ADDISON CENTRAL SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 57-01-01-04
last updated on 04/26/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Valley Early Childhood School:
19-1450 Reconstruction 0-004-012 08/07/20 DONE DONE DONE 02/20/20 02/07/20 07/23/19 03/26/19 8,155,16 355,104 355,104 SLC 0 0 0 Cannon Design 355,104 04/14/21 02/07/20
High School:
18-1198 Reconstruction 0-005-020 06/06/19 DONE DONE DONE 01/07/19 12/19/18 09/25/18 05/21/19 2,8 410,722 410,722 SLC 0 0 0 LA Group 0 09/06/19 12/19/18
19-1451 Reconstruction 0-005-021 08/07/20 DONE DONE DONE 02/20/20 02/07/20 07/23/19 03/26/19 8,155,16 932,925 932,925 SLC 0 0 0 Cannon Design 932,925 04/14/21 02/07/20
19-1287 Reconstruction 0-005-022 03/12/20 DONE DONE DONE 01/27/20 01/21/20 12/10/19 05/21/19 155 99,500 99,500 SLC 0 0 0 Cannon Design 0 06/17/20 01/21/20
20-1579 Reconstruction 0-005-023 06/18/21 DONE DONE DONE 04/13/21 04/02/21 03/18/21 06/09/20 16 100,000 100,000 SLC 0 0 0 SEI Design Group 0 06/30/21 04/02/21
21-0104 Reconstruction 0-005-024 10/08/21 DONE DONE DONE 07/28/21 07/26/21 03/18/21 05/18/21 2 100,000 100,000 SLC 0 0 0 SEI Design Group 0 06/30/22 07/26/21
22-0966 Reconstruction 0-005-025 02/17/23 DONE DONE DONE 11/14/22 11/14/22 02/07/22 05/17/22 2,4,7,8,9,10,14,155, 2,956,000 2,846,000 JJH 0 0 0 SEI Design Group 0 / / 11/14/22
23-1349 Reconstruction 0-005-026 03/20/24 DONE DONE DONE 01/12/24 01/05/24 06/08/23 05/17/23 2,7 100,000 100,000 JJH 0 0 0 SEI Design Group 0 / / 01/05/24
Tuscarora Elementary:
19-1452 Reconstruction 0-006-017 08/07/20 DONE DONE DONE 02/20/20 02/07/20 07/23/19 03/26/19 155,16 192,483 192,483 SLC 0 0 0 Cannon Design 192,483 04/14/21 02/07/20
Maintenance/Annex/FrmrDistBusiOffice:
19-1453 Reconstruction 1-015-003 08/07/20 DONE DONE DONE 02/20/20 02/07/20 08/06/19 03/26/19 7,8,16 239,844 0 SLC 0 0 0 Cannon Design 239,844 04/14/21 02/07/20
22-0967 Reconstruction 1-015-004 02/16/23 DONE DONE DONE 11/14/22 11/14/22 02/07/22 05/17/22 2,4,155,15,16 310,000 0 JJH 0 0 0 SEI Design Group 0 / / 11/14/22
J Mose Fam Res Ctr-Old Tn PostOffice:
19-1454 Reconstruction 1-016-003 08/07/20 DONE DONE DONE 02/20/20 02/07/20 08/06/19 03/26/19 8,16 1,966 0 SLC 0 0 0 Cannon Design 1,966 04/14/21 02/07/20
Bus Garage:
19-1455 Reconstruction 5-001-008 08/07/20 DONE DONE DONE 02/20/20 02/07/20 07/23/19 03/26/19 8,16 56,530 56,530 SLC 0 0 0 Cannon Design 56,530 04/14/21 02/07/20
22-0968 Reconstruction 5-001-009 02/16/23 DONE DONE DONE 11/14/22 11/14/22 02/07/22 05/17/22 2 785,000 785,000 JJH 0 0 0 SEI Design Group 0 / / 11/14/22
Transportation Facility:
21-1533PR New Construction 5-019-001 DONE 03/18/22 / / 02/07/22 / / 02 - 16 0 0 JJH 0 0 0 0 / / / /
22-0969 New Construction 5-019-001 02/16/23 DONE DONE DONE 11/14/22 11/14/22 02/07/22 05/17/22 02 - 16 19,874,000 19,874,000 JJH 0 0 0 SEI Design Group 0 / / 11/14/22
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
AVOCA CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 57-02-01-04
last updated on 04/26/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Main Building:
18-0953 Reconstruction 0-002-014 05/28/19 DONE DONE DONE 11/28/18 12/19/17 06/19/18 12/19/17 2,4 374,690 374,690 SLC 0 0 0 Clark Patterson Lee 0 08/31/20 12/19/17
18-0954 Reconstruction 0-002-016 05/28/19 DONE DONE DONE 11/28/18 10/22/18 08/09/18 12/19/17 16 723,246 723,246 SLC 0 0 0 Clark Patterson Lee 0 09/09/20 10/22/18
18-1793 Reconstruction 0-002-017 05/29/19 DONE DONE DONE 04/04/19 03/29/19 02/06/19 05/21/19 8 100,000 100,000 SLC 0 0 0 Clark Patterson Lee 0 06/18/20 03/29/19
19-0947 Reconstruction 0-002-018 04/02/20 DONE DONE DONE 12/09/19 11/18/19 06/12/19 03/19/19 155,16 676,288 676,288 SLC 0 0 0 Clark Patterson Lee 676,288 11/23/20 11/18/19
19-1779 Reconstruction 0-002-019 07/01/20 DONE DONE DONE 05/28/20 05/14/20 04/10/20 06/09/20 9 100,000 100,000 SLC 0 0 0 Clark Patterson Lee 0 06/16/21 05/14/20
20-1679 Reconstruction 0-002-020 07/03/21 DONE DONE DONE 05/06/21 04/30/21 04/21/21 05/18/21 2 100,000 100,000 SLC 0 0 0 Clark Patterson Lee 0 09/09/21 04/30/21
21-1952 Reconstruction 0-002-021 08/03/22 DONE DONE DONE 06/10/22 06/09/22 05/13/22 05/17/22 2,8,9 100,000 100,000 WLC 0 0 0 Clark Patterson Lee Architect 0 06/29/23 06/09/22
22-1696FA Reconstruction 0-002-022 05/16/23 DONE DONE DONE 02/17/23 12/13/22 11/15/22 12/20/22 8,9,10,155,15,16 400,000 400,000 WLC 0 0 0 Clark Patterson Lee Architect 0 / / 12/13/22
22-2267 Reconstruction 0-002-023 08/30/23 DONE DONE DONE 05/22/23 05/19/23 05/01/23 05/16/23 155,16 700,000 700,000 WLC 0 0 0 Clark Patterson Lee Architect 0 / / 05/19/23
22-2268 Reconstruction 0-002-024 08/30/23 DONE DONE DONE 05/22/23 05/19/23 05/01/23 05/16/23 7,155,16 100,000 100,000 WLC 0 0 0 Clark Patterson Lee Architect 0 / / 05/19/23
- Reconstruction 0-002-025 / / / / 02/26/24 / / 2,4,8,9,10,14,155,15 0 0 WLC 0 0 0 0 / / / /
- Reconstruction 0-002-026 / / / / 04/17/24 / / 9 0 0 WLC 0 0 0 0 / / / /
Bus Maintenance:
19-0948 Reconstruction 5-011-009 04/02/20 DONE DONE DONE 12/09/19 11/18/19 06/12/19 05/21/19 2,7,155,15,16 58,900 58,900 SLC 0 0 0 Clark Patterson Lee 58,900 11/23/20 11/18/19
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
BATH CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 57-03-02-06
last updated on 04/26/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Jr/Sr High School:
19-1760 Reconstruction 0-006-027 06/26/20 DONE DONE DONE 05/26/20 04/22/20 03/02/20 06/09/20 155,15,16 100,000 100,000 JLB 0 0 0 Hunt Engineers,Architects & l 0 01/14/21 04/22/20
20-0213 Reconstruction 0-006-028 08/28/20 DONE DONE DONE 08/13/20 08/12/20 07/31/20 07/30/20 15 24,450 24,450 JLB 0 0 0 Hunt Engineers,Architects & l 0 02/17/21 08/12/20
21-1591 Reconstruction 0-006-029 09/09/21 DONE DONE DONE 04/04/22 03/30/22 08/09/21 08/04/21 155,15,16 927,652 927,652 FMJ 0 0 0 Hunt Engineers,Architects & l 0 03/24/22 03/30/22
21-1757 Reconstruction 0-006-030 02/02/22 DONE DONE DONE 05/03/22 05/02/22 04/18/22 02/02/22 16 774,200 774,200 WLC 0 0 0 Hunt Engineers,Architects & l 0 11/22/22 05/02/22
22-1176 Reconstruction 0-006-031 04/10/23 DONE DONE DONE 12/07/22 12/06/22 11/22/22 01/10/23 7,155,16 1,216,270 1,216,270 WLC 0 0 0 Hunt Engineers,Architects & l 0 / / 12/06/22
23-1013 Reconstruction 0-006-032 UNREVIEWED 11/15/23 11/07/23 10/02/23 01/10/23 2,4,7,8,9,155,15,16 0 0 WLC 0 0 0 Hunt Engineers,Architects & l 0 / / 11/07/23
Wightman Primary:
20-0214 Reconstruction 0-007-016 08/28/20 DONE DONE DONE 08/13/20 08/12/20 07/31/20 07/30/20 15 33,300 33,300 JLB 0 0 0 Hunt Engineers,Architects & l 0 02/17/21 08/12/20
20-1772 Reconstruction 0-007-017 06/30/21 DONE DONE DONE 05/25/21 05/21/21 03/26/21 05/18/21 155,16 100,000 100,000 JLB 0 0 0 Hunt Engineers,Architects & l 0 05/11/22 05/21/21
21-1978 Reconstruction 0-007-018 10/06/22 DONE DONE DONE 06/15/22 06/14/22 05/18/22 05/17/22 155,15,16 100,000 100,000 WLC 0 0 0 Hunt Engineers,Architects & l 0 04/18/23 06/14/22
- Reconstruction 0-007-019 / / / / 05/19/22 / / 155,15,16 0 0 JLB 0 0 0 0 / / / /
22-2224 Reconstruction 0-007-020 10/12/23 DONE DONE DONE 05/17/23 05/16/23 04/13/23 05/16/23 155,15,16 100,000 100,000 WLC 0 0 0 Hunt Engineers,Architects & l 0 / / 05/16/23
23-0199 Reconstruction 0-007-021 01/29/24 DONE DONE DONE 08/04/23 07/28/23 07/03/23 01/10/23 2,4,7,8,9,155,15,16 9,913,323 9,913,323 WLC 0 0 0 Hunt Engineers,Architects & l 0 / / 07/28/23
District Office/Maint. (fmly 5-009):
23-1014 Reconstruction 1-009-004 UNREVIEWED 11/15/23 11/07/23 10/02/23 01/10/23 7,155,16 0 0 WLC 0 0 0 Hunt Engineers,Architects & l 0 / / 11/07/23
Bus Garage & Maintenance Facility:
18-2202 Reconstruction 5-017-009 08/09/19 DONE DONE DONE 06/26/19 06/17/19 05/07/19 05/21/19 155,16 100,000 100,000 JSS 0 0 0 Hunt Engineers,Architects & l 0 04/01/20 06/17/19
23-1015 Reconstruction 5-017-010 UNREVIEWED 11/15/23 11/07/23 10/02/23 01/10/23 2,7,9,155,15,16 0 0 WLC 0 0 0 Hunt Engineers,Architects & l 0 / / 11/07/23
Public Restroom Building:
23-1016 Reconstruction 7-003-003 UNREVIEWED 11/15/23 11/07/23 10/24/23 01/10/23 4,15 0 0 WLC 0 0 0 Hunt Engineers,Architects & l 0 / / 11/07/23
Soccer Concession:
23-1017 Reconstruction 7-011-004 UNREVIEWED 11/15/23 11/07/23 09/29/23 01/10/23 4,15 0 0 WLC 0 0 0 Hunt Engineers,Architects & l 0 / / 11/07/23
- Reconstruction 7-011-005 / / / / 10/02/23 / / 4,8,9,155,15,16 0 0 WLC 0 0 0 0 / / / /
Soccer Field Press Box:
23-1018 Reconstruction 7-013-005 UNREVIEWED 11/15/23 11/07/23 10/02/23 01/10/23 9,16 0 0 WLC 0 0 0 Hunt Engineers,Architects & l 0 / / 11/07/23
Concession Stand:
23-1019 Reconstruction 7-019-003 UNREVIEWED 11/15/23 11/07/23 09/29/23 01/10/23 9,15 0 0 WLC 0 0 0 Hunt Engineers,Architects & l 0 / / 11/07/23
Press Box @ Football Field:
23-1020 Reconstruction 7-021-003 UNREVIEWED 11/15/23 11/07/23 09/29/23 01/10/23 16 0 0 WLC 0 0 0 Hunt Engineers,Architects & l 0 / / 11/07/23
JV Softball Dugout:
23-1021 New Construction 7-027-001 UNREVIEWED 11/15/23 11/07/23 09/29/23 01/10/23 02 - 16 0 0 WLC 0 0 0 Hunt Engineers,Architects & l 0 / / 11/07/23
Softball Dugout:
23-1022 New Construction 7-028-001 UNREVIEWED 11/15/23 11/07/23 10/05/23 01/10/23 02 - 16 0 0 WLC 0 0 0 Hunt Engineers,Architects & l 0 / / 11/07/23
Locker Room Building:
- New Construction 7-029-001 / / / / 10/05/23 / / 02 - 16 0 0 WLC 0 0 0 0 / / / /
Softball Press Box:
23-1023 New Construction 7-030-001 UNREVIEWED 11/15/23 11/07/23 10/05/23 01/10/23 02 - 16 0 0 WLC 0 0 0 Hunt Engineers,Architects & l 0 / / 11/07/23
Baseball Press Box:
23-1024 New Construction 7-031-001 UNREVIEWED 11/15/23 11/07/23 10/05/23 01/10/23 02 - 16 0 0 WLC 0 0 0 Hunt Engineers,Architects & l 0 / / 11/07/23
District-Wide:
- SB Reconstruction 7-999-BA2 DONE / / / / / / / / 16 0 0 JLB 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
CAMPBELL-SAVONA CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 57-06-03-04
last updated on 04/26/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Campbell Jr/Sr HS (frmrly 6-12 sch):
19-0506 Reconstruction 0-001-023 12/10/19 DONE DONE DONE 09/27/19 09/23/19 08/12/19 05/21/19 155,16 100,000 100,000 SLC 0 0 0 Hunt Engineers,Architects & l 0 06/15/20 09/23/19
20-1004 Reconstruction 0-001-024 04/27/21 DONE DONE DONE 12/22/20 12/18/20 11/10/20 06/16/20 2,4,7,8,9,155,15,16 2,056,283 2,056,283 SLC 0 0 0 Hunt Engineers,Architects & l 0 08/17/22 12/18/20
21-0308 Reconstruction 0-001-025 02/07/22 DONE DONE DONE 09/08/21 09/08/21 08/10/21 06/09/20 2,4,7,8,9,155,15,16 5,404,581 5,404,581 SLC 0 0 0 Hunt Engineers,Architects & l 0 / / 09/08/21
K-5 Savona:
20-0266 Reconstruction 0-003-020 10/16/20 DONE DONE DONE 08/25/20 08/21/20 07/23/20 06/16/20 14 100,000 100,000 SLC 0 0 0 Hunt Engineers,Architects & l 0 06/11/21 08/21/20
20-1005 Reconstruction 0-003-021 04/27/21 DONE DONE DONE 12/22/20 12/18/20 11/10/20 06/16/20 2,4,7,8,9,155,15,16 1,672,930 1,672,930 SLC 0 0 0 Hunt Engineers,Architects & l 0 08/17/22 12/18/20
21-0074 Reconstruction 0-003-022 11/04/21 DONE DONE DONE 07/20/21 07/19/21 06/22/21 05/18/21 8,14,155,16 100,000 100,000 SLC 0 0 0 Hunt Engineers,Architects & l 0 06/08/22 07/19/21
21-0309 Reconstruction 0-003-023 02/07/22 DONE DONE DONE 09/08/21 09/08/21 08/10/21 06/09/20 2,4,7,9,155,15,16 3,701,235 3,701,235 SLC 0 0 0 Hunt Engineers,Architects & l 0 / / 09/08/21
21-0310FA Reconstruction 0-003-024 02/07/22 DONE DONE DONE 09/08/21 09/08/21 08/10/21 03/11/21 7,9,155,16 200,000 200,000 SLC 0 0 0 Hunt Engineers,Architects & l 0 / / 09/08/21
Storage Garage - No Bldg Aid:
20-1006 Reconstruction 2-004-004 04/27/21 DONE DONE DONE 12/22/20 12/18/20 11/10/20 06/16/20 4,8 27,150 0 SLC 0 0 0 Hunt Engineers,Architects & l 0 08/17/22 12/18/20
Storage Building:
21-0311 New Construction 2-010-001 02/07/22 DONE DONE DONE 09/08/21 09/08/21 08/10/21 06/09/20 02 - 16 136,200 0 SLC 0 0 0 Hunt Engineers,Architects & l 0 / / 09/08/21
Bus Garage:
20-1007 Reconstruction 5-006-007 04/27/21 DONE DONE DONE 12/22/20 12/18/20 11/10/20 06/16/20 4,14,15,16 855,720 855,720 SLC 0 0 0 Hunt Engineers,Architects & l 0 08/17/22 12/18/20
22-2420 Reconstruction 5-006-008 09/25/23 DONE DONE DONE 06/20/23 06/20/23 06/09/23 05/16/23 8,15,16 100,000 100,000 MSK 0 0 0 Hunt Engineers,Architects & l 0 / / 06/20/23
Campbell Press Box:
20-1008 Reconstruction 7-007-002 04/27/21 DONE DONE DONE 12/22/20 12/18/20 11/10/20 06/16/20 8,16 19,000 0 SLC 0 0 0 Hunt Engineers,Architects & l 0 08/17/22 12/18/20
New Concession Stand:
20-1009 Reconstruction 7-009-002 04/27/21 DONE DONE DONE 12/22/20 12/18/20 11/10/20 06/16/20 4,16 6,975 0 SLC 0 0 0 Hunt Engineers,Architects & l 0 08/17/22 12/18/20
District Wide:
22-0271 Reconstruction 7-999-004 11/16/22 DONE DONE DONE 08/17/22 08/11/22 07/08/22 05/17/22 100,000 100,000 SLC 0 0 0 Hunt Engineers,Architects & l 0 06/21/23 08/11/22
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
CORNING-PAINTED POST ASD STATUS REPORT ON CAPITAL PROJECTS
District No.: 57-10-00-01
last updated on 04/26/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Fred Carder Elementary:
21-1460 Reconstruction 0-005-025 10/31/22 DONE DONE DONE 03/08/22 03/08/22 08/03/21 09/24/19 8,155,16 548,750 548,750 JLB 0 0 0 Hunt Engineers,Architects & l 548,750 / / 03/08/22
- PR Additions and Alterations 0-005-026 / / / / 08/24/21 / / 02 - 16 0 0 JLB 0 0 0 0 / / / /
21-2020 Additions and Alterations 0-005-026 10/28/22 DONE DONE DONE 06/22/22 06/22/22 08/24/21 09/24/19 02 - 16 8,931,670 8,931,670 JLB 0 0 0 Hunt Engineers,Architects & l 0 / / 06/22/22
22-0010 Reconstruction 0-005-027 09/08/22 DONE DONE DONE 07/01/22 06/29/22 06/08/22 05/17/22 155 100,000 100,000 JLB 0 0 0 Hunt Engineers,Architects & l 0 06/07/23 06/29/22
Erwin Valley Elementary:
19-0335 Reconstruction 0-009-023 09/26/19 DONE DONE DONE 08/30/19 08/26/19 05/14/19 05/21/19 7,155,15,16 100,000 100,000 SLC 0 0 0 Hunt Engineers,Architects & l 0 01/20/20 08/26/19
- Reconstruction 0-009-024 / / / / 07/18/19 / / 7,155,15,16 0 9,749,100 SLC 0 0 0 0 / / / /
20-0650PR Additions and Alterations 0-009-025 DONE 10/21/20 / / 08/31/20 / / 02 - 16 0 10,086,192 SLC 0 0 0 0 / / / /
20-0986 Additions and Alterations 0-009-025 04/19/21 DONE DONE DONE 12/17/20 12/14/20 08/31/20 09/24/19 02 - 16 7,843,807 6,362,533 SLC 0 0 0 Hunt Engineers,Architects & l 0 09/07/22 12/14/20
20-1208 Reconstruction 0-009-026 07/14/21 DONE DONE DONE 01/28/21 01/26/21 12/23/20 09/24/19 155,16 449,891 449,891 SLC 0 0 0 Hunt Engineers,Architects & l 449,891 06/05/23 01/26/21
Hugh W. Gregg Elementary:
19-1544 Reconstruction 0-010-023 05/27/20 DONE DONE DONE 03/09/20 02/19/20 01/21/20 09/24/19 8 347,442 347,442 SLC 0 0 0 Hunt Engineers,Architects & l 347,442 07/31/21 02/19/20
21-1461 Reconstruction 0-010-024 10/31/22 DONE DONE DONE 03/08/22 03/08/22 08/03/21 09/24/19 8,155,16 493,680 493,680 JLB 0 0 0 Hunt Engineers,Architects & l 493,680 / / 03/08/22
21-1200 Reconstruction 0-010-025 06/14/22 DONE DONE DONE 01/28/22 01/26/22 08/24/21 09/24/19 2,4,8,9,155,15,16 5,488,270 5,488,270 JLB 0 0 0 Hunt Engineers,Architects & l 0 01/18/24 01/26/22
W. Severn Elementary:
20-0967 Reconstruction 0-018-021 04/19/21 DONE DONE DONE 12/15/20 12/09/20 10/23/20 09/24/19 2,4,8,9,10,155,15,16 7,806,670 7,806,670 SLC 0 0 0 Hunt Engineers,Architects & l 0 09/07/22 12/09/20
20-1209 Reconstruction 0-018-022 07/14/21 DONE DONE DONE 01/28/21 01/26/21 12/23/20 09/24/19 8,155,16 1,076,540 1,076,540 SLC 0 0 0 Hunt Engineers,Architects & l 1,076,540 06/05/23 01/26/21
Calvin U Smith Elementary:
22-2483 Reconstruction 0-019-022 08/22/23 DONE DONE DONE 06/30/23 06/29/23 05/03/23 05/16/23 155,16 100,000 100,000 JJH 0 0 0 Hunt Engineers,Architects & l 0 / / 06/29/23
23-0163 Reconstruction 0-019-023 01/22/24 DONE DONE DONE 07/28/23 07/24/23 06/15/23 09/24/19 2,4,7,8,9,10,155,15, 6,549,444 6,549,444 JJH 0 0 0 Hunt Engineers,Architects & l 0 / / 07/24/23
Winfield Elementary School:
23-0286 Reconstruction 0-021-021 02/22/24 DONE DONE DONE 08/18/23 08/18/23 07/31/23 09/24/19 2,8,9,10,14,155,15,1 4,114,537 4,114,537 JJH 0 0 0 Hunt Engineers,Architects & l 0 / / 08/18/23
East High School:
19-0149 Additions and Alterations 0-023-038 11/05/19 DONE DONE DONE 07/23/19 07/12/19 09/13/16 09/23/14 02 - 16 623,000 348,550 SLC 0 0 0 Hunt Engineers,Architects & l 0 10/16/20 07/12/19
19-1545 Reconstruction 0-023-039 05/27/20 DONE DONE DONE 03/09/20 02/19/20 01/21/20 09/24/19 155,16 1,765,548 1,765,548 SLC 0 0 0 Hunt Engineers,Architects & l 1,765,548 07/31/21 02/19/20
21-1462 Reconstruction 0-023-040 10/31/22 DONE DONE DONE 03/08/22 03/08/22 08/03/21 09/24/19 155,16 671,728 671,728 JLB 0 0 0 Hunt Engineers,Architects & l 671,728 / / 03/08/22
21-0646 Reconstruction 0-023-041 03/18/22 DONE DONE DONE 11/04/21 11/03/21 08/24/21 09/24/19 2,8,9,14,155,15,16 6,247,480 6,247,480 SLC 0 0 0 Hunt Engineers,Architects & l 0 11/18/22 11/03/21
23-1088 Reconstruction 0-023-042 UNREVIEWED 12/04/23 11/17/23 11/09/23 09/24/19 13 0 0 JJH 0 0 0 Hunt Engineers,Architects & l 0 / / 11/17/23
Middle School (frmly West HS):
19-1546 Reconstruction 0-024-038 05/27/20 DONE DONE DONE 03/09/20 02/19/20 / / 09/24/19 155,16 842,716 842,716 SLC 0 0 0 Hunt Engineers,Architects & l 842,716 07/31/21 02/19/20
19-1923 Reconstruction 0-024-039 08/25/20 DONE DONE DONE 06/30/20 03/25/20 03/02/20 06/09/20 8 100,000 100,000 SLC 0 0 0 Hunt Engineers,Architects & l 0 05/13/21 03/25/20
20-0761 Reconstruction 0-024-040 02/21/21 DONE DONE DONE 11/03/20 10/26/20 07/23/20 09/24/19 2,4,7,8,9,10,155,15, 15,713,854 15,713,854 SLC 0 0 0 Hunt Engineers,Architects & l 0 09/07/23 10/26/20
20-1210 Reconstruction 0-024-041 07/14/21 DONE DONE DONE 01/28/21 01/26/21 12/23/20 09/24/19 155,16 780,727 780,727 SLC 0 0 0 Hunt Engineers,Architects & l 780,727 06/05/23 01/26/21
20-1653 Reconstruction 0-024-042 07/13/21 DONE DONE DONE 04/29/21 04/28/21 04/19/21 05/18/21 8 100,000 100,000 SLC 0 0 0 Hunt Engineers,Architects & l 0 04/15/22 04/28/21
23-1189 Reconstruction 0-024-043 UNREVIEWED 12/14/23 12/08/23 11/09/23 / / 2,7,8,9,10,155,15,16 0 0 JJH 0 0 0 Hunt Engineers,Architects & l 0 / / 12/08/23
Administration Building:
19-0950 Reconstruction 1-001-008 03/12/20 DONE DONE DONE 12/09/19 11/22/19 11/01/19 09/24/19 2,7,14,16 1,464,568 0 SLC 0 0 0 Hunt Engineers,Architects & l 0 01/05/21 11/22/19
19-1547 Reconstruction 1-001-009 05/27/20 DONE DONE DONE 03/09/20 02/19/20 01/21/20 09/24/19 155,16 565,097 0 SLC 0 0 0 Hunt Engineers,Architects & l 565,097 07/31/21 02/19/20
20-1211 Reconstruction 1-001-010 07/14/21 DONE DONE DONE 01/28/21 01/26/21 12/23/20 09/24/19 155,16 79,670 0 SLC 0 0 0 Hunt Engineers,Architects & l 79,670 06/05/23 01/26/21
20-1427 Reconstruction 1-001-011 05/26/21 DONE DONE DONE 03/11/21 03/08/21 02/09/21 09/24/19 155 179,000 0 SLC 0 0 0 Hunt Engineers,Architects & l 0 01/11/22 03/08/21
21-1463XX Reconstruction 1-001-012 CANCELLED 03/08/22 03/08/22 08/03/21 09/24/19 155 208,914 0 JLB 0 0 0 Hunt Engineers,Architects & l 208,914 / / 03/08/22
Goff Road Building:
- DB Discovered Building 1-088-001 / / / / 11/28/23 / / 0 0 JJH 0 0 0 0 / / / /
- Reconstruction 1-088-002 / / / / 04/12/24 / / 2,4,7,8,9,155,15,16 0 0 JJH 0 0 0 0 / / / /
XXBus Garage Shed-Demolition 090520:
19-1717 Reconstruction 2-025-001 05/18/20 DONE DONE DONE 05/04/20 05/01/20 04/09/20 09/24/19 7,8,9,16 9,000 0 SLC 0 0 0 Hunt Engineers,Architects & l 0 10/03/20 05/01/20
CR-1:
20-0171XX Alterations 2-071-001 CANCELLED 08/11/20 08/10/20 08/10/20 / / 0 0 SLC 0 0 0 0 / / 08/10/20
CR-2:
20-0172XX Alterations 2-072-001 CANCELLED 08/11/20 08/10/20 08/10/20 / / 0 0 SLC 0 0 0 0 / / 08/10/20
CS-1:
20-0173XX Alterations 2-073-001 CANCELLED 08/11/20 08/10/20 08/10/20 / / 0 0 SLC 0 0 0 0 / / 08/10/20
EV-1:
20-0174XX Alterations 2-074-001 CANCELLED 08/11/20 08/10/20 08/10/20 / / 0 0 SLC 0 0 0 0 / / 08/10/20
HS-1:
20-0175XX Alterations 2-075-001 CANCELLED 08/11/20 08/10/20 08/10/20 / / 0 0 SLC 0 0 0 0 / / 08/10/20
HS-2:
20-0176XX Alterations 2-076-001 CANCELLED 08/11/20 08/10/20 08/10/20 / / 0 0 SLC 0 0 0 0 / / 08/10/20
HS-3:
20-0177XX Alterations 2-077-001 CANCELLED 08/11/20 08/10/20 08/10/20 / / 0 0 SLC 0 0 0 0 / / 08/10/20
HS-5:
20-0178XX Alterations 2-078-001 CANCELLED 08/11/20 08/10/20 08/10/20 / / 0 0 SLC 0 0 0 0 / / 08/10/20
MS-4:
20-0179XX Alterations 2-079-001 CANCELLED 08/11/20 08/10/20 08/10/20 / / 0 0 SLC 0 0 0 0 / / 08/10/20
SV-3:
20-0180XX Alterations 2-080-001 CANCELLED 08/11/20 08/10/20 08/10/20 / / 0 0 SLC 0 0 0 0 / / 08/10/20
SV-4:
20-0181XX Alterations 2-081-001 CANCELLED 08/11/20 08/10/20 08/10/20 / / 0 0 SLC 0 0 0 0 / / 08/10/20
MS-5:
20-0182XX Alterations 2-082-001 CANCELLED 08/11/20 08/10/20 08/10/20 / / 0 0 SLC 0 0 0 0 / / 08/10/20
Storage Building - Demolition:
21-0647 Reconstruction 2-083-001 03/18/22 DONE DONE DONE 11/04/21 11/03/21 08/19/21 09/24/19 15,000 0 SLC 0 0 0 Hunt Engineers,Architects & l 0 03/13/23 11/03/21
HS Storage Building:
21-0648 New Construction 2-084-001 03/18/22 DONE DONE DONE 11/04/21 11/03/21 10/04/21 09/24/19 02 - 16 425,000 0 SLC 0 0 0 Hunt Engineers,Architects & l 0 03/13/23 11/03/21
Goff Road Storage Building:
- PR New Construction 2-089-001 / / / / 11/28/23 / / 02 - 16 0 0 JJH 0 0 0 0 / / / /
23-1749DB Discovered Building 2-089-001 UNREVIEWED 04/04/24 04/04/24 11/28/23 12/19/23 02 - 16 0 0 JJH 0 0 0 Hunt Engineers,Architects & l 0 / / 04/04/24
Bus Garage:
19-1182 Reconstruction 5-015-008 05/18/20 DONE DONE DONE 01/08/20 12/23/19 11/01/19 09/24/19 2,4,7,8,9,155,15,16 1,831,638 1,831,638 SLC 0 0 0 Hunt Engineers,Architects & l 0 10/03/20 12/23/19
19-1548 Reconstruction 5-015-009 05/27/20 DONE DONE DONE 03/09/20 02/19/20 01/21/20 09/24/19 155,16 712,056 712,056 SLC 0 0 0 Hunt Engineers,Architects & l 712,056 07/31/21 02/19/20
XXPump House - Demolition 090520:
19-1716 Reconstruction 7-022-001 05/18/20 DONE DONE DONE 05/04/20 05/01/20 04/09/20 09/24/19 4,7,8,155,15,16 7,400 0 SLC 0 0 0 Hunt Engineers,Architects & l 0 10/03/20 05/01/20
E.H.S. Stadium:
19-1549 Reconstruction 7-026-008 05/27/20 DONE DONE DONE 03/09/20 02/19/20 01/30/20 09/24/19 16 21,673 0 SLC 0 0 0 Hunt Engineers,Architects & l 21,673 07/31/21 02/19/20
Baseball Dugout Storage:
23-1190 New Construction 7-086-001 UNREVIEWED 12/14/23 12/08/23 11/09/23 / / 02 - 16 0 0 JJH 0 0 0 Hunt Engineers,Architects & l 0 / / 12/08/23
Softball Dugout Storage:
23-1191 New Construction 7-087-001 UNREVIEWED 12/14/23 12/08/23 11/09/23 / / 02 - 16 0 0 JJH 0 0 0 Hunt Engineers,Architects & l 0 / / 12/08/23
District-Wide:
19-1739 Reconstruction 7-999-006 07/14/20 DONE DONE DONE 05/22/20 05/05/20 02/04/20 09/23/14 16 350,000 350,000 SLC 0 0 0 Hunt Engineers,Architects & l 0 01/12/22 05/05/20
- SB Reconstruction 7-999-BA3 DONE / / / / / / / / 16 0 0 SLC 0 0 0 0 / / / /
Victory Business Center:
22-0590TQ Temporary Quarters 8-085-001 12/13/22 DONE DONE DONE 09/26/22 09/26/22 07/07/22 / / 0 0 JLB 0 0 0 0 / / 09/26/22
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
HORNELL CITY SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 57-18-00-01
last updated on 04/26/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Intermediate School:
21-1657PR Additions and Alterations 0-003-019 DONE 04/13/22 / / 12/17/21 / / 02 - 16 0 13,138,667 WLC 0 0 0 0 / / / /
- PR Additions and Alterations 0-003-020 / / / / 02/02/23 / / 02 - 16 0 0 WLC 0 0 0 0 / / / /
23-0593 Additions and Alterations 0-003-020 ADDENDUM REQ'D 10/04/23 09/29/23 02/02/23 12/20/22 02 - 16 0 0 WLC 0 0 0 LaBella Associates P.C. 0 / / 09/29/23
North Hornell Elementary:
18-1615XX Additions and Alterations 0-012-010 06/03/19 CANCELLED 03/07/19 01/09/19 08/03/18 11/04/14 02 - 16 2,039,972 0 MTM 0 0 0 Hunt Engineers,Architects & l 0 / / 01/09/19
18-1900 Reconstruction 0-012-011 06/04/19 DONE DONE DONE 04/23/19 04/18/19 02/28/19 05/21/19 7,9 500,000 500,000 JLB 0 0 0 Hunt Engineers,Architects & l 0 10/24/19 04/18/19
20-1120SB Additions and Alterations 0-012-012 DONE / / / / 01/11/21 / / 02 - 16 0 0 JLB 0 0 0 0 / / / /
20-1443 Additions and Alterations 0-012-012 05/10/21 DONE DONE DONE 03/11/21 03/08/21 01/11/21 11/04/14 02 - 16 2,160,428 0 JLB 0 0 0 Hunt Engineers,Architects & l 0 08/04/22 03/08/21
20-1518FA Reconstruction 0-012-013 05/25/21 DONE DONE DONE 04/01/21 03/24/21 02/18/21 05/18/21 2,8,9,155,16 1,235,544 1,235,544 JLB 0 0 0 Hunt Engineers,Architects & l 0 06/29/22 03/24/21
- Reconstruction 0-012-014 / / / / 02/02/24 / / 2,4,7,8,9,155,15,16 0 0 WLC 0 0 0 0 / / / /
- Reconstruction 0-012-015 / / / / 02/02/24 / / 2,4,7,8,155,15,16 0 0 WLC 0 0 0 0 / / / /
23-1686 Reconstruction 0-012-016 UNREVIEWED 03/27/24 03/25/24 03/05/24 12/20/22 4,7,155,15,16 0 0 WLC 0 0 0 LaBella Associates P.C. 0 / / 03/25/24
Jr/Sr High School:
19-1698 Reconstruction 0-013-022 06/18/20 DONE DONE DONE 04/15/20 04/12/20 03/31/20 06/09/20 8,9,155,15,16 600,000 600,000 JLB 0 0 0 Hunt Engineers, Architects & 0 04/06/21 04/12/20
19-1702 Reconstruction 0-013-023 05/04/20 DONE DONE DONE 04/24/20 04/23/20 03/31/20 03/12/20 8,9 320,000 320,000 JLB 0 0 0 Hunt Engineers,Architects & l 0 12/18/20 04/23/20
21-1656PR Additions and Alterations 0-013-024 DONE 04/13/22 / / 12/17/21 / / 02 - 16 0 0 WLC 0 0 0 0 / / / /
21-1646 Reconstruction 0-013-025 07/22/22 DONE DONE DONE 04/11/22 04/08/22 02/24/22 05/17/22 2,4,8,9,10,14,155,15 1,300,000 1,300,000 WLC 0 0 0 LaBella Associates P.C. 0 06/30/23 04/08/22
22-2076 Reconstruction 0-013-026 07/19/23 DONE DONE DONE 04/21/23 04/20/23 02/02/23 05/16/23 2,16 1,300,000 1,300,000 WLC 0 0 0 LaBella Associates P.C. 0 / / 04/20/23
22-2077 Reconstruction 0-013-027 07/19/23 DONE DONE DONE 04/21/23 04/20/23 02/02/23 12/20/22 2,4,10,15,16 1,608,413 1,608,413 WLC 0 0 0 LaBella Associates P.C. 0 / / 04/20/23
23-1687 Reconstruction 0-013-028 UNREVIEWED 03/27/24 03/25/24 02/02/24 12/20/23 2,4,7,155,15,16 0 0 WLC 0 0 0 LaBella Associates P.C. 0 / / 03/25/24
- Reconstruction 0-013-029 / / / / 02/02/24 / / 2,4,7,8,9,10,155,15, 0 0 WLC 0 0 0 0 / / / /
Columbian Elementary-leased to BOCEs:
19-1691 Reconstruction 0-015-011 06/04/20 DONE DONE DONE 04/13/20 04/10/20 03/18/20 05/19/15 7 420,000 420,000 JLB 0 0 0 Hunt Engineers, Architects & 0 04/06/21 04/10/20
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
ARKPORT CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 57-19-01-04
last updated on 04/26/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Central School:
20-0312 Reconstruction 0-001-021 02/09/21 DONE DONE DONE 09/01/20 08/17/20 07/31/20 12/12/19 2,4,7,8,9,10,14,155, 9,928,150 9,928,150 JSS 0 0 0 LaBella Associates P.C. 0 08/30/22 08/17/20
20-1269 Reconstruction 0-001-022 03/12/21 DONE DONE DONE 02/09/21 01/21/21 07/31/20 05/29/19 2,4,8,9,10,155,15,16 100,000 100,000 JSS 0 0 0 0 06/06/22 01/21/21
20-0894 Reconstruction 0-001-023 03/02/21 DONE DONE DONE 12/01/20 11/18/20 08/11/20 08/14/19 9,155,16 722,912 722,912 JSS 0 0 0 LaBella Associates P.C. 722,912 07/25/22 11/18/20
22-1295 Reconstruction 0-001-024 02/16/23 DONE DONE DONE 12/21/22 12/20/22 05/23/22 05/17/22 4,8,9,16 100,000 100,000 JJH 0 0 0 LaBella Associates P.C. 0 06/30/23 12/20/22
23-1425 Reconstruction 0-001-025 STARTED DONE DONE 01/26/24 01/25/24 12/29/23 05/16/23 8 100,000 0 JJH 0 0 0 LaBella Associates P.C. 0 / / 01/25/24
- SB Reconstruction 0-001-BA1 DONE / / / / / / / / 16 0 0 JSS 0 0 0 0 / / / /
New Bus Garage:
20-0313 Reconstruction 5-009-002 02/09/21 DONE DONE DONE 09/01/20 08/17/20 07/31/20 12/12/19 2,4,16 806,851 806,851 JSS 0 0 0 LaBella Associates P.C. 0 08/30/22 08/17/20
20-0895 Reconstruction 5-009-003 03/02/21 DONE DONE DONE 12/01/20 11/18/20 08/11/20 08/14/19 4,155,16 10,455 10,455 JSS 0 0 0 LaBella Associates P.C. 10,455 07/25/22 11/18/20
District-Wide:
18-2162SB Reconstruction 7-999-001 DONE / / / / 06/19/19 / / 8,16 0 23,197,272 BMJ 0 0 0 0 / / / /
19-0314 Reconstruction 7-999-001 06/23/20 DONE DONE DONE 08/28/19 08/23/19 06/19/19 07/10/19 8,16 490,826 490,826 JSS 0 0 0 LaBella Associates P.C. 0 07/25/22 08/23/19
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
PRATTSBURGH CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 57-23-01-04
last updated on 04/26/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Main Building:
18-1070 Reconstruction 0-001-021 05/22/19 DONE DONE DONE 12/14/18 11/19/18 09/25/18 05/21/19 8,9,16 100,000 100,000 BMJ 0 0 0 Hunt Engineers,Architects & l 0 09/09/19 11/19/18
19-1481 Reconstruction 0-001-022 06/18/20 DONE DONE DONE 02/25/20 02/19/20 11/01/19 06/09/20 8,9,10,155,15,16 100,000 100,000 JSS 0 0 0 Hunt Engineers,Architects & l 0 05/18/21 02/19/20
20-0695 Reconstruction 0-001-023 01/26/21 DONE DONE DONE 10/27/20 10/23/20 10/15/20 06/09/20 16 346,000 346,000 JLB 0 0 33,701 Hunt Engineers,Architects & l 0 09/17/21 10/23/20
20-0696 Reconstruction 0-001-024 01/26/21 DONE DONE DONE 10/27/20 10/23/20 10/15/20 06/09/20 2,7,155,16 2,170,300 2,170,300 JSS 0 0 0 Hunt Engineers,Architects & l 0 09/17/21 10/23/20
20-1561 Reconstruction 0-001-025 06/02/21 DONE DONE DONE 04/06/21 04/02/21 03/05/21 05/18/21 8,16 100,000 100,000 JSS 0 0 0 Hunt Engineers,Architects & l 0 / / 04/02/21
21-0227 Reconstruction 0-001-026 01/18/22 DONE DONE DONE 08/26/21 08/24/21 03/05/21 06/09/20 2,4,7,8,9,10,155,15, 4,951,588 4,951,588 SLC 0 0 0 Hunt Engineers,Architects & l 0 09/04/23 08/24/21
21-0228FB Reconstruction 0-001-027 01/18/22 DONE DONE DONE 08/26/21 08/24/21 08/02/21 12/27/20 8,9,155,16 744,567 744,567 SLC 0 0 0 Hunt Engineers,Architects & l 0 09/04/23 08/24/21
21-2050 Reconstruction 0-001-028 08/04/22 DONE DONE DONE 06/27/22 06/24/22 06/07/22 05/17/22 9 100,000 100,000 WLC 0 0 0 Hunt Engineers,Architects & l 0 04/10/23 06/24/22
22-2299 Reconstruction 0-001-029 08/07/23 DONE DONE DONE 05/31/23 05/26/23 04/27/23 05/16/23 9,15,16 100,000 100,000 WLC 0 0 0 Hunt Engineers,Architects & l 0 / / 05/26/23
- Reconstruction 0-001-030 / / / / 03/28/24 / / 9,15 0 0 WLC 0 0 0 0 / / / /
- Reconstruction 0-001-031 / / / / 03/28/24 / / 2,9,15 0 0 WLC 0 0 0 0 / / / /
Agriculture Shop-Auxiliary CR:
21-0229 Reconstruction 0-002-011 01/18/22 DONE DONE DONE 08/26/21 08/24/21 03/05/21 06/09/20 9,155,15,16 80,000 80,000 SLC 0 0 0 Hunt Engineers,Architects & l 0 09/04/23 08/24/21
Agricultural Classroom:
20-0697 Reconstruction 0-008-010 01/26/21 DONE DONE DONE 10/27/20 10/23/20 10/15/20 06/09/20 2,155,16 350,000 272,560 JLB 0 0 0 Hunt Engineers,Architects & l 0 09/17/21 10/23/20
22-2401 Reconstruction 0-008-011 STARTED DONE DONE 06/16/23 06/15/23 04/27/23 06/09/20 8,9,10,155,15,16 1,100,000 0 WLC 0 0 0 Hunt Engineers,Architects & l 0 / / 06/15/23
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
JASPER-TROUPSBURG CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 57-27-02-04
last updated on 04/26/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Jasper-Troupsburg Elem.:
23-0287 Reconstruction 0-001-016 04/01/24 DONE DONE DONE 08/18/23 08/17/23 07/22/20 12/19/22 2,4,7,8,9,10,155,15, 5,785,000 0 MSK 0 0 0 Labella Associates 0 / / 08/17/23
- XX Reconstruction 0-001-017 CANCELLED / / / / 07/21/21 / / 8,9,155,15,16 0 9,158,046 SLC 0 0 0 0 / / / /
21-1505 Reconstruction 0-001-018 04/29/22 DONE DONE DONE 03/14/22 03/14/22 01/31/22 05/18/21 2,4,7,9,155,15,16 100,000 100,000 SLC 0 0 0 Labella Associates 0 05/08/23 03/14/22
22-0409SB Reconstruction 0-001-019 DONE / / / / 09/07/22 / / 4,8,9,16 0 0 SLC 0 0 0 0 / / / /
22-1531 Reconstruction 0-001-019 07/21/23 DONE DONE DONE 01/23/23 01/23/23 09/07/22 11/04/14 4,8,9,16 175,000 22,500 MSK 0 0 0 Labella Associates 0 / / 01/23/23
22-1658 Reconstruction 0-001-020 05/26/23 DONE DONE DONE 02/10/23 02/09/23 01/19/23 05/17/22 2,4,7,8,9,15 100,000 100,000 MSK 0 0 0 Labella Associates 0 / / 02/09/23
Main Building Jasper:
- XX Reconstruction 0-002-020 CANCELLED / / / / 07/22/20 / / 2,4,7,8,9,10,155,15, 0 0 SLC 0 0 0 0 / / / /
20-1645XX Reconstruction 0-002-021 07/10/21 CANCELLED 04/27/21 04/26/21 02/26/21 05/18/21 9,15,16 100,000 100,000 SLC 0 0 0 Labella Associates 0 / / 04/26/21
- XX Reconstruction 0-002-022 CANCELLED / / / / 07/21/21 / / 8,9,10,15,16 0 17,984,037 SLC 0 0 0 0 / / / /
21-1307 Reconstruction 0-002-023 08/20/21 DONE DONE DONE 02/16/22 02/11/22 08/30/21 08/19/21 2,8,9,10,13,14,155,1 6,355,000 3,559,602 SLC 0 0 0 Labella Associates 0 05/31/22 02/11/22
23-1544 Reconstruction 0-002-024 04/01/24 DONE DONE DONE 02/23/24 02/23/24 10/24/23 12/19/22 16 198,000 0 MSK 0 0 0 Labella Associates 0 / / 02/23/24
Track Storage Bldg. Demolished-flood:
21-0494 Reconstruction 2-011-002 12/09/21 DONE DONE DONE 10/08/21 10/06/21 09/23/21 08/19/21 2 35,000 0 SLC 0 0 0 Labella Associates 0 12/21/21 10/06/21
New Bus Garage Storage:
23-0288 Reconstruction 4-009-005 04/01/24 DONE DONE DONE 08/18/23 08/17/23 07/22/20 12/19/22 8 185,000 0 MSK 0 0 0 Labella Associates 0 / / 08/17/23
Bus Shared Fuel:
20-1769PR Additions and Alterations 5-004-009 DONE 05/21/21 / / 07/22/20 / / 02 - 16 0 0 SLC 0 0 0 0 / / / /
23-0289 Additions and Alterations 5-004-009 04/01/24 DONE DONE DONE 08/18/23 08/17/23 07/22/20 12/19/22 02 - 16 982,000 0 MSK 0 0 0 Labella Associates 0 / / 08/17/23
Concession Stand:
23-0290XX Reconstruction 7-012-002 CANCELLED 08/18/23 08/17/23 06/27/23 12/19/22 16 0 0 MSK 0 0 0 Labella Associates 0 / / 08/17/23
Dugout #1:
23-1666 New Construction 7-015-001 STARTED STARTED STARTED 03/25/24 03/22/24 05/18/23 08/19/21 02 - 16 0 0 MSK 0 0 0 LaBella Associates P.C. 0 / / 03/22/24
Dugout #2:
23-1667 New Construction 7-016-001 STARTED STARTED STARTED 03/25/24 03/22/24 05/18/23 08/19/21 02 - 16 0 0 MSK 0 0 0 LaBella Associates P.C. 0 / / 03/22/24
Dugout #3:
23-1668 New Construction 7-017-001 STARTED STARTED STARTED 03/25/24 03/22/24 05/18/23 08/19/21 02 - 16 0 0 MSK 0 0 0 LaBella Associates P.C. 0 / / 03/22/24
Dugout #4:
23-1669 New Construction 7-018-001 STARTED STARTED STARTED 03/25/24 03/22/24 05/18/23 08/19/21 02 - 16 0 0 MSK 0 0 0 LaBella Associates P.C. 0 / / 03/22/24
District-Wide:
20-1703SB Reconstruction 7-999-001 DONE / / / / 05/11/21 / / 8,9,155,16 0 0 SLC 0 0 0 0 / / / /
22-1532 Reconstruction 7-999-001 07/21/23 DONE DONE DONE 01/23/23 01/23/23 05/11/21 11/04/14 8,9,155,16 542,728 0 MSK 0 0 0 Labella Associates 0 / / 01/23/23
Former Canisteo-Greenwood MS:
21-0275TQ Temporary Quarters 8-014-001 09/08/21 DONE DONE DONE 09/03/21 09/03/21 08/30/21 / / 1 0 SLC 0 0 0 0 / / 09/03/21
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
WAYLAND-COHOCTON CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 57-30-02-04
last updated on 04/26/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Cohocton Elementary School:
20-1212 Reconstruction 0-001-015 04/15/21 DONE DONE DONE 01/28/21 01/26/21 10/19/20 12/13/16 8,9,155,15,16 76,400 76,400 JLB 0 0 0 SEI Design Group 0 02/06/23 01/26/21
21-0798 Reconstruction 0-001-016 01/18/22 DONE DONE DONE 11/30/21 11/23/21 06/18/21 05/18/21 2,7,9,155,15,16 937,100 937,100 JLB 0 0 0 SEI Design Group 0 05/31/23 11/23/21
Main Building - Wayland:
18-1974 Reconstruction 0-005-020 06/26/19 DONE DONE DONE 05/16/19 05/15/19 04/02/19 05/21/19 155 100,000 100,000 JLB 0 0 0 SEI Design Group 0 04/29/20 05/15/19
19-1738 Reconstruction 0-005-021 06/26/20 DONE DONE DONE 05/22/20 05/05/20 04/07/20 06/09/20 8,9,16 100,000 100,000 JLB 0 0 0 SEI Design Group 0 05/19/21 05/05/20
20-1213 Reconstruction 0-005-022 04/15/21 DONE DONE DONE 01/28/21 01/26/21 10/19/20 12/13/16 8,9,155,15,16 263,600 263,600 JLB 0 0 0 SEI Design Group 0 02/06/23 01/26/21
21-0451 Reconstruction 0-005-023 11/05/21 DONE DONE DONE 09/30/21 09/29/21 03/05/21 05/18/21 8,9,155,15,16 100,000 100,000 JLB 0 0 0 SEI Design Group 0 06/13/22 09/29/21
21-0799 Reconstruction 0-005-024 01/18/22 DONE DONE DONE 11/30/21 11/23/21 06/18/21 05/18/21 2,4,7,8,9,10,155,15, 8,744,799 8,744,799 JLB 0 0 0 SEI Design Group 0 05/31/23 11/23/21
22-0177 Reconstruction 0-005-025 10/20/22 DONE DONE DONE 07/27/22 07/27/22 04/29/22 05/17/22 10,16 100,000 100,000 WLC 0 0 0 SEI Design Group 0 06/12/23 07/27/22
22-0951 Reconstruction 0-005-026 03/16/23 DONE DONE DONE 11/09/22 11/09/22 10/04/22 05/18/21 10,16 699,900 699,900 WLC 0 0 0 SEI Design Group 0 / / 11/09/22
22-2398 Reconstruction 0-005-027 07/27/23 DONE DONE DONE 06/16/23 06/15/23 04/27/23 05/16/23 10 100,000 100,000 WLC 0 0 0 SEI Design Group 0 / / 06/15/23
Cohocton Storage Building:
21-0129DB Discovered Building 2-011-001 08/23/21 DONE DONE DONE 08/02/21 08/02/21 10/19/20 / / 0 0 JLB 0 0 0 0 / / 08/02/21
New W-C Bus Garage:
21-0800 Reconstruction 5-009-003 01/18/22 DONE DONE DONE 11/30/21 11/23/21 06/18/21 05/18/21 2,8,9,15,16 1,036,567 1,036,567 JLB 0 0 0 SEI Design Group 0 05/31/23 11/23/21
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED