Construction Project Status

Construction Project Status

THE STATE EDUCATION DEPARTMENT

FACILITIES PLANNING


UPDATED: 04/25/24 at 06:56:35




CANANDAIGUA CITY SCHOOLS STATUS REPORT ON CAPITAL PROJECTS
District No.: 43-03-00-05
last updated on 04/25/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Primary School:
  -    PR Additions and Alterations    0-004-022                                              /  /       /  /     03/13/20     /  /     02 - 16                        0             0  JSS             0           0           0                                         0        /  /                           /  /             
20-0906   Additions and Alterations    0-004-022  02/26/21     DONE    DONE       DONE      12/01/20   11/19/20   03/13/20   06/17/20   02 - 16               32,415,000    32,415,000  JSS             0           0           0 LaBella Associates P.C.                 0      09/13/22           YES         11/19/20           
20-0019   Reconstruction               0-004-023  08/26/20     DONE    DONE       DONE      07/02/20   06/23/20   03/13/20   06/09/20   8                        100,000       100,000  JSS             0           0           0 LaBella Associates P.C.                 0      04/13/21                       06/23/20           

          Canandaigua Middle School:
18-2002   Reconstruction               0-007-024  06/26/19     DONE    DONE       DONE      05/23/19   05/07/19   03/25/19   05/21/19   8,155,16                 100,000       100,000  JLB             0           0           0 SEI Design Group                        0      01/10/20                       05/07/19           
20-0907   Reconstruction               0-007-025  02/26/21     DONE    DONE       DONE      12/01/20   11/19/20   03/13/20   06/17/20   2,4,7,8,9,10,155,15,   9,840,000     9,840,000  JSS             0           0           0 LaBella Associates P.C.                 0      09/13/22           YES         11/19/20           
21-0248   Reconstruction               0-007-026  11/08/21     DONE    DONE       DONE      08/30/21   08/27/21   03/12/21   06/09/20   2,4,7,8,9,155,15,16   11,400,000             0  JLB             0           0           0 LaBella Associates P.C.                 0        /  /                         08/27/21           

          Canandaigua Academy - SHS:
21-0249   Reconstruction               0-013-028  11/08/21     DONE    DONE       DONE      08/30/21   08/27/21   03/13/20   06/09/20   2,8,9,155,15,16       13,270,000             0  JLB             0           0           0 LaBella Associates P.C.                 0        /  /                         08/27/21           
20-1580   Reconstruction               0-013-029  05/27/21     DONE    DONE       DONE      04/13/21   04/07/21   03/03/21   05/18/21   155,16                   100,000       100,000  JSS             0           0           0 LaBella Associates P.C.                 0      02/21/22                       04/07/21           
21-1713   Reconstruction               0-013-030  08/11/22     DONE    DONE       DONE      04/27/22   04/22/22   04/20/22   05/17/22   155,16                   100,000       100,000  WLC             0           0           0 LaBella Associates P.C.                 0      06/15/23                       04/22/22           
22-1485   Reconstruction               0-013-031  01/24/23     DONE    DONE       DONE      01/13/23   01/13/23   12/07/22   12/12/22   4,8,9,10,155,16        1,000,000     1,000,000  WLC             0           0           0 LaBella Associates P.C.                 0        /  /                         01/13/23           
23-0174   Reconstruction               0-013-032  08/28/23     DONE    DONE       DONE      08/01/23   07/28/23   06/26/23   05/17/23   9,155,16                 100,000       100,000  WLC             0           0           0 LaBella Associates P.C.                 0        /  /                         07/28/23           

          Academic & Career Cntr (fmly #8-027):
21-0250   Reconstruction               0-027-003  11/08/21     DONE    DONE       DONE      08/30/21   08/27/21   03/13/20   06/09/20   2,8,9,15,16              560,000       560,000  JLB             0           0           0 LaBella Associates P.C.                 0      01/19/23                       08/27/21           

          Storage Facility (New):
20-0017   New Construction             2-028-001  08/31/20     DONE    DONE       DONE      07/02/20   06/23/20   03/13/20   06/09/20   02 - 16                  700,000             0  JSS             0           0           0 LaBella Associates P.C.                 0      05/17/21                       06/23/20           

          Bus Garage (now Admin):
18-2035   Reconstruction               5-001-007  08/02/19     DONE    DONE       DONE      05/31/19   05/28/19   03/25/19   05/21/19   9,155,16                 600,000       600,000  JLB             0           0           0 SEI Design Group                        0      01/03/20                       05/28/19           
21-0251   Reconstruction               5-001-008  11/08/21     DONE    DONE       DONE      08/30/21   08/27/21   03/13/20   06/09/20   2,4,8,9,155,16           545,000       545,000  JLB             0           0           0 LaBella Associates P.C.                 0      09/19/23                       08/27/21           

          Transportation Facility:
20-0908   Reconstruction               5-021-004  02/26/21     DONE    DONE       DONE      12/01/20   11/19/20   03/13/20   06/17/20   10,155,15,16             330,000       330,000  JSS             0           0           0 LaBella Associates P.C.                 0      05/17/22                       11/19/20           
21-0252   Reconstruction               5-021-005  11/08/21     DONE    DONE       DONE      08/30/21   08/27/21   05/25/21   06/09/20   8,155                     63,000        63,000  JLB             0           0           0 LaBella Associates P.C.                 0      05/10/23                       08/27/21           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




EAST BLOOMFIELD CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 43-05-01-04
last updated on 04/25/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Jr. Sr. High School:
18-1652   Reconstruction               0-001-019  04/29/19     DONE    DONE       DONE      03/15/19   03/07/19   11/07/18   02/27/19   16                       500,000       500,000  MTM             0           0           0 SWBR Architects P.C.                    0      10/18/19                       03/07/19           
20-0130   Reconstruction               0-001-020  10/16/20     DONE    DONE       DONE      07/29/20   07/17/20   12/10/19   10/22/19   2,4,8,9,10,155,15,16   4,985,305     4,985,305  JLB             0           0           0 SWBR Architects P.C.                    0      09/01/22                       07/17/20           
20-1121   Reconstruction               0-001-021  05/12/21     DONE    DONE       DONE      01/11/21   12/09/20   05/28/20   10/22/19   2,15,16                  928,470       928,470  JLB             0           0           0 SWBR Architects P.C.                    0      09/01/22                       12/09/20           
20-1225   Reconstruction               0-001-022  07/09/21     DONE    DONE       DONE      02/01/21   01/29/21   08/07/20   10/07/20   155,16                 1,143,546     1,143,546  JLB             0           0           0 SWBR Architects P.C.            1,143,546      12/01/22                       01/29/21           
21-1133   Reconstruction               0-001-023  02/18/22     DONE    DONE       DONE      01/14/22   01/13/22   10/13/21   10/20/21   9                        600,000       600,000  JLB             0           0           0 SWBR Architects P.C.                    0        /  /                         01/13/22           
  -       Reconstruction               0-001-024                                              /  /       /  /     02/14/24     /  /     9,14,16                        0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Elementary School:
20-0131   Reconstruction               0-006-019  10/16/20     DONE    DONE       DONE      07/29/20   07/17/20   12/10/19   10/22/19   2,4,8,9,10,155,15,16   2,076,373     2,076,373  JLB             0           0           0 SWBR Architects P.C.                    0      09/01/21                       07/17/20           
20-1122   Reconstruction               0-006-020  05/12/21     DONE    DONE       DONE      01/11/21   01/08/21   05/28/20   10/22/19   2,15,16                1,988,997     1,988,997  JLB             0           0           0 SWBR Architects P.C.                    0      09/01/22                       01/08/21           
20-1226   Reconstruction               0-006-021  07/09/21     DONE    DONE       DONE      02/01/21   01/29/21   08/07/20   10/07/20   16                       453,354       453,354  JLB             0           0           0 SWBR Architects P.C.              453,354      12/01/22                       01/29/21           
  -       Reconstruction               0-006-022                                              /  /       /  /     02/14/24     /  /     9,14,16                        0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Storage/Toilet Building:
20-1123   New Construction             2-015-001  05/12/21     DONE    DONE       DONE      01/11/21   01/08/21   12/10/19   10/22/19   02 - 16                  198,879             0  JLB             0           0           0 SWBR Architects P.C.                    0      09/01/22                       01/08/21           

          Bus Garage/Admin.:
20-0132   Reconstruction               5-002-015  10/16/20     DONE    DONE       DONE      07/29/20   07/17/20   12/10/19   10/22/19   2,4,8,9,10,155,15,16   1,152,608     1,152,608  JLB             0           0           0 SWBR Architects P.C.                    0      09/01/21                       07/17/20           
20-1227   Reconstruction               5-002-016  07/09/21     DONE    DONE       DONE      02/01/21   01/29/21   08/07/20   10/07/20   155,16                   100,818       100,818  JLB             0           0           0 SWBR Architects P.C.              100,818      12/01/22                       01/29/21           

          Transportation & Operations Center:
  -       New Construction             5-016-001                                              /  /       /  /     02/14/24     /  /     02 - 16                        0             0  WLC             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




GENEVA CITY SCHOOLS STATUS REPORT ON CAPITAL PROJECTS
District No.: 43-07-00-01
last updated on 04/25/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          West Street School:
18-2064   Reconstruction               0-001-019  09/03/19     DONE    DONE       DONE      06/04/19   05/06/19   04/15/19   05/21/19   15                       100,000       100,000  BMJ             0           0           0 Clark Patterson Lee                     0      03/05/20                       05/06/19           
19-1847   Reconstruction               0-001-020  07/10/20     DONE    DONE       DONE      06/16/20   05/14/20   04/23/20   06/09/20   2,8                      100,000       100,000  JLB             0           0           0 Clark Patterson Lee                     0      01/31/21                       05/14/20           
21-0202   Reconstruction               0-001-021  09/13/21     DONE    DONE       DONE      08/20/21   07/16/21   04/28/21   05/18/21   2,7,155                  100,000       100,000  SLC             0           0           0 Popli Design Group                      0      04/15/22                       07/16/21           
21-1312   Reconstruction               0-001-022  12/22/21     DONE    DONE       DONE      02/16/22   02/11/22   12/09/21   12/08/21   155                      100,000       100,000  SLC             0           0           0 Popli Design Group                      0      04/15/22                       02/11/22           
22-0419   Reconstruction               0-001-023  01/27/23     DONE    DONE       DONE      09/07/22   09/07/22   12/10/21   12/07/21   2,4,7,155,15,16        7,767,610     7,311,173  SLC             0           0           0 Popli Design Group                      0        /  /                         09/07/22           

          North St. School:
22-0420   Reconstruction               0-006-021  01/27/23     DONE    DONE       DONE      09/07/22   09/07/22   12/10/21   12/07/21   2,4,8,9,155,15,16      2,415,901     2,415,901  SLC             0           0           0 Popli Design Group                      0        /  /                         09/07/22           
23-0812   Reconstruction               0-006-022  12/12/23     DONE    DONE       DONE      10/25/23   10/19/23   07/20/23   05/16/23   8                        100,000       100,000  JLB             0           0           0 Popli Design Group                      0        /  /                         10/19/23           

          Middle/High School:
18-1863   Reconstruction               0-010-015  05/06/19     DONE    DONE       DONE      04/15/19   04/12/19   03/22/19   05/15/18   7,9                      820,000       820,000  BMJ             0           0           0 Clark Patterson Lee                     0      08/25/20                       04/12/19           
21-1313   Reconstruction               0-010-016  12/21/21     DONE    DONE       DONE      02/16/22   02/11/22   12/09/21   12/08/21   155                      180,000       180,000  SLC             0           0           0 Popli Design Group                      0      04/15/22                       02/11/22           
22-0421   Reconstruction               0-010-017  01/27/23     DONE    DONE       DONE      09/07/22   09/07/22   12/10/21   12/07/21   2,4,7,8,9,10,13,155,  12,892,663    12,892,663  SLC             0           0           0 Popli Design Group                      0        /  /                         09/07/22           

          Central Serv BltAs2004BusGarage:
19-0231   Reconstruction               5-015-003  08/26/19     DONE    DONE       DONE      08/08/19   07/26/19   06/10/19   06/10/19   2                        550,000       550,000  BMJ             0           0           0 Clark Patterson Lee                     0      10/28/19                       07/26/19           
22-0422   Reconstruction               5-015-004  01/27/23     DONE    DONE       DONE      09/07/22   09/07/22   12/10/21   12/07/21   2,4,8,155,15,16        4,423,826     4,423,826  SLC             0           0           0 Popli Design Group                      0        /  /                         09/07/22           
22-0069   Reconstruction               5-015-005  11/21/22     DONE    DONE       DONE      07/11/22   07/11/22   05/23/22   05/17/22   8,10,155,16              100,000       100,000  SLC             0           0           0 Popli Design Group                      0      06/15/23                       07/11/22           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




GORHAM-MIDDLESEX CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 43-09-01-06
last updated on 04/25/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Gorham Elementary:
21-1710FC Reconstruction               0-001-018  07/20/22     DONE    DONE       DONE      04/27/22   03/29/22   12/16/21   03/14/22   2                        380,000       380,000  JLB             0           0           0 SEI Design Group                        0      08/16/23                       03/29/22           
22-0087FA Reconstruction               0-001-019  08/22/22     DONE    DONE       DONE      07/15/22   06/01/22   04/17/22   08/16/22   9,155,16                 121,700       121,700  JLB             0           0           0 SEI Design Group                        0        /  /                         06/01/22           
23-0993   Reconstruction               0-001-020                         UNREVIEWED         11/14/23   11/08/23   06/06/23   12/13/22   2,4,7,8,9,10,14,155,           0             0  JJH             0           0           0 SEI Design Group                        0        /  /                         11/08/23           
23-1845   Reconstruction               0-001-021                         UNREVIEWED         04/17/24   04/17/24   03/19/24   10/11/22   8,155,16                       0             0  JJH             0           0           0 SEI Design Group                        0        /  /                         04/17/24           

          Middlesex Valley Bldg.:
22-2084   Reconstruction               0-006-015  06/28/23     DONE    DONE       DONE      04/24/23   04/24/23   02/01/23   02/13/23   155                       25,500        25,500  JJH             0           0           0 SEI Design Group                        0        /  /                         04/24/23           
23-0994   Reconstruction               0-006-016                         UNREVIEWED         11/14/23   11/08/23   06/06/23   12/13/22   2,4,7,8,9,10,14,155,           0             0  JJH             0           0           0 SEI Design Group                        0        /  /                         11/08/23           
23-1846   Reconstruction               0-006-017                         UNREVIEWED         04/17/24   04/17/24   03/19/24   10/11/22   8,155,16                       0             0  JJH             0           0           0 SEI Design Group                        0        /  /                         04/17/24           

          Marcus Whitman Jr/Sr High:
18-2045   Additions and Alterations    0-012-020  08/12/19     DONE    DONE       DONE      06/03/19   05/23/19   12/03/18   12/13/17   02 - 16               18,262,642    18,136,508  MTM             0           0           0 SEI Design Group                        0      12/21/21                       05/23/19           
21-0495   Reconstruction               0-012-021  10/28/21     DONE    DONE       DONE      10/08/21   10/06/21   02/10/21   05/18/21   2,4,9,155,16             100,000       100,000  JLB             0           0           0 SEI Design Group                        0      06/30/22                       10/06/21           
  -       Reconstruction               0-012-022                                              /  /       /  /     07/12/21     /  /     16                             0    33,300,780  JLB             0           0           0                                         0        /  /                           /  /             
21-0124SB Reconstruction               0-012-022               DONE                           /  /       /  /     07/12/21     /  /     16                             0    33,300,780  JLB             0           0           0                                         0        /  /                           /  /             
21-1488   Reconstruction               0-012-023  06/22/22     DONE    DONE       DONE      03/10/22   03/10/22   11/16/21   05/17/22   2,4,8,9,10,155,15,16     100,000       100,000  JLB             0           0           0 SEI Design Group                        0      06/20/23                       03/10/22           
21-1711FC Reconstruction               0-012-024  06/02/22     DONE    DONE       DONE      04/27/22   03/29/22   12/16/21   03/14/22   8                         90,000        90,000  JLB             0           0           0 SEI Design Group                        0        /  /                         03/29/22           
22-0088FA Reconstruction               0-012-025  09/08/22     DONE    DONE       DONE      07/15/22   06/01/22   04/17/22   08/16/22   7,9,155,16               880,455             0  JLB             0           0           0 SEI Design Group                        0        /  /                         06/01/22           
23-0877   Reconstruction               0-012-026  01/02/24     DONE    DONE       DONE      11/03/23   10/30/23   09/06/23   05/16/23   2,8,16                   100,000       100,000  JJH             0           0           0 SEI Design Group                        0        /  /                         10/30/23           
23-1235   Reconstruction               0-012-027                         UNREVIEWED         12/20/23   12/19/23   11/09/23   10/10/23   15                             0             0  JJH             0           0           0 SEI Design Group                        0        /  /                         12/19/23           
23-1847   Reconstruction               0-012-028                         UNREVIEWED         04/17/24   04/17/24   03/19/24   10/11/22   8,155,16                       0             0  JJH             0           0           0 SEI Design Group                        0        /  /                         04/17/24           
  -       Reconstruction               0-012-029                                              /  /       /  /     04/23/24     /  /     2,4,7,8,9,10,14,155,           0             0  JJH             0           0           0                                         0        /  /                           /  /             

          Storage Building (fmly 5-003):
23-1848   Reconstruction               2-003-001                         UNREVIEWED         04/17/24   04/17/24   03/19/24   10/11/22   8,16                           0             0  JJH             0           0           0 SEI Design Group                        0        /  /                         04/17/24           

          Storage Building (fmly 5-004):
23-1849   Reconstruction               2-004-001                         UNREVIEWED         04/17/24   04/17/24   03/19/24   10/11/22   16                             0             0  JJH             0           0           0 SEI Design Group                        0        /  /                         04/17/24           

          Maintenance Storage:
18-2046   Reconstruction               2-005-003  08/12/19     DONE    DONE       DONE      06/03/19   05/23/19   12/03/18   12/13/17   2,4,7,9                   33,589             0  MTM             0           0           0 SEI Design Group                        0        /  /                         05/23/19           
23-1850   Reconstruction               2-005-004                         UNREVIEWED         04/17/24   04/17/24   03/19/24   10/11/22   16                             0             0  JJH             0           0           0 SEI Design Group                        0        /  /                         04/17/24           

          Bus Garage:
23-1851   Reconstruction               4-002-006                         UNREVIEWED         04/17/24   04/17/24   03/19/24   10/11/22   16                             0             0  JJH             0           0           0 SEI Design Group                        0        /  /                         04/17/24           

          New Transportation Building:
23-1852   Reconstruction               5-013-005                         UNREVIEWED         04/17/24   04/17/24   03/19/24   10/11/22   16                             0             0  JJH             0           0           0 SEI Design Group                        0        /  /                         04/17/24           
  -       Reconstruction               5-013-006                                              /  /       /  /     04/23/24     /  /     2,4,7,8,14,155,15,16           0             0  JJH             0           0           0                                         0        /  /                           /  /             

          Marcus Whitman Sugar Process. Bldg:
21-1497   New Construction             7-020-001  11/15/22     DONE    DONE       DONE      03/11/22   03/11/22   11/16/21   09/12/22   02 - 16                   12,000             0  JLB             0           0           0 SEI Design Group                        0        /  /                         03/11/22           

          District-Wide:
21-1712FC Reconstruction               7-999-001  06/02/22     DONE    DONE       DONE      04/27/22   03/30/22   12/16/21   03/14/22   16                       400,000             0  JLB             0           0           0 SEI Design Group                        0      01/09/23                       03/30/22           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




MANCHESTER-SHORTSVILLE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 43-11-01-04
last updated on 04/25/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Manchester-Shortsville Inst Complex:
19-0023   Reconstruction               0-007-026  08/26/19     DONE    DONE       DONE      07/08/19   06/24/19   04/10/19   12/14/16   2,8,9,10,155,15,16       850,000       850,000  JLB             0           0           0 SEI Design Group                        0      06/04/21                       06/24/19           
19-0024   Reconstruction               0-007-027  08/26/19     DONE    DONE       DONE      07/08/19   06/24/19   04/10/19   05/21/19   9                        100,000       100,000  JLB             0           0           0 SEI Design Group                        0      05/26/20                       06/24/19           
20-0589   Reconstruction               0-007-028  12/17/20     DONE    DONE       DONE      10/13/20   10/05/20   08/04/20   06/09/20   8                        100,000       100,000  JLB             0           0           0 SEI Design Group                        0      12/29/21                       10/05/20           
  -       Reconstruction               0-007-029                                              /  /       /  /     08/26/20     /  /     16                    10,330,650    10,330,650  JLB             0           0           0                                         0        /  /                           /  /             
20-0269SB Reconstruction               0-007-029               DONE                           /  /       /  /     08/26/20     /  /     16                             0             0  JLB             0           0           0                                         0        /  /                           /  /             
21-0677   Reconstruction               0-007-030  04/11/22     DONE    DONE       DONE      11/10/21   11/10/21   05/13/21   02/09/21   2,7,8,9,10,155,15,16  10,330,650    10,330,650  JLB             0           0           0 SEI Design Group                        0        /  /                         11/10/21           
21-0394   Reconstruction               0-007-031  11/29/21     DONE    DONE       DONE      09/22/21   09/21/21   08/20/21   05/18/21   2,8,9,155,15,16          100,000       100,000  JLB             0           0           0 SEI Design Group                        0      06/01/23                       09/21/21           
22-2328   Reconstruction               0-007-032  08/18/23     DONE    DONE       DONE      06/05/23   06/05/23   04/13/23   05/18/22   10                       100,000       100,000  WLC             0           0           0 SEI Design Group                        0        /  /                         06/05/23           
23-0602   Reconstruction               0-007-033               STARTED DONE       DONE      10/04/23   09/25/23   04/13/23   12/14/16                                  0             0  WLC             0           0           0 SEI Design Group                        0        /  /                         09/25/23           
23-0601   Reconstruction               0-007-034  03/13/24     DONE    DONE       DONE      10/04/23   09/25/23   04/14/23   05/16/23   2,9                      100,000             0  WLC             0           0           0 SEI Design Group                        0        /  /                         09/25/23           

          Bus Garage Shed #1:
17-1803DB Discovered Building          2-020-001  06/18/19     DONE    DONE       DONE      05/03/18     /  /     02/28/18     /  /                                    0             0  MTM             0           0           0                                         0        /  /                           /  /             

          Bus Garage Shed #2:
17-1804DB Discovered Building          2-021-001  06/18/19     DONE    DONE       DONE      05/03/18     /  /     02/28/18     /  /                                    0             0  MTM             0           0           0                                         0        /  /                           /  /             

          Athletic Shed #1:
17-1805DB Discovered Building          2-022-001  06/18/19     DONE    DONE       DONE      05/03/18     /  /     02/28/18     /  /                                    0             0  MTM             0           0           0                                         0        /  /                           /  /             

          Athletic Shed #2:
17-1806DB Discovered Building          2-023-001  06/18/19     DONE    DONE       DONE      05/03/18     /  /     02/28/18     /  /                                    0             0  MTM             0           0           0                                         0        /  /                           /  /             

          Athletic Shed #3:
17-1807DB Discovered Building          2-024-001  06/18/19     DONE    DONE       DONE      05/03/18     /  /     02/28/18     /  /                                    0             0  MTM             0           0           0                                         0        /  /                           /  /             

          Storage Building:
  -    PR New Construction             2-025-001                                              /  /       /  /     05/13/21     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                           /  /             
21-0325   New Construction             2-025-001  11/15/21     DONE    DONE       DONE      09/13/21   09/10/21   05/13/21   02/09/21   02 - 16                  775,000             0  JLB             0           0           0 SEI Design Group                        0        /  /                         09/10/21           

          Maintenance Shed #2:
17-1809DB Discovered Building          3-014-001  06/18/19     DONE    DONE       DONE      05/03/18     /  /     02/27/18     /  /                                    0             0  MTM             0           0           0                                         0        /  /                           /  /             

          Maintenance Shed #3:
17-1810DB Discovered Building          3-015-001  06/18/19     DONE    DONE       DONE      05/03/18     /  /     02/27/18     /  /                                    0             0  MTM             0           0           0                                         0        /  /                           /  /             

          Maintenance Shed #4:
17-1811DB Discovered Building          3-016-001  06/18/19     DONE    DONE       DONE      05/03/18     /  /     02/27/18     /  /                                    0             0  MTM             0           0           0                                         0        /  /                           /  /             

          Maintenance Shed #5:
17-1812DB Discovered Building          3-017-001  06/18/19     DONE    DONE       DONE      05/03/18     /  /     02/27/18     /  /                                    0             0  MTM             0           0           0                                         0        /  /                           /  /             

          Maintenance Shed #6:
17-1813DB Discovered Building          3-018-001  06/18/19     DONE    DONE       DONE      05/03/18     /  /     02/27/18     /  /                                    0             0  MTM             0           0           0                                         0        /  /                           /  /             

          Bus Garage:
21-0678   Reconstruction               5-001-007  04/11/22     DONE    DONE       DONE      11/10/21   11/10/21   05/13/21   02/09/21   2,7,8                  1,569,350     1,569,350  JLB             0           0           0 SEI Design Group                        0        /  /                         11/10/21           

          Concession Building:
17-1814DB Discovered Building          7-019-001  06/18/19     DONE    DONE       DONE      05/03/18     /  /     02/28/18     /  /                                    0             0  MTM             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




NAPLES CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 43-12-01-04
last updated on 04/25/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Naples High School:
  -       Reconstruction               0-001-008                                              /  /       /  /     03/08/22     /  /     2,4                            0             0  SLC             0           0           0                                         0        /  /                           /  /             
20-1900   Reconstruction               0-001-016  07/19/21     DONE    DONE       DONE      06/18/21   06/14/21   12/11/20   05/18/21   155,16                   100,000       100,000  SLC             0           0           0 SEI Design Group                        0      05/25/22                       06/14/21           
21-1738   Reconstruction               0-001-017  06/17/22     DONE    DONE       DONE      05/02/22   04/28/22   03/21/22   12/07/21   7                        265,380       265,380  JLB             0           0           0 SEI Design Group                        0      09/09/22                       04/28/22           
22-1335   Reconstruction               0-001-018  05/10/23     DONE    DONE       DONE      12/27/22   12/22/22   09/08/22   12/07/21   2,4,7,8,9,10,155,15,   6,869,485     6,869,485  WLC             0           0           0 SEI Design Group                        0        /  /                         12/22/22           

          Naples Elementary:
20-0129   Reconstruction               0-002-016  09/11/20     DONE    DONE       DONE      07/28/20   07/27/20   03/18/20   06/16/20   155,16                   100,000       100,000  SLC             0           0           0 SEI Design Group                        0      05/27/21                       07/27/20           
22-0140   Reconstruction               0-002-017  10/13/22     DONE    DONE       DONE      07/25/22   07/22/22   04/21/22   05/17/22   2,7,8,9                  100,000       100,000  WLC             0           0           0 SEI Design Group                        0      06/25/23                       07/22/22           
22-0410   Reconstruction               0-002-018  07/06/22     DONE    DONE       DONE      09/07/22   09/06/22   07/18/22   07/06/22   2,9                       59,946        59,946  WLC             0           0           0 SEI Design Group                        0      08/19/22                       09/06/22           
22-1336   Reconstruction               0-002-019  05/10/23     DONE    DONE       DONE      12/27/22   12/22/22   09/08/22   12/07/21   2,4,7,8,9,10,155,15,   9,145,088     9,145,088  WLC             0           0           0 SEI Design Group                        0        /  /                         12/22/22           
22-1921   Reconstruction               0-002-020  06/27/23     DONE    DONE       DONE      03/22/23   03/21/23   02/03/23   05/16/23   2,8,9                    100,000       100,000  WLC             0           0           0 SEI Design Group                        0        /  /                         03/21/23           
  -       Reconstruction               0-002-021                                              /  /       /  /     04/05/24     /  /     2,8,9                          0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Bus Garage #2:
22-2444   Reconstruction               5-010-002  10/06/23     DONE    DONE       DONE      06/23/23   06/23/23   05/19/23   05/16/23   2,16                     140,000       140,000  WLC             0           0           0 SEI Design Group                        0        /  /                         06/23/23           

          XXStorage 1 - Removed:
20-0605TQ Temporary Quarters           8-011-001  03/18/21     DONE    DONE       DONE      10/15/20   10/15/20   08/20/20   09/16/20                              1,500             0  SLC             0           0           0                                         0      10/07/20                       10/15/20           

          XXStorage 2 - Removed:
20-0606TQ Temporary Quarters           8-012-001  03/18/21     DONE    DONE       DONE      10/15/20   10/15/20   08/20/20   09/16/20                              1,500             0  SLC             0           0           0                                         0      10/07/20                       10/15/20           

          XXStorage 3 - Removed:
20-0607TQ Temporary Quarters           8-013-001  03/18/21     DONE    DONE       DONE      10/15/20   10/15/20   08/20/20   09/16/20                              1,500             0  SLC             0           0           0                                         0      10/07/20                       10/15/20           

          XXStorage 4- Removed:
20-0608TQ Temporary Quarters           8-014-001  03/18/21     DONE    DONE       DONE      10/15/20   10/15/20   08/20/20   09/16/20                              1,500             0  SLC             0           0           0                                         0      10/07/20                       10/15/20           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




PHELPS-CLIFTON SPRINGS CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 43-13-01-06
last updated on 04/25/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Midlakes Middle/High School:
19-1508   Reconstruction               0-011-017  03/05/20     DONE    DONE       DONE      03/02/20   03/02/20   11/25/19   01/21/20   2,4,7,8,9,155,16         150,000       150,000  BMJ             0           0           0 EDGE Architecture                       0      08/18/20                       03/02/20           
21-0173   Reconstruction               0-011-018  10/25/21     DONE    DONE       DONE      08/16/21   08/13/21   04/17/20   12/10/19   2,4,7,8,9,10,155,15,   9,987,486     9,987,486  JLB             0           0           0 EDGE Architecture                       0      10/26/23           YES         08/13/21           

          Midlakes Elementary School:
20-1090   Reconstruction               0-014-003  05/05/21     DONE    DONE       DONE      01/06/21   01/04/21   04/17/20   12/10/19   2,4,7,8,9,10,155,15,   3,573,657     3,573,657  JLB             0           0           0 EDGE Architecture                       0      10/26/23                       01/04/21           

          District Maintenance Facility:
20-1091   Reconstruction               3-015-002  05/05/21     DONE    DONE       DONE      01/06/21   12/28/20   04/17/20   12/10/19   2,4,7                    127,586             0  JLB             0           0           0 EDGE Architecture                       0      10/26/23                       12/28/20           

          Midlakes Bus Garage:
20-1092   Reconstruction               5-013-004  05/05/21     DONE    DONE       DONE      01/06/21   12/28/20   04/17/20   12/10/19   2,4,7,15,16            1,747,861     1,747,861  JLB             0           0           0 EDGE Architecture                       0      10/26/23                       12/28/20           
21-0650   Reconstruction               5-013-005  11/29/21     DONE    DONE       DONE      11/04/21   11/02/21   09/09/21   03/15/21   4,13,15,16               210,000       210,000  JLB             0           0           0 EDGE Architecture                       0      09/01/22                       11/02/21           
22-1294   Reconstruction               5-013-006  11/14/22     DONE    DONE       DONE      12/21/22   12/19/22   11/28/22   11/14/22   4,13,15,16               450,000       450,000  WLC             0           0           0 EDGE Architecture                       0      03/31/23                       12/19/22           

          Salt Barn @ Midlakes Bus Garage:
20-1093   New Construction             7-035-001  05/05/21     DONE    DONE       DONE      01/06/21   01/04/21   04/17/20   12/10/19   02 - 16                  163,410             0  JLB             0           0           0 EDGE Architecture                       0      10/26/23                       01/04/21           

          District-Wide:
19-1407SB Reconstruction               7-999-001               DONE                           /  /       /  /     02/12/20     /  /     9,155,15,16                    0             0  JLB             0           0           0                                         0        /  /                           /  /             
20-1606   Reconstruction               7-999-001  06/01/21     DONE    DONE       DONE      05/21/21   04/09/21   02/12/20   11/04/14   9,155,15,16            1,906,614     1,906,614  JLB             0           0           0 EDGE Architecture                       0        /  /                         04/09/21           
21-1624FA Reconstruction               7-999-002  06/28/22     DONE    DONE       DONE      04/08/22   04/05/22   02/15/22   12/13/21   2,7,155,15,16          1,333,750             0  FMJ             0           0           0 EDGE Architecture                       0        /  /                         04/05/22           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




HONEOYE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 43-14-01-04
last updated on 04/25/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Main Building:
18-1600   Reconstruction               0-001-017  06/17/19     DONE    DONE       DONE      03/05/19   03/01/19   08/30/18   03/14/18   2,10,155,15,16           798,499       798,499  BMJ             0           0           0 Young And Wright Architectura           0      03/03/21                       03/01/19           
21-0259   Reconstruction               0-001-018  11/10/21     DONE    DONE       DONE      09/01/21   08/30/21   05/26/21   05/18/21   8                        100,000       100,000  JLB             0           0           0 Young And Wright Architectura           0      02/09/23                       08/30/21           
22-0401   Reconstruction               0-001-019  11/08/22     DONE    DONE       DONE      09/02/22   09/02/22   04/22/22   05/17/22   8,9                      100,000       100,000  JLB             0           0           0 Young And Wright Architectura           0      10/30/23                       09/02/22           
  -       Reconstruction               0-001-020                                              /  /       /  /     04/25/22     /  /     8,9                            0             0  JLB             0           0           0                                         0        /  /                           /  /             
23-1838   Reconstruction               0-001-021                         UNREVIEWED         04/17/24   04/17/24   02/01/24   05/16/23   8,155                          0             0  JJH             0           0           0 SWBR Architects P.C.                    0        /  /                         04/17/24           

          New Bus Garage:
18-1601   Reconstruction               5-008-003  06/17/19     DONE    DONE       DONE      03/05/19   03/01/19   08/30/18   03/14/18   13,16                    463,151       463,151  BMJ             0           0           0 Young And Wright Architectura           0      03/03/21                       03/01/19           

          CORAL Pavilion:
  -    PR New Construction             7-017-001                                              /  /       /  /     05/04/22     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




VICTOR CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 43-17-01-06
last updated on 04/25/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Education Center:
  -    PR Additions and Alterations    0-001-015               DONE                           /  /       /  /     08/10/20     /  /     02 - 16                        0    12,982,944  JLB             0           0           0                                         0        /  /                           /  /             
20-0449   Additions and Alterations    0-001-015  03/02/21     DONE    DONE       DONE      09/25/20   09/23/20   08/10/20   11/18/19   02 - 16                5,218,699     3,912,992  JLB             0           0           0 SWBR Architects P.C.                    0      01/07/22                       09/23/20           
  -       Reconstruction               0-001-016                                              /  /       /  /     10/21/21     /  /     2,8,9,155,15,16                0             0  JLB             0           0           0                                         0        /  /                           /  /             

          Primary School:
19-1601   Reconstruction               0-002-015  05/20/20     DONE    DONE       DONE      03/18/20   03/06/20   02/27/20   11/18/19   7,155,16               3,219,076     3,219,076  JLB             0           0           0 SWBR Architects P.C.                    0      10/15/20                       03/06/20           
20-0450   Reconstruction               0-002-016  03/02/21     DONE    DONE       DONE      09/25/20   09/02/20   08/10/20   11/18/19   2,4,8,9,10,13,155,15   1,621,980     1,621,980  JLB             0           0           0 SWBR Architects P.C.                    0      09/03/21                       09/02/20           

          Jr/Sr High(fmly Sr. High):
  -    PR Additions and Alterations    0-005-020                                              /  /       /  /     08/10/20     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                           /  /             
20-0451   Additions and Alterations    0-005-020  03/02/21     DONE    DONE       DONE      09/25/20   09/02/20   08/10/20   11/18/19   02 - 16                4,214,336     2,920,590  JLB             0           0           0 SWBR Architects P.C.                    0      01/17/22                       09/02/20           
21-1587   Reconstruction               0-005-021  12/01/22     DONE    DONE       DONE      04/01/22   03/30/22   02/14/22   11/18/19   2,9,155,16             1,393,500     1,393,500  JJH             0           0           0 SWBR Architects P.C.                    0        /  /                         03/30/22           
23-0299PR Additions and Alterations    0-005-022               STARTED                      08/21/23     /  /     04/13/23     /  /     02 - 16                        0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Intermediate:
19-1602   Reconstruction               0-008-013  05/20/20     DONE    DONE       DONE      03/18/20   03/06/20   02/27/20   11/18/19   2,9                    1,032,435     1,032,435  JLB             0           0           0 SWBR Architects P.C.                    0      10/15/20                       03/06/20           
21-0385   Reconstruction               0-008-014  12/08/21     DONE    DONE       DONE      09/20/21   09/20/21   07/27/21   11/18/19   7                        250,000       250,000  JLB             0           0           0 SWBR Architects P.C.                    0      08/26/22                       09/20/21           
21-1325   Reconstruction               0-008-015  08/10/22     DONE    DONE       DONE      02/17/22   02/11/22   10/21/21   11/18/19   2,8,9,155,16           1,069,210     1,069,210  FMJ             0           0           0 SWBR Architects P.C.                    0        /  /                         02/11/22           
23-0300PR Additions and Alterations    0-008-016               STARTED                      08/21/23     /  /     04/13/23     /  /     02 - 16                        0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Victor Learning Center:
22-2023DB Discovered Building          0-037-001  08/21/23     DONE    DONE       DONE      04/12/23   04/11/23   03/21/23     /  /                                    0             0  WLC             0           0           0                                         0        /  /                         04/11/23           

          Bus Garage:
20-0452   Reconstruction               5-003-012  03/02/21     DONE    DONE       DONE      09/25/20   09/02/20   08/10/20   11/18/19   2,4,8,9,10,155,15,16     639,631       639,631  JLB             0           0           0 SWBR Architects P.C.                    0      08/22/22                       09/02/20           

          Transportation Building:
20-0453   New Construction             5-036-001  03/02/21     DONE    DONE       DONE      09/25/20   09/02/20   08/10/20   11/18/19   02 - 16               11,092,749    11,092,749  JLB             0           0           0 King & King Architects                  0      07/18/22                       09/02/20           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




BOCES WAYNE-FINGER LAKES STATUS REPORT ON CAPITAL PROJECTS
District No.: 43-90-00-00
last updated on 04/25/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Tech Career Cntr - Stanley Campus:
18-2151   Reconstruction               0-001-020  08/09/19     DONE    DONE       DONE      06/18/19   06/11/19   12/18/17   08/21/17   2,7,15,16              1,575,261     1,575,261  JLB             0           0           0 King & King Architects                  0      01/04/21                       06/11/19           
22-1008   Reconstruction               0-001-021  05/16/23     DONE    DONE       DONE      11/18/22   11/10/22   08/05/22   02/07/22   2,4,7,8,9,10,155,15,   1,400,000     1,400,000  WLC             0           0           0 Beardsley Design Associates A           0        /  /                         11/10/22           
23-1784   Reconstruction               0-001-022                         UNREVIEWED         04/09/24   04/04/24   01/03/24   01/08/24   2,4,9,16                       0             0  WLC             0           0           0 Beardsley Design Associates A           0        /  /                         04/04/24           

          Alt. HS Flint Campus(Admin):
18-2152   Reconstruction               0-002-005  08/09/19     DONE    DONE       DONE      06/18/19   06/11/19   12/18/17   08/21/17   8,9,155                  731,897       731,897  JLB             0           0           0 King & King Architects                  0      01/04/21                       06/11/19           
22-1009   Reconstruction               0-002-006  05/16/23     DONE    DONE       DONE      11/18/22   11/10/22   08/05/22   02/07/22   2,8,9,155,15,16          350,000       350,000  WLC             0           0           0 Beardsley Design Associates A           0        /  /                         11/10/22           
23-1785   Reconstruction               0-002-007                         UNREVIEWED         04/09/24   04/04/24   01/03/24   01/08/24   2,7,10                         0             0  WLC             0           0           0 Beardsley Design Associates A           0        /  /                         04/04/24           

          Auto Shop Williamson:
18-2153   Reconstruction               0-012-004  08/09/19     DONE    DONE       DONE      06/18/19   06/11/19   12/18/17   08/21/17   8,9,10,155,15,16          29,323        29,323  JLB             0           0           0 King & King Architects                  0      01/04/21                       06/11/19           
22-1010   Reconstruction               0-012-005  05/16/23     DONE    DONE       DONE      11/18/22   11/10/22   08/05/22   02/07/22   8,15,16                   75,000        75,000  WLC             0           0           0 Beardsley Design Associates A           0        /  /                         11/10/22           
23-1786   Reconstruction               0-012-006                         UNREVIEWED         04/09/24   04/04/24   01/04/24   01/08/24   155                            0             0  WLC             0           0           0 Beardsley Design Associates A           0        /  /                         04/04/24           

          Occup. Center/Williamson:
18-2154   Reconstruction               0-014-022  08/09/19     DONE    DONE       DONE      06/18/19   06/11/19   12/18/17   08/21/17   155,15,16                889,811       889,811  JLB             0           0           0 King & King Architects                  0      01/04/21                       06/11/19           
22-1011   Reconstruction               0-014-023  05/16/23     DONE    DONE       DONE      11/18/22   11/10/22   08/05/22   02/07/22   8,9,10,155,15,16         900,000       900,000  WLC             0           0           0 Beardsley Design Associates A           0        /  /                         11/10/22           
23-1787   Reconstruction               0-014-024                         UNREVIEWED         04/09/24   04/04/24   01/04/24   01/08/24   2,7,10,155                     0             0  WLC             0           0           0 Beardsley Design Associates A           0        /  /                         04/04/24           

          Education Center Williamson:
18-2155   Additions and Alterations    0-025-010  08/09/19     DONE    DONE       DONE      06/18/19   06/11/19   12/18/17   08/21/17   02 - 16                  282,960       282,960  JLB             0           0           0 King & King Architects                  0      01/04/21                       06/11/19           
22-1013   Reconstruction               0-025-011  05/16/23     DONE    DONE       DONE      11/18/22   11/10/22   08/05/22   02/07/22   2,7,8,9                  125,000       125,000  WLC             0           0           0 Beardsley Design Associates A           0        /  /                         11/10/22           
23-1788   Reconstruction               0-025-012                         UNREVIEWED         04/09/24   04/04/24   01/03/24   01/08/24   7,155                          0             0  WLC             0           0           0 Beardsley Design Associates A           0        /  /                         04/04/24           

          Anmal Sci Bldg/Flint Campus:
22-1014   Reconstruction               0-027-006  05/16/23     DONE    DONE       DONE      11/18/22   11/10/22   08/05/22   02/07/22   8,155,16                 300,000       300,000  WLC             0           0           0 Beardsley Design Associates A           0        /  /                         11/10/22           

          New Visions (Hannicap Bldg):
22-1015   Reconstruction               0-028-003  05/16/23     DONE    DONE       DONE      11/18/22   11/10/22   08/05/22   02/07/22   7,9                       30,000        30,000  WLC             0           0           0 Beardsley Design Associates A           0        /  /                         11/10/22           

          Day Care Teaching Center:
23-1789   Reconstruction               0-030-004                         UNREVIEWED         04/09/24   04/04/24   01/03/24   01/08/24   9,15                           0             0  WLC             0           0           0 Beardsley Design Associates A           0        /  /                         04/04/24           

          Wayne Education Center:
18-2156   Reconstruction               0-046-003  08/09/19     DONE    DONE       DONE      06/18/19   06/11/19   05/20/19   08/21/17   15                        68,530        68,530  JLB             0           0           0 King & King Architects                  0      01/04/21                       06/11/19           
22-1016   Reconstruction               0-046-004  05/16/23     DONE    DONE       DONE      11/18/22   11/10/22   08/05/22   02/07/22   4,9                      175,000       175,000  WLC             0           0           0 Beardsley Design Associates A           0        /  /                         11/10/22           
23-1790   Reconstruction               0-046-005                         UNREVIEWED         04/09/24   04/04/24   01/03/24   01/08/24   2,7,9,155                      0             0  WLC             0           0           0 Beardsley Design Associates A           0        /  /                         04/04/24           

          Classroom & Storage Building:
  -    DB Discovered Building          0-061-001                                              /  /       /  /       /  /       /  /                                    0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Stanley Campus-Auto Tech/Storage:
18-2157   Reconstruction               2-005-003  08/09/19     DONE    DONE       DONE      06/18/19   06/11/19   12/18/17   08/21/17   2,15                      22,218             0  JLB             0           0           0 King & King Architects                  0      01/04/21                       06/11/19           
22-1017   Reconstruction               2-005-004  05/16/23     DONE    DONE       DONE      11/18/22   11/10/22   11/16/22   02/07/22   16                        40,000             0  WLC             0           0           0 Beardsley Design Associates A           0        /  /                         11/10/22           

          Truck Barn Storage:
22-1012   Reconstruction               2-023-001  05/16/23     DONE    DONE       DONE      11/18/22   11/10/22   08/05/22   02/07/22   16                        60,000             0  WLC             0           0           0 Beardsley Design Associates A           0        /  /                         11/10/22           

          Pole Barn #2:
23-1791   Reconstruction               2-029-003                         UNREVIEWED         04/09/24   04/04/24   01/03/24   01/08/24   8,9,16                         0             0  WLC             0           0           0 Beardsley Design Associates A           0        /  /                         04/04/24           

          Maint Bldg Flint Campus:
22-1018   Reconstruction               2-041-002  05/16/23     DONE    DONE       DONE      11/18/22   11/10/22   08/05/22   02/07/22   4,8                      125,000             0  WLC             0           0           0 Beardsley Design Associates A           0        /  /                         11/10/22           
23-1792   Reconstruction               2-041-003                         UNREVIEWED         04/09/24   04/04/24   01/04/24   01/08/24   2,8,9,155,16                   0             0  WLC             0           0           0 Beardsley Design Associates A           0        /  /                         04/04/24           

          Edu-Tech Receiving:
21-0573   Reconstruction               7-039-003  02/18/22     DONE    DONE       DONE      10/22/21   10/22/21   06/09/21   06/07/21   2,7,9,155,16           1,500,000             0  JLB             0           0           0 Beardsley Design Associates A           0        /  /                         10/22/21           

          Silver Hill:
17-1416TQ Temporary Quarters           8-059-001  08/29/19     DONE    DONE       DONE      03/28/18   02/16/18   11/29/16     /  /                                    0             0  MTM             0           0           0 King & King Architects                  0        /  /                         02/16/18           

          Career Creations Silver Hill:
19-1259TQ Temporary Quarters           8-060-001  12/16/20     DONE    DONE       DONE      01/22/20   01/22/20   12/17/19     /  /                                    0             0  JSS             0           0           0                                         0      01/15/21                       01/22/20           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED