Construction Project Status

Construction Project Status

THE STATE EDUCATION DEPARTMENT

FACILITIES PLANNING


UPDATED: 04/19/24 at 06:55:14




ARGYLE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 64-01-01-04
last updated on 04/19/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Argyle Central School:
19-1274   Reconstruction               0-001-017  03/30/20     DONE    DONE       DONE      01/27/20   12/24/19   11/04/19   05/21/19   2,4,7                    100,000       100,000  JSS             0           0           0 Mosaic Associates                       0      06/19/20                       12/24/19           
21-0758   Reconstruction               0-001-018  03/17/22     DONE    DONE       DONE      11/19/21   11/19/21   04/12/21   06/16/20   7,10                     100,000       100,000  JLB             0           0           0 Collins & Scoville Architects           0      07/20/23                       11/19/21           
23-0919   Reconstruction               0-001-019  12/14/23     DONE    DONE       DONE      11/08/23   11/02/23   11/01/23   05/16/23   7                        100,000       100,000  JJH             0           0           0 Collins & Scoville Architects           0        /  /                         11/02/23           

          Bus Garage:
22-0378   Reconstruction               5-002-008  10/12/22     DONE    DONE       DONE      08/29/22   08/29/22   04/28/21   05/18/21   10,155,15,16             100,000       100,000  JLB             0           0           0 Collins & Scoville Architects           0        /  /                         08/29/22           

          District-Wide:
  -    SB Reconstruction               7-999-001                                              /  /       /  /       /  /       /  /     16                             0             0  JJH             0           0           0                                         0        /  /                           /  /             
23-1520SB Reconstruction               7-999-001               DONE                           /  /       /  /     02/20/24     /  /     16                             0             0  JJH             0           0           0                                         0        /  /                           /  /             
  -    SB Reconstruction               7-999-BA1               DONE                           /  /       /  /       /  /       /  /     10                             0             0  JSS             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               7-999-BA2               DONE                           /  /       /  /       /  /       /  /     16                             0             0  JJH             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




FORT ANN CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 64-05-02-04
last updated on 04/19/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Main Building:
23-0109   Reconstruction               0-001-016  08/17/23     DONE    DONE       DONE      07/19/23   07/19/23   09/13/22   05/16/23   8,16                     100,000       100,000  JJH             0           0           0 Collins & Scoville Architects           0        /  /                         07/19/23           
  -       Reconstruction               0-001-017                                              /  /       /  /     03/03/23     /  /     2,4,7,8,9,155,15,16            0             0  JJH             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-001-018                                              /  /       /  /     09/29/23     /  /     16                             0             0  JJH             0           0           0                                         0        /  /                           /  /             

          Bus Garage:
  -       Reconstruction               5-002-005                                              /  /       /  /       /  /       /  /     2,14,155,15,16                 0             0  JJH             0           0           0                                         0        /  /                           /  /             

          District-Wide:
19-0631   Reconstruction               7-999-002  12/09/19     DONE    DONE       DONE      10/29/19   10/15/19   09/23/19   05/21/19   16                       100,000       100,000  JLB             0           0           0 Mosaic Associates                       0      06/19/20                       10/15/19           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




FORT EDWARD UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 64-06-01-02
last updated on 04/19/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Fort Edward School (fmly Elem Schl):
22-2121   Reconstruction               0-005-013  01/09/23     DONE    DONE       DONE      05/01/23   05/01/23   01/03/23   01/09/23   155,15,16                550,000       550,000  WLC             0           0           0 Tetra Tech Architects and Eng           0        /  /                         05/01/23           
  -       Reconstruction               0-005-014                                              /  /       /  /     03/26/24     /  /     16                             0             0  WLC             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




GRANVILLE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 64-07-01-04
last updated on 04/19/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          JR/SR HIGH SCHOOL:
19-0762   Reconstruction               0-001-020  03/11/20     DONE    DONE       DONE      11/12/19   11/04/19   09/05/19   05/21/19   2,4,7                  4,652,446     4,652,446  SLC             0           0           0 SEI Design Group                        0      12/01/20                       11/04/19           
  -    PR Additions and Alterations    0-001-021                                              /  /       /  /     11/13/19     /  /     02 - 16                        0             0  SLC             0           0           0                                         0        /  /                           /  /             
19-1381   Additions and Alterations    0-001-021  09/24/20     DONE    DONE       DONE      02/06/20   01/31/20   11/13/19   05/21/19   02 - 16                8,003,433     7,803,433  SLC             0           0           0 SEI Design Group                        0      11/11/22                       01/31/20           
20-0954   Reconstruction               0-001-022  07/31/20     DONE    DONE       DONE      12/11/20   12/02/20   08/10/20   08/10/20   2                         80,000        80,000  SLC             0           0           0 SEI Design Group                        0      01/25/21                       12/02/20           
21-1573   Reconstruction               0-001-023  04/29/22     DONE    DONE       DONE      03/28/22   03/28/22   12/30/21   05/18/21   8,9                      100,000       100,000  SLC             0           0           0 SEI Design Group                        0      05/05/23                       03/28/22           
22-2434   Reconstruction               0-001-024  09/08/23     DONE    DONE       DONE      06/21/23   06/21/23   04/27/23   05/16/23   9,10                     100,000       100,000  MSK             0           0           0 Collins & Scoville Architects           0        /  /                         06/21/23           
  -       Reconstruction               0-001-025                                              /  /       /  /     04/27/23     /  /     2,4,8,9,155,15,16              0             0  JLB             0           0           0                                         0        /  /                           /  /             
  -    SB Reconstruction               0-001-BA1               DONE                           /  /       /  /       /  /       /  /                                    0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Granville Elem (fmrly Quaker):
19-0763   Reconstruction               0-013-010  03/11/20     DONE    DONE       DONE      11/12/19   11/04/19   09/05/19   05/21/19   4,7                    1,071,001     1,071,001  SLC             0           0           0 SEI Design Group                        0      12/01/20                       11/04/19           
19-1382   Reconstruction               0-013-011  09/24/20     DONE    DONE       DONE      02/06/20   01/31/20   11/13/19   05/21/19   4,9,16                   415,800       415,800  SLC             0           0           0 SEI Design Group                        0      11/11/22                       01/31/20           
20-0111   Reconstruction               0-013-012  11/03/20     DONE    DONE       DONE      07/22/20   07/17/20   06/04/20   06/09/20   2,16                     100,000       100,000  SLC             0           0           0 SEI Design Group                        0      03/01/21                       07/17/20           
  -       Reconstruction               0-013-013                                              /  /       /  /     06/09/23     /  /                                    0    14,202,645  MSK             0           0           0                                         0        /  /                           /  /             

          Mary J. Tanner Elementary:
19-0764   Reconstruction               0-014-007  03/11/20     DONE    DONE       DONE      11/12/19   11/04/19   09/05/19   05/21/19   4,7                    1,134,000     1,134,000  SLC             0           0           0 SEI Design Group                        0      12/01/20                       11/04/19           
19-1383   Reconstruction               0-014-008  09/24/20     DONE    DONE       DONE      02/06/20   01/31/20   11/13/19   05/21/19   7,9,155,16               485,100       485,100  SLC             0           0           0 SEI Design Group                        0      11/11/22                       01/31/20           
19-1427   Reconstruction               0-014-009  04/13/20     DONE    DONE       DONE      02/19/20   02/10/20   01/24/20   05/21/19   2,155                    100,000       100,000  SLC             0           0           0 SEI Design Group                        0      06/29/20                       02/10/20           
  -       Reconstruction               0-014-010                                              /  /       /  /     04/27/23     /  /     16                             0             0  JLB             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-014-011                                              /  /       /  /     06/09/23     /  /                                    0    11,708,520  MSK             0           0           0                                         0        /  /                           /  /             

          Storage Container 3:
20-0362DB Discovered Building          2-021-001  01/20/21     DONE    DONE       DONE      09/09/20   08/13/20   07/02/20   11/25/20   02 - 16                    4,735             0  SLC             0           0           0 SEI Design Group                        0      11/25/20                       08/13/20           

          Bus Garage:
19-0765   Reconstruction               5-002-006  03/11/20     DONE    DONE       DONE      11/12/19   11/04/19   09/05/19   05/21/19   7                        189,001       189,001  SLC             0           0           0 SEI Design Group                        0      12/01/20                       11/04/19           
  -       Reconstruction               5-002-007                                              /  /       /  /     04/20/21     /  /     2                              0             0  SLC             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




GREENWICH CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 64-08-01-04
last updated on 04/19/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Primary Bldg:
19-0897   Reconstruction               0-004-013  06/03/20     DONE    DONE       DONE      12/03/19   11/15/19   01/11/19   12/11/18   2,4,8,9,15,16            332,000       332,000  JSS             0           0           0 Mosaic Associates                       0      02/25/22                       11/15/19           
19-1908   Reconstruction               0-004-014  07/27/20     DONE    DONE       DONE      06/30/20   06/22/20   01/22/20   05/21/19   2,15                     100,000       100,000  JSS             0           0           0 Mosaic Associates                       0      01/08/21                       06/22/20           
22-0873FA Reconstruction               0-004-015  03/23/23     DONE    DONE       DONE      11/02/22   10/26/22   04/21/22   03/15/18   2,4,7,8,9,14,155,15,   1,263,000     1,263,000  JLB             0           0           0 Mosaic Associates                       0        /  /                         10/26/22           

          Middle Grade Building:
19-0898   Reconstruction               0-005-015  06/03/20     DONE    DONE       DONE      12/03/19   11/15/19   01/11/19   12/11/18   2,4,8,9,15,16          1,650,000     1,650,000  JSS             0           0           0 Mosaic Associates                       0      02/25/22                       11/15/19           
20-1728   Reconstruction               0-005-016  06/22/21     DONE    DONE       DONE      05/18/21   05/12/21   03/25/21   06/09/20   2,9                      100,000       100,000  JLB             0           0           0 Mosaic Associates                       0      05/13/22                       05/12/21           
22-2354   Reconstruction               0-005-017  07/18/23     DONE    DONE       DONE      06/12/23   06/09/23   04/18/23   05/17/22   4,9,15                   100,000       100,000  JJH             0           0           0 Mosaic Associates                       0        /  /                         06/09/23           

          High School:
19-0899   Additions and Alterations    0-007-018  06/03/20     DONE    DONE       DONE      12/03/19   11/15/19   01/11/19   12/11/18   02 - 16                5,973,050     5,048,019  JSS             0           0           0 Mosaic Associates                       0      06/30/22                       11/15/19           
21-1923   Reconstruction               0-007-020  07/25/22     DONE    DONE       DONE      06/06/22   06/01/22   03/14/22   05/18/21   2,10                     100,000       100,000  JLB             0           0           0 Mosaic Associates                       0      05/25/23                       06/01/22           
22-0874   Reconstruction               0-007-021  03/23/23     DONE    DONE       DONE      11/02/22   10/26/22   04/21/22   03/15/18   2,9,15,16              4,977,000     4,977,000  JLB             0           0           0 Mosaic Associates                       0      09/28/23           YES         10/26/22           

          Athletic Storage Building 3:
19-0900   New Construction             2-016-001  06/03/20     DONE    DONE       DONE      12/03/19   11/15/19   03/22/19   12/11/18   02 - 16                  134,500             0  JSS             0           0           0 Mosaic Associates                       0      02/25/22                       11/15/19           

          Bus Garage:
19-0901   Reconstruction               5-001-009  06/03/20     DONE    DONE       DONE      12/03/19   11/15/19   01/11/19   12/11/18   16                        10,450        10,450  JSS             0           0           0 Mosaic Associates                       0      02/25/22                       11/15/19           

          District-Wide:
  -    SB Reconstruction               7-999-BA1               DONE                           /  /       /  /       /  /       /  /                                    0             0  JSS             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




HARTFORD CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 64-10-01-04
last updated on 04/19/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Main Building(High School):
18-1690   Reconstruction               0-001-017  05/16/19     DONE    DONE       DONE      03/19/19   03/13/19   10/23/18   09/20/18   2,16                     300,000       300,000  MTM             0           0           0 Collins & Scoville Architects           0      02/19/20                       03/13/19           
19-0017   Reconstruction               0-001-018  08/06/19     DONE    DONE       DONE      07/03/19   06/24/19   04/10/19   05/21/19   4,9                      100,000       100,000  JLB             0           0           0 Collins & Scoville Architects           0      12/23/19                       06/24/19           
20-0326   Reconstruction               0-001-020  01/28/21     DONE    DONE       DONE      09/02/20   08/25/20   07/23/20   06/09/20   7                        100,000       100,000  JLB             0           0           0 Collins & Scoville Architects           0      06/04/21                       08/25/20           
21-1422PR Reconstruction               0-001-021               DONE                         03/02/22     /  /     02/08/22     /  /     2,4,7,8,9,10,14,155,           0    19,030,386  JJH             0           0           0                                         0        /  /                           /  /             
22-1566   Reconstruction               0-001-021  09/20/23     DONE    DONE       DONE      01/30/23   01/24/23   02/08/22   05/17/22   2,4,7,8,9,10,14,155,   5,060,000     3,059,200  JJH             0           0           0 Collins & Scoville Architects           0        /  /                         01/24/23           
22-0353   Reconstruction               0-001-022  10/24/22     DONE    DONE       DONE      08/26/22   08/26/22   06/21/22   05/17/22   8,9,16                   100,000       100,000  JLB             0           0           0 Collins & Scoville Architects           0      03/20/23                       08/26/22           
22-1966FA Reconstruction               0-001-023  05/15/23     DONE    DONE       DONE      03/31/23   03/07/23   01/04/23   01/13/23   2,16                     300,000       300,000  MSK             0           0           0 Collins & Scoville Architects           0        /  /                         03/07/23           
  -       Reconstruction               0-001-024                                              /  /       /  /       /  /       /  /     2,15                           0             0  JJH             0           0           0                                         0        /  /                           /  /             

          Elementary Building:
21-0186   Reconstruction               0-003-007  09/27/21     DONE    DONE       DONE      08/18/21   08/16/21   06/28/21   05/18/21   15                       100,000       100,000  JLB             0           0           0 Collins & Scoville Architects           0      06/30/22                       08/16/21           
21-1423PR Reconstruction               0-003-008               DONE                         03/02/22     /  /     02/14/22     /  /     2,4,7,8,9,10,14,155,           0     8,288,316  JJH             0           0           0                                         0        /  /                           /  /             
22-1567   Reconstruction               0-003-008  09/20/23     DONE    DONE       DONE      01/30/23   01/24/23   02/14/22   05/17/22   2,4,7,8,9,10,14,155,     609,000     2,298,000  JJH             0           0           0 Collins & Scoville Architects           0        /  /                         01/24/23           
22-2301   Reconstruction               0-003-009  07/17/23     DONE    DONE       DONE      05/31/23   05/30/23   01/31/23   05/16/23   15                       100,000       100,000  JJH             0           0           0 Collins & Scoville Architects           0        /  /                         05/30/23           

          Hartford Bus Garage:
19-1563   Reconstruction               5-004-005  07/02/20     DONE    DONE       DONE      03/11/20   03/04/20   01/31/20   05/17/16   7,9                      110,000       110,000  JLB             0           0           0 Collins & Scoville Architects           0      09/14/20                       03/04/20           

          District-Wide:
  -    SB Reconstruction               7-999-BA2               DONE                           /  /       /  /       /  /       /  /     10                             0             0  JJH             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




HUDSON FALLS CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 64-13-01-06
last updated on 04/19/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Senior High School:
  -       Reconstruction               0-001-020                                              /  /       /  /     08/16/19     /  /     2,4,7,8,9,10,155,15,           0    20,776,107  JSS             0           0           0                                         0        /  /                           /  /             
  -    PR Additions and Alterations    0-001-021                                              /  /       /  /     05/14/21     /  /     02 - 16                        0             0  JSS             0           0           0                                         0        /  /                           /  /             
21-0215   Additions and Alterations    0-001-021  03/25/22     DONE    DONE       DONE      08/25/21   08/24/21   05/14/21   02/23/21   02 - 16               10,966,607    10,966,607  SLC             0           0           0 March Associates                        0      11/10/23                       08/24/21           
23-0359   Reconstruction               0-001-022                       ADDENDUM REQ'D       09/01/23   08/30/23   02/24/23   02/23/21   7,155,16                       0             0  MSK             0           0           0 March Associates                        0        /  /                         08/30/23           
  -       Reconstruction               0-001-023                                              /  /       /  /     03/27/24     /  /     16                             0             0  MSK             0           0           0                                         0        /  /                           /  /             

          Margaret Murphy Kindergarten Ctr.:
  -       Reconstruction               0-003-013                                              /  /       /  /     08/16/19     /  /     2,4,7,8,9,10,155,15,           0             0  JSS             0           0           0                                         0        /  /                           /  /             
  -    PR Additions and Alterations    0-003-014                                              /  /       /  /     05/14/21     /  /     02 - 16                        0             0  JSS             0           0           0                                         0        /  /                           /  /             
21-0216   Additions and Alterations    0-003-014  03/25/22     DONE    DONE       DONE      08/25/21   08/24/21   05/14/21   02/23/21   02 - 16                  564,160       564,160  SLC             0           0           0 March Associates                        0      11/10/23                       08/24/21           
23-0360   Reconstruction               0-003-015                       ADDENDUM REQ'D       09/01/23   08/30/23   02/24/23   02/23/21   155,16                         0             0  MSK             0           0           0 March Associates                        0        /  /                         08/30/23           

          Intermediate Sch. (was Maple St):
  -       Reconstruction               0-004-015                                              /  /       /  /     07/09/10     /  /     2,4,7,8,9,10,155,15,           0     6,829,470  HCM             0           0           0                                         0        /  /                           /  /             
  -    PR Additions and Alterations    0-004-017                                              /  /       /  /     08/16/19     /  /     02 - 16                        0             0  JSS             0           0           0                                         0        /  /                           /  /             
21-0217   Reconstruction               0-004-018  03/25/22     DONE    DONE       DONE      08/25/21   08/24/21   05/14/21   02/23/21   2,4,7,8,9,10,155,15,     726,439       726,439  SLC             0           0           0 March Associates                        0      11/10/23                       08/24/21           
23-0361   Reconstruction               0-004-019                       ADDENDUM REQ'D       09/01/23   08/30/23   02/24/23   02/23/21   7,155,16                       0             0  MSK             0           0           0 March Associates                        0        /  /                         08/30/23           

          Primary Sch.(Was Dix Avenue):
21-0218   Reconstruction               0-005-013  03/25/22     DONE    DONE       DONE      08/25/21   08/24/21   08/16/19   02/23/21   2,4,7,8,9,10,155,15,   1,787,966     1,787,966  SLC             0           0           0 March Associates                        0      11/10/23                       08/24/21           
23-0362   Reconstruction               0-005-014                       ADDENDUM REQ'D       09/01/23   08/30/23   02/24/23   02/23/21   7,155,16                       0             0  MSK             0           0           0 March Associates                        0        /  /                         08/30/23           

          Middle School (Was Junior High):
  -       Reconstruction               0-007-013                                              /  /       /  /     08/16/19     /  /     2,4,7,8,9,10,155,15,           0             0  JSS             0           0           0                                         0        /  /                           /  /             
  -    PR Additions and Alterations    0-007-014                                              /  /       /  /     05/14/21     /  /     02 - 16                        0             0  JSS             0           0           0                                         0        /  /                           /  /             
21-0219   Additions and Alterations    0-007-014  03/25/22     DONE    DONE       DONE      08/25/21   08/24/21   05/14/21   02/23/21   02 - 16                1,287,378     1,287,378  SLC             0           0      78,595 March Associates                        0      11/10/23                       08/24/21           
23-0363   Reconstruction               0-007-015                       ADDENDUM REQ'D       09/01/23   08/30/23   02/24/23   02/23/21   7,155,16                       0             0  MSK             0           0           0 March Associates                        0        /  /                         08/30/23           

          Bus Garage:
21-0220   Reconstruction               5-008-008  03/25/22     DONE    DONE       DONE      08/25/21   08/24/21   08/16/19   02/23/21   2,4,7,8,9,10,155,15,      52,450        52,450  SLC             0           0           0 March Associates                        0      11/10/23                       08/24/21           
23-0364   Reconstruction               5-008-009                       ADDENDUM REQ'D       09/01/23   08/30/23   02/24/23   02/23/21   7,155,16                       0             0  MSK             0           0           0 March Associates                        0        /  /                         08/30/23           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




PUTNAM CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 64-14-01-04
last updated on 04/19/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Pavilion:
  -       New Construction             7-003-001                                              /  /       /  /     08/08/19     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




SALEM CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 64-15-01-04
last updated on 04/19/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Primary School:
19-1268   Reconstruction               0-001-005  08/04/20     DONE    DONE       DONE      01/27/20   01/21/20   02/23/18   10/29/18   155,16                    50,738        50,738  JLB             0           0           0 Mosaic Associates                  50,738      12/22/21                       01/21/20           
19-0199   Reconstruction               0-001-006  12/17/19     DONE    DONE       DONE      07/31/19   07/22/19   04/17/18   03/27/18   2,4,8,9,10,155,15,16   3,002,640     3,002,640  BMJ             0           0           0 Mosaic Associates                       0      04/26/21           YES         07/22/19           
18-1746   Reconstruction               0-001-009  08/08/19     DONE    DONE       DONE      03/28/19   03/25/19   11/07/18   03/27/18   16                        50,400        50,400  BMJ             0           0           0 Mosaic Associates                       0      01/31/20                       03/25/19           
  -       Reconstruction               0-001-010                                              /  /       /  /     05/15/23     /  /     2,4,7,8,9,155,15,16            0             0  JJH             0           0           0                                         0        /  /                           /  /             

          Elementary/High School:
19-1269   Reconstruction               0-002-009  08/04/20     DONE    DONE       DONE      01/27/20   01/21/20   02/23/18   03/27/18   9,155,16                 963,164       963,164  JLB             0           0           0 Mosaic Associates                 963,164      12/22/21                       01/21/20           
19-0200   Reconstruction               0-002-010  12/17/19     DONE    DONE       DONE      07/31/19   07/22/19   04/17/18   03/27/18   2,4,7,8,9,10,13,155,  17,278,358    17,278,358  BMJ             0           0           0 Mosaic Associates                       0      03/04/21           YES         07/22/19           
18-1747   Reconstruction               0-002-012  08/09/19     DONE    DONE       DONE      03/28/19   03/25/19   11/07/18   03/27/18   16                        57,600        57,600  BMJ             0           0           0 Mosaic Associates                       0      01/31/20                       03/25/19           
21-1776   Reconstruction               0-002-013  10/13/22     DONE    DONE       DONE      05/06/22   05/04/22   09/23/21   03/27/18   2,4,7,8,9,155,16          81,550        81,550  JLB             0           0           0 Mosaic Associates                       0      06/06/23                       05/04/22           
  -       Reconstruction               0-002-014                                              /  /       /  /     05/15/23     /  /     2,4,7,8,9,10,155,15,           0             0  JJH             0           0           0                                         0        /  /                           /  /             

          Bus Garage:
19-1270   Reconstruction               5-003-005  08/04/20     DONE    DONE       DONE      01/27/20   01/21/20   02/23/18   10/29/18   9,16                      19,084        19,084  JLB             0           0           0 Mosaic Associates                  19,084      12/22/21                       01/21/20           
19-0201   Reconstruction               5-003-006  12/17/19     DONE    DONE       DONE      07/31/19   07/22/19   04/17/18   03/27/18   2,4,7,8,9,155,15,16      907,402       907,402  BMJ             0           0           0 Mosaic Associates                       0        /  /                         07/22/19           
18-1748   Reconstruction               5-003-008  08/09/19     DONE    DONE       DONE      03/28/19   03/25/19   11/07/18   03/27/18   16                         3,600             0  BMJ             0           0           0 Mosaic Associates                       0      01/31/20                       03/25/19           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




CAMBRIDGE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 64-16-10-04
last updated on 04/19/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Central School:
18-1338   Reconstruction               0-002-027  08/20/19     DONE    DONE       DONE      01/25/19   01/18/19   04/06/18   03/27/18   2,4,7,8,9,10,155,15,   9,934,674     9,934,674  MTM             0           0           0 Mosaic Associates                       0      05/31/21                       01/18/19           
19-0124   Reconstruction               0-002-029  09/05/19     DONE    DONE       DONE      07/19/19   07/15/19   05/29/19   05/21/19   2                        100,000       100,000  JLB             0           0           0 Mosaic Associates                       0      05/31/20                       07/15/19           
20-1134   Reconstruction               0-002-030  03/09/21     DONE    DONE       DONE      01/14/21   01/04/21   09/03/20   06/09/20   9,15                     100,000       100,000  JLB             0           0           0 Mosaic Associates                       0      06/15/21                       01/04/21           
20-1096   Reconstruction               0-002-031  04/01/21     DONE    DONE       DONE      01/07/21   01/04/21   11/04/20   03/27/18   7,155,16                 370,000       370,000  JLB             0           0           0 Mosaic Associates                       0      12/28/22                       01/04/21           
21-0164   Reconstruction               0-002-032  09/22/21     DONE    DONE       DONE      08/12/21   07/30/21   06/01/21   05/18/21   9,155,16                 100,000       100,000  JLB             0           0           0 Mosaic Associates                       0      05/13/22                       07/30/21           
22-0076   Reconstruction               0-002-033  08/31/22     DONE    DONE       DONE      07/13/22   07/12/22   04/29/22   05/17/22   14,16                    100,000       100,000  JLB             0           0           0 Mosaic Associates                       0      10/20/23                       07/12/22           
22-0972   Reconstruction               0-002-034               STARTED DONE       DONE      11/14/22   11/09/22   08/09/22   11/03/22   9                         75,000             0  JJH             0           0           0 Mosaic Associates                       0        /  /                         11/09/22           
23-0488   Reconstruction               0-002-035  10/25/23     DONE    DONE       DONE      09/15/23   09/12/23   08/01/23   05/16/23   9                        100,000       100,000  JJH             0           0           0 Mosaic Associates                       0        /  /                         09/12/23           
  -       Reconstruction               0-002-036                                              /  /       /  /     01/29/24     /  /     2,4,7,8,9,10,14,155,           0             0  JJH             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-002-037                                              /  /       /  /     04/09/24     /  /     9                              0             0  JJH             0           0           0                                         0        /  /                           /  /             

          New Bus Garage:
21-1130   Reconstruction               5-012-003  11/12/21     DONE    DONE       DONE      01/14/22   01/13/22   09/13/21   10/14/21   2,15                      87,670        87,670  JLB             0           0           0 Mosaic Associates                       0      05/06/22                       01/13/22           

          40x100 Tent:
  -    TQ Temporary Quarters           8-023-001                                              /  /       /  /     05/07/21     /  /                                    0             0  JLB             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




WHITEHALL CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 64-17-01-06
last updated on 04/19/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Elementary School:
19-0486   Additions and Alterations    0-003-008  04/14/20     DONE    DONE       DONE      09/25/19   09/18/19   02/11/19   12/11/18   02 - 16                4,689,139     4,689,139  BMJ             0           0           0 Tetra Tech Architects and Eng           0      12/14/22                       09/18/19           
20-0610   Reconstruction               0-003-009  10/16/20     DONE    DONE       DONE      10/16/20   10/15/20   08/28/20   12/11/18   2,7,9,15                 150,000       150,000  SLC             0           0           0 Tetra Tech Architects and Eng           0      08/20/21                       10/15/20           
20-1915   Reconstruction               0-003-010  07/09/21     DONE    DONE       DONE      06/25/21   06/23/21   08/28/20   09/21/20   2,4,7,8,9,10,13,14,1     391,600             0  SLC             0           0           0 Tetra Tech Architects and Eng           0      04/17/23                       06/23/21           
21-1529FB Reconstruction               0-003-011  04/05/22     DONE    DONE       DONE      03/18/22   03/14/22   01/03/22   02/02/22   2,155,16               1,231,594             0  SLC             0           0           0 Tetra Tech Architects and Eng           0      05/25/23                       03/14/22           
23-1225   Reconstruction               0-003-012                         UNREVIEWED         12/19/23   12/19/23   09/27/23   12/11/18   2,4,9,155,16                   0             0  MSK             0           0           0 Tetra Tech Architects and Eng           0        /  /                         12/19/23           

          Junior-Senior High School:
19-0487   Reconstruction               0-008-022  04/14/20     DONE    DONE       DONE      09/25/19   09/18/19   02/11/19   12/11/18   2,7,8,9,10,155,15,16  12,028,597    12,028,597  BMJ             0           0           0 Tetra Tech Architects and Eng           0      12/14/22                       09/18/19           
20-1916   Reconstruction               0-008-023  07/09/21     DONE    DONE       DONE      06/25/21   06/23/21   08/28/20   09/21/20   2,4,7,8,9,10,13,14,1   1,155,762     1,155,762  SLC             0           0           0 Tetra Tech Architects and Eng           0      04/17/23                       06/23/21           

          DISTRICT WIDE:
  -    SB Reconstruction               7-999-BA1               DONE                           /  /       /  /       /  /       /  /     16                             0             0  SLC             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




BOCES WASH-WARREN-HAMLTON-ESSEX STATUS REPORT ON CAPITAL PROJECTS
District No.: 64-90-00-00
last updated on 04/19/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Campus Building F:
19-1345   Reconstruction               0-047-001  03/13/20     DONE    DONE       DONE      02/03/20   01/17/20   01/16/19   05/08/19   2,7                      150,000       150,000  JSS             0           0           0 Bernier Carr Associates                 0      05/08/20                       01/17/20           

          Ed. Serv. Ctr. Cplx.(Bldg A,B,C,D,Eq:
19-1417   Reconstruction               0-056-005  06/15/20     DONE    DONE       DONE      02/14/20   02/12/20   06/11/20   02/13/19   2,4,8,9,10,155,15,16   1,070,000     1,070,000  JSS             0           0           0 Bernier, Carr & Associates              0      09/03/21                       02/12/20           
21-0577   Reconstruction               0-056-006  03/01/22     DONE    DONE       DONE      10/22/21   10/21/21   03/23/21   05/12/21   2,4,7,8,9,10,155,15,   2,619,867     2,619,867  JLB             0           0           0 Bernier Carr Associates                 0        /  /                         10/21/21           
22-1994   Reconstruction               0-056-007  05/22/23     DONE    DONE       DONE      04/03/23   04/03/23   02/28/23   03/08/23   2,9                      150,000       150,000  WLC             0           0           0 Bernier Carr Associates                 0      07/10/23                       04/03/23           

          Ballard Road:
18-0654TQ Temporary Quarters           8-093-001  11/03/20     DONE    DONE       DONE      10/16/18   10/16/18   09/12/18     /  /                                    0             0  JSS             0           0           0                                         0        /  /                         10/16/18           

          South Glens Falls CSD-Ballard Elem.:
  -    XX Alterations                  8-094-001                         CANCELLED            /  /       /  /     08/09/19     /  /                                    0             0  JSS             0           0           0                                         0        /  /                           /  /             

          LaCross Street:
19-1447TQ Temporary Quarters           8-095-001  12/31/20     DONE    DONE       DONE      02/20/20   02/20/20   02/14/20     /  /                                    0             0  JSS             0           0           0                                         0        /  /                         02/20/20           

          XXCongregation Shaaray Tefila:
20-0024TQ Temporary Quarters           8-096-001  01/15/21     DONE    DONE       DONE      07/06/20   06/29/20   06/08/20     /  /                                    0             0  JSS             0           0           0                                         0        /  /                         06/29/20           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED