BURNT HILLS-BALLSTON LAKE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 52-01-01-06
last updated on 04/25/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Burnt Hills Senior High:
19-1199XX Reconstruction 0-003-036 02/27/20 CANCELLED 01/13/20 01/03/20 11/27/19 10/23/18 16 80,000 80,000 JSS 0 0 0 Mosaic Associates 0 / / 01/03/20
- PR Additions and Alterations 0-003-037 / / / / 08/11/20 / / 02 - 16 0 0 JSS 0 0 0 0 / / / /
20-0416 Additions and Alterations 0-003-037 12/21/20 DONE DONE DONE 09/22/20 09/10/20 08/11/20 10/23/18 02 - 16 14,363,000 14,150,345 JSS 0 0 0 Mosaic Associates 0 / / 09/10/20
21-1430 Reconstruction 0-003-038 04/15/22 DONE DONE DONE 03/04/22 03/02/22 01/26/22 10/23/18 2,4,8,9 1,376,000 1,376,000 SLC 0 0 0 Mosaic Associates 0 08/11/23 03/02/22
22-1584 Reconstruction 0-003-039 08/28/23 DONE DONE DONE 01/30/23 01/27/23 12/06/22 05/17/22 2,9,155 142,000 142,000 MSK 0 0 0 Ashley McGraw 0 / / 01/27/23
23-0893 Reconstruction 0-003-040 01/05/24 DONE DONE DONE 11/06/23 10/25/23 06/29/23 05/16/23 9,10 100,000 100,000 MSK 0 0 0 Ashley McGraw 0 / / 10/25/23
23-1276 Reconstruction 0-003-041 UNREVIEWED 12/22/23 12/21/23 09/12/23 10/24/23 7 0 0 MSK 0 0 0 Ashley McGraw 0 / / 12/21/23
Stevens Elementary:
19-0448 Reconstruction 0-004-026 10/09/19 DONE DONE DONE 09/20/19 09/13/19 07/16/19 05/21/19 16 100,000 100,000 JSS 0 0 0 Mosaic Associates 0 06/12/20 09/13/19
21-1431 Reconstruction 0-004-027 04/15/22 DONE DONE DONE 03/04/22 03/02/22 01/26/22 10/23/18 2,9,10,15,16 1,203,000 1,203,000 SLC 0 0 0 Mosaic Associates 0 08/11/23 03/02/22
23-1277 Reconstruction 0-004-028 UNREVIEWED 12/22/23 12/21/23 09/12/23 10/24/23 7 0 0 MSK 0 0 0 Ashley McGraw 0 / / 12/21/23
Pashley Elementary School:
20-0026 Reconstruction 0-006-023 08/25/20 DONE DONE DONE 07/07/20 06/23/20 04/14/20 06/09/20 16 100,000 100,000 JLB 0 0 0 Mosaic Associates 0 05/14/21 06/23/20
20-0417 Reconstruction 0-006-024 12/21/20 DONE DONE DONE 09/22/20 09/10/20 08/11/20 10/23/18 2,7,9,155,15,16 574,000 574,000 JSS 0 0 0 Mosaic Associates 0 10/05/22 09/10/20
20-0418 Reconstruction 0-006-025 12/21/20 DONE DONE DONE 09/22/20 09/10/20 08/26/20 10/22/13 2,9,15 779,000 779,000 JSS 0 0 0 Mosaic Associates 0 10/05/22 09/10/20
21-1432 Reconstruction 0-006-026 04/15/22 DONE DONE DONE 03/04/22 03/02/22 01/26/22 10/23/18 2,8,9,10,15,16 91,000 91,000 SLC 0 0 0 Mosaic Associates 0 08/11/23 03/02/22
23-1278 Reconstruction 0-006-027 UNREVIEWED 12/22/23 12/21/23 09/12/23 10/24/23 7 0 0 MSK 0 0 0 Ashley McGraw 0 / / 12/21/23
Charlton Hghts. Elementary:
21-1433 Reconstruction 0-008-020 04/15/22 DONE DONE DONE 03/04/22 03/02/22 09/23/21 10/23/18 2,8,9,10,15,16 250,000 250,000 SLC 0 0 0 Mosaic Associates 0 08/11/23 03/02/22
21-0816 Reconstruction 0-008-021 02/10/22 DONE DONE DONE 12/02/21 11/30/21 09/23/21 05/18/21 16 100,000 100,000 SLC 0 0 0 Mosaic Associates 0 06/09/22 11/30/21
- Reconstruction 0-008-022 / / / / / / / / 0 0 SLC 0 0 0 0 / / / /
22-1585 Reconstruction 0-008-023 08/28/23 DONE DONE DONE 01/30/23 01/27/23 12/06/22 05/17/22 2,9,15 135,000 135,000 MSK 0 0 0 Ashley McGraw 0 / / 01/27/23
23-1279 Reconstruction 0-008-024 UNREVIEWED 12/22/23 12/21/23 09/12/23 10/24/23 2,7 0 0 MSK 0 0 0 Ashley McGraw 0 / / 12/21/23
O'Rourke Middle School:
18-1374 Reconstruction 0-010-026 04/26/19 DONE DONE DONE 01/31/19 01/09/19 11/15/18 09/18/18 16 100,000 100,000 BMJ 0 0 0 C&S Companies 0 06/30/19 01/09/19
19-0858 Reconstruction 0-010-027 03/02/20 DONE DONE DONE 11/21/19 11/08/19 03/12/19 10/23/18 2,4,7,8,9,10,155,15, 7,670,000 7,670,000 JSS 0 0 0 Mosaic Associates 0 04/27/21 11/08/19
22-1586 Reconstruction 0-010-028 08/28/23 DONE DONE DONE 01/30/23 01/27/23 12/06/22 05/17/22 2,9,15 339,000 339,000 MSK 0 0 0 Ashley McGraw 0 / / 01/27/23
23-1280 Reconstruction 0-010-029 UNREVIEWED 12/22/23 12/21/23 09/12/23 10/24/23 2,7 0 0 MSK 0 0 0 Ashley McGraw 0 / / 12/21/23
Walk-in Cooler/Freezer:
23-1498DB Discovered Building 2-020-001 UNREVIEWED 02/15/24 02/14/24 11/09/23 / / 0 0 MSK 0 0 0 Ashley McGraw 0 / / 02/14/24
Maintenance Center(Frmr.Bus Garage):
23-1281 Reconstruction 3-005-001 UNREVIEWED 12/22/23 12/21/23 09/12/23 10/24/23 7 0 0 MSK 0 0 0 Ashley McGraw 0 / / 12/21/23
Maintenance Garage:
23-1282 Reconstruction 5-002-002 UNREVIEWED 12/22/23 12/21/23 09/12/23 10/24/23 7 0 0 MSK 0 0 0 Ashley McGraw 0 / / 12/21/23
Transportation Center:
19-0675PR New Construction 5-019-001 DONE 11/04/19 / / 03/13/19 / / 02 - 16 0 0 JSS 0 0 0 0 / / / /
19-0859 New Construction 5-019-001 03/02/20 DONE DONE DONE 11/21/19 11/08/19 03/13/19 10/23/18 02 - 16 10,650,000 10,650,000 JSS 0 0 0 Mosaic Associates 0 10/27/21 11/08/19
22-1362 Reconstruction 5-019-002 03/29/23 DONE DONE DONE 12/28/22 12/23/22 11/04/22 05/17/22 2,7,16 100,000 100,000 JLB 0 0 0 Ashley McGraw 0 06/16/23 12/23/22
District-Wide:
19-0167 Reconstruction 7-999-004 10/03/19 DONE DONE DONE 07/26/19 07/24/19 02/22/19 10/23/18 16 110,000 110,000 JSS 0 0 0 Mosaic Associates 0 06/22/20 07/24/19
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
SHENENDEHOWA CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 52-03-02-06
last updated on 04/25/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Acadia-Gowana-Koda Middle School:
21-0759 Reconstruction 0-001-038 01/25/22 DONE DONE DONE 11/19/21 11/19/21 06/17/21 05/18/21 2,9,15,16 3,389,882 3,389,882 SLC 0 0 0 Mosaic Associates 0 / / 11/19/21
22-1035 Reconstruction 0-001-039 01/27/23 DONE DONE DONE 11/18/22 11/17/22 01/13/22 05/18/21 2,4,7,8,9,155,15,16 4,241,588 4,241,588 WLC 0 0 0 Mosaic Associates 0 / / 11/17/22
High School West(fmly Koda MS):
21-0760 Reconstruction 0-004-028 01/25/22 DONE DONE DONE 11/19/21 11/19/21 06/17/21 05/18/21 2,7,8,9,16 336,886 336,886 SLC 0 0 0 Mosaic Associates 0 / / 11/19/21
23-0772 Reconstruction 0-004-029 04/24/24 DONE DONE DONE 10/23/23 10/17/23 04/19/23 05/18/21 2 690,100 690,100 WLC 0 0 0 Mosaic Associates 0 / / 10/17/23
Skano-Tesago Elementary School:
22-1036 Reconstruction 0-006-027 01/27/23 DONE DONE DONE 11/18/22 11/17/22 01/13/22 05/18/21 2,9,155,15,16 2,558,733 2,558,733 WLC 0 0 0 Mosaic Associates 0 / / 11/17/22
Karigon-Orenda Elementary:
22-1037 Reconstruction 0-007-024 01/27/23 DONE DONE DONE 11/18/22 11/17/22 01/13/22 05/18/21 2,9,155,15,16 1,515,325 1,515,325 WLC 0 0 0 Mosaic Associates 0 / / 11/17/22
High School East:
19-1017 Reconstruction 0-008-028 03/04/20 DONE DONE DONE 12/17/19 11/25/19 03/12/19 12/05/17 2,4,7,8,9,10,155,15, 11,580,000 11,580,000 SLC 0 0 0 Mosaic Associates 0 12/22/21 11/25/19
21-0761 Reconstruction 0-008-030 01/25/22 DONE DONE DONE 11/19/21 11/19/21 06/17/21 05/18/21 2,7 2,653,914 2,653,914 SLC 0 0 0 Mosaic Associates 0 / / 11/19/21
22-1038 Reconstruction 0-008-031 01/27/23 DONE DONE DONE 11/18/22 11/17/22 01/13/22 05/18/21 2,4,8,9,155,15,16 3,394,671 3,394,671 WLC 0 0 0 Mosaic Associates 0 / / 11/17/22
21-1990 Reconstruction 0-008-032 11/22/22 DONE DONE DONE 06/17/22 06/15/22 05/13/22 05/18/21 2,9 700,215 700,215 WLC 0 0 0 Mosaic Associates 0 / / 06/15/22
23-0773 Reconstruction 0-008-033 04/24/24 DONE DONE DONE 10/23/23 10/17/23 04/19/23 05/18/21 2,8,15 3,741,350 0 WLC 0 0 0 Mosaic Associates 0 / / 10/17/23
23-0489 Reconstruction 0-008-034 03/12/24 DONE DONE DONE 09/15/23 09/12/23 09/06/23 05/18/21 155,16 480,000 480,000 WLC 0 0 0 Mosaic Associates 0 / / 09/12/23
Chango Elementary:
22-1039 Reconstruction 0-010-016 01/27/23 DONE DONE DONE 11/18/22 11/17/22 01/13/22 05/18/21 2,9,155,15,16 1,125,300 1,125,300 WLC 0 0 0 Mosaic Associates 0 / / 11/17/22
Okte Elementary:
22-1040 Reconstruction 0-011-016 01/27/23 DONE DONE DONE 11/18/22 11/17/22 01/13/22 05/18/21 2,9,155,15,16 788,294 788,294 WLC 0 0 0 Mosaic Associates 0 / / 11/17/22
Arongen E.S.(fmly ES #8):
19-0449 Reconstruction 0-031-013 12/12/19 DONE DONE DONE 09/20/19 09/12/19 07/15/19 05/21/19 7,9 100,000 100,000 SLC 0 0 0 Mosaic Associates 0 06/12/20 09/12/19
20-1611 Reconstruction 0-031-014 04/29/21 DONE DONE DONE 04/22/21 04/19/21 03/02/21 05/17/16 2,4,7,9,155,16 947,000 947,000 SLC 0 0 0 Mosaic Associates 0 07/26/22 04/19/21
21-0762 Reconstruction 0-031-015 01/25/22 DONE DONE DONE 11/19/21 11/19/21 06/17/21 05/18/21 2,7,8,9,155,15,16 1,380,391 1,380,391 SLC 0 0 0 Mosaic Associates 0 / / 11/19/21
Early Learning Center:
23-1690PR New Construction 0-080-001 UNREVIEWED 03/27/24 03/13/24 10/20/22 / / 02 - 16 0 0 WLC 0 0 0 0 / / 03/13/24
District Office:
21-1709 Reconstruction 1-052-006 11/23/22 DONE DONE DONE 04/27/22 04/22/22 06/17/21 05/18/21 2,155,15,16 1,446,363 0 WLC 0 0 0 Mosaic Associates 0 / / 04/22/22
Grounds Building:
22-1041 Reconstruction 3-045-003 01/27/23 DONE DONE DONE 11/18/22 11/17/22 01/13/22 05/08/21 15,16 39,587 0 WLC 0 0 0 Mosaic Associates 0 / / 11/17/22
Bus Garage:
22-1042 Reconstruction 5-003-016 01/27/23 DONE DONE DONE 11/18/22 11/17/22 01/13/22 05/18/21 15,16 316,696 316,696 WLC 0 0 0 Mosaic Associates 0 / / 11/17/22
23-0490 Reconstruction 5-003-017 03/12/24 DONE DONE DONE 09/15/23 09/12/23 09/06/23 05/18/21 2,16 100,000 100,000 WLC 0 0 0 Mosaic Associates 0 / / 09/12/23
District Wide Tech.:
18-0433 Reconstruction 7-999-005 05/31/19 DONE DONE DONE 09/14/18 09/05/18 04/11/18 12/05/17 4,992,800 4,721,304 SLC 0 0 0 Mosaic Associates 0 11/09/22 09/05/18
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
CORINTH CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 52-04-01-04
last updated on 04/25/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Oak StreetMiddle/High School:
19-0876 Reconstruction 0-001-031 01/24/20 DONE DONE DONE 11/27/19 11/18/19 03/27/19 05/17/16 2,7,8,9,10,16 762,000 762,000 JSS 0 0 0 Clark Patterson Lee 0 10/22/20 11/18/19
20-1319 Reconstruction 0-001-032 05/19/21 DONE DONE DONE 02/19/21 02/09/21 10/15/20 05/17/16 2,4,8,9,10,14,155,16 230,000 230,000 JSS 0 0 0 Bernier Carr Associates 0 02/21/22 02/09/21
- PR Additions and Alterations 0-001-033 / / / / 03/15/21 / / 02 - 16 0 0 JSS 0 0 0 0 / / / /
21-0956 Additions and Alterations 0-001-033 05/23/22 DONE DONE DONE 12/27/21 12/22/21 03/15/21 02/09/21 02 - 16 11,319,229 10,872,434 JLB 0 0 0 Bernier Carr Associates 0 / / 12/22/21
21-0255 Reconstruction 0-001-034 10/27/21 DONE DONE DONE 09/01/21 08/30/21 05/21/21 05/18/21 8,9,16 100,000 100,000 JLB 0 0 0 Bernier Carr Associates 0 05/27/22 08/30/21
21-1507FA Reconstruction 0-001-035 04/27/22 DONE DONE DONE 03/14/22 03/14/22 01/18/22 01/24/22 2,15 1,340,000 1,340,000 JLB 0 0 0 Bernier, Carr & Associates 0 10/27/22 03/14/22
22-0628 Reconstruction 0-001-036 11/15/22 DONE DONE DONE 10/03/22 10/03/22 06/02/22 05/17/22 8,9,16 100,000 100,000 JLB 0 0 0 Bernier Carr Associates 0 02/24/23 10/03/22
23-1411 Reconstruction 0-001-037 03/12/24 DONE DONE DONE 01/24/24 01/19/24 11/09/23 05/16/23 2,9 100,000 0 JJH 0 0 0 Bernier, Carr & Associates 0 / / 01/19/24
Elementary School K-4:
19-0877 Reconstruction 0-015-010 01/28/20 DONE DONE DONE 11/27/19 11/18/19 03/27/19 05/17/16 7,8,16 84,000 84,000 JSS 0 0 0 Clark Patterson Lee 0 09/10/20 11/18/19
20-0568 Reconstruction 0-015-011 01/28/21 DONE DONE DONE 10/09/20 09/29/20 03/09/20 06/09/20 8 100,000 100,000 JSS 0 0 0 Bernier Carr Associates 0 06/17/21 09/29/20
20-1320 Reconstruction 0-015-012 05/19/21 DONE DONE DONE 02/19/21 02/09/21 10/15/20 05/17/16 8,9,155,16 970,000 970,000 JLB 0 0 0 Bernier Carr Associates 0 02/21/22 02/09/21
21-0957 Reconstruction 0-015-013 05/23/22 DONE DONE DONE 12/27/21 12/23/21 03/15/21 02/09/21 4,8,9,155,15,16 1,080,000 1,080,000 JLB 0 0 0 Bernier Carr Associates 0 / / 12/23/21
Bus Garage (new 2016):
- Reconstruction 5-024-002 / / / / 06/25/19 / / 2,7 0 0 BMJ 0 0 0 0 / / / /
Salt Shed:
- PR New Construction 7-025-001 / / / / 04/04/22 / / 02 - 16 0 0 JLB 0 0 0 0 / / / /
District-Wide:
- Reconstruction 7-999-001 / / / / 10/07/20 / / 16 0 0 JSS 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
GALWAY CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 52-07-01-04
last updated on 04/25/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Galway K-12 Facility:
20-1335 Reconstruction 0-002-024 03/09/21 DONE DONE DONE 02/09/21 02/09/21 01/05/21 05/05/20 7 100,000 0 JSS 0 0 0 Collins & Scoville Architects 0 06/30/21 02/09/21
21-0872 Reconstruction 0-002-025 01/13/22 DONE DONE DONE 12/08/21 12/08/21 07/21/21 05/18/21 9,15 100,000 100,000 JLB 0 0 0 Collins & Scoville Architects 0 / / 12/08/21
21-1126 Reconstruction 0-002-026 07/11/22 DONE DONE DONE 01/14/22 01/12/22 07/21/21 05/18/21 2,9,15 420,000 420,000 JLB 0 0 0 Collins & Scoville Architects 0 / / 01/12/22
21-1427 Reconstruction 0-002-027 03/17/22 DONE DONE DONE 03/03/22 03/02/22 02/22/22 12/16/21 155 70,000 70,000 JLB 0 0 0 Collins & Scoville Architects 0 / / 03/02/22
21-1708 Reconstruction 0-002-028 09/01/22 DONE DONE DONE 04/27/22 04/26/22 03/02/22 12/16/21 8,9 600,000 600,000 JLB 0 0 0 Collins & Scoville Architects 0 / / 04/26/22
22-0544FC Reconstruction 0-002-029 12/06/22 DONE DONE DONE 09/21/22 09/20/22 08/26/22 08/04/22 2,9,10,15,16 704,275 704,275 JLB 0 0 0 Collins & Scoville Architects 0 / / 09/20/22
22-1451 Reconstruction 0-002-030 02/21/23 DONE DONE DONE 01/09/23 01/06/23 11/29/22 05/17/22 2,8 100,000 100,000 JJH 0 0 0 Collins & Scoville Architects 0 / / 01/06/23
- Reconstruction 0-002-031 / / / / 02/24/23 / / 2,4,7,8,9,155,15,16 0 0 JJH 0 0 0 0 / / / /
23-1297 Reconstruction 0-002-032 03/06/24 DONE DONE DONE 12/28/23 12/26/23 11/20/23 05/16/23 16 100,000 100,000 JJH 0 0 0 Collins & Scoville Architects 0 / / 12/26/23
XXTent 1 - Cancelled:
20-0372XX New Construction 0-014-001 CANCELLED 09/14/20 09/14/20 09/02/20 / / 02 - 16 0 0 JLB 0 0 0 0 / / 09/14/20
XXTent 2 - Cancelled:
20-0373XX New Construction 0-015-001 CANCELLED 09/14/20 09/14/20 09/02/20 / / 02 - 16 0 0 JLB 0 0 0 0 / / 09/14/20
XXTent 3 - Canceled:
20-0374XX New Construction 0-016-001 CANCELLED 09/14/20 09/14/20 09/02/20 / / 02 - 16 0 0 JLB 0 0 0 0 / / 09/14/20
XXTent 4 - Canceled:
20-0375XX New Construction 0-017-001 CANCELLED 09/14/20 09/14/20 09/02/20 / / 02 - 16 0 0 JSS 0 0 0 0 / / 09/14/20
Storage Building Demolition:
21-1939DB Discovered Building 2-007-002 06/08/22 DONE DONE DONE 06/08/22 06/08/22 04/11/22 / / 7,8,9 0 0 JLB 0 0 0 0 / / 06/08/22
Storage Building (2):
21-1127 New Construction 2-021-001 07/11/22 DONE DONE DONE 01/14/22 01/12/22 07/21/21 05/18/21 02 - 16 165,000 0 JLB 0 0 0 Collins & Scoville Architects 0 / / 01/12/22
Storage Building demolition:
- DB Discovered Building 2-026-001 / / / / 04/17/22 / / 0 0 JLB 0 0 0 0 / / / /
Bus Maint/Storage Facility:
21-1128 Reconstruction 5-008-005 07/11/22 DONE DONE DONE 01/14/22 01/12/22 07/21/21 05/18/21 2,9,10 1,914,000 1,914,000 JLB 0 0 0 Collins & Scoville Architects 0 / / 01/12/22
Pavilion with Toilet Room & Storage:
21-1129 New Construction 7-022-001 07/11/22 DONE DONE DONE 01/14/22 01/12/22 07/21/21 05/18/21 02 - 16 601,000 0 JLB 0 0 0 Collins & Scoville Architects 0 / / 01/12/22
Storage for Furniture:
- TQ Temporary Quarters 8-018-001 / / / / 11/10/20 / / 0 0 JSS 0 0 0 0 / / / /
Storage for Furniture (2):
- TQ Temporary Quarters 8-019-001 / / / / 12/07/20 / / 0 0 JSS 0 0 0 0 / / / /
XXGraduation Tent:
20-1878TQ Temporary Quarters 8-020-001 06/14/21 DONE DONE DONE 06/14/21 06/14/21 06/03/21 / / 0 0 JLB 0 0 0 0 / / 06/14/21
Homecoming Tent 1:
21-0425TQ Temporary Quarters 8-023-001 DONE ADD. REQ'D DONE 09/24/21 09/24/21 09/23/21 / / 0 0 FMJ 0 0 0 0 / / 09/24/21
Homecoming Tent 2:
21-0426TQ Temporary Quarters 8-024-001 DONE ADD. REQ'D DONE 09/24/21 09/24/21 09/23/21 / / 0 0 FMJ 0 0 0 0 / / 09/24/21
Graduation Tent:
- TQ Temporary Quarters 8-025-001 / / / / / / / / 0 0 JLB 0 0 0 0 / / / /
21-1762TQ Temporary Quarters 8-025-001 10/03/22 DONE DONE DONE 05/04/22 / / / / / / 0 0 JLB 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
MECHANICVILLE CITY SCHOOLS STATUS REPORT ON CAPITAL PROJECTS
District No.: 52-12-00-05
last updated on 04/25/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Middle School/High School:
18-1725XX Additions and Alterations 0-006-017 11/06/19 CANCELLED 03/27/19 03/21/19 09/28/16 12/10/15 02 - 16 2,294,000 0 MTM 0 0 0 Bonacci Architects 0 / / 03/21/19
21-0981 Reconstruction 0-006-019 03/21/22 DONE DONE DONE 12/27/21 12/27/21 11/19/21 05/18/21 7 556,261 556,261 JLB 0 0 0 Collins & Scoville Architects 0 12/22/22 12/27/21
22-2146 Reconstruction 0-006-020 09/11/23 DONE DONE DONE 05/05/23 05/04/23 02/27/23 12/10/15 2,9,16 6,454,048 6,454,048 WLC 0 0 0 Collins & Scoville Architects 0 / / 05/04/23
Elementary School:
- Reconstruction 0-010-005 / / / / 07/02/19 / / 2,4,7,8,9,10,155,15, 0 0 JLB 0 0 0 0 / / / /
22-2147 Reconstruction 0-010-006 09/11/23 DONE DONE DONE 05/05/23 05/04/23 02/27/23 12/10/15 2,7,8,9,10,155,15,16 940,338 940,338 WLC 0 0 0 Collins & Scoville Architects 0 / / 05/04/23
23-0320 Reconstruction 0-010-007 01/26/24 DONE DONE DONE 08/24/23 08/09/23 08/11/23 05/16/23 2,9,16 2,400,000 2,400,000 WLC 0 0 0 Collins & Scoville Architects 0 / / 08/09/23
Bus Garage:
22-2148 Reconstruction 5-005-004 07/24/23 DONE DONE DONE 05/05/23 05/04/23 02/27/23 12/10/15 2,4,7,8,9,10,13,155, 325,962 325,962 WLC 0 0 0 Collins & Scoville Architects 0 / / 05/04/23
District-Wide:
- Reconstruction 7-999-001 / / / / 06/03/19 / / 16 0 0 JLB 0 0 0 0 / / / /
18-2044SB Reconstruction 7-999-001 DONE / / / / 06/03/19 / / 16 0 0 JLB 0 0 0 0 / / / /
- SB Reconstruction 7-999-BA1 DONE / / / / / / / / 16 0 0 JLB 0 0 0 0 / / / /
Graduation Tent:
- XX Reconstruction 8-016-001 CANCELLED / / / / 05/06/21 / / 0 0 JLB 0 0 0 0 / / / /
Tent @ Jr/Sr High:
- TQ Temporary Quarters 8-017-001 / / / / 09/23/21 / / 0 0 JLB 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
BALLSTON SPA CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 52-13-01-06
last updated on 04/25/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Ballston Ave. Complex (HS/MS):
18-2000 Reconstruction 0-001-032 10/25/19 DONE DONE DONE 05/23/19 05/15/19 10/24/18 10/16/18 155,16 4,907,000 4,907,000 JSS 0 0 0 Energy Concepts Engineering,P 0 02/18/21 05/15/19
19-0066 Reconstruction 0-001-033 09/25/19 DONE DONE DONE 07/12/19 07/02/19 10/24/18 10/16/18 2,4,7,8,9,10,13,155, 10,765,000 10,765,000 JSS 0 0 0 Collins & Scoville Architects 0 12/01/22 07/02/19
20-1469 Reconstruction 0-001-034 05/04/21 DONE DONE DONE 03/23/21 03/18/21 02/24/20 06/09/20 2,13,16 100,000 100,000 JSS 0 0 0 Collins & Scoville Architects 0 03/23/22 03/18/21
21-0258 Reconstruction 0-001-035 12/14/21 DONE DONE DONE 09/01/21 08/30/21 04/27/21 05/18/21 10 100,000 0 FMJ 0 0 0 Collins & Scoville Architects 0 / / 08/30/21
21-1640 Reconstruction 0-001-036 05/13/22 DONE DONE DONE 04/11/22 04/06/22 02/22/22 10/16/18 2,8,9 1,400,000 1,400,000 SLC 0 0 0 Collins & Scoville Architects 0 10/20/23 04/06/22
22-1437FA Reconstruction 0-001-037 02/26/23 DONE DONE DONE 01/09/23 11/14/22 03/31/22 11/02/22 155,16 446,292 0 SLC 0 0 0 Collins & Scoville Architects 0 / / 11/14/22
22-1937 Reconstruction 0-001-038 05/04/23 DONE DONE DONE 03/27/23 03/24/23 12/01/22 05/17/22 9,155,16 100,000 100,000 JLB 0 0 0 Collins & Scoville Architects 0 / / 03/24/23
Malta Avenue School:
19-0067 Reconstruction 0-002-024 09/25/19 DONE DONE DONE 07/12/19 07/02/19 03/21/18 10/16/18 2,4,7,8,9,155,15,16 7,940,000 7,940,000 JSS 0 0 0 Collins & Scoville Architects 0 12/01/22 07/02/19
- Reconstruction 0-002-025 / / / / 12/10/21 / / 155,16 0 0 SLC 0 0 0 0 / / / /
Wood Rd Complex (Prim. Middle):
- PR Additions and Alterations 0-006-024 / / / / 05/01/19 / / 02 - 16 0 0 BMJ 0 0 0 0 / / / /
18-2194 Additions and Alterations 0-006-024 07/03/19 DONE DONE DONE 06/24/19 06/21/19 05/01/19 05/21/19 02 - 16 100,000 100,000 BMJ 0 0 0 Collins & Scoville Architects 0 06/22/20 06/21/19
Gordon Creek ES:
22-1438FC Reconstruction 0-024-002 03/05/23 DONE DONE DONE 01/09/23 11/14/22 12/10/21 11/02/22 155,16 639,461 0 SLC 0 0 0 Collins & Scoville Architects 0 / / 11/14/22
Field Storage Building:
19-0068 New Construction 2-027-001 09/25/19 DONE DONE DONE 07/12/19 07/02/19 10/26/18 10/16/18 02 - 16 368,000 0 MTM 0 0 0 Collins & Scoville Architects 0 09/16/20 07/02/19
District Wide:
- SB Reconstruction 7-999-BA1 DONE / / / / / / / / 16 0 0 JLB 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
SOUTH GLENS FALLS CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 52-14-01-04
last updated on 04/25/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Senior High School:
20-0074 Reconstruction 0-001-022 10/20/20 DONE DONE DONE 07/20/20 07/01/20 03/09/20 12/08/15 2,9,16 1,149,200 0 JSS 0 0 0 Collins & Scoville Architects 0 08/26/21 07/01/20
21-1578 Reconstruction 0-001-023 06/08/22 DONE DONE DONE 03/30/22 03/28/22 02/22/22 05/18/21 8 100,000 100,000 FMJ 0 0 0 Collins & Scoville Architects 0 06/30/22 03/28/22
22-1981 Reconstruction 0-001-024 09/20/23 DONE DONE DONE 04/03/23 03/30/23 07/20/22 05/17/22 2,4,9,155,15,16 6,172,000 5,130,940 WLC 0 0 0 Collins & Scoville Architects 0 / / 03/30/23
- Reconstruction 0-001-025 / / / / 07/20/22 / / 2,4,9,155,15,16 0 0 WLC 0 0 0 0 / / / /
- Reconstruction 0-001-026 / / / / 05/19/23 / / 2 0 0 WLC 0 0 0 0 / / / /
Harrison Elementary School:
20-0075 Reconstruction 0-002-013 10/20/20 DONE DONE DONE 07/20/20 07/01/20 03/09/20 12/08/15 2,9 491,500 491,500 JSS 0 0 0 Collins & Scoville Architects 0 08/26/21 07/01/20
- Reconstruction 0-002-014 / / / / 07/20/22 / / 2,4,9,155,15,16 0 0 WLC 0 0 0 0 / / / /
Moreau Elementary School:
20-0076 Reconstruction 0-003-016 10/20/20 DONE DONE DONE 07/20/20 07/01/20 03/09/20 12/08/15 2,9 658,600 0 JSS 0 0 0 Collins & Scoville Architects 0 08/26/21 07/01/20
- Reconstruction 0-003-017 / / / / 07/20/22 / / 2,4,9,155,15,16 0 0 WLC 0 0 0 0 / / / /
23-0056 Reconstruction 0-003-018 01/19/24 DONE DONE DONE 07/12/23 07/10/23 04/26/23 05/16/23 8,9,155,15,16 100,000 100,000 WLC 0 0 0 Collins & Scoville Architects 0 / / 07/10/23
- Reconstruction 0-003-019 / / / / 04/26/23 / / 8,9,155,15,16 0 0 WLC 0 0 0 0 / / / /
Oliver W. Winch Middle School:
22-1803 Reconstruction 0-007-013 10/25/23 DONE DONE DONE 03/08/23 03/07/23 07/20/22 05/17/22 2,4,8,9,10,155,15,16 12,418,000 12,418,000 WLC 0 0 0 Collins & Scoville Architects 0 / / 03/07/23
Tanglewood Elementary School:
19-0209 Reconstruction 0-008-011 08/27/19 DONE DONE DONE 08/05/19 08/02/19 07/23/19 12/08/15 15 182,000 182,000 JSS 0 0 0 Collins & Scoville Architects 0 11/12/19 08/02/19
20-0077 Reconstruction 0-008-012 10/20/20 DONE DONE DONE 07/20/20 07/01/20 03/09/20 12/08/15 2,9 425,300 0 JSS 0 0 0 Collins & Scoville Architects 0 08/26/21 07/01/20
22-0920 Reconstruction 0-008-013 03/09/23 DONE DONE DONE 11/07/22 11/03/22 07/20/22 05/17/22 2,9,16 6,300,800 3,120,084 WLC 0 0 0 Collins & Scoville Architects 0 / / 11/03/22
- Reconstruction 0-008-014 / / / / 07/20/22 / / 2,4,7,8,9,155,15,16 0 15,652,479 WLC 0 0 0 0 / / / /
22-2205 Reconstruction 0-008-015 11/09/23 DONE DONE DONE 05/15/23 05/12/23 04/26/23 05/17/22 8 100,000 100,000 WLC 0 0 0 Collins & Scoville Architects 0 / / 05/12/23
Ballard Elementary School:
20-0078 Reconstruction 0-009-009 10/20/20 DONE DONE DONE 07/20/20 07/01/20 03/09/20 12/08/15 2,9,155,16 496,500 0 JSS 0 0 0 Collins & Scoville Architects 0 08/26/21 07/01/20
- Reconstruction 0-009-010 / / / / 07/20/22 / / 2,4,7,8,9,155,15,16 0 0 WLC 0 0 0 0 / / / /
Utility Storage Bldg-Kindness Closet:
19-0005 New Construction 2-019-001 07/11/19 DONE DONE DONE 07/01/19 06/24/19 04/19/19 04/30/19 02 - 16 85,000 0 BMJ 0 0 0 Collins & Scoville Architects 0 11/21/19 06/24/19
Storage Building-Track:
- PR New Construction 2-020-001 / / / / 07/20/22 / / 02 - 16 0 0 WLC 0 0 0 0 / / / /
22-0921 New Construction 2-020-001 03/09/23 DONE DONE DONE 11/07/22 11/03/22 07/20/22 05/17/22 02 - 16 144,700 0 WLC 0 0 0 Collins & Scoville Architects 0 12/14/23 11/03/22
Stadium Storage Building:
- PR New Construction 2-021-001 / / / / 08/26/22 / / 02 - 16 0 0 WLC 0 0 0 0 / / / /
Concession Stand:
22-1982 Reconstruction 7-013-003 09/20/23 DONE DONE DONE 04/03/23 03/30/23 08/26/22 05/17/22 4,7,8,16 108,500 0 WLC 0 0 0 Collins & Scoville Architects 0 / / 03/30/23
Concession Building- Stadium:
- PR New Construction 7-019-001 / / / / 07/20/22 / / 02 - 16 0 0 WLC 0 0 0 0 / / / /
22-1983 New Construction 7-019-001 09/20/23 DONE DONE DONE 04/03/23 03/30/23 07/20/22 05/17/22 02 - 16 1,701,500 0 WLC 0 0 0 Collins & Scoville Architects 0 / / 03/30/23
Dugout BB1:
- PR New Construction 7-022-001 / / / / 09/09/22 / / 02 - 16 0 0 WLC 0 0 0 0 / / / /
22-0922 New Construction 7-022-001 03/09/23 DONE DONE DONE 11/07/22 11/03/22 09/09/22 05/17/22 02 - 16 62,500 0 WLC 0 0 0 Collins & Scoville Architects 0 12/14/23 11/03/22
Dugout BB2:
- PR New Construction 7-023-001 / / / / / / / / 02 - 16 0 0 WLC 0 0 0 0 / / / /
22-0923 New Construction 7-023-001 03/09/23 DONE DONE DONE 11/07/22 11/03/22 / / 05/17/22 02 - 16 62,500 0 WLC 0 0 0 Collins & Scoville Architects 0 12/14/23 11/03/22
Press Box:
- PR New Construction 7-024-001 / / / / 03/13/23 / / 02 - 16 0 0 WLC 0 0 0 0 / / / /
22-1984 New Construction 7-024-001 09/20/23 DONE DONE DONE 04/03/23 03/30/23 03/13/23 05/17/22 02 - 16 164,000 0 WLC 0 0 0 Collins & Scoville Architects 0 / / 03/30/23
Restroom Building:
- PR New Construction 7-025-001 / / / / 08/17/23 / / 02 - 16 0 0 WLC 0 0 0 0 / / / /
23-1427 New Construction 7-025-001 UNREVIEWED 01/26/24 01/25/24 08/17/23 05/17/22 02 - 16 0 0 WLC 0 0 0 Collins & Scoville Architects 0 / / 01/25/24
District-Wide:
- Reconstruction 7-999-004 / / / / 11/07/19 / / 8 0 0 JSS 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
SARATOGA SPRINGS CITY SCHOOLS STATUS REPORT ON CAPITAL PROJECTS
District No.: 52-18-00-01
last updated on 04/25/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Caroline Street ES Phase 4:
20-1935 Reconstruction 0-001-016 09/24/21 DONE DONE DONE 06/30/21 06/28/21 02/03/21 12/08/20 7,8,10,155,16 244,300 244,300 JLB 0 0 0 Mosaic Associates 0 06/07/23 06/28/21
22-1333 Reconstruction 0-001-017 05/16/23 DONE DONE DONE 12/27/22 12/22/22 04/07/21 12/08/20 2,4,7,8,9,10,155,15, 8,883,000 8,658,974 WLC 0 0 0 Mosaic Associates 0 / / 12/22/22
Maple Ave M.S.Phase 8:
20-1936 Reconstruction 0-003-013 09/24/21 DONE DONE DONE 06/30/21 06/28/21 02/03/21 12/08/20 7,8,155,15,16 6,000,000 6,000,000 JLB 0 0 0 Mosaic Associates 0 06/07/23 06/28/21
23-1244 Reconstruction 0-003-014 UNREVIEWED 12/20/23 12/15/23 04/07/21 12/08/20 2,4,7,8,9,155,15,16 0 0 WLC 0 0 0 Mosaic Associates 0 / / 12/15/23
- PR Additions and Alterations 0-003-015 / / / / 04/07/21 / / 02 - 16 0 0 JLB 0 0 0 0 / / / /
Division Street ES Phase 4:
20-1937 Reconstruction 0-004-015 09/24/21 DONE DONE DONE 06/30/21 06/28/21 02/03/21 12/08/20 7,8,10,155,16 244,300 244,300 JLB 0 0 0 Mosaic Associates 0 06/07/23 06/28/21
22-1334 Reconstruction 0-004-016 05/16/23 DONE DONE DONE 12/27/22 12/22/22 04/07/21 12/08/20 2,4,7,8,9,10,155,15, 9,714,000 9,519,293 WLC 0 0 0 Mosaic Associates 0 / / 12/22/22
Lake Avenue ES Phase 6:
20-1938 Reconstruction 0-005-012 09/24/21 DONE DONE DONE 06/30/21 06/28/21 02/03/21 12/08/20 4,7,8,155,15,16 2,340,200 2,340,200 JLB 0 0 0 Mosaic Associates 0 06/07/23 06/28/21
23-1240 Reconstruction 0-005-013 UNREVIEWED 12/20/23 12/15/23 04/07/21 12/08/20 2,4,7,8,9,10,155,15, 0 0 WLC 0 0 0 Mosaic Associates 0 / / 12/15/23
Greenfield Center Elementary:
20-1939 Reconstruction 0-014-019 09/24/21 DONE DONE DONE 06/30/21 06/28/21 02/03/21 12/08/20 7,8,10,155,16 653,700 653,700 JLB 0 0 0 Mosaic Associates 0 06/07/23 06/28/21
21-0967 Reconstruction 0-014-020 08/30/22 DONE DONE DONE 12/27/21 12/24/21 02/04/21 12/08/20 2,4,7,8,9,10,155,15, 8,552,300 8,186,379 WLC 0 0 0 Mosaic Associates 0 / / 12/24/21
Dorothy Nolan Elementary:
20-1940 Reconstruction 0-015-020 09/24/21 DONE DONE DONE 06/30/21 06/28/21 02/03/21 12/08/20 7,8,10,155,16 1,085,400 1,085,400 JLB 0 0 0 Mosaic Associates 0 06/07/23 06/28/21
21-0446PR Additions and Alterations 0-015-021 DONE 09/29/21 / / 02/04/21 / / 02 - 16 0 187,340 WLC 0 0 0 0 / / / /
21-0968 Additions and Alterations 0-015-021 08/30/22 DONE DONE DONE 12/27/21 12/24/21 02/04/21 12/08/20 02 - 16 11,201,400 10,435,820 WLC 0 0 0 Mosaic Associates 0 01/11/24 YES 12/24/21
Saratoga Springs HS Phase 7:
20-1941 Reconstruction 0-016-025 09/24/21 DONE DONE DONE 06/30/21 06/28/21 02/03/21 12/08/20 7,8,10,155,16 3,977,000 3,977,000 JLB 0 0 0 Mosaic Associates 0 06/07/23 06/28/21
21-0970 Reconstruction 0-016-026 08/25/22 DONE DONE DONE 12/27/21 12/24/21 02/04/21 12/08/20 2,4,7,8,9,10,155,15, 24,846,300 24,846,300 WLC 0 0 0 Mosaic Associates 0 01/05/24 YES 12/24/21
- Reconstruction 0-016-027 / / / / 04/07/21 / / 2,4,7,8,9,10,155,15, 0 0 JLB 0 0 0 0 / / / /
Geyser Road ES Phase 6:
20-1942 Reconstruction 0-017-013 09/24/21 DONE DONE DONE 06/30/21 06/28/21 02/03/21 12/08/20 8,155,16 524,700 524,700 JLB 0 0 0 Mosaic Associates 0 06/07/23 06/28/21
23-1241 Reconstruction 0-017-014 UNREVIEWED 12/20/23 12/15/23 04/07/21 12/08/20 2,4,7,8,9,10,155,15, 0 0 WLC 0 0 0 Mosaic Associates 0 / / 12/15/23
Sports Storage Shed@Maple Ave.MS:
- DB Discovered Building 2-096-001 / / / / 07/05/19 / / 0 0 JLB 0 0 0 0 / / / /
Storage Shed@ Caroline St. Elem.:
- DB Discovered Building 2-097-001 / / / / 07/05/19 / / 0 0 JLB 0 0 0 0 / / / /
Storage Shed@ Dorothy Nolan Elem.:
- DB Discovered Building 2-098-001 / / / / 07/05/19 / / 0 0 JLB 0 0 0 0 / / / /
Track Storage Shed@High School:
- DB Discovered Building 2-099-001 / / / / 07/05/19 / / 0 0 JLB 0 0 0 0 / / / /
Sustainability Park Shed@HS:
- DB Discovered Building 2-100-001 / / / / 07/05/19 / / 0 0 JLB 0 0 0 0 / / / /
Maintenance Building @ East Side Rec:
19-1250 Reconstruction 3-090-002 02/07/20 DONE DONE DONE 01/22/20 12/06/19 04/24/19 05/07/19 2,16 175,000 0 JLB 0 0 0 Mosaic Associates 0 / / 12/06/19
21-1131 Reconstruction 3-090-003 05/11/22 DONE DONE DONE 01/14/22 01/13/22 08/30/21 12/07/21 2 305,000 0 FMJ 0 0 0 Mosaic Associates 0 / / 01/13/22
- Reconstruction 3-090-004 / / / / 12/12/23 / / 2,155 0 0 WLC 0 0 0 0 / / / /
Tranportation Facility:
21-0969 Reconstruction 5-050-006 08/30/22 DONE DONE DONE 12/27/21 12/24/21 02/04/21 12/08/20 4,7,9,14,155,15,16 1,184,300 1,184,300 WLC 0 0 0 Mosaic Associates 0 04/02/24 12/24/21
Prom Tent 1@Saratoga Springs High:
20-1778TQ Temporary Quarters 8-101-001 05/26/21 DONE DONE DONE 05/26/21 / / 05/03/21 / / 0 0 JLB 0 0 0 0 / / / /
Prom Tent 2@ Saratoga Springs High:
20-1779TQ Temporary Quarters 8-102-001 05/26/21 DONE DONE DONE 05/26/21 / / 05/03/21 / / 0 0 JLB 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
STILLWATER CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 52-20-01-04
last updated on 04/25/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
MS/HS 6-12:
17-2040 Additions and Alterations 0-002-016 05/01/19 DONE DONE DONE 06/22/18 06/22/18 09/27/17 12/08/16 02 - 16 9,039,000 8,641,920 SLC 0 0 0 Griffith Dardanelli,Architect 0 03/17/21 06/22/18
- Reconstruction 0-002-017 / / / / 11/18/19 / / 2,8,9 0 27,819,975 SLC 0 0 0 0 / / / /
19-1584 Reconstruction 0-002-018 04/07/21 DONE DONE DONE 03/16/20 03/13/20 12/04/19 03/24/21 2,8,9,13,16 985,000 985,000 SLC 0 0 0 Bernier Carr Associates 0 10/08/21 03/13/20
22-0545 Reconstruction 0-002-019 11/16/22 DONE DONE DONE 09/21/22 09/21/22 07/14/22 05/17/22 4,8,9,10,155,15,16 100,000 100,000 JJH 0 0 0 Bernier Carr Associates 0 04/14/23 09/21/22
Elementary School:
18-1906 Reconstruction 0-003-019 06/26/19 DONE DONE DONE 04/25/19 04/24/19 03/19/19 05/21/19 9,10 100,000 100,000 SLC 0 0 0 Griffith Dardanelli,Architect 0 03/31/20 04/24/19
19-1246 Reconstruction 0-003-020 06/24/20 DONE DONE DONE 01/22/20 01/15/20 10/21/19 06/09/20 8,9,10 100,000 100,000 SLC 0 0 0 Bernier, Carr & Associates 0 02/23/21 01/15/20
- Reconstruction 0-003-021 / / / / 11/18/19 / / 2,8,9 0 0 SLC 0 0 0 0 / / / /
- Reconstruction 0-003-022 / / / / 11/18/19 / / 8,9,10,155,15,16 0 10,138,824 SLC 0 0 0 0 / / / /
21-0097 Reconstruction 0-003-023 11/17/21 DONE DONE DONE 07/23/21 07/21/21 05/12/21 05/18/21 8,9,10 100,000 100,000 SLC 0 0 0 Bernier Carr Associates 0 06/27/22 07/21/21
21-1141 Reconstruction 0-003-024 05/16/22 DONE DONE DONE 01/18/22 01/14/22 09/27/21 12/08/16 2,4,7,9,10,155,15,16 4,400,000 4,400,000 FMJ 0 0 0 Bernier Carr Associates 0 / / 01/14/22
22-2126 Reconstruction 0-003-025 06/05/23 DONE DONE DONE 05/03/23 05/01/23 03/09/23 05/16/23 9,10,16 100,000 100,000 WLC 0 0 0 Bernier Carr Associates 0 / / 05/01/23
Bus Garage:
17-2041 Additions and Alterations 5-007-005 05/01/19 DONE DONE DONE 06/22/18 06/22/18 07/27/16 12/08/16 02 - 16 5,000,000 5,000,000 SLC 0 0 0 Griffith Dardanelli,Architect 0 01/23/21 06/22/18
New Concession Stand:
21-0203 New Construction 7-015-001 11/29/21 DONE DONE DONE 08/20/21 08/19/21 08/01/19 05/18/21 02 - 16 375,000 0 SLC 0 0 0 Bernier Carr Associates 0 08/12/22 08/19/21
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
WATERFORD - HALFMOON UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 52-21-01-03
last updated on 04/25/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Main Building:
20-1791 Reconstruction 0-004-028 11/26/21 DONE DONE DONE 05/28/21 05/27/21 08/30/19 12/10/19 2,8 9,706,673 9,706,673 SLC 0 0 0 Bernier Carr Associates 0 10/12/23 05/27/21
20-1455SB Reconstruction 0-004-029 DONE / / / / 03/23/21 / / 16 0 0 SLC 0 0 0 0 / / / /
20-1959 Reconstruction 0-004-029 08/06/21 DONE DONE DONE 06/30/21 06/30/21 03/23/21 11/04/14 16 238,000 0 SLC 0 0 0 Bernier Carr Associates 0 06/16/22 06/30/21
21-0101 Reconstruction 0-004-030 08/27/21 DONE DONE DONE 07/26/21 07/26/21 04/28/21 05/18/21 155 100,000 100,000 SLC 0 0 0 Bernier Carr Associates 0 06/16/21 07/26/21
22-0505 Reconstruction 0-004-031 11/20/22 DONE DONE DONE 09/16/22 09/15/22 04/25/22 05/17/22 155,15,16 100,000 100,000 SLC 0 0 0 Bernier Carr Associates 0 05/10/23 09/15/22
22-1490 Reconstruction 0-004-032 06/01/23 DONE DONE DONE 01/17/23 01/13/23 09/09/22 12/10/19 2,4,7,8,9,155,15,16 5,281,327 5,281,327 WLC 0 0 0 Bernier Carr Associates 0 / / 01/13/23
23-1388 Reconstruction 0-004-033 02/22/24 DONE DONE DONE 01/17/24 01/17/24 12/22/23 05/16/23 9,155 100,000 0 WLC 0 0 0 Bernier Carr Associates 0 / / 01/17/24
XXSoftball Dugout 2 - cancelled:
- XX New Construction 7-016-001 CANCELLED / / / / 09/24/19 / / 02 - 16 0 0 SLC 0 0 0 0 / / / /
XXBaseball Dugout 2 - Cancelled:
- XX New Construction 7-017-001 CANCELLED / / / / 09/24/19 / / 02 - 16 0 0 SLC 0 0 0 0 / / / /
Press Box:
20-1792 New Construction 7-018-001 11/26/21 DONE DONE DONE 05/28/21 05/27/21 01/11/21 12/10/19 02 - 16 98,500 0 SLC 0 0 0 Bernier Carr Associates 0 10/12/23 05/27/21
Concession & Outdoor Toilet Room:
20-1793 New Construction 7-019-001 11/26/21 DONE DONE DONE 05/28/21 05/27/21 02/24/21 12/10/19 02 - 16 428,750 0 SLC 0 0 0 Bernier Carr Associates 0 / / 05/27/21
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED