Overdue Final Cost Reports

Projects Missing Substantial Completion Dates

Without the Substantial Completion Date We Cannot Warn You When the FCR is Due

THE STATE EDUCATION DEPARTMENT

FACILITIES PLANNING


UPDATED: 05/29/08 at 14:21:47




CLARKSTOWN CENTRAL SCHOOL DISTRICT SUBSTANTIAL COMPLETION DATE MISSING FOR APPROVED CAPITAL PROJECTS
District No.: 50-01-01-06
last updated on 05/29/08
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    ANTICIP   SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         COMPLETE  COMPLETE  MGR.
_______________________________________________________________________________________________________________________________________

           Birchwood School:
03-0417    Reconstruction               0-002-007  10/08/04   16                             0      353,800   12/31/03      /  /    HCM

           New City Elementary:
03-0418    Reconstruction               0-003-006  10/08/04   16                             0      151,702   12/31/03      /  /    HCM
01-0806    Reconstruction               0-003-007  06/07/02   2,9,10                         0       48,060   09/01/02      /  /    MGL
06-0625    Additions and Alterations    0-003-010  03/09/07   02 - 16                        0    1,680,000     /  /        /  /    HCM
05-0678    Reconstruction               0-003-011  05/23/06   2,155,15,16                    0    1,333,524     /  /        /  /    HCM

           Little Tor Elementary School:
03-0419    Reconstruction               0-004-009  10/08/04   16                             0      103,014   12/31/03      /  /    HCM
05-0679    Reconstruction               0-004-011  05/23/06   2,155,15,16                    0      960,603     /  /        /  /    HCM

           Chestnut Grove(Data Center):
03-0420    Reconstruction               0-005-009  10/08/04   16                             0      108,667   12/31/03      /  /    HCM

           West Nyack Elementary School:
01-0864    Reconstruction               0-006-007  11/27/02   8,9,155,15,16                  0      171,046   08/28/02      /  /    MGL
03-0421    Reconstruction               0-006-008  10/08/04   16                             0      135,805   12/31/03      /  /    HCM
02-0196    Reconstruction               0-006-012  03/25/03   2,4,7,8,9,155,15,16            0    1,010,000   08/31/03      /  /    MGL
05-0680    Reconstruction               0-006-014  05/23/06   2,155,15,16                    0    1,081,587     /  /        /  /    HCM

           Bardonia Elementary School:
03-0422    Reconstruction               0-007-007  10/08/04   16                             0      586,509   12/31/03      /  /    HCM
06-0564    Reconstruction               0-007-011  05/17/07   2,15                           0       35,000   01/31/06      /  /    HCM
05-0681    Reconstruction               0-007-012  05/23/06   2,9,155,15,16                  0    1,074,114     /  /        /  /    HCM

           High School North Annex:
04-0158    Reconstruction               0-009-004  10/08/04   8,155,16                       0      199,253   12/31/04      /  /    HCM

           Senior High School North:
03-0423    Reconstruction               0-010-013  10/08/04   16                             0      485,646   12/31/03      /  /    HCM
06-0626    Additions and Alterations    0-010-015  03/09/07   02 - 16                        0      250,000     /  /        /  /    HCM

           Laurel Plains Elementary:
03-0424    Reconstruction               0-011-006  10/08/04   16                             0      246,906   12/31/03      /  /    HCM
05-0682    Reconstruction               0-011-007  05/23/06   2,155,15,16                    0    1,238,413     /  /        /  /    HCM

           Felix Festa Junior High:
03-0425    Reconstruction               0-012-014  10/08/04   16                             0    1,499,750   12/31/03      /  /    HCM
03-1440    Reconstruction               0-012-016  04/13/05   4,155                          0      120,000   09/30/04      /  /    HCM
05-0287    Reconstruction               0-012-019  12/28/06   13                             0      244,000     /  /        /  /    HCM
05-1419    Reconstruction               0-012-020  01/24/07   9                              0      154,000     /  /        /  /    HCM

           Dina Link Elementary:
03-0426    Reconstruction               0-013-006  10/08/04   16                             0      236,404   12/31/03      /  /    HCM

           Wood Glen Elementary:
01-0283    Alterations                  0-016-005  11/29/01   02 - 16                        0      166,200   12/01/01      /  /    MGL
03-0427    Reconstruction               0-016-008  10/08/04   16                             0      419,265   12/31/03      /  /    HCM

           Lakewood Elementary School:
03-0428    Reconstruction               0-017-007  10/08/04   16                             0      411,257   12/31/03      /  /    HCM

           Senior High School South:
03-0429    Reconstruction               0-018-013  10/08/04   16                             0      606,705   12/31/03      /  /    HCM
05-0389    Reconstruction               0-018-015  02/21/06   9,14,16                        0       45,475     /  /        /  /    HCM
06-0936    Reconstruction               0-018-016  05/04/07   7                              0      901,100     /  /        /  /    HCM

           Strawtown Road Elementary:
03-0430    Reconstruction               0-019-008  10/08/04   16                             0      158,183   12/31/03      /  /    HCM

           Bus Garage:
03-0431    Reconstruction               5-022-004  10/08/04   155,15,16                      0       76,947   12/31/03      /  /    HCM


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




NANUET UFSD SUBSTANTIAL COMPLETION DATE MISSING FOR APPROVED CAPITAL PROJECTS
District No.: 50-01-08-03
last updated on 05/29/08
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    ANTICIP   SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         COMPLETE  COMPLETE  MGR.
_______________________________________________________________________________________________________________________________________

           Highview Elementary:
94-1337    Reconstruction               0-002-004  05/11/95   2,8,9,14,15,16                 0      301,000   08/30/95      /  /    MEM

           Land Purchse w/23 Structures(See L):
06-0690    New Construction             7-011-001  03/21/07   02 - 16                        0   17,200,000     /  /        /  /    HCM


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




NORTH ROCKLAND/HAVERSTRAW-STONY PT SUBSTANTIAL COMPLETION DATE MISSING FOR APPROVED CAPITAL PROJECTS
District No.: 50-02-01-06
last updated on 05/29/08
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    ANTICIP   SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         COMPLETE  COMPLETE  MGR.
_______________________________________________________________________________________________________________________________________

           No. Garnerville Elem/Admin.:
93-1368    Reconstruction               0-007-006  06/10/94   15                             0      504,240   01/01/95      /  /    MFK
01-0285    Reconstruction               0-007-010  02/08/02   155,15,16                      0       92,650   07/01/02      /  /    MAC

           North Rockland High School:
94-1090    Reconstruction               0-016-011  08/30/95   2,8,9,13,16                    0      100,000   09/30/95      /  /    MFK
96-1362    Reconstruction               0-016-013  05/22/97   2                              0      416,000   08/30/97      /  /    MEM
04-0319    Reconstruction               0-016-018  11/05/04   2                              0      151,000   06/01/05      /  /    MAC

           West Haverstraw Elementary:
96-1361    Reconstruction               0-024-006  05/22/97   9,155,15,16                    0      118,000   08/30/97      /  /    MEM
01-0284    Reconstruction               0-024-007  02/08/02   155,15,16                      0      114,450   07/01/02      /  /    MAC

           Thiells Elementary School:
92-1134    Additions and Alterations    0-025-006  05/05/93   02 - 16                        0      909,500   10/01/93      /  /    PNL
99-0303    Reconstruction               0-025-009  10/07/99   9,155                          0      750,000   12/30/99      /  /    BJB
03-1192    Reconstruction               0-025-011  04/09/04   7                              0      895,000   08/31/05      /  /    MAC

           8/9 Grade Ctr-Mechanical Bldg.(#28):
02-0310    Reconstruction               0-042-001  12/11/02   2,4,7,8,9,155,15,16            0    2,698,800   09/30/04      /  /    MAC
03-1651    Reconstruction               0-042-002  01/26/05   8                              0      580,295     /  /        /  /    MAC

           CAT Letchworth Bldg 29:
99-1202    Reconstruction               0-043-001  04/10/00   2,8,155,15,16                  0    2,110,943   11/30/00      /  /    MAC

           ````````````` Bldg 31:
99-0665    Reconstruction               0-045-001  04/10/00   2,8,155,15,16                  0      964,134   09/30/00      /  /    MAC

           CAT Letchworth Bldg 32:
99-0666    Reconstruction               0-046-001  04/10/00   2,8,155,15,16                  0      964,134   09/30/00      /  /    MAC

           CAT Letchworth Bldg 33:
99-0667    Reconstruction               0-047-001  04/10/00   2,8,155,15,16                  0      964,134   09/30/00      /  /    MAC

           CAT Letchworth Bldg 35:
99-0668    Reconstruction               0-049-001  04/10/00   2,8,155,15,16                  0      964,134   09/30/00      /  /    MAC

           CAT Letchworth Bldg 36:
99-0669    Reconstruction               0-050-001  04/10/00   2,8,155,15,16                  0      964,134   09/30/00      /  /    MAC

           CAT Letchworth Bldg 37:
99-0670    Reconstruction               0-051-001  04/10/00   2,8,155,15,16                  0      964,134   09/30/00      /  /    MAC

           CAT Letchworth Bldg 38:
99-0671    Reconstruction               0-052-001  04/10/00   2,8,155,15,16                  0      964,134   09/30/00      /  /    MAC

           Willow Grove Middle School:
02-0124    Reconstruction               8-030-005  09/17/02   7                              0      477,000   08/27/02      /  /    MAC


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




SOUTH ORANGETOWN CSD SUBSTANTIAL COMPLETION DATE MISSING FOR APPROVED CAPITAL PROJECTS
District No.: 50-03-01-06
last updated on 05/29/08
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    ANTICIP   SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         COMPLETE  COMPLETE  MGR.
_______________________________________________________________________________________________________________________________________

           Tappan Zee Elementary:
05-0524    Additions and Alterations    0-007-012  02/23/06   02 - 16                        0    2,317,024   01/17/06      /  /    RDR

           Middle School:
04-1160    Reconstruction               0-013-014  05/10/05   2,4,7,8,9,155,15,16            0    4,155,342   01/17/06      /  /    RDR


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




NYACK UFSD SUBSTANTIAL COMPLETION DATE MISSING FOR APPROVED CAPITAL PROJECTS
District No.: 50-03-04-03
last updated on 05/29/08
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    ANTICIP   SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         COMPLETE  COMPLETE  MGR.
_______________________________________________________________________________________________________________________________________

           Nyack High School:
03-1194    Reconstruction               0-003-009  06/30/04   155                            0    4,326,000   09/01/05      /  /    DDJ


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




PEARL RIVER UFSD SUBSTANTIAL COMPLETION DATE MISSING FOR APPROVED CAPITAL PROJECTS
District No.: 50-03-08-03
last updated on 05/29/08
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    ANTICIP   SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         COMPLETE  COMPLETE  MGR.
_______________________________________________________________________________________________________________________________________

           Evans Park School:
04-0624    Additions and Alterations    0-002-008  04/07/05   02 - 16                        0    2,234,346   08/18/06      /  /    HCM

           Lincoln Ave.Elementary School:
04-0625    Additions and Alterations    0-003-009  04/07/05   02 - 16                        0    1,187,938   08/18/06      /  /    HCM
03-1448    Reconstruction               0-003-010  06/01/04   155                            0      534,800   08/20/04      /  /    HCM

           Senior High School:
04-0626    Additions and Alterations    0-009-014  04/07/05   02 - 16                        0    7,019,754   08/18/06      /  /    HCM
03-1447    Reconstruction               0-009-015  06/01/04   2,7                            0      709,200   08/20/04      /  /    HCM

           Franklin Ave. Elementary:
04-0627    Additions and Alterations    0-010-007  04/07/05   02 - 16                        0    1,949,747   08/18/06      /  /    HCM

           Middle School:
04-0628    Additions and Alterations    0-011-012  04/07/05   02 - 16                        0    3,686,400   08/18/06      /  /    HCM


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




RAMAPO CSD SUBSTANTIAL COMPLETION DATE MISSING FOR APPROVED CAPITAL PROJECTS
District No.: 50-04-01-06
last updated on 05/29/08
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    ANTICIP   SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         COMPLETE  COMPLETE  MGR.
_______________________________________________________________________________________________________________________________________

           Suffern Middle School:
04-0462    Additions and Alterations    0-002-019  05/19/05   02 - 16                        0    5,864,569   09/30/06      /  /    RDR

           RP Connor Elementary School:
04-0463    Reconstruction               0-005-014  05/19/05   2,4,7,8,9,155,15,16            0    1,337,593   09/30/06      /  /    RDR

           Sloatsburg Elementary:
04-0464    Reconstruction               0-007-014  05/19/05   2,4,7,155,15,16                0    1,064,906   09/30/06      /  /    RDR

           Cherry Lane Elementary:
04-0465    Reconstruction               0-011-015  05/19/05   2,4,7,8,9,155,15,16            0    1,115,536   09/30/06      /  /    RDR

           Montebello Elementary:
94-0505    Reconstruction               0-019-006  01/09/95   4,7,15,16                      0       27,000   09/01/95      /  /    MEM
04-0466    Reconstruction               0-019-012  05/19/05   2,4,7,9,155,15,16              0    1,386,501   09/30/06      /  /    RDR

           Suffern High School:
04-0467    Additions and Alterations    0-020-023  05/19/05   02 - 16                        0    5,937,521   09/30/06      /  /    RDR

           Viola Elementary:
94-0506    Reconstruction               0-026-006  01/09/95   4,7,15,16                      0       27,000   09/01/95      /  /    MEM
04-0468    Reconstruction               0-026-012  05/19/05   2,4,8,9,155,15,16              0      832,378   09/30/06      /  /    RDR


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




EAST RAMAPO CSD SUBSTANTIAL COMPLETION DATE MISSING FOR APPROVED CAPITAL PROJECTS
District No.: 50-04-02-06
last updated on 05/29/08
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    ANTICIP   SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         COMPLETE  COMPLETE  MGR.
_______________________________________________________________________________________________________________________________________

           Spring Valley Senior High:
91-0237    Reconstruction               0-003-001  09/30/91   2                              0      138,000     /  /        /  /    MGL

           Hempstead School:
91-0239    Reconstruction               0-006-001  09/30/91   2                              0       58,000     /  /        /  /    MGL

           Pomona Middle(fmlyPomonaJR):
94-0507    Reconstruction               0-008-004  12/15/94   155                            0       80,400   04/30/95      /  /    MGL
94-0962    Reconstruction               0-008-005  03/13/95   9,16                           0      193,000   09/01/95      /  /    MGL

           Hillcrest Elementary:
02-2481    Reconstruction               0-011-006  07/08/03   7                              0      700,000   08/31/04      /  /    MGL

           Ramapo Fresh.Ctr.(frmlyKakiat):
93-1416    Reconstruction               0-013-005  06/15/94   16                             0       86,000   08/25/94      /  /    MGL

           Fleetwood Elementary School:
93-0591    Reconstruction               0-014-003  04/20/94   2,15,16                        0      163,500   09/01/94      /  /    MFK
93-1417    Reconstruction               0-014-004  06/15/94   16                             0       86,000   08/25/94      /  /    MGL
94-0508    Reconstruction               0-014-005  12/15/94   155                            0       74,400   04/30/95      /  /    MGL

           Summit Park Elementary:
93-1418    Reconstruction               0-015-005  06/15/94   16                             0       86,000   08/25/94      /  /    MGL
95-0341    Reconstruction               0-015-006  11/16/95   2,7                            0      511,000   10/31/95      /  /    MGL

           Margetts Road Elementary:
93-1419    Reconstruction               0-020-003  06/15/94   16                             0       86,000   08/25/94      /  /    MGL

           Lime Kiln School:
93-1360    Reconstruction               0-027-004  06/10/94   2                              0      655,500   09/01/94      /  /    MFK
93-1420    Reconstruction               0-027-005  06/15/94   16                             0       86,000   08/25/94      /  /    MGL

           Elmwood Elementary School:
94-0963    Reconstruction               0-030-003  03/13/95   9,16                           0       97,000   09/01/95      /  /    MGL

           Chestnut Ridge Middle(frmlySpring Va:
94-0964    Reconstruction               0-034-005  03/13/95   9,16                           0      181,000   09/01/95      /  /    MGL

           Eldorado Elementary:
94-0965    Reconstruction               0-037-005  03/13/95   9,16                           0       97,000   09/01/95      /  /    MGL

           Transportation Garage:
94-0509    Reconstruction               5-001-003  12/15/94   155                            0       78,000   04/30/95      /  /    MGL


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




EDWIN GOULD ACAD-LAKESIDE RAMAPO UFS SUBSTANTIAL COMPLETION DATE MISSING FOR APPROVED CAPITAL PROJECTS
District No.: 50-04-14-02
last updated on 05/29/08
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    ANTICIP   SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         COMPLETE  COMPLETE  MGR.
_______________________________________________________________________________________________________________________________________

           NO MISSING SUBS. COMPLETION DATES:
  -        FOR THIS DISTRICT                         /  /                                    0            0     /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




BOCES ROCKLAND SUBSTANTIAL COMPLETION DATE MISSING FOR APPROVED CAPITAL PROJECTS
District No.: 50-90-00-00
last updated on 05/29/08
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    ANTICIP   SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         COMPLETE  COMPLETE  MGR.
_______________________________________________________________________________________________________________________________________

           NO MISSING SUBS. COMPLETION DATES:
  -        FOR THIS DISTRICT                         /  /                                    0            0     /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition