12/10/19 2,4,7,8,9,10,155,15, 3,064,259 3,064,259 SLC 0 0 0 LaBella Associates P.C. 0 / / 04/22/21
21-0486 Reconstruction 0-001-015 12/14/21 DONE DONE DONE 10/07/21 10/06/21 06/21/21 06/09/20 2,8,9,10,155,16 100,000 100,000 SLC 0 0 0 LaBella Associates P.C. 0 06/20/22 10/06/21
Minerva Deland School (9th grade):
20-1614 Reconstruction 0-002-021 11/09/21 DONE DONE DONE 04/22/21 04/22/21 01/19/21 12/10/19 2,4,7,8,9,10,155,15, 3,782,348 3,782,348 SLC 0 0 0 LaBella Associates P.C. 0 / / 04/22/21
Martha Brown Middle School:
20-1615 Reconstruction 0-003-016 11/09/21 DONE DONE DONE 04/22/21 04/22/21 01/19/21 12/10/19 2,4,7,8,9,10,155,15, 3,466,636 3,466,636 SLC 0 0 0 LaBella Associates P.C. 0 / / 04/22/21
- Reconstruction 0-003-017 / / / / / / / / 2,4,8,9,10,155,15,16 0 0 MSK 0 0 0 0 / / / /
Brooks Hill Elem (K-5):
19-0315 Reconstruction 0-004-015 09/23/19 DONE DONE DONE 08/28/19 08/20/19 06/19/19 05/15/18 155,16 100,000 100,000 MTM 0 0 0 M/E Engineering 0 06/26/20 08/20/19
20-1616 Reconstruction 0-004-016 11/09/21 DONE DONE DONE 04/22/21 04/22/21 01/19/21 12/10/19 2,4,7,8,9,10,155,15, 671,283 671,283 SLC 0 0 0 LaBella Associates P.C. 0 / / 04/22/21
Jefferson Ave Elem (K-5):
20-1617 Reconstruction 0-006-018 11/09/21 DONE DONE DONE 04/22/21 04/22/21 01/19/21 12/10/19 2,4,7,8,9,10,155,15, 3,744,612 3,744,612 SLC 0 0 0 LaBella Associates P.C. 0 / / 04/22/21
Fairport High School (9-12):
20-0896 Reconstruction 0-007-024 02/18/21 DONE DONE DONE 12/01/20 11/25/20 01/10/20 05/21/19 2,4,8,9,16 100,000 100,000 SLC 0 0 0 LaBella Associates P.C. 0 06/22/21 11/25/20
20-0899 Reconstruction 0-007-025 02/12/21 DONE DONE DONE 12/01/20 10/28/20 01/21/20 12/10/19 2,4,7,8,9,10,13,155, 33,513,393 33,513,393 SLC 0 0 0 LaBella Associates P.C. 0 / / 10/28/20
21-1777PR Additions and Alterations 0-007-026 DONE 05/06/22 / / 01/05/22 / / 02 - 16 0 80,969,298 JLB 0 0 0 0 / / / /
22-1791 Reconstruction 0-007-027 07/14/23 DONE DONE DONE 03/06/23 03/06/23 11/09/22 12/10/19 4,9,10,15,16 820,874 820,874 MSK 0 0 0 LaBella Associates P.C. 0 / / 03/06/23
23-0260 Reconstruction 0-007-028 03/20/24 DONE DONE DONE 08/14/23 08/11/23 06/15/23 05/19/15 2,4,7,8,9,10,155,15, 1,384,682 1,384,682 MSK 0 0 0 LaBella Associates P.C. 0 / / 08/11/23
- Reconstruction 0-007-029 / / / / 12/29/23 / / 2,15,16 0 0 MSK 0 0 0 0 / / / /
- PR Additions and Alterations 0-007-030 / / / / 12/29/23 / / 02 - 16 0 0 MSK 0 0 0 0 / / / /
Northside Elem (3-5):
20-1618 Reconstruction 0-008-011 11/09/21 DONE DONE DONE 04/22/21 04/22/21 01/19/21 12/10/19 2,4,7,8,9,10,155,15, 1,628,080 1,628,080 SLC 0 0 0 LaBella Associates P.C. 0 / / 04/22/21
21-1314 Reconstruction 0-008-012 05/16/22 DONE DONE DONE 02/17/22 02/10/22 10/14/21 05/18/21 2,9,16 100,000 100,000 FMJ 0 0 0 LaBella Associates P.C. 0 / / 02/10/22
Dudley Elem (K-2):
20-1619 Reconstruction 0-009-015 11/09/21 DONE DONE DONE 04/22/21 04/22/21 01/19/21 12/10/19 2,4,7,8,9,10,155,15, 1,807,604 1,807,604 SLC 0 0 0 LaBella Associates P.C. 0 / / 04/22/21
23-0600 Reconstruction 0-009-016 12/22/23 DONE DONE DONE 10/04/23 09/21/23 11/09/22 05/17/22 8,9,16 100,000 100,000 MSK 0 0 0 LaBella Associates P.C. 0 / / 09/21/23
- Reconstruction 0-009-017 / / / / 02/01/24 / / 2,9 0 0 MSK 0 0 0 0 / / / /
Storage Building:
- New Construction 2-039-001 / / / / 01/04/24 / / 02 - 16 0 0 MSK 0 0 0 0 / / / /
Concession\Bathrooms:
20-0900 Reconstruction 7-025-002 02/12/21 DONE DONE DONE 12/01/20 10/28/20 06/15/20 12/10/19 4,9,15,16 50,500 0 SLC 0 0 0 LaBella Associates P.C. 0 / / 10/28/20
Baseball Dugout Away:
20-0901 New Construction 7-040-001 02/12/21 DONE DONE DONE 12/01/20 10/28/20 08/06/20 12/10/19 02 - 16 151,500 0 SLC 0 0 0 LaBella Associates P.C. 0 / / 10/28/20
Baseball Dugout/Storage Home:
20-0902 New Construction 7-041-001 02/12/21 DONE DONE DONE 12/01/20 10/28/20 08/06/20 12/10/19 02 - 16 151,500 0 SLC 0 0 0 LaBella Associates P.C. 0 / / 10/28/20
Softball Dugout Away:
20-0903 New Construction 7-042-001 02/12/21 DONE DONE DONE 12/01/20 10/28/20 08/06/20 12/10/19 02 - 16 151,500 0 SLC 0 0 0 LaBella Associates P.C. 0 / / 10/28/20
Softball Dugout/Storage Home:
20-0904 New Construction 7-043-001 02/12/21 DONE DONE DONE 12/01/20 10/28/20 08/06/20 12/10/19 02 - 16 151,500 0 SLC 0 0 0 LaBella Associates P.C. 0 / / 10/28/20
Track & Field Press Box:
- New Construction 7-044-001 / / / / 12/29/23 / / 02 - 16 0 0 MSK 0 0 0 0 / / / /
District Wide:
19-1368SB Reconstruction 7-999-003 DONE / / / / 02/06/20 / / 8,16 0 0 BMJ 0 0 0 0 / / / /
20-1029 Reconstruction 7-999-003 05/25/21 DONE DONE DONE 12/22/20 12/15/20 02/06/20 11/04/14 8,16 3,296,127 0 SLC 0 0 0 LaBella Associates P.C. 0 / / 12/15/20
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
PITTSFORD CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 26-14-01-06
last updated on 04/25/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Jefferson Rd. Elementary:
23-0027 Reconstruction 0-002-024 11/29/23 DONE DONE DONE 07/07/23 07/06/23 05/23/23 03/28/23 2,8,9,155,16 402,910 402,910 JLB 0 0 0 SEI Design Group 0 / / 07/06/23
23-1708 Reconstruction 0-002-025 UNREVIEWED 04/01/24 03/28/24 11/10/23 03/28/23 2,8,9,10,155,15,16 0 0 MSK 0 0 0 SEI Design Group 0 / / 03/28/24
Sutherland School:
21-0718 Reconstruction 0-003-027 04/15/22 DONE DONE DONE 11/16/21 11/12/21 08/19/21 05/18/21 2,155,16 1,073,625 1,073,625 SLC 0 0 0 SEI Design Group 0 09/29/23 11/12/21
23-0499 Reconstruction 0-003-028 02/07/23 DONE DONE DONE 09/18/23 09/14/23 03/06/23 02/07/23 7 351,320 351,320 MSK 0 0 0 SEI Design Group 0 09/29/23 09/14/23
23-0028 Reconstruction 0-003-029 11/29/23 DONE DONE DONE 07/07/23 07/06/23 05/23/23 03/28/23 2,8,9,155,16 416,686 416,686 JLB 0 0 0 SEI Design Group 0 / / 07/06/23
23-1709 Reconstruction 0-003-030 UNREVIEWED 04/01/24 03/28/24 11/10/23 03/28/23 2,155,15,16 0 0 MSK 0 0 0 SEI Design Group 0 / / 03/28/24
Allen Creek Elementary School:
21-0719 Reconstruction 0-004-021 04/15/22 DONE DONE DONE 11/16/21 11/12/21 08/19/21 05/18/21 2,15 432,930 432,930 SLC 0 0 0 SEI Design Group 0 09/29/23 11/12/21
23-0029 Reconstruction 0-004-022 11/29/23 DONE DONE DONE 07/07/23 07/06/23 05/23/23 03/28/23 2,8,9,155,16 352,406 352,406 JLB 0 0 0 SEI Design Group 0 / / 07/06/23
23-1710 Reconstruction 0-004-023 UNREVIEWED 04/01/24 03/28/24 11/10/23 03/28/23 2,7,8,9,10,155,15,16 0 0 MSK 0 0 0 SEI Design Group 0 / / 03/28/24
Mendon Center Elementary:
21-0720 Reconstruction 0-005-021 04/15/22 DONE DONE DONE 11/16/21 11/12/21 08/19/21 05/18/21 2,7,8,16 1,217,603 1,217,603 SLC 0 0 0 SEI Design Group 0 09/29/23 11/12/21
23-0030 Reconstruction 0-005-022 11/29/23 DONE DONE DONE 07/07/23 07/06/23 05/23/23 03/28/23 2,8,9,155,16 339,780 339,780 JLB 0 0 0 SEI Design Group 0 / / 07/06/23
23-1711 Reconstruction 0-005-023 UNREVIEWED 04/01/24 03/28/24 11/10/23 03/28/23 2,8,9,155,15,16 0 0 MSK 0 0 0 SEI Design Group 0 / / 03/28/24
Park Road Elementary:
18-2075 Reconstruction 0-006-019 07/01/19 DONE DONE DONE 06/07/19 05/29/19 11/29/18 05/21/19 2,7,155,15,16 710,000 710,000 SLC 0 0 0 SEI Design Group 0 10/01/19 05/29/19
21-0721 Reconstruction 0-006-020 04/15/22 DONE DONE DONE 11/16/21 11/12/21 08/19/21 05/18/21 2,16 216,965 216,965 SLC 0 0 0 SEI Design Group 0 09/29/23 11/12/21
23-0031 Reconstruction 0-006-021 11/29/23 DONE DONE DONE 07/07/23 07/06/23 05/23/23 03/28/23 2,8,9,155,16 451,877 451,877 JLB 0 0 0 SEI Design Group 0 / / 07/06/23
23-1712 Reconstruction 0-006-022 UNREVIEWED 04/01/24 03/28/24 11/10/23 03/28/23 2,8,9,10,155,15,16 0 0 MSK 0 0 0 SEI Design Group 0 / / 03/28/24
Barker Rd.MS (FrmlyPittsfordMS):
18-2055 Reconstruction 0-007-020 07/02/19 DONE DONE DONE 06/04/19 05/29/19 05/24/18 05/21/19 7,155,15,16 1,300,000 1,300,000 SLC 0 0 0 SEI Design Group 0 08/26/20 05/29/19
23-0033 Reconstruction 0-007-021 11/29/23 DONE DONE DONE 07/07/23 07/06/23 05/23/23 03/28/23 2,8,9,155,16 441,938 441,938 JLB 0 0 0 SEI Design Group 0 / / 07/06/23
23-1713 Reconstruction 0-007-022 UNREVIEWED 04/01/24 03/28/24 11/10/23 03/28/23 2,8,9,10,155,15,16 0 0 MSK 0 0 0 SEI Design Group 0 / / 03/28/24
Thornell Road School:
21-0722 Reconstruction 0-008-016 04/15/22 DONE DONE DONE 11/16/21 11/12/21 08/19/21 05/18/21 2,15,16 353,742 353,742 SLC 0 0 0 SEI Design Group 0 09/29/23 11/12/21
23-0032 Reconstruction 0-008-017 11/29/23 DONE DONE DONE 07/07/23 07/06/23 05/23/23 03/28/23 2,8,9,155,16 377,658 377,658 JLB 0 0 0 SEI Design Group 0 / / 07/06/23
23-1714 Reconstruction 0-008-018 UNREVIEWED 04/01/24 03/28/24 11/10/23 03/28/23 2,8,9,10,155,15,16 0 0 MSK 0 0 0 SEI Design Group 0 / / 03/28/24
Mendon (Pittsford) High Sch.:
21-0723 Reconstruction 0-009-026 04/15/22 DONE DONE DONE 11/16/21 11/12/21 08/19/21 05/18/21 2,7,155,15,16 1,563,146 1,563,146 SLC 0 0 0 SEI Design Group 0 09/29/23 11/12/21
23-0034 Reconstruction 0-009-027 11/29/23 DONE DONE DONE 07/07/23 07/06/23 05/23/23 03/28/23 2,8,9,13,155,16 746,909 746,909 JLB 0 0 0 SEI Design Group 0 / / 07/06/23
23-1568PR Additions and Alterations 0-009-028 DONE 03/04/24 / / 11/10/23 / / 02 - 16 0 45,424,080 MSK 0 0 0 0 / / / /
23-1715 Additions and Alterations 0-009-028 UNREVIEWED 04/01/24 03/28/24 11/10/23 03/28/23 02 - 16 0 0 MSK 0 0 0 SEI Design Group 0 / / 03/28/24
Calkins Road Middle School:
23-0035 Reconstruction 0-025-003 11/29/23 DONE DONE DONE 07/07/23 07/06/23 05/23/23 03/28/23 2,8,9,155,15 0 36,635,322 JLB 0 0 0 SEI Design Group 0 / / 07/06/23
- Reconstruction 0-025-004 / / / / 09/29/23 / / 155,15,16 0 0 MSK 0 0 0 0 / / / /
23-1716 Reconstruction 0-025-005 UNREVIEWED 04/01/24 03/28/24 11/10/23 03/28/23 7,155,16 0 0 MSK 0 0 0 SEI Design Group 0 / / 03/28/24
Administration Building:
21-0724 Reconstruction 1-001-006 04/15/22 DONE DONE DONE 11/16/21 11/12/21 08/19/21 05/18/21 2,8,9,155,15,16 144,978 0 SLC 0 0 0 SEI Design Group 0 09/29/23 11/12/21
23-1717 Reconstruction 1-001-007 UNREVIEWED 04/01/24 03/28/24 11/10/23 03/28/23 2,8,9 0 0 MSK 0 0 0 SEI Design Group 0 / / 03/28/24
Bus Garage:
18-1962 Reconstruction 5-011-069 07/25/19 DONE DONE DONE 05/15/19 05/14/19 05/24/18 05/15/18 2,155,15,16 640,000 640,000 SLC 0 0 0 SEI Design Group 0 06/01/20 05/14/19
21-0725 Reconstruction 5-011-070 04/15/22 DONE DONE DONE 11/16/21 11/12/21 08/19/21 05/18/21 2,15,16 252,959 252,959 SLC 0 0 0 SEI Design Group 0 09/29/23 11/12/21
21-0534 Reconstruction 5-011-071 03/29/22 DONE DONE DONE 10/15/21 10/14/21 08/19/21 05/18/21 2,7 689,500 689,500 SLC 0 0 0 SEI Design Group 0 12/02/22 10/14/21
23-1718 Reconstruction 5-011-072 UNREVIEWED 04/01/24 03/28/24 11/10/23 03/28/23 2,155,15,16 0 0 MSK 0 0 0 SEI Design Group 0 / / 03/28/24
Mendon HS - Stadium Toilet Rooms:
23-1719 New Construction 7-041-001 UNREVIEWED 04/01/24 03/28/24 11/10/23 03/28/23 02 - 16 0 0 MSK 0 0 0 SEI Design Group 0 / / 03/28/24
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
ROCHESTER CITY SCHOOLS STATUS REPORT ON CAPITAL PROJECTS
District No.: 26-16-00-01
last updated on 04/25/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
#3DrAliceHYoungSchExcellSee0058RecCt:
21-0737 Reconstruction 0-003-024 02/08/22 DONE DONE DONE 11/17/21 11/17/21 07/22/20 11/19/20 2,8,9,155,15,16 2,700,000 2,700,000 SLC 0 0 0 Design Group Educ. Fac. Dept. 0 / / 11/17/21
23-1751 Reconstruction 0-003-025 UNREVIEWED 04/05/24 04/02/24 03/24/23 06/23/22 16 0 0 MSK 0 0 0 Wendel Companies 0 / / 04/02/24
- Reconstruction 0-003-026 / / / / 10/25/23 / / 2,8,9,155,15,16 0 0 MSK 0 0 0 0 / / / /
#5 John Williams K-5:
19-1123 Reconstruction 0-005-027 03/06/20 DONE DONE DONE 01/02/20 12/11/19 07/15/19 05/07/19 2,4,8,9,16 1,100,000 1,100,000 SLC 0 0 0 Design Group Educ. Fac. Dept. 0 07/28/22 12/11/19
23-1072 Reconstruction 0-005-028 02/06/24 DONE DONE DONE 11/30/23 11/28/23 06/21/23 05/09/23 2,4,7,16 1,600,000 1,600,000 MSK 0 0 0 Design Group Educ. Fac. Dept. 0 / / 11/28/23
#9 M.L. King K-6 (See0-059RecCtr):
- Reconstruction 0-009-024 / / / / 12/12/23 / / 2,4,7,8,9,10,155,15, 0 0 MSK 0 0 0 0 / / / /
Roberto Clemente #8:
21-0733 Reconstruction 0-010-013 01/25/22 DONE DONE DONE 11/16/21 11/16/21 05/25/21 05/10/21 2,4,9,10,16 1,200,000 1,200,000 SLC 0 0 0 Design Group Educ. Fac. Dept. 0 / / 11/16/21
23-1752 Reconstruction 0-010-014 UNREVIEWED 04/05/24 04/02/24 01/30/23 06/23/22 16 0 17,079,474 MSK 0 0 0 Wendel Companies 0 / / 04/02/24
M McLeod Bethune #45(fmlyNE.Elem) 1:
23-1753 Reconstruction 0-011-012 UNREVIEWED 04/05/24 04/02/24 01/30/23 06/23/22 16 0 0 MSK 0 0 0 Wendel Companies 0 / / 04/02/24
23-1223 Reconstruction 0-011-013 02/28/24 DONE DONE DONE 12/19/23 12/19/23 06/21/23 05/09/23 4,155,15,16 1,700,000 1,700,000 MSK 0 0 0 Design Group Educ. Fac. Dept. 0 / / 12/19/23
23-1477 Reconstruction 0-011-014 04/08/24 DONE DONE DONE 02/06/24 02/06/24 10/25/23 05/09/23 9,155,15,16 2,000,000 2,000,000 MSK 0 0 0 Design Group Educ. Fac. Dept. 0 / / 02/06/24
#12 AnneMurrayDouglass(frmrDuffyK-5:
20-1094 Reconstruction 0-012-022 03/22/21 DONE DONE DONE 01/06/21 12/31/20 07/16/19 05/07/19 8,9,155,16 1,980,000 1,980,000 SLC 0 0 0 Design Group Educ. Fac. Dept. 0 07/27/23 12/31/20
20-1054 Reconstruction 0-012-023 02/25/21 DONE DONE DONE 12/28/20 12/22/20 07/31/20 05/07/20 2,4,8,9,16 2,000,000 2,000,000 SLC 0 0 0 Design Group Educ. Fac. Dept. 0 11/30/23 12/22/20
23-1754 Reconstruction 0-012-024 UNREVIEWED 04/05/24 04/02/24 01/30/23 06/23/22 16 0 0 MSK 0 0 0 Wendel Companies 0 / / 04/02/24
23-1224 Reconstruction 0-012-025 03/04/24 DONE DONE DONE 12/19/23 12/19/23 06/21/23 05/09/23 2,9,155,15,16 2,400,000 2,400,000 MSK 0 0 0 Design Group Educ. Fac. Dept. 0 / / 12/19/23
World Of Inquiry #58 (FrmrC Dewey#14:
20-1229 Reconstruction 0-014-028 04/14/21 DONE DONE DONE 02/01/21 01/13/21 07/17/20 11/21/19 2,9 854,450 854,450 SLC 0 0 0 Design Group Educ. Fac. Dept. 0 09/22/22 01/13/21
Enrico Fermi School #17 (InclHealthC:
19-1357 Reconstruction 0-017-026 03/21/20 DONE DONE DONE 02/04/20 01/27/20 11/15/19 10/26/17 10 100,000 0 SLC 0 0 0 Design Group Educ. Fac. Dept. 0 / / 01/27/20
21-0911 Reconstruction 0-017-027 02/15/22 DONE DONE DONE 12/17/21 12/16/21 05/25/21 05/10/21 7,8,9,155,15,16 1,800,000 1,800,000 SLC 0 0 0 Design Group Educ. Fac. Dept. 0 / / 12/16/21
23-0819 Reconstruction 0-017-028 01/22/24 DONE DONE DONE 10/27/23 10/25/23 06/21/23 05/09/23 2,8 200,000 200,000 MSK 0 0 0 Design Group Educ. Fac. Dept. 0 / / 10/25/23
School of the Arts:
19-0911 Reconstruction 0-018-018 02/13/20 DONE DONE DONE 12/03/19 11/18/19 07/16/19 05/07/19 7,8,155,15,16 1,450,000 1,450,000 SLC 0 0 0 Design Group Educ. Fac. Dept. 0 05/26/22 11/18/19
20-0953 Reconstruction 0-018-019 02/11/21 DONE DONE DONE 12/11/20 12/04/20 07/17/20 05/07/20 2,4,8,9,155,15,16 2,360,000 2,360,000 SLC 0 0 0 Design Group Educ. Fac. Dept. 0 / / 12/04/20
22-1473 Reconstruction 0-018-020 03/01/23 DONE DONE DONE 01/11/23 12/29/22 06/06/22 05/10/22 2,8,9,16 1,600,000 1,600,000 SLC 0 0 0 Design Group Educ. Fac. Dept. 0 / / 12/29/22
23-1755 Reconstruction 0-018-021 UNREVIEWED 04/05/24 04/02/24 01/30/23 06/23/22 16 0 0 MSK 0 0 0 Wendel Companies 0 / / 04/02/24
#19 Dr. C.T. Lunsford (see0-062RecCt:
19-0865 Reconstruction 0-019-023 01/29/20 DONE DONE DONE 11/27/19 11/15/19 05/24/18 05/15/18 2,7,8,9,155,15,16 2,655,940 2,655,940 SLC 0 0 0 Design Group Educ. Fac. Dept. 0 12/22/22 11/15/19
- Reconstruction 0-019-024 / / / / 05/25/21 / / 2,4,8,9,155,15,16 0 0 SLC 0 0 0 0 / / / /
23-1756 Reconstruction 0-019-025 UNREVIEWED 04/05/24 04/02/24 03/24/23 06/23/22 16 0 0 MSK 0 0 0 Wendel Companies 0 / / 04/02/24
23-0341 Reconstruction 0-019-026 09/21/23 DONE DONE DONE 08/29/23 08/28/23 06/26/23 05/16/23 2,8,9,16 200,000 200,000 JLB 0 0 0 Design Group Educ. Fac. Dept. 0 / / 08/28/23
#20 Henry LombSch-2020NStarProgAltEd:
19-0872 Reconstruction 0-020-016 01/31/20 DONE DONE DONE 11/27/19 11/18/19 07/15/19 05/07/19 2,4,7,8,9,155,15,16 2,700,000 2,700,000 SLC 0 0 0 Design Group Educ. Fac. Dept. 0 02/07/23 11/18/19
Francis Parker School No.23:
19-1177 Reconstruction 0-023-021 03/16/20 DONE DONE DONE 01/08/20 01/02/20 07/15/19 05/07/19 2,4,7,8,9,10,155,15, 3,200,000 3,185,400 SLC 0 0 0 Design Group Educ. Fac. Dept. 0 12/23/21 01/02/20
23-1757 Reconstruction 0-023-022 UNREVIEWED 04/05/24 04/02/24 01/30/23 06/23/22 16 0 0 MSK 0 0 0 Wendel Companies 0 / / 04/02/24
23-1030 Reconstruction 0-023-023 02/08/24 DONE DONE DONE 11/16/23 11/14/23 06/21/23 05/09/23 8,9,16 900,000 900,000 MSK 0 0 0 Design Group Educ. Fac. Dept. 0 / / 11/14/23
#28 Henry Hudson K-6:
22-1287 Reconstruction 0-028-026 03/03/23 DONE DONE DONE 12/19/22 12/02/22 06/03/22 05/10/22 2,4,8,9,10,16 800,000 800,000 SLC 0 0 0 Design Group Educ. Fac. Dept. 0 / / 12/02/22
23-1758 Reconstruction 0-028-027 UNREVIEWED 04/05/24 04/02/24 01/30/23 06/23/22 16 0 0 MSK 0 0 0 Wendel Companies 0 / / 04/02/24
#29 Adlai Stevenson:
- Reconstruction 0-029-027 DONE / / / / 01/30/23 / / 2,7,9,155,15,16 0 0 SLC 0 0 0 0 / / / /
Dr. Freddie Thomas (#25&53)Montessor:
21-0600 Reconstruction 0-031-016 01/25/22 DONE DONE DONE 10/29/21 10/28/21 05/25/21 05/10/21 10,155,15,16 1,530,000 1,530,000 SLC 0 0 0 Design Group Educ. Fac. Dept. 0 / / 10/28/21
22-1027 Reconstruction 0-031-017 02/02/23 DONE DONE DONE 11/18/22 11/07/22 06/06/22 05/10/22 4,7,16 2,600,000 2,600,000 SLC 0 0 0 Design Group Educ. Fac. Dept. 0 / / 11/07/22
23-1759 Reconstruction 0-031-018 UNREVIEWED 04/05/24 04/02/24 01/30/23 06/23/22 16 0 0 MSK 0 0 0 Wendel Companies 0 / / 04/02/24
Joseph Wilson Foundation Acad:
19-1304 Reconstruction 0-032-013 03/25/20 DONE DONE DONE 01/30/20 01/27/20 07/16/19 05/07/19 9,15,16 400,000 400,000 SLC 0 0 0 Design Group Educ. Fac. Dept. 0 03/24/22 01/27/20
21-0734 Reconstruction 0-032-014 01/25/22 DONE DONE DONE 11/16/21 11/16/21 05/25/21 05/10/21 9,10,155,15,16 1,300,000 1,300,000 SLC 0 0 0 Design Group Educ. Fac. Dept. 0 07/27/23 11/16/21
- PR Additions and Alterations 0-032-015 / / / / 06/13/22 / / 02 - 16 0 0 SLC 0 0 0 0 / / / /
22-1289 Additions and Alterations 0-032-015 03/03/23 DONE DONE DONE 12/19/22 12/08/22 06/13/22 05/10/22 02 - 16 4,500,000 2,800,000 SLC 0 0 0 Design Group Educ. Fac. Dept. 0 / / 12/08/22
23-1760 Reconstruction 0-032-016 UNREVIEWED 04/05/24 04/02/24 / / 06/23/22 16 0 0 MSK 0 0 0 Wendel Companies 0 / / 04/02/24
23-1424 Reconstruction 0-032-017 04/23/24 DONE DONE DONE 01/25/24 01/25/24 06/21/23 05/09/23 8,9,16 600,000 600,000 MSK 0 0 0 Design Group Educ. Fac. Dept. 0 / / 01/25/24
JohnJamesAudubon #33 (see0-0187RecCt:
20-1182 Reconstruction 0-033-025 03/23/21 DONE DONE DONE 01/25/21 01/05/21 07/17/20 05/07/20 2,7,9,14,16 1,300,000 1,300,000 SLC 0 0 0 Design Group Educ. Fac. Dept. 0 / / 01/05/21
21-0670 Reconstruction 0-033-026 12/29/21 DONE DONE DONE 11/08/21 11/08/21 05/25/21 05/10/21 7,155,16 700,000 700,000 SLC 0 0 0 Design Group Educ. Fac. Dept. 0 / / 11/08/21
23-1761 Reconstruction 0-033-027 UNREVIEWED 04/05/24 04/02/24 01/30/23 06/23/22 16 0 0 MSK 0 0 0 Wendel Companies 0 / / 04/02/24
- Reconstruction 0-033-028 / / / / 06/21/23 / / 2,8,9,155,15,16 0 0 MSK 0 0 0 0 / / / /
#34 Dr. L.A.Cerulli K-6:
20-0955 Reconstruction 0-034-022 02/01/21 DONE DONE DONE 12/11/20 11/24/20 07/17/20 05/07/20 2,8,9,14,155,15,16 1,200,000 1,200,000 SLC 0 0 0 Design Group Educ. Fac. Dept. 0 11/13/23 11/24/20
23-1762 Reconstruction 0-034-023 UNREVIEWED 04/05/24 04/02/24 01/30/23 06/23/22 16 0 0 MSK 0 0 0 Wendel Companies 0 / / 04/02/24
23-1055 Reconstruction 0-034-024 02/06/24 DONE DONE DONE 11/28/23 11/22/23 06/21/23 05/09/23 2,4,7,8,9,16 3,800,000 3,800,000 MSK 0 0 0 Design Group Educ. Fac. Dept. 0 / / 11/22/23
#35 Pinnacle:
20-1053 Reconstruction 0-035-021 03/04/21 DONE DONE DONE 12/28/20 12/22/20 07/17/20 05/07/20 8,9,15,16 800,000 800,000 SLC 0 0 0 Design Group Educ. Fac. Dept. 0 07/27/23 12/22/20
22-1286 Reconstruction 0-035-022 01/09/23 DONE DONE DONE 12/19/22 11/21/22 06/06/22 05/10/22 2,8,15 600,000 600,000 SLC 0 0 0 Design Group Educ. Fac. Dept. 0 / / 11/21/22
23-1763 Reconstruction 0-035-023 UNREVIEWED 04/05/24 04/02/24 01/30/23 06/23/22 16 0 0 MSK 0 0 0 Wendel Companies 0 / / 04/02/24
#39 Andrew J. Townson:
20-1330 Reconstruction 0-039-022 04/13/21 DONE DONE DONE 02/19/21 02/12/21 07/17/20 05/07/20 2,8,9,155,15,16 3,000,000 3,000,000 SLC 0 0 0 Design Group Educ. Fac. Dept. 0 / / 02/12/21
22-1084 Reconstruction 0-039-023 02/17/23 DONE DONE DONE 11/29/22 11/21/22 06/06/22 05/10/22 2,9,155,16 1,000,000 1,000,000 SLC 0 0 0 Design Group Educ. Fac. Dept. 0 / / 11/21/22
23-1764 Reconstruction 0-039-024 UNREVIEWED 04/05/24 04/02/24 01/30/23 06/23/22 16 0 0 MSK 0 0 0 Wendel Companies 0 / / 04/02/24
23-0823 Reconstruction 0-039-025 01/22/24 DONE DONE DONE 10/27/23 10/25/23 06/21/23 05/09/23 2,8 500,000 500,000 MSK 0 0 0 Design Group Educ. Fac. Dept. 0 / / 10/25/23
Rise Community Sch#106 (frmr#41Kodak:
19-0434 Reconstruction 0-041-028 03/14/19 DONE DONE DONE 09/19/19 09/18/19 04/29/19 08/22/19 7,9,16 300,000 300,000 SLC 0 0 0 Design Group Educ. Fac. Dept. 0 06/05/19 09/18/19
19-1125 Reconstruction 0-041-029 03/19/20 DONE DONE DONE 01/02/20 12/11/19 07/15/19 05/07/19 7,9,155,15,16 1,000,000 1,000,000 SLC 0 0 0 Design Group Educ. Fac. Dept. 0 07/22/21 12/11/19
- Reconstruction 0-041-030 / / / / 12/12/23 / / 2,4,7,8,9,10,14,155, 0 0 MSK 0 0 0 0 / / / /
#42 Abelard Reynolds School:
20-0875 Reconstruction 0-042-018 03/08/21 DONE DONE DONE 11/20/20 11/13/20 07/17/20 05/07/20 2,8,9,155,15,16 2,900,000 2,900,000 SLC 0 0 0 Design Group Educ. Fac. Dept. 0 / / 11/13/20
23-1765 Reconstruction 0-042-019 UNREVIEWED 04/05/24 04/02/24 01/30/23 06/23/22 16 0 0 MSK 0 0 0 Wendel Companies 0 / / 04/02/24
All City High School (fmly Sch#43):
87-1154 Reconstruction 0-043-001 03/03/88 DONE DONE DONE / / / / / / / / 2,7,8,9,10,16 54,357 0 HJB 0 0 0 0 / / / /
22-1483 Reconstruction 0-043-021 04/13/23 DONE DONE DONE 01/13/23 01/12/23 06/06/22 05/10/22 2,7,9,155,15,16 500,000 0 SLC 0 0 0 Design Group Educ. Fac. Dept. 0 / / 01/12/23
#44 Lincoln Park K-6 -TempClosed2020:
19-0987XX Reconstruction 0-044-027 CANCELLED 12/12/19 11/27/19 07/15/19 05/07/19 2,8,9,14,155,15,16 0 9,404,976 SLC 0 0 0 Design Group Educ. Fac. Dept. 0 / / 11/27/19
- Reconstruction 0-044-028 / / / / 07/17/20 / / 2,8,9,13,155,15,16 0 0 SLC 0 0 0 0 / / / /
Schl w/o Walls Commencemt. Academy:
23-1766 Reconstruction 0-045-022 UNREVIEWED 04/05/24 04/02/24 01/30/23 06/23/22 16 0 0 MSK 0 0 0 Wendel Companies 0 / / 04/02/24
23-1046 Reconstruction 0-045-023 01/22/24 DONE DONE DONE 11/17/23 11/17/23 06/21/23 05/09/23 2,7,14,155,15,16 600,000 600,000 MSK 0 0 0 Design Group Educ. Fac. Dept. 0 / / 11/17/23
#46 Charles Carroll K-6:
19-0912 Reconstruction 0-046-025 02/18/20 DONE DONE DONE 12/03/19 11/20/19 07/15/19 05/07/19 2,8,9,14,155,15,16 1,600,000 1,600,000 SLC 0 0 0 Design Group Educ. Fac. Dept. 0 07/27/23 11/20/19
23-1767 Reconstruction 0-046-026 UNREVIEWED 04/05/24 04/02/24 01/30/23 06/23/22 16 0 0 MSK 0 0 0 Wendel Companies 0 / / 04/02/24
23-1032 Reconstruction 0-046-027 01/25/24 DONE DONE DONE 11/16/23 11/15/23 06/21/23 05/09/23 2,8,9,155,15,16 2,500,000 2,500,000 MSK 0 0 0 Design Group Educ. Fac. Dept. 0 / / 11/15/23
#50HB MontgomeryK-5(MaynardDemo2017):
23-1768 Reconstruction 0-050-023 UNREVIEWED 04/05/24 04/02/24 01/30/23 06/23/22 16 0 0 MSK 0 0 0 Wendel Companies 0 / / 04/02/24
#52 Frank Fowler Dow School:
23-1769 Reconstruction 0-052-024 UNREVIEWED 04/05/24 04/02/24 01/30/23 06/23/22 16 0 0 MSK 0 0 0 Wendel Companies 0 / / 04/02/24
Central Kitchen (fmly 7-081):
22-1288 Reconstruction 0-081-004 03/01/23 DONE DONE DONE 12/19/22 12/02/22 / / 05/10/22 1,800,000 1,800,000 SLC 0 0 0 Design Group Educ. Fac. Dept. 0 / / 12/02/22
#57 Early Childhood Ctr.-closed2020:
- XX Reconstruction 0-087-016 CANCELLED / / / / 07/15/19 / / 2,8,9,10,155,15,16 0 5,420,856 SLC 0 0 0 0 / / / /
- XX Reconstruction 0-087-017 CANCELLED / / / / 07/17/20 / / 9,155,15,16 0 5,420,856 SLC 0 0 0 0 / / / /
23-1770 Reconstruction 0-087-018 UNREVIEWED 04/05/24 04/02/24 01/30/23 06/23/22 16 0 5,420,856 MSK 0 0 0 Wendel Companies 0 / / 04/02/24
Franklin Educ Campus9-12:
19-0818 Reconstruction 0-101-038 12/10/19 DONE DONE DONE 11/18/19 11/18/19 / / 08/22/19 14,16 140,000 140,000 SLC 0 0 0 Design Group Educ. Fac. Dept. 0 06/09/21 11/18/19
21-0601 Reconstruction 0-101-039 12/29/21 DONE DONE DONE 10/29/21 10/28/21 05/25/21 05/10/21 2,4,7,8,16 1,809,047 1,809,047 SLC 0 0 0 Design Group Educ. Fac. Dept. 0 / / 10/28/21
- XX Reconstruction 0-101-040 CANCELLED / / / / 01/30/23 / / 0 0 SLC 0 0 0 0 / / / /
- Reconstruction 0-101-041 / / / / 12/12/23 / / 2,4,7,8,9,10,14,155, 0 0 MSK 0 0 0 0 / / / /
Charlotte High Sch(LdrshpAcadYngMen):
19-1305 Reconstruction 0-102-036 03/25/20 DONE DONE DONE 01/30/20 01/27/20 07/15/19 05/07/19 4,8,9 750,000 750,000 SLC 0 0 0 Design Group Educ. Fac. Dept. 0 12/23/21 01/27/20
21-0812 Reconstruction 0-102-037 02/17/22 DONE DONE DONE 11/30/21 11/30/21 05/25/21 05/10/21 2,8,16 5,893,909 5,893,909 SLC 0 0 0 Design Group Educ. Fac. Dept. 0 / / 11/30/21
22-1290 Reconstruction 0-102-038 03/08/23 DONE DONE DONE 12/19/22 12/08/22 06/06/22 05/10/22 2,155,16 3,000,000 3,000,000 SLC 0 0 0 Design Group Educ. Fac. Dept. 0 / / 12/08/22
23-1771 Reconstruction 0-102-039 UNREVIEWED 04/05/24 04/02/24 01/30/23 06/23/22 16 0 0 MSK 0 0 0 Wendel Companies 0 / / 04/02/24
23-1556 Reconstruction 0-102-040 UNREVIEWED 02/27/24 02/27/24 06/21/23 05/09/23 2,8,9,155,16 3,000,000 0 MSK 0 0 0 Design Group Educ. Fac. Dept. 0 / / 02/27/24
East Educ Campus (frmly East HS):
21-0813 Reconstruction 0-103-036 02/03/22 DONE DONE DONE 11/30/21 11/30/21 05/25/21 05/10/21 2,155,15,16 2,650,000 2,650,000 SLC 0 0 0 Design Group Educ. Fac. Dept. 0 / / 11/30/21
- PR Additions and Alterations 0-103-037 UNREVIEWED 12/29/22 12/29/22 06/13/22 / / 02 - 16 0 0 SLC 0 0 0 Popli Design Group 0 / / 12/29/22
22-1647 Additions and Alterations 0-103-037 03/20/23 DONE DONE DONE 02/09/23 12/29/22 06/13/22 05/10/22 02 - 16 3,600,000 2,500,000 SLC 0 0 0 Popli Design Group 0 / / 12/29/22
23-1772 Reconstruction 0-103-038 UNREVIEWED 04/05/24 04/02/24 01/30/23 06/23/22 0 0 MSK 0 0 0 Wendel Companies 0 / / 04/02/24
- Reconstruction 0-103-039 / / / / 12/12/23 / / 2,4,7,8,9,10,155,15, 0 0 MSK 0 0 0 0 / / / /
Jefferson Educational Campus 6-8:
20-0864 Reconstruction 0-105-035 02/01/21 DONE DONE DONE 11/20/20 11/13/20 07/17/20 05/07/20 2,7,8,155,15,16 1,900,000 1,900,000 SLC 0 0 0 Design Group Educ. Fac. Dept. 0 / / 11/13/20
23-1773 Reconstruction 0-105-036 UNREVIEWED 04/05/24 04/02/24 01/30/23 06/23/22 16 0 0 MSK 0 0 0 Wendel Companies 0 / / 04/02/24
Monroe High School #107:
23-1774 Reconstruction 0-107-031 UNREVIEWED 04/05/24 04/02/24 01/30/23 06/23/22 0 0 MSK 0 0 0 Wendel Companies 0 / / 04/02/24
23-1137 Reconstruction 0-107-032 02/22/24 DONE DONE DONE 12/06/23 12/06/23 06/21/23 05/09/23 2,8,9,155,15,16 1,000,000 1,000,000 MSK 0 0 0 Design Group Educ. Fac. Dept. 0 / / 12/06/23
Wilson Commencement Academy 9-12:
20-1609 Reconstruction 0-108-025 01/27/21 DONE DONE DONE 04/21/21 04/20/21 12/23/20 02/25/21 2 100,000 100,000 SLC 0 0 0 Design Group Educ. Fac. Dept. 0 01/21/21 04/20/21
21-0910 Reconstruction 0-108-026 02/17/22 DONE DONE DONE 12/17/21 12/16/21 05/25/21 05/10/21 2,4,7,9,155,15,16 2,800,000 2,800,000 SLC 0 0 0 Design Group Educ. Fac. Dept. 0 / / 12/16/21
- PR Additions and Alterations 0-108-027 / / / / 12/12/23 / / 02 - 16 0 0 MSK 0 0 0 0 / / / /
Douglass Educ Campus:
- Reconstruction 0-109-025 / / / / 12/12/23 / / 2,4,7,8,9,10,14,155, 0 0 MSK 0 0 0 0 / / / /
Marshall Educ Campus (formerly HS:
20-0693 Reconstruction 0-110-037 10/17/19 DONE DONE DONE 10/26/20 10/26/20 10/03/19 10/17/19 14,155,15,16 375,000 375,000 SLC 0 0 0 Design Group Educ. Fac. Dept. 0 06/09/21 10/26/20
21-0877 Reconstruction 0-110-038 02/12/22 DONE DONE DONE 12/10/21 12/09/21 10/19/21 12/23/21 2,9 300,000 300,000 SLC 0 0 0 Design Group Educ. Fac. Dept. 0 11/13/23 12/09/21
23-1707 Reconstruction 0-110-039 UNREVIEWED 03/29/24 03/29/24 01/23/23 05/09/23 2,8,9,155,15,16 4,500,000 0 MSK 0 0 0 Design Group Educ. Fac. Dept. 0 / / 03/29/24
- Reconstruction 0-110-040 / / / / 12/12/23 / / 2,4,7,8,9,10,14,155, 0 0 MSK 0 0 0 0 / / / /
Edison Career & Tech HS:
18-1983SR Reconstruction 0-111-032 06/04/19 DONE DONE DONE 05/20/19 05/17/19 / / 03/24/16 4,8,9,10,155,15,16 0 25,957,401 SLC 0 0 0 LaBella Associates P.C. 0 / / 05/17/19
18-2184SR Reconstruction 0-111-032 08/01/19 DONE DONE DONE / / / / 05/02/16 / / 2,7 0 0 SLC 0 0 0 LaBella Associates P.C. 0 / / / /
23-1775 Reconstruction 0-111-033 UNREVIEWED 04/05/24 04/02/24 01/30/23 06/23/22 0 0 MSK 0 0 0 Wendel Companies 0 / / 04/02/24
- Reconstruction 0-111-034 / / / / 12/12/23 / / 2,4,7,8,9,10,155,15, 0 0 MSK 0 0 0 0 / / / /
RochEarlyChldhdEdCtr(FrmlySchW/OWall:
19-1193 Reconstruction 0-121-009 03/16/20 DONE DONE DONE 01/10/20 01/02/20 09/11/19 05/07/19 2,8,9,10,155,15,16 1,800,000 1,800,000 SLC 0 0 0 Design Group Educ. Fac. Dept. 0 05/16/22 01/02/20
- XX Reconstruction 0-121-010 CANCELLED / / / / 05/04/21 / / 2,155,15,16 0 10,907,820 SLC 0 0 0 0 / / / /
23-1776 Reconstruction 0-121-011 UNREVIEWED 04/05/24 04/02/24 01/30/23 06/23/22 0 0 MSK 0 0 0 Wendel Companies 0 / / 04/02/24
Central Office:
19-1239 Reconstruction 1-053-016 02/27/20 DONE DONE DONE 01/17/20 12/11/19 07/16/19 05/07/19 14,155,16 2,000,000 0 SLC 0 0 0 Design Group Educ. Fac. Dept. 0 / / 12/11/19
22-1637FC Reconstruction 1-053-017 02/28/23 DONE DONE DONE 02/08/23 12/08/22 06/06/22 05/10/22 2,4,8,9,155,15,16 2,400,000 0 SLC 0 0 0 Design Group Educ. Fac. Dept. 0 / / 12/08/22
23-1777 Reconstruction 1-053-018 UNREVIEWED 04/05/24 04/02/24 01/30/23 06/23/22 16 0 0 MSK 0 0 0 Wendel Companies 0 / / 04/02/24
Service Center Bldgs #1 (Transp?):
19-1495 Reconstruction 5-078-111 04/29/20 DONE DONE DONE 02/28/20 02/24/20 10/10/18 05/07/19 14,16 810,000 810,000 SLC 0 0 0 Design Group Educ. Fac. Dept. 0 06/17/21 02/24/20
Service Center (fmly Cen Ktch 0-81):
- XX Reconstruction 7-081-003 CANCELLED 12/19/22 12/02/22 06/06/22 05/10/22 2,7,16 0 0 SLC 0 0 0 Design Group Educ. Fac. Dept. 0 / / 12/02/22
Press Box Charlotte Campus:
21-0814 New Construction 7-194-001 02/17/22 DONE DONE DONE 11/30/21 11/30/21 07/16/19 05/10/21 02 - 16 200,000 0 SLC 0 0 0 Design Group Educ. Fac. Dept. 0 / / 11/30/21
XXPress Box Wilson Foundation:
- XX New Construction 7-195-001 CANCELLED / / / / 07/16/19 / / 02 - 16 0 0 SLC 0 0 0 0 / / / /
Guard Booth @ Service Center:
- New Construction 7-196-001 / / / / / / / / 02 - 16 0 0 SLC 0 0 0 0 / / / /
Edison Technology:
23-1620 Reconstruction 7-197-001 UNREVIEWED 03/13/24 03/13/24 02/14/23 06/29/23 7,13,16 30,000 0 MSK 0 0 0 Design Group Educ. Fac. Dept. 0 / / 03/13/24
District-Wide:
20-0270 Reconstruction 7-999-021 10/16/20 DONE DONE DONE 08/26/20 08/13/20 / / 10/27/16 13,16 348,440 0 SLC 0 0 0 Design Group Educ. Fac. Dept. 0 / / 08/13/20
20-1249 Reconstruction 7-999-025 04/05/21 DONE DONE DONE 02/05/21 01/25/21 07/17/20 05/07/20 16 1,200,000 1,200,000 SLC 0 0 0 Design Group Educ. Fac. Dept. 0 06/29/23 01/25/21
23-1863 Reconstruction 7-999-026 UNREVIEWED 04/18/24 04/18/24 05/11/23 11/30/23 0 0 MSK 0 0 0 Design Group Educ. Fac. Dept. 0 / / 04/18/24
23-1197 Reconstruction 7-999-027 02/15/24 DONE DONE DONE 12/15/23 12/14/23 06/21/23 05/09/23 1,600,000 1,600,000 MSK 0 0 0 Design Group Educ. Fac. Dept. 0 / / 12/14/23
Renaissance Acad. Chart Schl of Arts:
21-0361FA Reconstruction 0-067-004 01/21/22 DONE DONE DONE 09/15/21 09/13/21 06/21/21 06/16/21 8,9,155,16 46,715 0 SLC 0 0 0 Bergmann Associates 0 / / 09/13/21
22-0068FA Reconstruction 0-067-005 11/29/22 DONE DONE DONE 07/11/22 07/11/22 01/11/22 06/15/22 2,4,8,9,155,15,16 555,143 0 SLC 0 0 0 Bergmann Associates 0 / / 07/11/22
Exploration Charter Schl for Sci&Tec:
23-1415DB Discovered Building 0-001-001 UNREVIEWED 01/25/24 01/24/24 04/05/23 / / 10 0 0 MSK 0 0 0 0 / / 01/24/24
Academy Health Science Charter Schoo:
23-0209DB Discovered Building 0-002-001 02/26/24 DONE DONE DONE 08/07/23 08/07/23 07/20/23 / / 02 - 16 0 0 MSK 0 0 0 0 / / 08/07/23
Academy of Health Sciences Charter:
18-1845TQ Temporary Quarters 8-001-001 07/10/19 DONE DONE DONE 04/12/19 04/12/19 03/22/19 / / 0 0 SLC 0 0 0 0 / / 04/12/19
19-1853TQ Temporary Quarters 8-001-002 08/06/20 DONE DONE DONE 06/17/20 06/15/20 05/07/20 / / 13 0 0 SLC 0 0 0 0 / / 06/15/20
20-1568TQ Temporary Quarters 8-001-003 06/01/21 DONE DONE DONE 04/07/21 04/07/21 02/09/21 / / 0 0 SLC 0 0 0 0 / / 04/07/21
CSA Rochester Charter School:
21-1382TQ Temporary Quarters 8-001-001 08/25/22 DONE DONE DONE 02/28/22 02/14/22 04/25/22 / / 02 - 16 0 0 SLC 0 0 0 0 / / 02/14/22
Rochester Acad of Sci Chr @ Humboldt:
21-1519 New Construction 0-001-001 04/29/22 DONE DONE DONE 03/15/22 03/08/22 01/14/22 07/28/21 02 - 16 1,388,000 0 SLC 0 0 0 Bergmann Associates 0 / / 03/08/22
22-0228 Reconstruction 0-001-002 11/28/22 DONE DONE DONE 08/03/22 08/03/22 05/17/22 07/27/22 2,4,7,8,9,10,14,155, 1,109,040 0 SLC 0 0 0 Bergmann Associates 0 / / 08/03/22
- XX Reconstruction 0-001-100 CANCELLED 02/28/22 02/14/22 12/10/21 / / 0 0 SLC 0 0 0 0 / / 02/14/22
Rochester Acad of Sci Chr @Floverton:
21-1520 Alterations 0-002-001 04/29/22 DONE DONE DONE 03/15/22 03/08/22 01/26/22 07/28/21 02 - 16 1,173,000 0 SLC 0 0 0 Bergmann Associates 0 06/09/22 03/08/22
GeneseeCommChrtrFlourCityStrong Hall:
22-0227TQ Temporary Quarters 8-001-001 12/29/22 DONE DONE DONE 08/03/22 / / 06/02/22 / / 0 0 SLC 0 0 0 0 / / / /
- TQ Temporary Quarters 8-001-002 / / / / 03/21/23 / / 0 0 JJH 0 0 0 0 / / / /
23-0110 Reconstruction 8-001-003 ADDENDUM REQ'D 07/19/23 06/15/23 04/10/23 / / 8,9,155,15,16 0 0 MSK 0 0 0 0 / / 06/15/23
True North Rochester Prep Chartr Sch:
- XX Reconstruction 0-001-001 CANCELLED / / / / 10/04/22 / / 2,8 0 0 SLC 0 0 0 0 / / / /
True North Rochester Prep Cha:
- XX Reconstruction 8-001-001 CANCELLED / / / / 10/04/22 / / 0 0 SLC 0 0 0 0 / / / /
- Reconstruction 8-001-002 / / / / 04/19/23 / / 2,8 0 0 JLB 0 0 0 0 / / / /
Innova Girls Academy Charter School:
22-1723TQ Temporary Quarters 8-001-001 11/17/23 DONE DONE DONE 02/22/23 02/21/23 12/12/22 / / 0 0 MSK 0 0 0 0 / / 02/21/23
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
BROCKPORT CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 26-18-01-06
last updated on 04/25/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Oliver Middle School:
20-1400 Reconstruction 0-001-021 03/29/21 DONE DONE DONE 03/09/21 03/05/21 01/19/21 06/09/20 2,7,9 100,000 100,000 JLB 0 0 0 LaBella Associates P.C. 0 04/29/22 03/05/21
21-0874 Reconstruction 0-001-022 01/13/22 DONE DONE DONE 12/08/21 12/08/21 10/14/21 06/09/20 2,7,9 100,000 100,000 JLB 0 0 0 LaBella Associates P.C. 0 01/03/23 12/08/21
22-0437 Reconstruction 0-001-023 01/05/23 DONE DONE DONE 09/08/22 09/08/22 06/27/22 12/14/21 2,7,8,9,14,155,15,16 2,011,533 2,011,533 JLB 0 0 0 LaBella Associates P.C. 0 / / 09/08/22
22-0442 Reconstruction 0-001-024 12/01/22 DONE DONE DONE 09/08/22 09/08/22 08/29/22 05/17/22 4,7 100,000 100,000 JJH 0 0 0 LaBella Associates P.C. 0 / / 09/08/22
23-0219 Reconstruction 0-001-025 09/13/23 DONE DONE DONE 08/09/23 08/08/23 05/26/23 05/16/23 2,7,8,9,10,14,155,15 100,000 100,000 JJH 0 0 0 LaBella Associates P.C. 0 / / 08/08/23
- Reconstruction 0-001-026 / / / / 03/19/24 / / 2,4,7,8,9,155,15,16 0 0 JJH 0 0 0 0 / / / /
- Reconstruction 0-001-027 / / / / 03/19/24 / / 2,7,155,15,16 0 0 JJH 0 0 0 0 / / / /
E. Barclay Elementary:
19-1540 Reconstruction 0-002-019 06/15/20 DONE DONE DONE 03/05/20 02/26/20 08/06/19 05/16/17 2,4,7,8,9,155,15,16 658,104 658,104 JLB 0 0 0 LaBella Associates P.C. 0 04/21/21 02/26/20
19-1541 Reconstruction 0-002-020 05/25/20 DONE DONE DONE 03/05/20 02/26/20 08/06/19 06/18/19 2,7,155,15,16 100,000 100,000 JLB 0 0 0 LaBella Associates P.C. 0 04/21/21 02/26/20
22-0438 Reconstruction 0-002-021 01/05/23 DONE DONE DONE 09/08/22 09/08/22 06/27/22 12/14/21 2,7,9,155,15,16 666,409 666,409 JLB 0 0 0 LaBella Associates P.C. 0 / / 09/08/22
- Reconstruction 0-002-022 / / / / 03/19/24 / / 2,16 0 0 JJH 0 0 0 0 / / / /
- Reconstruction 0-002-023 / / / / 03/19/24 / / 2,4,8,9,155,15,16 0 0 JJH 0 0 0 0 / / / /
J. Ginther Elementary:
22-0439 Reconstruction 0-004-016 01/05/23 DONE DONE DONE 09/08/22 09/08/22 06/27/22 12/14/21 2,4,7,8,9,10,155,15, 3,796,794 3,796,794 JLB 0 0 0 LaBella Associates P.C. 0 / / 09/08/22
- Reconstruction 0-004-017 / / / / 03/19/24 / / 2,4,7,8,9,155,15,16 0 0 JJH 0 0 0 0 / / / /
Senior High School:
22-0440 Reconstruction 0-007-032 01/05/23 DONE DONE DONE 09/08/22 09/08/22 06/27/22 12/14/21 2,4,7,14,155,15,16 2,527,095 2,527,095 JLB 0 0 0 LaBella Associates P.C. 0 / / 09/08/22
- Reconstruction 0-007-033 / / / / 03/19/24 / / 2,4,7,8,9,155,15,16 0 0 JJH 0 0 0 0 / / / /
- Reconstruction 0-007-034 / / / / 03/19/24 / / 2,4,7,8,9,155,15,16 0 0 JJH 0 0 0 0 / / / /
Fred Hill Elementary School:
22-0441 Reconstruction 0-010-019 01/05/23 DONE DONE DONE 09/08/22 09/08/22 06/27/22 12/14/21 4,7,9,155,15,16 1,561,748 1,561,748 JLB 0 0 0 LaBella Associates P.C. 0 / / 09/08/22
- Reconstruction 0-010-020 / / / / 03/19/24 / / 2,4,7,8,9,155,15,16 0 0 JJH 0 0 0 0 / / / /
Bus Garage(see 1-003):
- Reconstruction 5-003-011 / / / / 09/22/22 / / 14,16 0 0 JLB 0 0 0 0 / / / /
Transporation Facility:
22-2350 Reconstruction 5-016-002 09/06/22 DONE DONE DONE 06/09/23 06/08/23 03/02/23 09/06/22 14 500,000 500,000 JJH 0 0 0 LaBella Associates P.C. 0 / / 06/08/23
- Reconstruction 5-016-003 / / / / 03/19/24 / / 2,4,7,9,16 0 0 JJH 0 0 0 0 / / / /
Temporary Tent:
- XX Alterations 8-018-001 CANCELLED / / / / 04/27/21 / / 0 0 JLB 0 0 0 0 / / / /
Temporary Classrooms:
- SS New Construction 8-019-001 / / / / 06/27/22 / / 02 - 16 0 0 JLB 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
WEBSTER CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 26-19-01-06
last updated on 04/25/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Spry MS 6-8 (was7-9):
21-0226 Reconstruction 0-001-016 10/08/21 DONE DONE DONE 08/26/21 08/24/21 04/27/21 08/02/21 2,4,8,9,155,15,16 137,307 137,307 SLC 0 0 0 LaBella Associates P.C. 0 / / 08/24/21
22-0250 Reconstruction 0-001-017 03/14/23 DONE DONE DONE 08/15/22 08/09/22 04/27/22 12/11/18 2,4,8 897,073 897,073 WLC 0 0 0 LaBella Associates P.C. 0 / / 08/09/22
- Reconstruction 0-001-018 / / / / 02/27/24 / / 2,4,8,9,14,155,15,16 0 0 WLC 0 0 0 0 / / / /
Klem Road North Elementary:
19-1061 Reconstruction 0-003-013 06/03/20 DONE DONE DONE 12/26/19 12/10/19 01/17/19 12/11/18 2,4,8,9,155,15,16 4,000,000 4,000,000 SLC 0 0 0 LaBella Associates P.C. 0 11/01/22 12/10/19
20-1902 Reconstruction 0-003-014 07/19/21 DONE DONE DONE 06/18/21 06/15/21 03/02/21 05/18/21 2,7 100,000 100,000 SLC 0 0 0 LaBella Associates P.C. 0 05/30/22 06/15/21
23-0914 Reconstruction 0-003-015 UNREVIEWED 11/08/23 11/06/23 10/13/23 10/11/23 7 0 0 WLC 0 0 0 LaBella Associates P.C. 0 / / 11/06/23
- Reconstruction 0-003-016 / / / / 02/27/24 / / 2,4,8,9,14,155,15,16 0 0 WLC 0 0 0 0 / / / /
Plank Road North Elementary:
19-1062 Reconstruction 0-009-016 06/03/20 DONE DONE DONE 06/03/20 12/10/19 01/17/19 12/11/18 2,4,8,9,155,15,16 3,400,000 3,400,000 SLC 0 0 0 LaBella Associates P.C. 0 11/01/22 12/10/19
23-0915 Reconstruction 0-009-017 UNREVIEWED 11/08/23 11/06/23 10/13/23 10/11/23 7 0 0 WLC 0 0 0 LaBella Associates P.C. 0 / / 11/06/23
- Reconstruction 0-009-018 / / / / 02/27/24 / / 2,4,8,9,155,15,16 0 0 WLC 0 0 0 0 / / / /
Dewitt Road Elementary:
19-1063 Reconstruction 0-010-012 06/03/20 DONE DONE DONE 12/26/19 12/10/19 01/17/19 12/11/18 2,4,8,9,155,15,16 2,700,000 2,700,000 SLC 0 0 0 LaBella Associates P.C. 0 11/01/22 12/10/19
- Reconstruction 0-010-013 / / / / 02/27/24 / / 2,4,8,9,14,155,15,16 0 0 WLC 0 0 0 0 / / / /
R L Thomas HS 9-12:
19-0127PR Reconstruction 0-011-027 STARTED 07/19/19 / / 01/17/19 / / 2,4,7,8,9,155,15,16 0 0 SLC 0 0 0 0 / / / /
19-0728 Reconstruction 0-011-027 05/08/20 DONE DONE DONE 11/06/19 10/03/19 01/17/19 12/11/18 2,4,7,8,9,155,15,16 13,508,074 12,798,168 SLC 0 0 0 LaBella Associates P.C. 0 09/15/21 10/03/19
21-0182 Reconstruction 0-011-028 12/02/21 DONE DONE DONE 08/16/21 08/13/21 07/27/21 12/11/18 2,7,8,9,15,16 784,900 784,900 SLC 0 0 0 LaBella Associates P.C. 0 / / 08/13/21
21-0635 Reconstruction 0-011-029 05/05/22 DONE DONE DONE 11/03/21 11/02/21 09/13/21 12/11/18 2,16 784,900 784,900 FMJ 0 0 0 LaBella Associates P.C. 0 / / 11/02/21
22-0251 Reconstruction 0-011-030 03/14/23 DONE DONE DONE 08/15/22 08/09/22 03/23/22 12/11/18 10 2,937,113 2,937,113 WLC 0 0 0 LaBella Associates P.C. 0 / / 08/09/22
- Reconstruction 0-011-031 / / / / 03/24/22 / / 0 0 SLC 0 0 0 0 / / / /
22-0499XX Additions and Alterations 0-011-032 CANCELLED 09/16/22 / / 07/28/22 / / 02 - 16 0 0 WLC 0 0 0 0 / / / /
- Reconstruction 0-011-033 / / / / 02/27/24 / / 2,8,9,155,15,16 0 0 WLC 0 0 0 0 / / / /
State Road Elementary:
19-1064 Reconstruction 0-012-014 06/03/20 DONE DONE DONE 12/26/19 12/10/19 / / 12/11/18 2,4,8,9,155,15,16 2,700,000 2,700,000 SLC 0 0 0 LaBella Associates P.C. 0 11/01/22 12/10/19
23-0327 Reconstruction 0-012-015 12/04/23 DONE DONE DONE 08/25/23 08/25/23 06/22/23 05/16/23 7 100,000 100,000 WLC 0 0 0 LaBella Associates P.C. 0 / / 08/25/23
23-0916 Reconstruction 0-012-016 UNREVIEWED 11/08/23 11/06/23 10/13/23 10/11/23 7 0 0 WLC 0 0 0 LaBella Associates P.C. 0 / / 11/06/23
- Reconstruction 0-012-017 / / / / 02/27/24 / / 2,4,8,9,14,155,15,16 0 0 WLC 0 0 0 0 / / / /
Schroeder HS 10-12:
19-0039 Reconstruction 0-013-026 08/15/19 DONE DONE DONE 07/09/19 06/28/19 01/17/19 05/21/19 16 100,000 100,000 SLC 0 0 0 LaBella Associates P.C. 0 05/29/20 06/28/19
19-0226 Reconstruction 0-013-027 11/27/19 DONE DONE DONE 08/08/19 08/05/19 01/31/19 12/11/18 2,4,7,8,9,155,15,16 5,677,000 5,677,000 SLC 0 0 0 LaBella Associates P.C. 0 08/29/21 08/05/19
19-1065 Reconstruction 0-013-028 06/03/20 DONE DONE DONE 06/03/20 12/10/19 10/30/19 12/11/18 2,4,7,8,9,155,15,16 10,854,372 10,854,372 SLC 0 0 0 LaBella Associates P.C. 0 / / 12/10/19
20-0025 Reconstruction 0-013-029 09/06/20 DONE DONE DONE 07/07/20 06/23/20 03/18/20 06/16/20 2,9,16 100,000 0 SLC 0 0 0 LaBella Associates P.C. 0 / / 06/23/20
21-0183 Reconstruction 0-013-030 12/02/21 DONE DONE DONE 08/16/21 08/13/21 06/07/21 12/11/18 16 248,070 248,070 SLC 0 0 0 LaBella Associates P.C. 0 / / 08/13/21
21-0636 Reconstruction 0-013-031 05/05/22 DONE DONE DONE 11/03/21 11/02/21 09/13/21 12/11/18 2,16 4,140,000 4,140,000 FMJ 0 0 0 LaBella Associates P.C. 0 / / 11/02/21
22-0252 Reconstruction 0-013-032 03/14/23 DONE DONE DONE 08/15/22 08/09/22 03/23/22 12/11/18 4,8,9,155,15,16 6,039,105 6,039,105 WLC 0 0 0 LaBella Associates P.C. 0 / / 08/09/22
21-2000 Reconstruction 0-013-033 08/03/22 DONE DONE DONE 06/17/22 06/17/22 03/24/22 05/17/22 4,8,9,155,15,16 100,000 100,000 WLC 0 0 0 LaBella Associates P.C. 0 06/20/23 06/17/22
23-0353 Reconstruction 0-013-034 09/14/23 DONE DONE DONE 08/30/23 08/30/23 06/05/23 06/13/23 4,8,9,10,13,155,16 400,000 400,000 WLC 0 0 0 LaBella Associates P.C. 0 / / 08/30/23
23-1056 Reconstruction 0-013-035 UNREVIEWED 11/28/23 11/22/23 10/13/23 10/11/23 2,9,155,16 0 0 WLC 0 0 0 LaBella Associates P.C. 0 / / 11/22/23
- Reconstruction 0-013-036 / / / / 02/27/24 / / 2,4,8,9,14,155,15,16 0 0 WLC 0 0 0 0 / / / /
Plank Road South Elementary:
19-1066 Reconstruction 0-016-011 06/03/20 DONE DONE DONE 12/26/19 12/10/19 01/17/19 12/11/18 2,4,8,9,155,15,16 3,400,000 3,400,000 SLC 0 0 0 LaBella Associates P.C. 0 11/01/22 12/10/19
- Reconstruction 0-016-012 / / / / 02/27/24 / / 2,4,8,9,155,15,16 0 0 WLC 0 0 0 0 / / / /
23-1671 Reconstruction 0-016-013 UNREVIEWED 03/25/24 03/25/24 02/27/24 10/11/23 2,4,8,9,13,155,15,16 0 0 WLC 0 0 0 LaBella Associates P.C. 0 / / 03/25/24
Klem Road South Elementary:
19-1067 Reconstruction 0-017-011 06/03/20 DONE DONE DONE 12/26/19 12/10/19 01/17/19 12/11/18 2,4,8,9,155,15,16 2,700,000 2,700,000 SLC 0 0 0 LaBella Associates P.C. 0 11/01/22 12/10/19
- Reconstruction 0-017-012 / / / / 02/27/24 / / 2,4,8,9,155,15,16 0 0 WLC 0 0 0 0 / / / /
23-1672 Reconstruction 0-017-013 UNREVIEWED 03/25/24 03/25/24 02/27/24 10/11/23 2,4,8,9,13,155,15,16 0 0 WLC 0 0 0 LaBella Associates P.C. 0 / / 03/25/24
Schlegel Road Elementary:
19-1068 Reconstruction 0-018-010 06/03/20 DONE DONE DONE 12/26/19 12/10/19 01/17/19 12/11/18 2,4,8,9,155,15,16 4,000,000 3,725,356 SLC 0 0 0 LaBella Associates P.C. 0 11/01/22 12/10/19
22-0500XX Additions and Alterations 0-018-011 CANCELLED 09/16/22 / / 07/28/22 / / 02 - 16 0 0 WLC 0 0 0 0 / / / /
- Reconstruction 0-018-012 / / / / 02/27/24 / / 2,4,8,9,155,15,16 0 0 WLC 0 0 0 0 / / / /
23-1673 Reconstruction 0-018-013 UNREVIEWED 03/25/24 03/25/24 02/27/24 10/11/23 2,4,8,9,13,155,15,16 0 0 WLC 0 0 0 LaBella Associates P.C. 0 / / 03/25/24
Willink Middle School:
19-1069 Reconstruction 0-026-004 06/03/20 DONE DONE DONE 12/26/19 12/10/19 01/17/19 12/11/18 2,4,8,9,15,16 5,615,000 5,615,000 SLC 0 0 0 LaBella Associates P.C. 0 / / 12/10/19
22-0253 Reconstruction 0-026-005 03/14/23 DONE DONE DONE 08/15/22 08/09/22 04/27/22 12/11/18 2 586,489 586,489 WLC 0 0 0 LaBella Associates P.C. 0 / / 08/09/22
22-0501PR Additions and Alterations 0-026-006 UNREVIEWED 01/03/24 01/03/24 07/28/22 / / 02 - 16 0 0 WLC 0 0 0 0 / / 01/03/24
- PR Additions and Alterations 0-026-007 / / / / 02/27/24 / / 02 - 16 0 0 WLC 0 0 0 0 / / / /
Thomas Athletic Pole Barn:
- PR New Construction 2-046-001 DONE / / / / 09/26/19 / / 02 - 16 0 0 SLC 0 0 0 0 / / / /
19-0729 New Construction 2-046-001 05/08/20 DONE DONE DONE 11/06/19 10/03/19 09/26/19 12/11/18 02 - 16 150,000 0 SLC 0 0 0 LaBella Associates P.C. 0 09/15/21 10/03/19
Webster Bus Garage:
19-1024 Additions and Alterations 5-028-007 04/19/21 DONE DONE DONE 12/18/19 12/10/19 01/17/19 12/11/18 02 - 16 7,900,000 7,900,000 SLC 0 0 0 LaBella Associates P.C. 0 / / 12/10/19
- Reconstruction 5-028-008 / / / / 03/02/21 / / 2 0 0 SLC 0 0 0 0 / / / /
Schroeder Pole Barn:
- PR New Construction 7-044-001 / / / / 07/17/19 / / 02 - 16 0 0 SLC 0 0 0 0 / / / /
19-0227 New Construction 7-044-001 11/27/19 DONE DONE DONE 08/08/19 08/05/19 07/17/19 12/11/18 02 - 16 193,000 0 SLC 0 0 0 LaBella Associates P.C. 0 08/31/22 08/05/19
XXThomas Pole Barn:
- DB Discovered Building 7-045-001 / / / / 07/17/19 / / 0 0 SLC 0 0 0 0 / / / /
Schroeder Press Box:
19-0839 New Construction 7-047-001 11/27/19 DONE DONE DONE 11/20/19 11/18/19 11/01/19 12/11/18 02 - 16 53,000 0 SLC 0 0 0 LaBella Associates P.C. 0 08/31/22 11/18/19
Schroeder Stadium Press Box:
- DB Discovered Building 7-048-001 / / / / 10/26/20 / / 0 0 SLC 0 0 0 0 / / / /
Willink Pole Barn:
- DB Discovered Building 7-049-001 / / / / 10/26/20 / / 0 0 SLC 0 0 0 0 / / / /
Willink Pole Barn 2024:
- New Construction 7-050-001 / / / / 02/27/24 / / 02 - 16 0 0 WLC 0 0 0 0 / / / /
Spry Pole Barn:
- New Construction 7-051-001 / / / / 02/27/24 / / 02 - 16 0 0 WLC 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED