DRYDEN CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 61-03-01-06
last updated on 04/19/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Cassavant Elementary:
19-0391 Reconstruction 0-001-010 12/16/19 DONE DONE DONE 09/09/19 08/28/19 05/20/19 05/21/19 8,9 100,000 100,000 SLC 0 0 0 Hunt Engineers,Architects & l 0 06/25/20 08/28/19
21-0323 Reconstruction 0-001-011 11/15/21 DONE DONE DONE 09/13/21 09/09/21 06/01/21 05/18/21 8 100,000 100,000 SLC 0 0 0 Hunt Engineers,Architects & l 0 06/22/22 09/09/21
- Reconstruction 0-001-012 / / / / 04/25/22 / / 7,15 0 0 SLC 0 0 0 0 / / / /
Dryden Elementary:
20-0443 Reconstruction 0-003-027 01/08/21 DONE DONE DONE 09/24/20 09/22/20 04/07/20 06/09/20 8 100,000 100,000 JLB 0 0 0 Hunt Engineers,Architects & l 0 06/25/21 09/22/20
21-0240 Reconstruction 0-003-028 02/08/22 DONE DONE DONE 08/26/21 08/26/21 06/01/21 03/28/17 2,16 1,140,500 1,140,500 SLC 0 0 0 Hunt Engineers,Architects & l 0 09/20/23 08/26/21
22-0031 Reconstruction 0-003-029 02/07/23 DONE DONE DONE 07/05/22 07/05/22 04/25/22 04/05/22 7,155,15,16 1,750,000 1,750,000 WLC 0 0 0 Hunt Engineers,Architects & l 0 / / 07/05/22
22-1071 Reconstruction 0-003-030 02/01/23 DONE DONE DONE 11/28/22 11/21/22 04/25/22 04/05/22 2,7,8,9,10,155,15,16 5,822,000 5,822,000 WLC 0 0 0 Hunt Engineers,Architects & l 0 / / 11/21/22
Freeville Elementary:
18-1634 Reconstruction 0-004-014 05/23/19 DONE DONE DONE 03/14/19 03/01/19 02/04/19 03/28/17 155 285,000 285,000 SLC 0 0 0 Hunt Engineers,Architects & l 0 02/06/20 03/01/19
22-0032 Reconstruction 0-004-015 02/07/23 DONE DONE DONE 07/05/22 07/05/22 04/25/22 04/05/22 2,7,155,15,16 500,000 500,000 WLC 0 0 0 Hunt Engineers,Architects & l 0 / / 07/05/22
22-0096 Reconstruction 0-004-016 10/24/22 DONE DONE DONE 07/15/22 07/13/22 04/25/22 05/17/22 4,7,8,9,155,16 100,000 100,000 WLC 0 0 0 Hunt Engineers,Architects & l 0 06/21/23 07/13/22
22-1754 Reconstruction 0-004-017 05/31/23 DONE DONE DONE 02/27/23 02/23/23 12/01/22 04/05/22 7 450,000 450,000 WLC 0 0 0 Hunt Engineers,Architects & l 0 / / 02/23/23
23-0551 Reconstruction 0-004-018 11/08/23 DONE DONE DONE 09/25/23 09/19/23 07/25/23 05/22/23 2,15,16 100,000 100,000 WLC 0 0 0 Hunt Engineers,Architects & l 0 / / 09/19/23
Junior/Senior High School:
19-1552 Reconstruction 0-005-028 06/01/20 DONE DONE DONE 03/09/20 02/21/20 12/17/19 12/10/19 2,4,8,9,155,15,16 2,500,000 2,500,000 SLC 0 0 0 Hunt Engineers,Architects & l 0 01/05/21 02/21/20
21-0241 Reconstruction 0-005-029 02/08/22 DONE DONE DONE 08/26/21 08/26/21 06/01/21 03/28/17 2,8,9,155,15,16 1,613,438 1,613,438 SLC 0 0 0 Hunt Engineers,Architects & l 0 09/20/23 08/26/21
22-0033 Reconstruction 0-005-030 02/07/23 DONE DONE DONE 07/05/22 07/05/22 04/25/22 04/05/22 7,155,15,16 2,207,000 2,207,000 WLC 0 0 0 Hunt Engineers,Architects & l 0 / / 07/05/22
Maint Facility (To be Demo'd):
20-0500 Reconstruction 2-010-004 10/07/20 DONE DONE DONE 09/30/20 09/30/20 02/09/18 03/28/17 2 70,000 0 SLC 0 0 0 Hunt Engineers,Architects & l 0 / / 09/30/20
Football Storage:
19-1816DB Discovered Building 2-021-001 ADDENDUM REQ'D 06/05/20 06/05/20 05/16/19 / / 02 - 16 0 0 SLC 0 0 0 0 / / 06/05/20
Bike Storage:
19-1817DB Discovered Building 2-022-001 ADDENDUM REQ'D 06/05/20 06/05/20 05/16/19 / / 02 - 16 0 0 SLC 0 0 0 0 / / 06/05/20
Track Storage:
19-1818DB Discovered Building 2-023-001 ADDENDUM REQ'D 06/05/20 06/05/20 05/16/19 / / 02 - 16 0 0 SLC 0 0 0 0 / / 06/05/20
A-Verdi Athletic Bike Storage:
- DB Discovered Building 2-025-001 / / / / / / / / 0 0 WLC 0 0 0 0 / / / /
A-Verdi Athletic Storage:
- DB Discovered Building 2-026-001 / / / / / / / / 0 0 WLC 0 0 0 0 / / / /
Residential House Demolition:
22-0034DB Discovered Building 7-024-001 UNREVIEWED
DONE DONE 07/11/22 07/05/22 04/26/22 / / 0 0 WLC 0 0 0 0 / / 07/05/22
District-Wide:
21-0593SB Reconstruction 7-999-005 DONE / / / / 10/27/21 / / 16 0 0 SLC 0 0 0 0 / / / /
21-0736 Reconstruction 7-999-005 02/08/22 DONE DONE DONE 11/17/21 11/16/21 10/27/21 11/04/14 16 491,000 0 SLC 0 0 0 Hunt Engineers,Architects & l 0 / / 11/16/21
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
GROTON CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 61-05-01-04
last updated on 04/19/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Junior/Senior High School:
21-0731 Reconstruction 0-002-020 03/29/22 DONE DONE DONE 11/16/21 11/16/21 08/17/21 12/07/21 2,155,15 5,162,500 5,162,500 SLC 0 0 0 Ashley McGraw 0 10/03/22 11/16/21
22-0515 Reconstruction 0-002-021 01/10/23 DONE DONE DONE 09/16/22 09/16/22 07/19/22 12/07/21 2,7,155,15,16 900,700 900,700 WLC 0 0 0 Ashley McGraw 0 09/18/23 09/16/22
- Reconstruction 0-002-022 / / / / 06/15/23 / / 7,13 0 0 WLC 0 0 0 0 / / / /
- Reconstruction 0-002-023 / / / / 08/21/23 / / 4,7,8,9,15 0 0 WLC 0 0 0 0 / / / /
- Reconstruction 0-002-024 / / / / 02/29/24 / / 8 0 0 WLC 0 0 0 0 / / / /
Elementary School:
21-0732 Reconstruction 0-003-014 03/29/22 DONE DONE DONE 11/16/21 11/12/21 08/17/21 12/07/21 2,155,15 1,525,500 1,525,500 SLC 0 0 0 Ashley McGraw 0 10/03/22 11/12/21
22-0516 Reconstruction 0-003-015 01/10/23 DONE DONE DONE 09/16/22 09/16/22 07/19/22 12/07/21 4,8,9,155,15,16 1,566,000 1,566,000 WLC 0 0 0 Ashley McGraw 0 09/18/23 09/16/22
XXStorage Building - cancelled:
- XX New Construction 2-015-001 CANCELLED / / / / 08/17/21 / / 02 - 16 0 0 SLC 0 0 0 0 / / / /
Bus Garage Maint. Storage:
22-0517 Reconstruction 5-001-008 01/10/23 DONE DONE DONE 09/16/22 09/16/22 07/19/22 12/07/21 7,155,15,16 973,300 973,300 WLC 0 0 0 Ashley McGraw 0 09/18/23 09/16/22
Ross Concession:
- Reconstruction 7-009-001 / / / / 01/25/22 / / 2,4,8,9,155,15,16 0 0 SLC 0 0 0 0 / / / /
Greenhouse:
- New Construction 7-014-001 / / / / 11/04/20 / / 02 - 16 0 0 SLC 0 0 0 0 / / / /
Concessions/Storage:
21-0679 New Construction 7-016-001 04/01/22 DONE DONE DONE 11/12/21 11/08/21 08/17/21 12/07/21 02 - 16 638,000 0 SLC 0 0 0 Ashley McGraw 0 10/03/22 11/08/21
Pressbox:
21-0750 New Construction 7-017-001 04/01/22 DONE DONE DONE 11/19/21 11/19/21 08/17/21 12/07/21 02 - 16 84,000 0 SLC 0 0 0 Ashley McGraw 0 10/03/22 11/19/21
District-Wide:
- SB Reconstruction 7-999-BA1 DONE / / / / / / / / 16 0 0 BMJ 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
ITHACA CITY SCHOOLS STATUS REPORT ON CAPITAL PROJECTS
District No.: 61-06-00-01
last updated on 04/19/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Lehman Alt. Community School (6-12):
- PR Additions and Alterations 0-003-012 / / / / 10/21/19 / / 02 - 16 0 0 JSS 0 0 0 0 / / / /
20-1814 Additions and Alterations 0-003-012 02/08/22 DONE DONE DONE 06/01/21 05/26/21 10/21/19 05/21/19 02 - 16 2,583,145 2,333,688 SLC 0 0 0 Tetra Tech Architects and Eng 0 / / 05/26/21
Enfield Elem School (K-5):
19-0109 Reconstruction 0-004-013 10/31/19 DONE DONE DONE 07/19/19 06/20/19 11/20/18 05/21/19 8,9,10,155,16 55,000 0 JSS 0 0 0 Tetra Tech Architects and Eng 0 / / 06/20/19
20-1815 Reconstruction 0-004-014 02/08/22 DONE DONE DONE 06/01/21 05/26/21 10/21/19 05/21/19 2,155,15,16 4,404,671 4,404,671 SLC 0 0 0 Tetra Tech Architects and Eng 0 / / 05/26/21
21-1989 Reconstruction 0-004-015 10/06/22 DONE DONE DONE 06/17/22 06/14/22 01/20/22 05/21/19 2,7,8,16 2,339,655 925,641 SLC 0 0 0 Tetra Tech Architects and Eng 0 / / 06/14/22
22-0327 Reconstruction 0-004-016 01/06/23 DONE DONE DONE 08/24/22 08/23/22 05/12/22 05/21/19 2,4,7,8,9,10,155,15, 1,510,350 1,510,350 SLC 0 0 0 Tetra Tech Architects and Eng 0 / / 08/23/22
Sherman Elem School(K-5) (see0-028):
19-0110 Reconstruction 0-007-012 10/31/19 DONE DONE DONE 07/19/19 06/20/19 11/20/18 05/21/19 8,9,155,16 95,000 0 JSS 0 0 0 Tetra Tech Architects and Eng 0 / / 06/20/19
20-1816 Reconstruction 0-007-013 02/08/22 DONE DONE DONE 06/01/21 05/26/21 10/21/19 05/21/19 2,7,9 1,015,017 1,015,017 SLC 0 0 0 Tetra Tech Architects and Eng 0 / / 05/26/21
Cayuga Heights Elem.(K-5):
19-0111 Reconstruction 0-011-010 10/31/19 DONE DONE DONE 07/19/19 06/20/19 11/20/18 05/21/19 8,9,10,155,16 195,000 195,000 JSS 0 0 0 Tetra Tech Architects and Eng 0 / / 06/20/19
18-1898 Reconstruction 0-011-011 05/30/19 DONE DONE DONE 04/23/19 04/22/19 02/13/19 05/21/19 2,9 250,000 0 BMJ 0 0 0 Tetra Tech Architects and Eng 0 / / 04/22/19
Beverly Martin Elementary:
19-0112 Reconstruction 0-012-013 10/31/19 DONE DONE DONE 07/19/19 06/20/19 11/20/18 05/21/19 8,9,10,155,16 265,000 265,000 JSS 0 0 0 Tetra Tech Architects and Eng 0 / / 06/20/19
22-0328 Reconstruction 0-012-014 01/06/23 DONE DONE DONE 08/24/22 08/23/22 01/20/22 05/21/19 2,4,8,9,10,13,14,155 2,475,315 2,475,315 SLC 0 0 0 Tetra Tech Architects and Eng 0 / / 08/23/22
- Reconstruction 0-012-015 / / / / 05/12/22 / / 2,9,16 0 0 SLC 0 0 0 0 / / / /
Fall Creek Elem School(K-5):
19-0113 Reconstruction 0-013-009 10/31/19 DONE DONE DONE 07/19/19 06/20/19 11/20/18 05/21/19 8,9,155,16 103,000 103,000 JSS 0 0 0 Tetra Tech Architects and Eng 0 / / 06/20/19
- Reconstruction 0-013-010 / / / / 05/12/22 / / 2,9,10,155,16 0 0 SLC 0 0 0 0 / / / /
23-1675 Reconstruction 0-013-011 UNREVIEWED 03/25/24 03/25/24 02/12/24 02/13/24 4,9,155,15,16 100,000 100,000 MSK 0 0 0 Tetra Tech Architects and Eng 0 / / 03/25/24
South Hill Elem School(K-5):
19-0114 Reconstruction 0-014-010 10/31/19 DONE DONE DONE 07/19/19 06/20/19 11/20/18 05/21/19 7,155,15,16 1,475,000 0 JSS 0 0 0 Tetra Tech Architects and Eng 0 / / 06/20/19
- PR Additions and Alterations 0-014-011 / / / / 10/21/19 / / 02 - 16 0 0 JSS 0 0 0 0 / / / /
20-1817 Additions and Alterations 0-014-011 02/08/22 DONE DONE DONE 06/01/21 05/26/21 10/21/19 05/21/19 02 - 16 4,191,729 2,151,271 SLC 0 0 0 Tetra Tech Architects and Eng 0 / / 05/26/21
21-0851 Reconstruction 0-014-012 06/02/22 DONE DONE DONE 12/07/21 12/06/21 08/06/21 05/17/22 9,10 95,000 95,000 SLC 0 0 0 Tetra Tech Architects and Eng 0 / / 12/06/21
High School(9-12):
19-0115 Reconstruction 0-015-025 10/31/19 DONE DONE DONE 07/19/19 06/20/19 11/20/18 05/21/19 2,4,7,8,9,10,13,14,1 14,230,162 14,230,162 JSS 0 0 0 Tetra Tech Architects and Eng 0 / / 06/20/19
20-1818 Reconstruction 0-015-026 02/08/22 DONE DONE DONE 06/01/21 05/26/21 10/21/19 05/21/19 2,7,9,10,155,15,16 1,296,786 1,296,786 SLC 0 0 0 Tetra Tech Architects and Eng 0 / / 05/26/21
19-1902 Reconstruction 0-015-027 07/28/20 DONE DONE DONE 06/29/20 06/23/20 11/04/19 05/21/19 2,7 7,181,645 7,181,645 JSS 0 0 0 Tetra Tech Architects and Eng 0 / / 06/23/20
- PR Additions and Alterations 0-015-028 / / / / 05/16/22 / / 02 - 16 0 0 SLC 0 0 0 0 / / / /
22-1999 Additions and Alterations 0-015-028 10/25/23 DONE DONE DONE 04/05/23 04/03/23 05/16/22 05/21/19 02 - 16 23,299,575 0 MSK 0 0 0 Tetra Tech Architects and Eng 0 / / 04/03/23
Caroline Elem School(K-5):
19-0116 Reconstruction 0-017-012 10/31/19 DONE DONE DONE 07/19/19 06/20/19 11/20/18 05/21/19 2,15,16 1,305,000 1,305,000 JSS 0 0 0 Tetra Tech Architects and Eng 0 / / 06/20/19
20-1819 Reconstruction 0-017-013 02/08/22 DONE DONE DONE 06/01/21 05/26/21 10/21/19 05/21/19 15,16 600,710 600,710 SLC 0 0 0 Tetra Tech Architects and Eng 0 / / 05/26/21
21-0654 Reconstruction 0-017-014 02/01/22 DONE DONE DONE 11/04/21 11/04/21 06/21/21 05/18/21 9,10 95,000 95,000 SLC 0 0 0 Tetra Tech Architects and Eng 0 12/30/22 11/04/21
Northeast Elem School(K-5):
19-0117 Reconstruction 0-024-008 10/31/19 DONE DONE DONE 07/19/19 06/20/19 11/20/18 05/21/19 8,9,155,16 160,000 160,000 JSS 0 0 0 Tetra Tech Architects and Eng 0 / / 06/20/19
19-0038 Reconstruction 0-024-009 08/22/19 DONE DONE DONE 07/09/19 06/28/19 02/26/19 05/21/19 2,9 250,000 0 JSS 0 0 0 Tetra Tech Architects and Eng 0 / / 06/28/19
22-0679 Reconstruction 0-024-010 01/07/23 DONE DONE DONE 10/07/22 10/07/22 04/04/22 05/18/22 328,680 328,680 SLC 0 0 0 Tetra Tech Architects and Eng 0 / / 10/07/22
23-1373 Reconstruction 0-024-011 STARTED DONE DONE 01/16/24 01/16/24 10/30/23 / / 9,10 0 15,138,090 MSK 0 0 0 Tetra Tech Architects and Eng 0 / / 01/16/24
23-1491 Reconstruction 0-024-012 UNREVIEWED 02/12/24 02/12/24 01/29/24 / / 9 0 0 MSK 0 0 0 Tetra Tech Architects and Eng 0 / / 02/12/24
Boynton MS (6-8):
19-0118 Reconstruction 0-026-016 10/31/19 DONE DONE DONE 07/19/19 06/20/19 12/21/18 05/21/19 8 866,814 866,814 JSS 0 0 0 Tetra Tech Architects and Eng 0 / / 06/20/19
20-1820 Reconstruction 0-026-017 02/08/22 DONE DONE DONE 06/01/21 05/26/21 10/21/19 05/21/19 2,4,8,9,10,155,15,16 4,266,074 4,266,074 SLC 0 0 0 Tetra Tech Architects and Eng 0 / / 05/26/21
20-1532 Reconstruction 0-026-018 07/26/21 DONE DONE DONE 04/02/21 03/29/21 03/03/20 05/21/19 13,155,16 729,736 729,736 SLC 0 0 0 Tetra Tech Architects and Eng 0 / / 03/29/21
20-0498 Reconstruction 0-026-019 01/27/21 DONE DONE DONE 09/30/20 09/14/20 08/19/20 05/19/20 2,10 95,000 95,000 JSS 0 0 0 Tetra Tech Architects and Eng 0 05/12/21 09/14/20
Dewitt MS (6-8):
18-1988 Reconstruction 0-027-015 06/25/19 DONE DONE DONE 05/20/19 05/15/19 02/13/19 05/21/19 9,10,16 97,075 97,075 BMJ 0 0 0 Tetra Tech Architects and Eng 0 01/15/20 05/15/19
20-1821 Reconstruction 0-027-016 02/08/22 DONE DONE DONE 06/01/21 05/26/21 03/03/20 05/21/19 13,155,16 4,384,117 4,384,117 SLC 0 0 0 Tetra Tech Architects and Eng 0 / / 05/26/21
20-1533 Reconstruction 0-027-017 07/26/21 DONE DONE DONE 04/02/21 03/29/21 10/21/19 05/21/19 2,4,8,9,10,155,15,16 729,736 729,736 SLC 0 0 0 Tetra Tech Architects and Eng 0 / / 03/29/21
Wilson Annex @ Sherman Sch.See 0-007:
19-0119 Reconstruction 0-028-008 10/31/19 DONE DONE DONE 07/19/19 06/20/19 11/20/18 05/21/19 8,9,155,16 100,000 100,000 JSS 0 0 0 Tetra Tech Architects and Eng 0 / / 06/20/19
20-1822 Reconstruction 0-028-009 02/08/22 DONE DONE DONE 06/01/21 05/26/21 10/21/19 05/21/19 2,8,9,10,155,16 558,943 558,943 SLC 0 0 0 Tetra Tech Architects and Eng 0 / / 05/26/21
Temp. Classroom - Complex A:
- PR New Construction 0-060-001 / / / / 03/02/23 / / 02 - 16 0 0 JLB 0 0 0 0 / / / /
22-2322 New Construction 0-060-001 10/04/23 DONE DONE DONE 06/05/23 06/02/23 03/02/23 05/21/19 02 - 16 1,207,500 0 JLB 0 0 0 Tetra Tech Architects and Eng 0 / / 06/02/23
Temp. Classroom - Complex B:
- PR New Construction 0-061-001 / / / / 03/02/23 / / 02 - 16 0 0 JLB 0 0 0 0 / / / /
22-2323 New Construction 0-061-001 10/04/23 DONE DONE DONE 06/05/23 06/02/23 03/02/23 05/21/19 02 - 16 1,207,500 0 JLB 0 0 0 Tetra Tech Architects and Eng 0 / / 06/02/23
Storage Building:
- PR New Construction 2-058-001 / / / / / / / / 02 - 16 0 0 JSS 0 0 0 0 / / / /
Transportation Cntr-EV Infrastucture:
19-0120 Reconstruction 5-002-011 10/31/19 DONE DONE DONE 07/19/19 06/20/19 11/20/18 05/21/19 2,155,16 3,245,000 3,245,000 JSS 0 0 0 Tetra Tech Architects and Eng 0 / / 06/20/19
22-2051 Reconstruction 5-002-012 09/07/23 DONE DONE DONE 04/17/23 04/14/23 02/16/23 03/28/23 2,16 104,000 104,000 MSK 0 0 0 Tetra Tech Architects and Eng 0 / / 04/14/23
- Reconstruction 5-002-013 / / / / 02/01/24 / / 2,9,16 0 0 MSK 0 0 0 0 / / / /
- Reconstruction 5-002-014 / / / / 02/01/24 / / 2,9,16 0 0 MSK 0 0 0 0 / / / /
PA Booth Demolition:
19-0121 Reconstruction 7-019-001 10/31/19 DONE DONE DONE 07/19/19 06/20/19 01/14/19 05/21/19 2,7,8,9,13,155,16 50,000 0 JSS 0 0 0 Tetra Tech Architects and Eng 0 / / 06/20/19
Press Box:
- PR New Construction 7-057-001 / / / / 06/27/19 / / 02 - 16 0 0 BMJ 0 0 0 0 / / / /
19-0122 New Construction 7-057-001 10/31/19 DONE DONE DONE 07/19/19 06/20/19 06/27/19 05/21/19 02 - 16 150,000 0 JSS 0 0 0 Tetra Tech Architects and Eng 0 / / 06/20/19
Caroline Pavilion:
21-0576 New Construction 7-059-001 02/08/22 DONE DONE DONE 10/22/21 10/21/21 05/27/21 08/31/21 02 - 16 27,000 0 SLC 0 0 0 Tetra Tech Architects and Eng 0 / / 10/21/21
District-Wide:
19-1688SB Reconstruction 7-999-007 DONE / / / / / / / / 10 0 0 JSS 0 0 0 0 / / / /
20-0359 Reconstruction 7-999-007 02/03/21 DONE DONE DONE 09/08/20 09/01/20 04/10/20 11/04/14 8,16 491,627 0 JSS 0 0 0 Hunt Engineers,Architects & l 0 / / 09/01/20
- Reconstruction 7-999-BA1 DONE / / / / / / / / 10 0 0 JSS 0 0 0 0 / / / /
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
LANSING CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 61-08-01-04
last updated on 04/19/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Lansing Middle School:
18-2049 Reconstruction 0-001-021 08/30/19 DONE DONE DONE 06/03/19 05/24/19 11/19/18 10/24/18 2,8,9,155,15,16 1,174,940 1,174,940 JSS 0 0 0 Tetra Tech Architects and Eng 0 09/03/21 05/24/19
23-0176 Reconstruction 0-001-022 03/08/24 DONE DONE DONE 08/01/23 07/28/23 04/03/23 11/01/22 2,4,7,9,155,16 3,100,000 3,100,000 WLC 0 0 0 Tetra Tech Architects and Eng 0 / / 07/28/23
23-0220 Reconstruction 0-001-023 02/23/24 DONE DONE DONE 08/09/23 08/08/23 05/11/23 01/24/23 155,16 2,420,000 2,420,000 WLC 0 0 0 Tetra Tech Architects and Eng 0 / / 08/08/23
23-0468 Reconstruction 0-001-024 02/26/24 DONE DONE DONE 09/13/23 09/13/23 05/11/23 01/24/23 2,4,7,9,10,155,15,16 2,510,068 2,510,068 WLC 0 0 0 Tetra Tech Architects and Eng 0 / / 09/13/23
23-1853 Reconstruction 0-001-025 UNREVIEWED 04/18/24 04/17/24 10/11/23 01/24/23 9 0 0 WLC 0 0 0 Tetra Tech Architects and Eng 0 / / 04/17/24
Technology Building:
18-2050 Reconstruction 0-002-006 08/30/19 DONE DONE DONE 06/03/19 05/24/19 11/19/18 10/24/18 15 15,556 0 JSS 0 0 0 Tetra Tech Architects and Eng 0 / / 05/24/19
23-1854 Reconstruction 0-002-007 UNREVIEWED 04/18/24 04/17/24 10/11/23 01/24/23 2,4,8,9,10,155,15,16 0 0 WLC 0 0 0 Tetra Tech Architects and Eng 0 / / 04/17/24
Lansing Elementary:
18-2048 Additions and Alterations 0-003-018 08/30/19 DONE DONE DONE 06/03/19 05/24/19 11/19/18 10/24/18 02 - 16 4,911,152 3,907,741 JSS 0 0 0 Tetra Tech Architects and Eng 0 09/03/21 05/24/19
23-0469 Reconstruction 0-003-019 02/26/24 DONE DONE DONE 09/13/23 09/13/23 05/11/23 01/24/23 2,7,155,15,16 575,818 575,818 WLC 0 0 0 Tetra Tech Architects and Eng 0 / / 09/13/23
23-1855 Reconstruction 0-003-020 UNREVIEWED 04/18/24 04/17/24 10/11/23 01/24/23 15,16 0 0 WLC 0 0 0 Tetra Tech Architects and Eng 0 / / 04/17/24
Senior High:
18-2051 Reconstruction 0-004-026 08/30/19 DONE DONE DONE 06/03/19 05/24/19 11/19/18 10/24/18 2,9,155,16 783,294 783,294 JSS 0 0 0 Tetra Tech Architects and Eng 0 09/03/21 05/24/19
19-1459 Reconstruction 0-004-027 07/27/20 DONE DONE DONE 02/21/20 02/14/20 08/20/19 02/08/16 7,155 25,000 0 JSS 0 0 0 Tetra Tech Architects and Eng 0 / / 02/14/20
23-0470 Reconstruction 0-004-028 02/26/24 DONE DONE DONE 09/13/23 09/13/23 05/11/23 01/24/23 2,7,9,10,15 689,343 689,343 WLC 0 0 0 Tetra Tech Architects and Eng 0 / / 09/13/23
23-1856 Reconstruction 0-004-029 UNREVIEWED 04/18/24 04/17/24 10/11/23 01/24/23 2,4,8,9,16 0 0 WLC 0 0 0 Tetra Tech Architects and Eng 0 / / 04/17/24
23-1528 Reconstruction 0-004-030 UNREVIEWED 02/20/24 02/20/24 01/31/24 01/24/23 155 0 0 WLC 0 0 0 Tetra Tech Architects and Eng 0 / / 02/20/24
Former District Office:
18-2052 Reconstruction 1-005-005 08/30/19 DONE DONE DONE 06/03/19 05/24/19 11/19/18 10/24/18 2,4,155,16 122,618 0 JSS 0 0 0 Tetra Tech Architects and Eng 0 / / 05/24/19
Grounds Building II:
18-2053 Reconstruction 3-013-003 08/30/19 DONE DONE DONE 06/03/19 05/24/19 11/19/18 10/24/18 16 18,302 0 JSS 0 0 0 Tetra Tech Architects and Eng 0 / / 05/24/19
Bus Maintenance Garage:
18-2054 Reconstruction 5-006-011 08/30/19 DONE DONE DONE 06/03/19 05/24/19 11/19/18 10/24/18 2,155,16 318,990 318,990 JSS 0 0 0 Tetra Tech Architects and Eng 0 09/03/21 05/24/19
19-1302 Reconstruction 5-006-012 02/11/20 DONE DONE DONE 01/29/20 01/29/20 11/04/19 11/25/19 4,14,16 212,000 0 JSS 0 0 0 Tetra Tech Architects and Eng 0 / / 01/29/20
22-1667 Reconstruction 5-006-013 03/23/23 DONE DONE DONE 02/13/23 02/13/23 01/10/23 05/17/22 16 100,000 100,000 WLC 0 0 0 Tetra Tech Architects and Eng 0 / / 02/13/23
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
BOCES TOMPKINS-SENECA-TIOGA STATUS REPORT ON CAPITAL PROJECTS
District No.: 61-90-00-00
last updated on 04/19/24
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER ENERGY PERF SUBS. COMPL. PARTIAL FINAL CERTIFICATE OF
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM CONTRACT DATE CSC REC'D APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
G Powell Bldg B:
19-1893 Reconstruction 0-009-008 08/25/20 DONE DONE DONE 06/29/20 06/15/20 12/01/16 07/06/17 2,8,9,155,15,16 638,843 0 JSS 0 0 0 LaBella Associates, P.C. 0 / / 06/15/20
C Building - Career & Technology:
19-1894 Reconstruction 0-010-009 08/25/20 DONE DONE DONE 06/29/20 06/15/20 12/01/16 07/06/17 2,8,9,155,15,16 256,677 0 JSS 0 0 0 LaBella Associates, P.C. 0 / / 06/15/20
Occ Ed Bldg D:
19-1895 Reconstruction 0-011-008 08/25/20 DONE DONE DONE 06/29/20 06/15/20 01/09/17 07/06/17 2,8,9,155,15,16 307,130 0 JSS 0 0 0 LaBella Associates, P.C. 0 / / 06/15/20
- Reconstruction 0-011-010 / / / / 05/20/19 / / 10,16 0 0 JLB 0 0 0 0 / / / /
Smith Special Ed Blg:
19-1896 Reconstruction 0-012-012 08/25/20 DONE DONE DONE 06/29/20 06/15/20 01/09/17 07/06/17 2,7,8,9,155,15,16 2,949,056 0 JSS 0 0 0 LaBella Associates P.C. 0 / / 06/15/20
Building A-Administration:
19-1897 Reconstruction 1-001-007 08/25/20 DONE DONE DONE 06/29/20 06/15/20 12/01/16 07/06/17 2,8,9,155,15,16 554,223 0 JSS 0 0 0 LaBella Associates, P.C. 0 / / 06/15/20
19-1156 Reconstruction 1-001-009 01/15/20 DONE DONE DONE 01/03/20 11/27/19 05/20/19 09/04/19 10,16 8,000 0 JSS 0 0 0 LaBella Associates, P.C. 0 / / 11/27/19
G Bldg Greenhouse:
19-1898 Reconstruction 2-007-005 08/25/20 DONE DONE DONE 06/29/20 06/15/20 12/01/16 07/06/17 2,8,9,155,15,16 137,650 0 JSS 0 0 0 LaBella Associates, P.C. 0 / / 06/15/20
G BLDG Warehouse/Bus Maint.:
19-1157 Reconstruction 5-007-003 01/15/20 DONE DONE DONE 01/03/20 11/27/19 05/20/19 09/04/19 10,16 8,000 0 JSS 0 0 0 LaBella Associates, P.C. 0 / / 11/27/19
District Wide:
19-1020 Reconstruction 7-999-003 01/30/20 DONE DONE DONE 12/17/19 12/11/19 09/30/19 / / 15,16 1,153,370 0 JSS 0 0 0 LaBella Associates P.C. 0 / / 12/11/19
Tompkins Cortland Community Col TC3:
19-0252TQ Temporary Quarters 8-022-001 ADDENDUM REQ'D 08/14/19 / / 07/05/19 / / 0 0 JSS 0 0 0 0 / / / /
TC3 Extension Center Tioga Place:
19-0253TQ Temporary Quarters 8-023-001 ADDENDUM REQ'D 08/14/19 / / 07/08/19 / / 0 0 JSS 0 0 0 0 / / / /
IC3 Community Care Center:
20-1591TQ Temporary Quarters 8-024-001 10/19/21 DONE DONE DONE 04/16/21 04/16/21 02/26/21 / / 0 0 JLB 0 0 0 0 / / 04/16/21
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED