Construction Project Status

Construction Project Status

THE STATE EDUCATION DEPARTMENT

FACILITIES PLANNING


UPDATED: 04/18/24 at 07:18:45




BERLIN CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 49-01-01-04
last updated on 04/18/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Berlin Elementary:
18-1143   Reconstruction               0-007-015  05/07/19     DONE    DONE       DONE      12/26/18   12/18/18   07/27/18   03/06/18   2,4,7,8,9,10,155,15,   1,676,960     1,676,960  JLB             0           0           0 Synthesis Architects,L.L.P.             0      07/01/21                       12/18/18           
19-1243   Reconstruction               0-007-016  01/29/20     DONE    DONE       DONE      01/21/20   12/23/19   10/04/19   05/21/19   10                        86,000        86,000  JLB             0           0           0 Synthesis Architects,L.L.P.             0      06/29/21                       12/23/19           
20-0947   Reconstruction               0-007-017  03/25/21     DONE    DONE       DONE      12/11/20   11/23/20   09/03/20   12/11/19   2,8,9,155,15,16        1,965,000     1,965,000  JLB             0           0           0 Synthesis Architects,L.L.P.             0      09/02/22                       11/23/20           
  -       Reconstruction               0-007-018                                              /  /       /  /     08/30/22     /  /     155,15,16                      0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Berlin Middle/High School:
18-1144   Reconstruction               0-009-011  05/07/19     DONE    DONE       DONE      12/26/18   12/18/18   07/27/18   03/06/18   2,4,8,9,10,155,15,16   7,669,540     6,696,590  JLB             0           0           0 Synthesis Architects,L.L.P.             0      09/21/22                       12/18/18           
20-0948   Reconstruction               0-009-012  03/25/21     DONE    DONE       DONE      12/11/20   11/23/20   09/03/20   12/11/19   2,4,8,9,10,155,15,16   3,675,000     3,675,000  JLB             0           0           0 Synthesis Architects,L.L.P.             0      06/23/23                       11/23/20           
  -       Reconstruction               0-009-013                                              /  /       /  /     08/30/22     /  /     155,15,16                      0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Bus Garage (old- new BG 5-016):
18-1145   Reconstruction               5-001-006  05/07/19     DONE    DONE       DONE      12/26/18   12/18/18   07/27/18   03/06/18   2,4,7,8,9,10,155,15,     306,575       306,575  MTM             0           0           0 Synthesis Architects,L.L.P.             0      10/14/19                       12/18/18           

          Bus Maintenance Facility:
18-1146   New Construction             5-016-001  05/07/19     DONE    DONE       DONE      12/26/18   12/18/18   07/27/18   03/06/18   02 - 16                3,308,260     3,308,260  MTM             0           0           0 Synthesis Architects,L.L.P.             0      03/31/21                       12/18/18           
20-0949   Additions and Alterations    5-016-002  03/25/21     DONE    DONE       DONE      12/11/20   11/23/20   09/16/20   12/11/19   02 - 16                1,015,500     1,015,500  JLB             0           0           0 Synthesis Architects,L.L.P.             0      08/02/22                       11/23/20           

          Elementary School Pavilion:
  -       New Construction             7-018-001                                              /  /       /  /     07/14/21     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                           /  /             

          District-Wide:
  -       Reconstruction               7-999-002                                              /  /       /  /     04/05/24     /  /     16                             0             0  WLC             0           0           0                                         0        /  /                           /  /             
23-1750SB Reconstruction               7-999-002               DONE                           /  /       /  /     04/05/24     /  /     16                             0             0  WLC             0           0           0                                         0        /  /                           /  /             
  -    SB Reconstruction               7-999-BA1               DONE                           /  /       /  /       /  /       /  /     16                             0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Temp. Dist. Office Const.Swing Space:
19-1421SS New Construction             8-017-001  04/05/21     DONE    DONE       DONE      02/19/20   02/18/20   12/20/19   03/06/18   02 - 16                        0             0  JLB             0           0           0 Synthesis Architects,L.L.P.             0      01/02/20                       02/18/20           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




BRUNSWICK CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 49-02-02-04
last updated on 04/18/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Tamarac MS/HS High School:
21-0135   Reconstruction               0-003-028  10/13/21     DONE    DONE       DONE      08/04/21   08/03/21   03/05/21   12/08/20   2,4,7,8,9,155,15,16   11,536,700    11,536,700  JLB             0           0           0 SEI Design Group                        0      08/31/23                       08/03/21           
  -       Reconstruction               0-003-029                                              /  /       /  /     11/06/23     /  /     16                             0             0  JJH             0           0           0                                         0        /  /                           /  /             

          Tamarac Elementary:
20-0061   Reconstruction               0-009-020  08/21/20     DONE    DONE       DONE      07/15/20   06/29/20   05/15/20   06/09/20   2,15,16                  100,000       100,000  JLB             0           0           0 SEI Design Group                        0      06/15/21                       06/29/20           
21-0136   Reconstruction               0-009-021  10/13/21     DONE    DONE       DONE      08/04/21   08/03/21   03/05/21   12/08/20   2,4,7,8,9,155,15,16    1,100,700     1,100,700  JLB             0           0           0 SEI Design Group                        0      08/31/23                       08/03/21           
21-0424   Reconstruction               0-009-022  11/04/21     DONE    DONE       DONE      09/24/21   09/23/21   06/21/21   05/18/21   15                       100,000       100,000  JLB             0           0           0 SEI Design Group                        0      03/08/22                       09/23/21           

          Baseball Dugout #1:
20-1886DB Discovered Building          7-016-001  07/13/21     DONE    DONE       DONE      06/16/21   06/14/21   05/27/21     /  /                                    0             0  JLB             0           0           0                                         0        /  /                         06/14/21           

          Baseball Dugout #2:
20-1887DB Discovered Building          7-017-001  07/13/21     DONE    DONE       DONE      06/16/21   06/14/21   05/27/21     /  /                                    0             0  JLB             0           0           0                                         0        /  /                         06/14/21           

          Softball Dugout #1:
20-1888DB Discovered Building          7-018-001  07/13/21     DONE    DONE       DONE      06/16/21   06/14/21   05/27/21     /  /                                    0             0  JLB             0           0           0                                         0        /  /                         06/14/21           

          Softball Dugout #2:
20-1889DB Discovered Building          7-019-001  07/13/21     DONE    DONE       DONE      06/16/21   06/14/21   05/27/21     /  /                                    0             0  JLB             0           0           0                                         0        /  /                         06/14/21           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




EAST GREENBUSH CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 49-03-01-06
last updated on 04/18/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Goff Middle School:
18-0539   Reconstruction               0-001-015  09/23/19     DONE    DONE       DONE      09/28/18   09/26/18   08/29/17   05/16/17   2,8,16                 6,340,238     6,340,238  SLC             0           0           0 March Associates                        0      09/15/22                       09/26/18           
21-0669   Reconstruction               0-001-016  11/12/21     DONE    DONE       DONE      11/08/21   11/08/21   07/27/21   05/16/17   155                    1,140,000     1,140,000  SLC             0           0           0 March Associates                        0      08/31/22                       11/08/21           
  -       Reconstruction               0-001-017                                              /  /       /  /     07/14/22     /  /     2                              0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Green Meadow Elem School:
18-0540   Reconstruction               0-002-017  09/23/19     DONE    DONE       DONE      09/28/18   09/26/18   08/29/17   05/16/17   2,8,16                 4,189,430     4,189,430  SLC             0           0           0 March Associates                        0      09/15/22                       09/26/18           
  -       Reconstruction               0-002-018                                              /  /       /  /     07/14/22     /  /     2,7,9,155,15,16                0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Citizen Genet School:
20-0365   Reconstruction               0-003-017  02/16/21     DONE    DONE       DONE      09/11/20   08/31/20   08/29/17   05/16/17   2,8,16                 6,533,938     6,533,938  SLC             0           0           0 March Associates                        0      10/31/22                       08/31/20           
22-1698   Reconstruction               0-003-018  06/08/23     DONE    DONE       DONE      02/17/23   02/15/23   10/28/22   05/16/17   2,8,155                  600,000       600,000  WLC             0           0           0 March Associates                        0        /  /                         02/15/23           

          Sutherland School:
20-0366   Reconstruction               0-006-018  02/16/21     DONE    DONE       DONE      09/11/20   08/31/20   08/29/17   05/16/17   2,8,16                 3,471,061     3,471,061  SLC             0           0           0 March Associates                        0      10/31/22                       08/31/20           
  -       Reconstruction               0-006-020                                              /  /       /  /     07/14/22     /  /     2,7,9,155,15,16                0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Red Mill Elem School:
18-0541   Reconstruction               0-007-012  09/23/19     DONE    DONE       DONE      09/28/18   09/26/18   08/29/17   05/16/17   2,8,16                 3,844,161     3,844,161  SLC             0           0           0 March Associates                        0      10/01/21                       09/26/18           
  -       Reconstruction               0-007-013                                              /  /       /  /     07/14/22     /  /     2,7,9,155,15,16                0             0  WLC             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-007-014                                              /  /       /  /     10/28/22     /  /     2,8,155                        0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Bell Top School:
20-0367   Reconstruction               0-008-014  02/16/21     DONE    DONE       DONE      09/11/20   08/31/20   08/29/17   05/16/17   2,4,7,8,9,155,15,16    2,949,038     2,949,038  SLC             0           0           0 March Associates                        0      09/06/22                       08/31/20           

          Columbia High School:
20-0368   Reconstruction               0-009-014  02/16/21     DONE    DONE       DONE      09/11/20   08/31/20   08/29/17   05/16/17   2,8,16                 5,693,761     5,693,761  SLC             0           0           0 March Associates                        0      07/18/23                       08/31/20           
21-2012   Reconstruction               0-009-016  10/13/22     DONE    DONE       DONE      06/21/22   06/21/22   05/05/22   05/16/17   8,16                   1,125,000     1,125,000  WLC             0           0           0 March Associates                        0      07/18/23                       06/21/22           
  -       Reconstruction               0-009-017                                              /  /       /  /     07/14/22     /  /     2,16                           0             0  WLC             0           0           0                                         0        /  /                           /  /             

          XXGoff MS Tent - cancelled:
20-1639XX New Construction             0-028-001                         CANCELLED          04/27/21   04/23/21   04/20/21     /  /     02 - 16                        0             0  SLC             0           0           0 March Associates                        0        /  /                         04/23/21           

          Storage/Shed #1 @ HS Athletic Field:
18-2084DB Discovered Building          2-025-001               UNREVIEWED
                                                                       DONE       DONE      06/10/19   06/10/19   12/15/04     /  /                                    0             0  HCM             0           0           0                                         0        /  /                         06/10/19           

          Storage Shed #2 @ HS Athletic Field:
18-2085DB Discovered Building          2-026-001               UNREVIEWED
                                                                       DONE       DONE      06/10/19   06/10/19   12/15/04     /  /                                    0             0  HCM             0           0           0                                         0        /  /                         06/10/19           

          Salt Storage Building:
  -       New Construction             2-027-001                                              /  /       /  /     10/18/19     /  /     02 - 16                        0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Grounds Shop:
18-0542   Reconstruction               3-012-006  09/23/19     DONE    DONE       DONE      09/28/18   09/26/18   08/29/17   05/16/17   2,8,16                    74,262             0  SLC             0           0           0 March Associates                        0      10/01/21                       09/26/18           

          Bus Garage:
18-0543   Reconstruction               5-010-009  09/23/19     DONE    DONE       DONE      09/28/18   09/26/18   08/28/17   05/16/17   2,8,16                   902,394       902,394  SLC             0           0           0 March Associates                        0      10/01/21                       09/26/18           
22-2292   Reconstruction               5-010-010  09/22/21     DONE    DONE       DONE      05/30/23   05/25/23   12/29/20   02/10/21   2,13,15                2,720,038     2,720,038  WLC             0           0           0 March Associates                        0      02/12/23                       05/25/23           

          Ticket Booth #1:
18-2086DB Discovered Building          7-023-001               UNREVIEWED
                                                                       DONE       DONE      06/10/19   06/10/19   12/15/04     /  /                                    0             0  HCM             0           0           0                                         0        /  /                         06/10/19           

          XXDPS Tent 1 - Removed:
20-1640XX New Construction             7-029-001                         CANCELLED          04/27/21   04/23/21   04/20/21     /  /     02 - 16                        0             0  SLC             0           0           0 March Associates                        0        /  /                         04/23/21           

          XXDPS Elem School Tent #2-Cancelled:
20-1641XX New Construction             7-030-001                         CANCELLED          04/27/21   04/23/21   04/20/21     /  /     02 - 16                        0             0  SLC             0           0           0 March Associates                        0        /  /                         04/23/21           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




HOOSICK FALLS CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 49-05-01-06
last updated on 04/18/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Main Building:
19-0406   Reconstruction               0-001-015  12/20/19     DONE    DONE       DONE      09/13/19   09/05/19   10/03/14   03/13/19   2,155,15,16              931,500       931,500  SLC             0           0           0 Synthesis Architects,L.L.P.             0      09/28/20                       09/05/19           
20-0280   Reconstruction               0-001-016  01/08/21     DONE    DONE       DONE      08/31/20   08/14/20   10/28/19   03/13/19   2,4,7,8,9,10,13,155,  21,083,000    21,083,000  SLC             0           0           0 Synthesis Architects,L.L.P.             0      02/21/23                       08/14/20           
22-0819FA Reconstruction               0-001-017  02/14/23     DONE    DONE       DONE      10/26/22   10/21/22   04/27/22   10/21/21   2,4,7,8,9,10,155,15,   3,544,000     3,544,000  SLC             0           0           0 Synthesis Architects,L.L.P.             0      09/01/23                       10/21/22           
  -    SB Reconstruction               0-001-BA1               DONE                           /  /       /  /       /  /       /  /     16                             0    34,793,309  SLC             0           0           0                                         0        /  /                           /  /             

          Bus Garage:
  -    XX Reconstruction               5-002-005                         CANCELLED            /  /       /  /     10/28/19     /  /     2,16                           0             0  SLC             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




LANSINGBURGH CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 49-06-01-06
last updated on 04/18/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Knickerbacker Middle School:
19-0446   Reconstruction               0-006-015  12/06/19     DONE    DONE       DONE      09/20/19   09/19/19   07/11/19   01/15/19   2,4,7,8,9,155,16         976,619       976,619  JSS             0           0           0 SEI Design Group                        0      10/30/20                       09/19/19           
22-1220   Reconstruction               0-006-016  03/07/23     DONE    DONE       DONE      12/12/22   10/31/22   06/17/21   12/07/21   2,15,16                2,407,873     2,407,873  SLC             0           0           0 SEI Design Group                        0        /  /                         10/31/22           
21-1732   Reconstruction               0-006-017  09/08/22     DONE    DONE       DONE      04/29/22   04/27/22   02/07/22   05/17/22   2,16                     317,725       317,725  SLC             0           0           0 SEI Design Group                        0        /  /                         04/27/22           

          Lansingburgh High School:
19-0447   Reconstruction               0-010-020  12/06/19     DONE    DONE       DONE      09/20/19   09/06/19   07/11/19   01/15/19   8                         30,750        30,750  JSS             0           0           0 SEI Design Group                        0      09/25/20                       09/06/19           
20-0951   Reconstruction               0-010-021  03/18/21     DONE    DONE       DONE      01/06/21   12/02/20   03/13/20   06/09/20   4,9                      345,000       345,000  JSS             0           0           0 SEI Design Group                        0      12/22/21                       12/02/20           
20-0944   Reconstruction               0-010-022  07/28/20     DONE    DONE       DONE      12/10/20   12/09/20   08/07/20   06/09/20   4,9                       89,000        89,000  JSS             0           0           0 SEI Design Group                        0      09/25/20                       12/09/20           

          Rensselaer Pk Elem (Grades3-5):
  -    PR Additions and Alterations    0-014-012               DONE                           /  /       /  /     06/17/21     /  /     02 - 16                        0    16,239,525  SLC             0           0           0                                         0        /  /                           /  /             
22-1221   Additions and Alterations    0-014-012  03/07/23     DONE    DONE       DONE      12/12/22   10/31/22   06/17/21   12/07/21   02 - 16               13,089,785    10,955,714  SLC             0           0           0 SEI Design Group                        0        /  /                         10/31/22           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




NORTH GREENBUSH COMMON SCHOOL STATUS REPORT ON CAPITAL PROJECTS
District No.: 49-08-01-08
last updated on 04/18/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Little Red School House:
  -    PR Additions and Alterations    0-001-002                                              /  /       /  /     04/30/20     /  /     02 - 16                        0             0  JSS             0           0           0                                         0        /  /                           /  /             
20-0045   Additions and Alterations    0-001-002  09/21/20     DONE    DONE       DONE      07/09/20   06/28/20   04/30/20   03/04/20   02 - 16                3,705,000             0  JSS             0           0           0 Phinney Design Group                    0        /  /                         06/28/20           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




WYNANTSKILL UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 49-08-04-02
last updated on 04/18/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Gardner Dickenson:
23-0183   Reconstruction               0-004-012  01/26/24     DONE    DONE       DONE      08/01/23   08/01/23   11/02/22   12/13/22   7,155,16               4,977,950     4,977,950  JJH             0           0           0 Phinney Design Group                    0        /  /                         08/01/23           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




RENSSELAER CITY SCHOOLS STATUS REPORT ON CAPITAL PROJECTS
District No.: 49-12-00-01
last updated on 04/18/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Pre-K-12 Building:
21-1773FC Reconstruction               0-013-007  05/12/22     DONE    DONE       DONE      05/06/22   04/06/22   03/22/22   03/16/22   155,16                 1,194,294             0  SLC             0           0           0 Bernier Carr Associates                 0      06/02/23                       04/06/22           
23-1793FA Reconstruction               0-013-008               STARTED STARTED    UNREVIEWED04/09/24   03/28/24   02/29/24   03/10/21   4,7                      350,000             0  MSK             0           0           0 Bernier Carr Associates                 0        /  /                         03/28/24           
  -    SB Reconstruction               0-013-BA1               DONE                           /  /       /  /       /  /       /  /     10                             0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Leased Bus Garage:
21-0388   Reconstruction               5-012-L03  09/21/21     DONE    DONE       DONE      09/21/21   09/13/21   09/22/21   05/18/21                            261,000       261,000  SLC             0           0           0                                         0        /  /                         09/13/21           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




AVERILL PARK CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 49-13-02-06
last updated on 04/18/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          High School:
20-0124   Reconstruction               0-001-013  08/25/20     DONE    DONE       DONE      07/28/20   07/16/20   05/21/20   06/09/20   8,9,155,16               100,000       100,000  JSS             0           0           0 Mosaic Associates                       0      04/14/21                       07/16/20           
21-1178   Reconstruction               0-001-014  08/10/21     DONE    DONE       DONE      01/19/22   01/19/22   08/17/21   08/30/21   2,9,155,15,16          1,081,833     1,081,833  SLC             0           0           0 Mosaic Associates                       0      05/26/22                       01/19/22           
21-1048   Reconstruction               0-001-015  05/03/22     DONE    DONE       DONE      01/07/22   01/06/22   11/17/21   10/12/21   8                         23,750        23,750  SLC             0           0           0 Mosaic Associates                       0      11/30/22                       01/06/22           
22-0495   Reconstruction               0-001-016  12/05/22     DONE    DONE       DONE      09/14/22   09/14/22   01/12/22   10/12/21   2,4,7,10,13,14,155,1   6,730,250     6,730,250  SLC             0           0           0 Mosaic Associates                       0        /  /                         09/14/22           
22-0077   Reconstruction               0-001-017  08/31/22     DONE    DONE       DONE      07/13/22   07/12/22   05/17/22   05/17/22   2,9,15,16                100,000       100,000  SLC             0           0           0 Mosaic Associates                       0      06/29/23                       07/12/22           
23-0553   Reconstruction               0-001-018  11/14/23     DONE    DONE       DONE      09/25/23   09/19/23   06/26/23   05/16/23   9                        100,000       100,000  MSK             0           0           0 Mosaic Associates                       0        /  /                         09/19/23           
  -       Reconstruction               0-001-019                                              /  /       /  /     11/08/23     /  /     9,155,15,16                    0             0  MSK             0           0           0                                         0        /  /                           /  /             

          Poestenkill Elementary:
21-1049   Reconstruction               0-004-010  05/03/22     DONE    DONE       DONE      01/07/22   01/06/22   11/17/21   10/12/21   8                         12,750        12,750  SLC             0           0           0 Mosaic Associates                       0      11/30/22                       01/06/22           
23-0575   Reconstruction               0-004-011  04/16/24     DONE    DONE       DONE      09/29/23   09/27/23   01/12/22   10/12/21   2,4,7,8,9,10,13,155,   1,273,000     1,273,000  MSK             0           0           0 Mosaic Associates                       0        /  /                         09/27/23           
23-1123   Reconstruction               0-004-012                         UNREVIEWED         12/05/23   11/22/23   09/28/23   10/12/21   2,4,7,8,9,10,13,155,           0             0  MSK             0           0           0 Mosaic Associates                       0        /  /                         11/22/23           

          West Sand Lake Elementary:
21-1050   Reconstruction               0-006-010  05/03/22     DONE    DONE       DONE      01/07/22   01/06/22   11/17/21   10/12/21   8                         67,750        67,750  SLC             0           0           0 Mosaic Associates                       0      05/22/23                       01/06/22           
23-0576   Reconstruction               0-006-011  04/16/24     DONE    DONE       DONE      09/29/23   09/27/23   01/12/22   10/12/21   2,4,7,8,9,10,13,155,   1,335,000     1,335,000  MSK             0           0           0 Mosaic Associates                       0        /  /                         09/27/23           
22-0346   Reconstruction               0-006-012  12/30/22     DONE    DONE       DONE      08/26/22   08/24/22   05/19/22   10/12/21   15                       172,500       172,500  SLC             0           0           0 Mosaic Associates                       0      10/25/23                       08/24/22           
23-1124   Reconstruction               0-006-013                         UNREVIEWED         12/05/23   11/22/23   09/28/23   10/12/21   2,4,7,8,9,10,13,155,           0             0  MSK             0           0           0 Mosaic Associates                       0        /  /                         11/22/23           

          Algonguin Middle School:
21-0551   Reconstruction               0-009-012  08/25/21     DONE    DONE       DONE      10/20/21   10/19/21   04/19/21   05/10/21   15,16                    150,000       150,000  SLC             0           0           0 Mosaic Associates                       0      12/13/22                       10/19/21           
21-0239   Reconstruction               0-009-013  11/08/21     DONE    DONE       DONE      08/26/21   08/26/21   05/21/21   05/18/21   16                       100,000       100,000  SLC             0           0           0 Mosaic Associates                       0      06/26/22                       08/26/21           
21-1179   Reconstruction               0-009-014  08/10/21     DONE    DONE       DONE      01/19/22   01/19/22   08/17/21   08/30/21   9                        694,512       694,512  SLC             0           0           0 Mosaic Associates                       0      05/26/22                       01/19/22           
21-1051   Reconstruction               0-009-015  05/03/22     DONE    DONE       DONE      01/07/22   01/06/22   11/17/21   10/12/21   8                         34,750        34,750  SLC             0           0           0 Mosaic Associates                       0      11/30/22                       01/06/22           
22-0496   Reconstruction               0-009-016  12/05/22     DONE    DONE       DONE      09/14/22   09/14/22   01/12/22   10/12/21   2,4,7,8,9,10,13,155,   5,183,850     5,183,850  SLC             0           0           0 Mosaic Associates                       0        /  /                         09/14/22           
22-0347   Reconstruction               0-009-017  12/30/22     DONE    DONE       DONE      08/26/22   08/24/22   05/19/22   10/12/21   2,155,15,16              652,500       652,500  SLC             0           0           0 Mosaic Associates                       0      10/25/23                       08/24/22           
  -       Reconstruction               0-009-018                                              /  /       /  /     03/26/24     /  /     15,16                          0             0  MSK             0           0           0                                         0        /  /                           /  /             

          Miller Hill Elementary:
21-1052   Reconstruction               0-010-009  05/03/22     DONE    DONE       DONE      01/07/22   01/06/22   11/17/21   10/12/21   8                         14,950        14,950  SLC             0           0           0 Mosaic Associates                       0      11/30/22                       01/06/22           
23-0577   Reconstruction               0-010-010  04/16/24     DONE    DONE       DONE      09/29/23   09/27/23   01/12/22   10/12/21   2,4,7,8,9,10,13,155,   1,240,000     1,240,000  MSK             0           0           0 Mosaic Associates                       0        /  /                         09/27/23           
23-1125   Reconstruction               0-010-011                         UNREVIEWED         12/05/23   11/22/23   09/28/23   10/12/21   2,4,7,8,9,10,13,155,           0             0  MSK             0           0           0 Mosaic Associates                       0        /  /                         11/22/23           

          Geo Washington Sch-LsdToBOCES-SpecEd:
21-1053   Reconstruction               0-017-008  05/03/22     DONE    DONE       DONE      01/07/22   01/06/22   11/17/21   10/12/21   8                         12,750             0  SLC             0           0           0 Mosaic Associates                       0      11/30/22                       01/06/22           
  -    PR Additions and Alterations    0-017-009               DONE                           /  /       /  /     01/12/22     /  /     02 - 16                        0     3,610,632  MSK             0           0           0                                         0        /  /                           /  /             
23-0578   Additions and Alterations    0-017-009  04/16/24     DONE    DONE       DONE      09/29/23   09/27/23   01/12/22   10/12/21   02 - 16                1,063,000     1,063,000  MSK             0           0           0 Mosaic Associates                       0        /  /                         09/27/23           
23-1126   Reconstruction               0-017-010                         UNREVIEWED         12/05/23   11/22/23     /  /     10/12/21   2,4,7,8,9,10,13,155,           0             0  MSK             0           0           0 Mosaic Associates                       0        /  /                         11/22/23           

          Bus Garage:
21-1054   Reconstruction               5-016-006  05/03/22     DONE    DONE       DONE      01/07/22   01/06/22   11/10/21   10/12/21   7,8                    4,295,000     4,295,000  SLC             0           0           0 Mosaic Associates                       0      10/10/23                       01/06/22           
22-0348   Reconstruction               5-016-007  12/30/22     DONE    DONE       DONE      08/26/22   08/24/22   01/12/22   10/12/21   2,9,155,15,16             69,500        69,500  SLC             0           0           0 Mosaic Associates                       0      10/25/23                       08/24/22           
22-1774   Reconstruction               5-016-008  02/27/23     DONE    DONE       DONE      03/03/23   03/02/23   10/06/22   11/14/22   16                        50,000        50,000  JLB             0           0           0 Mosaic Associates                       0      11/20/23                       03/02/23           
23-1127   Reconstruction               5-016-009                         UNREVIEWED         12/05/23   11/22/23   08/16/23   10/12/21   8,14,15                        0             0  MSK             0           0           0 Mosaic Associates                       0        /  /                         11/22/23           

          XXsee 7-025-001:
  -    PR New Construction             7-017-001                                              /  /       /  /     10/14/22     /  /     02 - 16                        0             0  SLC             0           0           0                                         0        /  /                           /  /             
  -    XX New Construction             7-017-001  11/14/22               CANCELLED          11/14/22   11/09/22   10/14/22   10/12/21   02 - 16                  684,000             0  SLC             0           0           0 Mosaic Associates                       0        /  /                         11/09/22           

          High Sch Press Box -ToBeDemo'd:
22-0497   Reconstruction               7-022-002  12/05/22     DONE    DONE       DONE      09/14/22   09/14/22   01/12/22   10/12/21   2,7,8,9,16                25,750             0  SLC             0           0           0 Mosaic Associates                       0        /  /                         09/14/22           

          Press Box:
22-0964   New Construction             7-025-001  11/21/22     DONE    DONE       DONE      11/14/22   11/09/22     /  /     10/12/21   02 - 16                  684,000             0  SLC             0           0           0 Mosaic Associates                       0        /  /                         11/09/22           

          District-Wide:
17-1899   Reconstruction               7-999-001  05/07/19     DONE    DONE       DONE      05/29/18   05/25/18   02/28/18   11/04/14   16                       925,300       925,300  SLC             0           0           0 Collins & Scoville Architects           0      04/20/22                       05/25/18           
  -       Reconstruction               7-999-002                                              /  /       /  /     11/10/21     /  /     16                             0             0  SLC             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




HOOSIC VALLEY CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 49-14-01-04
last updated on 04/18/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Elementary School:
18-1692   Reconstruction               0-001-015  05/13/19     DONE    DONE       DONE      03/19/19   03/15/19   06/28/18   05/15/18   9                         50,000        50,000  SLC             0           0           0 Collins & Scoville Architects           0      09/05/19                       03/15/19           
  -    PR Additions and Alterations    0-001-016                                              /  /       /  /     01/14/22     /  /     02 - 16                        0             0  SLC             0           0           0                                         0        /  /                           /  /             
22-1367FA Additions and Alterations    0-001-016  12/20/23     DONE    DONE       DONE      12/28/22   12/27/22   01/14/22   12/14/21   02 - 16                6,673,000     4,687,590  MSK             0           0           0 Collins & Scoville Architects           0        /  /                         12/27/22           
22-1237   Reconstruction               0-001-017  06/06/23     DONE    DONE       DONE      12/14/22   12/13/22   09/22/22   09/08/22   15,16                    743,956       743,956  JLB             0           0           0 ECG Engineering, LLC              705,755        /  /                         12/13/22           
22-2477   Reconstruction               0-001-018  07/31/23     DONE    DONE       DONE      06/30/23   06/29/23   04/19/23   05/16/23   9                        100,000       100,000  MSK             0           0           0 Collins & Scoville Architects           0      02/28/24                       06/29/23           

          Junior Senior High School:
18-1693   Reconstruction               0-002-020  05/13/19     DONE    DONE       DONE      03/19/19   03/15/19   06/28/18   05/15/18   9                         50,000        50,000  SLC             0           0           0 Collins & Scoville Architects           0      09/05/19                       03/15/19           
19-1542   Reconstruction               0-002-021  06/09/20     DONE    DONE       DONE      03/06/20   02/28/20   11/26/19   05/21/19   2,7,13                   310,263       310,263  SLC             0           0           0 Collins & Scoville Architects           0      09/30/20                       02/28/20           
  -       Reconstruction               0-002-022                                              /  /       /  /     04/14/20     /  /     9                              0             0  SLC             0           0           0                                         0        /  /                           /  /             
  -    PR Additions and Alterations    0-002-023                                              /  /       /  /     01/14/22     /  /     02 - 16                        0             0  SLC             0           0           0                                         0        /  /                           /  /             
22-1368FA Additions and Alterations    0-002-023  12/20/23     DONE    DONE       DONE      12/28/22   12/27/22   01/14/22   12/14/21   02 - 16                6,143,800     5,450,080  MSK             0           0           0 Collins & Scoville Architects           0        /  /                         12/27/22           
22-1238   Reconstruction               0-002-024  06/06/23     DONE    DONE       DONE      12/14/22   12/13/22   09/22/22   09/08/22   15,16                  1,111,626     1,111,626  JLB             0           0           0 ECG Engineering, LLC            1,054,545        /  /                         12/13/22           

          New Transportation Facility:
22-1369   Reconstruction               5-009-004  12/20/23     DONE    DONE       DONE      12/28/22   12/27/22   01/14/22   12/14/21   2,8,9,16               1,165,000     1,165,000  MSK             0           0           0 Collins & Scoville Architects           0        /  /                         12/27/22           
22-1239   Reconstruction               5-009-005  06/06/23     DONE    DONE       DONE      12/14/22   12/13/22   09/22/22   09/08/22   15,16                    155,867       155,867  JLB             0           0           0 ECG Engineering, LLC              147,863        /  /                         12/13/22           

          XXStorage Container @ HS:
20-0549TQ Temporary Quarters           8-013-001  12/02/20     DONE    DONE       DONE      10/07/20   10/07/20   08/24/20     /  /                                2,132             0  SLC             0           0           0                                         0        /  /                         10/07/20           

          Storage Container @ ES #1:
20-0550TQ Temporary Quarters           8-014-001  12/02/20     DONE    DONE       DONE      10/07/20   10/07/20   08/24/20     /  /                                2,132             0  SLC             0           0           0                                         0        /  /                         10/07/20           

          Storage Container @ ES #2:
20-1177TQ Temporary Quarters           8-015-001  03/16/21     DONE    DONE       DONE      01/21/21   01/21/21   12/02/20     /  /                                2,132             0  SLC             0           0           0                                         0        /  /                         01/21/21           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




SCHODACK CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 49-15-01-04
last updated on 04/18/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Castleton Elementary:
21-0115   Reconstruction               0-001-018  08/29/21     DONE    DONE       DONE      07/30/21   07/29/21   08/03/20   06/16/20   9,16                     100,000       100,000  SLC             0           0           0 Synthesis Architects,L.L.P.             0      06/07/22                       07/29/21           
22-1703   Reconstruction               0-001-019  05/31/23     DONE    DONE       DONE      02/21/23   02/17/23   07/07/22   05/17/22   2,4,7,8,155,15,16        668,525       668,525  WLC             0           0           0 Synthesis Architects,L.L.P.             0        /  /                         02/17/23           
22-1306   Reconstruction               0-001-020  05/04/23     DONE    DONE       DONE      12/21/22   12/21/22   12/14/22   05/17/22   2,8,16                   357,000       357,000  WLC             0           0           0 Synthesis Architects,L.L.P.             0        /  /                         12/21/22           

          Maple Hill High School (G7-12):
21-1039   Reconstruction               0-002-023  03/21/22     DONE    DONE       DONE      01/05/22   01/04/22   11/20/19   12/14/21   7                        350,000       350,000  SLC             0           0           0 Synthesis Architects,L.L.P.             0      07/12/22                       01/04/22           
  -    XX Reconstruction               0-002-024                         CANCELLED            /  /       /  /     12/17/21     /  /     7                              0    21,624,640  SLC             0           0           0                                         0        /  /                           /  /             
22-0654   Reconstruction               0-002-025  12/01/22     DONE    DONE       DONE      10/07/22   10/04/22   07/07/22   05/17/22   9,16                     100,000       100,000  JJH             0           0           0 Synthesis Architects,L.L.P.             0      06/28/23                       10/04/22           
22-1704   Reconstruction               0-002-026  05/31/23     DONE    DONE       DONE      02/21/23   02/17/23   07/07/22   05/17/22   2,9,155,15,16          4,459,900     4,459,900  WLC             0           0           0 Synthesis Architects,L.L.P.             0        /  /                         02/17/23           
22-1307   Reconstruction               0-002-027  05/04/23     DONE    DONE       DONE      12/21/22   12/21/22   12/14/22   05/17/22   2,155,15,16            2,035,000     2,035,000  WLC             0           0           0 Synthesis Architects,L.L.P.             0        /  /                         12/21/22           
23-0121   Reconstruction               0-002-028  08/25/23     DONE    DONE       DONE      07/21/23   07/21/23   05/18/23   05/16/23   10                       100,000        75,000  WLC             0           0           0 Synthesis Architects,L.L.P.             0        /  /                         07/21/23           

          Middle School-NoAidBldgSee15-0407Add:
20-0871   Reconstruction               0-004-015  02/11/21     DONE    DONE       DONE      11/20/20   11/02/20   08/03/20   06/09/20   7,15,16                   85,000             0  JSS             0           0           0 Synthesis Architects,L.L.P.             0      12/15/21                       11/02/20           
22-1705   Reconstruction               0-004-016  05/31/23     DONE    DONE       DONE      02/21/23   02/17/23   07/07/22   05/17/22   2,8,10,15,16             315,900             0  WLC             0           0           0 Synthesis Architects,L.L.P.             0        /  /                         02/17/23           
22-1308   Reconstruction               0-004-017  05/04/23     DONE    DONE       DONE      12/21/22   12/21/22   12/14/22   05/17/22   2                        321,200             0  WLC             0           0           0 Synthesis Architects,L.L.P.             0        /  /                         12/21/22           

          Soccer Shed #2:
19-0284DB Discovered Building          2-016-001  10/23/19     DONE    DONE       DONE      08/20/19   08/16/19   04/01/19     /  /     02 - 16                        0             0  JSS             0           0           0                                         0        /  /                         08/16/19           

          Bus Garage:
21-1040   Reconstruction               5-005-010  02/10/22     DONE    DONE       DONE      01/05/22   01/04/22   07/14/21   05/18/21   7,8,9                    100,000       100,000  SLC             0           0           0 Synthesis Architects,L.L.P.             0      11/23/22                       01/04/22           
22-1706   Reconstruction               5-005-011  05/31/23     DONE    DONE       DONE      02/21/23   02/17/23   07/07/22   05/17/22   2,8,16                   607,000       607,000  WLC             0           0           0 Synthesis Architects,L.L.P.             0        /  /                         02/17/23           

          District Wide:
  -    SB Reconstruction               7-999-BA1               DONE                           /  /       /  /       /  /       /  /     16                             0             0  JSS             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




TROY CITY SCHOOLS STATUS REPORT ON CAPITAL PROJECTS
District No.: 49-17-00-01
last updated on 04/18/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Public School #2:
19-1585   Reconstruction               0-002-011  04/10/20     DONE    DONE       DONE      03/16/20   03/13/20   11/21/19   05/17/16   2,8,10                   370,920             0  JLB             0           0           0 Mosaic Associates                       0        /  /                         03/13/20           
23-0677   Reconstruction               0-002-012               STARTED DONE       DONE      10/11/23   10/04/23   06/14/23   07/24/23   2,14,155,15,16           800,000             0  WLC             0           0           0 Mosaic Associates                       0        /  /                         10/04/23           

          Public School #12:
  -       Reconstruction               0-005-014                                              /  /       /  /       /  /       /  /     4,7,8,9,10,155,15,16           0             0  JLB             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-005-014                                              /  /       /  /     10/20/20     /  /     2,4,7,8,9,10,13,155,           0             0  JLB             0           0           0                                         0        /  /                           /  /             
20-0631SB Reconstruction               0-005-014               DONE                           /  /       /  /     10/20/20     /  /     2,4,7,8,9,10,13,155,           0             0  JLB             0           0           0                                         0        /  /                           /  /             
20-0722   Reconstruction               0-005-014  03/25/21     DONE    DONE       DONE      10/29/20   10/23/20   01/27/20   12/03/19   2,4,7,8,9,10,155,15,   4,840,000     4,840,000  JLB             0           0           0 Mosaic Associates                       0        /  /                         10/23/20           
  -       Reconstruction               0-005-015                                              /  /       /  /     07/27/21     /  /     10,16                          0             0  JLB             0           0           0                                         0        /  /                           /  /             
22-0142   Reconstruction               0-005-016  10/25/22     DONE    DONE       DONE      07/25/22   07/22/22   06/03/22   05/17/22   2,4,7,9,155,15,16      2,000,000     2,000,000  WLC             0           0           0 Mosaic Associates                       0        /  /                         07/22/22           
23-0678   Reconstruction               0-005-017               STARTED DONE       DONE      10/11/23   10/04/23   04/27/23   07/24/23   2,14,155,15,16         1,100,000             0  WLC             0           0           0 Mosaic Associates                       0        /  /                         10/04/23           

          Public School #16:
  -    PR Additions and Alterations    0-008-013                                              /  /       /  /     10/20/20     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                           /  /             
20-0632SB Additions and Alterations    0-008-013               DONE                           /  /       /  /     01/27/20     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                           /  /             
22-1896   Additions and Alterations    0-008-013  06/21/23     DONE    DONE       DONE      03/20/23   03/16/23   10/20/20   12/03/19   02 - 16                7,500,000     7,500,000  WLC             0           0           0 Mosaic Associates                       0        /  /                         03/16/23           
23-0297   Reconstruction               0-008-014  02/22/24     DONE    DONE       DONE      08/21/23   08/18/23   04/19/23   11/04/14   2,4,7,8,9,10,155,15,     500,000       500,000  WLC             0           0           0 Mosaic Associates                       0        /  /                         08/18/23           

          Public School #14 (New Elem Schl):
  -    PR Additions and Alterations    0-009-006                                              /  /       /  /     10/20/20     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                           /  /             
20-0633SB Additions and Alterations    0-009-006               DONE                           /  /       /  /     01/27/20     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                           /  /             
20-0723   Additions and Alterations    0-009-006  03/25/21     DONE    DONE       DONE      11/02/20   10/23/20   10/20/20   12/03/19   02 - 16               13,820,000    13,700,000  JLB             0           0           0 Mosaic Associates                       0        /  /                         10/23/20           
19-1769   Reconstruction               0-009-007  06/18/20     DONE    DONE       DONE      05/27/20   05/07/20   01/27/20   05/21/19   4                         75,000        75,000  JLB             0           0           0 Mosaic Associates                       0      01/25/21                       05/07/20           
  -       Reconstruction               0-009-008                                              /  /       /  /     07/27/21     /  /     10,16                          0             0  JLB             0           0           0                                         0        /  /                           /  /             
23-0679   Reconstruction               0-009-009               STARTED DONE       DONE      10/11/23   10/04/23   06/14/23   05/16/23   14,155,15,16             350,000             0  WLC             0           0           0 Mosaic Associates                       0        /  /                         10/04/23           

          Public School #18:
  -    PR Additions and Alterations    0-010-015                                              /  /       /  /     10/20/20     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                           /  /             
20-0634SB Additions and Alterations    0-010-015               DONE                           /  /       /  /     01/27/20     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                           /  /             
21-0807   Additions and Alterations    0-010-015  03/29/22     DONE    DONE       DONE      11/30/21   11/24/21   10/20/20   12/03/19   02 - 16                7,000,000     7,000,000  JLB             0           0           0 Mosaic Associates                       0        /  /                         11/24/21           
20-1854   Reconstruction               0-010-016  08/12/21     DONE    DONE       DONE      06/10/21   05/26/21   12/23/20   12/03/19   2,4,155,15,16            500,000       500,000  JLB             0           0           0 Mosaic Associates                       0        /  /                         05/26/21           

          Troy High School:
18-2017   Reconstruction               0-011-031  06/06/19     DONE    DONE       DONE      05/28/19   05/24/19   10/22/18   12/04/18   7                      3,850,000             0  JLB             0           0           0 Mosaic Associates                       0        /  /                         05/24/19           
19-0389   Reconstruction               0-011-032  11/18/19     DONE    DONE       DONE      09/09/19   08/28/19   07/05/19   05/21/19   2,4,8                    100,000       100,000  JLB             0           0           0 Mosaic Associates                       0      12/20/20                       08/28/19           
19-1275   Reconstruction               0-011-033  05/08/20     DONE    DONE       DONE      01/27/20   12/16/19   07/19/19   12/04/18   7                        330,000       330,000  JLB             0           0           0 Mosaic Associates                       0        /  /                         12/16/19           
  -       Reconstruction               0-011-034                                              /  /       /  /     10/20/20     /  /     2,4,7,8,9,10,155,15,           0             0  JLB             0           0           0                                         0        /  /                           /  /             
20-0636SB Reconstruction               0-011-034               DONE                           /  /       /  /     01/27/20     /  /     2,4,7,8,9,10,155,15,           0             0  JLB             0           0           0                                         0        /  /                           /  /             
21-1047XX Reconstruction               0-011-034                         CANCELLED          01/07/22   01/06/22   10/20/20   10/16/19   2,4,7,8,9,10,155,15,           0    77,721,514  FMJ             0           0           0 Mosaic Associates                       0        /  /                         01/06/22           
21-1888   Reconstruction               0-011-035  07/06/22     DONE    DONE       DONE      05/25/22   05/25/22   05/03/22   05/17/22   7                        500,000       500,000  FMJ             0           0           0 Mosaic Associates                       0        /  /                         05/25/22           
  -    PR Additions and Alterations    0-011-036                                              /  /       /  /     12/05/22     /  /     02 - 16                        0             0  WLC             0           0           0                                         0        /  /                           /  /             
23-1243   Additions and Alterations    0-011-036                         UNREVIEWED         12/20/23   12/15/23   12/05/22   10/16/19   02 - 16                        0             0  WLC             0           0           0 Mosaic Associates                       0        /  /                         12/15/23           
22-2491   Reconstruction               0-011-037  07/14/23     DONE    DONE       DONE      06/30/23   06/30/23   04/27/23   05/03/23   2,14,15,16               350,000       350,000  WLC             0           0           0 Mosaic Associates                       0        /  /                         06/30/23           

          Troy Middle Sch (frmly WK Doyle MS):
23-0888   Reconstruction               0-012-018                         UNREVIEWED         11/06/23   10/26/23   06/14/23   05/16/23   2,15,16                        0             0  WLC             0           0           0 Mosaic Associates                       0        /  /                         10/26/23           

          Carroll Hill School:
19-1633   Reconstruction               0-016-010  06/10/20     DONE    DONE       DONE      03/25/20   03/18/20   01/27/20   12/03/19   2,8,9,155,15,16        4,000,000             0  JLB             0           0           0 Mosaic Associates                       0        /  /                         03/18/20           
23-0680   Reconstruction               0-016-011               STARTED DONE       DONE      10/11/23   10/04/23   04/27/23   05/16/23   2,14,155,15,16           350,000             0  WLC             0           0           0 Mosaic Associates                       0        /  /                         10/04/23           

          Troy Community School:
20-0635SB New Construction             0-032-001               DONE                           /  /       /  /     01/06/20     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                           /  /             
20-0724   New Construction             0-032-001  03/25/21     DONE    DONE       DONE      11/02/20   10/23/20   10/20/20   12/03/19   02 - 16               10,770,000    10,770,000  JLB             0           0           0 Mosaic Associates                       0        /  /                         10/23/20           
20-1214PR New Construction             0-032-001                         UNREVIEWED         01/29/21   01/29/21     /  /       /  /     02 - 16                        0    11,278,896  JLB             0           0           0                                         0        /  /                         01/29/21           
  -       Reconstruction               0-032-002                                              /  /       /  /     07/27/21     /  /     10,16                          0             0  JLB             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




BOCES QUESTAR III STATUS REPORT ON CAPITAL PROJECTS
District No.: 49-90-00-00
last updated on 04/18/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Rensselaer Educational Center:
19-0483   Reconstruction               0-030-005  01/16/20     DONE    DONE       DONE      09/23/19   09/16/19   12/21/18   06/05/19   4,7,8,9,10,155,15,16   4,864,632     4,864,632  JSS             0           0           0 Bernier Carr Associates                 0      08/28/20                       09/16/19           
20-0454   Reconstruction               0-030-006  11/18/20     DONE    DONE       DONE      09/25/20   09/18/20   07/31/20   08/13/20   2,4,7,8,9,10,155,15,   4,042,011     4,042,011  JSS             0           0           0 Bernier Carr Associates                 0      09/03/21                       09/18/20           

          BOCES Welding & Heavy Equipmennt:
23-1139   Reconstruction               0-039-003  03/15/24     DONE    DONE       DONE      12/07/23   12/05/23     /  /     04/28/23                          3,975,360     3,182,909                  0           0           0                                         0        /  /                         12/05/23           
23-1632PR Reconstruction               0-039-003               DONE                         03/14/24     /  /       /  /     04/28/23                                  0     3,182,909                  0           0           0                                         0        /  /                           /  /             

          Durham Building:
  -    DB Discovered Building          0-081-001                                              /  /       /  /     12/06/21     /  /                                    0             0  JLB             0           0           0                                         0        /  /                           /  /             
22-0773   Reconstruction               0-081-002  11/30/22     DONE    DONE       DONE      10/21/22   10/19/22   09/14/22   10/06/22   2,4,7,8,9,155,15,16    2,223,180             0  JLB             0           0           0 Bernier Carr Associates                 0      07/25/23                       10/19/22           
  -       Reconstruction               0-081-003                                              /  /       /  /     03/08/24     /  /     4,7                            0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Temp CTE Storage Building:
  -    DB Discovered Building          2-082-001                                              /  /       /  /     12/06/21     /  /                                    0             0  JLB             0           0           0                                         0        /  /                           /  /             

          Durham Block Shed:
  -    DB Discovered Building          2-083-001                                              /  /       /  /     12/06/21     /  /                                    0             0  JLB             0           0           0                                         0        /  /                           /  /             

          Storage Container @ Durham Building:
  -    DB Discovered Building          2-084-001                                              /  /       /  /     12/06/21     /  /                                    0             0  JLB             0           0           0                                         0        /  /                           /  /             

          Rensselaer Trans./ Warehouse:
23-1139XX Reconstruction               5-039-003                         CANCELLED          12/07/23   12/05/23   09/27/23   04/28/23   2,4,7,8,9,10,155,15,   3,975,360     3,975,360  WLC             0           0           0 Bernier Carr Associates                 0        /  /                         12/05/23           

          Temp CTE Stg (Cairo-Durham #2-020):
18-0357TQ Temporary Quarters           8-077-001  02/20/20     DONE    DONE       DONE      09/06/18   08/27/18   08/31/18     /  /                                    0             0  MTM             0           0           0                                         0        /  /                         08/27/18           

          Maple Hill Middle School:
19-0807TQ Temporary Quarters           8-078-001  11/15/19     DONE    DONE       DONE      11/15/19   07/26/19   05/29/19     /  /                                    0             0  JLB             0           0           0                                         0        /  /                         07/26/19           

          Univ.@Albany, Catskill Building:
  -    TQ Temporary Quarters           8-079-001                                              /  /       /  /     08/04/20     /  /                                    0             0  JSS             0           0           0                                         0        /  /                           /  /             

          HVCC Lang Tech. Building:
21-0131TQ Temporary Quarters           8-080-001                       ADDENDUM REQ'D       08/02/21   08/02/21   06/02/21     /  /                                    0             0  JLB             0           0           0                                         0        /  /                         08/02/21           

          Graduation Tent 2024:
23-1778TQ Temporary Quarters           8-085-001                         UNREVIEWED         04/08/24   04/08/24     /  /       /  /                                    0             0  WLC             0           0           0                                         0        /  /                         04/08/24           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED