GILBOA CONESVILLE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 54-08-01-04
last updated on 04/24/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Main Building:
21-0015   Reconstruction               0-001-012  10/05/21     DONE    DONE       DONE      07/08/21   07/06/21   02/24/21   01/13/21   2,13,15                  250,000       250,000  SLC             0           0           0 IBI GROUP                               0      09/13/22                       07/06/21           

          Bus Garage Demolition:
20-1955   Reconstruction               5-007-003  08/09/21     DONE    DONE       DONE      06/30/21   06/29/21   02/24/21   03/10/21   2                         72,100        72,100  SLC             0           0           0 IBI GROUP                               0      12/31/21                       06/29/21           

          New Bus Garage:
20-1921PR New Construction             5-014-001                         UNREVIEWED         06/28/21   06/25/21   02/24/21     /  /     02 - 16                        0             0  SLC             0           0           0                                         0        /  /                         06/25/21           
20-1956   New Construction             5-014-001  08/09/21     DONE    DONE       DONE      06/30/21   06/29/21   02/24/21   03/10/21   02 - 16                2,610,000     2,610,000  SLC             0           0           0 IBI GROUP                               0        /  /                         06/29/21           

          UV Disinfection Building:
21-0016   New Construction             7-015-001  10/05/21     DONE    DONE       DONE      07/08/21   07/06/21   04/30/21   01/13/21   02 - 16                   37,000             0  SLC             0           0           0 IBI GROUP                               0      09/13/22                       07/06/21           

          District-Wide:
  -    SB Reconstruction               7-999-BA1               DONE                           /  /       /  /       /  /       /  /     16                             0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Bus Garage Storage Trailer 1 (Swing):
21-1547XX New Construction             8-010-001                         CANCELLED          03/23/22   01/25/22   10/06/20     /  /     02 - 16                        0             0  WLC             0           0           0                                         0        /  /                         01/25/22           

          Bus Garage Storage Trailer 2 (Swing):
21-1548XX New Construction             8-011-001                         CANCELLED          03/23/22   01/25/22   10/06/20     /  /     02 - 16                        0             0  WLC             0           0           0                                         0        /  /                         01/25/22           

          Highway Dept. Garage (Const Swing):
21-1549SS New Construction             8-012-001                       ADDENDUM REQ'D       03/23/22   01/25/22   10/19/20     /  /     02 - 16                        0             0  WLC             0           0           0                                         0        /  /                         01/25/22           

          Bus Garage Office Trailer (Swing):
21-1550SS New Construction             8-013-001                       ADDENDUM REQ'D       03/23/22   01/25/22   10/20/20     /  /     02 - 16                        0             0  WLC             0           0           0                                         0        /  /                         01/25/22           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




JEFFERSON CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 54-09-01-04
last updated on 04/24/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Jefferson Central School:
21-0632   Reconstruction               0-001-012  01/27/22     DONE    DONE       DONE      11/03/21   11/02/21   07/21/21   05/18/21   14,16                     90,750        90,750  SLC             0           0           0 Collins & Scoville Architects           0      06/26/23                       11/02/21           
23-1471   Reconstruction               0-001-013                         UNREVIEWED         02/05/24   02/01/24   07/07/23   05/16/23   2,4,7,8,9,155,15,16            0             0  WLC             0           0           0 Collins & Scoville Architects           0        /  /                         02/01/24           
  -       Reconstruction               0-001-014                                              /  /       /  /     07/10/23     /  /     2,4,7,8,9,155,15,16            0             0  WLC             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




MIDDLEBURGH CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 54-10-01-04
last updated on 04/24/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Jr/Sr High School:
19-0676   Reconstruction               0-001-017  02/21/20     DONE    DONE       DONE      11/04/19   10/25/19   04/16/19   12/12/18   2,4,7,8,9,10,155,15,   9,529,472     9,529,472  SLC             0           0           0 SEI Design Group                        0      06/14/22                       10/25/19           
19-1578   Reconstruction               0-001-018  04/30/20     DONE    DONE       DONE      03/16/20   03/09/20   01/30/20   05/21/19   155                      100,000       100,000  JSS             0           0           0 SEI Design Group                        0      06/30/20                       03/09/20           
20-1347   Reconstruction               0-001-019  03/05/21     DONE    DONE       DONE      02/24/21   02/02/21   01/05/21   06/17/20   2,8,9,16                 100,000       100,000  JSS             0           0           0 SEI Design Group                        0      06/29/21                       02/02/21           
22-1880   Reconstruction               0-001-020  04/28/23     DONE    DONE       DONE      03/20/23   03/16/23   10/11/22   05/17/22   8                        100,000       100,000  JLB             0           0           0 SEI Design Group                        0      06/29/23                       03/16/23           
  -       Reconstruction               0-001-021                                              /  /       /  /     10/11/22     /  /     2,4,9,15                       0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Elementary School:
19-0677   Reconstruction               0-007-010  02/21/20     DONE    DONE       DONE      11/04/19   10/25/19   04/16/19   12/12/18   2,4,7,8,9,10,155,15,   5,470,528     5,470,528  SLC             0           0           0 SEI Design Group                        0      06/15/22                       10/25/19           
21-0113   Reconstruction               0-007-011  09/07/21     DONE    DONE       DONE      07/30/21   07/29/21   03/24/21   05/18/21   9                        100,000       100,000  SLC             0           0           0 SEI Design Group                        0      06/14/22                       07/29/21           
23-0554   Reconstruction               0-007-012  01/30/24     DONE    DONE       DONE      09/27/23   09/25/23   10/12/22   05/16/23   8                        100,000       100,000  JLB             0           0           0 SEI Design Group                        0        /  /                         09/25/23           

          District-Wide:
18-2028SB Reconstruction               7-999-001               DONE                           /  /       /  /     05/31/19     /  /     16                             0             0  BMJ             0           0           0                                         0        /  /                           /  /             
19-1579   Reconstruction               7-999-001  05/15/20     DONE    DONE       DONE      03/16/20   03/09/20   05/31/19   07/13/17   16                       418,333             0  JSS             0           0           0 SEI Design Group                        0      06/25/21                       03/09/20           
  -    SB Reconstruction               7-999-BA1               DONE                           /  /       /  /       /  /       /  /     16                             0             0  BMJ             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




COBLESKILL-RICHMONDVILLE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 54-11-02-06
last updated on 04/24/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          George D. Ryder School:
20-1731   Reconstruction               0-002-012  07/26/21     DONE    DONE       DONE      05/18/21   05/14/21   03/12/21   02/03/21   2,7                    1,000,000     1,000,000  SLC             0           0           0 Mosaic Associates                       0        /  /                         05/14/21           
21-0514   Reconstruction               0-002-013  10/05/22     DONE    DONE       DONE      10/13/21   10/12/21   03/23/21   02/03/21   2,4,7,8,9,10,155,15,   2,800,000     1,860,681  SLC             0           0           0 Mosaic Associates                       0        /  /                         10/12/21           

          Golding Middle School(Jr/Sr):
19-1569   Reconstruction               0-003-013  06/23/20     DONE    DONE       DONE      03/13/20   03/06/20   06/25/19   05/14/19   2,155,15                  50,000        50,000  JSS             0           0           0 Mosaic Associates                       0      09/30/20                       03/06/20           
20-1732   Reconstruction               0-003-014  07/26/21     DONE    DONE       DONE      05/18/21   05/14/21   03/12/21   02/03/21   2,7                    1,040,000             0  SLC             0           0           0 Mosaic Associates                       0        /  /                         05/14/21           
21-0515   Reconstruction               0-003-015  10/05/22     DONE    DONE       DONE      10/13/21   10/12/21   03/23/21   02/03/21   2,4,7,8,9,10           2,415,000     1,938,193  SLC             0           0           0 Mosaic Associates                       0        /  /                         10/12/21           

          Main Building - Radez Elem.:
20-1733   Reconstruction               0-015-014  07/26/21     DONE    DONE       DONE      05/18/21   05/14/21   03/12/21   02/03/21   2,7                      860,000             0  SLC             0           0           0 Mosaic Associates                       0        /  /                         05/14/21           
21-0516   Reconstruction               0-015-015  10/05/22     DONE    DONE       DONE      10/13/21   10/12/21   03/23/21   02/03/21   2,4,7,8,9,10,155,15,   2,650,000     1,205,273  SLC             0           0           0 Mosaic Associates                       0        /  /                         10/12/21           

          High School:
21-0517   Reconstruction               0-018-008  10/05/22     DONE    DONE       DONE      10/13/21   10/12/21   03/23/21   02/03/21   7,8,9,10,13,155,15,1   3,400,000     3,400,000  SLC             0           0           0 Mosaic Associates                       0        /  /                         10/12/21           

          Pump House:
21-1428   New Construction             7-025-001  04/26/22     DONE    DONE       DONE      03/04/22   03/02/22   01/19/22   02/03/21   02 - 16                  176,250             0  FMJ             0           0           0 Mosaic Associates                       0        /  /                         03/02/22           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




SCHOHARIE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 54-12-01-04
last updated on 04/24/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Jr/Sr High School:
20-0518   Reconstruction               0-001-022  02/04/21     DONE    DONE       DONE      10/06/20   09/14/20   06/02/20   05/16/17   4,7,8,9,155,15,16        531,500       531,500  JSS             0           0           0 Mosaic Associates                       0      12/01/21                       09/14/20           
22-1089   Reconstruction               0-001-023  03/31/23     DONE    DONE       DONE      11/29/22   11/23/22   10/04/22   05/17/22   2,8,9,16               5,723,000     5,723,000  WLC             0           0           0 Mosaic Associates                       0        /  /                         11/23/22           
22-0936   Reconstruction               0-001-024  02/02/23     DONE    DONE       DONE      11/09/22   11/04/22   10/12/22   05/17/22   2,9                      100,000       100,000  WLC             0           0           0 Mosaic Associates                       0      05/11/23                       11/04/22           
23-1192   Reconstruction               0-001-025               STARTED DONE       DONE      12/14/23   12/07/23   08/16/23   05/17/22   2,16                   2,887,270             0  WLC             0           0           0 Mosaic Associates               2,523,464        /  /                         12/07/23           
23-1043   Reconstruction               0-001-026                         UNREVIEWED         11/17/23   11/15/23   09/29/23   05/17/22   2,4,7,8,9,10,155,15,           0             0  WLC             0           0           0 Mosaic Associates                       0        /  /                         11/15/23           
23-1511   Reconstruction               0-001-027  03/19/24     DONE    DONE       DONE      02/16/24   02/14/24   01/25/24   05/16/23   8                        100,000       100,000  WLC             0           0           0 Mosaic Associates                       0        /  /                         02/14/24           

          Elementary School:
21-0735   Reconstruction               0-002-016  03/09/22     DONE    DONE       DONE      11/17/21   11/16/21   08/12/21   05/18/21   2                        100,000       100,000  SLC             0           0           0 Mosaic Associates                       0      05/15/22                       11/16/21           
22-1090   Reconstruction               0-002-017  03/31/23     DONE    DONE       DONE      11/29/22   11/23/22   11/10/22   05/17/22   16                       200,000       200,000  WLC             0           0           0 Mosaic Associates                       0        /  /                         11/23/22           
23-0345   Reconstruction               0-002-018  05/16/23     DONE    DONE       DONE      08/29/23   08/24/23   04/19/23   05/16/23   2,7,155,15,16            316,229       316,229  WLC             0           0           0 Mosaic Associates                       0      11/30/23                       08/24/23           
23-1044   Reconstruction               0-002-019                         UNREVIEWED         11/17/23   11/15/23   09/29/23   05/17/22   2,4,7,8,9,10,155,15,           0             0  WLC             0           0           0 Mosaic Associates                       0        /  /                         11/15/23           

          District-Wide:
  -       Reconstruction               7-999-002                                              /  /       /  /     07/29/21     /  /     16                             0             0  SLC             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




SHARON SPRINGS CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 54-14-01-04
last updated on 04/24/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Main Building:
19-1148   Reconstruction               0-001-022  02/07/20     DONE    DONE       DONE      01/03/20   12/30/19   12/04/19   05/21/19   4,8,9                    100,000       100,000  SLC             0           0           0 Teitsch-Kent                            0      06/12/20                       12/30/19           
20-0327   Reconstruction               0-001-023  11/03/20     DONE    DONE       DONE      09/02/20   08/19/20   06/23/20   06/09/20   4,8,9,10,155,15,16       100,000       100,000  SLC             0           0           0 Teitsch-Kent                            0      06/28/21                       08/19/20           
21-0382   Reconstruction               0-001-024  01/28/22     DONE    DONE       DONE      09/20/21   09/20/21   06/25/21   05/18/21   2,4,8,9,155,15,16        100,000       100,000  SLC             0           0           0 Teitsch-Kent                            0      06/24/22                       09/20/21           
  -    PR Additions and Alterations    0-001-025                                              /  /       /  /     11/29/21     /  /     02 - 16                        0             0  SLC             0           0           0                                         0        /  /                           /  /             
21-1829FA Additions and Alterations    0-001-025  10/04/22     DONE    DONE       DONE      05/18/22   05/12/22   11/23/21   12/14/21   02 - 16                  502,421             0  SLC             0           0           0 Teitsch-Kent                            0        /  /                         05/12/22           
22-1092   Reconstruction               0-001-026  04/03/23     DONE    DONE       DONE      11/29/22   11/28/22   05/19/22   05/17/22   2,4,7,8,9,155,15,16    4,148,860     4,073,860  JLB             0           0           0 Teitsch-Kent                            0        /  /                         11/28/22           
22-0200   Reconstruction               0-001-027  08/02/22     DONE    DONE       DONE      08/01/22   08/01/22   05/23/22   05/17/22   8,9                      100,000       100,000  SLC             0           0           0 Teitsch-Kent                            0      10/12/23                       08/01/22           
22-0345   Reconstruction               0-001-028  09/12/22     DONE    DONE       DONE      08/26/22   08/25/22   08/10/22   08/09/22   4,9,16                   175,000       175,000  SLC             0           0           0 Teitsch-Kent                            0      10/12/23                       08/25/22           
23-1034   Reconstruction               0-001-029  12/20/23     DONE    DONE       DONE      11/16/23   11/16/23   05/24/23   05/16/23   8,9,13,16                100,000       100,000  JLB             0           0           0 Teitsch-Kent                            0        /  /                         11/16/23           

          Maintenance Building:
  -    DB Discovered Building          3-007-001                                              /  /       /  /     02/13/20     /  /                                    0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Bus Maintenance Facility see 0-002:
22-1093   Reconstruction               5-005-002  04/03/23     DONE    DONE       DONE      11/29/22   11/28/22   08/04/22   05/17/22   2,7,9,16                 401,140       401,140  JLB             0           0           0 Teitsch-Kent                            0        /  /                         11/28/22           

          Outdoor Pavilion:
22-0619FA New Construction             7-008-001  10/04/22     DONE    DONE       DONE      10/03/22   09/30/22   06/22/22   12/13/21   02 - 16                  144,514             0  SLC             0           0           0 Teitsch-Kent                            0        /  /                         09/30/22           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED